Recommendations
Total Page:16
File Type:pdf, Size:1020Kb
RECOMMENDATIONS . 7-1 Anchorage Metropolitan Area Transportation Solutions 2035 Metropolitan Transportation Plan 7-2 . A Call to Action . 7-3 Anchorage Metropolitan Area Transportation Solutions 2035 Metropolitan Transportation Plan 7-4 7-5 Anchorage Metropolitan Area Transportation Solutions 2035 Metropolitan Transportation Plan 7-6 Roads Scoring Points Criterion 0 1 3 5 Some preliminary Final engineering design and/or ROW purchased; Project readiness No work started completed or environmental ready to construct nearing completion work complete Needed in short Needed in short term (2011- term—helps to Can wait until Long-term need 2023)— addresses Timing of need complete grid beyond 2035 (2023-2035) major system or improves safety/capacity facility to standards needs Next logical or final Logical sequencing N/A New project N/A phase of an existing road Functional classification Local Collector Arterial/expressway Freeway Number of modes (automobile, pedestrian, bike, transit, freight Single Two Three Four or more or intermodal) 1st quartile Cost/length/AADT 4th quartile 3rd quartile 2nd quartile (highest score) AADT = Annual Average Daily Traffic N/A = not applicable 7-7 Anchorage Metropolitan Area Transportation Solutions 2035 Metropolitan Transportation Plan 7-8 Criterion Scoring Points 2010 Cost Cost/ Project Project Timing of Logical Functional Multi-modal Project Name Project Location Estimate Length/ Total Number Readiness Need Sequencing Classification Function ($ million) AADT Seward Hwy - Dimond Blvd Dimond Blvd to Dowling 101 $88.8 3 5 5 5 5 3 26 to Dowling Rd Rd Dowling Rd Extension - 102 C St to Minnesota Dr $63.4 3 5 5 3 1 5 22 Phase II 100th Ave Extension - 103 Minnesota Dr to C St $8.7 5 5 5 1 0 5 21 Minnesota Dr to C St 36th Ave/Seward Hwy 104 Tudor Rd to 33rd Ave $108.0 1 5 1 5 3 5 20 Interchange Glenn Hwy - Hiland Rd to 105 Hiland Rd to Artillery Rd $62.8 1 5 1 5 5 3 20 Artillery Rd (Eagle River) 106 Muldoon Rd Interchange Glenn Hwy at Muldoon Rd $70.0 1 5 1 3 5 5 20 Seward Hwy - O'Malley Rd O'Malley Rd to Dimond 107 $42.1 1 3 5 5 3 3 20 to Dimond Blvd Blvd 36th Ave Access 108 Management - Spenard Rd Spenard Rd to Denali St $1.5 0 5 1 3 5 5 19 to Denali St Jewel Lake Rd - Dimond Blvd Dimond Blvd to 109 $13.0 0 5 1 3 5 5 19 to International Airport Rd International Airport Rd Arctic Blvd Rehabilitation - 110 36th Ave to Tudor Rd $8.5 0 3 5 3 3 5 19 36th Ave to Tudor Rd Northern Lights Blvd - Lake Lake Otis Pkwy to Bragaw 111 $8.0 0 3 5 3 3 5 19 Otis Pkwy to Bragaw St St Spenard Rd Rehabilitation - 112 Hillcrest Dr to Benson Blvd $16.6 3 5 1 3 1 5 18 Hillcrest Dr to Benson Blvd O'Malley Rd - Seward Hwy 113 Seward Hwy to Hillside Dr $29.0 3 3 1 3 5 3 18 to Hillside Dr Seward Hwy Improvements 114 (Midtown Congestion 33rd Ave to Chester Creek $178.0 1 5 1 5 1 5 18 Relief) Fireweed Ln Rehabilitation - 115 Spenard Rd to Seward Hwy $10.4 1 5 1 3 5 3 18 Spenard Rd to Seward Hwy Criterion Scoring Points 2010 Cost Cost/ Project Project Timing of Logical Functional Multi-modal Project Name Project Location Estimate Length/ Total Number Readiness Need Sequencing Classification Function ($ million) AADT Seward Hwy - O'Malley Rd O'Malley Rd to Rabbit 116 $7.1 1 3 1 5 5 3 18 to Rabbit Creek Rd Creek Rd Seward Hwy/92nd Ave 117 Homer Dr to Brayton Dr $60.4 3 5 1 5 0 3 17 Grade Separation Lake Otis Pkwy - Northern Northern Lights Blvd to 118 $34.9 0 5 1 3 3 5 17 Lights Blvd to Debarr Rd Debarr Rd Northern Lights Blvd - Postmark Dr to Nathaniel 119 $14.9 0 5 1 3 5 3 17 Postmark Dr to Nathaniel Ct Ct DeArmoun Rd 120 140th Ave to Hillside Dr $15.0 1 5 5 1 1 3 16 Reconstruction - Phase II Spenard Rd Rehabilitation - Benson Blvd to Minnesota 121 Benson Blvd to Minnesota $50.2 1 5 1 3 0 5 15 Dr Dr Eagle River Rd Eagle River Rd, MP 5.3 to 122 Rehabilitation - MP 5.3 to $28.4 3 5 1 3 1 1 14 MP 12.6 MP 12.6 (Eagle River) Eklutna River Bridge 123 Rehabilitation/Replacement Old Glenn Hwy $6.8 1 5 1 3 1 3 14 (Eagle River) Abbott Rd - Lake Otis Pkwy 124 Lake Otis Pkwy to Birch Rd $39.0 1 3 1 3 3 3 14 to Birch Rd North Access to U-Med Providence Dr to Northern 125 $17.5 1 3 1 3 1 5 14 District Lights Blvd Glenn Hwy/Farm Ave Partial 126 Glenn Hwy at Farm Ave $50.0 0 3 1 5 0 5 14 Interchange (Eagle River) Artillery Rd northbound off- Glenn Hwy to Eagle River 127 ramp to Eagle River Rd $13.5 0 5 1 5 1 1 13 Rd (Eagle River) Farm Ave Realignment at Winter Park Place to Old 128 $6.5 0 5 1 3 1 3 13 Old Glenn Hwy (Eagle River) Glenn Hwy Eagle River Rd Eagle River Rd, MP 0 to 129 Rehabilitation - MP 0.0 to $29.0 0 3 1 3 3 3 13 Upper Terrace St (MP 5.3) MP 5.3 (Eagle River) 7-9 Anchorage Metropolitan Area Transportation Solutions 2035 Metropolitan Transportation Plan 7-10 Criterion Scoring Points 2010 Cost Cost/ Project Project Timing of Logical Functional Multi-modal Project Name Project Location Estimate Length/ Total Number Readiness Need Sequencing Classification Function ($ million) AADT 130 92nd Ave/Academy Dr Extension - Brayton Dr to Brayton Dr to Abbott Rd $8.8 1 3 1 3 1 3 12 Abbott Rd Mountain Air Dr - Rabbit Rabbit Creek Rd to E 164th 131 $7.9 3 3 1 1 0 3 11 Creek Rd to E 164th Ave Ave Northwood Dr Extension - 132 Strawberry Rd to Dimond Strawberry to Dimond Blvd $26.2 0 3 1 3 0 3 10 Blvd Business Blvd Extension Business Blvd to Eagle 133 $10.0 0 3 1 1 0 5 10 (Eagle River) River Rd at Artillery Rd Homestead Rd 134 Oberg Rd to Voyles Blvd $7.1 0 3 1 1 0 3 8 Improvements (Eagle River) Short-Term MTP Element 135 AMATS area $6.0 N/A N/A N/A N/A N/A N/A 0 Implementation Projects 3rd Ave,6th Ave Couplet/E L St to Ingra-Gambell 136 St Conversion Couplet/3rd Ave to 4th $0.5 N/A N/A N/A N/A N/A N/A 0 Reconnaissance Study Ave Glenn Hwy Operations 137 Analysis - Muldoon Rd to Muldoon Rd to Eklutna $5.6 N/A N/A N/A N/A N/A N/A 0 Eklutna Midtown Subarea 138 Midtown area $0.8 N/A N/A N/A N/A N/A N/A 0 Transportation Plan Seward Hwy/O'Malley Rd Old Seward Hwy to Seward 139 $0.5 N/A N/A N/A N/A N/A N/A 0 Interchanges Study Hwy A-C Couplet to Point 140 Knik Arm Crossing - Phase I MacKenzie-Burma Rd $852.0 3 1 1 3 1 3 12 Intersection Seward Hwy/Glenn Hwy Chester Creek to Airport 201 $605.0 1 5 1 5 3 5 20 Connection – Phase III Heights Dr Huffman Rd Rehabilitation - 202 Pintail St to Birch Rd $8.0 0 3 5 1 3 3 15 Pintail St to Birch Rd Rabbit Creek Rd - Seward Seward Hwy to Golden 203 $11.7 0 3 1 3 3 3 13 Hwy to Golden View Dr View Dr Criterion Scoring Points 2010 Cost Cost/ Project Project Timing of Logical Functional Multi-modal Project Name Project Location Estimate Length/ Total Number Readiness Need Sequencing Classification Function ($ million) AADT Glenn Hwy HOV Lane - Eagle River, Artillery Rd to 204 Artillery Rd to Mile 21.5 $55.0 0 1 1 5 5 1 13 Mile 21.5 (Eagle River) Glenn Hwy HOV Lane - Boniface Pkwy to Eagle 205 Boniface Pkwy to Artillery River Artillery Rd $71.7 0 1 1 5 5 1 13 Rd Interchange Interchange Davis St and Santa Maria Dr Old Glenn Hwy - Eagle 206 Realignment at Old Glenn River Loop and North $5.5 0 3 1 3 0 5 12 Hwy (Eagle River) Eagle River Access Eleonora St and S Juanita Old Glenn Hwy - Eagle 207 Loop Realignment at Old River Loop and North $2.0 0 3 1 3 0 5 12 Glenn Hwy (Eagle River) Eagle River Access South Birchwood Loop Rd Old Glenn Hwy to 208 $38.0 0 3 1 1 3 3 11 Improvements (Eagle River) Birchwood Loop Rd A/C St Couplet Restripe - 209 Tudor Rd to 9th Ave $0.5 0 1 1 3 5 1 11 Tudor Rd to 9th Ave Birchwood Loop and Old Glenn Hwy to 210 Birchwood Spur Rd $16.6 0 1 1 3 3 3 11 Birchwood Airport Improvements (Eagle River) Seward Hwy/O'Malley Rd Old Seward Hwy to Seward 211 $75.0 0 1 1 5 3 1 11 Interchange Hwy C St/Ocean Dock Rd Access C St Viaduct to Ocean Dock 212 $11.2 0 3 1 3 0 3 10 Ramp Rd Ingra-Gambell Couplet 213 Extension - 3rd Ave to 3rd Ave to Whitney Rd $26.0 0 1 1 3 0 3 8 Whitney Rd Boniface Pkwy to Muldoon Boniface Pkwy to Muldoon 214 $18.0 0 3 1 1 1 1 7 Frontage Rd Rd Eagle River CBD - Phase II, Downtown Eagle River & 215 $0.5 N/A N/A N/A N/A N/A N/A 0 Study (Eagle River) Residential Core Long-Term MTP Element 216 AMATS area $6.0 N/A N/A N/A N/A N/A N/A 0 Implementation Projects 7-11 Anchorage Metropolitan Area Transportation Solutions 2035 Metropolitan Transportation Plan 7-12 Criterion Scoring Points 2010 Cost Cost/ Project Project Timing of Logical Functional Multi-modal Project Name Project Location Estimate Length/ Total Number Readiness Need Sequencing Classification Function ($ million) AADT 217 North Eagle River Interchange Capacity Glenn Hwy at North Eagle $0.5 N/A N/A N/A N/A N/A N/A 0 Modifications Study (Eagle River Access Rd River) Ingra-Gambell Couplet 218 Knik Arm Crossing - Phase II $230.0 1 1 1 3 0 5 11 Connection Tudor Rd Access 301 Management - Seward Hwy Seward Hwy to Arctic Blvd $14.0 0 5 1 3 5 5 19 to Arctic Blvd Tudor Rd Access Seward Hwy to Patterson 302 Management - Seward Hwy $41.6 0 5 1 3 5 5 19 St to Patterson St Boniface Pkwy Access 303 Management - Tudor Rd to Tudor Rd to Glenn Hwy $22.5 0 1 1 3 5 3 13 Glenn Hwy Jewel Lake Rd/International Jewel Lake Rd to 304 $50.6 0 0 1 3 3 5 12 Airport Rd Grade Separation Northwood St Postmark Dr/International Postmark Dr to 305 $23.6 0 0 1 3 3 5 12 Airport Rd Grade Separation International Airport Rd Lake Otis Pkwy Extension - 306 Debarr Rd to Glenn Hwy $36.0 1 3 1 3 0 3 11 Debarr Rd to Glenn Hwy Elmore Rd Extension - 307 O'Malley Rd to Abbott Rd $35.2 0 3 1 1 3 3 11 O'Malley Rd to Abbott Rd Hiland Rd Improvements - Hiland Rd - MP 1.0 to MP 308 MP 1.0 to MP 8.3 (Eagle $31.7 0 3 1 1 5 1 11 8.3 River) International Airport Rd to Minnesota Dr Northern