MO-201 Electric Power Distribution Systems

Total Page:16

File Type:pdf, Size:1020Kb

MO-201 Electric Power Distribution Systems ______________________________________________________________________ http://waterheatertimer.org/How-to-wire-3-phase-electric.html http://waterheatertimer.org/What-is-3-phase-electric.html Naval Facilities Engineering Command 200 Stovall Street Alexandria, Virginia 22332-2300 Electric Power Distribution Systems Operations NAVFAC MO-201 April 1990 SN 0525-LP-320-1900 FOREWORD This manual on electric power distribution systems is one of a series developed to aid utility supervisory personnel at shore establishments in the performance of their duties. It includes information obtained from extensive research of current literature on the subject and preferred practices based on practical experience. The principles and procedures described are in accordance with national professional society, association, and institute codes. Additional information concerning procedures, suggestions, recommendations or modifications that will improve this manual are invited and should be submitted through appropriate channels to the Commander, Naval Facilities Engineering Command, (Attention: Code 165), 200 Stovall Street, Alexandria, VA 22332-2300. This publication has been reviewed and approved in accordance with the Secretary of the Navy Instruction 5600.16A and is certified as an official publication of the Naval Facilities Engineering Command. It cancels and supersedes Operation of Electric Power Distribution Systems, NAVFAC MO-201, November 1963, in its entirety. D. B. CAMPBELL Assistant Commander for Public Works Centers and Departments ABSTRACT Application principles and procedures for the operation of electric power distribution systems and associated major apparatus are presented. The contents include principles of power systems, cabling systems, electrical equipment, power system protection and coordination, instruments and meters, operational procedures, and electrical utilization systems. i CONTENTS PAGE CHAPTER 1 PRINCIPLES OF POWER SYSTEMS 1-1 1.1 Typical Power Network............................................................................ 1-1 1.2 Electric Power Generation........................................................................ 1-2 1.3 Alternating Current Power Transmission System.................................... 1-3 1.4 Primary Distribution Systems................................................................... 1-4 1.5 Secondary Distribution Systems............................................................... 1-9 1.6 Emergency and Standby Power Systems.................................................. 1-15 CHAPTER 2 POWER DISTRIBUTION CABLE SYSTEMS 2-1 2.1 Cable Specifications................................................................................. 2-1 2.2 Cable Construction................................................................................... 2-1 2.3 Cable Ratings and Selection Criteria........................................................ 2-5 2.4 Types of Cable Installations..................................................................... 2-7 2.5 Power System Applications...................................................................... 2-10 CHAPTER 3 POWER SYSTEM ELECTRICAL EQUIPMENT 3-1 3.1 Major Apparatus....................................................................................... 3-1 3.2 Transformers............................................................................................. 3-2 3.3 Voltage Regulators.................................................................................... 3-16 3.4 Switches.................................................................................................... 3-21 3.5 Circuit Breakers........................................................................................ 3-26 3.6 Automatic Circuit Reclosers..................................................................... 3-38 3.7 Power Capacitors...................................................................................... 3-44 3.8 Distribution Substation............................................................................. 3-53 CHAPTER 4 POWER SYSTEM PROTECTION AND COORDINATION 4-1 4.1 System Protection Methods...................................................................... 4-1 4.2 Short-Circuit Currents.............................................................................. 4-2 4.3 Relays....................................................................................................... 4-8 4.4 Applied Protective Relaying.................................................................... 4-15 4.5 Fuses........................................................................................................ 4-19 4.6 Low-Voltage Circuit Breakers................................................................. 4-25 4.7 System Coordination Study..................................................................... 4-28 CHAPTER 5 POWER SYSTEM INSTRUMENTS AND METERS 5-1 5.1 Instrumentation and Metering.................................................................. 5-1 5.2 Instruments............................................................................................... 5-3 5.3 Meters....................................................................................................... 5-6 vii CONTENTS (continued) PAGE CHAPTER 6 POWER SYSTEM OPERATION 6-1 6.1 Power System Structure........................................................................... 6-1 6.2 Control Center Procedures....................................................................... 6-2 6.3 Switchboards............................................................................................ 6-5 6.4 Safety and Environmental Requirements................................................. 6-8 CHAPTER 7 ELECTRICAL UTILIZATION SYSTEMS 7-1 7.1 System Voltages....................................................................................... 7-1 7.2 Equipment Nameplate Ratings and Nominal System Voltages................ 7-1 7.3 Street Lighting Systems............................................................................ 7-3 CHAPTER 8 MANAGING THE OPERATION OF ELECTRICAL DISTRIBUTION SYSTEMS 8-1 8.1 Operations Overview................................................................................. 8-1 8.2 Operations Management............................................................................ 8-1 8.3 Maintenance Management......................................................................... 8-9 8.4 System Planning Studies............................................................................ 8-14 CHAPTER 9 NEW AND EMERGING TECHNOLOGY 9-1 9.1 Supervisory Control and Data Acquisition................................................ 9-1 9.2 Control Circuits and Devices..................................................................... 9-4 9.3 Cogeneration.............................................................................................. 9-6 9.4 Variable Speed Electric Drive Systems..................................................... 9-7 APPENDIX A Operating Responsibilities and Organizational Relationships...... A-1 BIBLIOGRAPHY.................................................................................... Bibliography-1 INDEX................................................................................................................. Index-1 viii FIGURES FIGURE NO. TITLE PAGE 1-1 Typical Electric Power Generation, Transmission, and Distribution System.............. 1-1 1-2 Typical Distribution Substation Arrangements............................................................ 1-5 1-3 Typical Bus Arrangements........................................................................................... 1-7 1-4 Four Primary Feeder Arrangements............................................................................. 1-8 1-5 Conventional Simple-Radial Distribution System....................................................... 1-11 1-6 Expanded Radial Distribution System......................................................................... 1-11 1-7 Primary Selective Distribution System........................................................................ 1-12 1-8 Loop Primary-Radial Distribution System................................................................... 1-12 1-9 Secondary Selective-Radial Distribution System......................................................... 1-14 1-10 Secondary Network Distribution System..................................................................... 1-14 1-11 Secondary Banking Distribution System..................................................................... 1-16 1-12 Engine Generators (Parallel Operation)....................................................................... 1-20 1-13 Peak Load Control System........................................................................................... 1-20 1-14 Combined Utility-Generator System............................................................................ 1-20 1-15 Rotating Flywheel No Break System........................................................................... 1-24 1-16 Nonredundant UPS System.......................................................................................... 1-25 1-17 Nonredundant UPS System with Static Bypass........................................................... 1-25 1-18 Redundant UPS System............................................................................................... 1-26 3-1 Delta-Wye....................................................................................................................
Recommended publications
  • Synchrophasor Monitoring for Distribution Systems: Technical Foundations and Applications
    NASPI-2018-TR-001 Synchrophasor Monitoring for Distribution Systems: Technical Foundations and Applications A White Paper by the NASPI Distribution Task Team January 2018 Editor: Alexandra von Meier - UC Berkeley Contributing Authors (in alphabetical order): Reza Arghandeh - Florida State University Kyle Brady - UC Berkeley Merwin Brown – UC Berkeley George R. Cotter – Isologic LLC Deepjyoti Deka – Los Alamos National Laboratory Hossein Hooshyar – Rennselaer Polytechnic Institute Mahdi Jamei – Arizona State University Harold Kirkham – Pacific Northwest National Laboratory Alex McEachern – Power Standards Lab Laura Mehrmanesh – UC Berkeley Tom Rizy – Oak Ridge National Laboratory Anna Scaglione – Arizona State University Jerry Schuman – PingThings, Inc. Younes Seyedi – Polytechnique Montreal Alireza Shahvasari – UC Riverside Alison Silverstein - NASPI Emma Stewart – Lawrence Livermore National Laboratory Luigi Vanfretti – Rensselaer Polytechnic Institute Alexandra von Meier - UC Berkeley Lingwei Zhan – Oak Ridge National Laboratory Junbo Zhao – Virginia Tech 2 Contents 1.0 Introduction ........................................................................................................................ 5 1.1 Premise of Distribution PMUs ........................................................................................ 6 1.2 What’s new? Synchrophasor technology ....................................................................... 7 1.3 Why bother? High-value uses for distribution monitoring ...........................................
    [Show full text]
  • Vuspec Power Dist 2016
    Notice of New Standard Products Title: IEEE Power, Distribution & Regulating Transformers Collection: VuSpec™ Summary (Abstract): IEEE Power, Distribution and Regulatory Transformer Collection: VuSpec™ contains the latest standards, guides, and recommended practices of the Institute of Electrical and Electronics Engineers, Inc. (IEEE) Transformers Committee. It also contains IEEE C57 series of standards. This collection represents the most complete resource available for professional engineers looking for best practices and techniques covering testing, repair, installation, operation, and maintenance of transformers, reactors, and associated components that are used within the electric utility and industrial power systems. These standards provide provides a crucial service to society's need for continuing development and maintenance of a reliable, safe, and efficient power system infrastructure. Table of Contents: Includes 104 active IEEE standards for Power Distribution & Regulating Transformers family. • IEEE Std 4-2012, IEEE Standard for High-Voltage Testing Techniques • IEEE Std 259™-1999 (R2010), IEEE Standard Test Procedure for Evaluation of Systems of Insulation for Dry-Type Specialty and General - Purpose Transformers • IEEE Std 638™-2013, IEEE Standard for Qualification of Class 1E Transformers for Nuclear Power Generating Stations • IEEE Std 1276™-1997 (R2006), IEEE Guide for the Application of High-Temperature Insulation Materials in Liquid- Immersed Power Transformers • IEEE Std 1277™-2010, IEEE Standard General Requirements
    [Show full text]
  • Transformer Parameter Monitoring Using Gsm Module
    International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 04 | Apr -2017 www.irjet.net p-ISSN: 2395-0072 TRANSFORMER PARAMETER MONITORING USING GSM MODULE Rashmi Ashok Panherkar 1, Prajakta Vaidya 2 ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - This paper present transformer parameter logic by feeler and which is position in pointer to monitoring using GSM module. The main advantages of this microcontroller. The indication is monitor as of scheme is using through GSM module. The devious of commencement to finish GSM Module.[3] transformer is over and done with by way of high temperature detector.GSM & Microcontroller used in wireless revelation. The bringing mutually is appliance to intellect the casing The reading and result of transformer like voltage, current, is tone of transformer and commencement in sequence to not allowed by using microcontroller & send sms through GSM monitor.[1]Sheltered headset which is also a microcontroller module. unit. It create organization flank via locate rate and position value, but some wrong step occur next convey interested in KeyWords: Wireless control System, GSM Module, existing person it is give you an idea about on LCD.[4] Microcontroller, Temperature Sensor. Technological assistance broken connected to decision the an collection of scheme to organize situations of 1.INTRODUCTION transformer by means of form of information communiqué construction as a result of the line of assail of pointed on A transformer is a piece of equipment used either for rising communiqué services, reserve inspection & critique in print or lowers the voltage of an a.c. supply with equivalent joined to processor and to end support embellish are bring reduces or enlarge in current.
    [Show full text]
  • Diploma in Electrical and Electronics Engineering PAGE 1
    ` DIPLOMA IN ELECTRICAL AND ELECTRONICS ENGINEERING COURSES OFFERED CODE COURSE CREDITS YEAR/SEMESTER 15O A) FOUNDATION COURSES : (49 CREDITS) (COMMON FOR ALL PROGRAMMES) 0101 Communicative English – I 5 I/ODD 0102 Engineering Mathematics-I 8 I/ODD 0103 Engineering Physics – I 5 I/ODD 0104 Engineering Chemistry – I 5 I/ODD 0105 Engineering Physics- I Practical 1 I/ODD 0106 Engineering Chemistry – I Practical 1 I/ODD 0107 Communicative English – II 4 I/EVEN 0108 Engineering Mathematics-II 5 I/EVEN 0109 Applied Mathematics 5 I/EVEN 0110 Engineering Physics – II 4 I/EVEN 0111 Engineering Chemistry – II 4 I/EVEN 0112 Engineering Physics – II Practical 1 I/EVEN 0113 Engineering Chemistry – II Practical 1 I/EVEN B) CORE TECHNOLOGY COURSES : ( 43 CREDITS) 0201A Workshop Practical 1 I/ODD 0202 Engineering Graphics-I 3 I/ODD 0203 Engineering Graphics-II 3 I/EVEN 0204 Computer Applications Practical – I 1 I/ODD 0205 Computer Applications Practical – II 1 I/EVEN 3201 Electrical Circuit Theory 6 II/ODD 3202 Electrical Machines - I 5 II/ODD 3203 Electronic Devices and Circuits 5 II/ODD 3204 Electrical Circuits and Machines Practical 3 II/ODD 3205 Electronic Devices and Circuits Practical 3 II/ODD 3206 Electrical Workshop Practical 2 II/ODD 3207 Life and Employability Skills Practical 2 II/ODD 3208 Digital Electronics 5 II/EVEN 3209 Integrated CircuitsPractical 3 II/EVEN Diploma in Electrical and Electronics Engineering PAGE 1 ` C) APPLIED TECHNOLOGY COURSES: (58 CREDITS) 3301 Electrical Machines – II 5 II/EVEN 3302 Measurements and Instruments 4 II/EVEN
    [Show full text]
  • Distribution Transformers
    Shoemaker_CH15.qxd 13/07/06 11:43AM Page 15.1 CHAPTER 15 DISTRIBUTION TRANSFORMERS The purpose of a distribution transformer is to reduce the primary voltage of the electric distribution system to the utilization voltage serving the customer. A distribution trans- former is a static device constructed with two or more windings used to transfer alternating- current electric power by electromagnetic induction from one circuit to another at the same frequency but with different values of voltage and current. Figure 15.1 shows distribution transformers in stock at an electric utility company ser- vice building. The distribution transformers available for use for various applications, as shown, include pole-type (Figs. 15.2 and 15.3), pad-mounted (Fig. 15.4), vault or network type (Fig. 15.5), and submersible (Fig. 15.6). The distribution transformer in Fig. 15.2 is self-protected. It is equipped with a lightning arrester, a weak-link or protective-link expulsion-type fuse (installed under oil in the trans- former tank), a secondary circuit breaker, and a warning light. The transformer primary bushing conductor is connected to one phase of the three-phase primary circuit through a partial-range current-limiting fuse. The transformer tank is grounded and connected to the FIGURE 15.1 Electric utility distribution storage yard. Forklift trucks are used to load transformers on line trucks. Storage area is covered with concrete to pro- vide accessibility and protect transformers. 15.1 Shoemaker_CH15.qxd 13/07/06 11:43AM Page 15.2 15.2 CHAPTER 15 FIGURE 15.2 Typical pole-type dis- tribution transformer installation with the transformer bolted directly to the pole.
    [Show full text]
  • Coupling for Power Line Communication: a Survey Luis Guilherme Da S
    JOURNAL OF COMMUNICATION AND INFORMATION SYSTEMS, VOL. 32, NO. 1, 2017. 8 Coupling for Power Line Communication: A Survey Luis Guilherme da S. Costa, Antonio Carlos M. de Queiroz, Bamidele Adebisi, Vinicius L. R. da Costa, and Moises V. Ribeiro Abstract—The advent of power line communication (PLC) electric power cables. These power cables could be alternating for smart grids, vehicular communications, internet of things current (AC) or direct current (DC) power lines and the signals and data network access has recently gained ample interest in of PLC transceivers are subsequently coupled to them via a industry and academia. Due to the characteristics of electric power grids and regulatory constraints, the effectiveness of coupling circuit. In the case of power lines used to transmit coupling between the power line and PLC transceivers has AC power, the coupling circuit has also to filter out the AC become a very important issue. Coupling devices used to inject or mains signal. On the other hand, the coupling circuit simply extract data communication signals into or from power lines are has to block the DC mains voltage of the DC electric power very important components of a PLC system. There is, however, grids. an obvious gap in the literature for a detailed review of existing PLC couplers. In this paper, we present a comprehensive review During the late 1970s and early 1980s, new investigations of couplers, which are required for narrowband and broadband to characterize electric power grids as a medium for data PLC transceivers. Prevailing issues that protract the design of communication showed a higher potential in the range of couplers and consequently subtended the inventions of different frequencies between 5 kHz and 500 kHz [2].
    [Show full text]
  • THE ULTIMATE Tesla Coil Design and CONSTRUCTION GUIDE the ULTIMATE Tesla Coil Design and CONSTRUCTION GUIDE
    THE ULTIMATE Tesla Coil Design AND CONSTRUCTION GUIDE THE ULTIMATE Tesla Coil Design AND CONSTRUCTION GUIDE Mitch Tilbury New York Chicago San Francisco Lisbon London Madrid Mexico City Milan New Delhi San Juan Seoul Singapore Sydney Toronto Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Manufactured in the United States of America. Except as permitted under the United States Copyright Act of 1976, no part of this publication may be reproduced or distributed in any form or by any means, or stored in a database or retrieval system, without the prior written permission of the publisher. 0-07-159589-9 The material in this eBook also appears in the print version of this title: 0-07-149737-4. All trademarks are trademarks of their respective owners. Rather than put a trademark symbol after every occurrence of a trademarked name, we use names in an editorial fashion only, and to the benefit of the trademark owner, with no intention of infringement of the trademark. Where such designations appear in this book, they have been printed with initial caps. McGraw-Hill eBooks are available at special quantity discounts to use as premiums and sales promotions, or for use in corporate training programs. For more information, please contact George Hoare, Special Sales, at [email protected] or (212) 904-4069. TERMS OF USE This is a copyrighted work and The McGraw-Hill Companies, Inc. (“McGraw-Hill”) and its licensors reserve all rights in and to the work. Use of this work is subject to these terms. Except as permitted under the Copyright Act of 1976 and the right to store and retrieve one copy of the work, you may not decompile, disassemble, reverse engineer, reproduce, modify, create derivative works based upon, transmit, distribute, disseminate, sell, publish or sublicense the work or any part of it without McGraw-Hill’s prior consent.
    [Show full text]
  • IEEE/PES Transformers Committee Fall 2017 Meeting Minutes
    Transformers Committee Chair: Stephen Antosz Vice Chair: Sue McNelly Secretary: Bruce Forsyth Treasurer: Greg Anderson Awards Chair/Past Chair: Don Platts Standards Coordinator: Jim Graham IEEE/PES Transformers Committee Fall 2017 Meeting Minutes Louisville, KY October 30 – November 2, 2017 Unapproved (These minutes are on the agenda to be approved at the next meeting in Spring 2018) TABLE OF CONTENTS GENERAL ADMINISTRATIVE ITEMS 1.0 Agenda 2.0 Attendance OPENING SESSION – MONDAY OCTOBER 30, 2017 3.0 Approval of Agenda and Previous Minutes – Stephen Antosz 4.0 Chair’s Remarks & Report – Stephen Antosz 5.0 Vice Chair’s Report – Susan McNelly 6.0 Secretary’s Report – Bruce Forsyth 7.0 Treasurer’s Report – Gregory Anderson 8.0 Awards Report – Don Platts 9.0 Administrative SC Meeting Report – Stephen Antosz 10.0 Standards Report – Jim Graham 11.0 Liaison Reports 11.1. CIGRE – Raj Ahuja 11.2. IEC TC14 – Phil Hopkinson 11.3. Standards Coordinating Committee, SCC No. 18 (NFPA/NEC) – David Brender 11.4. Standards Coordinating Committee, SCC No. 4 (Electrical Insulation) – Paulette Payne Powell 12.0 Hot Topics for the Upcoming – Subcommittee Chairs 13.0 Opening Session Adjournment CLOSING SESSION – THURSDAY NOVEMBER 2, 2017 14.0 Chair’s Remarks and Announcements – Stephen Antosz 15.0 Meetings Planning SC Minutes & Report – Gregory Anderson 16.0 Reports from Technical Subcommittees (decisions made during the week) 17.0 Report from Standards Subcommittee (issues from the week) 18.0 New Business 19.0 Closing Session Adjournment APPENDIXES – ADDITIONAL DOCUMENTATION Appendix 1 – Meeting Schedule Appendix 2 – Semi-Annual Standards Report Appendix 3 – IEC TC14 Liaison Report Appendix 4 – CIGRE Report Page 2 of 55 ANNEXES – UNAPPROVED MINUTES OF TECHNICAL SUBCOMMITTEES NOTE: The Annexes included in these minutes are unapproved by the respective subcommittees and are accurate as of the date the Transformers Committee meeting minutes were published.
    [Show full text]
  • IEEE Grounding Transformers
    Grounding Transformers John S. Levine, P.E. Levine Lectronics and Lectric, Inc. [email protected] 1 • It is used to provide a ground path on either an ungrounded Wye or a Delta connected system • The relatively low impedance path to ground maintains the system neutral at ground potential • On Ungrounded systems you can have overvoltages of 6 to 8 times normal with arcing faults Arcing Ground Faults Intermittent or Re-strike •Plot of transient over-voltage for an arcing ground fault Arcing Ground Faults Intermittent or Re-strike •Intermittent ground fault: A re-striking ground fault can create a high frequency oscillator (RLC circuit), independent of L and C values, causing high transient over- voltages. – i.e. re-striking due to ac voltage waveform or loose wire caused by vibration 480V Delta Source 3Ø Load Rfe V V Cb Cb S fa THE HIGH RESISTANCE GROUNDED POWER SYSTEM CONTROL OF TRANSIENT OVERVOLTAGE • It supports the voltage on a faulted phase – If a single line-to-ground fault occurs on an ungrounded or isolated system, no return path exists and no current flows – The system will continue to operate but the other two un- faulted lines will rise in in voltage by the square root of 3, possibly overstressing the transformer insulation, and other components, by 173% UNGROUNDED SYSTEM NORMAL CONDITIONS UNGROUNDED SYSTEM GROUND FAULT ON PHASE A • Provides a metering point to measure faults A typical example is a Wind Farm. They utilize grounding transformers for fault protection on ungrounded lines When a ground fault occurs on a collector cable causes the substation circuit breaker to open, the wind turbine string becomes isolated Turbines do not always detect the fault and the generators continue to energize the cable.
    [Show full text]
  • Eaton Pad-Mounted Transformer
    Three-Phase Transformers COOPER POWER Effective July 2015 CA202003EN Supersedes 210-12 August 2013 SERIES Three-phase pad-mounted compartmental type transformer General At Eaton, we are constantly striving to introduce With transformer sizes ranging from 45 kVA new innovations to the transformer industry, to 12 MVA and high voltages ranging from bringing you the highest quality, most reliable 2400 V to 46 kV, Eaton has you covered. From transformers. Eaton’s Cooper Power series fabrication of the tanks and cabinets to winding Transformer Products are ISO 9001 compliant, of the cores and coils, to production of arresters, emphasizing process improvement in all phases switches, tap changers, expulsion fuses, current of design, manufacture, and testing. In order limit fuses, bushings (live and dead) and molded to drive this innovation, we have invested rubber goods, Eaton does it all. Eaton’s Cooper both time and money in the Thomas A. Edison Power series transformers are available with Technical Center, our premier research facility electrical grade mineral oil or Envirotemp™ FR3™ in Franksville, Wisconsin. Such revolutionary fluid, a less-flammable and bio-degradable fluid. products as distribution-class UltraSIL™ Electrical codes recognize the advantages of Polymer-Housed Evolution™ surge arresters and using Envirotemp™ FR3™ fluid both indoors and Envirotemp™ FR3™ fluid have been developed at outdoors for fire sensitive applications. The bio- our Franksville lab. based fluid meets Occupational Safety and Health Administration (OSHA) and Section 450.23 NEC Requirements. Catalog Data CA202003EN Three-phase pad-mounted compartmental type transformer Effective July 2015 Liquid level gauge Nameplate Bay-O-Net fusing Drip shield laser-scribed anodized aluminum LOW-VOLTAGE BUSHING Low-voltage molded epoxy bushings with NEMA® spades LOW- LOADBREAK SWITCH VOLTAGE BUSHING SUPPORT HIGH-VOLTAGE BUSHING SILL Removable cabinet Suitable for skidding, 5-position tap changer walls rolling, and jacking Ground pad and strap for x Parking stand 0 Figure 1.
    [Show full text]
  • Neutral Current Problem and Mitigation Techniques: an Overview
    IOSR Journal of Engineering (IOSR JEN) www.iosrjen.org ISSN (e): 2250-3021, ISSN (p): 2278-8719 PP 62-68 Neutral Current Problem and Mitigation Techniques: An Overview Karuna Nikum1, Rakesh Saxena2, Abhay Wagh3 1(Department of Electrical Engineering, ACE, Mumbai University, India) 2(SGSITS, RGPV University, Indore, India) 3(Directorate of Technical Education, Mumbai, India ) Abstract: In this paper, an attempt to overview a various number of mitigation techniques and power quality problems associated with neutral current for commercial loads are discussed. The load connected to three phase four wire system are generally single-phase loads and generate triplen harmonic currents due to unbalancing in phases at neutral. There are various neutral current mitigation techniques including active and passive has been discussed. The existing approach and a framework of references for researchers in this field are provided. I. ‘Introduction The ample use of electronic devices in all types of loads i.e. residential, commercial and industrial is adversely affecting the power quality (PQ) of the system[1]-[10]. When three-phase four-wire distribution (3P4W) systems are used to supply single-phase low voltage loads such as lighting ballasts (electronic type), light emitting diodes (LED), compact fluorescent lighting (CFL), personal computers, monitors, laser printers, variable speed drives, adjustable speeds drives (ASD) in air conditioner, UPS systems and other electronic equipment. These loads produces harmonics especially 3rd harmonics in the neutral. In general, the distribution systems designed for linear load type and no longer suitable for delivering large number of non-linear and harmonic generating loads [11]-[15]. The concern PQ issues are high reactive power requirement, harmonic current, low power factor and increased losses[16], [17].
    [Show full text]
  • Test Procedure for Distribution Transformers
    This document, concerning distribution transformers is an action issued by the Department of Energy. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document. [6450-01-P] DEPARTMENT OF ENERGY 10 CFR Part 431 [EERE-2017-BT-TP-0055] RIN 1904-AB39 Energy Conservation Program: Test Procedure for Distribution Transformers AGENCY: Office of Energy Efficiency and Renewable Energy, Department of Energy. ACTION: Notice of proposed rulemaking and request for comment. SUMMARY: The U.S. Department of Energy (“DOE”) proposes clarifying amendments to the test procedure for distribution transformers to revise and add definitions of certain terms, to incorporate revisions based on the latest versions of relevant Institute of Electrical and Electronics Engineers (IEEE) industry standards, and to specify the basis for voluntary representations at additional per-unit loads (PULs) and additional reference temperatures. The proposals in this NOPR are minor revisions that do not significantly change the test procedure. Therefore, none of the revisions would pose undue burden on manufacturers. DOE is seeking comment from interested parties on the proposal. DATES: DOE will accept comments, data, and information regarding this notice of proposed rulemaking (NOPR) no later than [INSERT DATE 60 DAYS AFTER DATE OF 1 PUBLICATION IN THE FEDERAL REGISTER]. See section V, “Public Participation,” for details. ADDRESSES: Any comments submitted must identify the Test Procedure NOPR for Distribution Transformers and provide docket number EERE-2017-BT-TP-0055 and/or regulatory information number (RIN) 1904-AB39.
    [Show full text]