** NEW YORK STATE DEPARTMENT of TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 1 of 64 for REGION 09
Total Page:16
File Type:pdf, Size:1020Kb
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 1 of 64 for REGION 09 AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars Tn of Mamakating THIS MOBILITY PROJECT WILL RESURFACE THE EXISTING D&H CANAL NFA 2020 0.011 CONST 0.011 TOWPATH, AND BRING THE TRAIL TO ADA STANDARDS. IT WILL ALSO TAP RURAL 2020 0.104 CONINSP 0.104 900937 LINK EXISTING TRAIL SECTIONS LOCATED TO NORTH AND SOUTH. TN NFA 2020 0.026 CONINSP 0.026 OF MAMAKATING AND VIL OF WURTSBORO, SULLIVAN CO TAP 2014 //// TAP RURAL 2020 0.685 CONST 0.685 THIS MOBILITY PROJECT WILL RESURFACE THE EXISTING D&H CANAL NFA 2020 0.171 CONST 0.171 TOWPATH, AND BRING THE TRAIL TO ADA STANDARDS. IT WILL ALSO LINK EXISTING TRAIL SECTIONS LOCATED TO NORTH AND SOUTH. TN OF MAMAKATING AND VIL OF WURTSBORO, SULLIVAN CO TAP 2014 // THIS MOBILITY PROJECT WILL RESURFACE THE EXISTING D&H CANAL TOWPATH, AND BRING THE TRAIL TO ADA STANDARDS. IT WILL ALSO LINK EXISTING TRAIL SECTIONS LOCATED TO NORTH AND SOUTH. TN OF MAMAKATING AND VIL OF WURTSBORO, SULLIVAN CO TAP 2014 AQC:N/A SULLIVAN TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.997 0.997 0.000 0.000 0.000 Sullivan Co HURLEYVILLE MAIN ST SIDEWALKS. THIS PROJECT WILL PROVIDE A TAP SM URBAN 2022 0.013 DETLDES 0.013 CONTINUOUS 6.5 FOOT WIDE ADA COMPLIANT SIDEWALK ALONG THE NFA 2022 0.003 DETLDES 0.003 900942 WEST SIDE OF MAIN ST, BETWEEN RAILROAD AVE AND BAKER HILL RD TAP SM URBAN 2022 0.004 ROWACQU 0.004 IN THE HAMLET OF HURLEYVILLE, TN OF FALLSBURG, SULLIVAN CO NFA 2022 0.001 ROWACQU 0.001 2023 0.059 CONST 0.059 TOTAL AWARD = $501,181. TAP 2017 NFA TAP SM URBAN 2023 0.048 CONINSP 0.048 NFA 2023 0.012 CONINSP 0.012 TAP SM URBAN 2023 0.301 CONST 0.301 NFA 2023 0.075 CONST 0.075 AQC:N/A SULLIVAN TPC : < $0.75 M TOTAL 4YR COST : 0.516 0.000 0.000 0.021 0.495 TN of Vestal VESTAL HIGH SCHOOL PEDESTRIAN IMPROVEMENTS PROJECT. THIS TAP SM URBAN 2021 0.064 CONINSP 0.064 PROJECT WILL INSTALL A HIGH-INTENSITY PEDESTRIAN ACTIVATED NFA 2021 0.016 CONINSP 0.016 900943 CROSSWALK SIGNAL ON RT 434 AT THE TOWN LIBRARY, 320 VESTAL TAP SM URBAN 2021 0.244 CONST 0.244 PKWY EAST AND REPLACE SIDEWALKS ON THE EAST SIDE OF CLAYTON NFA 2021 0.060 CONST 0.060 TAP SM URBAN 2021 0.026 ROWACQU 0.026 AVE FROM CHARLES ST TO RT 434 AS WELL AS ON THE WEST SIDE OF NFA 2021 0.007 ROWACQU 0.007 CLAYTON AVE FROM RT 434 TO WOODLAWN AVE / VESTAL HIGH SCHOOL MAIN ENTRANCE. THE PROJECT WILL IMPROVE SAFETY AND MOBILITY OF PEDESTRIANS AND STUDENTS ALONG THE PROJECT VICINITY. TN OF VESTAL, BROOME CO TOTAL FA AWARD = $525,200. TAP 2017 AQC:N/A BROOME TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.417 0.000 0.417 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 2 of 64 for REGION 09 AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars Broome Co DPW THE PROJECT WILL CONSTRUCT/RECONSTRUCT APPROXIMATELY 6,350 TAP FLEX 2021 0.028 ROWACQU 0.028 LINEAR FEET OF SIDEWALK ALONG CHENANGO STREET IN THE TOWN NFA 2021 0.006 ROWACQU 0.006 900944 OF FENTON. THE PROJECT WILL ALSO INCLUDE THE INSTALLATION NFA 2022 0.121 CONST 0.121 AND ADDITION OF ADA COMPLIANT CURB RAMPS, BUS STOPS, SIGNAGE TAP FLEX 2022 0.061 CONINSP 0.061 2022 0.015 CONINSP 0.015 AND STRIPING. NFA TAP FLEX 2022 0.494 CONST 0.494 NFA 2022 0.123 CONST 0.123 TAP FLEX 2020 0.068 DETLDES 0.068 NFA 2020 0.017 DETLDES 0.017 AQC:N/A BROOME TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.933 0.085 0.034 0.814 0.000 NYSDOT THIS PROJECT WILL IMPROVE EXISTING SIDEWALK SAFETY, TAP FLEX 2021 0.001 DETLDES 0.001 ACCESSIBILITY, AESTHETICS, AND BRING SIDEWALKS UP TO NFA 2021 0.001 DETLDES 0.001 900945 COMPLIANT STANDARDS ALONG ROUTE 23 FROM RT 10 HOBART TAP FLEX 2022 0.128 CONINSP 0.128 ST/LAKE ST TO BEAVER ST/MOUNTAIN AVE. VILLAGE OF STAMFORD, NFA 2022 0.032 CONINSP 0.032 TAP FLEX 2022 1.438 CONST 1.438 DELAWARE COUNTY. NFA 2022 0.359 CONST 0.359 AQC:N/A DELAWARE TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.959 0.000 0.002 1.957 0.000 NYSDOT THIS RECONSTRUCTION PROJECT WILL REPLACE THE APPROACH SLABS STBG FLEX 2020 0.123 CONINSP 0.123 AND DETERIORATED STRUCTURE THAT CARRIES RT 205 OVER SMALL NFA 2020 0.027 CONINSP 0.027 901218 BROOK. TN OF HARTWICK, OTSEGO CO (BIN 1040320) STBG FLEX 2020 0.920 CONST 0.920 NFA 2020 0.230 CONST 0.230 AQC:N/A OTSEGO TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.300 1.300 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 3 of 64 for REGION 09 AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars NYSDOT THIS PROJECT WILL PROVIDE SAFETY IMPROVEMENTS BY INSTALLING HSIP 2021 0.225 DETLDES 0.225 LEFT TURN LANES TO REDUCE CRASHES AND ACCIDENT RATES AT THE NFA 2021 0.025 DETLDES 0.025 901338 INTERSECTION OF RTS 42, CR 52, AND CR 53, (FROM MILE POINT 19.78 HSIP 2020 0.324 PRELDES 0.324 TO 20.72) TN OF FALLSBURG, SULLIVAN CO HSIP STUDY #965448 NFA 2020 0.036 PRELDES 0.036 HSIP 2020 0.225 4/1/2016. THE STATE CERTIFIES THAT THIS PROJECT HAS BEEN 0.225 DETLDES 2020 0.025 DETLDES 0.025 APPROVED BY THE REGIONAL SAFETY EVALUATION ENGINEER AND NFA HSIP 2020 0.150 ROWACQU 0.150 SIGNED OFF BY THE REGIONAL TRAFFIC ENGINEER. NFA 2020 0.011 ROWACQU 0.011 HSIP 2022 0.090 CONINSP 0.090 NFA 2022 0.010 CONINSP 0.010 HSIP 2022 0.900 CONST 0.900 NFA 2022 0.100 CONST 0.100 STBG FLEX 2022 0.068 CONINSP 0.068 NFA 2022 0.017 CONINSP 0.017 STBG FLEX 2022 0.680 CONST 0.680 NFA 2022 0.170 CONST 0.170 AQC:N/A SULLIVAN TPC : $2-$4 M TOTAL 4YR COST : 3.056 0.771 0.250 2.035 0.000 NYSDOT THIS PROJECT PROPOSES RECONSTRUCTING THE RT 17, EXIT 105 NHFP 2021 0.800 DETLDES 0.800 INTERCHANGE TO BRING IT UP TO CURRENT STANDARDS FOR FREIGHT NFA 2021 0.200 DETLDES 0.200 901339 MOVEMENT AND IMPROVE SAFETY RELATED DEFICIENCIES. NHFP 2022 1.800 CONINSP 1.800 IMPROVEMENTS WILL ALSO BE MADE TO RT 42 TO CORRECT SIDEWALK NFA 2022 0.450 CONINSP 0.450 NHFP 2022 7.104 CONST 7.104 DEFICIENCIES, PROVIDE PEDESTRIAN ACCESS WHERE MISSING, MAKE NFA 2022 1.776 CONST 1.776 PEDESTRIAN FACILITIES ADA COMPLIANT, AND PROVIDE APPROPRIATE NHPP 2022 9.696 CONST 9.696 FACILITIES FOR BICYCLISTS. VILLAGE OF MONTICELLO, TOWN OF NFA 2022 2.424 CONST 2.424 THOMPSON, SULLIVAN COUNTY (BIN 1013750). AQC:N/A SULLIVAN TPC : $21-$31 M TOTAL 4YR COST : 24.250 0.000 1.000 23.250 0.000 NYSDOT THIS PROJECT PROPOSES TO REPLACE THE DECK AND STBG FLEX 2023 3.120 CONINSP 3.120 SUPERSTRUCTURE OF THE BRIDGE ALONG ROUTES 42 AND 52 OVER THE NFA 2023 0.780 CONINSP 0.780 901340 NEVERSINK RIVER TO PRESERVE SAFE, RELIABLE AND STBG FLEX 2023 0.312 CONST 0.312 ENVIRONMENTALLY SOUND PASSAGE AND TO INCREASE THE NFA 2023 0.078 CONST 0.078 STBG FLEX 2020 0.120 PRELDES 0.120 BRIDGE\\\\\\\\'S USEFUL LIFE. TOWN OF FALLSBURG, SULLIVAN COUNTY NFA 2020 0.030 PRELDES 0.030 (BIN 1024990). STBG FLEX 2022 0.120 DETLDES 0.120 NFA 2022 0.030 DETLDES 0.030 AQC:N/A SULLIVAN TPC : $3.3-$5.6 M TOTAL 4YR COST : 4.590 0.150 0.000 0.150 4.290 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 4 of 64 for REGION 09 AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars NYSDOT THIS PROJECT WILL REPAIR AND/OR REPLACE PORTIONS THE CLOSED STBG FLEX 2023 0.092 DETLDES 0.092 DRAINAGE SYSTEM ALONG ROUTE 42, STARTING AT ROUTE 42 OVER THE NFA 2023 0.023 DETLDES 0.023 901343 PLEASURE LAKE INLET AND EXTENDING TO THE INTERSECTION OF STBG FLEX 2023 0.032 ROWACQU 0.032 ROUTE 42 AND RAILROAD PLAZA IN THE HAMLET OF SOUTH NFA 2023 0.002 ROWACQU 0.002 STBG FLEX 2021 0.156 PRELDES 0.156 FALLSBURG, MP 17.83 TO MP 18.03.