LNG Carrier Master's Marine Services Manual

Total Page:16

File Type:pdf, Size:1020Kb

LNG Carrier Master's Marine Services Manual LNG Carrier Masters’s Marine Services Manual LNG Carrier Master’s Marine Services Manual Version November 2019 1 This document is proprietary to Gate terminal BV and shall not be reproduced in whole or part by any means without prior approval in writing from Gate’ LNG Carrier Masters’s Marine Services Manual Emergency Contacts Contact External Telephone Number / VHF Internal Gate LNG Main Office +31 (0)181 799 000 1000 Gate LNG Emergency – Main Gate +31 (0)181 799 001 1001 Gate LNG Security – Main Gate +31 (0)181 799 035 1035 Gate LNG Control Room +31 (0) 181 799 020 / VHF 9 1020 Gate LNG SHEQ Advisor +31 (0)181 799 024 1024 Mobile +31 (0)6 1243 5062 Gate LNG PFSO = Marine Supervisor +31 (0)181 799 023 1023 Mobile +31 (0)6 1277 5202 email [email protected] Shipping mailbox email [email protected] Gate LNG Shift supervisor Operations +31 (0)181 799 022 1022 Mobile +31 (0)6 2352 7519 Duty Manager Mobile +31 (0)6 2007 1058 LNGC on Jetty 1 2010 LNGC on Jetty 2 2011 Immigration +31 (0)88 964 27 20 email [email protected] Dirkzwager +31 (0)10 414 42 22 Port Security Officer (PFO) +31 (0)10 252 18 27 Port – Harbour Coordination Center (HCC) +31 (0)10 252 10 00/ VHF 14 HCC (Emergencies, ordering tugs, boatmen) VHF 11 HCC (listen out when alongside) VHF 19 Port – Vessel Traffic & Operations +31 (0)10 252 10 00 / VHF 19 Rotterdam – Rijnmond Seaport Police +31 (0)88 964 27 20 Rotterdam Police / Fire / Ambulance +31 (0)10 252 10 00 / VHF 11 DISCLAIMER: For information purposes only, no right can be claimed, no responsibility for errors, subject to change without notice Version November 2019 2 This document is proprietary to Gate terminal BV and shall not be reproduced in whole or part by any means without prior approval in writing from Gate’ LNG Carrier Masters’s Marine Services Manual TABLE OF CONTENTS 1. INTRODUCTION ................................................................................................................... 6 1.1 Statement of purpose. .....................................................................................................................................................................6 1.2 Scope of application. ........................................................................................................................................................................6 1.3 References. .............................................................................................................................................................................................6 1.4 Definitions ..............................................................................................................................................................................................6 2. PORT OF ROTTERDAM. ...................................................................................................... 8 2.1 Port Description. .................................................................................................................................................................................8 2.2 Port Location. .......................................................................................................................................................................................8 2.3 Safety and Admission policy for LNG carriers. .....................................................................................................................8 2.4 Port Metocean Environmental Data. .........................................................................................................................................8 2.5 Port adverse weather conditions. ............................................................................................................................................ 12 2.6 Port Tug Requirements / Towage. .......................................................................................................................................... 12 2.7 Port Pilots / Pilotage. ..................................................................................................................................................................... 13 2.8 Health. ................................................................................................................................................................................................... 13 2.9 Immigration. ....................................................................................................................................................................................... 13 2.10 Customs. .............................................................................................................................................................................................. 14 2.11 Documentation Required by PoR aboard LNGC. ............................................................................................................. 14 2.12 Reporting of Incidents. ................................................................................................................................................................. 15 2.13 Emergency / Safety. ........................................................................................................................................................................ 15 2.14 LNGC Maintenance and Repairs. ............................................................................................................................................. 16 2.15 Port Security. ...................................................................................................................................................................................... 16 2.16 Stores and bunkering .................................................................................................................................................................... 17 2.17 Dangerous Goods. .......................................................................................................................................................................... 17 2.18 Waste..................................................................................................................................................................................................... 17 2.19 Port Communication – VHF Channels. .................................................................................................................................. 18 2.20 Port LNGC Anchorage. .................................................................................................................................................................. 19 2.21 Port Traffic Control – Vessel Traffic Service (VTS). .......................................................................................................... 19 2.22 Port / Local Time Zone. ................................................................................................................................................................ 19 2.23 Flags and Signals. ............................................................................................................................................................................ 19 3. TERMINAL INFORMATION. ............................................................................................... 20 3.1 General Description. ....................................................................................................................................................................... 20 Version November 2019 3 This document is proprietary to Gate terminal BV and shall not be reproduced in whole or part by any means without prior approval in writing from Gate’ LNG Carrier Masters’s Marine Services Manual 3.2 Terminal Specification Overview. ............................................................................................................................................. 20 3.3 Terminal & Berth Location. ......................................................................................................................................................... 21 3.4 Terminal Policies. ............................................................................................................................................................................. 22 3.5 Gate Pre-Arrival Procedures. ...................................................................................................................................................... 28 3.6 Gate Terminal Cargo Sequence of Events. .......................................................................................................................... 29 3.7 Mooring / Berthing the LNGC. .................................................................................................................................................. 30 3.8 Gangway Setting. ............................................................................................................................................................................. 32 3.9 Ship / Shore Communications. ................................................................................................................................................. 33 3.10 Ship / Shore Interface Meeting or Pre-Cargo Operation Meeting. ......................................................................... 33 3.11 Cargo Preparation. .........................................................................................................................................................................
Recommended publications
  • Ferry LNG Study Draft Final Report
    Evaluating the Use of Liquefied Natural Gas in Washington State Ferries Draft Final Report Prepared For: Joint Transportation Committee Consultant Team Cedar River Group John Boylston January 2012 Joint Transportation Committee Mary Fleckenstein P.O. Box 40937 Olympia, WA 98504‐0937 (360) 786‐7312 [email protected] Cedar River Group Kathy Scanlan 755 Winslow Way E, Suite 202 Bainbridge Island, WA 98110 (206) 451‐4452 [email protected] The cover photo shows the Norwegian ferry operator Fjord1's newest LNG fueled ferry. Joint Transportation Committee LNG as an Energy Source for Vessel Propulsion EXECUTIVE SUMMARY The 2011 Legislature directed the Joint Transportation Committee to investigate the use of liquefied natural gas (LNG) on existing Washington State Ferry (WSF) vessels as well as the new 144‐car class vessels and report to the Legislature by December 31, 2011 (ESHB 1175 204 (5)); (Chapter 367, 2011 Laws, PV). Liquefied natural gas (LNG) provides an opportunity to significantly reduce WSF fuel costs and can also have a positive environmental effect by eliminating sulfur oxide and particulate matter emissions and reducing carbon dioxide and nitrous oxide emissions from WSF vessels. This report recommends that the Legislature consider transitioning from diesel fuel to liquefied natural gas for WSF vessels, making LNG vessel project funding decisions in the context of an overall LNG strategic operation, business, and vessel deployment and acquisition analysis. The report addresses the following questions: Security. What, if any, impact will the conversion to LNG fueled vessels have on the WSF Alternative Security Plan? Vessel acquisition and deployment plan. What are the implications of LNG for the vessel acquisition and deployment plan? Vessel design and construction.
    [Show full text]
  • Removal-Fill: Channel History & Proposed Changes
    Review of Proposed Earthwork Projects in the Port of Coos Bay Presentation by: Michael Graybill Presented to: League of Women Voters 31 January 2019 Two Closely Related Dredging Projects Are Under Consideration in Coos Bay: DREDGING PROJECT #1 The Jordan Cove Energy Project 5.7 million cubic yards (Not including maintenance volume) DREDGING PROJECT #2. The Coos Bay Navigation Channel Expansion project 18 million cubic yards (Not including maintenance volume) Two Closely Related Dredging Projects Are Under Consideration in Coos Bay: DREDGING PROJECT #1 The Jordan Cove Energy Project 5.7 million cubic yards (Not including maintenance volume) 23.7 Million Cubic Yards! DREDGING PROJECT #2. The Coos Bay Navigation Channel Expansion project 18 million cubic yards (Not including maintenance volume) DREDGING PROJECT #1 The Jordan Cove Energy Project 5.7 million cubic yards (Does not include maintenance volume) Land disposal DREDGING PROJECT #2. The Coos Bay Navigation Channel Expansion project 18 million cubic yards (Does not including maintenance volume) Ocean disposal DREDGING PROJECT #1 The Jordan Cove Energy Project 5.7 million cubic yards (Does not include maintenance volume) Land disposal DREDGING PROJECT #2. The Coos Bay Navigation Channel Expansion Project 18 million cubic yards (Does not include maintenance volume) Ocean disposal Project #1 Proposed Earthwork: Jordan Cove Energy Project Project has 3 Elements: 1. Natural Gas Pipeline 229-mile route; mostly over land; crosses 400+ wetlands and water bodies Hardly any dredging but massive excavation work to bury pipe Extensive Horizontal Directional Drilling of pipeline under the Bay 2. LNG Factory on N Spit Factory super chills gas to a liquid (-220 degrees F) No dredging needed to build factory Much filling needed to elevate facility above tsunami zone 3.
    [Show full text]
  • Key Technologies of LNG Carrier and Recent MHI Activity- Variation Of
    Mitsubishi Heavy Industries Technical Review Vol. 47 No. 3 (September 2010) 1 Technology Trends and MHI Activities for LNG Carriers - Diverse Shipbuilding and Marine Products in the LNG Supply Chain - SAI HIRAMATSU*1 KAZUYOSHI HIRAOKA*1 YOSHIKAZU FUJINO*1 KENJI TSUMURA*1 With natural gas garnering greater attention as an energy option with low environmental impact, shipbuilding and marine products in the liquefied natural gas (LNG) supply chain have become increasingly diverse. Mitsubishi Heavy Industries, Ltd., (MHI) through a variety of activities, has been introducing many products that meet customer needs. Taking a long-term perspective, MHI continues to be active in the development of products that offer dependability, economic efficiency, and low fuel consumption, such as continuous tank-cover LNG carriers with drastic weight reductions and performance improvements, fuel-efficient and environmentally-friendly ultra-steam turbine (UST) and slow-speed diesel with gas injection and re-liquefaction (SSD-GI) propulsion plants, regasification vessels that significantly reduce fuel consumption during the regasification process, and reliable highly economic LNG floating production storage and offloading units. |1. Introduction Mitsubishi Heavy Industries, Ltd., (MHI) has built forty-two liquefied natural gas (LNG) carriers since delivery of its first in 1983. While safe, reliable, and economically efficient LNG carrier technologies are being developed through the design and shipbuilding process, the recent rise in LNG demand has generated diverse customer needs for shipbuilding and marine products in the LNG supply chain. This article describes MHI’s activities in the development of highly novel products that take into account diverse supply sources, the need for lower environmental impact, and product development requirements at both upper and lower supply chain streams.
    [Show full text]
  • LNG Fuelled Ships Norwegian Experience
    LNG fuelled ships Norwegian experience Per Magne Einang Research Director MARINTEK www.marintek.com ECSA – EMSA meeting Brussels 24th of November 2009 MARINTEK 1 MARINTEK Independent research and development institute Trondheim Norway MARINTEK 2 Gas engine development since 1984 Wärtsilä Vasa 32 Rolls-Royce B-type Rolls-Royce K-type Dual Fuel gas engines Lean Burn gas engines - Constant speed (generator load) - Variable speed (propeller load) MARINTEK 3 Kystgass Snøhvit - base load LNG plant Visjjygon ”Kystgass” Deep sea LNG Coastal LNG ship Regional LNG depot Local LNG skip Local depot Coastal LNG ship MARINTEK 4 LNG distribution and production capacity MARINTEK 5 Small scale receiving terminals in Norway (2009) Receiving LNG terminals LNG receiving terminals in opp(g)eration (green) and under construction (blue) Total number of 30 terminals Wide span in size 100m3 - 3500m3 LNG Source of LNG Local production (marked P) Karmøy 20000 ton/year Kollsnes1 40000 ton/year Kollsnes2 80000 ton/year Tjelbergodden 10000 ton/year Total 150000 ton/year MARINTEK 6 Small receivinggp terminal at an aluminum plant LNG ship 1000m3 LNG MARINTEK 7 New LNG carrier capacity of 7500m3 (Opera te d b y A nt ony V ed er) MARINTEK 8 Lyse gas LNG i Risavika Stavanger Cappyacity 300 000 tons/y ear Starting gq 4. quarter 2010 Possible second train 300 000 tons/year MARINTEK 9 Nordic LNG (Lyse Gas and Skaugen) Logistic solutions with ships Six multi gas (LNG, Ethylene, LPG) carriers of 10 000 cbm and two of 12 000 cbm MARINTEK 10 Large LNG terminals in Europe MARINTEK 11 LNG chain – energy consumption MARINTEK 12 Well – to – wheel analyses, road transport WllWell – to – TkTank (ti)(energy consumption processes) 1.
    [Show full text]
  • Shipping LNG from a Remote Arctic Plant
    Shipping LNG from a Remote Arctic Plant Frederic Hannon LNG Shipping Project Manager TOTAL – Gas, Renewables & Power Division YAMAL LNG, a Pilot Project in the Arctic – Some Key Features Shareholders 9.9% 20.0% 50.1% Source: Public information 20.0% ● LNG Plant located in Sabetta, North-East Wells 208 directional and horizontal of the Yamal Peninsula, Russia Capacity 3 x 5.5 MMtpa + 1 x 0,94 MMtpa LNG, 1.2 MMtpa Condensates ● Arctic conditions (Temperatures -52°C / 3 months of polar night) Capex 27 G$ (Yamal LNG) ● Ice free port: 5 months Trains 1,2,3 started ( nameplate 16,5 Mmtpa) T4 pilot under Construction Status ● South Tambey Gas-Condensate Field: construction exploration and development license until 15 ARC7 LNG Carriers, 11 Conventional LNGCs , 2 ARC7 2045 Shipping Condensate tankers Trans-shipment capacity in Zeebrugge and Ship-to-Ship Transfers ● Reservoirs: 1000- 3500 m deep LNG Deliveries Asia, Europe ● Proved & Probable Reserves : 926 billion cubic meters of natural gas An Integrated Project : • Presidential decree on October 10th, 2010 • Final Investment Decision on December 13th, 2013 with Pioneering Solutions in field of logistics and transportation schemes : The Shipping Scheme for the Export of LNG Westbound : annual ice Eastbound : pluri-annual ice Average ice extension : 830 Nmiles / 2,900 Average ice extension 2,100 Nm / 4,900 Nm – 7/9 days Nm – 14/16 days Year Round Northern Sea Route Route Sabetta 16,5 mtpa LNG / Trans-shipment # 220 cargoes Terminal /year Summer Route TRANSHIPMENT : SHIP – STORAGE - SHIP Winter
    [Show full text]
  • Lng Bunkering Technical and Operational Advisory
    LNG BUNKERING TECHNICAL AND OPERATIONAL ADVISORY ABS | LNG BUNKERING TECHNICAL AND OPERATIONAL ADVISORY | 01 © VladSV/Shutterstock OUR MISSION The mission of ABS is to serve the public interest as well as the needs of our members and clients by promoting the security of life and property and preserving the natural environment. HEALTH, SAFETY, QUALITY & ENVIRONMENTAL POLICY We will respond to the needs of our members and clients and the public by delivering quality service in support of our Mission that provides for the safety of life and property and the preservation of the marine environment. We are committed to continually improving the effectiveness of our HSQE performance and management system with the goal of preventing injury, ill health and pollution. We will comply with all applicable legal requirements as well as any additional requirements ABS subscribes to which relate to HSQE aspects, objectives and targets. Disclaimer: While ABS uses reasonable efforts to accurately describe and update the information in this Advisory, ABS makes no warranties or representations as to its accuracy, currency or completeness. ABS assumes no liability or responsibility for any errors or omissions in the content of this Advisory. To the extent permitted by applicable law, everything in this Advisory is provided “as is” without warranty of any kind, either expressed or implied, including, but not limited to, the implied warranties of merchantability, fitness for a particular purpose, or noninfringement. In no event will ABS be liable for any damages whatsoever, including special, indirect, consequential or incidental damages or damages for loss of profits, revenue or use, whether brought in contract or tort, arising out of or connected with this Advisory or the use or reliance upon any of the content or any information contained herein.
    [Show full text]
  • U.S. LNG Export Projects Update
    LNG ALLIES > DEVELOPMENTS IN Q4 2018 U.S. LNG Export Projects Update LEAD: CORPUS CHRISTI SHIPS INITIAL LNG CARGO On Dec. 11, 2018, the first commissioning cargo of liq- uefied natural gas (LNG) was loaded and departed from Cheniere Energy’s Corpus Christi liquefaction facility in Texas, marking the first export of LNG from the state and from a greenfield liquefaction facility in the lower 48 states. The cargo was loaded on the LNG carrierMaria Energy, chartered by Cheniere Marketing. The Corpus Christi liquefaction facility consists of three large-scale LNG trains and supporting infrastructure, with an additional seven smaller trains proposed. The facility’s first train produced first LNG in Nov. 2018 and is expected to reach substantial completion in Q1 2019. Train 2 is ex- and Regasification Units (FSRU), Floating Liquefaction pected to reach substantial completion in the H2 2019, and (FLNG), and small scale LNG. Wouter Pastoor, also from Train 3 in H2 2021. Golar, is Delfin’s new Chief Operating Officer. Poston takes over from Delfin founder Fred Jones. PROJECTS UNDER CONSTRUCTION ■ Magnolia LNG (Louisiana) ■ Cameron LNG (Louisiana) Liquefied Natural Gas Ltd. has extended through June 30, On Nov. 2, Cameron LNG requested authorization from 2019, its current binding engineering, procurement, and the Federal Energy Regulatory Commission (FERC) to construction contract with KSJV (a KBR/SKE&C joint begin commissioning activities for the first train of the venture led by KBR) for the Magnolia LNG project. 14 mtpa project now under construction in Hackberry, Louisiana. Sempra continues to state that all of the first ■ Sabine Pass Train Six (Louisiana) three trains at Cameron should be in service in 2019.
    [Show full text]
  • GIIGNL Annual Report Profile
    The LNG industry GIIGNL Annual Report Profile Acknowledgements Profile We wish to thank all member companies for their contribution to the report and the GIIGNL is a non-profit organisation whose objective following international experts for their is to promote the development of activities related to comments and suggestions: LNG: purchasing, importing, processing, transportation, • Cybele Henriquez – Cheniere Energy handling, regasification and its various uses. • Najla Jamoussi – Cheniere Energy • Callum Bennett – Clarksons The Group constitutes a forum for exchange of • Laurent Hamou – Elengy information and experience among its 88 members in • Jacques Rottenberg – Elengy order to enhance the safety, reliability, efficiency and • María Ángeles de Vicente – Enagás sustainability of LNG import activities and in particular • Paul-Emmanuel Decroës – Engie the operation of LNG import terminals. • Oliver Simpson – Excelerate Energy • Andy Flower – Flower LNG • Magnus Koren – Höegh LNG • Mariana Ortiz – Naturgy Energy Group • Birthe van Vliet – Shell • Mika Iseki – Tokyo Gas • Yohei Hukins – Tokyo Gas • Donna DeWick – Total • Emmanuelle Viton – Total • Xinyi Zhang – Total © GIIGNL - International Group of Liquefied Natural Gas Importers All data and maps provided in this publication are for information purposes and shall be treated as indicative only. Under no circumstances shall they be regarded as data or maps intended for commercial use. Reproduction of the contents of this publication in any manner whatsoever is prohibited without prior
    [Show full text]
  • Capacity Analysis for Approach Channels Shared by LNG Carriers
    Journal of Marine Science and Engineering Article Capacity Analysis for Approach Channels Shared by LNG Carriers Xiang Gao 1,2, Linying Chen 1,2,*, Pengfei Chen 1,2, Yu Luo 1 and Junmin Mou 1,2 1 School of Navigation, Wuhan University of Technology, Wuhan 430063, China; [email protected] (X.G.); [email protected] (P.C.); [email protected] (Y.L.); [email protected] (J.M.) 2 Hubei Key Laboratory of Inland Shipping Technology, Wuhan University of Technology, Wuhan 430063, China * Correspondence: [email protected] Received: 28 July 2020; Accepted: 7 September 2020; Published: 9 September 2020 Abstract: The transport of liquefied natural gas (LNG) has significant impact on traffic capacity of waterways, especially the approach channels shared by LNG carriers and other types of ships (general cargo ships, container ships, etc.). Few studies take the behavioral characteristics of LNG carriers and their impacts into consideration. In this paper, we propose a framework for capacity analysis of shared approach channels based on the spatial–temporal consumption method. It consists of three modules: (1) the tide module predicts the tidal height and tidal time for identifying the time windows for LNG carriers; (2) the spatial–temporal consumption module is introduced to calculate the capacity of approach channels; (3) the LNG carrier navigation module is for analyzing the characteristics of LNG carriers and the impact on the capacity of approach channels. A spatial–temporal indexed chart is designed to visualize the utilization of the spatial–temporal resources. A case study on the approach channel of Yueqing Bay near the east coast of China is conducted to verify the effectiveness of the framework.
    [Show full text]
  • Assessment of Innovative Small Scale Lng Carrier Concepts
    ASSESSMENT OF INNOVATIVE SMALL SCALE LNG CARRIER CONCEPTS Carlos Guerrero, Global Market Leader, Tankers and Gas Carriers Bureau Veritas Marine & Offshore Carlos Guerrero, Bureau Veritas Marine & Offshore INTRODUCTION/BACKGROUND Sophisticated liquefied natural gas (LNG) carriers for break bulk distribution commonly known as small scale LNG carriers have been developed for many years already. The first modern designs are in service for more than one decade. Although this market segment represent less than one per cent of the total shipping capacity, it is still a high value fleet taking into account the unitary cost of small scale carriers. The concept of small scale LNG carrier has further developed in the past few years due to new developments linked to the distribution of LNG as a marine bunker fuel. LNG as a marine fuel is step by step taking a relevant position as one of the most interesting solution to comply with stringent environmental regulations for shipping. The global cap of 0,5% of sulphur content in marine fuels established by the International Maritime Organization (IMO) will possibly drive shipowners to consider clean fuels instead of exhaust gas abatement systems in the horizon of 2020. As a consequence additional LNG bunker supply capacity is required to satisfy the demand and it is expected that new small scale carriers dedicated to deliver this bunker fuel will be deployed in the most important bunkering hubs all over the world. In fact several small scale LNG ships below 10,000 cubic meters have recently entered into service with LNG bunkering ability. These ships are more innovative than standard small LNG carriers and have been designed and built to perform break bulk LNG distribution but mainly distribution of LNG as a bunker fuel.
    [Show full text]
  • Public Safety Consequences of a Terrorist Attack on a Tanker Carrying Liquefied Natural Gas Need Clarification
    United States Government Accountability Office Report to Congressional Requesters GAO February 2007 MARITIME SECURITY Public Safety Consequences of a Terrorist Attack on a Tanker Carrying Liquefied Natural Gas Need Clarification GAO-07-316 February 2007 MARITIME SECURITY Accountability Integrity Reliability Highlights Public Safety Consequences of a Highlights of GAO-07-316, a report to Terrorist Attack on a Tanker Carrying congressional requesters Liquefied Natural Gas Need Clarification Why GAO Did This Study What GAO Found The United States imports natural The six unclassified completed studies GAO reviewed examined the effect of gas by pipeline from Canada and by a fire resulting from an LNG spill but produced varying results; some studies tanker as liquefied natural gas also examined other potential hazards of a large LNG spill. The studies’ (LNG) from overseas. LNG—a conclusions about the distance at which 30 seconds of exposure to the heat supercooled form of natural gas— (heat hazard) could burn people ranged from less than 1/3 of a mile to about currently accounts for about 3 percent of total U.S. natural gas 1-1/4 miles. Sandia National Laboratories (Sandia) conducted one of the supply, with an expected increase studies and concluded, based on its analysis of multiple attack scenarios, to about 17 percent by 2030, that a good estimate of the heat hazard distance would be about 1 mile. according to the Department of Federal agencies use this conclusion to assess proposals for new LNG Energy (DOE). With this projected import terminals. The variations among the studies occurred because increase, many more LNG import researchers had to make modeling assumptions since there are no data for terminals have been proposed.
    [Show full text]
  • Enabling the NGL Oceangoing Pipeline
    Navigator Holdings Ltd 2018 Annual Report Enabling the NGL oceangoing pipeline “Navigator Aurora loading a maiden cargo of ethane at Marcus Hook, Pennsylvania” Our world-class fleet Ethylene capable fleet Aurora Eclipse Nova Prominence (37.3k cbm) (37.3k cbm) (37.3k cbm) (37.3k cbm) Neptune Pluto Saturn Venus Orion (22.1k cbm) (22.1k cbm) (22.1k cbm) (22.1k cbm) (22.1k cbm) Atlas Europa Oberon Triton Umbrio (21k cbm) (21k cbm) (21k cbm) (21k cbm) (21k cbm) Semi refrigerated fleet Magellan Pegasus Phoenix Aries Capricorn Gemini (20.9k cbm) (22k cbm) (22k cbm) (20.5k cbm) (20.5k cbm) (20.5k cbm) Scorpio Taurus Virgo Leo Libra Centauri (20.5k cbm) (20.5k cbm) (20.5k cbm) (20.5k cbm) (20.5k cbm) (22k cbm) Ceres Ceto Copernico Luga Yauza (22k cbm) (22k cbm) (22k cbm) (22k cbm) (22k cbm) Fully refrigerated fleet Jorf (38k cbm) Glory Grace Gusto Genesis Galaxy Global (22.5k cbm) (22.5k cbm) (22.5k cbm) (22.5k cbm) (22.5k cbm) (22.5k cbm) Vessels in the fleet technically managed in-house by Navigator Gas Shipmanagement Limited. UNITED STATES SECURITIES AND EXCHANGE COMMISSION WASHINGTON, D.C. 20549 FORM 20-F ‘ REGISTRATION STATEMENT PURSUANT TO SECTION 12(b) or (g) OF THE SECURITIES EXCHANGE ACT OF 1934 OR È ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 For the fiscal year ended December 31, 2018 OR ‘ TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 For the transition period from to OR ‘ SHELL COMPANY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 Date of event requiring this shell company report Commission file number: 001-36202 NAVIGATOR HOLDINGS LTD.
    [Show full text]