Chicago-Area Projects
Total Page:16
File Type:pdf, Size:1020Kb
District 1 (Cook, DuPage, Will, McHenry, Kane and Lake Counties) -Jane Byrne Interchange reconstruction in Chicago o $76.6 million; $31.8 million spent o Spread over four separate contracts o Interstate 290 westbound bridge over Interstate 90/94, westbound I-290 capacity enhancements -Interstate 55 and Lake Shore Drive in Chicago o $135.7 million; $112.5 million spent o Two contracts o Reconstruction of Interstate 55 and U.S. 41 interchange, as well as new retaining walls, lighting, other related work, due to be complete this fall -159th Street (Illinois 7/U.S. 6) from Interstate 355 to U.S. 45 in Will County o $105 million; $28.3 million spent o Two contracts under construction o Additional lanes, bike and pedestrian accommodations -Kennedy Expressway Auxiliary Lanes from eastbound Cumberland Avenue to Harlem Avenue in Chicago o $23 million; $3.9 million spent o Adding auxiliary lanes, resurfacing, ramp repair, retaining wall, drainage, lighting, signing; also includes Illinois 72 improvements between Oriole and Harlem avenues -Cumberland Flyover in Chicago o $24 million; $5.1 million spent o New bridge -Illinois 132 at U.S. 41 in Lake County o $20 million; $825,000 spent o Intersection reconstruction/bridge replacement, Union Pacific Railroad over Illinois 132 in Gurnee District 2 (Jo Daviess, Stephenson, Winnebago, Boone, Carroll, Ogle, Whiteside, Lee, Rock Island, Henry counties) -Illinois 84 and U.S. 52 over Mississippi River at Savanna o $81.7 million; $59.7 million spent o Reconstructing Illinois 84 and new bridge over Mississippi River -Interstate 80 from Interstate 88 to Interstate 74/280 o $25.5 million; $14.2 million spent o Six bridge replacements -Illinois 5 from west of 38th Street to east of 70th Street in Moline o $51.3 million; $14.7 million spent o Reconstruction -Illinois 2 (North Main Street) from Riverside Boulevard to Auburn Street in Rockford o $32.4 million; $11.7 million spent o Reconstruction District 3 (DeKalb, Bureau, LaSalle, Kendall, Grundy, Livingston, Kankakee, Iroquois and Ford counties) -Interstate 57 and 6000N; U.S. 45/52 and Illinois 50 in Bourbonnais o $46.2 million; $26.1 million spent o New bridge and interchange, widening and intersection improvements -Illinois 47 in Kendall County, north of Interstate 80 in Morris to Sherrill Road, and bridges over Saratoga Creek and Valley Run Creek o $38.4 million; $33.1 million spent o Reconstruction of Illinois 47 and new bridges over Saratoga and Valley Run creeks. -Illinois 89 over Illinois River in Bureau County o $38.6 million; $20.2 million spent o Bridge replacement -Illinois 47, from Sherrill Road to Canton Farm Road in Grundy County o $46.2 million; $9.6 million spent o Reconstruction -U.S. 34 east of Illinois 47 in Yorkville to Orchard Road in Oswego o $33 million; $1.1 million spent o Reconstruction -Illinois 178 over the Illinois River o $25.6 million; $1 million spent o Bridge replacement District 4 (Mercer, Henderson, Warren, McDonough, Fulton, Knox, Stark, Peoria, Putnam, Marshall, Woodford and Tazewell counties) -Interstate 474 over Illinois River in Tazewell County o $13.5 million; $1.2 million spent o Structural repairs over Illinois River -Illinois 336/U.S. 136/Illinois 110 near Macomb in McDonough County o $36 million; $23.9 million spent o 6.5 miles of new pavement and construction of eight structures -Interstate 74 from Illinois 78 to the Spoon River in Knox and Peoria counties o $12.4 million; $1milllion spent o Resurfacing District 5 (McLean, DeWitt, Piatt, Champaign, Douglas, Vermillion and Edgar counties) -Interstate 57 from west of Tolono to just south of Interstate 74 o $14 million; $4 million spent o Resurfacing -Interstate 74 from U.S. 150 to east of Farmer City o $4.5 million; $4 million spent o Concrete overlays -Interstate 74 over the Vermilion River in Danville o $1.1 million; $176,000 spent o Concrete overlays -Interstate 74 over Illinois 47 at Mahomet o $1.5 million; $330,000 spent o Concrete overlays -Interstate 74 from east of LeRoy to one mile west of Farmer City o $6.5 million; $2.5 million spent o Resurfacing District 6 (Hancock, Adams, Pike, Schuyler, Brown, Cass, Morgan, Scott, Mason, Menard, Sangamon, Christian, Montgomery, Macoupin and Logan counties) -Lincoln Parkway from south of Kenwood Drive to Illinois 10 in Lincoln o $6.2 million; $$720,00 spent o Resurfacing and drainage improvements -Illinois 123 from just east of Petersburg to just west of Illinois 29 o $2.7 million; $50,000 spent o Resurfacing and bridge repairs -Illinois 104 from east of Mound Road to east of Hardin Avenue in Jacksonville o $10.5 million; $8.4 million spent o Resurfacing and bridge repairs -Illinois 104 over the Illinois River at Meredosia o $75.1 million; $52.3 million spent o New bridge construction -Interstate 55 from just north of Stevenson Drive just north of Clear Lake Avenue o $9.9 million; $16,000 spent o Resurfacing District 7 (Macon, Moultrie, Coles, Clark, Shelby, Cumberland, Fayette, Effingham, Jasper, Crawford, Clay, Richland, Lawrence, Wayne, Edwards and Wabash counties) -Interstate 70 from Effingham County line to 7.5 miles east o $18.8 million; $1.5 million spent o Patching and resurfacing -U.S. 50 over Muddy and Little Muddy creeks at the Clay County line and west of Richland County line o $11.3 million; $700,000 spent o Bridge replacements -U.S. 51 over the Sangamon River south of Harristown o $8.4 million; $6.2 million spent o Bridge replacement District 8 (Calhoun, Greene, Jersey, Madison, Bond, Marion, Clinton, St. Clair, Monroe, Washington and Randolph counties) -Joe Page Bridge over the Illinois River at Hardin o $5.3 million, $3.3 million spent o Bridge repairs -Interstate 70 near Highland o $26.8 million, $14.4 million spent o Patching, pavement reconstruction, milling, resurfacing, guardrail and bridge repair -Illinois 15 over Illinois 13 and Illinois Central Railroad o $20.5 million, $18.4 million spent o Bridge replacements District 9 (Jefferson, Perry, Jackson, Franklin, Hamilton, White, Williamson, Saline, Gallatin, Union, Johnson, Pope, Hardin, Alexander, Pulaski and Massac counties) -Illinois 13 from Division Street in Carterville to Illinois 148 o $24 million, $18 million spent o New diamond interchange at Illinois 13 and Wolf Creek Road, a new bridge and additional lanes -Interstate 57 from Marion to Interstate 24 o $31 million, $17.5 million spent o Full-depth resurfacing -U.S. 45 from Illinois 142 in Eldorado to Texas City Road o $27 million, $17.3 million spent o Road widening -Illinois 127 over the Big Muddy River in Murphysboro o $1.7 million, $200,000 spent o Superstructure replacement -Interstate 64 from Interstate 57 to Illinois 142 o $8 million, $0 spent (plan to start after July 4th) o Resurfacing .