AREA TRANSPORTATION STUDY TRANSPORTATION IMPROVEMENT PROGRAM

FISCAL YEAR 2019

TIP PERIOD: OCTOBER 1, 2015-SEPTEMBER 30, 2022

CONSIDERED BY THE POLICY COMMITTEE: June 26, 2015 REVIEWED FOR PUBLIC COMMENT: MAY 8, 2015 – JUNE 8, 2015

AMENDMENT (MAJOR) #1 ADOPTED BY THE POLICY COMMITTEE: February 26, 2016 REVIEWED FOR PUBLIC COMMENT: JANUARY 8, 2016 – FEBRUARY 15, 2016

AMENDMENT (MAJOR) #2 ADOPTED BY THE POLICY COMMITTEE: September 23, 2016 REVIEWED FOR PUBLIC COMMENT: SEPTEMBER 9, 2016 – OCTOBER 9, 2016

AMENDMENT (MAJOR) #3 ADOPTED BY THE POLICY COMMITTEE: February 15, 2019 REVIEWED FOR PUBLIC COMMENT: FEBRUARY 15, 2019 – MARCH 18, 2019

FY 2016 OCTOBER 1, 2015 – SEPTEMBER 30, 2016 FY 2017 OCTOBER 1, 2016 – SEPTEMBER 30, 2017 FY 2018 OCTOBER 1, 2017 – SEPTEMBER 30, 2018 FY 2019 OCTOBER 1, 2018 – SEPTEMBER 30, 2019 FY 2020 OCTOBER 1, 2019 – SEPTEMBER 30, 2020 FY 2021 OCTOBER 1, 2020 – SEPTEMBER 30, 2021 FY 2022 OCTOBER 1, 2021 – SEPTEMBER 30, 2022

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

KEY

ARRA ...... American Reinvestment and Recovery Act CAP...... Capital CONST ...... Construction FTA ...... Federal Transit Administration NHS...... National Highway System OP ...... Operating PE...... Preliminary Engineering ROW ...... Right – of – Way RIDE ...... Road Improvement Development Effort STP...... Surface Transportation Program SIB……………… ...... State Infrastructure Bank TA… ...... Transportation Alternatives TIP...... Transportation Improvement Program UW...... Underway

Unidentified Funding Source

Multiple Funding Sources

Federal Transit Administration

Federal Highway Administration

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Table of Contents

GRAND STRAND AREA TRANSPORTATION STUDY ...... I

CHANGES TO THE TIP ...... III MINOR AMENDMENT ...... IV MAJOR AMENDMENT ...... V TIP AMENDMENT REQUEST SUBMITTAL ...... VI

SOUTH CAROLINA PROJECTS ...... 1

BLACK RIVER ROAD WIDENING ...... 2 BROADWAY/OAK ST/9TH AVE INTERSECTION ...... 3 CAROLINA BAYS PARKWAY NORTHERN EXTENSION ...... 4 CAROLINA BAYS PARKWAY SOUTHERN EXTENSION ...... 5 COAST RTA MULTI-MODAL FACILITY ...... 6 COAST RTA 5309 PROGRAM ...... 7 COAST RTA 5316 PROGRAM ...... 8 COAST RTA 5317 PROGRAM ...... 9 COX FERRY LAKE RECREATIONAL AREA ...... 10 -MAIN SPINE ...... 11 EAST COAST GREENWAY –City of Georgetown Extension ...... 12 EAST COAST GREENWAY – River Oaks ...... 13 ELM STREET SIDEWALK ...... 14 FORESTBROOK ROAD WIDENING ...... 15 FRED NASH ROAD EXTENSION ...... 16 FTA 5307 PROGRAM ...... 17 FTA 5310 PROGRAM ...... 18 FTA 5339 PROGRAM ...... 19 GEORGETOWN COUNTY CORRIDOR STUDY ...... 20 GRAND PARK CONNECTOR ...... 21 GSATS METROPOLITAN TRANSPORTATION PLAN ...... 22 INTERSECTION IMPROVEMENTS ...... 23 KINGS HIGHWAY – NEW CROSS SECTION ...... 24 MARTIN LUTHER KING & PETIGRU DR ...... 25 NEIGHBOR 2 NEIGHBOR FTA 5317 STATE OF GOOD REPAIR ...... 26 PALMETTO POINTE BLVD. EXTENSION ...... 27 PAVEMENT RESURFACING/PRESERVATION ...... 28 PERIMETER ROAD ...... 29 RIVERWOOD DR. & OLD KINGS HIGHWAY INTERSECTION IMPROVEMENT ...... 30 S-57 & S-111 INTERSECTION IMPROVEMENT ...... 31 SC 65 WIDENING ...... 32

SC 707 WIDENING ...... 33 SIGNAL SYSTEM TIMING ...... 34 SINGLETON RIDGE RD. @ TECHNOLOGY PKWY. INTERSECTION IMPROVEMENT ...... 35 SOUTHERN EVACUATION LIFELINE (SELL) ...... 36 SURFSIDE BEACH FRONTAGE ROADS ...... 37 THIRD AVE. SOUTH WIDENING ...... 38 Tournament Blvd and McDowell Shortcut ………………………………………………………………………………………………………. 39 TRANSPORTATION ALTERNATIVES ...... 40 US 17 & 27TH AVE. SOUTH INTERSECTION IMPROVEMENT ...... 41 US 17 & 46TH AVE. SOUTH ...... 42 US 17 & 48TH AVE. SOUTH ...... 43 US 17 & US 521 ...... 44 US 17 & US 701 ...... 45 US 17 & OCEAN CREEK ...... 46 US 17 BUS – GARDEN CITY INTERSECTIONS ...... 47 US 17 WIDENING (2ND AVE. N. TO SEA MOUNTAIN HWY) ...... 48 US 17 BYPASS WIDENING ( Shetland to Backgate) ...... 49 US 17 – US 17 BUS BRIDGE REHAB ...... 50 US 17 - WACCAMAW RIVER BRIDGE REHAB ...... 51 US 378 @16th Ave Intersection…………………………………………………………………………………………………………………………. 52 US 501 Realignment Myrtle Beach- Broadway to 7th Ave N ……………………………………………………………………………….53 US 501 SOUTH WIDENING (GARDNER LACY to SC 31) ...... 54 US 501 & GRISSOM INTERSECTION IMPROVEMENT ...... 55 US 501 CORRIDOR (S-1121 TO NEAR SC 31) ...... 56 US 701 – GREAT PEE DEE RIVER BRIDGE REPLACEMENT ...... 57 WAVERLY ROAD & PETIGRU ...... 58 WITHERS SWASH BRIDGE REPLACEMENT ...... 59

NORTH CAROLINA PROJECTS…………………………………………………………………………………………………………………….60

BRIDGERS ROAD BRIDGE REPLACEMENT ...... 61 Brunswick County Corridor Study- Holden Beach Causeway………………………………………………………………………………62 Main St. Sidewalk Project- Sunset Beach …………………………………………………………………………………………………………..63 Ocean Isle Beach- First Street Bike Path …………………………………………………………………………………………………………….64 ODELL WILLIAMSON MUNICIPAL AIRPORT ...... 65 Shallote Sidewalk- Mulberry East Pedestrian Corridor……………………………………………………………………………………….66 US 17 & SMITH AVE. INTERCHANGE ...... 67 US 17 SHALLOTTE BYPASS (NORTH AND SOUTH) ...... 68 US 17 SUPERSTREET @ NC 904 ...... 69 US 17 INTERCHANGE @ NC 211 ...... 70 US 17 BUS MAIN ST.-SHALLOTTE ...... 71

UNIDENTIFED FUNDING ...... 72 INTERSTATE 73 ...... 73 TRANSIT BUS SHELTERS & SIGNAGE ...... 74 WEST OF THE WATERWAY PKWY ...... 75

SOUTH CAROLINA FINANCIAL SUMMARY ...... 76 NORTH CAROLINA FINANCIAL SUMMARY ...... 77

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

GRAND STRAND AREA TRANSPORTATION STUDY METROPOLITAN PLANNING ORGANIZATION

The Grand Strand Area Transportation Study (GSATS) has produced amendments to the following document to list specific projects for which federal funds are anticipated in Federal Fiscal Years 2015, 2016, 2017, 2018, 2019, 2020, 2021, and 2022. The “Draft” of the proposed TIP was available for review and comment by the public from September 9, 2016 until October 9, 2016 at area libraries, on the web at www.gsats.org, and at the MPO area’s municipal and county planning offices.

There will be opportunities to provide the Policy Committee with comments at the Public Hearings on September 16, 2016 at 11:00 am at the Carolina Shores Town Hall (200 Persimmon Road, Carolina Shores, NC); on September 16, 2016 at 3:30 pm at the Horry County Government and Justice Center Room B (1301 Second Avenue, Conway, SC); on September 19, 2016 at 11:00 am at the Myrtle Beach City Hall First Floor Conference Room (937 Broadway Street, Myrtle Beach, SC); and on September 19, 2016 at 4:00 pm at the Waccamaw Regional Council of Governments (1230 Highmarket Street, Georgetown, SC).

After review of the public comment, the GSATS Policy Committee will meet on September 23, 2016 to consider these amendments pending the public comment period.

2015-2022 TRANSPORTATION IMPROVEMENT PROGRAM - PURPOSE

The Grand Strand Area Transportation Study (GSATS) is the designated Metropolitan Planning Organization (MPO) responsible for carrying out the urban transportation planning process for the Grand Strand area. The GSATS MPO study area boundary includes portions of Horry and Georgetown counties in South Carolina and Brunswick County in North Carolina. The municipalities that are also within the boundary are: Myrtle Beach, Conway, North Myrtle Beach, Georgetown, Surfside Beach, Shallotte, Sunset Beach, Carolina Shores, Calabash, Holden Beach, Ocean Isle Beach, Varnamtown, Briarcliffe Acres, Atlantic Beach, and Pawleys Island. The primary responsibilities of an MPO are to: 1) develop a Long Range Transportation Plan (also referred to as a Metropolitan Transportation Plan), which is the 25- year transportation vision for the metropolitan area; 2) develop a Transportation Improvement Program (TIP), which is the list of specific projects for which federal funds are anticipated; and 3) develop a Unified Planning Work Program (UPWP), which identifies in a single document the annual transportation planning activities that are to be undertaken in support of the goals, objectives and actions established in the Long Range Transportation Plan.

As the MPO, GSATS provides the forum for cooperative decision making in developing regional transportation plans and programs to meet changing needs. It is composed of elected and appointed officials representing local, state and federal governments or agencies having interest or responsibility in comprehensive transportation planning.

i

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

MPO STRUCTURE

To facilitate and encourage maximum interaction among these groups and the local community, GSATS has an adopted committee structure. The Policy Committee, as the official decision making body, establishes the policies for the overall conduct of GSATS, is responsible for the adoption of plans and programs and approves recommendations from the standing committees.

The Study Team, which was established by the Policy Committee, is composed of professional/technical representatives from the member governments and public agencies having direct or indirect responsibility for transportation planning and/or implementation. Their primary responsibility is to monitor all technical activities including the biennial development of a draft UPWP and biennial development of a draft TIP. They also direct and consider for recommendation, to the Policy Committee for final endorsement, all major studies and planning activities affecting the South Carolina portion of the study area.

A Transportation Advisory Committee (NCTAC) and Technical Coordinating Committee (NCTCC) were also established to assist the Policy Committee in carrying out transportation planning responsibilities in the North Carolina portion of the GSATS study area. The NCTAC is responsible for the review and approval of the Comprehensive Transportation Plan (CTP), Prospectus for Transportation Planning, and those portions of the UPWP affecting North Carolina. The NCTAC also directs and considers for recommendation, to the Policy Committee for final endorsement, major studies and planning activities affecting the North Carolina portion of the study area.

The NCTCC is composed of professional/technical representatives from the North Carolina member governments and public agencies having direct or indirect responsibility for transportation planning and/or implementation. The NCTCC’s primary responsibility is to monitor all technical activities including the biennial development of a draft UPWP and biennial development of a draft TIP. This committee makes recommendations to the NCTAC.

METROPOLITIAN TRANSPORTATION PLAN (MTP)

Fixing America’s Surface Transportation Act (FAST Act) mandates that MPOs have a Metropolitan Transportation Plan (MTP) which includes environmental, social, and intermodal considerations. The MTP must also provide a financially constrained 25-year vision of future transportation improvements.

The GSATS 2040 MTP was adopted in November 2017, and must be updated every five years to reflect changing conditions and new planning principles. The 2017 update established goals and objectives, which form the basis for the initial evaluation of projects submitted for the TIP. The process of undertaking major transportation studies, identifying short and long-range needs, and targeting major growth areas in the GSATS area for intensive study has strengthened subsequent programming for the TIP. The entire planning/programming/implementation process involves input by federal, state and local governments and the public in the early planning stages. This support carries through into TIP programming.

ii

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

TRANSPORTATION IMPROVEMENTS PROGRAM (TIP)

The 2015-2022 TIP for the GSATS area is typically a five-year program of transportation capital projects combined with a three-year estimate of transit capital and maintenance requirements. While the TIP is usually approved biennially, the document may be amended throughout the year. The FAST ACT, as well as the Metropolitan Planning Regulations, mandates that a TIP comprise the following:

1. Identify transportation improvement projects recommended for advancement during the program years. The projects required are those located within the study area and receiving Federal Highway Administration (FHWA) or Federal Transit Administration (FTA) funds;

2. Identify the criteria and process for prioritization for inclusion of projects in the TIP and any changes from past TIPs;

3. Group improvements of similar urgency and anticipated staging into appropriate staging periods;

4. Include realistic estimates of total costs and revenue for the program period;

5. Include a discussion of how improvements recommended from the Long Range Transportation Plan were merged into the TIP; and

6. List major projects from previous TIPs that were implemented and identify any major delays in planned implementation.

The TIP may also include regional highway projects that are being implemented by the state, city and county for which federal funding is requested.

TIP AMENDMENT PROCESS AND PROCEDURES

Changes to the TIP

Occasionally circumstances dictate that changes be made to the TIP following its biennial adoption. Federal regulations permit changes to the TIP if the procedures are consistent with federal requirements for TIP development and approval. These changes, or amendments, are not routine. GSATS will consider such amendments when the circumstances prompting the change are compelling.

Proposed changes will be reviewed by GSATS staff before any actions are considered. All changes must follow GSATS policies on the Public Participation Process. Changes must be consistent with the MTP, must maintain the financial constraint of the TIP, and must be consistent with federal Title VI requirements. Proposed additions or changes to projects must also be consistent with the rules of the particular funding program involved.

iii

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Once new projects proposed for funding are identified and the funding committed, staff initiates the process to amend the projects and project funding in the TIP. All rules for amending new projects in the TIP are followed (Public participation process, Title VI requirements, MTP consistency, financial constraint, etc.).

When GSATS is not involved in the programming decision associated with a project, staff relies on project sponsors to initiate a TIP amendment. If GSATS is aware of new funding (i.e. Federal earmarks, one-time state funding programs, etc), staff may alert sponsors of the funding commitment and request that an amendment be initiated that more fully documents the project scope and funding commitment. However, generally it is up to the project sponsor to initiate an amendment request to add new funding, or make necessary adjustments to project scope, cost and schedule.

All regionally significant transportation projects and all transportation projects requiring a federal action must be included in the TIP. These projects may be added to the TIP at any time, as long as procedures for doing so are consistent with federal requirements for TIP development and approval.

TYPES OF TIP AMENDMENTS

Federal and state policies distinguish between two types of TIP amendments: Minor Amendments and Major Amendments. These types of amendments differ based on the magnitude of the proposed change and the level of review required by various federal, state and local agencies. As a general rule, significant changes to the cost, scope and schedule of a project listing requires a major amendment, whereas minor changes in funding sources, description, lead agency, project limits, etc. may be processed as minor amendments. Major amendments must be approved by the Policy Committee, the South Carolina Department of Transportation (SCDOT), FHWA, and FTA. Approval of minor amendments has been delegated to GSATS MPO Director and the SCDOT Office of Planning.

Proposed amendments to the Federal TIP, other than minor amendments, must be developed in accordance with the provisions of 23 CFR 450.326 and/or 23 CFR 450.216, and approved by the federal agencies in accordance with 23 CFR 450.220.

Regardless of the type of change, all modifications must be consistent with the LRTP, must maintain the financial constraint of the TIP, and must be consistent with federal Title VI requirements.

Minor Amendment

Minor amendments are changes that revise project descriptions and funding source. Other types of changes that can be made through a minor amendment are changes to a project's lead agency, changes that split or combine more than one project, and changes to required information for grouped project listings. Minor amendments take about 30 days to process and need to be approved by GSATS MPO Director and the SCDOT Office of Statewide Planning.

iv

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

The following changes may be made through a minor amendment, as long as the change occurs within the approved timeframe of the TIP:

• Changes in project cost (“right sizing”) or fiscal year; • Change in project sponsor or implementing agency; • Splitting or combining projects; • Change or clarification of project description, as long as the change does not significantly alter the original project intent as identified through the environmental process. Changes in project limits must be within 10 percent of the total project length, not to exceed a total of 2 miles; and • Redirection of funds between existing phases-as long as a phase is not added or deleted.

Federal public participation procedures required by 23 CFR 450.316 are not necessary for minor changes.

Major Amendment

Major amendments are changes other than minor amendments as described. Major amendments usually take about 90 days to process and need to be approved by the GSATS Policy Committee, SCDOT, FHWA and FTA. Adding or deleting a project or a change in funding is considered a major amendment.

Proposed amendments to the TIP, other than minor amendments, must be developed pursuant to all federal guidelines. In general terms, these regulations state the TIP may be modified at any time consistent with the procedures agreed to by the cooperating parties for developing the TIP and all other federal requirements in 23 CFR part 450 concerning the development, public participation, and federal agencies approval of the TIP. The interagency consultation or coordination requirements of 23 CFR 450.216(c) and 23 CFR 450.22 will be followed for all major amendments to the TIP.

All changes that do not fall within the category of a minor amendment are processed as major amendments. The following changes are examples of changes made through a major amendment:

• Adding or deleting project(s); • Changes in funding source or amount (above the “right sizing” limits); • Adding or deleting a project phase; and • Significant changes in project scope, so as to alter the original intent of the project.

These amendment classifications and procedures are consistent with the Statewide TIP Guidelines as endorsed by SCDOT in coordination with the FHWA and FTA. It is the intent that GSATS TIP Amendment Process and Procedures adhere to the provisions of the Statewide TIP Guidelines.

v

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

TIP Amendment Request Submittal

To request a TIP amendment, a project sponsor must submit a proposal to amend the TIP. GSATS programming staff will review the submitted request for compliance with federal regulations, state statutes and regional polices, including finding completeness, impacts to air quality, financial constraint and compliance with other federal, state and regional requirements before approving the submitted application or amendment. If the proposal is found not to conform to the funding program guidelines or is inconsistent with the financial constraint of the TIP, the proposal may not be processed.

Proposed additions or changes to projects contained in the TIP must also conform to the amendment rules of the funding program involved (e.g. if the project is funded with guideshare funds, it must also conform to the federal and state amendment guidelines before it can be processed).

RELATIONSHIP OF THE TIP TO OTHER FEDERAL AND STATE TRANSPORTATION PROGRAMS

Just as each metropolitan region is required to develop a TIP, each state is required to develop a Statewide Transportation Improvement Program (STIP) pursuant to federal regulations. The STIP includes all federally funded transportation projects from throughout the state. In South Carolina, MPO TIPs are included in the STIP without modification once approved by the relevant Metropolitan Planning Organization (GSATS, in the case of the Grand Strand Area) and after FHWA and FTA make their required financial constraint findings. Projects must be in the STIP before funding authorities, such as FTA, FHWA, or SCDOT, can "obligate" funds (i.e., commit funds to contract) and before sponsors can actually spend any of these moneys.

vi

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

SOUTH CAROLINA PROJECTS

1

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name Black River Road Widening Priority# 30 Funding Legend Route or State Road# S-22-82 Length (mi/km) 0.76mi/1.28km Unidentified Funding Source Jurisdiction City of Georgetown Multiple Funding Sources Functional Class Minor Arterial Federal Transit Administration Total Cost $3,300,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 PE $250k ROW $250k Construction $2.8 m Total $250k $250k $2.8 m Programmed and Planned Improvements TIP Project Turn lanes and sidewalks from US 701 to Willow Bank Road, along Black River Road. Description Program SYSTEM UPGRADE Type Funding through the Surface Transportation Program. Remarks

2

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name Broadway/Oak/9th Intersection Priority# 18D Route or State Road# Funding Legend Length (mi/km) 0.0 Unidentified Funding Source Jurisdiction Myrtle Beach Multiple Funding Sources Functional Class Major Collector Federal Transit Administration Total Cost $4,050,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 PE $375,000 ROW $325,000 Construction Total $375,000 $325,000 Programmed and Planned Improvements TIP Project Incorporate a roundabout to more safely integrate motorists, bicyclists and Description pedestrians. Program System upgrade- intersection improvement Type Funding through the Surface Transportation Program. Selected as part of the GSATS Round 3 Remarks Intersection program. An additional $3,350,000 is anticipated in future years to complete the project.

3

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name Carolina Bays Parkway Northern Extension Priority# 1 Route or State Road# SC 31 Funding Legend Length (mi/km) 4.9mi/8.3km Unidentified Funding Source Jurisdiction Horry County Multiple Funding Sources Functional Class Principal Arterial Federal Transit Administration Total Cost $185,000,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 PE $610,000 $15,000,000 ROW $10,000,000 Construction Total $610,000 $15,000,000 $10,000,000 Programmed and Planned Improvements TIP Project Extend SC 31 five miles to the north (from SC 9) to intersect with a corresponding road in North Description Carolina. Program Local System Upgrade Type This project is included in the RIDE III Program. Remarks

4

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name Carolina Bays Parkway Southern Extension Priority# 2 Route or State Road# SC 31 Funding Legend Length (mi/km) 4.0mi/6.43km Unidentified Funding Source Jurisdiction Horry County Multiple Funding Sources Functional Class Principal Arterial Federal Transit Administration Total Cost $189,262,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 PE $7,362,000 ROW $52,800,000 Construction $129,100,000 Total $189,262,000 Programmed and Planned Improvements TIP Project Extend SC 31 four miles to the southeast (from SC 544) to intersect with SC 707 Description Program STATE INFRASTRUCTURE BANK & ARRA Type Funding sources: RIDE, SIB, NHS, STP and $10 M in ARRA funds. Remarks

5

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name Coast RTA Multi-Modal Facility Priority# 22 Route or State Road# NA Funding Legend Length (mi/km) mi/km Unidentified Funding Source Jurisdiction NA Multiple Funding Sources Functional Class NA Federal Transit Administration Total Cost $800,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 PE $800,000 ROW Construction Total $800,000 Programmed and Planned Improvements TIP Project Funding for a feasibility analysis for the location of and possible purchase of land for a new facility Description for Coast RTA. Program SYSTEM UPGRADE Type STP Funding. Funds flexed to FTA. Coast is looking at the feasibility of relocating their operation east of the Intracoastal Waterway. Remarks There was $200K added back in carryover as well.

6

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name Coast RTA 5309 Program Priority# 34 Route or State Road# NA Funding Legend Length (mi/km) mi/km Unidentified Funding Source Jurisdiction NA Multiple Funding Sources Functional Class NA Federal Transit Administration Total Cost $ Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 PE ROW OP Total $149,000 Programmed and Planned Improvements TIP Project Operating, Capital and Administrative funding for Coast RTA Description Program Mass Transit (5309) Large Urbanized Area Type Section 5309 funding is for the GSATS’ portions of Georgetown & Horry counties. Remarks

7

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name Coast RTA 5316 Program Priority# 35 Route or State Road# NA Funding Legend Length (mi/km) mi/km Unidentified Funding Source Jurisdiction NA Multiple Funding Sources Functional Class NA Federal Transit Administration Total Cost $ Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 PE ROW OP Total $414,000 Programmed and Planned Improvements TIP Project Operating, Capital and Administrative funding for Coast RTA Description Program Mass Transit (5316) Large Urbanized Area Type Section 5316 funding is for the GSATS portions of Georgetown and Horry counties. Remarks

8

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name Coast RTA 5317 Program Priority# 37 Route or State Road# NA Funding Legend Length (mi/km) mi/km Unidentified Funding Source Jurisdiction NA Multiple Funding Sources Functional Class NA Federal Transit Administration Total Cost $ Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 PE ROW OP Total $187,000 Programmed and Planned Improvements TIP Project Operating, Capital and Administrative funding for Coast RTA Description Program Mass Transit (5317) Large Urbanized Area Type Section 5317 funding is for the GSATS portion of Georgetown and Horry counties. Remarks

9

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name Cox Ferry Lake Recreational Area Priority# 39- TA project Route or State Road# NA Funding Legend Length (mi/km) mi/km Unidentified Funding Source Jurisdiction Horry Co. Multiple Funding Sources Functional Class N/A Federal Transit Administration Total Cost $50,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 PE ROW CON Total $50,000 Programmed and Planned Improvements TIP Project Trail enhancement project including a section of boardwalk at the Cox Ferry Lake Recreational Area Description section of the Waccamaw National Wildlife Refuge. Program Transportation Alternatives Program (Non-MPO funds) Type Funding from Recreational Trails Program Remarks

10

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

East Coast Greenway-Main Spine Priority# 39 (TA-18) Route or State Road# TBD Funding Legend Length (mi/km) mi/km Unidentified Funding Source Jurisdiction regionwide Multiple Funding Sources Functional Class Federal Transit Administration Total Cost $378,000 Federal Highway Administration

Estimated Unobligated Cost FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 PE ROW CON Total $378,000 Programmed and Planned Improvements TIP Project Un-programmed Alternatives funding for East Coast Greenway spine route projects available in Description 2020. Program Transportation Alternatives. Type Funding from Surface Transportation Program. 20% minimum local match required by participating Remarks local jurisdictions

11

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

East Coast Greenway – City of Georgetown Extension. Priority# TA -11 Route or State Road# TBD Funding Legend Length (mi/km) mi/km- TBD Unidentified Funding Source Jurisdiction Georgetown Multiple Funding Sources Functional Class Collector Federal Transit Administration Total Cost $628,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 PE ROW CON $628,000 Total $628,000 Programmed and Planned Improvements TIP Project Connect the East Coast Greenway through the City of Georgetown. Description Program Transportation Alternatives Program. Type Remarks Funding from Surface Transportation Program. 20% minimum local match required by local jurisdiction.

12

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

East Coast Greenway –River Oaks Priority# 39 (TA-13) Route or State Road# River Oaks Dr./Frnt Rd. Funding Legend Length (mi/km) mi/km 2.08/3.35 Unidentified Funding Source Jurisdiction Horry County Multiple Funding Sources Functional Class Collector Federal Transit Administration Total Cost $583,200 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 PE ROW CON $395,200 $188,000 Total $395,200 $188,000 Programmed and Planned Improvements TIP Project Extend existing multipurpose path along River Oaks Dr and the frontage road from the Bike Run Description Park to International Dr. Program Transportation Alternatives. Type Funding from Surface Transportation Program. 20% minimum local match required by local Remarks jurisdiction.

13

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Elm Street Sidewalk Priority# 39 (TA-16) Route or State Road# Elm Street Funding Legend Length (mi/km) mi/km 0.53/0.85 Unidentified Funding Source Jurisdiction Conway Multiple Funding Sources Functional Class Collector Federal Transit Administration Total Cost $200,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 PE ROW CON $200,000 Total $200,000 Programmed and Planned Improvements th TIP Project Construct a five foot wide sidewalk along the west side of Elm Street from Mill Pond Road to 16 Description Ave. Program Transportation Alternatives. Type Funding from Surface Transportation Program. 20% minimum local match required by local Remarks jurisdiction.

14

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Forestbrook Road Widening Priority# 12 Route or State Road# SR S-26 Funding Legend Length (mi/km) mi/km 4.5/7.24 Unidentified Funding Source Jurisdiction Horry County Multiple Funding Sources Functional Class Collector Federal Transit Administration Total Cost $89,100,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 PE 5,000,000 ROW $15,000,000 CON $69,100,000 Total $5,000,000 $15,000,000 $69,100,000 Programmed and Planned Improvements TIP Project Widen Forestbrook Road between Hwy 501 and Dick Pond Road. Improvements will feature 5-lanes Description including a center turn lane and the installation of bike/pedestrian facilities such as sidewalks and wider travel lanes. Program Local - System Upgrade Type Funding from Horry County Ride 3 Program. Also eligible for funding through the Surface Transportation Remarks Program.

15

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name Fred Nash Road Extension Priority# 14 Funding Legend Route or State Road# New Location Length (mi/km) mi/km (1.75/2.79) Unidentified Funding Source Jurisdiction Myrtle Beach Multiple Funding Sources Functional Class New Location Federal Transit Administration Total Cost $19,300,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 PE $1,500,000 ROW $3,000,000 CON $14,800,000 Total $1,500,000 $3,000,000 $14,800,000 Programmed and Planned Improvements TIP Project Construct new 3-lane road, including a center turn-lane, to extend Fred Nash Boulevard around the Description end of the airport runway (MYR) to provide a direct connection to . The project includes bicycle facilities. Program Local- System Upgrade Type Funding from Horry County Ride 3 Program. Also eligible for funding through the Surface Transportation Remarks Program.

16

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name FTA 5307 Program Priority# 33A Funding Legend Route or State Road# NA Length (mi/km) mi/km Unidentified Funding Source Jurisdiction NA Multiple Funding Sources Functional Class NA Federal Transit Administration Total Apportionment $ Federal Highway Administration

Estimated Unobligated Cost Agency Type FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 Coast RTA Ops $977,950 $1,035,738 $1,063,173 $1,091,422 $1,120,513 $1,150,476 Coast RTA Capital $348,000 $348,880 $45,778 $46,693 $47,627 $48,579 Coast RTA Prevt. Main. $686,582 $729,595 $745,494 $761,750 $778,371 $795,366 GSATS Capital $168,788 $83,890 $75,836 Total $2,181,319 $2,198,103 $1,930,280 $1,899,864 $1,946,511 $1,994,422 Programmed and Planned Improvements FTA apportions Urbanized Area Formula Program funds to urbanized areas (UZAs) and to states for TIP Project public transportation capital projects, operating assistance, job access and reverse commute Description projects, and for transportation-related planning. Federal Transit Administration Urbanized Area Formula Program (5307). Program Type Coast RTA is the direct recipient of 5307 funds. Remarks

17

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name FTA 5310 Program Priority# 33B Route or State Road# NA Funding Legend Length (mi/km) mi/km Unidentified Funding Source Jurisdiction NA Multiple Funding Sources Functional Class NA Federal Transit Administration Total Cost $1,973,000 (FY07-19) Federal Highway Administration

Estimated Unobligated Cost Agency Type FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 Neighbor to Capital (M) Neighbor $52,510 $211,063 $49,776 Horry Co DSNB Capital (V) $0 $50,475 Coast RTA Capital (V) $101,784 $110,500 $44,951 GSATS Admin $17,144 $51,863 Total $171,438 $423,901 $94,727 $283,000 Programmed and Planned Improvements TIP Project FTA apportions funds for Elderly Individuals and Individuals with Disabilities to designated Description recipients. Public transportation capital projects are planned, designed, and carried out to meet the special needs of seniors and individuals with disabilities when public transportation is insufficient, unavailable or inappropriate. (E)=Service Expansion, (V)= Vehicle Purchase (C)=Capital Cost of Contracting, and (M)=Mobility Management Program Federal Transit Administration Elderly Individuals and Individuals with Disabilities Program (5310). Type GSATS will have a competitive application process for Section 5310 funds. Remarks

18

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name FTA 5339 Program Priority# 33C Route or State Road# NA Funding Legend Length (mi/km) mi/km Unidentified Funding Source Jurisdiction NA Multiple Funding Sources Functional Class NA Federal Transit Administration Total Cost $ Federal Highway Administration

Estimated Unobligated Cost Agency Type FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 Coast RTA Capital (V) $176,388 $169,406 $168,973 $133,352 Total $176,388 $169,406 $168,973 $133,352 Programmed and Planned Improvements TIP Project FTA apportions Bus and Bus Facilities Program to assist eligible recipients in financing capital Description projects to replace, rebuild, and purchase buses and related equipment, and to construct bus- related facilities. (V)=Vehicle Purchase

Program Federal Transit Administration Bus and Bus Facilities Program (5339) Type Coast RTA is the direct recipient of Section 5339 funds. Remarks

19

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name Georgetown County Corridor Study Priority# 47 Route or State Road# NA Funding Legend Length (mi/km) mi/km Unidentified Funding Source Jurisdiction NA Multiple Funding Sources Functional Class NA Federal Transit Administration Total Cost $100,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 PE $100,000 ROW OP Total $100,000 Programmed and Planned Improvements TIP Project Update the 2003 US 17 Georgetown County corridor. Description Program Corridor Study Type Funded through the Surface Transportation Program. No Local Match Requirement Remarks

20

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name

Grand Park Connector Priority# 39 (TA-15) Route or State Road# King Hwy/Kings Road Funding Legend Length (mi/km) mi/km 1.17/1.89 Unidentified Funding Source Jurisdiction Myrtle Beach Multiple Funding Sources Functional Class Collector Federal Transit Administration Total Cost $302,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 PE ROW CON $302,000 Total $302,000 Programmed and Planned Improvements TIP Project Construct a multipurpose path along from Emory Road to Crabtree Lane. The Description path will link parks to businesses and neighborhoods. Program Transportation Alternatives. Type Funding from Surface Transportation Program. 20% match contributed by local jurisdiction Remarks

21

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name GSATS Long Range Transportation Plan Priority# 46 Route or State Road# Funding Legend Length (mi/km) Unidentified Funding Source Jurisdiction Entire Study Area Multiple Funding Sources Functional Class Federal Transit Administration Total Cost $300,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 PE ROW CON Total $300,000 Programmed and Planned Improvements TIP Project 2040 GSATS Long Range Transportation Plan. Description Program Surface Transportation Program Type Funded by Surface Transportation Program and 20% local match. Remarks

22

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name Intersection Improvements Priority# 16,17, & 18 Funding Legend Route or State NA Road# Length (mi/km) mi/km Unidentified Funding Source Jurisdiction GSATS Study Area Multiple Funding Sources Functional Class NA Federal Transit Administration Total Cost $32,692,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 PE ROW CON Total $10.565m $4.940m $925k $1.5m $750k $2.138 $6.1m Programmed and Planned Improvements

TIP Project Safety and geometric improvements at locations throughout the GSATS region. Description Program System Upgrade Type Priorities 16, 17, and 18 represent three prioritized lists of projects that were developed by the Study Team and approved by the Policy Committee for which funding has been identified for 2015-2022. Remarks Dollar amounts are in the millions. An additional $5.775 million is anticipated in future years to complete the projects selected through the Round 3 intersection program.

23

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name Kings Highway – New Cross Section Priority# 24 Route or State Road# US 17 Bus Funding Legend Length (mi/km) mi/km .78/1.26 Unidentified Funding Source Jurisdiction Myrtle Beach Multiple Funding Sources Functional Class Arterial Federal Transit Administration Total Cost $2,500,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 PE ROW CON Total $2,500,000 Programmed and Planned Improvements rd TIP Project New cross section on Kings Highway, from 3 Ave. South to US 501, as proposed in the US 17 Description Corridor Study to include accommodation for additional modes of travel Program System Upgrade Type Surface Transportation Program funding Remarks

24

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name Martin Luther King & Petigru Dr. Priority# 17I Route or State Road# S-22-499/S-22-450 Funding Legend Length (mi/km) mi/km .71/1.14 Unidentified Funding Source Jurisdiction Georgetown County Multiple Funding Sources Functional Class Collector Federal Transit Administration Total Cost $1,000,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 PE ROW $75,000 CON $925,000 Total $75,000 $925,000 Programmed and Planned Improvements TIP Project Construct left and right turn lanes on MLK. Widen Petigru to allow for turn lanes. Pave Petigru to Description Aspen Loop. Additional funding from Georgetown County to complete project to Aspen Loop. Program System Upgrade Type Surface Transportation Program and Georgetown County funding. Remarks

25

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name

Neighbor to Neighbor FTA 5317 State of Good Repair Priority# 36 Route or State Road# NA Funding Legend Length (mi/km) mi/km Unidentified Funding Source Jurisdiction G’town & Horry County Multiple Funding Sources Functional Class NA Federal Transit Administration Total Cost $140,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 PE ROW CON $140,000 Total $140,000 Programmed and Planned Improvements TIP Project FTA Section 5317 funds to provide assistance to an assisted rides program operating in Horry and Description Georgetown Counties. Program Federal Transit Administration Type FTA Section 5317 New Freedom Remarks

26

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name Palmetto Pointe Blvd. Extension Priority# 6 Funding Legend Route or State Road# NA Length (mi/km) mi/km .76/1.2 Unidentified Funding Source Jurisdiction Horry County Multiple Funding Sources Functional Class Collector Federal Transit Administration Total Cost $4,000,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 PE $1.0M ROW CON $3.0M Total $1.0M $3.0M Programmed and Planned Improvements TIP Project Construct an extension of Palmetto Point Blvd. to intersect with SC 544 at the existing intersection Description with Big Block Rd. Program System Upgrade Type This project is included the RIDE III program. It is also eligible for Surface Transportation Program Remarks funding

27

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name Pavement Resurfacing/Preservation Priority# 48-51 Route or State Road# NA Funding Legend Length (mi/km) mi/km Unidentified Funding Source Jurisdiction G’town & Horry County Multiple Funding Sources Functional Class NA Federal Transit Administration Total Cost $16,051,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 PE ROW CON Total $16,051,000 Programmed and Planned Improvements TIP Project Reflects funding dedicated to resurfacing projects in the Georgetown and Horry County portion of Description the GSATS Study Area to date during this TIP period.

Program System Maintenance Type Funding from the Surface Transportation Program. Remarks

28

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name Perimeter Road Phase II Priority# 13 Route or State Road# New Location Funding Legend Length (mi/km) mi/km (1.59 /2.55) Unidentified Funding Source Jurisdiction Conway Multiple Funding Sources Functional Class New Location Federal Transit Administration Total Cost $18,400,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 PE $2,000,000 ROW $5,000,000 CON $11,400,000 Total $2,000,000 $5,000,000 $11,400,000 Programmed and Planned Improvements TIP Project Construct new road with multi-use path from US378 (at El-Bethel Road) to US 701 South. The new Description road will feature 4 lanes with median and turning lanes at the intersection.

Program Local- System Upgrade Type Funding from Horry County Ride 3 Program. This project is also eligible for Surface Transportation Program Remarks funding.

29

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name Riverwood & Old Kings Highway Intersection Priority# 18 C Route or State Road# NA Funding Legend Length (mi/km) mi/km NA Unidentified Funding Source Jurisdiction Georgetown County Multiple Funding Sources Functional Class Major Collector Federal Transit Administration Total Cost $4,700,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 PE $375,000 ROW $325,000 CON $4,000,000 Total $375,000 $325,000 $4,000,000 Programmed and Planned Improvements TIP Project Construction of a roundabout. Description

Program System Upgrade- Intersection Improvement. Type Selected as part of the GSATS Round 3 Intersection program. Remarks

30

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name S-57 & S-111 Intersection Priority# 18B Route or State Road# S-57 and S-111 Funding Legend Length (mi/km) mi/km NA Unidentified Funding Source Jurisdiction Horry County Multiple Funding Sources Functional Class Major Collector Federal Transit Administration Total Cost $4,292,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 PE ROW $750,000 CON $800,000 Total $750,000 $800,000 Programmed and Planned Improvements TIP Project Signalize the intersection and construct left-turn lanes on the S-57 and S-111 approaches. Description

Program System Upgrade- Intersection Improvement. Type Selected as part of the GSATS Round 3 Intersection program. $1,192,000 in funding also provided Remarks by the Horry County Transportation Committee

31

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name SC 65 Widening Priority# 23 Route or State Road# SC 65 (Ocean Dr.) Funding Legend Length (mi/km) mi/km .8/1.3 Unidentified Funding Source Jurisdiction North Myrtle Beach Multiple Funding Sources Functional Class Collector Federal Transit Administration Total Cost $5,000,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 PE $450,000 ROW $550,000 CON $3,500,000 $500,000 Total $450,000 $550,000 $3,500,000 $500,000 Programmed and Planned Improvements th th TIP Project Widen Ocean Dr. to a three lane cross section from 28 Ave. South to 17 Ave. south, to match Description previous improvements to the south. Program System Upgrade Type Surface Transportation Program funding. Remarks

32

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name SC 707 Widening Priority# 4 Route or State Road# SC 707 Funding Legend Length (mi/km) mi/km 9.13/14.69 Unidentified Funding Source Jurisdiction Horry & G’twn Counties Multiple Funding Sources Functional Class Minor Arterial Federal Transit Administration Total Cost $116,000,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 PE $5,300,000 ROW $23,250,000 CON $80,800,000 Total $109,350,000 Programmed and Planned Improvements TIP Project Widen SC 707 to a five lane cross section with sidewalk from Enterprise Rd. to US 17 in Description Georgetown County. Program System Upgrade non Guideshare Type Surface Transportation Program funding, along with RIDE II and SIB. Remarks

33

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name Signal System Timing Priority# 26 Route or State Road# NA Funding Legend Length (mi/km) mi/km Unidentified Funding Source Jurisdiction GSATS Study Area Multiple Funding Sources Functional Class NA Federal Transit Administration Total Cost $1,194,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 PE $685,000 ROW CON $509,000 Total Programmed and Planned Improvements TIP Project This project involves the retiming of traffic signal systems, installing time of day, responsive or Description adaptive signal systems and installing traffic monitoring cameras at signals. Program System Upgrade Type Surface Transportation Program funding. Locations to be within the GSATS Study Area. Remarks

34

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name Singleton Ridge Rd. @ Technology Pkwy. Intersection Priority# 16I Route or State Road# NA Funding Legend Length (mi/km) mi/km Unidentified Funding Source Jurisdiction Conway Multiple Funding Sources Functional Class Collector Federal Transit Administration Total Cost $3,285,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 PE $150,000 ROW $250,000 CON $960,000 $1,400,000 Total $400,000 $960,000 $1,400,000 Programmed and Planned Improvements TIP Project This project involves the installation of a traffic circle to resolve the geometric issues with the Description intersection of Singleton Ridge Rd., Technology Pkwy. and William Findlayson Rd. Program System Upgrade Type Surface Transportation Program funding. Multiple funding sources include: SCDOT Safety ($700,000), City of Conway, Horry County CTC ($825,000)., Coastal Carolina University, Horry Remarks Georgetown Technical College, and Conway Hospital.

35

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name Southern Evacuation Lifeline (SELL) Priority# 8 Route or State Road# New Alignment Funding Legend Length (mi/km) mi/km .76/1.28 Unidentified Funding Source Jurisdiction Horry County Multiple Funding Sources Functional Class Expressway Federal Transit Administration Total Cost TBD Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 PE $4,500,000 $10,000,000 ROW $15,000,000 CON Total $4,500,000 $10,000,000 $15,000,000 Programmed and Planned Improvements TIP Project Funding shown is to do a Final Environmental Impact Statement, with a plan to begin Right of Way Description acquisition in FY2021. Project would provide a crossing of the Intracoastal Waterway and connect the South Strand to US 501 in the proximity of SC 22. Program System Upgrade Type This project is included in RIDE III ($25,000,000). Project is also eligible for funding through the Remarks Surface Transportation Program.

36

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name Surfside Beach Frontage Rds. Priority# 29 Route or State Road# US 17 Bus Funding Legend Length (mi/km) mi/km 2.85/4.6 Unidentified Funding Source Jurisdiction Surfside Beach Multiple Funding Sources Functional Class Minor Arterial Federal Transit Administration Total Cost $12,900,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 PE $500,000 ROW $200,000 CON $8,200,000 $4,000,000 Total $500,000 $200,000 $8,200,000 $4,000,000 Programmed and Planned Improvements TIP Project Close US 17 median breaks between SC 544 and Melody Lane. Modify intersections to Description accommodate U-turns, interrupt flow on frontage roads at signals and coordinate traffic signals. Program System Upgrade- Corridor Improvement Type Surface Transportation Program and Surface Transportation Block Grant funding. Project has been Remarks combined with intersection improvement projects at US 17 Bus and 14th- 16th Ave North and US 17 Bus and 10th Ave South due to proximity and for efficiency.

37

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name Third Ave. South Widening Priority# 5 Route or State Road# S-26-84 Funding Legend Length (mi/km) mi/km 1.2/1.93 Unidentified Funding Source Jurisdiction Myrtle Beach Multiple Funding Sources Functional Class Collector Federal Transit Administration Total Cost $14,280,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 PE $1,000,000 ROW $2,450,000 CON $9,754,000 Total $13,204,000 Programmed and Planned Improvements TIP Project Widen to three lanes with bike lanes and sidewalk from US 501 to US 17 Business. Description Program System Upgrade Type Surface Transportation Program and $4,480,000 City of Myrtle Beach funding to total project cost. Remarks

38

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name Tournament Blvd. & McDowell Shortcut Priority# 18A Route or State Road# SR S-26-477 Funding Legend Length (mi/km) mi/km NA Unidentified Funding Source Jurisdiction Horry County Multiple Funding Sources Functional Class Collector Federal Transit Administration Total Cost $2,650,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 PE $250,000 ROW $300,000 CON $2,100,000 Total $250,000 $300,000 $2,100,000 Programmed and Planned Improvements TIP Project Signalize intersection and install left-turn lanes on all approaches. Install a right-turn lane on Description westbound Tournament Blvd.

Program System Upgrade- Intersection Improvement. Type Selected as part of the GSATS Round 3 Intersection program. Remarks

39

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study Project Name Transportation Alternatives Priority# 39 Route or State Road# NA Funding Legend Length (mi/km) mi/km Unidentified Funding Source Jurisdiction GSATS Area Multiple Funding Sources Functional Class NA Federal Transit Administration Total Cost $4,033,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 PE ROW CON Total $1,321,000 $307,000 $707,000 $307,000 $307,000 $307,000 Programmed and Planned Improvements TIP Project Funding for sidewalks, pathways and general bike and pedestrian facilities. Description Program System Upgrade Type Funding based on status as a Transportation Management Area. Remarks

40

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name

US 17 & 27th Ave S Intersection NMB Priority# 18E Route or State Road# NA Funding Legend Length (mi/km) mi/km NA Unidentified Funding Source Jurisdiction North Myrtle Beach Multiple Funding Sources Functional Class Major Arterial Federal Transit Administration Total Cost $1,850,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 PE $250,000 ROW $200,000 CON Total $250,000 $200,000 Programmed and Planned Improvements TIP Project Project consists of intersection widening, realignment, signal improvements, as well as bicycle and Description pedestrian facility enhancements.

Program System Upgrade- Intersection Improvement. Type Selected as part of the GSATS Round 3 Intersection program. $1,400,000 in funding is anticipated Remarks in future years to complete this project. Right of Way provided by City of North Myrtle Beach.

41

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name US 17 & 46th Ave. South Priority# 17P Route or State Road# US 17 Funding Legend Length (mi/km) mi/km Unidentified Funding Source Jurisdiction North Myrtle Beach Multiple Funding Sources Functional Class Major Arterial Federal Transit Administration Total Cost $1,727,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 PE $288,000 ROW $118,000 CON $1,321,000 Total $288,000 $118,000 $1,321,000 Programmed and Planned Improvements TIP Project Signalize with mast arms, turn lanes, crosswalks, pedestrian signal heads and other. Description Program System Upgrade Type Funding from Surface Transportation System. Combined with 16E and 17S. Remarks

42

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name US 17 & 48th Ave. South Priority# 16E Route or State Road# US 17 Funding Legend Length (mi/km) mi/km Unidentified Funding Source Jurisdiction North Myrtle Beach Multiple Funding Sources Functional Class Major Arterial Federal Transit Administration Total Cost $940,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 PE $165,000 ROW $775,000 CON Total $165,000 $775,000 Programmed and Planned Improvements TIP Project Improve intersection geometry, drainage and signal timing. Add additional turn lanes, sidewalks, Description pedestrian crosswalks and access control. Program System Upgrade Type Funding from Surface Transportation System. Combined with 17P and 17S. Remarks

43

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name US 17 and US 521 Priority# 170 Route or State US 17 Funding Legend Length (mi/km) mi/km Unidentified Funding Source Jurisdiction Georgetown Multiple Funding Sources Functional Class Major Arterial Federal Transit Administration Total Cost $575,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 PE $75,000 ROW $75,000 CON $425,000 Total $150,000 $425,000 Programmed and Planned Improvements TIP Project Signal mast arms, turn lanes, crosswalks, pedestrian signal heads and other. This project will be Description combined with Priority 17D and 19. Program System Upgrade Type Funding from Surface Transportation System. Remarks

44

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name US 17 and US 701 Priority# 17D Route or State Road# US 17 Funding Legend Length (mi/km) mi/km Unidentified Funding Source Jurisdiction Georgetown Multiple Funding Sources Functional Class Major Arterial Federal Transit Administration Total Cost $550,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 PE $100,000 ROW CON $450,000 Total $100,000 $450,000 Programmed and Planned Improvements Add northbound left turn lane to US 17A and expand southbound right onto US 701. Signal mast TIP Project arms, turn lanes, crosswalks, pedestrian refuge islands and signal heads and other improvements. Description This project along will be combined Priority 17-O and 19. Program System Upgrade Type Funding from Surface Transportation System. Remarks

45

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name US 17 & Ocean Creek NMB Priority# 17S Route or State Road# US 17 Funding Legend Length (mi/km) mi/km Unidentified Funding Source Jurisdiction North Myrtle Beach Multiple Funding Sources Functional Class Major Arterial Federal Transit Administration Total Cost $655,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 PE ROW CON $490,000 Total $165,000 $490,000 Programmed and Planned Improvements TIP Project Intersection enhancements to improve safety and reduce congestion near the Barefoot Landing Description development complex. Program System Upgrade Type Funding from Surface Transportation Program. Combined with projects 16E and 17 P due to Remarks proximity and for project efficiency.

46

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name

US 17 Bus – Garden City Intersections Priority# 11 Route or State Road# US 17 Business Funding Legend Length (mi/km) mi/km NA Unidentified Funding Source Jurisdiction Horry County Multiple Funding Sources Functional Class Principal Arterial Federal Transit Administration Total Cost $19,800,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 PE $1,500,000 ROW $5,000,000 CON $13,300,000 Total $1,500,000 $5,000,000 $13,300,000 Programmed and Planned Improvements TIP Project Improve capacity and safety at the following three intersections in Garden City (intersection Description widening, turn lane extensions, and other operational improvements) 1). US 17 Bus @Inlet Square Mall// Mt. Gilead Rd. 2). US 17 Bus @ Atlantic Ave. 3). US 17 Bus@ Garden City Connector/ Pine Ave Program Local- Horry Sales Tax. System Upgrade- Intersection Improvements. Type Funding from Horry County Ride 3 Program. Also eligible for Surface Transportation Program funding. Remarks

47

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name US 17 Widening 2nd Ave. N. to Sea Mountain Hwy Priority# 20 Route or State Road# US 17 Funding Legend Length (mi/km) mi/km 2.9/4.7 Unidentified Funding Source Jurisdiction North Myrtle Beach Multiple Funding Sources Functional Class Major Arterial Federal Transit Administration Total Cost $5,366,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 PE ROW CON Total $1,577,000 Programmed and Planned Improvements nd TIP Project Widen southbound US 17 from 2 Ave. North to Sea Mountain Hwy. from two travel lanes to three. Description Program System Upgrade Type Funding from Surface Transportation Program. $3,799,000 in ARRA funding included for a total project cost of $5,365,000. A third lane already exists between 8th and 11th Aves. North Remarks

48

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

US 17 Bypass Widening- Shetland to Backgate Priority# 28 Route or State Road# US 17 Funding Legend Length (mi/km) mi/km 1.1/1.8 Unidentified Funding Source Jurisdiction Myrtle Beach/Horry Co. Multiple Funding Sources

Functional Class Major Arterial Federal Transit Administration Total Cost $12,710,00 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 PE $500,000 ROW $10,000 CON $7,500,000 $4,700,000 Total $500,000 $10,000 $7,500,000 $4,700,000 Programmed and Planned Improvements TIP Project Widen US 17 from four to six lanes from Shetland Ave. to SC 707/Farrow Pkwy. Description System Upgrade Program Type Funding from Surface Transportation System. Remarks

49

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

US 17 – US 17 Bus Bridge Rehab Priority# 43 Route or State Road# US 17 / US 17 Bus Funding Legend Length (mi/km) mi/km Unidentified Funding Source Jurisdiction Horry County Multiple Funding Sources Functional Class Major Arterial Federal Transit Administration Total Cost $663,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 PE $30,000 ROW CON $633,000 Total $30,000 $633,000 Programmed and Planned Improvements TIP Project Bridge Rehab. Description Program System Upgrade Type Funding from Surface Transportation Program (Non- Guideshare project) Remarks

50

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name US 17 - Waccamaw River Bridge Rehab Priority# 42 Route or State Road# US 17 Funding Legend Length (mi/km) mi/km Unidentified Funding Source Jurisdiction Georgetown County Multiple Funding Sources Functional Class Major Arterial Federal Transit Administration Total Cost $4,030,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 PE $169,000 ROW CON $3,861,000 Total $169,000 $3,861,000 Programmed and Planned Improvements TIP Project Rehab bridge over the Waccamaw River north of Georgetown. Description Program System Upgrade Type Funding from Surface Transportation Program. (Non-Guideshare project) Remarks

5252

51

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name

US 378 & 16th Ave Conway Priority# 18F Route or State Road# US 378 Funding Legend Length (mi/km) mi/km NA Unidentified Funding Source Jurisdiction Conway Multiple Funding Sources Functional Class Principal Arterial Federal Transit Administration Total Cost $2,188,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 PE $250,000 ROW $188,000 CON Total $250,000 $188,000 Programmed and Planned Improvements th TIP Project Signalize intersection at US Hwy 378 and 16 Ave with mast arms and pedestrian crosswalks. th Description Consolidate and realign Brown and Rhue St. with 16 Ave.

Program System Upgrade- Intersection Improvement. Type Selected as part of the GSATS Round 3 Intersection program. An additional $1,750,000 is Remarks anticipated in future years to complete this project.

52

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name

US 501 Realignment Broadway to 7th Ave N Priority# 9 Route or State Road# US 501 Funding Legend Length (mi/km) 0.2 mi Unidentified Funding Source Jurisdiction Myrtle Beach Multiple Funding Sources Functional Class Major Arterial Federal Transit Administration Total Cost $13,9000,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2017 FY 2019 FY 2020 FY 2021 FY 2022 PE $1,500,000 ROW $5,500,000 CON $6,900,000 Total $1,500,000 $5,500,000 $6,900,000 Programmed and Planned Improvements th TIP Project Realign Highway 501 at Broadway St intersection to connect to 7 Ave N at Oak St in City of Myrtle th Description Beach (new alignment). Install sidewalks and intersection improvements on 7 Ave N, between Oak St and North Kings Hwy. Program System Upgrade Type Funding from Horry County RIDE III. Also eligible for Surface Transportation Program funding. Remarks

53

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

US 501 South Widening-Gardner Lacy to SC 31 Priority# 27 Route or State Road# US 501 Funding Legend Length (mi/km) 2.6 mi Unidentified Funding Source Jurisdiction Horry County Multiple Funding Sources Functional Class Major Arterial Federal Transit Administration Total Cost $17,500,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2016 FY 2018 FY 2019 FY 2020 FY 2021 PE $1,000,000 $1,000,000 ROW $10,000,000 CON $5,500,000 Total $1,000,000 $1,000,000 $10,000,000 $5,500,000 Programmed and Planned Improvements TIP Project Add an additional lane to the southbound side of US 501, from Gardner Lacy to SC 31 ramp. Description Program System Upgrade Type Funding from Surface Transportation Program. Remarks

54

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name US 501 & Grissom Intersection Priority# 52 Route or State Road# US 501 Funding Legend Length (mi/km) mi/km Unidentified Funding Source Jurisdiction Myrtle Beach Multiple Funding Sources Functional Class Major Arterial Federal Transit Administration Total Cost $2,875,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 PE ROW $25,000 CON $2,850,000 Total $25,000 $2,850,000 Programmed and Planned Improvements TIP Project Intersection Improvement at US 501 at S-1315 (Robert M. Grissom Parkway) Description Program Safety Program- Intersection Safety Improvements Type Funding from the Highway Safety Program. A Non-Guideshare project. Remarks

55

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name

US 501 Corridor (SC 31 to SC544) Priority# 10 Route or State Road# US 501 Funding Legend Length (mi/km) mi/km (6.2/10.0) Unidentified Funding Source Jurisdiction Horry County Multiple Funding Sources Functional Class Major Arterial Federal Transit Administration Total Cost $50,000,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 PE $2,500,000 ROW $7,500,000 CON $40,000,000 Total $2,500,000 $7,500,000 $40,000,000 Programmed and Planned Improvements TIP Project 1. Complete 6-lane widening and signalized intersection improvements on US Hwy 501 from SC 31 Description to the US 501/ SC 544 interchange. 2. Extend Postal Way east to Waccamaw Pines Dr. and install required intersection improvements and sidewalks (including Postal Way @ Carolina Forest Blvd./ Renee Dr./ Oak Heart Rd) 3. Extend Middle Ridge Ave. east (Myrtle Ridge Dr. to W. Perry Road- and west (Wal-Mart to Singleton Ridge Road) Program System Upgrade Type Funding from Horry Ride III Program. Project is also eligible for funding through the Surface Remarks Transportation Program

56

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name US 701- Great Pee Dee River Priority# 44 Route or State Road# US Hwy 701 Funding Legend Length (mi/km) mi/km .52/.84 Unidentified Funding Source Jurisdiction Horry/ Georgetown Cty Multiple Funding Sources Functional Class Arterial Federal Transit Administration Total Cost 53,725,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 PE ROW CON $53,600,000 $125,000 Total $53,600,000 $125,000 Programmed and Planned Improvements TIP Project Design/ Build Bridge Replacements of US 701 over Great Pee Dee River, Overflow and Description Yauhannah Lake. Program Bridge Replacement Type Funding from Surface Transportation Program (A non-Guideshare project) Remarks

57

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name Waverly Road & Petigru Drive Priority# 17L Route or State Road# Waverly Rd. Funding Legend Length (mi/km) mi/km Unidentified Funding Source Jurisdiction Georgetown County Multiple Funding Sources Functional Class Collector Federal Transit Administration Total Cost $1,300,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 PE $150,000 ROW CON Total $150,000 Programmed and Planned Improvements TIP Project Construct a realignment of the intersection with the possibility of a roundabout. Description Program System Upgrade Type Funding from Surface Transportation Program. It is anticipated that $1,150,000 in future year Remarks funding will be required to complete the project.

58

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name Withers Swash Bridge Replacement Priority# 45 Route or State Road# Ocean Blvd Funding Legend Length (mi/km) mi/km Unidentified Funding Source Jurisdiction Myrtle Beach Multiple Funding Sources Functional Class Collector Federal Transit Administration Total Cost $2,630,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 PE $279,000 ROW $169,000 CON $1,661,000 Total $521,000 $279,000 $169,000 $1,661,000 Programmed and Planned Improvements TIP Project Replace the bridge over Withers Swash on Broadway. Description Program System Upgrade Type Funding from Surface Transportation Program. (Non-Guideshare Project) Remarks

59

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

NORTH CAROLINA PROJECTS

60

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name Bridgers Road Bridge Over Mulberry Br. Priority# B-4440 Route or State Road# SR 1349 Funding Legend Length (mi/km) NA Unidentified Funding Source Jurisdiction Brunswick County Multiple Funding Sources Functional Class Collector Federal Transit Administration Total Cost $1,432,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 PE $68,000 ROW $140,000 CON $1,200,000 Total $208,000 $1,200,000 Programmed and Planned Improvements TIP Project Replace bridge # 163 over Mulberry Branch. Description Program System Upgrade Type Surface Transportation Program funding. Remarks

61

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name Brunswick County Corridor Study- Holden Beach Causeway Priority# NC, 4-A Route or State Road# NC 130 Funding Legend Length (mi/km) 0.75 mi Unidentified Funding Source Jurisdiction Brunswick County Multiple Funding Sources Functional Class Arterial Federal Transit Administration Total Cost $40,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 PE $40,000 ROW CON Total $40,000 Programmed and Planned Improvements TIP Project Master planning study to examine roadway improvements along the Holden Beach Causeway Description corridor. Program Surface Transportation Block Grant- Direct Attributable program Type Project selected during the Surface Transportation Block Grant- Direct Attributable program call for Remarks projects issued in the fall of 2018. $32,000 federal funds, $8,000 local match.

62 6

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name Main St. Sidewalk- Sunset Beach Priority# EB- 5927 Route or State Road# SR-1177 Funding Legend Length (mi/km) 1.6 Unidentified Funding Source Jurisdiction Brunswick County Multiple Funding Sources Functional Class Collector Federal Transit Administration Total Cost $500,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 PE ROW CON $500,000 Total $500,000 Programmed and Planned Improvements TIP Project Construction of a sidewalk on Main St in Sunset Beach from the East end of the barrier island to Description the West end of barrier island Program Transportation Alternatives Project- Direct Attributable Funds Type Includes 20% Local Match Remarks

63

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name Ocean Isle Beach- First Street Bike Path Priority# NC-4C Route or State Road# SR 1144 Funding Legend Length (mi/km) 3.1 mi Unidentified Funding Source Jurisdiction Ocean Isle Beach Multiple Funding Sources Functional Class Collector Federal Transit Administration Total Cost $700,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 PE ROW CON $700,000 Total $700,000 Programmed and Planned Improvements TIP Project Construction of 4-5 ft bike lanes on both sides of First Street from Raleigh St to Beaufort St. Description Program System Upgrade-Surface Transportation Block Grant- Direct Attributable Funds Type Project selected during the Surface Transportation Block Grant- Direct Attributable program call for Remarks projects issued in the fall of 2018. $385,000 federal funds, $315,000 local match.

64

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name Odell Williamson Municipal Airport Priority# AV-5742 Route or State Road# NA Funding Legend Length (mi/km) NA Unidentified Funding Source Jurisdiction Brunswick County Multiple Funding Sources Functional Class NA Federal Transit Administration Total Cost $1,270,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 PE ROW $1,270,000 CON Total $1,270,000 Programmed and Planned Improvements TIP Project Right of Way acquisition for runway protection zone 2 – runway 24. Description Program System Upgrade Type Surface Transportation Program funding. Remarks

65

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name Shallotte Sidewalk- Mulberry-East Pedestrian Corridor Priority# NC-4B Route or State Road# SR 1349 Funding Legend Length (mi/km) 0.92 mi Unidentified Funding Source Jurisdiction Shallotte Multiple Funding Sources Functional Class Collector and Arterial Federal Transit Administration Total Cost $200,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 PE ROW CON $200,000 Total $200,000 Programmed and Planned Improvements TIP Project Sidewalk extension project from Mulberrry Park along White Street, connecting with commercial Description development at the intersection of Smith Ave. Program System Upgrade-Surface Transportation Block Grant- Direct Attributable Funds Type Project selected during the Surface Transportation Block Grant- Direct Attributable program call for Remarks projects issued in the fall of 2018. $385,000 federal funds, $315,000 local match.

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name US 17 and Smith Ave. Interchange Priority# U-5862 Route or State Road# SR 1357 Funding Legend Length (mi/km) mi/km 0.88/1.42 Unidentified Funding Source Jurisdiction Shallotte Multiple Funding Sources Functional Class Major Thoroughfare Federal Transit Administration Total Cost $7,842,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 PE $1,000,000 ROW $1,380,000 CON $2,731,000 $2,731,000 Total $1,000,000 $1,380,000 $2,731,000 $2,731,000 Programmed and Planned Improvements TIP Project This project is an upgrade of the intersection of US 17 and Smith Ave. to an interchange. Description Program System Upgrade Type Surface Transportation Program funding. Remarks

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name US 17 Shallotte Bypass (North and South) Priority# R- 5857 Route or State Road# US 17 Bypass Funding Legend Length (mi/km) mi/km 4.3 mi/ 6.88 km Unidentified Funding Source Jurisdiction Shallotte/ Brunswick Cty Multiple Funding Sources Functional Class Major Arterial Federal Transit Administration Total Cost $5,408,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 PE ROW $1.2 m CON $2.184 m $2.184 m Total $1.2 m $2.184 m $2.184 m Programmed and Planned Improvements TIP Project Convert existing intersections to superstreet segments to improve safety and traffic Description congestion. Program System Upgrade Type Funding from Surface Transportation Program Remarks

68

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name US 17 Superstreet @ NC 904 Priority# R-5851 Route or State Road# US 17 Bypass Funding Legend Length (mi/km) N/A Unidentified Funding Source Jurisdiction Brunswick County Multiple Funding Sources Functional Class Major Arterial Federal Transit Administration Total Cost $3,000,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 PE ROW $600,000 CON $2,400,000 Total $600,000 $2,400,000 Programmed and Planned Improvements TIP Project Convert existing intersections to superstreet segments to improve safety and traffic congestion Description Program System Upgrade Type Surface Transportation Program funding. Remarks

69

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name US 17 Interchange @ NC 211 Priority# U-5932 Route or State Road# US 17 Bypass Funding Legend Length (mi/km) NA Unidentified Funding Source Jurisdiction Brunswick County Multiple Funding Sources Functional Class Major Arterial Federal Transit Administration Total Cost $50,400,000 Federal Highway Administration

Estimated Unobligated Cost FY2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 PE ROW $8.467M $10.967M $10.966M CON $6.667M $6.667M $6.667M Total $8.467M $10.967M $10.966M $6.667M $6.667M $6.667M Programmed and Planned Improvements TIP Project Convert At-grade signalized intersection to a grade separation interchange at US 17 and NC 211 in Description Supply. Program System Upgrade Type Surface Transportation Program funding. Remarks

70

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name US 17 Bus Main St.-Shallotte Priority# U-5788 Route or State Road# US 17 Bus Funding Legend Length (mi/km) NA Unidentified Funding Source Jurisdiction Shallotte Multiple Funding Sources Functional Class Major Thoroughfare Federal Transit Administration Total Cost $2.235M Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 PE $750,000 ROW $785,000 CON $700,000 Total $750,000 $785,000 $700,000 Programmed and Planned Improvements TIP Project Realign Wall St with Shallotte Ave. Description Program System Upgrade Type Surface Transportation Program funding. Remarks

63

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

UNIDENTIFED FUNDING

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name Interstate 73 Priority# 7 Route or State Road# New Location Funding Legend Length (mi/km) mi/km 43.5/70.0 Unidentified Funding Source Jurisdiction Horry County Multiple Funding Sources Functional Class Expressway Federal Transit Administration Total Cost NA Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 PE ROW CON Total Programmed and Planned Improvements TIP Project Interstate connection from SC 22 to I 95, south of Dillon, on new location. Description Program System Upgrade Type Funding not identified. Remarks

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name Transit Bus Shelters & Signage Priority# 21 Route or State Road# NA Funding Legend Length (mi/km) mi/km Unidentified Funding Source Jurisdiction GSATS Area Multiple Funding Sources Functional Class NA Federal Transit Administration Total Cost $ Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 PE ROW CON Total Programmed and Planned Improvements TIP Project Funding for the project has been removed temporarily. Description Program System Upgrade Type Originally a $1M project that had unobligated funds returned to the budget. Project was Remarks discontinued and awaits final accounting.

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

Project Name West of the Waterway Pkwy. Priority# 31 Route or State Road# New Alignment Funding Legend Length (mi/km) mi/km 3.2/5.2 Unidentified Funding Source Jurisdiction North Myrtle Beach Multiple Funding Sources Functional Class Collector Federal Transit Administration Total Cost $6,000,000 Federal Highway Administration

Estimated Unobligated Cost Prior Yrs FY 20215 FY 2022 FY 2023 FY 2024 FY 2025 PE $250,000 ROW CON Total $250,000 Programmed and Planned Improvements TIP Project Construct a new four lane divided parkway with multipurpose path from SC 90 to Water Tower Description Rd. Program System Upgrade Type Funding from Surface Transportation Program. A majority of the funding for this project has not Remarks been identified.

2015-2022 Transportation Improvement Program Grand Strand Area Transportation Study

SOUTH CAROLINA FINANCIAL SUMMARY

2018-2027 Transportation Improvement Program Grand Strand Area Transportation Study

NORTH CAROLINA FINANCIAL SUMMARY

74

GSATS FY 2018-2027 MTIP

STIP DEVEL PRIORITY ID # ACTIVITY PROJECT DESCRIPTION 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 FUNDING FUNDING U-5862 R US 17 (SHALLOTTE BYPASS) SMITH AVE - 1,380 1,380 0 1 INTERSECTION TO INTERCHANGE C 2,731 2731 5,462 0 US 17 BUSINESS (MAIN STREET) -TOWN OF U-5788 R 78566 785 0 2 SHALLOTTE - Wall St. Intersection C Realignment 700 700 0 3 U-5910 P GSATS MTP UPDATE (DA FUNDS TO PL) 0 0 4 U-5990 C GSATS STBGDA FUNDS 275 275 275 275 275 275 275 275 275 275 1,375 1,375 U-5932 R NC 211 INTERSECTION TO INTERCHANGE 5,000 7,500 7,500 12,500 7,500 5 U 3,467 3,467 3,466 6,934 3,466 C 6,667 6,667 6,666 0 20,000 R-5851 R NC 904 & US 17, CONVERT INTERSECTION 500 0 500 TO SUPERSTREET 6 U 100 0 100 C 2,400 0 2,400 BRIDGE B-4440 R BRIDGERS ROAD (BRIDGE 090163) 0 0 MULBERRY BRANCH M 0 0 C 0 0 U 0 0 R-5857 R US 17 BUS, NORTH and SOUTH OF 840 4,368 5,208 0 SHALLOTTE - CONVERT INTERSECTIONS 7 U 200 200 0 TO SUPERSTREET INTERSECTIONS C 2,400 0 2,400 AV- ODELL WILLIAMSON MUNICIPAL AVIATION 5742 R AIRPORT 1,270 1,270 0 R 0 0 EB- HOLDEN BEACH SIDEWALK (7 LOCAL, 27 8 5928 C TAAPDA) 34 34 0 EB- SUNSET BEACH SIDEWALK (400 LOCAL, 9 5927 C 100 TAPDA) 500 500 0 TOTALS 2,830 309 3,395 275 21,305 11,995 1,275 11,959 14,143 275 28,114 39,647 ALL FIGURES IN $1,000 FEDERAL BRIDGE REPLACEMENT DEVELOPMENTAL PROGRAM NON HIGHWAY PROGRAM STATE TRANSPORTATION PROGRAM C -- CONSTRUCTION PL -- PLANNING

M -- MITIGATION R -- RIGHT OF WAY PE -- PRELIMINARY ENGINEERING U -- UTILITIES