Nameplates and Numberplates

Total Page:16

File Type:pdf, Size:1020Kb

Nameplates and Numberplates Signal Boxes (NOT in alphabetical order) 1. Kinross Junction with signalman ready to receive a J37 0-6-0 and freight c.1950 2. Small Heath Junction with a view of all the running lines around it 11/39 3. Stanhope, view from train crossing Wear bridge, Stanhope goods in background c 1964 4. View of Ledbury signal box from the station, GWR railcar in view 7/59 5. View of Torpantau signal box in 1960 6.) Wolf Hall Junction 9/7/55 with a Castle passing on a down express. 7.) Belston Jct signal box c 1962 8.) Llandudno Jct Crossing (during building of new bridge) 9.) St.Dunstans in 1962 with a train in view 10.) Winchester City in the 1960`s 11.) View of Willington Signal Box in the 1950`s 12.) View of signal box and level crossing at Cliff Common in the 1950`s 13.) View of Hirstwood Signal Box taken from a train 8/55 14.) View from ground level of Peterborough East Signal Box in 1953 15.) General view of Hall Green signal box 22/4/69 16.) View of Midhurst signal box 9/7/51 17.) General view of Mildenhall signal box 2/10/54 18.) View of Plymouth Friary (B) signal box 9/9/52 19.) Bartlow Junction signal box 2/10/54 20.) Hardham Junction signal box 5/2/55 21.) Petersfield signal box 5/2/55 22.) Petworth signal box 5/2/55 23.) Tisted signal box 5/2/55 24.) Pulborough Jct signal box 28/12/54 25.) Cowes signal box 12/9/52 26.) Paddington Arrival Box 26/11/38 27.) Ventnor West signal box 12/9/52 28.) Walnut Tree Junction,Taffs Well nearly a full front view in 1974 29.) Ystrad Mynach South Signal Box viewed from the front 28/7/84 30.) Porth,view of the modern box 12/8/84 31.) Nixons Crossing Signal Box, view of the ex TVR box at Mountain Ash in 1975 32.) Cresselley Crossing Signal Box,a poor shot of the Mountain Ash Box c.1960 33.) Abercynon Signal Box view of the ex TVR station box in 1975 34.) Abercwmboi Signal Box, view of the ex TVR box 1/4/86 35.) Aber Junction Signal box,ex Rhymney Box near Caerphilly 18/5/85 36.) Aberbeeg Junction Signal Box,view from the road 12/1/86 37.) Robertstown Signal Box,view of the box on the top end of Aberdare yard 12/9/66 38.) Aberthaw East Signal Box, front view of box 25/4/81 39.) Ammanford Town Signal Box 12/5/77 1 40.) Bargoed Signal Box, a modern type box 21/5/84 41.) Barry Town Signal Box in 1973 42.) Barry Dock Basin Signal Box 21/4/84 43.) Barry Island Signal Box 15/4/84 44.) Black Lion Signal Box on the Merthyr branch 20/9/87 45.) Bodmin Road Signal Box 20/5/82 46.) Brynmenyn Signal Box 10/5/84 47.) Teignmouth Signal Box 20/8/87 48.) Tenby Signal Box, modern type box 12/4/82 49.) Tiverton Junction Signal Box 29/5/82 50.) Tondu Signal Box 10/5/84 51.) Caedu Signal Box in 1970 52.) Caerau Signal Box in 1962 53.) Cowley Bridge Junction Signal Box 18/8/87 54.) Dawlish Signal Box 30/8/80 55.) Dawlish Warren 11/5/81 56.) Exeter Middle Signal Box 30/8/80 57.) Exminster Signal Box 12/5/81 58.) Whiteball Sidings Signal Box, viewed from a train 27/6/81 59.) Truro East Signal Box 30/8/86 60.) Totnes Signal Box 14/5/81 61.) Torre Signal Box 19/8/77 62.) Torquay Signal Box 18/5/81 63.) Stormstown Signal Box in 1977 64.) St Erth 23/5/87 65.) St Blazey Signal Box 6/75 66.) St Austell Signal Box in 1978 67.) Roskear Junction Signal Box,24/10/84 68.) Rhondda Fach Junction Signal Box 11/8/67 69.) Radyr Quarry Signal Box 20/8/84 70.) Penzance Signal Box 18/4/87 71.) Pembrey Signal Box 24/9/78 72.) Paignton South Signal Box in 1976 73.) Paignton North Signal Box in 1965 74.) Park Junction Signal Box 15/8/86 75.) Newent Signal Box in 1960 76.) Neath and Brecon Junction Signal Box 22/8/73 77.) Menheniot Signal Box 9/6/87 78.) Maesmawr Signal Box 21/7/84 79.) Lostwithiel Signal Box 15/1/87 80.) Llanelly West Signal Box 4/4/76 81.) Llandaff Signal Box 8/4/84 82.) Little Mill Junction Signal Box in 1976 83.) Liskeard Signal Box 15/1/87 84.) Lime Kiln Sidings Signal Box 13/8/86 85.) Kidwelly Signal Box 7/8/87 86.) Henley in Arden Signal Box in 1963 87.) Gyfeillion Signal Box 12/8/84 88.) Glanaman Signal Box 20/1/79 89.) Ferryside Signal Box 11/6/77 90.) Fishguard and Goodwick Signal Box 9/72 91.) Dare Valley Junction Signal Box in 1959 92.) Pontypool Road South Signal Box in 1975 93.) View of the nameboard at Bryn Teifi signal box in 1962 94.) Close view of the nameboard, Abercynon Signal Box in 1975 95.) Great Rocks Junction s/b 96.) Tram Inn s/b in the 1950’s 97.) Romiley Signal Box in 1984 98.) Girvan No.2 Signal Box in 1960 99.) Llandenny Signal Box in 1955 100.) Abergavenny Junction Signal Box in 1958 101.) Nantybwch in 1958 102.) Tredegar No 1 in 1958 103.) Wyllie in 1958 104.) Llanvihangel Signal Box in 1958 105.) Barrow in Furness South Signal Box in the 1950’s 106.) Deganwy in 1991 107.) Nantwich in 1991 108.) Pontypridd Junction in 1958 109.) Llandaff in 1958 110.) Treforest Junction in 1958 111.) Maerdy in 1958 112.) Caerphilly East in 1958 113.) Trethomas in 1958 114.) Fochriw in 1958 115.) Bargoed North in the 1960’s 116.) Lymm Lane signal box in 1974 117.) Midgham in the 1970’s 118.) Clydach Court Junction 5/6/60 119.) Gelli Tarw Junction 18/8/62 120.) Treforest Junction 5/6/60 Signals 1.) LNWR signals at Birmingham(New Street) in 1963 2.) NER signal gantry at Port Clarence 1963 3.) NER signal gantry at Morpeth 1963 4.) Signal gantry at Highbridge on the S&D 1961 5.) MR signal bracket at Luffenham 5/63 6.) NER signal at Tyne Dock 9/63 7.) NER signal at Cliff Common 1/65 8.) LNWR bracket signal at Tredegar 1961 9.) LNWR gantry at Nine Mile Point in 1961 10.) GSWR signal at Blackhouse Jct Ayr 10/4/66 11.) LNWR signals at Gwyddelwern 1961 12.) LNWR up starter at Caerwys 21/4/62 13.) Signals at Barnstaple Town Crossing 1966 14.) CLC signals in the Stockport area 1962 15.) As above 16.) As above 17.) GSW signal at Skares 1961 18.) NCB signals at Ashington c1962 19.) As above but different signals 20.) NER slotted signal at Cliff Common 9/1/65 21.) Signal at Gaisgill crossing 1/62 22.) MSJ & Altringham signal Nr Stretford c 1962 23.) Signals at the Merstone end of Ventnor West station 12/9/52 24.) Signals on the Tavistock end of Plymouth Friary 9/9/52 25.) Signals at the Newport end of Cowes station 12/9/52 26.) Signals at the platform end at Lewes 30/10/54 27.) Three arm bracket (LBSCR) at Midhurst 9/7/51 28.) View of the signals at Highbridge station 26/8/65 29.) C.L.C. drop arm signal at Hough Green 7/5/75 30.) View of the impressive signal gantry (17 signals) at Bishop Auckland North Junction c.1956 31.) As above but from a different angle 32.) The signal gantry at the end of Stockport station 3/7/54 33.) Ex Barry Railway somersault signal at Southerdown Road in 1962 34.) Remains of a Cardiff Railway somersault signal at Nantgarw 30/4/84 35.) Up home bracket signals at Llantwit Major 18/9/35 36.) TVR somersault and revolving disc signal at Ely Paper Mills 6/55 37.) Barry Railway somersault signal at Southerndown Road in 1962 38.) LNWR home signal at Golden Grove in 1967 39.) View of signals at the west end of Tonbridge in 1960 40.) Ex Cardiff Railway signal on the Nantgarw branch 18/5/85 .
Recommended publications
  • A New Signalling System for Automatic Block Signal Between Stations Controlling Through an IP Network
    A New Signalling System for Automatic Block Signal between Stations Controlling through an IP Network 1R. Ishima, 1Y. Fukuta, 1M. Matsumoto, 2N. Shimizu, 3H. Soutome, 4M. Mori East Japan Railway Company, Saitama, Japan1; Daido Signal Co.,Ltd., Tokyo, Japan2; Hitachi, Ltd., Hitachinaka, Japan3; Toshiba Corp., Tokyo, Japan4 Abstract This paper describes a new signalling system which controls signalling field devices of automatic block signal between stations through an IP network. The system improves the method of the system already installed to Ichikawaono station on the Musasino line in February 2007. The Logic Controller (LC), placed in a signal house, exchanges the command and feedback data with the Field Controller (FC), placed near each automatic block signal, through the Ethernet Passive Optical Network (E- PON). Following the command data, the FC electrically controls signalling field devices such as signals, track circuits, transponders of the Automatic Train Stop (i.e. Automatic Train Protection) system with Pattern (ATS-P), transponders of the S-type of ATS (ATS-S), and output relays. Only optical fiber cable requires between the LC and the FC. The system has high reliability because the LC, the FC, and the data paths of E-PON are all duplex. The system provides sufficient maintenance information through the IP network. The system can realize higher reliability, less wire-connection- work, less amount of cable, cost cutting, and faster troubleshooting. A prototype system was under evaluation on the Joban Rapid Service line between Mabashi and Kitakashiwa from August 2006 to January 2008. Evaluating the results of the field test, we conclude that the prototype system is technically suitable for signal control.
    [Show full text]
  • BACKTRACK 22-1 2008:Layout 1 21/11/07 14:14 Page 1
    BACKTRACK 22-1 2008:Layout 1 21/11/07 14:14 Page 1 BRITAIN‘S LEADING HISTORICAL RAILWAY JOURNAL VOLUME 22 • NUMBER 1 • JANUARY 2008 • £3.60 IN THIS ISSUE 150 YEARS OF THE SOMERSET & DORSET RAILWAY GWR RAILCARS IN COLOUR THE NORTH CORNWALL LINE THE FURNESS LINE IN COLOUR PENDRAGON BRITISH ENGLISH-ELECTRIC MANUFACTURERS PUBLISHING THE GWR EXPRESS 4-4-0 CLASSES THE COMPREHENSIVE VOICE OF RAILWAY HISTORY BACKTRACK 22-1 2008:Layout 1 21/11/07 15:59 Page 64 THE COMPREHENSIVE VOICE OF RAILWAY HISTORY END OF THE YEAR AT ASHBY JUNCTION A light snowfall lends a crisp feel to this view at Ashby Junction, just north of Nuneaton, on 29th December 1962. Two LMS 4-6-0s, Class 5 No.45058 piloting ‘Jubilee’ No.45592 Indore, whisk the late-running Heysham–London Euston ‘Ulster Express’ past the signal box in a flurry of steam, while 8F 2-8-0 No.48349 waits to bring a freight off the Ashby & Nuneaton line. As the year draws to a close, steam can ponder upon the inexorable march south of the West Coast Main Line electrification. (Tommy Tomalin) PENDRAGON PUBLISHING www.pendragonpublishing.co.uk BACKTRACK 22-1 2008:Layout 1 21/11/07 14:17 Page 4 SOUTHERN GONE WEST A busy scene at Halwill Junction on 31st August 1964. BR Class 4 4-6-0 No.75022 is approaching with the 8.48am from Padstow, THE NORTH CORNWALL while Class 4 2-6-4T No.80037 waits to shape of the ancient Bodmin & Wadebridge proceed with the 10.00 Okehampton–Padstow.
    [Show full text]
  • Crossing Protection with Indicators for Train Movements
    Crossing Protection With Indicators For Train Movements By G. K. Zulandt Assistant Signal Engineer Terminal Railroad Association of St. louis St. louis. Mo. New Installations, on Terminal Railroad Asso­ ciation of St. Louis, include special color-light This indicator, 50 ft. from the crossing, dwarf signals, known as crossing protection in- . has a key-controller on top dicators, which inform ·enginemen whether f Iash in g -I i g h t signals and gates are operat­ ing, and give advance notice of time cut-outs main tracks are about 750 ft. long. The fastest train which was checked consumed 24.4 sec. from the tiirie it shunted its approach until it foul­ .ed the crossing. The flashing-light THE first of seven highway crossing being left open. The new flashing­ signals operated 4.6 se~-as a .pre­ gate installations to be made on light signals and gates at Lynch warning before the gates were r~:­ the Illinois Transfer Railway, oper­ avenue are controlled automatically leased; and the gates desc~nded 'in ated by the Terminal Railroad As­ by track circuits but, on account of 10.5 sec. Thus, the.gates were down sociation of St. Louis, has been switching moves. to serve industries, 9.3 sec. before the train arrived at placed in service recently at Lynch and because of other unusual op­ the crossing . ,Conventional direc­ avenue in East St. Louis, Ill. A traf­ erations, special cut-out features are tional stick relays are used to clear fic count for 24 hours over this necessary. , the gates for receding train moves.
    [Show full text]
  • Level Crossings: a Guide for Managers, Designers and Operators Railway Safety Publication 7
    Level Crossings: A guide for managers, designers and operators Railway Safety Publication 7 December 2011 Contents Foreword 4 What is the purpose of this guide? 4 Who is this guide for? 4 Introduction 5 Why is managing level crossing risk important? 5 What is ORR’s policy on level crossings? 5 1. The legal framework 6 Overview 6 Highways and planning law 7 2. Managing risks at level crossings 9 Introduction 9 Level crossing types – basic protection and warning arrangements 12 General guidance 15 Gated crossings operated by railway staff 16 Barrier crossings operated by railway staff 17 Barrier crossings with obstacle detection 19 Automatic half barrier crossings (AHBC) 21 Automatic barrier crossings locally monitored (ABCL) 23 Automatic open crossings locally monitored (AOCL) 25 Open crossings 28 User worked crossings (UWCs) for vehicles 29 Footpath and bridleway crossings 30 Foot crossings at stations 32 Provision for pedestrians at public vehicular crossings 32 Additional measures to protect against trespass 35 The crossing 36 Gates, wicket gates and barrier equipment 39 Telephones and telephone signs 41 Miniature stop lights (MSL) 43 Traffic signals, traffic signs and road markings 44 3. Level crossing order submissions 61 Overview and introduction 61 Office of Rail Regulation | December 2011 | Level crossings: a guide for managers, designers and operators 2 Background and other information on level crossing management 61 Level crossing orders: scope, content and format 62 Level crossing order request and consideration process 64 Information
    [Show full text]
  • 5 Level Crossings 4
    RSC-G-006-B Guidelines For The Design Of Section 5 Railway Infrastructure And Rolling Stock LEVEL CROSSINGS 5 LEVEL CROSSINGS 4 5.1. THE PRINCIPLES 4 5.2. GENERAL GUIDANCE 5 5.2.1. General description 5 5.2.2. Structure of the guidance 5 5.2.3. Positioning of level crossings 5 5.2.4. Equipment at level crossings 5 5.2.5. Effects on existing level crossings 6 5.2.6. Operating conditions 6 5.3. TYPES OF CROSSINGS 7 5.3.1. Types of crossing 7 5.3.2. Conditions for suitability 9 5.4. GATED CROSSINGS OPERATED BY RAILWAY STAFF 12 5.4.1. General description (for user worked gates see section 5.8) 12 5.4.2. Method of operation 12 5.4.3. Railway signalling and control 12 5.5. BARRIER CROSSINGS OPERATED BY RAILWAY STAFF (MB) 13 5.5.1. General description 13 5.5.2. Method of operation 13 5.5.3. Railway signalling and control 14 5.6. AUTOMATIC HALF BARRIER CROSSINGS (AHB) 15 5.6.1. General description 15 5.6.2. Method of operation 15 5.6.3. Railway signalling and control 16 5.7. AUTOMATIC OPEN CROSSING (AOC) 17 5.7.1. General description 17 5.7.2. Method of operation 17 5.7.3. Railway signalling and control 18 5.8. USER-WORKED CROSSINGS (UWC) WITH GATES OR LIFTING BARRIERS 19 5.8.1. General description 19 5.8.2. Method of operation 19 5.9. PEDESTRIAN CROSSINGS (PC) PRIVATE OR PUBLIC FOOTPATH 21 5.9.1.
    [Show full text]
  • Pearce Higgins, Selwyn Archive List
    NATIONAL RAILWAY MUSEUM INVENTORY NUMBER 1997-7923 SELWYN PEARCE HIGGINS ARCHIVE CONTENTS PERSONAL PAPERS 3 RAILWAY NOTES AND DIARIES 4 Main Series 4 Rough Notes 7 RESEARCH AND WORKING PAPERS 11 Research Papers 11 Working Papers 13 SOCIETIES AND PRESERVATION 16 Clubs and Societies 16 RAILWAY AND TRAMWAY PAPERS 23 Light Railways and Tramways 23 Railway Companies 24 British Railways PSH/5/2/ 24 Cheshire Lines Railway PSH/5/3/ 24 Furness Railway PSH/5/4/ 25 Great Northern Railway PSH/5/7/ 25 Great Western Railway PSH/5/8/ 25 Lancashire & Yorkshire Railway PSH/5/9/ 26 London Midland and Scottish Railway PSH/5/10/ 26 London & North Eastern Railway PSH/5/11/ 27 London & North Western Railway PSH/5/12/ 27 London and South Western Railway PSH/5/13/ 28 Midland Railway PSH/5/14/ 28 Midland & Great Northern Joint Railway PSH/5/15/ 28 Midland and South Western Junction Railway PSH/5/16 28 North Eastern Railway PSH/5/17 29 North London Railway PSH/5/18 29 North Staffordshire Railway PSH/5/19 29 Somerset and Dorset Joint Railway PSH/5/20 29 Stratford-upon-Avon and Midland Junction Railway PSH/5/21 30 Railway and General Papers 30 EARLY LOCOMOTIVES AND LOCOMOTIVES BUILDING 51 Locomotives 51 Locomotive Builders 52 Individual firms 54 Rolling Stock Builders 67 SIGNALLING AND PERMANENT WAY 68 MISCELLANEOUS NOTEBOOKS AND PAPERS 69 Notebooks 69 Papers, Files and Volumes 85 CORRESPONDENCE 87 PAPERS OF J F BRUTON, J H WALKER AND W H WRIGHT 93 EPHEMERA 96 MAPS AND PLANS 114 POSTCARDS 118 POSTERS AND NOTICES 120 TIMETABLES 123 MISCELLANEOUS ITEMS 134 INDEX 137 Original catalogue prepared by Richard Durack, Curator Archive Collections, National Railway Museum 1996.
    [Show full text]
  • FOLLOWING RAILWAY SIGNAL INDICATIONS Train Crews Do Not Consistently Recognize and Follow Railway Signals
    FOLLOWING RAILWAY SIGNAL INDICATIONS Train crews do not consistently recognize and follow railway signals. This poses a risk of train collisions or derailments, which can have catastrophic consequences. The situation For over a century, Canada has relied on a system of visual signals to control traffic on a significant portion of its rail network. These signals convey direction such as operating speed and the operating limits within which the train is permitted to travel. Train crews are required to identify and communicate the signal indications among themselves, and then take required action in how they operate the train. Sometimes, however, train crews misinterpret or misperceive a signal indication, which results in it not being followed. In the absence of physical fail-safe defences, this could result in a collision or a derailment. How often does this happen? Since 2004, there has been an annual average of 31 reported occurrences in which a train crew did not respond appropriately to a signal indication displayed in the field, and the number of occurrences each year is on the rise. The years 2018 and 2019 have the highest number of occurrences, 40 and 38 respectively (Figure 1). Figure 1. Rail transportation occurrences involving missed signals, 2004 to 2019: number of occurrences and trend over the period 45 40 35 30 25 20 Occurrences 15 10 5 0 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 Occurrences Sen's estimate of slope * * Upward trend in the number of occurrences over the period (τb = 0.324, p 1-tailed = 0.0425).
    [Show full text]
  • Speed Signaling in England Distribution Boxes
    357 • Speed-Signaling In England" Searchlight signals installed on the London-Midland Scottish Three- four- and five-aspect signals are used Fig. 3-Typic.1 sign.ls in the new installation N INSTALLATION of color-light signaling of the signal ahead and the braking distance required. which constitutes 0l1e of the most impOliant de­ Each signal, other than those at junctions, normally A velopments in British railway signaling was displays two red lights-one 12 ft. and the other 8 ft. brought into service last summer. This searchlight color­ above rail level. The upper light is a mull;iple-aspect light system is now in operation at Mirfield, between color-light signal of the searchlight type, capable of dis­ Heaton Lodge Junction and Thornhill L. and N. W. playing a red, yellow or green light; the lower light is J unction-a distance of 2y,( miles-on the London­ the marker (See Fig. 1 and 3A). The lower light indi­ Midland-Scottish main line northeast of Huddersfield. cates to an engineman that he is in a multiple-aspect The new signaling installation was not intended pri­ signaling area; this light can also be used as a low-speed marily as a means of economizing in the number of signal. These marker lights are placed vertically below cabins, although this feature was carefully considered, the top light, except in the case of automatic signals, having regard to the work to be ·perfonned. On the where they are placed 10 in. to the left of the vertical, other hand, with its complicated junction operation and giving a staggered effect.
    [Show full text]
  • View / Open TM Railway Signals.Pdf
    III••••••••••• ~ TRANSPORTATION MARKINGS: A STUDY IN COMMUNICATION MONOGRAPH SERIES VOLUME I FIRST STUDIES IN TRANSPORTATION MARKINGS: Parts A-D, First Edition [Foundations, A First Study in Transportation Markings: The U.S., International Transportation Markings: Floating & Fixed Marine] University Press of America, 1981 Part A, FOUNDATIONS, Second Edition, Revised & Enlarged Mount Angel Abbey 1991 Parts C & D, INTERNATIONAL MARINE AIDS TO NAVIGATION Second Edition, Revised, Mount Angel Abbey, 1988 VOLUME II FURTHER STUDIES IN TRANSPORTATION MARKINGS: Part E, INTERNATIONAL TRAFFIC CONTROL DEVICES, First Edition Mount Angel Abbey, 1984 Part F, INTERNATIONAL RAILwAY SIGNALS, First Edition, Mount Angel Abbey, 1991 Part G, INTERNATIONAL AERONAUTICAL AIDS TO NAVIGATION, In Preparation Part H, A COMPREHENSIVE CLASSIFICATION OF TRANSPORTATION MARKINGS Projected ­ • • TRANSPORTATION MARKINGS: • A STUDY IN COMMUNICATION • • Volume II F International Railway Signals • • Brian Clearman • Mount Angel Abbey • 1991 • • • •,. Copyright (C) 1991 by Mount Angel Abbey At Saint Benedict, Oregon 97373. All Rights Reserved. Library of Congress Cataloging-in-Publication l?ata Clearman, Brian. International railway signals / Brian Clearman. p. cm. (Transportation markings a study in communication monograph series ; v. 2, pt. F) Includes bibliographical references and index. ISBN 0-918941-03-2 : $18.95 1. Railroads--Signaling. I. Title. II. Series: Clearman, Brian. Transportation markings i v. 2, pt. F. (TF615 ) 629.04'2 s--dc20 (625. 1'65) 91-67255 CIP ii \,
    [Show full text]
  • Controlled Manual Block Signaling with Train Control Missouri Pacific Eliminates Train Orders by Directing Train Move­ Ments with Signal Indications
    Controlled Manual Block Signaling With Train Control Missouri Pacific Eliminates Train Orders by Directing Train Move­ ments With Signal Indications HE Missouri Pacific is installing a system of con­ trains, the remainder being freight trains. A ruling T trolled manual block signaling on 50 miles of grade of about 1 per cent in each direction in this SO­ single track between Leeds, Mo. (Kansas City) · mile district limits the train load. The draw bar pull of and Osawatomie, Kan . Superimposed on this block sig­ the Mikado 1,400 class locomotives used in this territory naling is an automatic train control system, which is is approximately i0,000 lb. In the direction of heavy being installed in compliance with the order of the Inter­ traffic, the maximum grade is located within 20 miles of state Commerce Commission. The intermittent inductive the initial terminal (Osawatomie), therefore full tonnage train control of the National Safety Appliance Company can be handled with the assistance of a helper which is was installed as a part of the wayside equipment, while cut off at \Vagstaff. The line has numerous sharp 19 freight and 10 passenger locomotives have been curves that will necessitate heavy reconstruction when a equipped with the engine apparatus. Following the com­ second track is necessary. pletion of the installation on the first 25 miles between The results desired by the present installation of sig- West End of Martin City Passenger on Main Line Passing Dodson with Uoth Train- East End of Kenneth Passing Track Order Signal and Block Signal 2998 Clear Passinc Track Leeds and Kenneth a representative of the Interstate naling were : ( 1) to provide a section of automatic train Commerce Commission made an official inspection be­ control as required by the order of the Interstate Com­ tween September 1 and 12.
    [Show full text]
  • F T a Report Number 27, Asset Management Guide
    Asset Management Guide Focusing on the Management of Our Transit Investments OCTOBER 2012 FTA Report No. 0027 Federal Transit Administration PREPARED BY Dr. David Rose Lauren Isaac Keyur Shah Tagan Blake Parsons Brinckerhoff, Inc. COVER PHOTO Courtesy of David Sailors DISCLAIMER This document is intended as a technical assistance product. It is disseminated under the sponsorship of the U.S. Department of Transportation in the interest of information exchange. The United States Government assumes no liability for its contents or use thereof. The United States Government does not endorse products of manufacturers. Trade or manufacturers’ names appear herein solely because they are considered essential to the objective of this report. Asset Management Guide Focusing on the Management of Our Transit Investments OCTOBER 2012 FTA Report No. 0027 PREPARED BY Dr. David Rose Lauren Isaac Keyur Shah Tagan Blake Parsons Brinckerhoff, Inc. One Penn Plaza New York, NY 11019 SPONSORED BY Federal Transit Administration Office of Research, Demonstration and Innovation U.S. Department of Transportation 1200 New Jersey Avenue, SE Washington, DC 20590 AVAILABLE ONLINE http://www.fta.dot.gov/research FEDERAL TRANSIT ADMINISTRATION i Metric Conversion Table Metric Conversion Table SYMBOL WHEN YOU KNOW MULTIPLY BY TO FIND SYMBOL LENGTH in inches 25.4 millimeters mm ft feet 0.305 meters m yd yards 0.914 meters m mi miles 1.61 kilometers km VOLUME fl oz fluid ounces 29.57 milliliters mL gal gallons 3.785 liters L 3 3 ft cubic feet 0.028 cubic meters m 3 3 yd cubic yards 0.765 cubic meters m 3 NOTE: volumes greater than 1000 L shall be shown in m MASS oz ounces 28.35 grams g lb pounds 0.454 kilograms kg megagrams T short tons (2000 lb) 0.907 Mg (or "t") (or "metric ton") TEMPERATURE (exact degrees) o 5 (F-32)/9 o F Fahrenheit Celsius C or (F-32)/1.8 FEDERAL TRANSIT ADMINISTRATION ii FEDERAL TRANSIT ADMINISTRATION ii REPORT1.
    [Show full text]
  • (CCS) and Migration to ERTMS
    FEASIBILITY STUDY REFERENCE FEASIBILITY STUDY REFERENCE SYSTEM ERTMS FinalSYSTEM Report ERTMS DigitalisationFinal Report of CCS (Control Command and Signalling) and MigrationDigitalisation to ERTMS of CCS (Control Command and Signalling) and Migration to ERTMS European Railway Agency - 2017 23 OP European Railway Agency - 2017 23 OP 14 AUGUST 2018 14 AUGUST 2018 FEASIBILITY STUDY REFERENCE SYSTEM ERTMS Contact ANDRÉ VAN ES Arcadis Nederland B.V. P.O. Box 220 3800 AE Amersfoort The Netherlands Our reference: 083702890 A - Date: 2 November 2018 2 of 152 FEASIBILITY STUDY REFERENCE SYSTEM ERTMS CONTENTS 1 INTRODUCTION 9 1.1 EU Context of Feasibility Study 9 1.2 Digitalisation of the Rail Sector 9 1.3 Objectives of Feasibility Study 11 1.4 Focus of Feasibility Study 11 1.5 Report Structure 12 2 SCOPE AND METHODOLOGY 13 2.1 Methodology 13 2.2 Scope Addition 15 2.3 Wider Pallet of Interviewed Parties 15 2.4 Timeframes 19 3 INFRASTRUCTURE MANAGERS 20 3.1 Findings and Trends Infrastructure Managers 20 3.2 Reasons for Replacing Non-ETCS Components 28 3.3 Short-Term versus Long-Term 31 4 OPERATING COMPANIES 33 4.1 Dutch Railways (NS) 33 4.2 DB Cargo 35 4.3 RailGood 36 4.4 European Rail Freight Association 37 4.5 Findings and Trends Operating Companies 38 5 RAIL INDUSTRY SUPPLIERS 40 5.1 Supplier 1 40 5.2 Supplier 2 41 5.3 Supplier 3 42 5.4 Supplier 4 42 5.5 Supplier 5 42 Our reference: 083702890 A - Date: 2 November 2018 3 of 152 FEASIBILITY STUDY REFERENCE SYSTEM ERTMS 5.6 Findings and Trends Suppliers 43 6 RAILWAY INDUSTRY DEVELOPMENT INITIATIVES
    [Show full text]