Docklands Station Options Study Options Sift 1 Report National Transport Authority 20th December 2018 Dublin Docklands: Sift 1 Report Quality information Prepared by Checked by Verified by Approved by Edw in Marks Claire Falkiner, Associate Damien Lambert, Associate Derval Cummins, Associate Director, Director, Transportation Director, Transportation Director, European Transportation Advisory Revision History Revision Revision date Details Authorized Name Position 2 03 Dec 2018 Initial issue Derval Cummins Director, European Advisory 2 20 Dec 2018 Issue 2 Derval Cummins Director, European Advisory Prepared for: National Transport Authority Prepared by: Edwin Marks Associate Director, Transportation M: +44 (0) 7921 646147 E:
[email protected] AECOM Ireland Limited 4th Floor Adelphi Plaza Georges Street Upper Dun Laoghaire Co. Dublin A96 T927 Ireland T: +353 1 238 3100 aecom.com © 2018 AECOM Ireland Limited. All Rights Reserved. This document has been prepared by AECOM Ireland Limited (“AECOM”) for sole use of our client (the “Client”) in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AECOM and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AECOM, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AECOM. Prepared f or: National Transport Authority AECOM Dublin Docklands: Sift 1 Report Executive Summary An assessment is in progress to identify the optimal solution for a DART station in the Docklands/North Lotts area. The process of assessment is divided into distinct stages consisting of: • Sift 1 assessment • Sift 2 assessment • Identification of a preferred solution This report outlines the approach and findings of the Sift 1 stage of the assessment.