STIP) Page 1 of 63 for REGION 03

Total Page:16

File Type:pdf, Size:1020Kb

STIP) Page 1 of 63 for REGION 03 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 1 of 63 for REGION 03 AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars NYSDOT MBC, PAVEMENT, DUE TO EXCESSIVE WEAR, RTS 5 & 92 FROM EDWARDS NHPP 2020 0.542 CONINSP 0.542 DR TO LYNDON CORNERS, RT 5 FROM LYNDON CORNERS TO LYNDON NFA 2020 0.135 CONINSP 0.135 301020 GOLF AND RT 92 FROM LYNDON CORNERS TO RT 257, TNS OF DEWITT & NHPP 2020 4.800 CONST 4.800 MANLIUS, VIL OF MANLIUS, ONONDAGA CO NFA 2020 1.200 CONST 1.200 AQC:N/A ONONDAGA TPC : $6-$9.4 M TOTAL 4YR COST : 6.677 6.677 0.000 0.000 0.000 NYSDOT MBC, MILL & FILL PAVEMENT; ADDRESS ADA DEFICIENT CURB RAMPS; NHPP 2022 0.195 CONINSP 0.195 REPLACE SIDEWALKS, DETECTABLE WARNINGS, CROSSWALKS, SIGNS, NFA 2022 0.049 CONINSP 0.049 301021 REFERENCE AND CULVERT MARKERS; DUE TO DETERIORATION TO NHPP 2022 1.954 CONST 1.954 BRING TO STATE OF GOOD REPAIR; RT 92, RT 257 TO ACADEMY ST; RT NFA 2022 0.489 CONST 0.489 STBG LG URB 2022 0.076 CONINSP 0.076 173, WEST OF FLUME RD TO CLINTON ST; VIL & TN OF MANLIUS, NFA 2022 0.019 CONINSP 0.019 ONONDAGA CO STBG LG URB 2022 0.760 CONST 0.760 NFA 2022 0.190 CONST 0.190 STBG FLEX 2021 0.121 PRELDES 0.121 NFA 2021 0.030 PRELDES 0.030 STBG FLEX 2021 0.121 SCOPING 0.121 NFA 2021 0.030 SCOPING 0.030 STBG FLEX 2022 0.201 DETLDES 0.201 NFA 2022 0.050 DETLDES 0.050 AQC:N/A ONONDAGA TPC : $3.3-$5.6 M TOTAL 4YR COST : 4.285 0.000 0.302 3.983 0.000 NYSDOT REPLACE RT. 96B OVER BUTTERMILK CREEK TRIBUTARY BRIDGE-BIN NHPP 2021 0.080 PRELDES 0.080 1035310 ON EXISTING ALIGNMENT, WITH NEW PILES, AND AN NFA 2021 0.020 PRELDES 0.020 301603 IMPROVED HYDRAULIC OPENING. TOWN OF DANBY, TOMPKINS CO. NHPP 2021 0.080 SCOPING 0.080 NFA 2021 0.020 SCOPING 0.020 NHPP 2022 0.080 DETLDES 0.080 NFA 2022 0.020 DETLDES 0.020 AQC:EXEMPT TOMPKINS TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.300 0.000 0.200 0.100 0.000 NYSDOT REPLACE BRIDGE; DUE TO DETERIORATION TO BRING TO STATE OF STBG FLEX 2021 0.075 PRELDES 0.075 GOOD REPAIR; RT 49, OVER BIG BAY CREEK; TN OF W MONROE, OSWEGO NFA 2021 0.019 PRELDES 0.019 301713 CO, BIN 1026190 STBG FLEX 2021 0.075 SCOPING 0.075 NFA 2021 0.019 SCOPING 0.019 STBG FLEX 2022 0.100 DETLDES 0.100 NFA 2022 0.025 DETLDES 0.025 AQC:N/A ONONDAGA TPC : $2-$4 M TOTAL 4YR COST : 0.313 0.000 0.188 0.125 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 2 of 63 for REGION 03 AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars NYSDOT RT 38 AND RT 38A PEDESTRIAN SAFETY IMPROVEMENT PROJECT, HSIP 2020 0.040 PRELDES 0.040 VILLAGE OF MORAVIA, CAYUGA COUNTY. THIS PROJECT WILL REPLACE NFA 2020 0.004 PRELDES 0.004 302235 THE EXISTING CROSSWALKS WITH RAISED CROSSWALKS OR RAISED HSIP 2020 0.040 SCOPING 0.040 INTERSECTION TO REDUCE IDENTIFIED PEDESTRIAN COLLISIONS AND NFA 2020 0.004 SCOPING 0.004 INCREASE PEDESTRIAN VISIBILITY. TO IMPROVE SAFETY. HSIP 2021 0.040 DETLDES 0.040 NFA 2021 0.004 DETLDES 0.004 HSIP 2022 0.054 CONINSP 0.054 NFA 2022 0.006 CONINSP 0.006 HSIP 2022 0.540 CONST 0.540 NFA 2022 0.060 CONST 0.060 AQC:N/A CAYUGA TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.792 0.088 0.044 0.660 0.000 NYSDOT RT 221 OVER BIG BROOK BRIDGE REPLACEMENT, BIN 1041790, TOWN OF NHPP 2022 0.110 PRELDES 0.110 LAPEER, CORTLAND COUNTY NFA 2022 0.027 PRELDES 0.027 302409 NHPP 2022 0.109 SCOPING 0.109 NFA 2022 0.027 SCOPING 0.027 NHPP 2023 0.146 DETLDES 0.146 NFA 2023 0.036 DETLDES 0.036 AQC:N/A CORTLAND TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.455 0.000 0.000 0.273 0.182 NYSDOT RT 281 AT RT 41 INTERSECTION IMPROVEMENT PROJECT, VILLAGE OF STBG FLEX 2023 0.169 CONINSP 0.169 HOMER, CORTLAND COUNTY NFA 2023 0.042 CONINSP 0.042 302814 STBG FLEX 2023 1.695 CONST 1.695 NFA 2023 0.424 CONST 0.424 STBG FLEX 2020 0.089 PRELDES 0.089 NFA 2020 0.022 PRELDES 0.022 STBG FLEX 2020 0.008 ROWINCD 0.008 NFA 2020 0.002 ROWINCD 0.002 STBG FLEX 2020 0.089 SCOPING 0.089 NFA 2020 0.022 SCOPING 0.022 STBG FLEX 2021 0.089 DETLDES 0.089 NFA 2021 0.022 DETLDES 0.022 STBG FLEX 2021 0.035 ROWACQU 0.035 NFA 2021 0.009 ROWACQU 0.009 AQC:N/A CORTLAND TPC : $3.3-$5.6 M TOTAL 4YR COST : 2.717 0.232 0.155 0.000 2.330 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 3 of 63 for REGION 03 AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars NYSDOT RT 281 OVER I-81 BRIDGE DECK REPLACEMENT, BIN 1031450, TOWN OF NFA 2021 0.250 PRELDES 0.250 PREBLE, CORTLAND COUNTY NFA 2021 0.250 SCOPING 0.250 302815 NFA 2022 0.300 DETLDES 0.300 STBG FLEX 2022 0.320 CONINSP 0.320 NFA 2022 0.080 CONINSP 0.080 STBG FLEX 2022 3.200 CONST 3.200 NFA 2022 0.800 CONST 0.800 AQC:N/A CORTLAND TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.200 0.000 0.500 4.700 0.000 NYSDOT NYSDOT HSIP 16-20, INTERSECTION IMPROVEMENTS TO RT 31 AT HSIP 2021 0.120 DETLDES 0.120 THOMPSON RD & RT 31 AT SOUTH BAY RD, CONSTRUCTION OF LEFT HSIP 2021 0.270 ROWACQU 0.270 303771 TURN LANES FOR ALL RT 31 APPROACHES TO THESE TWO HSIP 2022 0.370 CONINSP 0.370 INTERSECTIONS OR THE POSSIBLE CONSTRUCTION OF A ROUNDABOUT, NFA 2022 0.005 CONINSP 0.005 HSIP 2022 3.695 CONST 3.695 FOR SAFETY AND OPERATIONAL BENEFITS TO REDUCE THE NUMBER NFA 2022 0.055 CONST 0.055 AND SEVERITY OF CRASHES, RT 31 AT THOMPSON RD & RT 31 AT SOUTH BAY RD, TN OF CICERO, ONONDAGA CO AQC:N/A ONONDAGA TPC : $4.6-$7.5 M TOTAL 4YR COST : 4.515 0.000 0.390 4.125 0.000 NYSDOT RECONSTRUCTION, PAVEMENT, DUE TO EXCESSIVE WEAR, RT 31, CNS STBG FLEX 2021 0.089 DETLDES 0.089 HIGH SCHOOL TO S BAY RD, TN OF CICERO, ONONDAGA CO NFA 2021 0.022 DETLDES 0.022 303774 STBG FLEX 2022 0.200 CONINSP 0.200 NFA 2022 0.050 CONINSP 0.050 STBG FLEX 2022 2.000 CONST 2.000 NFA 2022 0.500 CONST 0.500 STBG FLEX 2020 0.083 PRELDES 0.083 NFA 2020 0.021 PRELDES 0.021 STBG FLEX 2020 0.080 SCOPING 0.080 NFA 2020 0.020 SCOPING 0.020 AQC:N/A ONONDAGA TPC : $2-$4 M TOTAL 4YR COST : 3.065 0.204 0.111 2.750 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 4 of 63 for REGION 03 AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars NYSDOT SAFETY IMPROVEMENTS; INTERSECTION; RT 11 & RT 49; VIL OF HSIP 2020 0.251 PRELDES 0.251 CENTRAL SQUARE, TOWN OF HASTINGS, OSWEGO CO NFA 2020 0.028 PRELDES 0.028 304364 HSIP 2020 0.046 ROWINCD 0.046 NFA 2020 0.005 ROWINCD 0.005 HSIP 2020 0.251 SCOPING 0.251 NFA 2020 0.028 SCOPING 0.028 HSIP 2022 0.518 DETLDES 0.518 NFA 2022 0.058 DETLDES 0.058 HSIP 2022 0.239 ROWACQU 0.239 NFA 2022 0.027 ROWACQU 0.027 HSIP 2023 0.159 CONINSP 0.159 NFA 2023 0.018 CONINSP 0.018 HSIP 2023 1.571 CONST 1.571 NFA 2023 0.175 CONST 0.175 STBG FLEX 2023 0.140 CONINSP 0.140 NFA 2023 0.035 CONINSP 0.035 STBG FLEX 2023 1.383 CONST 1.383 NFA 2023 0.346 CONST 0.346 STBG LG URB 2023 0.017 CONINSP 0.017 NFA 2023 0.004 CONINSP 0.004 STBG LG URB 2023 0.169 CONST 0.169 NFA 2023 0.042 CONST 0.042 AQC:N/A ONONDAGA TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.510 0.609 0.000 0.842 4.059 NYSDOT ADA SIDEWALK PROJECT, IMPROVEMENTS TO SIDEWALK & STBG FLEX 2022 0.060 CONINSP 0.060 PEDESTRIAN FACILITIES, TO IMPROVE PEDESTRIAN MOBILITY, RT 11 , NFA 2022 0.015 CONINSP 0.015 304368 MELROSE DR TO HIGHLAND AVE & CAUGHDENOY RD TO FACTORY ST, STBG FLEX 2022 0.600 CONST 0.600 VIL OF N SYRACUSE, TN OF CICERO, ONONDAGA CO NFA 2022 0.150 CONST 0.150 NFA 2020 0.001 DETLDES 0.001 STBG FLEX 2021 0.435 DETLDES 0.435 NFA 2021 0.109 DETLDES 0.109 STBG FLEX 2021 0.567 ROWACQU 0.567 NFA 2021 0.142 ROWACQU 0.142 AQC:N/A ONONDAGA TPC : $2-$4 M TOTAL 4YR COST : 2.079 0.001 1.253 0.825 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 5 of 63 for REGION 03 AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars NYSDOT SAFETY IMPROVEMENT: RAMP REALIGNMENT TO ADDRESS SAFETY HSIP 2020 0.045 CONINSP 0.045 ISSUES SUCH AS REAR END CRASH PATTERNS, I-481 AT KIRKVILLE RD NFA 2020 0.005 CONINSP 0.005 305626 INTERCHANGE, TN OF DEWITT, ONONDAGA CO, THE STATE CERTIFIES HSIP 2020 0.450 CONST 0.450 THIS PROJECT IS APPROVED BY THE REGIONAL SAFETY EVALUATION NFA 2020 0.050 CONST 0.050 ENGINEER AND SIGNED OFF BY THE REGIONAL TRAFFIC ENGINEER.
Recommended publications
  • WSDOT Design Manual July 2017 Revision
    Publications Transmittal Transmittal Number Date PT 17-039 July 2017 Publication Distribution To: Design Manual Holders Publication Title Publication Number Design Manual – July 2017 M 22-01.14 Originating Organization WSDOT Development Division, Design Office – Design Policy, Standards, and Safety Research Section Remarks and Instructions What’s changed in the Design Manual for July 2017? See the summary of revisions beginning on Page 3. How do you stay connected to current design policy? It’s the designer’s responsibility to apply current design policy when developing transportation projects at WSDOT. The best way to know what’s current is to reference the manual online. Access the current electronic WSDOT Design Manual, the latest revision package, and individual chapters at: www.wsdot.wa.gov/publications/manuals/m22-01.htm We’re ready to help. If you have comments or questions about the Design Manual, please don’t hesitate to contact us. Area of Practice Your Contacts Geometric Design, Roadside Safety Jeff Petterson 360-705-7246 [email protected] and Traffic Barriers Kurt Sielbach 360/705-7937 [email protected] Chris Schroedel 360-705-7299 [email protected] General Guidance and Support John Donahue 360-705-7952 [email protected] To get the latest information on individual WSDOT publications: Sign up for email updates at: www.wsdot.wa.gov/publications/manuals/ HQ Design Office Signature Phone Number /s/ Jeff Carpenter 360-705-7821 Page 1 of 8 Remove/Insert instructions for those who maintain a printed manual NOTE: Also
    [Show full text]
  • D) Pavement Milling Machine
    COUNCIL WORKSHOP ITEM ITEM: Recommendation to Purchase a Pavement Milling Machine DATE: 6/5/01 PREPARED BY: Jack J. Bajor, Jr., Director of Public Works Rick Ebel, Pavement Division Manager PURPOSE: Street Pavement Maintenance BID AMOUNT: $ 184,700.00 BUDGET AMOUNT: $ 190,000.00 DISCUSSION: Beginning in the mid-nineties the Public Works Department began discussions on methods of improving the effectiveness and efficiency of our in-house patching and pavement work. Discussions quickly turned to milling or grinding pavement patch areas to a depth of two (2) inches, rather than doing full depth patches of the pavement surface. Pavement thicknesses in Downers Grove are quite variable commonly ranging in depth from six (6) to ten (10) inches. So for a pavement patch of a 10’ X 20’ area, we are removing and replacing approximately 100 to 167 cu.ft. of material with each full depth patch, while the grinder would remove only 33.3 cu.ft. of material for the same 10’ X 20’ patch. Table 1 compares the material volume differences of three patch sizes for full depth patching verses milling. Obviously, if we are taking a greater volume of material out, there is a greater need for the re-installation of new asphalt. On average a three to one reduction can be realized by moving from full depth patching to milling. Additionally, the process to remove a full depth patch is much more labor intensive as the area is first saw cut, then broken out and finally loaded on to a truck with a backhoe. A grinder can complete all three of these steps as it works, again in about a third of the time.
    [Show full text]
  • Pavement Milling Notice
    T O W N o f B R O O K L I N E Massachusetts Department of Public Works Engineering & Transportation Division July 15, 2015 Andrew M. Pappastergion Commissioner Peter M. Ditto, PE Director PAVEMENT MILLING NOTICE Dear Abutting Residents Starting on THURS, JULY 16, and continuing through FRI, JULY 17, weather permitting, the Contractor, Newport Construction Corp, will be milling (grinding) and removing the top several inches of roadway surface on FISHER AVENUE BETWEEN CLINTON ROAD AND BOYLSTON STREET. Roadway grinding operations commence at 7:00 A.M. and will run through 5:00 P.M. daily. This work will be done in four phases as follows: (1) Phase I – Clinton Road to Buckminster Road (Thursday July 16, 2015) (2) Phase II – Buckminster Road to Holland Road (Thursday July 16, 2015) (3) Phase III – Holland Road to Leicester Street (Friday July 17, 2015) (4) Phase IV – Leicester Street to Boylston Street (Friday July 17, 2015) In order to facilitate this activity, there will be roadway closures along Fishers Avenue, and traffic will have to be detoured around the construction activity. A detour plan can be found on the Town’s website at http://www.brooklinema.gov/Fisher-Avenue-Reconstruction/ Residents and Institutions with driveway or private way access on Fisher Avenue should plan to remove their vehicles prior to 7:00 A.M. on work days, as access will be restricted until approximately 5:00 P.M. Please park on an adjacent side street should you anticipate using your vehicle during the work day. Curbside parking will be prohibited within active work zones along Fisher Avenue, but re- open end of work day.
    [Show full text]
  • Construction Notice
    CURRENT RESIDENT RE: 2021 Street Resurfacing Program-Construction The City of Batavia is pleased to inform you that the street adjacent to your home has been included for resurfacing this year. See the attached exhibit for the limits of the proposed work. The work will generally include curb repairs, sidewalk repairs, utility repairs/adjustments and a new asphalt overlay. Below are some important details regarding this project. CONTRACTOR: The contract has been awarded to Builders Paving Company of Hillside, IL. START DATE: The construction work is tentatively scheduled to begin during the week of August 14. Please visit the Sidewalk and Street Improvements page on the City’s website at http://www.cityofbatavia.net/625/Sidewalk-and-Street-Improvements for updates on the start dates and construction updates for each street. Look under the Street Resurfacing Program. COMPLETION DATE: The completion date for this project is October 1, 2020. The completion date schedule may be adjusted as weather and unforeseen conditions warrant. IMPROVEMENTS & PROCESS: 1. Signage and Saw Cutting: - The first phase of the roadway work will involve the installation of traffic control signs and saw cutting of the concrete curb and sidewalk to be replaced. 2. Curb & Sidewalk Replacement: The next step will involve the removal and replacement of the concrete curb and sidewalk areas that need repairs. Once new materials are replaced, there will be several days of cure time before the next stage of work will begin. 3. Pavement Milling and resurfacing: This operation consists of milling off the top asphalt surface to remove the deteriorating layer.
    [Show full text]
  • Pavement Design Manual
    PAVEMENT DESIGN MANUAL November 2018 PREFACE The Montana Department of Transportation (MDT) Pavement Design Manual has been developed to provide discussion and fundamental principles on pavement design, detailed material information, procedures for designing pavement sections on the range of MDT roadways, and specification information. The Pavement Design Manual was developed by the MDT Surfacing Design Unit. Additional formatting and editorial updates were provided by the transportation engineering consulting firm of Kittelson & Associates, Inc. The Pavement Design Manual Review Committee consisted of: Jim Davies, P.E. MDT Pavement Analysis Engineer Darin Reynolds, P.E. VA Engineer Miles Yerger, P.E. Surfacing Design Unit Supervisor Mark Studt, P.E. MDT – Consultant Design Andy Daleiden, P.E. Kittelson & Associates, Inc. Julia Knudsen, P.E. Kittelson & Associates, Inc. Katie Ayer Kittelson & Associates, Inc. Erma Halili Kittelson & Associates, Inc. Table of Contents CHAPTER 1: Introduction CHAPTER 2: Pavement Design Process CHAPTER 3: Pavement Typical Sections CHAPTER 4: Flexible Pavement Design Overview CHAPTER 5: Flexible Pavement Design Method CHAPTER 6: Flexible Pavement Rehabilitation CHAPTER 7: Engineered Overlays CHAPTER 8: Gravel Road Design CHAPTER 9: New and Reconstructed Rigid Pavement Design CHAPTER 10: Rigid Pavement Rehabilitation CHAPTER 11: Pavement Preservation & Scheduled Treatments CHAPTER 12: Bridge End Pavement CHAPTER 13: Traffic Estimation – Special Cases CHAPTER 14: Tools for Pavement Analysis CHAPTER 15: Pavement
    [Show full text]
  • Best Practices for RAP and RAS Management
    Quality Improvement Series 129 Best Practices for RAP and RAS Management This publication is provided by the Members of the National Asphalt Pavement Association (NAPA), who are the nation’s leading asphalt producer/contractor firms and those furnishing equipment and services for the construction of quality asphalt pavements. NAPA Members are dedicated to providing the highest quality asphalt paving materials and pavements, and to increasing the knowledge of quality asphalt pavement design, construction, maintenance and rehabilitation. NAPA also strongly supports the development and dissemination of research, engineering and educational information that meets America’s needs in transportation, recreational, and environmental pavements. NAPA Building 5100 Forbes Blvd. Lanham, MD 20706-4407 Tel: 301-731-4748 Fax: 301-731-4621 Toll free 1-888-468-6499 www.AsphaltPavement.org [email protected] Mike Acott President T. Carter Ross Vice President for Communications This publication is designed to provide information of interest to NAPA Members and is not to be considered a publication of standards or regulations. The views of the authors expressed herein do not necessarily reflect the decision making process of NAPA with regard to advice or opinions on the merits of certain processes, procedures, or equipment. COPYRIGHT NOTICE Publications produced and published by the National Asphalt Pavement Association (NAPA) are copy- righted by the Association and may not be republished or copied (including mechanical reproductions) without written consent. To obtain this consent contact the Association at the address given above. © 2015 National Asphalt Pavement Association Quality Improvement Series 129 Printed 12/15 Quality Improvement Series 129 Best Practices for RAP and RAS Management By Randy C.
    [Show full text]
  • Performance of Reclaimed Asphalt Pavement on Unpaved Roads (MPC-13-251)
    Performance of Reclaimed Asphalt Pavement on Unpaved Roads Scott Koch George Huntington, P.E. Khaled Ksaibati, PhD., P.E. Wyoming Technology Transfer Center University of Wyoming Laramie, Wyoming May 2013 Acknowledgments The authors would like to thank all the employees of Laramie, Johnson and Sweetwater counties who assisted with this project. Without their expertise, assistance, and cooperation, this study could not have been conducted. Thanks to the Desert Mountain Corporation for their expertise and assistance on the Sweetwater County sections. We would also like to thank the Wyoming Department of Transportation for their support of this project. Finally, we would like to thank Mary Harman, Bart Evans, Josh Jones, Burt Andreen, Jonathan Zumwalt, and Harry Rocheville for their work on this project. Disclaimer The contents of this report reflect the work of the authors, who are responsible for the facts and the accuracy of the information presented. Mention of specific products is for informational purposes only and does not constitute any endorsement. This document does not constitute any policy of or endorsement by the Mountain-Plains Consortium or the University of Wyoming.This document is disseminated under the sponsorship of the Mountain-Plains Consortium in the interest of information exchange. The U.S. Government assumes no liability for the contents or use thereof. North Dakota State University does not discriminate on the basis of age, color, disability, gender expression/identity, genetic information, marital status, national origin, public assistance status, sex, sexual orientation, status as a U.S. veteran., race or religion. Direct inquiries to the Vice President for Equity, Diversity and Global Outreach, 205 Old Main, (701) 231-7708.
    [Show full text]
  • Proposed Capital Improvement Program
    PROPOSED CAPITAL IMPROVEMENT PROGRAM SOUTH JERSEY TRANSPORTATION AUTHORITY APRIL 2020 SOUTH JERSEY TRANSPORTATION AUTHORITY PROPOSED CAPITAL IMROVEMENT PROGRAM 11 8 1 7 2 12 10 9 3 4 5 1. AC Expressway Resurfacing 2. Interchange Lighting Improvements 3. Pleasantville Maintenance Garage Replacement 4. AC Expressway Connector, Rt 30, Rt 87, Rt 187, AC Corridor Resurfacing 5. AC Expressway Connector & Tunnel LED Lighting Upgrades 6. AC Expressway Fleet Replacement 7. All Electronic Tolling & ITS Upgrades 8. AC Expressway Third Lane Widening 9. AC Expressway Interchange 7 Improvements 10. AC Expressway / ACY Direct Connector 11. Glassboro-Camden Light Rail Line 12. Upgrades to Atlantic City Rail Line Note: Project schedules detailed herein do not begin concurrently APRIL 2020 with the adoption of this Capital Plan PAGE 1 OF 13 ATLANTIC CITY EXPRESSWAY RESURFACING SYSTEM-WIDE ATLANTIC CITY EXPRESSWAY RESURFACING PROJECT DESCRIPTION LOCATION System-wide This project involves supplemental pavement milling and resurfacing to maintain state of good repair for the Atlantic City Expressway mainline TOTAL PROJECT COST in 2020. It is also intended that beginning in 2021 the Authority’s annual $10 Million resurfacing program will receive a bump over current funding which has averaged $1.5M to $2.5M a year over the last five years. SCHEDULE Planning & Design: POTENTIAL ENVIRONMENTAL / AGENCY COORDINATION 3 months None Anticipated Construction: 3 months POTENTIAL RIGHT-OF-WAY IMPACTS None Anticipated BENEFITS Safety State of Good Repair UTILITIES Customer Satisfaction None Anticipated STATUS To be programmed APRIL 2020 PAGE 2 OF 13 INTERCHANGE LIGHTING IMPROVEMENTS SYSTEM-WIDE INTERCHANGE LIGHTING IMPROVEMENTS PROJECT DESCRIPTION LOCATION Atlantic County This project involves modernization of interchange ramp lighting at Interchanges 5, 7, 12, 14, 28, and 31 on the Expressway.
    [Show full text]
  • Bid Documents; Paving Project; Bid 13-690T
    SPECIFICATIONS AND SPECIMEN CONTRACT DOCUMENTS FOR: 2012 PAVEMENT PRESERVATION AND REPAIRS TOWN OF WESTPORT PROJECT #2012-03 BID NO. 13-690T DEPARTMENT OF PUBLIC WORKS GORDON JOSELOFF FIRST SELECTMAN STEPHEN J. EDWARDS DIRECTOR OF PUBLIC WORKS PETER A. RATKIEWICH TOWN ENGINEER DATE ISSUED CONTRACTOR June 2012 Engineering Division THIS DOCUMENT IS TO REMAIN 110 Myrtle Avenue, Room #210 INTACT NO ADDITIONS OR DELETIONS Tel: (203)-341-1120 ARE TO BE MADE. IRS ID #06-6002128 TOWN OF WESTPORT TOWN OF WESTPORT, CONNECTICUT DEPARTMENT OF PUBLIC WORKS 2012 PAVEMENT PRESERVATION AND REPAIRS WESTPORT PROJECT #2012-03 TABLE OF CONTENTS SECTION 1 - TOWN OF WESTPORT BIDDING AND CONTRACT REQUIREMENTS 00100 - INVITATION TO BID 00200 - INFORMATION FOR BIDDERS 00300 - PROPOSAL 00401 - BID BOND 00402 - QUALIFICATIONS OF BIDDER 00403 - NON-COLLUSIVE BID STATEMENT 00404 - AGREEMENT 00405 - PAYMENT BOND 00406 - PERFORMANCE BOND 00500 - GENERAL CONDITIONS 00700 - SPECIAL CONDITIONS 01010 - INTRODUCTION TO TECHNICAL SPECIFICATIONS 01530 – DUST CONTROL 01600 - RESTORATION 01800 – PAVEMENT PRESERVATION LIST SECTION 2 – ConnDOT-BASED NOTICES, SPECIFICATIONS, AND SPECIAL PROVISIONS A1-NOTICE TO CONTRACTOR - UTILITY CONTACT LIST A2-NOTICE TO CONTRACTOR - MIX DESIGNATION EQUIVALENCY A3-NOTICE TO CONTRACTOR - SUPERPAVE DESIGN LEVEL INFORMATION A4-NOTICE TO CONTRACTOR - NCHRP 350 REQ. FOR WORK ZONE TRAFFIC CONTROL DEVICES B1-SECTION 1.08T - PROSECUTION AND PROGRESS C1-SECTION 9.75T – MOBILIZATION D1-ITEM #0980001A-T – CONSTRUCTION STAKING E1-SECTION 9.71T – MAINTENANCE
    [Show full text]
  • Economies, Efficiencies & Innovations Report
    Economies, Efficiencies & Innovations Reported Savings: 2010 to 2017 Michigan Department of Transportation Estimated Annual Savings for Estimated Annual Savings to Year State Others Cumulative 2010 to Present $675,342,570 $27,217,088 2010 $87,057,957 Not counted 2011 $71,357,957 Not counted 2012 $86,726,290 Not counted 2013 $80,520,920 $13,294,988 2014 $166,974,066 $10,698,988 2015 $108,433,877 $1,865,702 2016 $53,984,392 $1,328,710 2017 $20,287,111 $28,700 2018 $18,285,288 $28,700 2019 $18,259,788 $24,000 2020 $18,259,788 $24,000 Data last updated February, 2018 The Economies, Efficiencies & Innovations Report is produced from data managed through MDOT’s Innovation Central application. Innovation Central is an MDOT tool developed to enable employees to self-report their innovation ideas in a shared database, to be implemented with approval by management, eliminating unnecessary bureaucracy, saving time and money, and improving customer service. This allows MDOT management to promote a culture of innovation and engage employees in the organization’s success. The new process shifts the focus of the report from simply calculating cost saving innovations to also include innovations that improve quality or service without calculable cost savings. This report reflects implemented actions since CY2010. To prevent overstating budgetary savings, actions for which good estimates of dollar savings can be generated will reflect those savings. Other actions, which generate improvement, but where accurate dollar savings either cannot be calculated or where the savings result in a redirection of the resources, will not show a dollar value.
    [Show full text]
  • Innovative Materials and Equipment for Pavement Surface Repairs
    SHRP-M/UFR-91-505 Innovative Materials and Equipments for Pavement Surface Repairs Volume Ih Synthesis of Operational Deficiencies of Equipment Used for Pavement Surface Repairs Jim A. Crovetti Michael I. Darter Kurt D. Johnson Kelly L. Smith Mike C. Belangie ERES Consultants, Inc. Savoy, Illinois Strategic Highway Research Program National Research Council Washington, D.C. 1991 SHRP-M/UFR-91-505 Contract H-105 Product No.: 3003 Program Manager: Don M. Harriott Project Manager: Shashikant Shah Production Editor: Marsha Barrett Program Area Secretary: Carina Hreib February 1991 Reprint March 1994 key words: asphalt pavement concrete pavement crack sealing data base joint sealing maintenance materials pavement maintenance pavement restoration pavement rehabilitation performance pothole repair spall repair Strategic Highway Research Program National Academy of Sciences 2101 Constitution Avenue N.W. Washington, DC 20418 (202) 334-3774 The publication of this report does not necessarily indicate approval or endorsement of the findings, opinions, conclusions, or recommendations either inferred or specifically expressed herein by the National Academy of Sciences, the United States Government, or the American Association of State Highway and Transportation Officials or its member states. © 1994 National Academy of Sciences 50/NAP/394 Acknowledgments The research described herein was supported by the Strategic Highway Research Program (SHRP). SHRP is a unit of the National Research Council that was authorized by section 128 of the Surface Transportation and Uniform Relocation Assistance Act of 1987. Many transportation agencies have given their support to this project. SHRP State Coordinators, as well as man), other engineers, have contributed by completing and returning lengthy questionnaires; the same assistance has been provided by the Canadian Provinces, several foreign countries, and numerous other transportation agencies.
    [Show full text]
  • 2019 Standard Spec with Supplemental Spec July 2019
    STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION EDITION OF 2019 Approved for June 1, 2019 Andy Barber, P.E. State Highway Engineer KYTC Mission Statement: To provide a safe, efficient, environmentally sound and fiscally responsible transportation system that delivers economic opportunity and enhances the quality of life in Kentucky. Copies of this publication may be obtained from: Transportation Cabinet Office of Human Resource Management Organizational Management Branch 200 Mero Street, 6th Floor West Frankfort, KY 40622 (502) 564-4610 i TABLE OF CONTENTS DIVISION 100 - GENERAL PROVISIONS 101 Definitions and Terms 102 Bidding Requirements and Conditions 103 Award and Execution of Contract 104 Scope of Work 105 Control of Work 106 Control of Materials 107 Legal Relations and Responsibility to Public 108 Prosecution and Progress 109 Measurement and Payment 110 Mobilization and Demobilization 111 Value Engineering Change Proposal 112 Maintenance and Control of Traffic During Construction 113 Quality Assurance Program DIVISION 200 - EARTHWORK 201 Staking 202 Clearing and Grubbing 203 Removal of Structures and Obstructions 204 Roadway and Drainage Excavation 205 Borrow and Excess Excavation Sites 206 Embankment 207 Subgrade 208 Chemically Stabilized Roadbed 209 Ditching and Shouldering 210 Embankment Drainage Blankets 211 Final Dressing 212 Erosion Control 213 Water Pollution Control 214 Geotextile Construction 215 Treatment of Open Sinkholes 216 Settlement Platforms DIVISION 300 - AGGREGATE BASE COURSES 301 Traffic-Bound Base 302
    [Show full text]