Chicago-Area Projects

Total Page:16

File Type:pdf, Size:1020Kb

Chicago-Area Projects District 1 (Cook, DuPage, Will, McHenry, Kane and Lake Counties) -Jane Byrne Interchange reconstruction in Chicago o $76.6 million; $31.8 million spent o Spread over four separate contracts o Interstate 290 westbound bridge over Interstate 90/94, westbound I-290 capacity enhancements -Interstate 55 and Lake Shore Drive in Chicago o $135.7 million; $112.5 million spent o Two contracts o Reconstruction of Interstate 55 and U.S. 41 interchange, as well as new retaining walls, lighting, other related work, due to be complete this fall -159th Street (Illinois 7/U.S. 6) from Interstate 355 to U.S. 45 in Will County o $105 million; $28.3 million spent o Two contracts under construction o Additional lanes, bike and pedestrian accommodations -Kennedy Expressway Auxiliary Lanes from eastbound Cumberland Avenue to Harlem Avenue in Chicago o $23 million; $3.9 million spent o Adding auxiliary lanes, resurfacing, ramp repair, retaining wall, drainage, lighting, signing; also includes Illinois 72 improvements between Oriole and Harlem avenues -Cumberland Flyover in Chicago o $24 million; $5.1 million spent o New bridge -Illinois 132 at U.S. 41 in Lake County o $20 million; $825,000 spent o Intersection reconstruction/bridge replacement, Union Pacific Railroad over Illinois 132 in Gurnee District 2 (Jo Daviess, Stephenson, Winnebago, Boone, Carroll, Ogle, Whiteside, Lee, Rock Island, Henry counties) -Illinois 84 and U.S. 52 over Mississippi River at Savanna o $81.7 million; $59.7 million spent o Reconstructing Illinois 84 and new bridge over Mississippi River -Interstate 80 from Interstate 88 to Interstate 74/280 o $25.5 million; $14.2 million spent o Six bridge replacements -Illinois 5 from west of 38th Street to east of 70th Street in Moline o $51.3 million; $14.7 million spent o Reconstruction -Illinois 2 (North Main Street) from Riverside Boulevard to Auburn Street in Rockford o $32.4 million; $11.7 million spent o Reconstruction District 3 (DeKalb, Bureau, LaSalle, Kendall, Grundy, Livingston, Kankakee, Iroquois and Ford counties) -Interstate 57 and 6000N; U.S. 45/52 and Illinois 50 in Bourbonnais o $46.2 million; $26.1 million spent o New bridge and interchange, widening and intersection improvements -Illinois 47 in Kendall County, north of Interstate 80 in Morris to Sherrill Road, and bridges over Saratoga Creek and Valley Run Creek o $38.4 million; $33.1 million spent o Reconstruction of Illinois 47 and new bridges over Saratoga and Valley Run creeks. -Illinois 89 over Illinois River in Bureau County o $38.6 million; $20.2 million spent o Bridge replacement -Illinois 47, from Sherrill Road to Canton Farm Road in Grundy County o $46.2 million; $9.6 million spent o Reconstruction -U.S. 34 east of Illinois 47 in Yorkville to Orchard Road in Oswego o $33 million; $1.1 million spent o Reconstruction -Illinois 178 over the Illinois River o $25.6 million; $1 million spent o Bridge replacement District 4 (Mercer, Henderson, Warren, McDonough, Fulton, Knox, Stark, Peoria, Putnam, Marshall, Woodford and Tazewell counties) -Interstate 474 over Illinois River in Tazewell County o $13.5 million; $1.2 million spent o Structural repairs over Illinois River -Illinois 336/U.S. 136/Illinois 110 near Macomb in McDonough County o $36 million; $23.9 million spent o 6.5 miles of new pavement and construction of eight structures -Interstate 74 from Illinois 78 to the Spoon River in Knox and Peoria counties o $12.4 million; $1milllion spent o Resurfacing District 5 (McLean, DeWitt, Piatt, Champaign, Douglas, Vermillion and Edgar counties) -Interstate 57 from west of Tolono to just south of Interstate 74 o $14 million; $4 million spent o Resurfacing -Interstate 74 from U.S. 150 to east of Farmer City o $4.5 million; $4 million spent o Concrete overlays -Interstate 74 over the Vermilion River in Danville o $1.1 million; $176,000 spent o Concrete overlays -Interstate 74 over Illinois 47 at Mahomet o $1.5 million; $330,000 spent o Concrete overlays -Interstate 74 from east of LeRoy to one mile west of Farmer City o $6.5 million; $2.5 million spent o Resurfacing District 6 (Hancock, Adams, Pike, Schuyler, Brown, Cass, Morgan, Scott, Mason, Menard, Sangamon, Christian, Montgomery, Macoupin and Logan counties) -Lincoln Parkway from south of Kenwood Drive to Illinois 10 in Lincoln o $6.2 million; $$720,00 spent o Resurfacing and drainage improvements -Illinois 123 from just east of Petersburg to just west of Illinois 29 o $2.7 million; $50,000 spent o Resurfacing and bridge repairs -Illinois 104 from east of Mound Road to east of Hardin Avenue in Jacksonville o $10.5 million; $8.4 million spent o Resurfacing and bridge repairs -Illinois 104 over the Illinois River at Meredosia o $75.1 million; $52.3 million spent o New bridge construction -Interstate 55 from just north of Stevenson Drive just north of Clear Lake Avenue o $9.9 million; $16,000 spent o Resurfacing District 7 (Macon, Moultrie, Coles, Clark, Shelby, Cumberland, Fayette, Effingham, Jasper, Crawford, Clay, Richland, Lawrence, Wayne, Edwards and Wabash counties) -Interstate 70 from Effingham County line to 7.5 miles east o $18.8 million; $1.5 million spent o Patching and resurfacing -U.S. 50 over Muddy and Little Muddy creeks at the Clay County line and west of Richland County line o $11.3 million; $700,000 spent o Bridge replacements -U.S. 51 over the Sangamon River south of Harristown o $8.4 million; $6.2 million spent o Bridge replacement District 8 (Calhoun, Greene, Jersey, Madison, Bond, Marion, Clinton, St. Clair, Monroe, Washington and Randolph counties) -Joe Page Bridge over the Illinois River at Hardin o $5.3 million, $3.3 million spent o Bridge repairs -Interstate 70 near Highland o $26.8 million, $14.4 million spent o Patching, pavement reconstruction, milling, resurfacing, guardrail and bridge repair -Illinois 15 over Illinois 13 and Illinois Central Railroad o $20.5 million, $18.4 million spent o Bridge replacements District 9 (Jefferson, Perry, Jackson, Franklin, Hamilton, White, Williamson, Saline, Gallatin, Union, Johnson, Pope, Hardin, Alexander, Pulaski and Massac counties) -Illinois 13 from Division Street in Carterville to Illinois 148 o $24 million, $18 million spent o New diamond interchange at Illinois 13 and Wolf Creek Road, a new bridge and additional lanes -Interstate 57 from Marion to Interstate 24 o $31 million, $17.5 million spent o Full-depth resurfacing -U.S. 45 from Illinois 142 in Eldorado to Texas City Road o $27 million, $17.3 million spent o Road widening -Illinois 127 over the Big Muddy River in Murphysboro o $1.7 million, $200,000 spent o Superstructure replacement -Interstate 64 from Interstate 57 to Illinois 142 o $8 million, $0 spent (plan to start after July 4th) o Resurfacing .
Recommended publications
  • CHICAGO PREMIUM OUTLETS 1650 Premium Outlets Boulevard | Aurora, IL 60504
    CHICAGO PREMIUM OUTLETS 1650 Premium Outlets Boulevard | Aurora, IL 60504 SEMI-IMPROVED PADS AVAILABLE FOR SALE OR LEASE A. RICK SCARDINO Principal [email protected] 773.355.3040 All information furnished regarding property for sale, rental or financing is from sources deemed reliable, but no warranty or representation is made to the accuracy thereof and same is submitted to errors, omissions, change of price, rental or other conditions prior to sale, lease or financing or withdrawal without notice. No liability of any kind is to be imposed on the broker herein. 9450 West Bryn Mawr Avenue | Suite 550 | Rosemont, IL 60018 | 773.355.3000 (main) | www.lee-associates.com CHICAGO PREMIUM OUTLETS Semi-Improved Pads Available for Sale or Lease PROPERTY OVERVIEW HIGHLIGHTS: OPPORTUNITY IDENTIFICATION: • 687,000 SF Premium Outlet Center with Over 170 Stores • Semi-Improved Pads with Interstate 88 Visibility Available Surrounded by Strong Demographics • Pads are Situated at the Southeast Corner of the Property • Opened in May 2004 and was Expanded in August 2015 and Near Large Parking Fields • Chicago Premium Outlets is One of the Top Performing • Ideal for a Hotel, Full Service Restaurant, Retail, or Outlet Centers in the U.S. with 6,000,000 Annual Visitors Entertainment Users • The City of Aurora, with a Population of More Than TRAFFIC COUNTS: 199,000, is the Second Largest City in Illinois • Interstate 88 (Chicago-Kansas City Expressway): 94,000 VPD • Other Local Attractions Include Hollywood Casino, Paramount Theatre, and Two Brothers
    [Show full text]
  • Gilman Industrial Park Brochure
    Illinois Gilman has an available 265 acre park waiting for you! o'Crossroadsof Opportunity" Location-Location-Location This 265 acre industrial park 90 miles south of Chicago is ideally located at the intersections of Interstate 57 US 24 and US 45. It is also bordered by the main lines for the TP&W (SantaFe) and Illinois Cenfal (CN) Railroads. The infrasffucture available is extensive. The property can be divided into lots to suit individual usersneeds. Shawn Coady Rick Theesfeld 204 N. Rt s4lP.O.Box98 215N. Central RobertsoIllinois 60962 Gilman, Illinois 60938 217-395-2281, 8t5-265-42t3 217-395-2572(Bax) 815-265-4640(Fax) INFRASTRUCTURE THAT IS CURRENTLY AVAILABLE OR SCHEDULED/SPRING 2OO4 COMPLETED . 400,000 gallon vertical water storagetank on . Site Survey site . Topographicalmaps . Looped 12" x S" watermains in park . Illinois historical survey . 8" municipal sanitary sewer system . PhaseI Environmental . Two electrical serviceproviders with . Wetlands survey extensiveinfrastructure availablein the park . Drainage plans . 138 KV overhead . 69 KV overhead ECONOMIC INCENTIVES . 12 KV overhead . Substationlocated in the park Tax Increment Finance District Iroquois DevelopmentCouncil 8" natural gas service Local city incentives City streetaccess to the park 3 lane,concrete,40 foot curb and gutter RAIL SERVICE Lishted streetentrance . Illinois Central (CN) main line . Illinois Central (CN) Springfield line INTERSTATEACCESS . TP&W (SantaFe) , I-57,US-24, US-45 border the site . Switching yard in Gilman ELECTRIC WASTEWATER WATER AverageLoad Supplier 250,000gallons per Ameren CIPS day City of Gilman . 13,700MW Generation Design Capacity Source Capacity 500,000gallons per day 2DeepWells . Multiple interconnections Tlpe of Plant . ElevatedStorage Capacity Substationon site Primary .
    [Show full text]
  • Metropolitan Transportation Plan (MTP) 2040
    Metropolitan Transportation Plan (MTP) 2040 4.1 Roads and Highways Element The largest part of the transportation system is a roadway network of more than 7,000 lane miles and is comprised of NCDOT maintained roads, locally maintained roads, and private roads. In late 2013 the metropolitan area boundary for the High Point MPO increased in size to include the remaining portion of Davidson County not already included in an MPO. This substantially expanded the roadway network for the MPO. Radial movements that are strongest in the MPO are: • Towards Greensboro and Jamestown to the northeast, • Towards Winston-Salem from High Point to the northwest via Interstate 74, • Towards the Piedmont Triad International Airport to the north via NC 68, • Towards Lexington from High Point to the southwest via Interstate 85 and US 29/70, and • Towards Winston-Salem from Lexington via US 52. • There is some radial demand between High Point, Thomasville, Archdale, Trinity, and Wallburg. Heavily traveled routes include: • Eastchester Drive (NC 68), towards Piedmont Triad International Airport • Westchester Drive and National Highway (NC 68), towards Thomasville • NC 109 • Main Street in High Point, • Main Street in Archdale, • US 311 Bypass, • Interstate 85, • US 29-70, • Wendover Avenue, • Main Street and NC 8 in and around Lexington, • High Point - Greensboro Road, and 4.1 Roads and Highways Element • Surrett Drive. Chapter: 1 Metropolitan Transportation Plan (MTP) 2040 The projects in the Roadway Element of the Transportation Plan come from the Comprehensive Transportation Plan (CTP) for the High Point Urbanized Area. The differences between the Roadway Element of the MTP and the CTP include: • The MTP is required by Federal Law, CTP is mandated by the North Carolina Department of Transportation.
    [Show full text]
  • Winter Storm 2004 Hammered the Nation’S Courtesy of Randy West Heartland from the Great Lakes to the Texas Panhandle with Heaping Amounts of Snow and Ice
    The joyful holiday season of 2004 was thrown awry when Heavy snow early in the storm in Harrison County brings traffic to a crawl along mother nature threw in a “large monkey wrench” just before Interstate 64 in southern Indiana. Christmas. Winter Storm 2004 hammered the nation’s Courtesy of Randy West heartland from the Great Lakes to the Texas Panhandle with heaping amounts of snow and ice. This historic event was the biggest winter phenomenon in the Louisville, Kentucky area since the February 1998 and January 1994 major snowstorms. Winter Storm 2004 pounded the Ohio Valley with two heavy bursts of snow and ice separated by only a few hours. Snow fell in southern Indiana at rates approaching 4 inches per hour and totaling up to 30 inches in some areas. In parts of Louisville, up to 6 inches of sleet accumulated with 6-12 inches total of snow and sleet. In some locations across central Kentucky, solid ice layers up to 1-1.5 inches thick blanketed homes, trees, and roadways. Uncommon thunder- snow and thundersleet were observed during this extraordinary Storm Impacts winter storm. To top it all off, bitter cold temperatures as • Very heavy snow accumulations and snow drifts low as -13°F greeted area residents Christmas morning. The up to 5 feet made travel extremely difficult and December 2004 winter storm is one residents in the Ohio shut down interstates in parts of the Ohio River Valley will not soon forget! Valley: I-64 (3 days) and I-65 (12 hours). • Areas of 1-1.5 inches of ice from Bowling Green to Bardstown caused power outages and tree/structural roof damage.
    [Show full text]
  • Transportationtransportation
    Transportationtransportation City of Elmhurst Comprehensive Plan TransporTATion Elmhurst’s transportation system consists of an extensive roadway network, including direct access to Interstate High- ways I-290, I-294, and I-88, an extensive commuter rail and bus transit system, as well as a well-connected pedestrian and bike network. This transportation network allows for easy and accessible travel within the City and excellent con- nections to the surrounding metropolitan area. Elmhurst’s interstate highway and commuter rail access are among its strongest assets, making it a very desirable community for living and conducting business. Therefore, maintain- ing a well-functioning and efficient transportation system is critical to sustaining the high quality-of-life in the com- munity. A review of existing conditions, including average daily traffic and transit ridership history, formed the basis for the development of the transportation framework and functional street classification. Through this analysis, pri- Commuter and freight rail tracks ority improvement areas were identified, as well as general improvements or suggestions to manage population and employment growth, relative to a functional and efficient 8. Improve wayfinding signage throughout the city to aid transportation system. This section provides an overview pedestrians, bicyclists and motorists in locating and of the transportation network in Elmhurst and offers some accessing key community facilities. recommendations to sustain and strengthen community mobility. Goal 2: Maintain and determine adequate parking facilities to serve land uses throughout the city. Goals AND OBJECTIVES Objectives: Goal 1: Continue to enhance mobility within the City by 1. Actively monitor, manage and address on-street and effectively managing local traffic issues and anticipating the off-street parking needs within the city to ensure ad- impact of future development on current traffic patterns.
    [Show full text]
  • Ultimate RV Dump Station Guide
    Ultimate RV Dump Station Guide A Complete Compendium Of RV Dump Stations Across The USA Publiished By: Covenant Publishing LLC 1201 N Orange St. Suite 7003 Wilmington, DE 19801 Copyrighted Material Copyright 2010 Covenant Publishing. All rights reserved worldwide. Ultimate RV Dump Station Guide Page 2 Contents New Mexico ............................................................... 87 New York .................................................................... 89 Introduction ................................................................. 3 North Carolina ........................................................... 91 Alabama ........................................................................ 5 North Dakota ............................................................. 93 Alaska ............................................................................ 8 Ohio ............................................................................ 95 Arizona ......................................................................... 9 Oklahoma ................................................................... 98 Arkansas ..................................................................... 13 Oregon ...................................................................... 100 California .................................................................... 15 Pennsylvania ............................................................ 104 Colorado ..................................................................... 23 Rhode Island ...........................................................
    [Show full text]
  • Gregor Weichbrodt on the Road 0X0a
    0x0a On the Road Gregor Weichbrodt On the Road Gregor Weichbrodt 0x0a © 2014 Gregor Weichbrodt All rights reserved. www.ggor.de CONTENTS About this book ........................ 5 Chapter 1 ............................... 7 Chapter 2 .............................. 23 Chapter 3 .............................. 41 Chapter 4 .............................. 53 ABOUT THIS BOOK Based on the novel “On the Road” by Jack Kerouac and Google Maps Direction Service. The exact and approximate spots Kerouac traveled and described are taken from the book and parsed by Google Direction Service API. The chapters match those of the original book. Gregor Weichbrodt January 2014 www.ggor.de 7 CHAPTER 1 Head northwest on W 47th St toward 7th Ave. Take the 1st left onto 7th Ave. Turn right onto W 39th St. Take the ramp onto Lincoln Tunnel. Parts of this road are closed Mon–Fri 4:00 – 7:00 pm. Entering New Jersey. Continue onto NJ-495 W. Keep right to continue on NJ-3 W, follow signs for New Jersey 3 W/Garden State Parkway/Secaucus. Take the New Jersey 3 W exit on the left toward Clifton. Merge onto NJ-3 W. Slight right onto the Garden State Pkwy N ramp. Merge onto Garden State Pkwy. Take exit 155P on the left to merge onto NJ-19 N toward I-80/ Paterson. Turn left onto Cianci St. Turn right onto Market St. Head west on Market St toward Washington St. Turn left onto Main St. Turn right onto County Rd 509 S. Take the Interstate 80 E ramp. Merge onto I-80 E. Take exit 62A-62B toward Saddle 9 Brook/Saddle River Rd/Garden State Pkwy.
    [Show full text]
  • I-24 SMART CORRIDOR Leveraging Technology to Improve Safety and Mobility
    I-24 SMART CORRIDOR Leveraging Technology to Improve Safety and Mobility Brad Freeze, Director, Traffic Operations Division, TDOT The Need • Interstate 24 (I-24) is a integral part of the Nashville transportation network and a major route for commuters and freight. • Traffic volumes along the I-24 corridor have experienced exponential growth rates over the past decade. Since 2005, traffic volumes have increased more than 60% on I-24 near Murfreesboro. • Currently, peak hour volumes exceed capacity and even a minor incident can have a severe impact on travel time reliability. • Due to physical, environmental, and financial constraints along the Corridor there are no viable, short term roadway widening projects. Area Map I-24 Congestion Contributors Traffic Incidents 27% Incidents Breakdown 2015 Contributors to Congestion (Total Crashes:1,661) Crash History & Analysis I-24 Section Crash Rate Crash Rate Data represents information collected between 2013-2015 System Performance Review AM Peak Period Travel Time I-24 From I-840 to Briley Pkwy. 85 High Variability 75 65 55 Travel Time 95th Percentile 45 Average Travel Time Travel Time (min) Time Travel 35 25 15 Reliability From Exit 78 (SR-96) & Exit 53 (I-440 Interchange), 25 miles Westbound Travel (Weekdays 2014-2016) Buffer time (minutes) Planning time (minutes) Travel time (minutes) 5:00 AM - 9:00 AM 3:00 PM - 7:00 PM 5:00 AM - 9:00 AM 3:00 PM - 7:00 PM 5:00 AM - 9:00 AM 3:00 PM - 7:00 PM 39.64 3.59 69.32 30.14 36 27.94 43.98 4.48 73.64 31.04 37.3 27.57 43.57 4.63 73.22 31.18 37.59 27.32 Eastbound Travel (Weekdays 2014-2016) Buffer time (minutes) Planning time (minutes) Travel time (minutes) 5:00 AM - 9:00 AM 3:00 PM - 7:00 PM 5:00 AM - 9:00 AM 3:00 PM - 7:00 PM 5:00 AM - 9:00 AM 3:00 PM - 7:00 PM 2.76 19.18 27.22 45.71 24.93 30.63 2.86 22.16 27.31 48.69 24.97 32.53 1.97 25.85 26.43 52.38 24.46 33.92 2014 User Costs 2015 2016 Previous Studies I-24 Multimodal Corridor Study • Identified short- and long-term solutions for improving problem spots along the entire corridor.
    [Show full text]
  • Nelson County Comprehensive Plan
    Nelson County Comprehensive Plan As Approved by the Nelson County Board of Supervisors and Nelson County Planning Commission Adopted _______, 2012 Prepared by The Nelson County Planning Commission with the assistance of The Citizens of Nelson County at the request of The Nelson County Board of Supervisors Staff support from the Thomas Jefferson Planning District Commission Design Resources Center, University of Virginia Nelson County Department of Planning Nelson County Comprehensive Plan Table of Contents Executive Summary i Chapter One-Portrait of Nelson County 1 A Brief History of Nelson County 1 Nelson County Today 2 Chapter Two-Purpose of the Plan 4 Chapter Three-Goals and Principles 5 Economic Development 5 Transportation 7 Education 8 Public and Human Services 9 Natural, Scenic, and Historic Resources 10 Recreation 11 Development Areas 13 Rural Conservation 14 Chapter Four-Land Use Plan 16 Introduction 16 Land Use Planning Data 17 Existing Land Use 17 Areas Served by Water and/or Sewer 19 Environmental Constraints: Steep Slopes, Soil Potential for Agricultural Use 21 Land Use Plan for Designated Development Areas 25 Rural Small Town Development Model 26 Rural Village Development Model 28 Neighborhood Mixed Use Development Model 30 Mixed Commercial Development Model 32 Light Industrial Development Model 34 Land Use Plan for Rural Conservation Areas 36 Future Land Use Plan and Map 38 Chapter Five – Transportation Plan 41 Introduction 41 Purpose 41 Background 42 Existing Plans and Studies 42 Existing Roadway Inventory 48 Interstate
    [Show full text]
  • Northeast Energy Direct Project Docket No. Pf14-22-000
    NORTHEAST ENERGY DIRECT PROJECT DOCKET NO. PF14-22-000 DRAFT ENVIRONMENTAL REPORT RESOURCE REPORT 10 ALTERNATIVES PUBLIC Submitted by: Tennessee Gas Pipeline Company, L.L.C. 1001 Louisiana Street Houston, Texas 77002 November 2014 Environmental Report NED Project Resource Report 10 Alternatives 10-i RESOURCE REPORT 10 – ALTERNATIVES SUMMARY OF FILING INFORMATION INFORMATION FOUND IN Address the “no action” alternative (§ 380.12 (l)(1)). Section 10.1 For large Projects, address the effect of energy conservation or Section 10.1.1 energy alternatives to the Project Section 10.1.2 (§ 380.12 (l)(1)). Identify system alternatives considered during the identification of the Project and provide the rationale for rejecting each Section 10.2 alternative (§ 380.12 (l)(1)). Identify major and minor route alternatives considered to avoid impact on sensitive environmental areas (e.g., wetlands, parks, Section 10.3 or residences) and provide sufficient comparative data to justify the selection of the proposed route (§ 380.12 (l)(2)(ii)). Identify alternative sites considered for the location of major new aboveground facilities and provide sufficient comparative Sections 10.4, 10.5, and 10.6 data to justify the selection of the proposed site (§ 380.12 (l)(2)(ii)). November 2014 Environmental Report NED Project Resource Report 10 Alternatives 10-ii TABLE OF CONTENTS 10.0 INTRODUCTION..................................................................................................................... 10-1 10.1 NO-ACTION ALTERNATIVE ...................................................................................
    [Show full text]
  • BRIDGE POINT MELROSE PARK Bridgepmp.Com | Melrose Park, IL
    BRIDGE POINT MELROSE PARK bridgepmp.com | Melrose Park, IL AVAILABLE SPACE Up to 1,539,780 SF # OF BUILDINGS 1 - 3 CLEAR HEIGHT 36' - 40' NEW INFILL DEVELOPMENT O'HARE / WEST COOK SUBMARKET LAND SIZE HIGHLIGHTS 86.63 Acres • High profile location for labor and last mile distribution • Class A buildings with state-of-the-art • Unmatched connectivity to local expressways, specifications DELIVERY DATE intermodal centers, and O'Hare International Airport • Only site in O'Hare / West Cook submarket which • Direct access to Interstate 290 and Interstate 294 can accommodate over 500,000 SF building Q2 2023 • Potential for built-to-suit development with flexibility in • Site offers flexibility to accommodate heavy trailer design and layout parking CHARLIE KENNING BRIAN CARROLL Executive Vice President Senior Vice President [email protected] [email protected] +1 773 304 4117 +1 773 632 1102 CONCEPT PLAN #1 STORMWATER MANAGEMENT FACILITY 3 Clear Height: 40' 56'-6" Exterior Docks: 130 (expandable to 148) (89) 5 5 70'-0" TRAILER POSITIONS 1 3 1 5 13 15 Drive-In Doors: 4 (65) EXTERIOR DOCKS (9) FUTURE EXTERIOR DOCKS 2 2 22 707,953 SF 60'-0" D.I.D. D.I.D. 1180'-0" Car Parking: 610 stalls 60'-0" 121'-0" 121'-0" 50'-0" 2 0 2 0 50'-0" 1080'-0" 4 0 20 20 40 (20)BAYS @ 54'-0" 10'-0" Trailer Parking: 178 stalls 16'-4" 10'-0" Truck Court: 130' (10) B A Y S @ 48'-0" PROPOSED 2 0 20 40 20 20 Spec Office: To suit 40 480'-0" 600'-0" FACILITY #3 ±707,953 SQ.FT.
    [Show full text]
  • Chapter Provides Information on EGC ESP Site Location, On-Site
    CHAPTER 2 Site Characteristics This chapter provides information on the EGC ESP Site location, on-site activities and controls, present and projected population distribution, meteorological, hydrological, geological, and seismological characteristics. The purpose of presenting this information is to provide the bases for demonstrating the adequacy of the site characteristics from a site safety viewpoint and to provide input to support environmental characterization. The influence of the EGC ESP site characteristics on the design and operation of a possible future nuclear power facility will be assessed at the construction and operating license (COL) stage pursuant to 10 CFR 52 Subpart C. REV2 2-1 CHAPTER 2 - SITE CHARACTERISTICS SITE SAFETY ANALYSIS REPORT FOR EGC EARLY SITE PERMIT SECTION 2.1 – GEOGRAPHY AND DEMOGRAPHY 2.1 Geography and Demography 2.1.1 Site Location and Description 2.1.1.1 Specification of Location The EGC ESP Facility will be co-located on the property of the existing CPS Facility and its associated 4,895 ac man-made cooling reservoir (Clinton Lake) (CPS, 2002). The EGC ESP Facility will be located approximately 700 ft south of the existing CPS Facility. The CPS Facility lies within Zone 16 of the Universal Transverse Mercator (UTM) coordinates. The exact UTM coordinates for the EGC ESP Facility will depend upon the specific reactor technology selected for deployment and will be finalized at COL. As shown on Figures 1.2-1 and 2.1-1 there is a complex transportation system surrounding the EGC ESP Site. The nearest major highways are Illinois State Routes 54, 10, and 48, all of which cross the CPS Facility property.
    [Show full text]