Performance of Reclaimed Asphalt Pavement on Unpaved Roads (MPC-13-251)

Total Page:16

File Type:pdf, Size:1020Kb

Performance of Reclaimed Asphalt Pavement on Unpaved Roads (MPC-13-251) Performance of Reclaimed Asphalt Pavement on Unpaved Roads Scott Koch George Huntington, P.E. Khaled Ksaibati, PhD., P.E. Wyoming Technology Transfer Center University of Wyoming Laramie, Wyoming May 2013 Acknowledgments The authors would like to thank all the employees of Laramie, Johnson and Sweetwater counties who assisted with this project. Without their expertise, assistance, and cooperation, this study could not have been conducted. Thanks to the Desert Mountain Corporation for their expertise and assistance on the Sweetwater County sections. We would also like to thank the Wyoming Department of Transportation for their support of this project. Finally, we would like to thank Mary Harman, Bart Evans, Josh Jones, Burt Andreen, Jonathan Zumwalt, and Harry Rocheville for their work on this project. Disclaimer The contents of this report reflect the work of the authors, who are responsible for the facts and the accuracy of the information presented. Mention of specific products is for informational purposes only and does not constitute any endorsement. This document does not constitute any policy of or endorsement by the Mountain-Plains Consortium or the University of Wyoming.This document is disseminated under the sponsorship of the Mountain-Plains Consortium in the interest of information exchange. The U.S. Government assumes no liability for the contents or use thereof. North Dakota State University does not discriminate on the basis of age, color, disability, gender expression/identity, genetic information, marital status, national origin, public assistance status, sex, sexual orientation, status as a U.S. veteran., race or religion. Direct inquiries to the Vice President for Equity, Diversity and Global Outreach, 205 Old Main, (701) 231-7708. TABLE OF CONTENTS 1. Introduction ........................................................................................................................... 1 1.1 Background ...................................................................................................................... 1 1.2 Problem Statement ........................................................................................................... 1 1.3 Research Objectives ......................................................................................................... 2 1.4 Report Organization ......................................................................................................... 3 2. Literature Review ................................................................................................................. 5 2.1 Asphalt Pavement Reclamation and Recycling ............................................................... 5 2.2 Obtaining Reclaimed Asphalt Pavement.......................................................................... 6 2.3 Uses of Reclaimed Asphalt Pavement ............................................................................. 6 2.3.1 In-Place Recycling .................................................................................................... 7 2.3.2 Hot Mix Asphalt and Reclaimed Asphalt Pavement (RAP) ..................................... 8 2.3.3 Cold Mix Asphalt (Central Processing Facility) ....................................................... 8 2.3.4 Full Depth Reclamation ............................................................................................ 8 2.3.5 Embankment or Fill .................................................................................................. 8 2.3.6 Mechanically Stabilized Earth Walls ........................................................................ 9 2.4 Economics of Reclaimed Asphalt Pavement (RAP) ........................................................ 9 2.4.1 RAP in Hot Mix Asphalt........................................................................................... 9 2.4.2 RAP in Road Base .................................................................................................. 12 2.5 Unpaved Roads .............................................................................................................. 12 2.5.1 Gravel Road Distresses ........................................................................................... 13 2.5.2 Dust Control ............................................................................................................ 16 2.5.3 Dust Collection and Measurement .......................................................................... 19 2.6 Literature Review Summary .......................................................................................... 20 3. Methodology ........................................................................................................................ 21 3.1 Test Section Descriptions ............................................................................................... 21 3.1.1 Site Layouts ............................................................................................................ 23 3.1.2 Traffic ..................................................................................................................... 25 3.1.3 Surfacing Materials: Aggregate, RAP and Cement-Treated Base (CTB) ............. 25 3.1.4 Dust Suppression Agents ........................................................................................ 33 3.2 Testing Methods ............................................................................................................. 34 3.2.1 Aggregate ................................................................................................................ 34 3.2.2 Weather ................................................................................................................... 34 3.2.3 Dust Assessment ..................................................................................................... 34 3.2.4 Roadway Condition Evaluations: URCI ................................................................ 37 3.3 Construction Methods .................................................................................................... 37 3.3.1 Laramie County: Blade Mixed............................................................................... 37 3.3.2 Johnson County: Stockpile Mixed ......................................................................... 40 3.3.3 Sweetwater County: Reclaimer Mixed .................................................................. 45 3.4 Summary of Methodologies ........................................................................................... 52 4. Results .................................................................................................................................. 53 4.1 Visual Dust Ratings vs Dustometer Measurements ....................................................... 53 4.2 Environmental Effects on Dust Measurements .............................................................. 56 4.2.1 Dust vs Age ............................................................................................................. 56 4.2.2 Dust vs Moisture Content ....................................................................................... 57 4.2.3 Dust vs Wind Speed ................................................................................................ 57 4.3 Laramie County .............................................................................................................. 60 4.3.1 Materials Properties ................................................................................................ 60 4.3.2 Visual Observations ................................................................................................ 64 4.3.3 Unsurfaced Road Condition Index (URCI) ............................................................ 68 4.3.4 Dust Emissions........................................................................................................ 69 4.4 Johnson County .............................................................................................................. 72 4.4.1 Materials Properties ................................................................................................ 72 4.4.2 Visual Observations ................................................................................................ 74 4.4.3 Unsurfaced Road Condition Index.......................................................................... 77 4.4.4 Dust Emissions........................................................................................................ 77 4.5 Sweetwater County ........................................................................................................ 78 4.5.1 Materials Properties ................................................................................................ 78 4.5.2 Visual Observations ................................................................................................ 81 4.5.3 Unsurfaced Road Condition Index.......................................................................... 94 4.5.4 Dust Emissions........................................................................................................ 98 4.6 Summary of Results ..................................................................................................... 100 5. Economic Analyses............................................................................................................ 103 5.1 Study Section: Sweetwater County Road 23: Crooks Gap Road ...............................
Recommended publications
  • WSDOT Design Manual July 2017 Revision
    Publications Transmittal Transmittal Number Date PT 17-039 July 2017 Publication Distribution To: Design Manual Holders Publication Title Publication Number Design Manual – July 2017 M 22-01.14 Originating Organization WSDOT Development Division, Design Office – Design Policy, Standards, and Safety Research Section Remarks and Instructions What’s changed in the Design Manual for July 2017? See the summary of revisions beginning on Page 3. How do you stay connected to current design policy? It’s the designer’s responsibility to apply current design policy when developing transportation projects at WSDOT. The best way to know what’s current is to reference the manual online. Access the current electronic WSDOT Design Manual, the latest revision package, and individual chapters at: www.wsdot.wa.gov/publications/manuals/m22-01.htm We’re ready to help. If you have comments or questions about the Design Manual, please don’t hesitate to contact us. Area of Practice Your Contacts Geometric Design, Roadside Safety Jeff Petterson 360-705-7246 [email protected] and Traffic Barriers Kurt Sielbach 360/705-7937 [email protected] Chris Schroedel 360-705-7299 [email protected] General Guidance and Support John Donahue 360-705-7952 [email protected] To get the latest information on individual WSDOT publications: Sign up for email updates at: www.wsdot.wa.gov/publications/manuals/ HQ Design Office Signature Phone Number /s/ Jeff Carpenter 360-705-7821 Page 1 of 8 Remove/Insert instructions for those who maintain a printed manual NOTE: Also
    [Show full text]
  • PASER Manual Asphalt Roads
    Pavement Surface Evaluation and Rating PASER ManualAsphalt Roads RATING 10 RATING 7 RATING 4 RATING PASERAsphalt Roads 1 Contents Transportation Pavement Surface Evaluation and Rating (PASER) Manuals Asphalt PASER Manual, 2002, 28 pp. Introduction 2 Information Center Brick and Block PASER Manual, 2001, 8 pp. Asphalt pavement distress 3 Concrete PASER Manual, 2002, 28 pp. Publications Evaluation 4 Gravel PASER Manual, 2002, 20 pp. Surface defects 4 Sealcoat PASER Manual, 2000, 16 pp. Surface deformation 5 Unimproved Roads PASER Manual, 2001, 12 pp. Cracking 7 Drainage Manual Patches and potholes 12 Local Road Assessment and Improvement, 2000, 16 pp. Rating pavement surface condition 14 SAFER Manual Rating system 15 Safety Evaluation for Roadways, 1996, 40 pp. Rating 10 & 9 – Excellent 16 Flagger’s Handbook (pocket-sized guide), 1998, 22 pp. Rating 8 – Very Good 17 Work Zone Safety, Guidelines for Construction, Maintenance, Rating 7 – Good 18 and Utility Operations, (pocket-sized guide), 1999, 55 pp. Rating 6 – Good 19 Wisconsin Transportation Bulletins Rating 5 – Fair 20 #1 Understanding and Using Asphalt Rating 4 – Fair 21 #2 How Vehicle Loads Affect Pavement Performance Rating 3 – Poor 22 #3 LCC—Life Cycle Cost Analysis Rating 2 – Very Poor 23 #4 Road Drainage Rating 1 – Failed 25 #5 Gravel Roads Practical advice on rating roads 26 #6 Using Salt and Sand for Winter Road Maintenance #7 Signing for Local Roads #8 Using Weight Limits to Protect Local Roads #9 Pavement Markings #10 Seal Coating and Other Asphalt Surface Treatments #11 Compaction Improves Pavement Performance #12 Roadway Safety and Guardrail #13 Dust Control on Unpaved Roads #14 Mailbox Safety #15 Culverts-Proper Use and Installation This manual is intended to assist local officials in understanding and #16 Geotextiles in Road Construction/Maintenance and Erosion Control rating the surface condition of asphalt pavement.
    [Show full text]
  • D) Pavement Milling Machine
    COUNCIL WORKSHOP ITEM ITEM: Recommendation to Purchase a Pavement Milling Machine DATE: 6/5/01 PREPARED BY: Jack J. Bajor, Jr., Director of Public Works Rick Ebel, Pavement Division Manager PURPOSE: Street Pavement Maintenance BID AMOUNT: $ 184,700.00 BUDGET AMOUNT: $ 190,000.00 DISCUSSION: Beginning in the mid-nineties the Public Works Department began discussions on methods of improving the effectiveness and efficiency of our in-house patching and pavement work. Discussions quickly turned to milling or grinding pavement patch areas to a depth of two (2) inches, rather than doing full depth patches of the pavement surface. Pavement thicknesses in Downers Grove are quite variable commonly ranging in depth from six (6) to ten (10) inches. So for a pavement patch of a 10’ X 20’ area, we are removing and replacing approximately 100 to 167 cu.ft. of material with each full depth patch, while the grinder would remove only 33.3 cu.ft. of material for the same 10’ X 20’ patch. Table 1 compares the material volume differences of three patch sizes for full depth patching verses milling. Obviously, if we are taking a greater volume of material out, there is a greater need for the re-installation of new asphalt. On average a three to one reduction can be realized by moving from full depth patching to milling. Additionally, the process to remove a full depth patch is much more labor intensive as the area is first saw cut, then broken out and finally loaded on to a truck with a backhoe. A grinder can complete all three of these steps as it works, again in about a third of the time.
    [Show full text]
  • Experimental Study on the Dynamics of Washboard Road on Various Surfaces
    Experimental Study on the Dynamics of Washboard Road on Various Surfaces Teeranai SRIMAHACHOTA Candidate for the Degree of Master’s Degree Supervisor: Prof. Shunji KANIE Division of Engineering and Policy for Sustainable Environment Introduction Washboarding is the spontaneous formation of transverse ripple on dirt road. It is usually found on unpaved heavy- traffic road under dry weather condition. Driving over washboard road may increase risk of traffic accident since ripples reduce the contact area of the wheel to the road. Mitigating washboard road has long been a challenge for the road maintenance [1]. In addition, spontaneous formation of ripple pattern similar to washboarding can be found on other physical system; for examples, rail corrugation [2, 3], sand dune [4], lubricated disks [5], and periodic ripples on snow covered road [6]. The mechanism of washboarding was first studied in 1962 Fig. 1. Schematic illustration of the experimental apparatus. by Mather [7], and he concluded that it caused by the (a) top view of the self-rotating track showing several ripples bouncing motion of the wheel excided by random formed on the track. (b) diagram of the seesaw-shaped perturbation on road surface. Recent studies have shown that oscillator. washboard road can be formed using rolling wheel [8] and inclined plowed dragged on a granular surface [9, 10]. measure original height of the surface. Then we place the Washboarding can be described by theoretical models which oscillator to touch gently on the flat surface. The oscillator is determine the effect of lift and drag forces to the time in the balance of force so that almost no compression force variation of surface geometry.
    [Show full text]
  • The Road Inventory of Mackay Island National Wildlife Refuge Knotts Island, NC
    The Road Inventory of Mackay Island National Wildlife Refuge Knotts Island, NC Prepared By: Federal Highway Administration Central Federal Lands Highway Division October, 2010 Report Generated: 10/05/2010 TABLE OF CONTENTS SECTION PAGE I. INTRODUCTION 1 - 1 II. SUMMARY INFORMATION Summaries by Condition, Surface Type and Functional Class 2 - 1 III. REFUGE ROUTE LOCATION MAPS 3 - 1 IV. ROUTE IDENTIFICATION LIST 4 - 1 V. ROUTE CONDITION RATING SHEETS 5 - 1 VI. PARKING LOT CONDITION RATING SHEETS 6 - 1 VII. BRIDGE INVENTORY INFORMATION 7 - 1 VIII. PHOTOGRAPHIC SHEETS 8 - 1 IX. ACCIDENT SUMMARY 9 - 1 APPENDIX Funcitonal Classification Table i Description of Rating System ii INTRODUCTION The Transportation Equity Act for the 21st Century (Public Law 105-178) created the Refuge Roads Program. Refuge roads are those public roads that provide access to or within a unit of the National Wildlife Refuge System and for which title and maintenance responsibility is vested in the United States Government. Funds from the Highway Trust Fund are available for refuge roads and can be used by the station to pay the cost of: (a) Maintenance and improvements of refuge roads. (b) Maintenance and improvements of: (1) Adjacent vehicle parking areas (2) Provision for pedestrians and bicycles and (3) Construction and reconstruction of roadside rest areas that are located in or adjacent to wildlife refuges (c) Administrative costs associated with such maintenance and improvements. The funds available for refuge roads are to be disbursed based on the relative needs of the various refuges in the National Wildlife Refuge System, and taking into consideration: (a) The comprehensive conservation plan for each refuge; (b) The need for access as identified through land use planning; and (c) The impact of land use planning on existing transportation facilities.
    [Show full text]
  • Table of Contents INTRODUCTION City of Lubbock Street Department
    TABLE OF CONTENTS TABLE OF CONTENTS Introduction • Brief Summary of the Pavement Preservation Strategy and Assessment of Current Conditions Pavement Preservation Overview • What is Pavement Preservation? iVIaintenance Strategies and Practices • strategies for Asphalt Paving • Strategies for Concrete Paving • Strategies for Brick Paving Test Sections of Streets • List of Test Sections • Test Sections Evaluations PAVER • Overview of MicroPAVER • Sample Inspections Sheets • Sample Report Sheets Pavement Distresses • Paved Asphalt Distresses • Paved Concrete Distresses • Paved Brick Distresses Paver Aids in Implementing GASB 34 • PAVER Aids in Implementing GASB 34 • Current Estimated Value of City of Lubbock Streets • Current Estimated Value of City of Lubbock Streets by Council District • Articles briefly explaining GASB 34 Glossary • Pavement Preservation Glossary of Terms Appendix • November 1983, APWA Reporter Article on PAVER • Asset Management and Innovative Finance Page 1 of 1 Pavement Preservation Strategies Table of Contents INTRODUCTION City of Lubbock street Department August 22, 2003 Brief Summary of the Pavement Preservation Strategy And Assessment of Current Conditions The City of Lubbock has over 2600 lane-miles of paved streets with a replacement value of approximately $250,000,000. Street Department is charged with the responsibility of effectively preserving this extensive portion of the City's infrastructure. Although the overall pavement preservation strategy has many aspects, the following is a brief summary of the typical scenario. A. History: The City of Lubbock since 1984 has been a subscriber to the American Public Works Association (APWA) PAVER Project. This computerized street maintenance program, as well as an associated Microsoft Access database program, provides such information on each block of paved street as; 1.
    [Show full text]
  • Pavement Milling Notice
    T O W N o f B R O O K L I N E Massachusetts Department of Public Works Engineering & Transportation Division July 15, 2015 Andrew M. Pappastergion Commissioner Peter M. Ditto, PE Director PAVEMENT MILLING NOTICE Dear Abutting Residents Starting on THURS, JULY 16, and continuing through FRI, JULY 17, weather permitting, the Contractor, Newport Construction Corp, will be milling (grinding) and removing the top several inches of roadway surface on FISHER AVENUE BETWEEN CLINTON ROAD AND BOYLSTON STREET. Roadway grinding operations commence at 7:00 A.M. and will run through 5:00 P.M. daily. This work will be done in four phases as follows: (1) Phase I – Clinton Road to Buckminster Road (Thursday July 16, 2015) (2) Phase II – Buckminster Road to Holland Road (Thursday July 16, 2015) (3) Phase III – Holland Road to Leicester Street (Friday July 17, 2015) (4) Phase IV – Leicester Street to Boylston Street (Friday July 17, 2015) In order to facilitate this activity, there will be roadway closures along Fishers Avenue, and traffic will have to be detoured around the construction activity. A detour plan can be found on the Town’s website at http://www.brooklinema.gov/Fisher-Avenue-Reconstruction/ Residents and Institutions with driveway or private way access on Fisher Avenue should plan to remove their vehicles prior to 7:00 A.M. on work days, as access will be restricted until approximately 5:00 P.M. Please park on an adjacent side street should you anticipate using your vehicle during the work day. Curbside parking will be prohibited within active work zones along Fisher Avenue, but re- open end of work day.
    [Show full text]
  • Preliminary Design Report
    Guemes Island Ferry Replacement Preliminary Design Report PREPARED FOR: BY: Jeffrey M. Rider, PE Skagit County Public Works PROJECT ENGINEER Mount Vernon, Washington CHECKED: William L. Moon III, PE PROJECT MANAGER APPROVED: Matthew S. Miller, PE PRINCIPAL-IN-CHARGE DOC: REV: FILE: DATE: 17097.02-053-02 - 17097.02 12 February 2021 References 1. Guemes Island Ferry Replacement, Concept Design Report, Glosten Inc., Report No. 17097- 053-01, Rev -, 11 December 2017. 2. Guemes Island Ferry Replacement, Vessel Capacity Study, Glosten Inc., Report No. 17097- 000-01, Rev -, 20 October 2017. 3. Guemes Island Ferry Replacement, Transportation System Assessment, Glosten Inc., Report No. 17097-000-02, Rev -, 14 December 2017. 4. Kristensen, H. O. H. "The manoeuvrability of double-ended ferries: design considerations, construction and service experience." Proceedings of the International Conference on Ship Motions & Manoeuvrability, RINA, London, UK, Paper: P1998-5 Proceedings. 1998. 5. Guemes Island Ferry Replacement, Preliminary Vessel Cost Estimate, Glosten Inc., Report No. 17097.02-043-03. 6. Guemes Island Ferry Replacement, Preliminary Vessel Cost Estimate, Glosten Inc., Report No. 17097.02-043-03. 7. Guemes Island Ferry Replacement, Preliminary Shoreside Cost Estimate, Glosten Inc., Report No. 17097.02-043-04. Summary This report describes the preliminary vessel design developed to replace the M/V Guemes, currently operating as a vehicle and passenger ferry between Anacortes and Guemes Island, Washington. The following drawings and reports
    [Show full text]
  • Guidelines for Mine Haul Road Design
    GGUUIIDDEELLIINNEESS FFOORR MMIINNEE HHAAUULL RROOAADD DDEESSIIGGNN Dwayne D. Tannant & Bruce Regensburg 2001 Guidelines for Mine Haul Road Design Table of Contents 1 SURVEY OF HAUL TRUCKS & ROADS FOR SURFACE MINES ............................... 1 1.1 Introduction ..................................................................................................................... 1 1.2 Haul Trucks and Construction/Maintenance Equipment ................................................. 1 1.3 Haul Road Length ............................................................................................................ 3 1.4 Haul Road Geometry ....................................................................................................... 4 1.5 Haul Road Construction Materials .................................................................................. 6 1.6 Symptoms and Causes of Haul Road Deterioration ........................................................ 6 1.7 Haul Road Maintenance .................................................................................................. 7 1.8 Evolution of Haul Road Design at Syncrude ................................................................... 8 1.8.1 Layer Thickness .................................................................................................................. 9 1.8.2 Haul Road Geometry .......................................................................................................... 9 1.8.3 Construction Techniques .................................................................................................
    [Show full text]
  • Construction Notice
    CURRENT RESIDENT RE: 2021 Street Resurfacing Program-Construction The City of Batavia is pleased to inform you that the street adjacent to your home has been included for resurfacing this year. See the attached exhibit for the limits of the proposed work. The work will generally include curb repairs, sidewalk repairs, utility repairs/adjustments and a new asphalt overlay. Below are some important details regarding this project. CONTRACTOR: The contract has been awarded to Builders Paving Company of Hillside, IL. START DATE: The construction work is tentatively scheduled to begin during the week of August 14. Please visit the Sidewalk and Street Improvements page on the City’s website at http://www.cityofbatavia.net/625/Sidewalk-and-Street-Improvements for updates on the start dates and construction updates for each street. Look under the Street Resurfacing Program. COMPLETION DATE: The completion date for this project is October 1, 2020. The completion date schedule may be adjusted as weather and unforeseen conditions warrant. IMPROVEMENTS & PROCESS: 1. Signage and Saw Cutting: - The first phase of the roadway work will involve the installation of traffic control signs and saw cutting of the concrete curb and sidewalk to be replaced. 2. Curb & Sidewalk Replacement: The next step will involve the removal and replacement of the concrete curb and sidewalk areas that need repairs. Once new materials are replaced, there will be several days of cure time before the next stage of work will begin. 3. Pavement Milling and resurfacing: This operation consists of milling off the top asphalt surface to remove the deteriorating layer.
    [Show full text]
  • Dry Kiln Operator's Manual
    United States Department of Agriculture Dry Kiln Forest Service Operator's Forest Products Laboratory Manual Madison, Wisconsin Agriculture Handbook No. 188 Dry Kiln Operator’s Manual Edited by William T. Simpson, Research Forest Products Technologist United States Department of Agriculture Forest Service Forest Products Laboratory 1 Madison, Wisconsin Revised August 1991 Agriculture Handbook 188 1The Forest Products Laboratory is maintained in cooperation with the University of Wisconsin. This publication reports research involving pesticides. It does not contain recommendations for their use, nor does it imply that the uses discussed here have been registered. All uses of pesticides must be registered by appropriate State and/or Federal agencies before they can be recommended. CAUTION, Pesticides can be injurious to humans, domestic animals, desirable plants, and fish or other wildlife-if they are not handled or applied properly. Use all pesticides selectively and carefully. Follow recommended practices for the disposal of surplus pesticides aand pesticide containers. Preface Acknowledgments The purpose of this manual is to describe both the ba- Many people helped in the revision. We visited many sic and practical aspects of kiln drying lumber. The mills to make sure we understood current and develop- manual is intended for several types of audiences. ing kiln-drying technology as practiced in industry, and First and foremost, it is a practical guide for the kiln we thank all the people who allowed us to visit. Pro- operator-a reference manual to turn to when questions fessor John L. Hill of the University of New Hampshire arise. It is also intended for mill managers, so that they provided the background for the section of chapter 6 can see the importance and complexity of lumber dry- on the statistical basis for kiln samples.
    [Show full text]
  • Residential Concrete Tips
    W hy C oncrete? Choosing concrete for driveways, sidewalks and patios enhances the appearance and value of your home and requires very little maintenance. The most common materials used in home exterior flatwork are concrete and asphalt. At first glance, they seem quite similar. Both materials appear to give a smooth, solid finish. The similarities end there. Concrete Asphalt Longer product lifecycle (30+ years) means fewer repairs Requires regular sealing to keep the pavement flexible, or replacement. increasing the overall cost of pavement ownership. Concrete is environmentally friendly. Its production and “Hot mix” asphalt production and placement requires tem- placement are not energy intensive. peratures that exceed 200 – 250 degrees F. Concrete pavements are “cooler”; their light color reduces Darker colored asphalt pavement absorb the heat and pro- heat retention. duce greater surface and ambient temperatures. Lighter colored concrete pavements require less lighting to Darker colored asphalt pavement may require 33% more illuminate a given area. lighting for a given area than concrete. Concrete is considered a “rigid” pavement and can evenly Asphalt is considered a “flexible” pavement and is subject carry heavy loads (trucks, boats, etc.). to defects such as rutting and washboarding under heavy traffic. Resistant to oils and other petroleum-based liquids. Easily deteriorated by gas, oil, anti-freeze and other com- Concrete can easily be constructed in a variety of shapes mon chemicals. and colors. Asphalt does not offer a variety of creative construction RESIDENTIAL options. Architectural Concrete CONCRETE Homeowners also have a variety of color and texture options available to them by staining or stamping concrete.
    [Show full text]