Coastal Engineering Hampton, Virginia City Of

Total Page:16

File Type:pdf, Size:1020Kb

Coastal Engineering Hampton, Virginia City Of COASTAL CITY OF HAMPTON E N G I N E E R I N G 2406 Princess Anne Road, Suite 200 Virginia Beach, VA 23456 Phone (757) 563-9027 Facsimile(757) 563-9028 TH EAL OF W V N IR O G M I N M I O A C RICHARD M. KLEIN No. 027864 P R R O E F E E N SS GI HVAC UPGRADE IONAL EN HAMPTON HEALTH DEPARTMENT HAMPTON, VIRGINIA COASTAL ENGINEERING CONSULTING ENGINEERS JAK RMK RMK 2406 PRINCESS ANNE RD, SUITE 200 15-041 VIRGINIA BEACH, VA 23456 01-06-2017 PHONE: (757) 563-9027 FAX: (757) 563-9028 LOCATION MAP VICINITY MAP DRAWING INDEX: T-1.0 TITLE SHEET S-101 STRUCTURAL ROOF FRAMING PLAN S-201 STRUCTURAL SECTIONS AND DETAILS M-001 MECHANICAL LEGEND, NOTES, ABBREVIATIONS M-002 MECHANICAL FLOOR PLAN - PHASING M-101 MECHANICAL FLOOR PLAN - DEMOLITION M-201 MECHANICAL FLOOR PLAN - NEW WORK M-202 MECHANICAL ROOF PLAN - NEW WORK M-401 MECHANICAL ENLARGED PLANS, DETAILS AND SCHEDULES CITY OF HAMPTON M-701 MECHANICAL SPECIFICATIONS TITLE SHEET E-001 ELECTRICAL LEGEND, NOTES, ABBREVIATIONS E-101 ELECTRICAL FLOOR PLAN - DEMOLITION POWER E-102 ELECTRICAL FLOOR PLAN - DEMOLITION LIGHTING E-201 ELECTRICAL FLOOR PLAN - NEW WORK POWER E-202 ELECTRICAL FLOOR PLAN - NEW WORK LIGHTING HAMPTON, VA SITE LOCATION: E-501 ELECTRICAL PANEL BOARD SCHEDULES NORTH NORTH T-1.0 E-601 ELECTRICAL RISER DIAGRAM, PANEL BOARD NOT TO SCALE 3130 VICTORIA BLVD. NOT TO SCALE SCHEDULES, AND LOAD SUMMARY HAMPTON, VA 23661 1 18 E-701 ELECTRICAL SPECIFICATIONS MECHANICAL LEGEND GENERAL NOTES NOTE: HEAVY LINE WEIGHT INDICATES NEW EQUIPMENT OR EQUIPMENT TO BE REMOVED, LIGHT LINE WEIGHT INDICATES EQUIPMENT WHICH IS 1. SCOPE OF WORK INCLUDES PROVIDING A FIRST CLASS WORKING SYSTEM IN COMPLIANCE WITH THESE DRAWINGS AND GRILLE REGISTER AND DIFFUSER SCHEDULE EXISTING TO REMAIN SPECIFICATIONS, TESTED READY FOR OPERATION COMPLETE WITH LABOR, MATERIALS, APPARATUS, TRANSPORTATION, AND TOOLS REQUIRED FOR THE INSTALLATION. MANUFACTURER / NECK MAX. MARK TYPE SERVICE APD "WC REMARKS POINT OF CONNECTION-NEW TO EXISTING AND MODEL SIZE CFM COASTAL POINT OF DEMOLITION TERMINATION 2. COORDINATE WORK WITH THAT OF OTHER TRADES. SEE ARCHITECTURAL REFLECTED CEILING PLANS FOR THE EXACT E N G I N E E R I N G LOCATIONS OF CEILING MOUNTED DEVICES. ANEMOSTAT / 24 X 24 A SUPPLY 6" Ø 120 .03 3 2 DUCT SMOKE DETECTOR MODEL EPL LAY-IN 2406 Princess Anne Road, 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MODIFICATIONS, CHANGES, ETC. FOR THE EQUIPMENT HE PROVIDES, Suite 200 A GRILLE OR DIFFUSER MARK - SEE SCHEDULE OR EVEN IF APPROVED AS AN EQUAL. Virginia Beach, VA 23456 SPECIFICATION (CFM NOTE) SURFACE 100 ANEMOSTAT/ Phone (757) 563-9027 4. MISCELLANEOUS ITEMS NOT SHOWN ON THE PLANS BUT NECESSARY FOR A COMPLETE OPERABLE SYSTEM, SHALL BE B 1 MOUNT SUPPLY 6" Ø 155 .05 3 2 Facsimile(757) 563-9028 NEW WORK NOTE MARK MODEL E-1 SUPPLIED AND INSTALLED. 24 X 24 TH DEMOLITION WORK NOTE MARK 5. INSTALL EQUIPMENT PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. MAINTAIN ALL RECOMMENDED CLEARANCES. EAL OF W V N IR O G SURFACE M I N CHILLED WATER SUPPLY 6. REMOVE EXCESS MATERIAL, SCRAP, ETC. FROM THE JOB SITE. M ANEMOSTAT/ I C O A 1 MOUNT SUPPLY 6" Ø 120 .06 3 2 C RICHARD M. KLEIN CHILLED WATER RETURN 7. REPAIR ANY MATERIAL OR WORK WHICH HE HAS DAMAGED. MODEL E-1 12 X 12 No. 027864 P HOT WATER SUPPLY PIPING R R O E 8. BALANCE AIR AND WATER SYSTEMS WITHIN ±10% OF THE VALUES INDICATED. F E E N SS GI HOT WATER RETURN PIPING ANEMOSTAT/ 24 X 24 IONAL EN 9. TEST THE ENTIRE SYSTEM IN ALL MODES OF OPERATION TO INSURE PROPER OPERATION. D SUPPLY 8" Ø 245 .05 3 2 CONDENSER WATER SUPPLY MODEL EPL LAY-IN 10. FURNISH AND INSTALL ALL EQUIPMENT AND MATERIALS FOR A COMPLETE INSTALLATION IN ALL RESPECTS READY OF CONDENSER WATER RETURN INTENDED USE AND IN STRICT ACCORDANCE WITH ALL STATE AND LOCAL CODES AND MANUFACTURER'S RECOMMENDATIONS. PAY NECESSARY FEES AND OBTAIN PERMITS. INITIATE, MAINTAIN AND SUPERVISE ALL SAFETY SURFACE ANEMOSTAT/ DUAL TEMPERATURE SUPPLY PRECAUTIONS AND PROCEDURES. E MOUNT SUPPLY 4" Ø 60 .05 3 2 MODEL E-1 1 DUAL TEMPERATURE RETURN 11. ALL INDICATED DUCT DIMENSIONS ARE INSIDE CLEAR DIMENSIONS. 12 X 12 CONDENSATE DRAIN SEQUENCE OF OPERATION 24 X 24 GAS PIPING ANEMOSTAT / X 1 SURFACE RETURN 10x10 200 .05 3 2 ROOF TOP UNIT (RTU-1, RTU-2, RTU-3, RTU-4, RTU-5, RTU-6, RTU-7, RTU-8) MODEL 30 BACKFLOW PREVENTER MOUNT BALANCING VALVE (GLOBE VALVE/SQUARE HEAD COCK) THE PROGRAMMABLE SPACE THERMOSTAT SHALL INDEX THE OCCUPIED AND UNOCCUPIED MODE OF OPERATION BASED ON A USER SELECTED SCHEDULE. THE SPACE THERMOSTAT SHALL CONTROL THE HEATING SET POINT, 68 DEGREES F 24 X 24 BALL VALVE ANEMOSTAT / (ADJUSTABLE) THE COOLING SET POINT, 75 DEGREES F (ADJUSTABLE), AND THE SETUP/SET BACK TEMPERATURE. Y 1 SURFACE RETURN 12x12 300 .05 3 2 MODEL 30 CHECK VALVE MOUNT OCCUPIED MODE BUTTERFLY VALVE 24 X 24 ANEMOSTAT / Z 1 SURFACE RETURN 16x16 550 .05 3 2 STRAINER WITH BLOW DOWN VALVE THE SUPPLY FAN SHALL ENERGIZE AND RUN CONTINUOUSLY. THE UNITS CORRESPONDING CO2 SENSOR SHALL BE ACTIVATED MODEL 30 AND THE SENSOR SHALL MODULATE THE UNITS OUTSIDE AIR DAMPER TO MAINTAIN THE SPACE CO2 SET POINT. MOUNT 3-WAY AUTO CONTROL VALVE NOTES: PRESSURE REDUCING VALVE HEATING MODE 1 SURFACE MOUNT GRILLE, LAY-IN PANELS CAN BE USED WHERE CEILING GRID ALLOWS 2-WAY AUTO CONTROL VALVE ON A FALL IN SPACE TEMPERATURE BELOW THE HEATING SET POINT (ADJUSTABLE) THE PROGRAMMABLE SPACE 2 ALUMINUM CONSTRUCTION THERMOMETER THERMOSTAT SHALL CYCLE THE ROOF TOP UNITS GAS FIRED HEATING SECTION TO MAINTAIN THE HEATING SET POINT. ON A 3 COLOR TO BE WHITE RISE IN SPACE TEMPERATURE ABOVE THE SET POINT WITH A 3 DEGREE FAHRENHEIT DEAD BAND (ADJUSTABLE) THE REVERSE FLEXIBLE PIPING CONNECTION JAK RMK SHALL OCCUR. RMK 15-041 PRESSURE GAUGE SHUT-OFF COCK COOLING MODE 01-06-2017 AUTOMATIC AIR VENT UNION ON A RISE IN SPACE TEMPERATURE ABOVE THE COOLING SET POINT (ADJUSTABLE) THE PROGRAMMABLE SPACE THERMOSTAT SHALL CYCLE THE ROOF TOP UNITS COMPRESSOR SECTION TO MAINTAIN THE COOLING SET POINT. ON A ON A PIPE SLOPE (DOWN IN ARROW DIRECTION) FALL IN SPACE TEMPERATURE BELOW THE SET POINT WITH A 3 DEGREE FAHRENHEIT DEAD BAND (ADJUSTABLE) THE REVERSE FLOW CONTROL BALANCING VALVE WITH SHALL OCCUR. GAS SHUT-OFF COCK PRESSURE TAPS (GPM NOTED) UNOCCUPIED MODE RELIEF VALVE THE SPACE THERMOSTAT SHALL CYCLE THE UNITS SUPPLY AIR FAN AND HEATING AND COOLING SYSTEMS TO MAINTAIN THE ECCENTRIC PIPE REDUCER HEATING SET BACK TEMPERATURE, 55 DEGREES F (ADJUSTABLE) AND THE COOLING SET UP TEMPERATURE, 85 DEGREES F (ADJUSTABLE) WITH A 3 DEGREE FAHRENHEIT DEAD BAND (ADJUSTABLE). THE UNITS OUTSIDE AIR DAMPER SHALL REMAIN PIPE CAP CLOSED. DIRECTION OF FLOW SMOKE DETECTOR PIPE ANCHOR SUPPLY DUCT SECTION THE DUCT MOUNTED SMOKE DETECTOR SHALL SHUT DOWN THE SUPPLY AIR FAN AND CLOSE THE OUTSIDE AIR DAMPER UPON SENSING PRODUCTS OF COMBUSTION. THE SMOKE DETECTOR SHALL ALSO SEND A SIGNAL TO THE BUILDINGS FIRE ALARM EXHAUST DUCT SECTION SYSTEM. ACTIVATION OF THE SMOKE DETECTOR SHALL REQUIRE MANUAL RESET PRIOR TO THE UNIT BEING PLACED BACK IN OPERATION. RETURN DUCT SECTION FD FIRE DAMPER WITH ACCESS DOOR ABBREVIATIONS T THERMOSTAT/SENSOR MOUNT 48" ABOVE FLOOR AD ACCESS DOOR EWB ENTERING WET BULB LDB LEAVING DRY BULB RTU-1 ROOF TOP UNIT MARK RTU-1 SUBSCRIPT INDICATES EQUIPMENT BEING CONTROLLED AFF ABOVE FINISHED FLOOR EWT ENTERING WATER TEMPERATURE LWB LEAVING WET BULB SA SUPPLY AIR AFG ABOVE FINISHED GRADE ESP EXTERNAL STATIC PRESSURE LWT LEAVING WATER TEMPERATURE SCT SATURATED CONDENSING TEMPERATURE ELBOW WITH TURNING VANES APD AIR PRESSURE DROP EXIST EXISTING MAX MAXIMUM SEER SEASONAL ENERGY EFFICIENCY RATING APPROX APPROXIMATELY FCU-1 FAN COIL UNIT MARK MOCP MAXIMUM OVER CURRENT PROTECTION SF SQUARE FEET BD MANUAL BALANCING DAMPER WITH LOCKING QUADRANT AS-1 AIR SEPARATOR MARK FD FIRE DAMPER WITH ACCESS DOOR MIN MINIMUM SP STATIC PRESSURE FDB DEGREE FAHRENHEIT DRY BULB MBH THOUSAND BTU/HR SST SATURATED SUCTION TEMPERATURE FLEXIBLE DUCT CONNECTION BD BALANCING DAMPER CITY OF HAMPTON BDD BACK DRAFT DAMPER FF FINISHED FLOOR MCA MINIMUM CIRCUIT AMPS TS TIP SPEED MECHANICAL LEGEND, NOTES, ABBREVIATIONS LOW PRESSURE SUPPLY OR RETURN DUCT WORK BTUH BRITISH THERMAL UNIT PER HOUR FPM FEET PER MINUTE MFS MAXIMUM FUSE SIZE T'STAT THERMOSTAT CFH CUBIC FEET PER HOUR FT FEET NOM NOMINAL TYP TYPICAL CFM CUBIC FEET PER MINUTE FWB DEGREE FAHRENHEIT WET BULB NO NUMBER "WC INCHES WATER COLUMN FLEXIBLE DUCT CONNECTION WITH BALANCING DAMPER CHLR-1 CHILLER MARK - SEE SCHEDULE GA GAUGE OA OUTSIDE AIR WPD WATER PRESSURE DROP COP COEFFICIENT OF PERFORMANCE GPH GALLONS PER HOUR OD OUTSIDE DIAMETER CU-1 CONDENSING UNIT MARK GPM GALLONS PER MINUTE P-1 PUMP MARK CWR CHILLED WATER RETURN "HG INCHES OF MERCURY PD PRESSURE DROP CWS CHILLED WATER SUPPLY HP HORSE POWER PH PHASE DN DOWN HWR HOT WATER RETURN PSIG POUNDS PER SQUARE INCH GAGE DSS-1 DUCTLESS SPLIT SYSTEM MARK HWS HOT WATER SUPPLY RA RETURN AIR EAT ENTERING AIR TEMPERATURE ID INSIDE DIAMETER RBJ RUN BETWEEN JOIST M-001 EDB ENTERING DRY BULB KW KILOWATT RLA RATED LOAD AMPS EF-1 EXHAUST FAN MARK LAT LEAVING AIR TEMPERATURE RPM REVOLUTIONS PER MINUTE EMD END OF MAIN DRIP LBS/HR POUND PER HOUR RTJ RUN THRU JOIST 4 18 ALL WORK IN THIS AREA SHALL BE DONE ON NIGHTS OR WEEKENDS. THE ALL WORK IN THIS AREA SHALL BE DONE ON NIGHTS OR PHASING NOTES: (THIS SHEET ONLY) ENTRANCE AND TOILETS SHALL REMAIN OPEN TO THE PUBLIC WITH WEEKENDS, ENTRANCE SHALL REMAIN OPEN TO THE ACCESS TO THE BUILDING AT ALL TIMES (TOILETS ARE THE ONLY PUBLIC AT ALL TIMES (THIS IS THE ONLY HANDICAPPED 1.
Recommended publications
  • EXHIBIT B CPC Report N 190230 ZRY (Residential Tower
    EXHIBIT B CPC Report N 190230 ZRY (Residential Tower Mechanical Voids) CITY PLANNING COMMISSION April 10, 2019, Calendar No. 11 N 190230 ZRY IN THE MATTER OF an application submitted by the Department of City Planning pursuant to Section 201 of the New York City Charter for an amendment of Article II, Chapter 3 and related provisions of the Zoning Resolution of the City of New York, modifying residential tower regulations to require certain mechanical spaces to be calculated as residential floor area. _____________________________________________________________________________ This application (N 190230 ZRY) for a zoning text amendment was filed by the Department of City Planning (DCP) on January 25, 2019 to discourage the use of excessively tall mechanical floors in high-density residential tower districts. The proposal would require that mechanical floors, typically excluded from zoning floor area calculations, would be counted toward the overall permitted floor area on the zoning lot if they are taller than new specified limits or overly concentrated in portions of the building. The proposed floor area requirements would apply to residential towers in non-contextual R9 and R10 Residence Districts and their equivalent Commercial Districts, as well as Special Purpose Districts that rely on underlying floor area and height and setback regulations or that are primarily residential in character. The provision would also apply to non-residential portions of a mixed-use building if the building contains a limited amount of non-residential floor area. BACKGROUND The New York City Zoning Resolution allows floor space containing mechanical equipment to be excluded from zoning floor area calculations, reflecting the recognition that these spaces perform important and necessary functions within buildings.
    [Show full text]
  • Scope of Services Template
    November 2018 SCOPE OF SERVICES FOR FINANCIAL PROJECT ID(S). To Be Determined by Task Work Order Continuing Services Existing Roadway Condition Assessment Report (ERCAR) Development District-Wide Florida’s Turnpike Enterprise 1 PURPOSE ............................................................................................................................. 4 2 PROJECT DESCRIPTION ................................................................................................. 6 3 PROJECT COMMON AND PROJECT GENERAL TASKS....................................... 34 4 ROADWAY ANALYSIS ................................................................................................... 44 5 ROADWAY PLANS .......................................................................................................... 51 6A DRAINAGE ANALYSIS ................................................................................................... 52 6B DRAINAGE PLANS .......................................................................................................... 56 7 UTILITIES .......................................................................................................................... 57 8 ENVIRONMENTAL PERMITS, COMPLIANCE, AND ENVIRONMENTAL CLEARANCES .................................................................................................................. 61 9 STRUCTURES - SUMMARY AND MISCELLANEOUS TASKS AND DRAWINGS .............................................................................................................................................
    [Show full text]
  • Space Efficiency in Multi-Use Tall Building
    ctbuh.org/papers Title: Space Efficiency in Multi-Use Tall Building Authors: Mahjoub Elnimeiri, Research Associate, Illinois Institute of Technology Hyeong-Ill Kim, Professor, Illinois Institute of Technology Subject: Architectural/Design Keywords: Design Process Mixed-Use Planning Publication Date: 2004 Original Publication: CTBUH 2004 Seoul Conference Paper Type: 1. Book chapter/Part chapter 2. Journal paper 3. Conference proceeding 4. Unpublished conference paper 5. Magazine article 6. Unpublished © Council on Tall Buildings and Urban Habitat / Mahjoub Elnimeiri; Hyeong-Ill Kim Space Efficiency in Multi-Use Tall Building Hyeong-ill Kim1, Mahjoub Elnimeiri2, 1 Research Associate, College of Architecture, Illinois Institute of Technology 2Professor, College of Architecture, Illinois Institute of Technology Abstract This paper seeks to make a contribution to the development of the design strategies for multi-use tall buildings in relation to space efficiency of the building for architects, engineers and developers during their early phases of the design process. This research describes the complex challenges of a design development process influenced by vertically stacked functions. This paper addresses the important parameters in the design of multi-use tall buildings and their relationship to the space efficiency. Parameters including functions, lease span, floor-to-floor height, vertical transportation, site area, FAR(Floor Area Ratio), building height, number of floors, building size at the base and top, , aspect ratio, structural system were analyzed. Ten multi-use buildings were carefully surveyed and investigated through specific case studies. To achieve this comparative analysis, a comprehensive data base was established. Based on the results of the case studies, a set of quantitative analysis was performed to show relationship among design factors.
    [Show full text]
  • Single Family Dwelling Addition Handout 3-19
    HUMBOLDT COUNTY BUILDING DEPARTMENT 25 W. FOURTH STREET WINNEMUCCA, NV 89446 (775) 623-6322 (775) 623-6337 – FAX hcnv.us (web site) [email protected] (e-mail) CITY OF WINNEMUCCA BUILDING DEPARTMENT 90 W. FOURTH STREET WINNEMUCCA, NV 89445 (775) 623-6319 (775) 623-6321 - FAX RESIDENTIAL ADDITION PERMIT GUIDE March 2019 GENERAL INFORMATION This guide outlines the requirements for obtaining a building permit to construct a residential addition in Humboldt County. In order to ensure that your application is processed in a timely manner, your submittal package must be complete. Once submitted, your plan package will require review and approval from the following County and State Agencies: Zoning Approval Humboldt County Planning & Zoning Department (Site Plan/Zoning Codes) 623-6393 Street Excavation Humboldt County Road Department 623-6416 Excavation permits are available from the Road Department for any excavation in a county road easement or right of Way Plan Review Humboldt County Building Department Flood Zone Area Review Humboldt County Building Department Water/Domestic Well Installation Shall be approved by Nevada State Water Resources (775) 684-2800 Nevada State Manufactured Housing Division (702) 486 – 4138 - Las Vegas Upon submitting your plans to the Building Department and prior to final inspection, the applicant will need to contact the Bureau of Health Protection Services for septic approval. Written approval shall be submitted to this office. Approval from water district or sewer districts is also required. We recommend you
    [Show full text]
  • Elevator Pressurization in Tall Buildings 2. Journal Paper Ctbuh
    ctbuh.org/papers Title: Elevator Pressurization in Tall Buildings Author: John H. Klote, Smoke and Fire Consulting Subjects: Fire & Safety Vertical Transportation Keywords: Fire Safety Vertical Transportation Publication Date: 2013 Original Publication: International Journal of High-Rise Buildings Volume 2 Number 4 Paper Type: 1. Book chapter/Part chapter 2. Journal paper 3. Conference proceeding 4. Unpublished conference paper 5. Magazine article 6. Unpublished © Council on Tall Buildings and Urban Habitat / John H. Klote International Journal of High-Rise Buildings International Journal of December 2013, Vol 2, No 4, 341-344 High-Rise Buildings www.ctbuh-korea.org/ijhrb/index.php Elevator Pressurization in Tall Buildings John H. Klote† Smoke and Fire Consulting, 19355 Cypress Ridge Terrace, Leesburg, VA 20176, USA Abstract During a building fire, smoke can flow through elevator shafts threatening life on floors remote from the fire. Many buildings have pressurized elevators intended to prevent such smoke flow. The computer program, CONTAM, can be used to analyze the performance of pressurization smoke control systems. The design of pressurized elevators can be challenging for the following reasons: (1) often the building envelope is not capable of effectively handling the large airflow resulting from elevator pressurization, (2) open elevator doors on the ground floor tend to increase the flow from the elevator shaft at the ground floor, and (3) open exterior doors on the ground floor can cause excessive pressure differences across the elevator shaft at the ground floor. To meet these challenges, the following systems have been developed: (1) exterior vent (EV) system, (2) floor exhaust (FE) system, and ground floor lobby (GFL) system.
    [Show full text]
  • Thompson Center, Thompson Center Name of Multiple Property Listing N/A (Enter "N/A" If Property Is Not Part of a Multiple Property Listing)
    NPS Form 10900 OMB No. 10240018 United States Department of the Interior National Park Service National Register of Historic Places Registration Form This form is for use in nominating or requesting determinations for individual properties and districts. See instructions in National Register Bulletin, How to Complete the National Register of Historic Places Registration Form. If any item does not apply to the property being documented, enter "N/A" for "not applicable." For functions, architectural classification, materials, and areas of significance, enter only categories and subcategories from the instructions. Place additional certification comments, entries, and narrative items on continuation sheets if needed (NPS Form 10-900a). 1. Name of Property historic name State of Illinois Center other names/site number James R. Thompson Center, Thompson Center Name of Multiple Property Listing N/A (Enter "N/A" if property is not part of a multiple property listing) 2. Location street & number 100 West Randolph Street not for publication city or town Chicago vicinity state Illinois county Cook zip code 60601 3. State/Federal Agency Certification As the designated authority under the National Historic Preservation Act, as amended, I hereby certify that this nomination request for determination of eligibility meets the documentation standards for registering properties in the National Register of Historic Places and meets the procedural and professional requirements set forth in 36 CFR Part 60. In my opinion, the property meets does not meet the National Register Criteria. I recommend that this property be considered significant at the following level(s) of significance: national statewide local Applicable National Register Criteria: A B C D Signature of certifying official/Title: Deputy State Historic Preservation Officer Date Illinois Department of Natural Resources - SHPO State or Federal agency/bureau or Tribal Government In my opinion, the property meets does not meet the National Register criteria.
    [Show full text]
  • Schematic Design Narrative
    Valdez Middle School Project Project No.: 11‐310‐9507 City of Valdez Schematic Design Narrative June 27, 2012 ARCHITECTS, PLANNERS, INTERIOR DESIGNERS AND LANDSCAPE ARCHITECTS Valdez Middle School Schematic Design Submittal TABLE OF CONTENTS Acknowledgements 2 Overview 3 Code Summary 5 Environmental Design Narrative 7 Geotechnical Narrative 8 Landscape Design Narrative 12 Civil Design Narrative 16 Architectural Narrative 19 Structural Design Narrative 21 Mechanical Design Narrative 22 Electrical Design Narrative 29 Appendix A: “Valdez Middle School Site Pre‐Demolition Hazardous Building Materials & Environmental Assessment” BETTISWORTH NORTH ARCHITECTS AND PLANNERS 212 FRONT ST FAIRBANKS AK 99701 907 456 5780 1 Valdez Middle School Schematic Design Submittal ACKNOWLEDGEMENTS Client City of Valdez P.O. Box 307, Valdez, AK 99686 John Hozey, City Manager Jack McCay, Project Manager Valdez City School District P.O. Box 398, Valdez, AK 99686 Jacob Jensen, Superintendent Rod Morrison, Junior High Principal Consultant Team Bettisworth North Architects and Planners (Architect/Landscape Architect) 212 Front Street, Fairbanks, AK 99701 Charles Bettisworth, Principal in Charge Tracy Vanairsdale, Principal, Project Manager Mark Kimerer, Project Landscape Architect DeJong‐Richter (Educational Specifications) 4945 Badenton Blvd., Suite B, Dublin, OH 43017 Bill DeJong, Principal Tracy Richter, Principal CRW Engineering Group, LLC (Civil) 3940 Arctic Blvd., #300, Anchorage, AK 99503 Pete Bellezza, Principal Civil Engineer BBFM Engineers Inc. (Structural) 510 L Street, Suite 200, Anchorage, AK 99501 Forrest T. Braun, Principal Structural Engineer RSA Engineering, Inc. (Mechanical/Electrical) 2522 Arctic Blvd., Anchorage, AK 99503 Brian Pekar, Senior Mechanical Engineer Channing Lillo, Associate Principal Electrical Engineer Shannon & Wilson, Inc. (Geotechnical) 2355 Hill Road, Fairbanks, AK 99709 Steve Adamczak, Principal Geotechnical Engineer NORTECH, Inc.
    [Show full text]
  • The-Noma-Offering-Plan Part3.Pdf
    210 211 EXHIBIT "4" DESCRIPTION OF PROPERTY 212 213 50 West 30th Street 50 West 30th Street, New York, NY ARCHITECT'S DESCRIPTION OF PROPERTY AND SPECIFICATIONS 23 November 2015 TABLE OF CONTENTS SECTION PAGE A. Location of Property ...........................................................................................................................2 B. Status of Construction .......................................................................................................................2 C. Site .............................................................................................................................................................2 D. Utilities ......................................................................................................................................................3 E. Sub-Surface Conditions .....................................................................................................................4 F. Streetscape & Enclosure ...................................................................................................................4 G. Building Size ...........................................................................................................................................4 H. Building Systems ..................................................................................................................................5 (1) Foundation ..................................................................................................................................5
    [Show full text]
  • Land Uses and Densities
    APPENDIX C PERMITTED LAND USES AND DENSITIES Section 1.0 Purpose and Intent Section 2.0 Scope Section 3.0 Definitions Section 4.0 Land Use Established Section 5.0 Standard Lot Dimensions by Land Use Section 6.0 Structure Height Section 7.0 Accessory Dwelling Units Section 8.0 Enforcement Section 9.0 Administrative Modifications of Standards Exhibit C-1 Land Use Categories 1.0 Purpose and Intent The purpose of this appendix is to encourage a variety of land uses, densities, and housing types to achieve the East VillageTALUS vision of an urban village, as described in the Planning Goals (Appendix A) and the Urban Village Design Guidelines (Appendix B). The standards set forth within this appendix are intended to guide the general location, bulk, and densities for the various land uses while allowing flexibility to respond to new and innovative approaches to an urban village setting. 2.0 Scope The provisions of this appendix shall apply to the East VillageTALUS Project. 3.0 Definitions 3.1. Accessory Dwelling Unit “Accessory Dwelling Unit” “(ADU)” means a room or set of rooms, either free standing, added onto or created within a single family residence. It generally includes living, sleeping, kitchen, and bathroom facilities, and has a lockable entrance. 3.2. Administrative Minor Modification “Administrative Modification” means those modifications to the East VillageTALUS Project meeting the standards and procedures for an administrative minor modification in Appendix K (Elections and Modifications), processed and approved pursuant to Appendix J (Processing). 3.3. Administrative Review “Administrative Review” means the administrative process established in Appendix J (Processing) of the East VillageTALUS Development Agreement.
    [Show full text]
  • STANDARD PLAN RELEASE SUMMARY(SPR) Physical Facilities Department
    STANDARD PLAN RELEASE SUMMARY(SPR) Physical Facilities Department Building Design: Legacy 98 Release Date: November 2003 Release Number: 9 Summarized below is a list of modifications made to the Standard Plans, which are applicable to the Building Design indicated. This list is not intended to be exhaustive or detailed in nature, but is a tool for Project Managers and their consultants to quickly identify the changes made since the last Standard Plan Update. The Priority Level is intended to identify four levels of implementation for current projects in the late design phase or construction phase. Current projects in the planning phase or early design phase should incorporate all Changes where applicable. Level 1 - Critical Priority: Implement Change even if building is near Substantial Completion; Level 2 - High Priority: Implement Change even when Change may require minor additional cost - if Change will require significant additional cost or time, Change is left to PM's discretion; Level 3 - Standard Priority: Implement Change at PM's sole discretion. Level 4 - Low Priority: Implement Change as appropriate to phase of project. Change should not affect cost or schedule. Affected Affected Item Sheet No's SPC Spec. Description No. and Detail No. Section No's Priority Level A1.1, A2.1, Entry Storefronts: Changed the configuration of the entry 1 A2.2, A3.3, 861.3 storefronts at Vestibules 109 &148 to reduce the size of the center A5.2 lite to avoid the look of an additional door. Restroom Bench: Changed the wood bench in restrooms 127 & 2 A6.6 880 128 to 1 inch solid plastic.
    [Show full text]
  • The Hows, Whats and Wows of the Willis Tower a Guide for Teachers Skydeck Chicago
    THE HOWS, WHATS AND WOWS OF THE WILLIS TOWER A GUIDE FOR TEACHERS SKYDECK CHICAGO PROPERTY MANAGED BY U.S. EQUITIES ASSET MANAGEMENT LLC WELCOME TO SKYDECK CHICAGO AT WILLIS TOWER THE NATION’S TALLEST SCHOOL When you get back to your school, we hope your students will send us photos or write or create There are enough impressive facts about the Willis artwork about their experiences and share them Tower to make even the most worldly among us with us (via email or the mailing address at the end say, “Wow!” So many things at the Willis Tower can of this guide). We’ve got 110 stories already, and we be described by a superlative: biggest, fastest, would like to add your students’ experiences to our longest. But there is more to the building than all collection. these “wows”: 1,450 sky-scraping, cloud-bumping feet of glass and steel, 43,000 miles of telephone One photo will be selected as the “Photo of the cable, 25,000 miles of plumbing, 4.56 million Day” and displayed on our Skydeck monitors for all square feet of floor space and a view of four states. to see. Artwork and writing will posted on bulletin boards in the lunchroom area. Your students also Behind the “wows” are lots of “hows” and “whats” can post their Skydeck Chicago photos to the Willis for you and your students to explore. In this Tower or Skydeck Chicago pages on flickr, a free guide you will be introduced to the building—its public photo-sharing site: http://www.flickr.com/ beginnings as the Sears Tower and its design, photos/tags/willistower/ or http://www.flickr.com/ construction and place in the pantheon of photos/skydeckchicago/ skyscrapers.
    [Show full text]
  • Reference Structural Models and Baseline Performance Analysis of the World Trade Center Towers
    NISTNCSTAR1-2A Federal Building and Fire Safety Investigation of the World Trade Center Disaster Reference Structural Models and Baseline Performance Analysis of the World Trade Center Towers William J. Fasclian Ridiard B. Garlocl< National Institute of Standards and Technology Technology Administrofion • U.S. Deportment of Commerce NIST NCSTAR 1-2A Federal Building and Fire Safety Investigation of the World Trade Center Disaster Reference Structural Models and Baseline Performance Analysis of the World Trade Center Towers William J. Faschan Richard B. Garlock Leslie E. Robertson Associates. R.L.L.P. September 2005 i % U.S. Department of Commerce Carlos M. Gutierrez, Secretary Technology Administration Michelle O'Neill. Acting Under Secretary for Technology National Institute of Standards and Technology William Jeffrey, Director Abstract • Development of estimates of design gravity and wmd loads on the towers for implementation into the reference structural models and use in the baseline perfonnance analysis. Various wind load cases were considered in this study, including wind loads used in the original WTC design, wind loads based on two recent wind tunnel studies conducted in 2002 by Cennak Peterka Peterson, Inc. (CPP) and Rowan Williams Davies and Irwin, Inc. (RWDl) for insurance litigation concerning the towers, and refined wind load estimates developed by NIST from critical assessment of infonnation obtained from the CPP and RWDl reports and state-of-the-art considerations. The following three loading cases were considered for the baseline perfonnance analysis: - Original WTC design loads case. Loads included dead and live loads as in original WTC design in conjunction with original WTC design wind loads. - Slate-of-the-practice case.
    [Show full text]