Greater Birmingham HMA Strategic Growth Study
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Download CD7/1 Landscape Character Assessment ( Report)
CONTENTS 1.0 INTRODUCTION 2.0 METHODOLOGY Inception meeting and data review Desk study and initial mapping Field survey Landscape Characterisation (Stage 1) Settlement Setting / Landscape Capacity Study (Stage 2) 3.0 LANDSCAPE CONTEXT Background National Context County Context The Warwickshire Historic Landscape Characterisation Study Surrounding Authorities Other Reference Material 4.0 OVERVIEW OF THE LANDSCAPE CHARACTER OF THE DISTRICT Physical Influences Human Influences 5.0 CHARACTER OF THE NORTH WARWICKSHIRE LANDSCAPES LCA 1 No Man’s Heath to Warton – Lowlands LCA 2 Little Warton to Fields Farm – Fen Lanes LCA 3 Anker Valley LCA4 Baddesley to Hartshill – Uplands LCA5 Tamworth – Urban Fringe Farmlands LCA6 Wood End to Whitacre – Upper Tame Valley Farmlands LCA7 Church End to Corley – Arden Hills and Valleys LCA8 Blythe Valley – Parkland Farmlands LCA9 Hoggrill’s to Furnace End – Arden Hamlets LCA10 Cole Valley LCA11 Tame Valley Wetlands LCA12 Middleton to Curdworth – Tame Valley Farmland LCA13 Wishaw to Trickley Coppice – Wooded Uplands J/4189/Final Report/Nwarks LCA Final Report Aug 2010.doc SLS 20.08.2010 1 6.0 CAPACITY STUDY 6.1 Atherstone / Mancetter 6.2 Polesworth / Dordon, 6.3 Coleshill 6.4 Old and New Arley 6.5 Grendon / Baddesley Ensor 6.6 Hartshill with Ansley Common, 6.7 Kingsbury 6.8 Water Orton FIGURES Figure 1: Borough Boundary Figure 2: Green Belt Figure 3: RIGs Figure 4: Topography Figure 5: Flood zones Figure 6: Ancient Woodland Figure 7: Ecological Designations Figure 8: Land Use Figure 9: Settlement Patterns Figure -
Long Marston
THIS IS CALA AT FERNLEIGH PARK LONG MARSTON BEAUTIFUL HOMES IN AN INSPIRATIONAL SETTING Computer generated image of Fernleigh Park Local photography Local photography Set in a brand new village community just a 10 minute drive from Stratford-upon-Avon, with abundant green spaces, cycle paths and Stock photography countryside walks on your doorstep, CALA at Fernleigh Park is a wonderful place to call home. Stock photography Local photography Local photography A HOME TO SUIT YOU Whether you’re setting up your own place for the first time or looking for more space for a growing family, you’ll find everything you are looking for at Fernleigh Park. There’s a wide range of carefully thought out and crafted designs to choose from, all with beautifully laid-out, light and spacious interiors. Stock photography Flexible floorplans enable you to tailor your choice to your lifestyle, whether it be a home office with the assurance of consistent speed and connectivity with a full fibre hyperoptic connection, a playroom or a den. The charming, characterful exteriors incorporate distinctive architectural features in brick, timber and stone to give each home a personality all of its own. CALA at Fernleigh Park is more than buying a new home, you will become part of a greater vision for a whole new community and way of life. Enjoy the best of both worlds with green and restful surroundings on your doorstep and easy access to a wealth of amenities in the wider area. Just reimagine… Stock photography FUTURE DEVELOPMENT POSSIBLE FUTURE THE VISION STRETCH OF -
Third Party Funding
THIRD PARTY FUNDING IS WORKING IAN BAXTER, Strategy Director at SLC Rail, cheers enterprising local authorities and other third parties making things happen on Britain’s complex railway n 20 January 1961, John F. Kennedy used being delivered as central government seeks be up to them to lead change, work out how his inaugural speech as US President more external investment in the railway. to deliver it and lever in external investment Oto encourage a change in the way of into the railway. It is no longer safe to assume thinking of the citizens he was to serve. ‘Ask DEVOLUTION that central government, Network Rail or not what your country can do for you,’ intoned So, the theme today is: ‘Ask not what the train operators will do this for them. JFK, ‘but what you can do for your country.’ the railway can do for you but what However, it hardly needs to be said, least of Such a radical suggestion neatly sums up you can do for the railway’. all to those newly empowered local railway the similar change of approach represented Central government will sponsor, develop, promoters themselves, enthusiastic or sceptical, collectively by the Department for Transport’s fund and deliver strategic railway projects that the railway is a complex entity. That March 2018 ‘Rail Network Enhancements required for UK plc, such as High Speed 2, applies not only in its geographical reach, Pipeline’ (RNEP) process, Network Rail’s ‘Open for electrification, long-distance rolling stock scale and infrastructure, but also in its regularly Business’ initiative and the ongoing progress of replacement or regeneration at major stations reviewed post-privatisation organisation, often devolution of railway planning and investment like London Bridge, Reading or Birmingham New competing or contradictory objectives, multiple to the Scottish and Welsh governments, Street. -
Landscape Character Assessment
Nuneaton and Bedworth Landscape Character Assessment Published August 2012 Nuneaton and Bedworth Landscape Character Assessment Document Reference: 2534.016 Version 4.0 June 2011 Prepared by: TEP Genesis Centre Birchwood Science Park Warrington WA3 7BH Tel: 01925 844004 Fax: 01925 844002 e-mail: [email protected] for Nuneaton and Bedworth Borough Council Council House Nuneaton Warwickshire CV11 5AA Written: Checked: Approved: JTS IJG IJG Nuneaton and Bedworth Landscape Character Assessment CONTENTS PAGE 1.0 INTRODUCTION ..................................................................................... 6 2.0 STUDY OBJECTIVES .............................................................................. 8 3.0 METHOD ............................................................................................... 9 4.0 PLANNING POLICY CONTEXT ................................................................ 15 5.0 NATIONAL, COUNTY & NEIGHBOURING LANDSCAPE CHARACTER AREAS . 19 6.0 LANDSCAPE CONTEXT ......................................................................... 23 7.0 NUNEATON & BEDWORTH BOROUGH LANDSCAPE CHARACTER AREAS .... 31 8.0 CONCLUSIONS .................................................................................... 33 APPENDICIES Appendix 1 Landscape Character Summaries DRAWINGS Figure 1.1 Borough Location Plan Figure 4.1 Borough Green Belt, Areas of Restraint and Countryside Figure 5.1 National Landscape Character Areas Figure 5.2 Warwickshire Landscape Guidelines Figure 5.3 Entec Landscape Character Areas within Areas -
5. Proposed Development of a New Rail Station and Associated Infrastructure
Planning and Regulatory Committee 25 August 2015 5. PROPOSED DEVELOPMENT OF A NEW RAIL STATION AND ASSOCIATED INFRASTRUCTURE. THE APPLICATION COMPRISES OF NEW PLATFORMS ON THE BIRMINGHAM - BRISTOL RAILWAY LINE AND ONE PLATFORM ON THE COTSWOLD RAILWAY LINE, A NEW STATION BUILDING, A PUBLIC RIGHT OF WAY FOOTBRIDGE OVER THE BIRMINGHAM - BRISTOL RAILWAY LINE, CAR PARKING, FLOOD ATTENUATION AND A NEW ROUNDABOUT ON THE B4084 ON LAND TO THE EAST AND SOUTH OF THE CRUCIBLE BUSINESS PARK, NORTON, WORCESTER, WORCESTERSHIRE Applicant Worcestershire County Council Local Councillor Mr R C Adams Purpose of Report 1. To consider a planning application under Regulation 3 of the Town and Country Planning General Regulations 1992 for a proposed development of a new rail station and associated infrastructure. The application comprises of new platforms on the Birmingham - Bristol railway line and one platform on the Cotswold railway line, a new station building, a Public Right of Way footbridge over the Birmingham - Bristol railway line, car parking, flood attenuation and a new roundabout on the B4084 on Land to the east and south of The Crucible Business Park, Norton, Worcester, Worcestershire. The Proposal 2. The proposed development comprises the provision of a new railway station at the intersection of the Oxford, Worcester and Wolverhampton railway line (Cotswold railway line) and the Birmingham and Bristol railway lines at Norton, near Worcester, Worcestershire. 3. In summary the proposed development would comprise of the following: A single platform -
Safer Communities Sub-Committee Agenda
To: The Chairman and Members of the Safer Communities Sub-Committee (Councillors Reilly, Clews, Davey, Deakin, M Humphreys, Jarvis, Jenns, Lees, Gosling, Osborne and Parsons) For the information of the other Members of the Council For general enquiries please contact Democratic Services on 01827 719221 or via e-mail: [email protected] For enquiries about specific reports please contact the officer named in the reports. This document can be made available in large print and electronic accessible formats if requested. SAFER COMMUNITIES SUB-COMMITTEE 18 NOVEMBER 2019 The Safer Communities Sub-Committee will meet in the Committee Room, The Council House, South Street, Atherstone, Warwickshire on Monday 18 November 2019 at 6.30pm. AGENDA 1 Evacuation Procedure 2 Apologies for Absence/ Members away on official Council business. 3 Disclosable Pecuniary and Non-Pecuniary Interests. Page1 of 127 4 Minutes of the meeting of the Sub-Committee held on 1 July 2019 (copy herewith). 5 Public Participation Up to twenty minutes will be set aside for members of the public to put questions to elected Members. Questions should be submitted by 9.30am 2 working days prior to the meeting. Participants are restricted to five minutes each. If you wish to put a question to the meeting please contact Emma Humphreys on 01827 719221 or email [email protected]. ITEMS FOR DISCUSSION AND DECISION (WHITE PAPERS) 6 Fly Tipping Progress Report – Report of the Chief Executive Summary This report provides Members with an update on progress on the action plan for tackling fly tipping across the Borough. The Contact Officer for this report is Robert Beggs (719238). -
Hydroflex Takes to the Main Line
News Front HydroFlex on the main line: No 799001 passes year (p88, July 2019 issue), the Clayfield level crossing en-route from Evesham to University received grant funding Long Marston on 25 September 2020. Philip Sherratt through the Department for Transport’s First of a Kind (FOAK) competition in conjunction with Innovate UK towards the start of main line testing. The trial has seen Class 319 EMU No 319001 rechristened as No 799001. On board the train space within one of the four carriages houses batteries, a hydrogen fuel cell and hydrogen tanks. The two batteries are supplied by Denchi and work in hybrid with the fuel cell from Canadian firm Ballard, which is controlled by software written by the University. The hydrogen tanks are supplied by Luxfer. AUTOMATION Dr Stuart Hilmansen, Reader in Railway Traction Systems at the University of Birmingham, told Modern Railways work over the last year has concentrated on automating functions within the train to reduce human input, including further development of HYDROFLEX TAKES the university’s control software. An important factor in moving trials from Long Marston onto the main line was technical robustness TO THE MAIN LINE and reliability improvements. In particular, work has focused CLASS 799 MAKES DEBUT RUN ON COTSWOLD LINE on the amount of power provided HYDROFLEX, THE UK’s first Secretary Grant Shapps travelled and the University of Birmingham, by the fuel cell and batteries full size hydrogen train, made on the train and announced that which have together invested to avoid the possibility of an its debut on the main line on the Tees Valley would host the more than £1 million in the project. -
Worcestershire Rail Investment Strategy Supporting Development of Worcestershire’S Local Transport Plan 4
Worcestershire County Council Worcestershire Rail Investment Strategy Supporting Development of Worcestershire’s Local Transport Plan 4 Autumn 2017 Contents An Evidenced Rail Vision For Worcestershire 4 1. Executive Summary 7 2. Introduction 12 3. Stage 1 – Current Travel Markets, Train Services & Accessibility 15 4. Stage 2 – Review of Worcestershire’s Development Proposals 39 5. Stage 3 – Rail Industry Plans & Gap Analysis 52 6. Stage 4 – Economic Testing Of Connectivity Options 78 7. Stage 5 – The Prioritised Conditional Outputs 84 8. Stage 6 – Making It Happen 96 An Evidenced Rail Vision For Worcestershire Worcestershire is an attractive, thriving County of The Rail Industry’s Plans 566,000 people, set to grow by 47,200 new homes 2030 and 25,000 new jobs by 2025 which will result The industry forecasts up to 97% growth in in a £2.9bn growth in Gross Value Added (GVA) passenger volumes on Worcestershire routes by from £9bn to £11.9bn per annum 1. The County’s rail 2043 2 . services will not match these ambitions without signifcant earlier development and investment The industry has an emerging vision, shared in beyond that committed by the rail industry. Worcestershire, for a faster 2 trains per hour (tph) Worcestershire to London service, supported by The Challenge enhancements to the North Cotswold Line, the Great Western electrifcation scheme and new Connectivity to London is slow and of limited Intercity Express Programme (IEP) trains. frequency, with many Worcestershire passengers using the M5-M42-M40 to access better Birmingham However its planning processes do not include International and Warwick Parkway services. -
Final Recommendations on the Future Electoral Arrangements for Warwickshire County Council
Final recommendations on the future electoral arrangements for Warwickshire County Council Report to The Electoral Commission April 2004 © Crown Copyright 2004 Applications for reproduction should be made to: Her Majesty’s Stationery Office Copyright Unit. The mapping in this report is reproduced from OS mapping by The Electoral Commission with the permission of the Controller of Her Majesty’s Stationery Office, © Crown Copyright. Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. Licence Number: GD 03114G. This report is printed on recycled paper. Report no: 367 2 Contents Page What is The Boundary Committee for England? 5 Summary 7 1 Introduction 15 2 Current electoral arrangements 19 3 Draft recommendations 23 4 Responses to consultation 25 5 Analysis and final recommendations 29 6 What happens next? 75 Appendix A Final recommendations for Warwickshire: detailed mapping 77 3 4 What is The Boundary Committee for England? The Boundary Committee for England is a committee of The Electoral Commission, an independent body set up by Parliament under the Political Parties, Elections and Referendums Act 2000. The functions of the Local Government Commission for England were transferred to The Electoral Commission and its Boundary Committee on 1 April 2002 by the Local Government Commission for England (Transfer of Functions) Order 2001 (SI 2001 No. 3692). The Order also transferred to The Electoral Commission the functions of the Secretary of State in relation to taking decisions on recommendations for changes to local authority electoral arrangements and implementing them. Members of the Committee are: Pamela Gordon (Chair) Professor Michael Clarke CBE Robin Gray Joan Jones CBE Ann M Kelly Professor Colin Mellors Archie Gall (Director) We are required by law to review the electoral arrangements of every principal local authority in England. -
Stratford to Honeybourne Railway Re-Instatement Business Case Study by Arup 1
ED.4.7.8 Stratford on Avon District Council Stratford to Honeybourne Railway Reinstatement - Business Case Study Final Report Issue | 25 September 2012 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility is undertaken to any third party. Job number 224132-00 Ove Arup & Partners Ltd The Arup Campus Blythe Gate Blythe Valley Park Solihull B90 8AE United Kingdom www.arup.com Stratford on Avon District Council Stratford to Honeybourne Railway Reinstatement - Business Case Study Final Report Contents Page Executive Summary 5 1 Introduction 8 1.1 Background 8 1.2 Purpose of the Study 8 1.3 Objectives of the Study 9 1.4 Study Scope Definition 9 1.5 Previous Work in the public domain 10 1.6 Study Approach 12 2 Outline Project Operational and Functional Requirements 15 2.1 Line Speed Requirements 15 2.2 Gauge Requirements 15 2.3 Axle Loading Requirements 15 2.4 Stations 15 2.5 Theoretical Capacity (TPH) 16 2.6 Proposed train service provision (TPH) 16 2.7 Existing Train Service Performance (by TOC Routes) 16 2.8 Level Crossing and Grade separation requirements 16 2.9 Utilities 17 2.10 Safety 17 2.11 Noise and Vibration 17 2.12 Environment 18 3 Train Service Options 19 3.1 Medium term (with no additional infrastructure) 19 3.2 Longer term (with additional infrastructure) 19 3.3 Service options 19 4 Design Issues and Construction Options 21 4.1 Introduction 21 4.2 Structural Assessment 21 4.3 Route Option Development -
Stratford-Upon-Avon Station
STATIONS AS PLACES Opportunity Prospectus Integration, Community and Delivery: A Masterplan for Stratford-upon-Avon station STRATFORD-UPON-AVON STATION May 2020 FOREWORD Introducing the concept of Stations as Places The Stations as Places (SAP) programme is a process to help put railway stations at the heart of local communities. It is designed to help create a vision for the future and to identify opportunities for delivering improvements to the local environment and create a welcoming ambience. The aim is to work in partnership with others to unlock potential and to meet shared objectives and aspirations. Railway stations are more than access points to the rail network; they can be hubs of activity that are rooted in the locality with the potential to support regeneration and development opportunities. They can also host community and business activities and offer facilities/infrastructure to encourage sustainable, multi modal travel with a view to reducing car dependency and improving local air quality. The Vision “We will develop stations as quality gateways between communities and the railway, supporting the changing needs of our passengers, residents and visitors. Stations in the West Midlands will be community assets, supporting the wellbeing and development of the areas they serve through involving local community and business.” West Midlands Station Alliance (WMSA) Mission Statement What does this prospectus do for Stratford-upon-Avon Station? There is an important role for the railways to play in both the economic and social regeneration of the local areas which our stations serve. This Opportunity Prospectus sets out the economic, social and geographic landscape of the area around our station and highlights some of the opportunities for commercial development, partnership working, inward investment and community regeneration. -
APPENDIX B: LOCAL CONTEXT B.1. the Borough Is
APPENDIX B – THE LOCAL CONTEXT - HEALTH, WELL-BEING AND LEISURE STRATEGY, GREEN SPACE STRATEGY, PLAYING PITCH STRATEGY, LEISURE FACILITIES STRATEGY NORTH WARWICKSHIRE BOROUGH COUNCIL APPENDIX B: LOCAL CONTEXT BACKGROUND B.1. The Borough is the Northernmost district in the county of Warwickshire. It has several large urban settlements on its doorstep, with the Borough lying between Birmingham, Solihull, Tamworth, Coventry, Nuneaton and Hinckley, all of which are growing areas. B.2. North Warwickshire itself is overwhelmingly rural in nature with approximately two thirds of its area designated as Green Belt. The population of the Borough is 62,124 (2011 Census), most of which is centred in the three main towns in the Borough: Atherstone, Coleshill and Polesworth. The rest of the population is dispersed throughout a number of smaller rural settlements. The dispersed nature of the Borough has particular implications for the provision of, and access to, services and facilities, particularly as public transport in limited, and not everyone has access to private transport. The population is predicted to grow from 62,700 in 2017, to 83,561 by 2031. (The projected growth in housing development of 5,280, plus 3,790 equates to 9,070 new homes by 2031. Assuming a minimum of 2.3 persons per household, this potentially equates to 20,861 new people in the Borough, who will need community facilities and services) B.3. Settlements range in size from Atherstone and Mancetter, with a population of 10,000 to small hamlets. Atherstone with Mancetter, Coleshill and Polesworth are the three market towns and are important to the health of the surrounding rural economy as they provide many services and facilities to the surrounding areas.