Land Uses and Densities

Total Page:16

File Type:pdf, Size:1020Kb

Land Uses and Densities APPENDIX C PERMITTED LAND USES AND DENSITIES Section 1.0 Purpose and Intent Section 2.0 Scope Section 3.0 Definitions Section 4.0 Land Use Established Section 5.0 Standard Lot Dimensions by Land Use Section 6.0 Structure Height Section 7.0 Accessory Dwelling Units Section 8.0 Enforcement Section 9.0 Administrative Modifications of Standards Exhibit C-1 Land Use Categories 1.0 Purpose and Intent The purpose of this appendix is to encourage a variety of land uses, densities, and housing types to achieve the East VillageTALUS vision of an urban village, as described in the Planning Goals (Appendix A) and the Urban Village Design Guidelines (Appendix B). The standards set forth within this appendix are intended to guide the general location, bulk, and densities for the various land uses while allowing flexibility to respond to new and innovative approaches to an urban village setting. 2.0 Scope The provisions of this appendix shall apply to the East VillageTALUS Project. 3.0 Definitions 3.1. Accessory Dwelling Unit “Accessory Dwelling Unit” “(ADU)” means a room or set of rooms, either free standing, added onto or created within a single family residence. It generally includes living, sleeping, kitchen, and bathroom facilities, and has a lockable entrance. 3.2. Administrative Minor Modification “Administrative Modification” means those modifications to the East VillageTALUS Project meeting the standards and procedures for an administrative minor modification in Appendix K (Elections and Modifications), processed and approved pursuant to Appendix J (Processing). 3.3. Administrative Review “Administrative Review” means the administrative process established in Appendix J (Processing) of the East VillageTALUS Development Agreement. Revised 2009 – Adopted December 1999 C-1 Final Document 3.4. Applicant “Applicant” means either the Master Developer or a Parcel Builder as the submitter of an application to the City to develop or improve one or more Development Parcels, or (in the case of the Master Developer) as the submitter of an application to develop or improve general facilities, infrastructure, or amenities for the East VillageTALUS project. 3.5. Commercial Use “Commercial Use” means an occupation, employment, or enterprise that is carried on for profit by the owner, lessee, or licensee. For the purposes of this Agreement, aside from Home Occupations and Live/Work Units, Commercial Uses are listed in Subsections 4.5 and 4.6 of this appendix. 3.6. Cultural Facility A public or community gathering place such as a community center, theater, etc. 3.7. Day Care Any type of group program, for children or adults. 3.8. Designated Official “Designated Official” means the person, appointed by the Mayor, empowered, authorized, and charged with the duty to administer, interpret, process and approve plans as required by this appendix. 3.9. Density “Density” means the number of dwelling units per gross site area. The allowable number of dwelling units is determined by multiplying the gross site area (in acres) by the applicable density. Fractional numbers one-half (½) or above shall be rounded to the next higher whole number. Fractional numbers less than one-half (½) shall be rounded down to the next lowest whole number. 3.10. Development Parcels “Development Parcels” means the Development Parcels 1 through 21, as conceptually shown in Exhibit 3 (Cougar Mountain East VillageTALUS Development Area Exhibit) and as further defined in this Appendix C which are authorized for development pursuant to the pre- approved uses, densities and other Development Standards established in this Agreement. 3.11. Dwelling Unit, Multifamily A building containing more than two Dwelling Units, located on a single parcel, that may have one or more vertical walls and/or one or more horizontal walls in common. 3.12. Dwelling Unit, Single Family Attached A building that contains multiple dwelling units that occupy the entire space from the ground to the roof, and have one or more vertical walls in common with, or abutting, other Dwelling Units. Revised 2009 – Adopted December 1999 C-2 Final Document 3.13. Dwelling Unit, Single Family Detached A free-standing Dwelling Unit on a separate parcel. 3.14. Finish Grade “Finish Grade” means the land surface elevation of the site after final alterations are completed. 3.15. Gross Floor Area or Gross Square Footage “Gross Floor Area” or “Gross Square Footage” means the number of square feet of total floor area bounded by the inside surface of the exterior walls of the structure as measured at the floor line excluding parking, mechanical floor area and outside balconies that do not exceed a projection of six feet beyond the exterior walls of the building. 3.16. Gross Site Area “Gross Site Area” means the total area of a Development Parcel prior to any deductions for public or private roadways, dedicated right-of-way, exclusively used easements or special purpose overlay districts. 3.17. Home Occupation “Home Occupation" means a business carried on as a secondary, incidental or accessory use by the permanent resident(s) of the dwelling for gain or support, when on-site work is conducted entirely within a residential dwelling, an Accessory Dwelling Unit or a building accessory thereto, and when such occupation is in compliance with the terms and conditions of this appendix. 3.18. Live/Work Unit “Live/Work Unit” means a building providing the resident and opportunity to live and work at the same location. Generally, the work space has some street exposure and a separate entrance from the residence. 3.19. Master Developer “Master Developer” means the Partnership, as defined in the Main Body of this Development Agreement (Section 32), so long as the Partnership owns any then-undeveloped Development Parcel in the East VillageTALUS Project, or any Master Developer Transferee as defined in the Main Body (Section 32) of this Development Agreement. 3.20. Neighborhood “Neighborhood” means an area defined by topography, critical areas, land use, activity, significant streets, and/or other features that are distinguishable from adjacent areas. A project by a single Applicant is not a Neighborhood, unless it is defined by one or more of the above features. The term “Neighborhood”, as it is used in this appendix, includes residential, retail and commercial areas within the East VillageTALUS Project. 3.21. Net Square Footage Revised 2009 – Adopted December 1999 C-3 Final Document “Net Square Footage” means the building or unit floor space that may be utilized. This generally excludes common areas and space devoted to the heating, cooling, and other equipment of a building. 3.22. Noncritical Open Space “Noncritical Open Space” means the Open Space areas outside of Critical Areas and their buffers. 3.23. Open Space “Open Space” means areas north of the top of the slope defining the north bank of West Fork Tibbetts Creek that are located outside of Development Parcels or Utility Tracts. The Open Space areas consist of Critical Areas and their buffers and Noncritical Open Space. The Open Space areas are shown in bright green on Exhibit 3 (Cougar Mountain East VillageTALUS Development Area Exhibit). 3.24. Property Owner “Property Owner” means the legal owner or owners of the property. 3.25. Public Service and Quasi-Public Uses “Public Service and Quasi-Public Uses” means those uses that provide a public or community benefit. Those uses include, but are not limited to fire protection, law enforcement, public health, education, recreation, environmental protection, governmental services, bus/taxi stops, church (with or without day care), library, community center, clubhouses associated with residential uses, and utilities. For the purposes of this Agreement, Public Services and Quasi-Public Uses shall generally not be counted against the East VillageTALUS Allowable Development. See Section 5.4 of this appendix. 3.26. Recreational Areas “Recreational Areas” means active and passive parks, plazas, trails, informal gathering areas, community gardens, and other like facilities and areas, developed by the Master Developer on and in Development Parcels or Noncritical Open Space, including the land segregated for such uses and all equipment, appurtenances, facilities, and other improvements thereon related thereto. 3.27. Retail Use “Retail Use” means those uses providing services, or the sale of goods or merchandise to the general public for personal or household consumption, and primarily rendering services incidental to the sale of such services or goods. Retail service uses include, but are not limited to, eating and drinking establishments and real estate and financial offices. Retail trade uses include, but are not limited to, lumber yards, office supply stores, nurseries and garden centers, butcher shops, paint stores and similar uses, and shall be deemed retail trade establishments even though a portion of such business activity may concern contractors or other business establishments. For the purposes of this Development Agreement, Retail Uses within the East VillageTALUS Project shall be limited to 50,000 gross square feet as defined in Section 9 (Allowable Development) of the Main Body of this Agreement. Revised 2009 – Adopted December 1999 C-4 Final Document 3.28. Single Household “Single Household” means the occupancy of a single dwelling unit limited to family, or cohabitants, or persons who have obtained a grant of reasonable accommodation, as defined in the Issaquah Municipal Code. 3.29. Unit “Unit” means one or more rooms or structures providing complete, independent living facilities, including permanent provisions for living, sleeping, cooking and sanitation. 4.0 Land Use Established Seven main land use categories have been established for East VillageTALUS that will dictate development type and characteristics. The seven categories are: A. Low-Density Residential (3 to 12 units per Gross Site Area); B. Medium Density Residential (13 to 22 units per Gross Site Area ); C. High-density Residential (23 to 150 units per Gross Site Area); D. Village Center (23 to 200 units per Gross Site Area); E.
Recommended publications
  • EXHIBIT B CPC Report N 190230 ZRY (Residential Tower
    EXHIBIT B CPC Report N 190230 ZRY (Residential Tower Mechanical Voids) CITY PLANNING COMMISSION April 10, 2019, Calendar No. 11 N 190230 ZRY IN THE MATTER OF an application submitted by the Department of City Planning pursuant to Section 201 of the New York City Charter for an amendment of Article II, Chapter 3 and related provisions of the Zoning Resolution of the City of New York, modifying residential tower regulations to require certain mechanical spaces to be calculated as residential floor area. _____________________________________________________________________________ This application (N 190230 ZRY) for a zoning text amendment was filed by the Department of City Planning (DCP) on January 25, 2019 to discourage the use of excessively tall mechanical floors in high-density residential tower districts. The proposal would require that mechanical floors, typically excluded from zoning floor area calculations, would be counted toward the overall permitted floor area on the zoning lot if they are taller than new specified limits or overly concentrated in portions of the building. The proposed floor area requirements would apply to residential towers in non-contextual R9 and R10 Residence Districts and their equivalent Commercial Districts, as well as Special Purpose Districts that rely on underlying floor area and height and setback regulations or that are primarily residential in character. The provision would also apply to non-residential portions of a mixed-use building if the building contains a limited amount of non-residential floor area. BACKGROUND The New York City Zoning Resolution allows floor space containing mechanical equipment to be excluded from zoning floor area calculations, reflecting the recognition that these spaces perform important and necessary functions within buildings.
    [Show full text]
  • Scope of Services Template
    November 2018 SCOPE OF SERVICES FOR FINANCIAL PROJECT ID(S). To Be Determined by Task Work Order Continuing Services Existing Roadway Condition Assessment Report (ERCAR) Development District-Wide Florida’s Turnpike Enterprise 1 PURPOSE ............................................................................................................................. 4 2 PROJECT DESCRIPTION ................................................................................................. 6 3 PROJECT COMMON AND PROJECT GENERAL TASKS....................................... 34 4 ROADWAY ANALYSIS ................................................................................................... 44 5 ROADWAY PLANS .......................................................................................................... 51 6A DRAINAGE ANALYSIS ................................................................................................... 52 6B DRAINAGE PLANS .......................................................................................................... 56 7 UTILITIES .......................................................................................................................... 57 8 ENVIRONMENTAL PERMITS, COMPLIANCE, AND ENVIRONMENTAL CLEARANCES .................................................................................................................. 61 9 STRUCTURES - SUMMARY AND MISCELLANEOUS TASKS AND DRAWINGS .............................................................................................................................................
    [Show full text]
  • Space Efficiency in Multi-Use Tall Building
    ctbuh.org/papers Title: Space Efficiency in Multi-Use Tall Building Authors: Mahjoub Elnimeiri, Research Associate, Illinois Institute of Technology Hyeong-Ill Kim, Professor, Illinois Institute of Technology Subject: Architectural/Design Keywords: Design Process Mixed-Use Planning Publication Date: 2004 Original Publication: CTBUH 2004 Seoul Conference Paper Type: 1. Book chapter/Part chapter 2. Journal paper 3. Conference proceeding 4. Unpublished conference paper 5. Magazine article 6. Unpublished © Council on Tall Buildings and Urban Habitat / Mahjoub Elnimeiri; Hyeong-Ill Kim Space Efficiency in Multi-Use Tall Building Hyeong-ill Kim1, Mahjoub Elnimeiri2, 1 Research Associate, College of Architecture, Illinois Institute of Technology 2Professor, College of Architecture, Illinois Institute of Technology Abstract This paper seeks to make a contribution to the development of the design strategies for multi-use tall buildings in relation to space efficiency of the building for architects, engineers and developers during their early phases of the design process. This research describes the complex challenges of a design development process influenced by vertically stacked functions. This paper addresses the important parameters in the design of multi-use tall buildings and their relationship to the space efficiency. Parameters including functions, lease span, floor-to-floor height, vertical transportation, site area, FAR(Floor Area Ratio), building height, number of floors, building size at the base and top, , aspect ratio, structural system were analyzed. Ten multi-use buildings were carefully surveyed and investigated through specific case studies. To achieve this comparative analysis, a comprehensive data base was established. Based on the results of the case studies, a set of quantitative analysis was performed to show relationship among design factors.
    [Show full text]
  • Single Family Dwelling Addition Handout 3-19
    HUMBOLDT COUNTY BUILDING DEPARTMENT 25 W. FOURTH STREET WINNEMUCCA, NV 89446 (775) 623-6322 (775) 623-6337 – FAX hcnv.us (web site) [email protected] (e-mail) CITY OF WINNEMUCCA BUILDING DEPARTMENT 90 W. FOURTH STREET WINNEMUCCA, NV 89445 (775) 623-6319 (775) 623-6321 - FAX RESIDENTIAL ADDITION PERMIT GUIDE March 2019 GENERAL INFORMATION This guide outlines the requirements for obtaining a building permit to construct a residential addition in Humboldt County. In order to ensure that your application is processed in a timely manner, your submittal package must be complete. Once submitted, your plan package will require review and approval from the following County and State Agencies: Zoning Approval Humboldt County Planning & Zoning Department (Site Plan/Zoning Codes) 623-6393 Street Excavation Humboldt County Road Department 623-6416 Excavation permits are available from the Road Department for any excavation in a county road easement or right of Way Plan Review Humboldt County Building Department Flood Zone Area Review Humboldt County Building Department Water/Domestic Well Installation Shall be approved by Nevada State Water Resources (775) 684-2800 Nevada State Manufactured Housing Division (702) 486 – 4138 - Las Vegas Upon submitting your plans to the Building Department and prior to final inspection, the applicant will need to contact the Bureau of Health Protection Services for septic approval. Written approval shall be submitted to this office. Approval from water district or sewer districts is also required. We recommend you
    [Show full text]
  • Elevator Pressurization in Tall Buildings 2. Journal Paper Ctbuh
    ctbuh.org/papers Title: Elevator Pressurization in Tall Buildings Author: John H. Klote, Smoke and Fire Consulting Subjects: Fire & Safety Vertical Transportation Keywords: Fire Safety Vertical Transportation Publication Date: 2013 Original Publication: International Journal of High-Rise Buildings Volume 2 Number 4 Paper Type: 1. Book chapter/Part chapter 2. Journal paper 3. Conference proceeding 4. Unpublished conference paper 5. Magazine article 6. Unpublished © Council on Tall Buildings and Urban Habitat / John H. Klote International Journal of High-Rise Buildings International Journal of December 2013, Vol 2, No 4, 341-344 High-Rise Buildings www.ctbuh-korea.org/ijhrb/index.php Elevator Pressurization in Tall Buildings John H. Klote† Smoke and Fire Consulting, 19355 Cypress Ridge Terrace, Leesburg, VA 20176, USA Abstract During a building fire, smoke can flow through elevator shafts threatening life on floors remote from the fire. Many buildings have pressurized elevators intended to prevent such smoke flow. The computer program, CONTAM, can be used to analyze the performance of pressurization smoke control systems. The design of pressurized elevators can be challenging for the following reasons: (1) often the building envelope is not capable of effectively handling the large airflow resulting from elevator pressurization, (2) open elevator doors on the ground floor tend to increase the flow from the elevator shaft at the ground floor, and (3) open exterior doors on the ground floor can cause excessive pressure differences across the elevator shaft at the ground floor. To meet these challenges, the following systems have been developed: (1) exterior vent (EV) system, (2) floor exhaust (FE) system, and ground floor lobby (GFL) system.
    [Show full text]
  • Thompson Center, Thompson Center Name of Multiple Property Listing N/A (Enter "N/A" If Property Is Not Part of a Multiple Property Listing)
    NPS Form 10900 OMB No. 10240018 United States Department of the Interior National Park Service National Register of Historic Places Registration Form This form is for use in nominating or requesting determinations for individual properties and districts. See instructions in National Register Bulletin, How to Complete the National Register of Historic Places Registration Form. If any item does not apply to the property being documented, enter "N/A" for "not applicable." For functions, architectural classification, materials, and areas of significance, enter only categories and subcategories from the instructions. Place additional certification comments, entries, and narrative items on continuation sheets if needed (NPS Form 10-900a). 1. Name of Property historic name State of Illinois Center other names/site number James R. Thompson Center, Thompson Center Name of Multiple Property Listing N/A (Enter "N/A" if property is not part of a multiple property listing) 2. Location street & number 100 West Randolph Street not for publication city or town Chicago vicinity state Illinois county Cook zip code 60601 3. State/Federal Agency Certification As the designated authority under the National Historic Preservation Act, as amended, I hereby certify that this nomination request for determination of eligibility meets the documentation standards for registering properties in the National Register of Historic Places and meets the procedural and professional requirements set forth in 36 CFR Part 60. In my opinion, the property meets does not meet the National Register Criteria. I recommend that this property be considered significant at the following level(s) of significance: national statewide local Applicable National Register Criteria: A B C D Signature of certifying official/Title: Deputy State Historic Preservation Officer Date Illinois Department of Natural Resources - SHPO State or Federal agency/bureau or Tribal Government In my opinion, the property meets does not meet the National Register criteria.
    [Show full text]
  • Schematic Design Narrative
    Valdez Middle School Project Project No.: 11‐310‐9507 City of Valdez Schematic Design Narrative June 27, 2012 ARCHITECTS, PLANNERS, INTERIOR DESIGNERS AND LANDSCAPE ARCHITECTS Valdez Middle School Schematic Design Submittal TABLE OF CONTENTS Acknowledgements 2 Overview 3 Code Summary 5 Environmental Design Narrative 7 Geotechnical Narrative 8 Landscape Design Narrative 12 Civil Design Narrative 16 Architectural Narrative 19 Structural Design Narrative 21 Mechanical Design Narrative 22 Electrical Design Narrative 29 Appendix A: “Valdez Middle School Site Pre‐Demolition Hazardous Building Materials & Environmental Assessment” BETTISWORTH NORTH ARCHITECTS AND PLANNERS 212 FRONT ST FAIRBANKS AK 99701 907 456 5780 1 Valdez Middle School Schematic Design Submittal ACKNOWLEDGEMENTS Client City of Valdez P.O. Box 307, Valdez, AK 99686 John Hozey, City Manager Jack McCay, Project Manager Valdez City School District P.O. Box 398, Valdez, AK 99686 Jacob Jensen, Superintendent Rod Morrison, Junior High Principal Consultant Team Bettisworth North Architects and Planners (Architect/Landscape Architect) 212 Front Street, Fairbanks, AK 99701 Charles Bettisworth, Principal in Charge Tracy Vanairsdale, Principal, Project Manager Mark Kimerer, Project Landscape Architect DeJong‐Richter (Educational Specifications) 4945 Badenton Blvd., Suite B, Dublin, OH 43017 Bill DeJong, Principal Tracy Richter, Principal CRW Engineering Group, LLC (Civil) 3940 Arctic Blvd., #300, Anchorage, AK 99503 Pete Bellezza, Principal Civil Engineer BBFM Engineers Inc. (Structural) 510 L Street, Suite 200, Anchorage, AK 99501 Forrest T. Braun, Principal Structural Engineer RSA Engineering, Inc. (Mechanical/Electrical) 2522 Arctic Blvd., Anchorage, AK 99503 Brian Pekar, Senior Mechanical Engineer Channing Lillo, Associate Principal Electrical Engineer Shannon & Wilson, Inc. (Geotechnical) 2355 Hill Road, Fairbanks, AK 99709 Steve Adamczak, Principal Geotechnical Engineer NORTECH, Inc.
    [Show full text]
  • The-Noma-Offering-Plan Part3.Pdf
    210 211 EXHIBIT "4" DESCRIPTION OF PROPERTY 212 213 50 West 30th Street 50 West 30th Street, New York, NY ARCHITECT'S DESCRIPTION OF PROPERTY AND SPECIFICATIONS 23 November 2015 TABLE OF CONTENTS SECTION PAGE A. Location of Property ...........................................................................................................................2 B. Status of Construction .......................................................................................................................2 C. Site .............................................................................................................................................................2 D. Utilities ......................................................................................................................................................3 E. Sub-Surface Conditions .....................................................................................................................4 F. Streetscape & Enclosure ...................................................................................................................4 G. Building Size ...........................................................................................................................................4 H. Building Systems ..................................................................................................................................5 (1) Foundation ..................................................................................................................................5
    [Show full text]
  • STANDARD PLAN RELEASE SUMMARY(SPR) Physical Facilities Department
    STANDARD PLAN RELEASE SUMMARY(SPR) Physical Facilities Department Building Design: Legacy 98 Release Date: November 2003 Release Number: 9 Summarized below is a list of modifications made to the Standard Plans, which are applicable to the Building Design indicated. This list is not intended to be exhaustive or detailed in nature, but is a tool for Project Managers and their consultants to quickly identify the changes made since the last Standard Plan Update. The Priority Level is intended to identify four levels of implementation for current projects in the late design phase or construction phase. Current projects in the planning phase or early design phase should incorporate all Changes where applicable. Level 1 - Critical Priority: Implement Change even if building is near Substantial Completion; Level 2 - High Priority: Implement Change even when Change may require minor additional cost - if Change will require significant additional cost or time, Change is left to PM's discretion; Level 3 - Standard Priority: Implement Change at PM's sole discretion. Level 4 - Low Priority: Implement Change as appropriate to phase of project. Change should not affect cost or schedule. Affected Affected Item Sheet No's SPC Spec. Description No. and Detail No. Section No's Priority Level A1.1, A2.1, Entry Storefronts: Changed the configuration of the entry 1 A2.2, A3.3, 861.3 storefronts at Vestibules 109 &148 to reduce the size of the center A5.2 lite to avoid the look of an additional door. Restroom Bench: Changed the wood bench in restrooms 127 & 2 A6.6 880 128 to 1 inch solid plastic.
    [Show full text]
  • The Hows, Whats and Wows of the Willis Tower a Guide for Teachers Skydeck Chicago
    THE HOWS, WHATS AND WOWS OF THE WILLIS TOWER A GUIDE FOR TEACHERS SKYDECK CHICAGO PROPERTY MANAGED BY U.S. EQUITIES ASSET MANAGEMENT LLC WELCOME TO SKYDECK CHICAGO AT WILLIS TOWER THE NATION’S TALLEST SCHOOL When you get back to your school, we hope your students will send us photos or write or create There are enough impressive facts about the Willis artwork about their experiences and share them Tower to make even the most worldly among us with us (via email or the mailing address at the end say, “Wow!” So many things at the Willis Tower can of this guide). We’ve got 110 stories already, and we be described by a superlative: biggest, fastest, would like to add your students’ experiences to our longest. But there is more to the building than all collection. these “wows”: 1,450 sky-scraping, cloud-bumping feet of glass and steel, 43,000 miles of telephone One photo will be selected as the “Photo of the cable, 25,000 miles of plumbing, 4.56 million Day” and displayed on our Skydeck monitors for all square feet of floor space and a view of four states. to see. Artwork and writing will posted on bulletin boards in the lunchroom area. Your students also Behind the “wows” are lots of “hows” and “whats” can post their Skydeck Chicago photos to the Willis for you and your students to explore. In this Tower or Skydeck Chicago pages on flickr, a free guide you will be introduced to the building—its public photo-sharing site: http://www.flickr.com/ beginnings as the Sears Tower and its design, photos/tags/willistower/ or http://www.flickr.com/ construction and place in the pantheon of photos/skydeckchicago/ skyscrapers.
    [Show full text]
  • Reference Structural Models and Baseline Performance Analysis of the World Trade Center Towers
    NISTNCSTAR1-2A Federal Building and Fire Safety Investigation of the World Trade Center Disaster Reference Structural Models and Baseline Performance Analysis of the World Trade Center Towers William J. Fasclian Ridiard B. Garlocl< National Institute of Standards and Technology Technology Administrofion • U.S. Deportment of Commerce NIST NCSTAR 1-2A Federal Building and Fire Safety Investigation of the World Trade Center Disaster Reference Structural Models and Baseline Performance Analysis of the World Trade Center Towers William J. Faschan Richard B. Garlock Leslie E. Robertson Associates. R.L.L.P. September 2005 i % U.S. Department of Commerce Carlos M. Gutierrez, Secretary Technology Administration Michelle O'Neill. Acting Under Secretary for Technology National Institute of Standards and Technology William Jeffrey, Director Abstract • Development of estimates of design gravity and wmd loads on the towers for implementation into the reference structural models and use in the baseline perfonnance analysis. Various wind load cases were considered in this study, including wind loads used in the original WTC design, wind loads based on two recent wind tunnel studies conducted in 2002 by Cennak Peterka Peterson, Inc. (CPP) and Rowan Williams Davies and Irwin, Inc. (RWDl) for insurance litigation concerning the towers, and refined wind load estimates developed by NIST from critical assessment of infonnation obtained from the CPP and RWDl reports and state-of-the-art considerations. The following three loading cases were considered for the baseline perfonnance analysis: - Original WTC design loads case. Loads included dead and live loads as in original WTC design in conjunction with original WTC design wind loads. - Slate-of-the-practice case.
    [Show full text]
  • The Hearst Tower: Combining Steam Driven Absorption Cooling with a DOAS/Radiant System
    The Hearst Tower: Combining Steam Driven Absorption Cooling with a DOAS/Radiant System Jessica M. Lucas The Pennsylvania State University Department of Architectural Engineering Senior Thesis-Mechanical Option Architecture Hearst Tower 959 Eighth Avenue o 856,000 Square Feet New York, NY o 42 stories, 597 feet tall o Glass and metal curtain Project Team wall façade o Diagrid design features Owner: triangular glass panels Hearst Corporation four stories high o Primarily office space, but Development Manager: will also house an Tishman Speyer auditorium, test kitchens, Properties executive dining hall, and a television studio Architect: Foster and Partners Associate Architect: Adamson Associates Construction Structural Engineer: o December 2004-June Cantor Seinuk 2006 o Expected to earn MEP: LEED gold Flack+Kurtz certification Construction Manager: o Original 6 story Structural System Turner Construction headquarters facade preserved with new Composite steel and Lighting: o tower constructed concrete floor system with George Sexton through center 40 foot column free interior span Mechanical System o Tower is connected to the landmark façade by a o Low temperature air distributed using central horizontal skylighting VAV system system o 4-4000 ton cooling towers serve the chiller plant o Diagrid members are wide o Chiller plant contains 2-1200 ton and 1-400 ton flange rolled steel sections centrifugal chillers connecting at nodes o Radiant floor heating and cooling serves the lobby o The secondary lateral system is a braced frame at the service
    [Show full text]