Chicago-Area Projects

Chicago-Area Projects

District 1 (Cook, DuPage, Will, McHenry, Kane and Lake Counties) -Jane Byrne Interchange reconstruction in Chicago o $76.6 million; $31.8 million spent o Spread over four separate contracts o Interstate 290 westbound bridge over Interstate 90/94, westbound I-290 capacity enhancements -Interstate 55 and Lake Shore Drive in Chicago o $135.7 million; $112.5 million spent o Two contracts o Reconstruction of Interstate 55 and U.S. 41 interchange, as well as new retaining walls, lighting, other related work, due to be complete this fall -159th Street (Illinois 7/U.S. 6) from Interstate 355 to U.S. 45 in Will County o $105 million; $28.3 million spent o Two contracts under construction o Additional lanes, bike and pedestrian accommodations -Kennedy Expressway Auxiliary Lanes from eastbound Cumberland Avenue to Harlem Avenue in Chicago o $23 million; $3.9 million spent o Adding auxiliary lanes, resurfacing, ramp repair, retaining wall, drainage, lighting, signing; also includes Illinois 72 improvements between Oriole and Harlem avenues -Cumberland Flyover in Chicago o $24 million; $5.1 million spent o New bridge -Illinois 132 at U.S. 41 in Lake County o $20 million; $825,000 spent o Intersection reconstruction/bridge replacement, Union Pacific Railroad over Illinois 132 in Gurnee District 2 (Jo Daviess, Stephenson, Winnebago, Boone, Carroll, Ogle, Whiteside, Lee, Rock Island, Henry counties) -Illinois 84 and U.S. 52 over Mississippi River at Savanna o $81.7 million; $59.7 million spent o Reconstructing Illinois 84 and new bridge over Mississippi River -Interstate 80 from Interstate 88 to Interstate 74/280 o $25.5 million; $14.2 million spent o Six bridge replacements -Illinois 5 from west of 38th Street to east of 70th Street in Moline o $51.3 million; $14.7 million spent o Reconstruction -Illinois 2 (North Main Street) from Riverside Boulevard to Auburn Street in Rockford o $32.4 million; $11.7 million spent o Reconstruction District 3 (DeKalb, Bureau, LaSalle, Kendall, Grundy, Livingston, Kankakee, Iroquois and Ford counties) -Interstate 57 and 6000N; U.S. 45/52 and Illinois 50 in Bourbonnais o $46.2 million; $26.1 million spent o New bridge and interchange, widening and intersection improvements -Illinois 47 in Kendall County, north of Interstate 80 in Morris to Sherrill Road, and bridges over Saratoga Creek and Valley Run Creek o $38.4 million; $33.1 million spent o Reconstruction of Illinois 47 and new bridges over Saratoga and Valley Run creeks. -Illinois 89 over Illinois River in Bureau County o $38.6 million; $20.2 million spent o Bridge replacement -Illinois 47, from Sherrill Road to Canton Farm Road in Grundy County o $46.2 million; $9.6 million spent o Reconstruction -U.S. 34 east of Illinois 47 in Yorkville to Orchard Road in Oswego o $33 million; $1.1 million spent o Reconstruction -Illinois 178 over the Illinois River o $25.6 million; $1 million spent o Bridge replacement District 4 (Mercer, Henderson, Warren, McDonough, Fulton, Knox, Stark, Peoria, Putnam, Marshall, Woodford and Tazewell counties) -Interstate 474 over Illinois River in Tazewell County o $13.5 million; $1.2 million spent o Structural repairs over Illinois River -Illinois 336/U.S. 136/Illinois 110 near Macomb in McDonough County o $36 million; $23.9 million spent o 6.5 miles of new pavement and construction of eight structures -Interstate 74 from Illinois 78 to the Spoon River in Knox and Peoria counties o $12.4 million; $1milllion spent o Resurfacing District 5 (McLean, DeWitt, Piatt, Champaign, Douglas, Vermillion and Edgar counties) -Interstate 57 from west of Tolono to just south of Interstate 74 o $14 million; $4 million spent o Resurfacing -Interstate 74 from U.S. 150 to east of Farmer City o $4.5 million; $4 million spent o Concrete overlays -Interstate 74 over the Vermilion River in Danville o $1.1 million; $176,000 spent o Concrete overlays -Interstate 74 over Illinois 47 at Mahomet o $1.5 million; $330,000 spent o Concrete overlays -Interstate 74 from east of LeRoy to one mile west of Farmer City o $6.5 million; $2.5 million spent o Resurfacing District 6 (Hancock, Adams, Pike, Schuyler, Brown, Cass, Morgan, Scott, Mason, Menard, Sangamon, Christian, Montgomery, Macoupin and Logan counties) -Lincoln Parkway from south of Kenwood Drive to Illinois 10 in Lincoln o $6.2 million; $$720,00 spent o Resurfacing and drainage improvements -Illinois 123 from just east of Petersburg to just west of Illinois 29 o $2.7 million; $50,000 spent o Resurfacing and bridge repairs -Illinois 104 from east of Mound Road to east of Hardin Avenue in Jacksonville o $10.5 million; $8.4 million spent o Resurfacing and bridge repairs -Illinois 104 over the Illinois River at Meredosia o $75.1 million; $52.3 million spent o New bridge construction -Interstate 55 from just north of Stevenson Drive just north of Clear Lake Avenue o $9.9 million; $16,000 spent o Resurfacing District 7 (Macon, Moultrie, Coles, Clark, Shelby, Cumberland, Fayette, Effingham, Jasper, Crawford, Clay, Richland, Lawrence, Wayne, Edwards and Wabash counties) -Interstate 70 from Effingham County line to 7.5 miles east o $18.8 million; $1.5 million spent o Patching and resurfacing -U.S. 50 over Muddy and Little Muddy creeks at the Clay County line and west of Richland County line o $11.3 million; $700,000 spent o Bridge replacements -U.S. 51 over the Sangamon River south of Harristown o $8.4 million; $6.2 million spent o Bridge replacement District 8 (Calhoun, Greene, Jersey, Madison, Bond, Marion, Clinton, St. Clair, Monroe, Washington and Randolph counties) -Joe Page Bridge over the Illinois River at Hardin o $5.3 million, $3.3 million spent o Bridge repairs -Interstate 70 near Highland o $26.8 million, $14.4 million spent o Patching, pavement reconstruction, milling, resurfacing, guardrail and bridge repair -Illinois 15 over Illinois 13 and Illinois Central Railroad o $20.5 million, $18.4 million spent o Bridge replacements District 9 (Jefferson, Perry, Jackson, Franklin, Hamilton, White, Williamson, Saline, Gallatin, Union, Johnson, Pope, Hardin, Alexander, Pulaski and Massac counties) -Illinois 13 from Division Street in Carterville to Illinois 148 o $24 million, $18 million spent o New diamond interchange at Illinois 13 and Wolf Creek Road, a new bridge and additional lanes -Interstate 57 from Marion to Interstate 24 o $31 million, $17.5 million spent o Full-depth resurfacing -U.S. 45 from Illinois 142 in Eldorado to Texas City Road o $27 million, $17.3 million spent o Road widening -Illinois 127 over the Big Muddy River in Murphysboro o $1.7 million, $200,000 spent o Superstructure replacement -Interstate 64 from Interstate 57 to Illinois 142 o $8 million, $0 spent (plan to start after July 4th) o Resurfacing .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    5 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us