Light Rail Funding

Total Page:16

File Type:pdf, Size:1020Kb

Light Rail Funding light rail funding LRT, BY STEPHANIE W. KAM, ESQ., NOSSAMAN LLP, AND DANIEL P. LOSCHACOFF, KPMG LLP THE P3 WAY Canada may be commonly known for its ice hockey, poutine, maple syrup and the colloquial “eh?”, but when it comes to infrastructure, the P3 delivery model is also well entrenched, particularly for LRT. anadian taxpayers are not Although P3 approaches may vary from and maintenance functions to a private accustomed to user-pay or jurisdiction to jurisdiction, public transit sector partner over a long term, the private revenue generating infra- agencies in Canada have typically used one party has an incentive to implement life- structure, and public transit of three P3 delivery models for LRT projects: cycle cost management before the project is generally runs at a loss, DBFOM, DBFM and DBF (listed in decreas- transferred back to the public sector. Higher Crequiring large subsidies. Yet since the ing order of risk to the private sector). expenditures on design and construction 2000s, billions on offer from federal and can be justified if operation and mainte- provincial programs have helped spur DESIGN-BUILD-FINANCE- nance costs will be reduced later on. The municipal decisions to develop light rail OPERATE-MAINTAIN (DBFOM) integration of all project phases also helps transit (LRT) under complex, long-term Canadian DBFOM projects are largely minimize costs, since there is an opportu- contractual agreements between public financed by leveraging availability payments nity to start the next phase before the prior agencies and the private sector. from the public owner to secure private debt phase is finished (commencing construc- Canada currently has two LRT projects financing. The DBFOM approach is partic- tion before the design has been approved). procured as a P3 (public-private partner- ularly well-suited to optimizing operational The Canada Line on Vancouver’s ship) in operation, with another five under performance. By bundling and transfer- SkyTrain rapid transit system was the inau- construction and five under procurement. ring the design, build, finance, operation gural transit infrastructure project in North Region Waterloo 26 Railway Age // April 2018 railwayage.com light rail Funding Ontario (pictured, opposite) is using the Although the DBFOM model used for the DBFOM method. Canada Line was examined, it was deter- mined not to be appropriate due to the DESIGN-BUILD FINANCE- greater economies of scale that could be MAINTAIN (DBFM) achieved with the Evergreen Line being The DBFM approach is similar to DBFOM, operated and maintained as part of the except the public owner retains operational SkyTrain system. Ridership on SkyTrain responsibilities and related risks vis-à-vis and the Canada Line has steadily increased the private sector partner. While some since the opening of the Evergreen Line. operational elements may be transferred to the private sector partner, such as cleaning, CDPQ INFRA these services are typically limited in scope. CDPQ Infra is a subsidiary of Caisse de Metrolinx has been utilizing the DBFM dépôt et placement du Québec and was model for both the Eglinton Crosstown launched in July 2015. It has since intro- and Finch West LRT projects in Toronto, duced a new alternative delivery model into leveraging the local transit service’s years the Canadian infrastructure market. The of experience operating rapid transit. CDPQ Infra model is distinguished from a Similarly in Ottawa, LRT operations are traditional P3 with the transfer of respon- outside the scope of P3 contracts and will sibilities and related risks from the project be managed by the local transit service. owner to CDPQ Infra, a public institution Having an existing public transit service, with investment expertise in public transit however, does not always translate in the and greenfield projects. adoption of the DBFM model for LRT CDPQ Infra has selected two private project delivery, particularly when there is sector teams to develop Montréal’s auto- political interference. The Hamilton LRT mated Réseau électrique Métropolitain procurement was stalled for four months under two separate contracts: (1) infra- because of operational concerns. The city structure engineering, procurement and reaffirmed its original approach to using construction (EPC), and (2) provision of the DBFOM delivery model after it agreed rolling stock, systems, operation and main- to include a requirement during contract tenance (RSSOM). While the EPC contract negotiations for the future LRT operator to is not alternative delivery, the RSSOM unionize its staff. The project will now go contract adopts a DBF + OM model, where through another election process because of the private consortium assumes some expo- the delay and serves as a good reminder of sure on operations and maintenance. America adopting a P3 model. The local the importance of mitigating political risks government’s decision to deliver the Canada throughout the entire procurement process. LAUNCH OF CANADA Line as a DBFOM was, however, controver- INFRASTRUCTURE BANK sial. The project was first described as a pie- DESIGN-BUILD-FINANCE (DBF) PPP Canada was a Crown corporation in-the-sky system that would never achieve The DBF model entails an agreement for a established by the Conservative govern- its break-even ridership threshold. Unions private contractor to design, construct and ment in 2008 that invested more than C$1.3 criticized P3s as a form of privatization that finance the capital cost of a project for a billion in 25 infrastructure projects, includ- provided no real benefits to the public. fixed price by a fixed date. The public owner ing the Edmonton Crosstown LRT and Shattering negative expectations, the identifies the level of funding it will provide Sheppard East Rail Maintenance Facility. system was completed on budget and put and requires the developer to finance The current Liberal government has now into service three months early, in time for project costs in excess of the public funding phased out PPP Canada and launched a new the 2010 Winter Olympics. SNC Lavalin over a specified period of time. In return, C$35 billion Canada Infrastructure Bank built a longer LRT line than anticipated the developer typically receives periodic or (CIB). The CIB’s purpose is to invest in through the cost-saving cut-and-cover milestone payments from the owner during revenue-generating infrastructure projects method of construction, rather than boring and for some time following construction, and attract private sector and institutional the whole line, the latter of which was pursuant to the contract’s schedule for investment. Since almost all Canadian P3s proposed by Bombardier, whose ART linear repayment of project costs. have been structured as performance-based induction motor technology was used for The procurement decision to use a DBF availability payment deals, there is a possi- the SkyTrain Expo and Millennium Lines. model for the Evergreen Line, an 11-km bility that future LRT projects will leverage The Canada Line’s ridership goal was (6.8-mile) extension to the SkyTrain system project-generated revenues, such as transit reached three years ahead of projections. in Vancouver, was based on a thorough fares. The benefit of transferring demand Waterloo Region Waterloo The Kitchener-Waterloo LRT project in analysis of different procurement options. risk is often offset by cost increase of private railwayage.com April 2018 // Railway Age 27 light rail funding financing. The P3 industry will have to wait and see how the CIB’s mandate will unfold. P3s, though, have become the backbone of Canadian LRT development and opera- tions. Project pipelines have grown dramat- ically through comprehensive, coordinated policies that implement the P3 model, such as PPP Canada’s previous mandatory P3 viability screen for projects with capital costs over C$100 million. The past decade of realizing new LRT projects has created a significant public transit success story, providing an opportunity to focus on life cycle maintenance and line expansion. Stephanie Kam is an Attorney in the Infrastructure Practice Group at Nossa- man LLP. Daniel Loschacoff is the Head of the Global Infrastructure Rail Practice at KPMG LLP. They have represented various public owners in connection with complex procurements and contracts for rail projects throughout the world, and can be reached on Twitter @P3Law and @GlobalRailK- PMG, or by email at [email protected] and [email protected]. ARE YOU A CERTIFIED DBE WITH THE GEORGIA UNIFIED CERTIFICATION PROGRAM? KINKISHARYO IS LOOKING FOR QUALIFIED DBE VENDORS! CONTACT US AT [email protected] 28 Railway Age // April 2018 railwayage.com.
Recommended publications
  • For Transit Information, Including Real-Time Next Bus, Please Call 604.953.3333 Or Visit Translink.Ca
    Metro Vancouver Transit Map Effective Until Dec. 19, 2016 259 to Lions Bay Ferries to Vancouver Island, C12 to Brunswick Beach Bowen Island and Sunshine Coast Downtown Vancouver Transit Services £ m C Grouse Mountain Skyride minute walk SkyTrain Horseshoe Bay COAL HARBOUR C West End Coal Harbour C WEST Community Community High frequency rail service. Canada Line Centre Centre Waterfront END Early morning to late Vancouver Convention evening. £ Centre C Canada Expo Line Burrard Tourism Place Vancouver Millennium Line C Capilano Salmon Millennium Line Hatchery C Evergreen Extension Caulfeild ROBSON C SFU Harbour Evelyne Capilano Buses Vancouver Centre Suspension GASTOWN Saller City Centre BCIT Centre Bridge Vancouver £ Lynn Canyon Frequent bus service, with SFU Ecology Centre Art Gallery B-Line Woodward's limited stops. UBC Robson Sq £ VFS £ C Regular Bus Service Library Municipal St Paul's Vancouver Carnegie Service at least once an hour Law Edgemont Hall Community Centre CHINATOWN Lynn Hospital Courts during the daytime (or College Village Westview Valley Queen
    [Show full text]
  • 2018 Transit Service Guidelines
    2018 TRANSIT SERVICE GUIDELINES DRAFT: June 6, 2018 TABLE OF CONTENTS 1 INTRODUCTION 2 3 REFERENCE INFORMATION 48 1.1 What are the Transit Service Guidelines? 3 3.1 Vehicle Capacity Reference Table 49 1.2 Using the Transit Service Guidelines 5 3.2 Service Productivity Reference Tables 50 1.3 Understanding Service Types 7 2 TRANSIT SERVICE GUIDELINES 10 APPENDIX 54 2.1 Overview 11 A Glossary 55 2.2 Layout and Organization 12 B References 59 DI Demand-oriented Service 14 C Acknowledgements 60 D.1 Transit-supportive Land Use and Demand 16 U Useful Service 20 U.1 Passenger Load 21 U.2 Stop Spacing 24 U.3 Service Frequency 26 U.4 Span of Service 28 U.5 Punctuality and Regularity 30 U.6 Route Design 34 PE Productive and Efficient Service 38 PE.1 Boardings per Revenue Hour 40 PE.2 Capacity Utilization 42 PE.3 Passenger Turnover 44 PE.4 Cost per Boarded Passenger 46 2 TransLink Transit Service Guidelines 1 Introduction 1. Introduction 1.1 What are the Transit Service Guidelines? 1.2 Using the Transit Service Guidelines 1.3 Understanding Service Types TransLink is the transportation authority for the Vancouver metropolitan area. It has responsibility for planning, managing, and delivering an integrated regional transit network—including rapid transit, commuter rail, and bus services—to provide access and mobility for people across the region. In consultation with stakeholders and customers, TransLink determines where demand is greatest, what types of service are most appropriate, and how resources are prioritized. The Transit Service Guidelines provide a framework for achieving these objectives and delivering a transit network useful to the greatest number of people.
    [Show full text]
  • Metro Vancouver Transit Map
    Metro Vancouver Transit Map Ferries to 2591 to Lions Bay / C12 to Brunswick Beach Vancouver Island, 2 3 4 5 6 7 8 9 Bowen Island and Sunshine Coast C Grouse Mountain Skyride C Horseshoe Bay NightNightBus Buses Legend C Frequent Transit Network Other Transit Services C Compass Vending Machine The Frequent Transit Network (FTN) is a network of stops For schedule information about other transit services, and stations that have transit service every 15 minutes please visit translink.ca, consult a printed timetable, or N or better, during at least all of the following times: call Customer Information at 604-953-3333. C Capilano Salmon Hatchery – Monday to Friday: 6:00–21:00 C – Saturdays: 7:00–21:00 Caulfeild N Regular Bus 1 – Sundays and holidays: 8:00–21:00 a C Available at ­ Capilano N Suspension N Service at least once an hour during the daytime, all week, N Additional service may also be provided outside of these Bridge N N N all year. Additional service may be provided early mornings Lynn Canyon times. For schedule information, please visit translink.ca, Ecology Centre UBC N and evenings. ­ consult a printed timetable, or call Customer Information N N N N at 604-953-3333. N C Library N Municipal Hall 1 Edgemont Lynn Limited Service Bus Valley Village Westview N N N N Canada Line Municipal Shopping ­ Shopping N Centennial Point Atkinson Hall Centre Deep Cove / Limited service bus routes operate only part of the day, week, Park Royal Centre Theatre Cultural Centre N High frequency rail service.
    [Show full text]
  • Overhaul Resource Planning for Rolling Stock Using MIP Models
    Article Overhaul Resource Planning for Rolling Stock using MIP Models RinradaJiravanstita and WipaweeTharmmaphornphilasb,* Department of Industrial Engineering, Faculty of Engineering, Chulalongkorn University, Bangkok 10330, Thailand E-mail: [email protected], [email protected] (Corresponding author) Abstract. In term of maintenance, parts must be maintained to satisfy operating conditions. Although, maintenance is costly and unprofitable, it is indispensable. Thus, reducing maintenance costs without reducing maintenance is one of the critical issues. Since maintenance costs mainly come from resources, they should be properly managed to minimize the cost. Hence, the goal of this paper is to find the optimal number of resources for required maintenance activities. Two mixed-integer programming models are developed. The first model is used for a long-term plan to find a proper number of resources while the second one generates a maintenance schedule for a shorter time frame to verify feasibility of the plan. Keywords: Rolling-stock, overhaul maintenance, scheduling, MIP. ENGINEERING JOURNAL Volume 21 Issue 5 Received 4 December 2016 Accepted 13 March 2017 Published 29 September 2017 Online at http://www.engj.org/ DOI:10.4186/ej.2017.21.5.145 DOI:10.4186/ej.2017.21.5.145 1. Introduction One of the main public transportations is a rail system due to its ability to transport a large amount of entity, people and goods. For metropolitan zone, Mass Rapid Transport is widely implemented due to its speed, reliability and convenience. For instance, Bangkok has 4 major HRT (Heavy-Rail-Transit) with other 8 extended lines in the future [1-2] and Vancouver has 3 lines (Expo line, Millennium Line and Canada line).
    [Show full text]
  • Canada Rail Opportunities Scoping Report Preface
    01 Canada Rail Opportunities Canada Rail Opportunities Scoping Report Preface Acknowledgements Photo and image credits The authors would like to thank the Agence Métropolitaine de Transport following organisations for their help and British Columbia Ministry of Transportation support in the creation of this publication: and Infrastructure Agence Métropolitaine de Transport BC Transit Alberta Ministry of Transport Calgary Transit Alberta High Speed Rail City of Brampton ARUP City of Hamilton Balfour Beatty City of Mississauga Bombardier City of Ottawa Calgary Transit Edmonton Transit Canadian National Railway Helen Hemmingsen, UKTI Toronto Canadian Urban Transit Association Metrolinx Edmonton Transit OC Transpo GO Transit Sasha Musij, UKTI Calgary Metrolinx Société de Transport de Montréal RailTerm TransLink SNC Lavalin Toronto Transit Commission Toronto Transit Commission Wikimedia Commons Wikipedia Front cover image: SkyTrain in Richmond, Vancouver Canada Rail Opportunities Contents Preface Foreword 09 About UK Trade & Investment 10 High Value Opportunities Programme 11 Executive Summary 12 1.0 Introduction 14 2.0 Background on Canada 15 2.1 Macro Economic Review 16 2.2 Public-Private Partnerships 18 3.0 Overview of the Canadian Rail Sector 20 4.0 Review of Urban Transit Operations and Opportunities by Province 21 4.1 Summary Table of Existing Urban Transit Rail Infrastructure and Operations 22 4.2 Summary Table of Key Project Opportunities 24 4.3 Ontario 26 4.4 Québec 33 4.5 Alberta 37 4.6 British Columbia 41 5.0 In-Market suppliers 45 5.1 Contractors 45 5.2 Systems and Rolling Stock 48 5.3 Consultants 49 6.0 Concluding Remarks 51 7.0 Annexes 52 7.1 Doing Business in Canada 52 7.2 Abbreviations 53 7.3 Bibliography 54 7.4 List of Reference Websites 56 7.5 How can UKTI Help UK Organisations Succeed in Canada 58 Contact UKTI 59 04 Canada Rail Opportunities About the Authors David Bill Helen Hemmingsen David is the International Helen Hemmingsen is a Trade Officer Development Director for the UK with the British Consulate General Railway Industry Association (RIA).
    [Show full text]
  • It's Time to Cure Congestion In
    IT’S TIME TO CURE CONGESTION IN VANCOUVER AND THE UEL/UBC The Mayors’ Council has heard loud and clear from Metro Vancouver residents: it is time to cure congestion. Traffic on our roads and overcrowding on our transit system frustrate commuters every single day and it’s affecting our quality of life, our economy, and our environment. We need all levels of government working together to fix this problem, and we need to make sure transportation is a key issue in the May 2017 provincial election. Learn more at www.curecongestion.ca. TRANSPORTATION CHALLENGES IN VANCOUVER AND THE U E L / U B C Here in Vancouver, our population is growing and our transportation system hasn’t been keeping up. As a result, overcrowding is a persistent problem on SkyTrain and buses causing transit riders to have to stand for long periods of time and unable to get on buses and trains. And road congestion is causing buses to be unreliable and key roads to be backed up, especially during peak times. REAL TRANSPORTATION IMPROVEMENTS IN VANCOUVER AND THE UEL/UBC The good news is we can keep Metro Vancouver moving and help cure congestion. The first step is to complete the 10-Year Vision for Metro Vancouver Transit and Transportation, a plan for more transit services, better roads and active transportation infrastructure across the region and right here in Vancouver, including: 1. New rapid transit projects for a growing population o Broadway Subway: Tunnel extension of the Millennium Line from VCC-Clark to Arbutus St. with connection to Canada Line and the 99 B-Line to UBC 2.
    [Show full text]
  • A Case for Edmonton to Explore Bus Rapid Transit
    A Case for Edmonton to Explore Bus Rapid Transit Edmonton Transit Service Advisory Board August 2015 Executive Summary 1 A Case for Edmonton to Explore Bus Rapid Transit 1 BRT Strategic Impact Map 4 Research Report 5 Background 5 a) What is Bus Rapid Transit (BRT)? b) Previous BRT Studies in Edmonton - What has changed? Costs and benefits of BRT 10 a) Capital and Operating Costs b) TOD Opportunities c) Strengths, Weaknesses, Opportunities and Challenges BRT Examples in cities similar to Edmonton 17 a) Winnipeg b) Calgary c) Ottawa d) York e) Vancouver Appendixes 31 Appendix A: BRT Best Practice Guides 31 Appendix B: A Brief History of Transportation in the City of Edmonton 32 Executive Summary A Case for Edmonton to Explore Bus Rapid Transit (BRT) The Board recommends that Council investigate in further detail the potential of adopting Bus Rapid Transit (BRT) in Edmonton as both an interim method of servicing routes earmarked for future LRT expansion (LRT Network Plan), as well as other high-traffic corridors that are suitable for high-speed, high-frequency transit services. Bus rapid transit (BRT) is a high-speed, high frequency bus-based mode of transit that delivers fast, high-capacity, and cost-effective transit services in urban areas. The Edmonton Transit System Advisory Board believes there is tremendous value in the City of Edmonton exploring BRT as an alternate mode of transit to complement LRT and regular bus service, and better meet the needs and expectations of Edmontonians now and in the future. BRT is a feasible option both as a pre-cursor to LRT where funding and construction is decades away, as well as in high-traffic corridors where there are no LRT plans proposed in the long- term.
    [Show full text]
  • How to Get to Vancouver Airport
    Option 2: Pacific Coach Lines from Victoria Option 4: By Car How to Get to Overall estimated travel time: 3.5 hours From the hostel, follow Blanshard Street away from Ferry fare is included in cost. town (North). This turns into the Pat Bay Highway 17 Departs: Victoria Bus Depot (700 Douglas St.) 7 times which terminates at Swartz Bay Ferry Terminal. The Vancouver Airport daily Ferry for Vancouver will be clearly signposted. Arrives: Vancouver Airport (YVR) From Swartz Bay to Tsawwassen by BC Ferries. How you get to Vancouver International Airport (YVR), Contact Info: PCL toll-free 1-800-661-1725 Estimated crossing time: 1hr 35min. depends on how much money you want to spend and www.pacificcoach.com how comfortable you want to be! You can certainly do Note: The ferry will accept cash, Visa and Mastercard it on a budget--if you don’t mind facing crowded buses but NOT debit cards. with your bags. Option 3: Pacific Coach Lines from Ferry You need to be at the terminal 30 minutes prior to Overall estimated travel time: 4 hours sailing. During peak months you need to be there at Option 1: City Bus Take #70/#72/#73 city bus to Swartz Bay Ferry least an hour prior to sailing. If in doubt call and make Overall estimated travel time: 4 hours Terminal and board the ferry as a walk on passenger. reservations! (See Option 1.) In the first half hour of the ferry For info and car reservations contact Take #70/#72/#73 City Bus to Swartz Bay Ferry crossing you need to go to the PCL kiosk located on Fare: $2.50 (exact change required) 1-888-BCFERRY (1-888-223-3779) or see the main deck and buy a ticket for Vancouver Airport.
    [Show full text]
  • VANCOUVER BURNABY RICHMOND Dim Sum to Dinner Via Canada
    Dim Sum to Dinner via Canada Line and SeaBus 10 9 Lonsdale Quay Make it a whole-day trip on the SkyTrain and ride your way through all that makes Canada’s West Waterfront Coast such a special place to eat and drink. Vibrant Vancouver Asian influences on local ingredients paired with City Centre 8 many other cultural influences with the Pacific 7 Moody Ocean as a backyard make for an only-in-BC Yaletown - Centre Roundhouse culinary adventure. Olympic Village Broadway - City Hall COQUITLAM King Edward BURNABY 1 CHEF TONY 6 SEASONS IN THE PARK VANCOUVER 6 101-4600 No 3 Rd, Richmond W 33rd Ave, Vancouver West Coast Express Stop: Aberdeen Station Stop: King Edward Station 5 Oakridge - Walking: 5 minutes Walking: 19 minutes 41st Avenue Langara - 49th Avenue 2 COPA CAFÉ 7 CRAFT BEER MARKET 6200 River Rd, Richmond 85 W 1st Ave, Vancouver NEW Stop: Lansdowne Station Stop: Olympic Village Station WESTMINSTER Walking: 17 minutes Walking: 11 minutes Marine Drive 3 RICHMOND PUBLIC MARKET 8 BLUE WATER CAFE 8260 Westminster Hwy, Richmond 1095 Hamilton St, Vancouver Templeton YVR - Airport Bridgeport Stop: Richmond-Brighouse Station Stop: Yaletown Roundhouse Station Sea Island Walking: 6 minutes Walking: 3 minutes Centre Aberdeen 1 4 75 WEST COAST GRILL 9 TAP & BARREL - SHIPYARDS 2 Lansdowne 7571 Westminster Hwy, Richmond 8 Lonsdale Ave, North Vancouver 4 3 Stop: Richmond-Brighouse Station Stop: Lonsdale Quay Station Walking: 7 minutes Walking: 1 minute Richmond - Brighouse SkyTrain 5 PENINSULA SEAFOOD RESTAURANT 1010 BURGOO BISTRO LONSDALE Canada Line 650 W 41st Ave, Vancouver 3 Lonsdale Ave, North Vancouver RICHMOND Expo Line Stop: Oakridge - 41st Avenue Stop: Lonsdale Quay Station Walking: 4 minutes Walking: 1 minute Millennium Line Bus B-Line Other Transit Services SeaBus West Coast Express.
    [Show full text]
  • Canada Line Final Project Report
    Canada Line Final Project Report COMPETITIVE SELECTION PHASE April 12, 2006 Table of Contents Executive Summary ...............................................................................................................1 1 Purpose of the Final Project Report.......................................................................................4 2 History of the Project..............................................................................................................5 2.1 Project Governance, Funding and Ownership .............................................................6 2.2 Project Description .......................................................................................................7 3 Achieving Value for Money ....................................................................................................8 3.1 Competitive Selection Process ....................................................................................9 3.1.1 The Concession Agreement.......................................................................12 3.1.2 The Essential Elements and the Affordability Tests...................................14 3.1.3 Total Construction Cost and Funding.........................................................15 3.2 Net Cost of the Project and the Public Sector Comparator (PSC).............................16 3.2.1 Basis for the Comparison...........................................................................16 3.2.2 Public Sector Comparator ..........................................................................17
    [Show full text]
  • Vancouver, Bc
    SPACE RATES: BUS VANCOUVER, BC TRADITIONAL PRODUCTS DETAILS product unit rate All rates are net. Rates listed are per 4 week period and represent space KING only. 1 $840 30” x 139” Minimum media space requirements do apply. FREE production for 52 week campaigns. Initial display(s) only. KING W/ 1 $1,070 HEADLINER Lamar is required to do all signature product production. For campaigns under 52 weeks, contact your Lamar 70S 1 $500 Account Manager for production costs and any applica- 21” x 70” ble installation fees. Foil, reflective, exotic vinyl, extensions and other em- bellishments are available at additional cost. INTERIOR CARDS min. 50 $34 each 11” x 35” Guaranteed rear placement of seventy (21” x 70”) displays is subject to a 50% premium charge and availability of space. Please contact your Lamar account manager to verify SIGNATURE PRODUCTS display size, availability and art/production and minimum media space requirements. product unit rate Rates are subject to change without notice. Specific placement premiums may apply. Icons are for refer- ence only. SUPER TAIL 1 $840 FULL BACK 1 $1,230 (8 WEEK MINIMUM) SUPER KING 1 $1,000 SUPER KING W/ HEADLINER 1 $1,230 (8 WEEK MINIMUM) DOUBLE KONG W/ HEADLINER 1 $2,100 (8 WEEK MINIMUM) FULLWRAP (no window coverage) 1 $6,400 (8 WEEK MINIMUM) ARTICULATED FULLWRAP (no window coverage) 1 $9,000 (8 WEEK MINIMUM) | VANCOUVER | 3280 Production Way | Burnaby, BC V5A 4R4 | PH: 800.233.9942 | F: 604.528.6251 | lamar.com/BCCanada BUS BARN COVERAGE VANCOUVER, BC BUS BARN coverage area pop- primary area
    [Show full text]
  • Rapid Transit: Housing Affordability
    Rapid Transit: Housing Affordability Alvin Lin, Tom Black, Jenil Doshi “ Policy Question Should the Broadway Subway project be extended to UBC? Research Question How does extending the Broadway Subway project to UBC influence regional housing affordability? 2 Background ● The Broadway Corridor is one of BC’s more important economic centres ○ Second largest employment hub ○ Connects UBC and Vancouver General Hospital ● Lack of sufficient transportation ○ According to the C.D. Howe Institute, congestion can cost anywhere from $0.5B to $1.4B 3 ● In Summer 2018, Phase Two of Translink’s 10-Year Vision was approved, confirming the construction of the Broadway Subway ● The Broadway Subway project includes: ○ Extension of the Millennium Line from VCC-Clark to Arbutus St. ○ Planning for a further extension to UBC (approximately 7 kms) ● According to 2016 Conference Board of Canada Report, the net present value of benefits of extending the Millennium line to UBC are estimated to exceed $4 billion 4 Evaluating the Benefits of Rapid Transit ● Conventional Benefits - Reduced travel costs, reduced operating costs ● Impact on Housing Affordability ● Agglomeration Benefits - Productivity gains 5 Literature Review Baum-Snow and Kahn (2000): Glaeser et al. (2008): ● Added convenience of living ● Public transit proximity drives near transit station tends to housing prices downward as increase the housing prices impoverished households are more likely to converge near the ● The authors argue that potential transit stations to capitalize on time savings
    [Show full text]