Republic of the Philippines DEPARTMENT of PUBLIC WORKS and HIGHWAYS OFFICE of the DISTRICT ENGINEER Cavite 1St District Engineering Office Brgy

Total Page:16

File Type:pdf, Size:1020Kb

Republic of the Philippines DEPARTMENT of PUBLIC WORKS and HIGHWAYS OFFICE of the DISTRICT ENGINEER Cavite 1St District Engineering Office Brgy Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS OFFICE OF THE DISTRICT ENGINEER Cavite 1st District Engineering Office Brgy. De Ocampo, Trece Martires City Addendum to Invitation to Bid October 25, 2019 Project ID Project Name ABC Local Program-Local Infrastructure Program, Flood Control and 20DF0045 Drainage, Drainage/ Protection Works, Construction of Drainage, Mahogany St., Brgy. Silangan II, Rosario, Cavite P1,980,000.00 Organizational Outcome 1: Ensure Safe and Reliable National Road System, Asset Preservation Program, Preventive Maintenance, 20DF0046 Primary Road, Indang-Alfonso via Luksuhin Rd. – K0056+311.7 – P5,956,440.00 K0056+582 Organizational Outcome 1: Ensure Safe and Reliable, Asset Preservation Program, Construction/Upgrading/Rehabilitation of 20DF0047 Drainage along National Roads, Tertiary Roads, Tejero-Gen. Trias- P16,503,200.00 Amadeo-Tagaytay Road – K0053+000 – K0053+424 Local Program-Local Infrastructure Program, Buildings and Other Structures, Multipurpose/Facilities, Construction (Completion) of 20DF0048 Multi-Purpose Building, Brgy. Medicion, Imus City; Construction of P19,800,000.00 Multi-Purpose Building, Brgy. Maharlika, Imus City; Construction of Multi-Purpose Building, Brgy. Malagasang II-A, Imus City; Construction of Multi-Purpose Building, Brgy. Malagasang II-G, Imus City, Cavite Organizational Outcome 2: Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/ 20DF0049 Maintenance of Flood Mitigation Structures and Drainage Systems, P30,135,000.00 Construction of Revetment along Ilang-Ilang River, Phase II, Brgy. Alapan II-A, Imus City, Cavite Organizational Outcome 2: Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/ 20DF0050 Maintenance of Flood Mitigation Structures and Drainage Systems- P39,200,000.00 Construction of Revetment along Ilang-Ilang River, Brgy. Sta. Clara, Phase III General Trias City, Cavite Organizational Outcome 2: Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/ 20DF0051 Maintenance of Flood Mitigation Structures and Drainage Systems- P44,100,000.00 Construction of Revetment along Cañas River, Brgy. Poblacion I, Tanza, Cavite Organizational Outcome 2: Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/ 20DF0052 Maintenance of Flood Mitigation Structures and Drainage Systems – P49,000,000.00 Construction of Revetment along Cañas River, Phase II, Brgy. Luciano, Trece Martires City Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS OFFICE OF THE DISTRICT ENGINEER Cavite 1st District Engineering Office Brgy. De Ocampo, Trece Martires City Project ID Project Name ABC Organizational Outcome 2: Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/ 20DF0053 Maintenance of Flood Mitigation Structures and Drainage Systems – P49,000,000.00 Construction of Revetment along Cañas River, Phase III, Brgy. De Ocampo, Trece Martires City Organizational Outcome 2: Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/ 20DF0054 Maintenance of Flood Mitigation Structures and Drainage Systems – P49,000,000.00 Construction of Revetment along Cañas River, Brgy. Bucal, Tanza, Cavite Organizational Outcome 2: Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/ 20DF0055 Maintenance of Flood Mitigation Structures and Drainage Systems – P53,529,515.00 Construction of Revetment along Ilang-Ilang River, Downstream, Phase II, Brgy. F. Manalo, General Trias City, Cavite Organizational Outcome 1: Ensure Safe and Reliable National Road System, Asset Preservation Program, Preventive Maintenance, 20DF0056 Tertiary Roads, Tejero-Gen. Trias-Amadeo-Tagaytay Rd – P70,756,980.00 K0035+349 – K0036+421, K0040+177.6 – K0041+409, K0044+641 – K0045+643 The Size Range for the above stated project should be Small B for Project ID Nos. 20DF0045 – 20DF0046 and Medium A for Project ID Nos. 20DF0047-20DF0056 Please be guided accordingly. GILBERTO M. ALMANZOR Chief, Construction Section BAC Chairperson NOTED: OSCAR U. DELA CRUZ District Engineer .
Recommended publications
  • 12Th Annual Seminar on Cavite History and Culture Disaster,Calamity Awareness Discussed
    GALEDECEMBER 2010Ó VOL. 1 NO.N 1 10 PAGES Official publication of the Cavite Studies Center • DE LA SALLE UNIVERSITY-DASMARIÑAS 12th Annual Seminar on Cavite history and culture Disaster,calamity awareness discussed To assess the geographical condition of the province and to single out the preparedness capacity of Caviteños in terms of catastrophe and calamities, the Cavite Studies Center (CSC) convened its 12th annual seminar on history and culture entitled Desastres y Calamidades: Cavite and the Signs of the Times. The event took place at the Aguinaldo Shrine, Kawit, Cavite on September 24. Public school teachers from Kawit and Dasmariñas and local government officials of Kawit, Noveleta, Naic, Ternate, Trece Martires, and Imus attended the seminar. The opening ceremonies Before the lecture proper, Kawit Mayor Reynaldo ‘Tik’ Aguinaldo commended the CSC regarding the importance of holding such activity. This, accordingly, will give the audience the ability to determine the actions to be done once a calamity or a disaster happens. Former Prime Minister Cesar EA Virata stressed that population growth which contribute to environmental and garbage problems is one factor in the occurrence of calamities. He even suggested some measures such as education and concentrated efforts for a cleaner surroundings that Caviteños have to observe in order to lessen the problem. CSC Director Aquino Garcia, on the other hand, delivered the conference overview. An overview of the disasters and calamities in the Philippines Dr. Regino Paular, CSC writer-in-residence, an expert in history, anthropology and in Spanish language discussed and summarized the major (continued on page 2) GALEÓN DECEMBER 2010 VOL.
    [Show full text]
  • 11844024 43.Pdf
    92 716 REGIONAL DEVELOPMENT COUNCIL 93 717 94 719 MEMORANDUM OF UNDERSTANDING ( D R A F T ) This Memorandum of Understanding is entered into by and between Department of Public Works and Highways (DPWH), with office address on Bonfacio Drive, Manila, as the government agency responsible for the planning and development of the Cavite-Laguna Arterial Roads described herein; - and – One Asia Development Corporation, with office address at Suite 2302, The Orient Square, Emerald Avenue, Ortigas Center, Pasig, and the acknowledged developer of one of the properties to be affected by the planned arterial roads in Cavite;. 1. THE PLANNED ARTERIAL ROADS Following the JICA-assisted feasibility study on the CALA East-West National Road Project which was conducted from February 2005 to September 2006, the Philippine government through the Department of Public Works and Highways has decided to build the following arterial roads: a) North-South Expressway, hereinafter referred to as “NS-Way”, extending from Bacoor-Cavite in the north to Sta.Rosa-Laguna in the south and broken down into the following segments: a. NS1 – a grade separation interchange to connect the existing R-1 Expressway to an upgraded Molino Boulevard, approximately 1.9 kms; b. NS2 – a 6-lane expressway, approximately 4.6 km., on Molino Boulevard from NS1; c. NS3 – a 6-lane expressway, approximately 6.3 km, from NS2 to Daang Hari, through the One Asia Property; d. NS4 – extends about 6.8 km. South from Daang Hari extension up to Aguinaldo Highway towards Palapala in Dasmariñas, and almost parallel to Aguinaldo Highway;. e. NS5 – runs on the west-side of Aguinaldo Highway about 2 km before Governor’s Drive and terminates at the Silang area, with a length of about 7.6 km.
    [Show full text]
  • Chapter 2. Geophysical Environment
    Chapter 2. Geophysical Environment Geographical Location dated February 08, 2012 and RA 10161 dated April 10, Cavite is part of the Philippines’ largest island, the Luzon 2012, respectively, and the newly converted City of Gen. Peninsula. Found in the southern portion, Cavite belongs Trias through Republic Act 10675 which was signed into to Region IV-A or the CALABARZON region. The provinces law on August 19, 2015 and ratified on December 12, of Batangas in the south, Laguna in the east, Rizal in the 2015. northeast, Metro Manila and Manila Bay in the north, and West Philippine Sea in the west bounds the Province. Presidential Decree 1163 declared the City of Imus is the de jure provincial capital, and Trece Martires City is the Cavite has the GPS coordinates of 14.2456º N, 120.8786º E. Its proximity to Metro Manila gives the province a de facto seat of the provincial government. significant edge in terms of economic development. In addition, in 1909, during the American regime, Governor-General W. Cameron Forbes issued the Executive Order No. 124, declaring Act No. 1748 that annexed Corregidor and the Islands of Caballo (Fort Hughes), La Monja, El Fraile (Fort Drum), Sta. Amalia, Carabao (Fort Frank) and Limbones, as well as all waters and detached rocks surrounding them to the City of Cavite. These are now major tourist attractions of the province. The municipality of Ternate also has Balut Island. Table 2.1 Number of barangays by city/municipality and congressional district; Province of Cavite: 2018 Number of City/Municipality Barangays 1st District 143 Cavite City 84 Kawit 23 Political Boundaries Noveleta 16 Rosario 20 The province of Cavite has well-defined political 2nd District 73 subdivisions.
    [Show full text]
  • Chapter 4. Analysis of Future Population and Land Use in the Study Area
    Chapter 4. Analysis of Future Population and Land Use in the Study Area 4.1 Current Land Use Plan Each of the cities/municipalities in the Study Area has prepared a comprehensive land use plan (hereinafter referred to as CLUP) for its jurisdiction. These CLUPs were combined and integrated into one map in the Study as shown in Fig. 4.1 and Table 4.1. The land uses projected in the CLUPs are further summarized in the table below. Table R 4.1 Existing and Future Land Use Projected by City/Municipality in the Study Area Present (As of 2003) Future (Projected by City/Municipality) Land Use Area (ha) Share Area (ha) Share Residential 8,420 20.7% 6,294 15.4% Industrial 914 2.2% 1,883 4.6% Institutional 208 0.5% 64 0.2% Built-up Area Commercial 422 1.0% 1,395 3.4% Built-up/Mix Use 57 0.1% 16,926 41.5% Sub-total 10,021 24.6% 26,561 65.2% Agricultural 19,037 46.7% 12,861 31.6% Grassland/Open Area 6,278 15.4% 1,004 2.5% Tree Plantation 4,484 11.0% 249 0.6% Non-Built-up Area Water Bodies 903 2.2% 68 0.2% Unclassified 21 0.1% 1 0.0% Sub-total 30,722 75.4% 14,182 34.8% Total 40,743 100.0% 40,743 100.0% As shown above, the present built-up area covers 24.6% of the entire Study Area, but it was projected to remarkably increase to 65.2%.
    [Show full text]
  • Hospital Capacity for COVID-19 Cases
    Intellicare Hospital Capacity for COVID-19 Cases National Capital Region COVID CASES NON-COVID CASES NAME OF FACILITY PROVINCE/CITY IN PATIENT CAPACITY IN PATIENT CAPACITY ALLIED CARE EXPERTS (ACE) PATEROS PATEROS WITH AVAILABLE ROOMS WITH AVAILABLE ROOMS CAPITOL MEDICAL CENTER QUEZON CITY WITH AVAILABLE ROOMS WITH AVAILABLE ROOMS CHINESE GENERAL HOSPITAL MANILA WITH AVAILABLE ROOMS WITH AVAILABLE ROOMS DILIMAN DOCTORS HOSPITAL QUEZON CITY WITH AVAILABLE ROOMS FULL CAPACITY DR. FE DEL MUNDO HOSPITAL QUEZON CITY WITH AVAILABLE ROOMS WITH AVAILABLE ROOMS DR. VICTOR POTENCIANO MEDICAL MANDALUYONG WITH AVAILABLE ROOMS WITH AVAILABLE ROOMS CENTER CITY FATIMA UNIVERSITY MEDICAL CENTER VALENZUELA WITH AVAILABLE ROOMS WITH AVAILABLE ROOMS / NEED TO CALL SINCE THE AVAILABILITY OF ROOMS MAY CHANGE DAILY HOLYLIFE HOSPITAL PASIG CITY WITH AVAILABLE ROOMS WITH AVAILABLE ROOMS MANILA DOCTORS HOSPITAL MANILA WITH AVAILABLE ROOMS WITH AVAILABLE ROOMS FOR MILD TO MODERATE; SEVERE TO CRITICAL COVID FULL MARIKINA VALLEY MEDICAL CENTER MARIKINA CITY WITH AVAILABLE ROOMS WITH AVAILABLE ROOMS AS OF THE MOMENT- CALL HOSPITAL FIRST MCU HOSPITAL CALOOCAN CITY WITH AVAILABLE ROOMS WITH AVAILABLE ROOMS FOR MILD TO MODERATE; SEVERE TO CRITICAL COVID FULL MEDICAL CENTER MANILA MANILA WITH AVAILABLE ROOMS WITH AVAILABLE ROOMS METROPOLITAN MEDICAL CENTER MANILA WITH AVAILABLE ROOMS WITH AVAILABLE ROOM FOR MILD AND MODERATE COVID, FACILITY HAS NO AVAILABLE ICU ROOM INSIDE THE FACILITY. PACIFIC GLOBAL MEDICAL CENTER QUEZON CITY WITH AVAILABLE ROOMS WITH AVAILABLE ROOMS PROVIDENCE HOSPITAL QUEZON CITY WITH AVAILABLE ROOMS WITH AVAILABLE ROOMS ST. LUKE'S MEDICAL CENTER QUEZON QUEZON CITY WITH AVAILABLE ROOMS NO AVAILABLE ROOMS CITY WORLD CITI MEDICAL CENTER QUEZON CITY WITH AVAILABLE ROOMS WITH AVAILABLE ROOMS Intellicare Hospital Capacity for COVID-19 Cases F.E.U HOSPITAL QUEZON CITY ACCEPTING MILD TO WITH AVAILABLE ROOMS MODERATE; SEVERE TO CRITICAL FULL CAPACITY MEDICAL CENTER PARANAQUE PARAÑAQUE CITY MILD CASES ONLY.
    [Show full text]
  • Lions Clubs International
    GN1067D Lions Clubs International Clubs Missing a Current Year Club Officer (Only President, Secretary or Treasurer) as of June 30, 2009 District 301A2 District Club Club Name Title (Missing) District 301A2 23474 BATANGAS President District 301A2 23474 BATANGAS Secretary District 301A2 23474 BATANGAS Treasurer District 301A2 23475 BINAN President District 301A2 23475 BINAN Secretary District 301A2 23475 BINAN Treasurer District 301A2 23477 BULAN President District 301A2 23477 BULAN Secretary District 301A2 23477 BULAN Treasurer District 301A2 23478 CABUYAO President District 301A2 23478 CABUYAO Secretary District 301A2 23478 CABUYAO Treasurer District 301A2 23479 CALAMBA HOST President District 301A2 23479 CALAMBA HOST Secretary District 301A2 23479 CALAMBA HOST Treasurer District 301A2 23480 CAMARINES SUR President District 301A2 23480 CAMARINES SUR Secretary District 301A2 23480 CAMARINES SUR Treasurer District 301A2 23481 CAVITE CITY President District 301A2 23481 CAVITE CITY Secretary District 301A2 23481 CAVITE CITY Treasurer District 301A2 23482 DAET President District 301A2 23482 DAET Secretary District 301A2 23482 DAET Treasurer District 301A2 23484 IMUS President District 301A2 23484 IMUS Secretary District 301A2 23484 IMUS Treasurer District 301A2 23485 LAS PINAS HOST President District 301A2 23485 LAS PINAS HOST Secretary District 301A2 23485 LAS PINAS HOST Treasurer District 301A2 23488 LEGASPI CITY President District 301A2 23488 LEGASPI CITY Secretary District 301A2 23488 LEGASPI CITY Treasurer District 301A2 23492 MAKATI
    [Show full text]
  • List of Licensed Covid-19 Testing Laboratory in the Philippines
    LIST OF LICENSED COVID-19 TESTING LABORATORY IN THE PHILIPPINES ( as of November 26, 2020) OWNERSHIP MUNICIPALITY / NAME OF CONTACT LICENSE REGION PROVINCE (PUBLIC / TYPE OF TESTING # CITY FACILITY NUMBER VALIDITY PRIVATE) Amang Rodriguez 1 NCR Metro Manila Marikina City Memorial Medical PUBLIC Cartridge - Based PCR 8948-0595 / 8941-0342 07/18/2020 - 12/31/2020 Center Asian Hospital and 2 NCR Metro Manila Muntilupa City PRIVATE rRT PCR (02) 8771-9000 05/11/2020 - 12/31/2020 Medical Center Chinese General 3 NCR Metro Manila City of Manila PRIVATE rRT PCR (02) 8711-4141 04/15/2020 - 12/31/2020 Hospital Detoxicare Molecular 4 NCR Metro Manila Mandaluyong City PRIVATE rRT PCR (02) 8256-4681 04/11/2020 - 12/31/2020 Diagnostics Laboratory Dr. Jose N. Rodriguez Memorial Hospital and (02) 8294-2571; 8294- 5 NCR Metro Manila Caloocan City PUBLIC Cartridge - Based PCR 08/13/2020 - 12/31/2020 Sanitarium 2572 ; 8294-2573 (GeneXpert)) Lung Center of the 6 NCR Metro Manila Quezon City PUBLIC rRT PCR 8924-6101 03/27/2020 - 12/31/2020 Philippines (LCP) Lung Center of the 7 NCR Metro Manila Quezon City Philippines PUBLIC Cartridge - Based PCR 8924-6101 05/06/2020 - 12/31/2020 (GeneXpert) Makati Medical Center 8 NCR Metro Manila Makati City PRIVATE rRT PCR (02) 8888-8999 04/11/2020 - 12/31/2020 (HB) Marikina Molecular 9 NCR Metro Manila Marikina City PUBLIC rRT PCR 04/30/2020 - 12/31/2020 Diagnostic laboratory Philippine Genome 10 NCR Metro Manila Quezon City Center UP-Diliman PUBLIC rRT PCR 8981-8500 Loc 4713 04/23/2020 - 12/31/2020 (NHB) Philippine Red Cross - (02) 8790-2300 local 11 NCR Metro Manila Mandaluyong City PRIVATE rRT PCR 04/23/2020 - 12/31/2020 National Blood Center 931/932/935 Philippine Red Cross - 12 NCR Metro Manila City of Manila PRIVATE rRT PCR (02) 8527-0861 04/14/2020 - 12/31/2020 Port Area Philippine Red Cross 13 NCR Metro Manila Mandaluyong City Logistics and PRIVATE rRT PCR (02) 8790-2300 31/12/2020 Multipurpose Center Research Institute for (02) 8807-2631; (02) 14 NCR Metro Manila Muntinlupa City Tropical Medicine, Inc.
    [Show full text]
  • GOOD PRACTICE EXCHANGE: Localizing National Climate Change Action Targets Through Implementation of Mitigation Actions 16 March 2016 | Seda Nuvali, Sta
    GOOD PRACTICE EXCHANGE: Localizing National Climate Change Action Targets Through Implementation of Mitigation Actions 16 March 2016 | Seda Nuvali, Sta. Rosa City, Laguna, Philippines Hosted by: the City Government of Sta. Rosa DOCUMENTATION REPORT TABLE OF CONTENTS 1. Introduction • Project Background • Objectives of the Event 2. Opening Remarks • Context setting of the V-LED Project • Climate Dialogue Exchange 3. Intended Nationally Determined Contributions (INDC) • Updates on the INDC focusing on Solid Waste 4. About Santa Rosa • Santa Rosa: City Profile, Issues, and Vision 5. The Santa Experience • Santa Rosa’s efforts to mitigate 6. Moderated Feedback Session 7. World Café • Knowledge-sharing through a photo gallery of GHG mitigation actions by: Laguna’s Sta. Rosa and San Pedro, and Cavite’s Imus, Silang, and Carmona 8. 5 x 5 x 5 Challenge: Improving Local Climate Change Actions 9. Learning, Challenges and Opportunities for Actions Annex I: Photos Annex II: Post-Activity Evaluation Survey Annex III: Attendance Sheet INTRODUCTION Project Background Objectives of the GPE The success of a global response to the climate ① Learn the highlights of Sta. Rosa’s challenge depends on the coordinated effort at process of formulating their GHG multiple levels. Although national climate and Management Plan and setting their green growth strategies and targets may be in climate change baselines and targets to place, very few countries have been able to lower emissions in three years; establish dynamic vertical policy coordination ② Be oriented to the mitigation projects mechanisms between the national and local currently implemented to contribute to levels. It is against this backdrop that UN- the reduction targets; Habitat continues to support the Philippine ③ Learn from other LGUs’ experiences in government’s efforts in responding to local climate change action planning and challenges of climate change.
    [Show full text]
  • Inception Workshop for ASEAN-Norwegian Cooperation Project on Local Capacity Building for Reducing Plastic Pollution in the ASEA
    PEMSEA Workshop Report Inception workshop for ASEAN-Norwegian cooperation project on local capacity building for reducing plastic pollution in the ASEAN region (ASEANO) and associated activities 3-6 March 2020 Executive Summary Representatives from PEMSEA, NIVA, and CSEAS undertook a trip to Cavite, Philippines, facilitated by Cavite PG-ENRO, to study the proposed pilot site for the Philippine sub-component of the ASEANO project, to meet relevant stakeholders, and to launch the sub-component through an inception workshop with relevant stakeholders from the city of Dasmariñas and nearby areas. During two days of site visits, various sites along the river were visited and documented, and local stakeholders including politicians and academe representatives were met. These visits allowed the project team to obtain a better picture of existing waste reduction efforts along the Imus river. For the river, the project team observed an expected increase in pollution levels as the river moved downstream, and observed numerous areas of waste accumulation and points of waste entry into the river. The university stakeholders, Cavite State University and De La Salle University Dasmariñas, expressed great support for the project and are enthusiastic about becoming involved in the research component of the project. Local politicians were also supportive, and referred us to their various material recovery schemes, which across different jurisdictions performed similar material recovery including producing biogas, recycling plastic into new products such as bags and ecobricks, and creating charcoal. The Inception Workshop held on 5th March brought together stakeholders and interested parties with the dual aims of introducing these parties to the project and providing an opportunity for the project team to ask questions of these individuals.
    [Show full text]
  • 11844016 03.Pdf
    Appendix 7.1 Hydrology A.1 Objectives and Work Flow Taking account of the goals of the recommended project, the objectives of the hydrological and hydraulic studies are set as follows: (i) To clarify the current conditions of river channel and riparian areas, where are subject to proposed road network (ii) To estimate the flood discharges of the rivers in various return periods through statistical approach at crossings along proposed road alignment (iii) To recommend betterment of drainage system along the proposed alignment, where deterioration of present drainage conditions due to implementation of the project is predicted, if any In order to accomplish the objectives above mentioned, the work flow of sectoral studies has been set up as follows: Collection of Data/ Information Hydrological and Setting of design parameters Verification of River Survey Hydraulic Analyses at crossing structures current river ・ Rainfall Analysis ・ Design High Water Level conditions Questionnaire Survey ・ Runoff Analysis ・ Design Flow Velocity, etc. Field Reconnaissance Figure A.1.1 General Work Flow of Hydrological Analysis A.2 Available Data, Maps and Documents (1) Topographic Maps Topographic maps of the Study Area were obtained from NAMRIA Map Sales Office in Fort Bonifacio, Manila. These maps of scale 1:50,000 and 1:10,000 were utilized to confirm the watershed boundaries of river basins and road crossings, which are concerned to the road/bridge design of three routes, i.e. CALA Expressway, North-South Road and Daang Hari Extension. The maps collected for the Study is schematically shown with index numbers in Figure A.2.1. On the other hand, the cross sections with 50 m intervals and plan along the proposed road alignment with 100 m wide became available exclusively for the present study together with the aerial photographs.
    [Show full text]
  • Cavite Province
    CAVITE PROVINCE PROVINCIAL DISASTER RISK REDUCTION AND MANAGEMENT PLAN 2011-2016 PROVINCIAL HAZARD PROFILE Provincial Disaster Risk Reduction and Management Plan CAVITE PROVINCE INTRODUCTION Disasters or emergencies can happen suddenly, creating a situation in which the everyday, routinely and sometimes dreary existence of a community can become overwhelmed. During crises, the Province requires special procedures to address the needs of emergency response operations and recovery management. To address such emergencies, the Province of Cavite has established a Disaster Risk Reduction and Management Plan (DRRMP), which provides a guideline for the immediate action and operations required to respond to an emergency or disaster. The Province of Cavite has one of the most dynamic and vibrant economy in the Philippines. This could be attributed to several innate and competitive advantages it has compared to other provinces in the country. The crucial question, however, is how the Province can sustain this performance to generate far more jobs and continue to become a destination of choice for investors and tourists alike. The danger of climate change arguably presents a greater threat than what the government sees as its priorities such as education, health and poverty. If sustained growth is to take place, this challenge must be met. Specifically, we need to strengthen disaster resilience, care more for the urban environment, and confront climate change as part of the growth paradigm. In other words, planners should include disaster resilience into its growth strategies and raise the priority of urban management as a strategic thrust. This would ensure that development plans that are viewed to facilitate economic growth are designed in such a way that would attain the desired level of prosperity without sacrificing the needed balance with the environment.
    [Show full text]
  • Natural Disaster Risk Assessment and Area Business Continuity Plan Formulation for Industrial Agglomerated Areas in the ASEAN Region
    Natural Disaster Risk Assessment and Area Business Continuity Plan Formulation for Industrial Agglomerated Areas in the ASEAN Region Risk Profile Report - Cavite, Laguna and Southern Part of Metropolitan Manila of the Philippines - February 2015 AHA CENTRE Japan International Cooperation Agency OYO International Corporation Mitsubishi Research Institute, Inc. CTI Engineering International Co., Ltd. Outline of the Pilot Area Country name The Philippines Pilot areas Industrial clusters and surrounding areas in Cavite Province, Laguna Province and the southern part of Metropolitan Manila Location of pilot Pilot areas are located in the south of Metropolitan Manila. Industrial clusters are areas scattered across Cavite Province, Laguna Province and the southern part of Metropolitan Manila. (The approximate area where industrial parks are scattered is indicated by a red broken line.) Metropolitan Manila Cavite Laguna Batangas Local The land of the Philippines is largely divided into three blocks, which are subdivided administrative into 17 Regions. Regions have 81 Provinces in total. Provinces consist of Cities and agencies in pilot Municipalities. Metropolitan Manila (National Capital Region) is at the same level as areas Regions, consisting of 16 Cities and one Municipality with no Province. Area and Local administrative Area (km2) Population* population of pilot agencies areas Metropolitan Manila Cavite Province * May 2010, National Laguna Province Statistics Office, the Philippines Natural conditions The island of Luzon, where Metropolitan Manila, Cavite Province and Laguna of pilot areas Province are located, is a mountainous and volcanic region. Laguna de Bay, the largest lake in the Philippines with the surface area of 949 km2, is located at the southeast of Manila Bay.
    [Show full text]