Recommendations

Recommendations

RECOMMENDATIONS . 7-1 Anchorage Metropolitan Area Transportation Solutions 2035 Metropolitan Transportation Plan 7-2 . A Call to Action . 7-3 Anchorage Metropolitan Area Transportation Solutions 2035 Metropolitan Transportation Plan 7-4 7-5 Anchorage Metropolitan Area Transportation Solutions 2035 Metropolitan Transportation Plan 7-6 Roads Scoring Points Criterion 0 1 3 5 Some preliminary Final engineering design and/or ROW purchased; Project readiness No work started completed or environmental ready to construct nearing completion work complete Needed in short Needed in short term (2011- term—helps to Can wait until Long-term need 2023)— addresses Timing of need complete grid beyond 2035 (2023-2035) major system or improves safety/capacity facility to standards needs Next logical or final Logical sequencing N/A New project N/A phase of an existing road Functional classification Local Collector Arterial/expressway Freeway Number of modes (automobile, pedestrian, bike, transit, freight Single Two Three Four or more or intermodal) 1st quartile Cost/length/AADT 4th quartile 3rd quartile 2nd quartile (highest score) AADT = Annual Average Daily Traffic N/A = not applicable 7-7 Anchorage Metropolitan Area Transportation Solutions 2035 Metropolitan Transportation Plan 7-8 Criterion Scoring Points 2010 Cost Cost/ Project Project Timing of Logical Functional Multi-modal Project Name Project Location Estimate Length/ Total Number Readiness Need Sequencing Classification Function ($ million) AADT Seward Hwy - Dimond Blvd Dimond Blvd to Dowling 101 $88.8 3 5 5 5 5 3 26 to Dowling Rd Rd Dowling Rd Extension - 102 C St to Minnesota Dr $63.4 3 5 5 3 1 5 22 Phase II 100th Ave Extension - 103 Minnesota Dr to C St $8.7 5 5 5 1 0 5 21 Minnesota Dr to C St 36th Ave/Seward Hwy 104 Tudor Rd to 33rd Ave $108.0 1 5 1 5 3 5 20 Interchange Glenn Hwy - Hiland Rd to 105 Hiland Rd to Artillery Rd $62.8 1 5 1 5 5 3 20 Artillery Rd (Eagle River) 106 Muldoon Rd Interchange Glenn Hwy at Muldoon Rd $70.0 1 5 1 3 5 5 20 Seward Hwy - O'Malley Rd O'Malley Rd to Dimond 107 $42.1 1 3 5 5 3 3 20 to Dimond Blvd Blvd 36th Ave Access 108 Management - Spenard Rd Spenard Rd to Denali St $1.5 0 5 1 3 5 5 19 to Denali St Jewel Lake Rd - Dimond Blvd Dimond Blvd to 109 $13.0 0 5 1 3 5 5 19 to International Airport Rd International Airport Rd Arctic Blvd Rehabilitation - 110 36th Ave to Tudor Rd $8.5 0 3 5 3 3 5 19 36th Ave to Tudor Rd Northern Lights Blvd - Lake Lake Otis Pkwy to Bragaw 111 $8.0 0 3 5 3 3 5 19 Otis Pkwy to Bragaw St St Spenard Rd Rehabilitation - 112 Hillcrest Dr to Benson Blvd $16.6 3 5 1 3 1 5 18 Hillcrest Dr to Benson Blvd O'Malley Rd - Seward Hwy 113 Seward Hwy to Hillside Dr $29.0 3 3 1 3 5 3 18 to Hillside Dr Seward Hwy Improvements 114 (Midtown Congestion 33rd Ave to Chester Creek $178.0 1 5 1 5 1 5 18 Relief) Fireweed Ln Rehabilitation - 115 Spenard Rd to Seward Hwy $10.4 1 5 1 3 5 3 18 Spenard Rd to Seward Hwy Criterion Scoring Points 2010 Cost Cost/ Project Project Timing of Logical Functional Multi-modal Project Name Project Location Estimate Length/ Total Number Readiness Need Sequencing Classification Function ($ million) AADT Seward Hwy - O'Malley Rd O'Malley Rd to Rabbit 116 $7.1 1 3 1 5 5 3 18 to Rabbit Creek Rd Creek Rd Seward Hwy/92nd Ave 117 Homer Dr to Brayton Dr $60.4 3 5 1 5 0 3 17 Grade Separation Lake Otis Pkwy - Northern Northern Lights Blvd to 118 $34.9 0 5 1 3 3 5 17 Lights Blvd to Debarr Rd Debarr Rd Northern Lights Blvd - Postmark Dr to Nathaniel 119 $14.9 0 5 1 3 5 3 17 Postmark Dr to Nathaniel Ct Ct DeArmoun Rd 120 140th Ave to Hillside Dr $15.0 1 5 5 1 1 3 16 Reconstruction - Phase II Spenard Rd Rehabilitation - Benson Blvd to Minnesota 121 Benson Blvd to Minnesota $50.2 1 5 1 3 0 5 15 Dr Dr Eagle River Rd Eagle River Rd, MP 5.3 to 122 Rehabilitation - MP 5.3 to $28.4 3 5 1 3 1 1 14 MP 12.6 MP 12.6 (Eagle River) Eklutna River Bridge 123 Rehabilitation/Replacement Old Glenn Hwy $6.8 1 5 1 3 1 3 14 (Eagle River) Abbott Rd - Lake Otis Pkwy 124 Lake Otis Pkwy to Birch Rd $39.0 1 3 1 3 3 3 14 to Birch Rd North Access to U-Med Providence Dr to Northern 125 $17.5 1 3 1 3 1 5 14 District Lights Blvd Glenn Hwy/Farm Ave Partial 126 Glenn Hwy at Farm Ave $50.0 0 3 1 5 0 5 14 Interchange (Eagle River) Artillery Rd northbound off- Glenn Hwy to Eagle River 127 ramp to Eagle River Rd $13.5 0 5 1 5 1 1 13 Rd (Eagle River) Farm Ave Realignment at Winter Park Place to Old 128 $6.5 0 5 1 3 1 3 13 Old Glenn Hwy (Eagle River) Glenn Hwy Eagle River Rd Eagle River Rd, MP 0 to 129 Rehabilitation - MP 0.0 to $29.0 0 3 1 3 3 3 13 Upper Terrace St (MP 5.3) MP 5.3 (Eagle River) 7-9 Anchorage Metropolitan Area Transportation Solutions 2035 Metropolitan Transportation Plan 7-10 Criterion Scoring Points 2010 Cost Cost/ Project Project Timing of Logical Functional Multi-modal Project Name Project Location Estimate Length/ Total Number Readiness Need Sequencing Classification Function ($ million) AADT 130 92nd Ave/Academy Dr Extension - Brayton Dr to Brayton Dr to Abbott Rd $8.8 1 3 1 3 1 3 12 Abbott Rd Mountain Air Dr - Rabbit Rabbit Creek Rd to E 164th 131 $7.9 3 3 1 1 0 3 11 Creek Rd to E 164th Ave Ave Northwood Dr Extension - 132 Strawberry Rd to Dimond Strawberry to Dimond Blvd $26.2 0 3 1 3 0 3 10 Blvd Business Blvd Extension Business Blvd to Eagle 133 $10.0 0 3 1 1 0 5 10 (Eagle River) River Rd at Artillery Rd Homestead Rd 134 Oberg Rd to Voyles Blvd $7.1 0 3 1 1 0 3 8 Improvements (Eagle River) Short-Term MTP Element 135 AMATS area $6.0 N/A N/A N/A N/A N/A N/A 0 Implementation Projects 3rd Ave,6th Ave Couplet/E L St to Ingra-Gambell 136 St Conversion Couplet/3rd Ave to 4th $0.5 N/A N/A N/A N/A N/A N/A 0 Reconnaissance Study Ave Glenn Hwy Operations 137 Analysis - Muldoon Rd to Muldoon Rd to Eklutna $5.6 N/A N/A N/A N/A N/A N/A 0 Eklutna Midtown Subarea 138 Midtown area $0.8 N/A N/A N/A N/A N/A N/A 0 Transportation Plan Seward Hwy/O'Malley Rd Old Seward Hwy to Seward 139 $0.5 N/A N/A N/A N/A N/A N/A 0 Interchanges Study Hwy A-C Couplet to Point 140 Knik Arm Crossing - Phase I MacKenzie-Burma Rd $852.0 3 1 1 3 1 3 12 Intersection Seward Hwy/Glenn Hwy Chester Creek to Airport 201 $605.0 1 5 1 5 3 5 20 Connection – Phase III Heights Dr Huffman Rd Rehabilitation - 202 Pintail St to Birch Rd $8.0 0 3 5 1 3 3 15 Pintail St to Birch Rd Rabbit Creek Rd - Seward Seward Hwy to Golden 203 $11.7 0 3 1 3 3 3 13 Hwy to Golden View Dr View Dr Criterion Scoring Points 2010 Cost Cost/ Project Project Timing of Logical Functional Multi-modal Project Name Project Location Estimate Length/ Total Number Readiness Need Sequencing Classification Function ($ million) AADT Glenn Hwy HOV Lane - Eagle River, Artillery Rd to 204 Artillery Rd to Mile 21.5 $55.0 0 1 1 5 5 1 13 Mile 21.5 (Eagle River) Glenn Hwy HOV Lane - Boniface Pkwy to Eagle 205 Boniface Pkwy to Artillery River Artillery Rd $71.7 0 1 1 5 5 1 13 Rd Interchange Interchange Davis St and Santa Maria Dr Old Glenn Hwy - Eagle 206 Realignment at Old Glenn River Loop and North $5.5 0 3 1 3 0 5 12 Hwy (Eagle River) Eagle River Access Eleonora St and S Juanita Old Glenn Hwy - Eagle 207 Loop Realignment at Old River Loop and North $2.0 0 3 1 3 0 5 12 Glenn Hwy (Eagle River) Eagle River Access South Birchwood Loop Rd Old Glenn Hwy to 208 $38.0 0 3 1 1 3 3 11 Improvements (Eagle River) Birchwood Loop Rd A/C St Couplet Restripe - 209 Tudor Rd to 9th Ave $0.5 0 1 1 3 5 1 11 Tudor Rd to 9th Ave Birchwood Loop and Old Glenn Hwy to 210 Birchwood Spur Rd $16.6 0 1 1 3 3 3 11 Birchwood Airport Improvements (Eagle River) Seward Hwy/O'Malley Rd Old Seward Hwy to Seward 211 $75.0 0 1 1 5 3 1 11 Interchange Hwy C St/Ocean Dock Rd Access C St Viaduct to Ocean Dock 212 $11.2 0 3 1 3 0 3 10 Ramp Rd Ingra-Gambell Couplet 213 Extension - 3rd Ave to 3rd Ave to Whitney Rd $26.0 0 1 1 3 0 3 8 Whitney Rd Boniface Pkwy to Muldoon Boniface Pkwy to Muldoon 214 $18.0 0 3 1 1 1 1 7 Frontage Rd Rd Eagle River CBD - Phase II, Downtown Eagle River & 215 $0.5 N/A N/A N/A N/A N/A N/A 0 Study (Eagle River) Residential Core Long-Term MTP Element 216 AMATS area $6.0 N/A N/A N/A N/A N/A N/A 0 Implementation Projects 7-11 Anchorage Metropolitan Area Transportation Solutions 2035 Metropolitan Transportation Plan 7-12 Criterion Scoring Points 2010 Cost Cost/ Project Project Timing of Logical Functional Multi-modal Project Name Project Location Estimate Length/ Total Number Readiness Need Sequencing Classification Function ($ million) AADT 217 North Eagle River Interchange Capacity Glenn Hwy at North Eagle $0.5 N/A N/A N/A N/A N/A N/A 0 Modifications Study (Eagle River Access Rd River) Ingra-Gambell Couplet 218 Knik Arm Crossing - Phase II $230.0 1 1 1 3 0 5 11 Connection Tudor Rd Access 301 Management - Seward Hwy Seward Hwy to Arctic Blvd $14.0 0 5 1 3 5 5 19 to Arctic Blvd Tudor Rd Access Seward Hwy to Patterson 302 Management - Seward Hwy $41.6 0 5 1 3 5 5 19 St to Patterson St Boniface Pkwy Access 303 Management - Tudor Rd to Tudor Rd to Glenn Hwy $22.5 0 1 1 3 5 3 13 Glenn Hwy Jewel Lake Rd/International Jewel Lake Rd to 304 $50.6 0 0 1 3 3 5 12 Airport Rd Grade Separation Northwood St Postmark Dr/International Postmark Dr to 305 $23.6 0 0 1 3 3 5 12 Airport Rd Grade Separation International Airport Rd Lake Otis Pkwy Extension - 306 Debarr Rd to Glenn Hwy $36.0 1 3 1 3 0 3 11 Debarr Rd to Glenn Hwy Elmore Rd Extension - 307 O'Malley Rd to Abbott Rd $35.2 0 3 1 1 3 3 11 O'Malley Rd to Abbott Rd Hiland Rd Improvements - Hiland Rd - MP 1.0 to MP 308 MP 1.0 to MP 8.3 (Eagle $31.7 0 3 1 1 5 1 11 8.3 River) International Airport Rd to Minnesota Dr Northern

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    79 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us