Third Village Investment Project (P146970) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROCUREMENT Kyrgyz Republic : Third Village Investment Project PLAN General Information

Country: Kyrgyz Republic Bank’s Approval Date of the Original Procurement Plan: 2019-12-17 Revised Plan Date(s): (comma delineated, leave blank if none)2020-10-23 Project ID: P146970 GPN Date: Project Name: Third Village Investment Project Loan / Credit No: IDA / 56010, IDA / D0410 Executing Agency(ies):Community Development and Investment Agency

WORKS Bid Evaluation Activity Reference No. / Procurement Estimated Actual Draft Bidding Loan / Credit Market Procurement Prequalification High SEA/SH Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Contract Description Component Review Type Method Document Amount Amount Document / Signed Contract No. Approach Process (Y/N) Risk Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Completion Type (US$) (US$) Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned

IDA-VIP3-HO-CW-16-05 / Construction of a Capacity Building of Local kindergarten for 100 places Single Stage - One IDA / 56010 Self-Governments and Prior Request for Bids Open - National 0.00 347,529.04 Signed 2016-10-03 2016-09-30 2016-10-19 2016-10-19 in v., Tamga AO, Jeti- Envelope Communities Oguz Raion, Issyk-Kul Region

IDA-VIP3-HO-CW-NCB-20-1 / Construction of an additional building for Single Stage - One IDA / D0410 Village Investments Post Request for Bids Open - National 152,173.91 132,012.63 Signed 2020-03-25 2020-04-17 2020-03-30 2020-05-11 2020-05-11 2020-06-10 2020-06-11 2020-07-15 2020-06-30 2021-01-11 "Zhetigen" Kindergarten in Envelope

Beryu-Bash village, Ak-Suu region, Issyk-Kul oblast

IDA-VIP3-HO-CW-NCB-20-2 / Construction of a Single Stage - One 46,893,748.0 kindergarten for 100 places IDA / D0410 Village Investments Post Request for Bids Open - National 143,500.00 Signed 2020-03-25 2020-04-17 2020-03-30 2020-05-11 2020-05-11 2020-06-10 2020-06-11 2020-07-15 2020-07-29 2021-01-11 Envelope 9 Ak-Sai village, Ton region, Issyk-Kul oblast

IDA-VIP3-HO-CW-NCB-20-3 / Construction of a Single Stage - One kindergarten for 50 places IDA / D0410 Village Investments Post Request for Bids Open - National 254,130.43 222,477.40 Signed 2020-02-21 2020-03-06 2020-02-26 2020-03-06 2020-04-08 2020-05-06 2020-05-08 2020-07-15 2020-06-12 2020-08-11 2020-12-09 Envelope Zherge-Tal village, Ak-Tala region, oblast

IDA-VIP3-HO-CW-SH-20-3 / Construction of FAP in Request for Single Stage - One Kyzyl-Zhyldyz village, IDA / D0410 Village Investments Post Limited 28,418.48 31,135.12 Signed 2020-02-26 2020-02-21 2020-04-22 2020-03-16 2020-10-19 Quotations Envelope Zhumgal region, Naryn oblast

IDA-VIP3-HO-CW-NCB-20-4 / Construction of a Single Stage - One kindergarten for 50 places IDA / D0410 Village Investments Post Request for Bids Open - National 182,608.70 217,340.32 Signed 2020-02-24 2020-03-06 2020-02-29 2020-03-06 2020-04-11 2020-05-06 2020-05-11 2020-06-09 2020-06-15 2020-08-13 2020-12-12 Envelope Zher-Kechkyu village, Naryn region, Naryn oblast

IDA-VIP3-HO-CW-SH-20-6 / Construction of FAP in Request for Single Stage - One IDA / D0410 Village Investments Post Limited 30,434.78 38,072.83 Signed 2020-03-30 2020-05-07 2020-05-25 2020-07-20 2020-11-21 Tamchy-Bulak village, Kara- Quotations Envelope

Buura region, oblast

IDA-VIP3-HO-CW-NCB-20-5 / Construction of a Single Stage - One kindergarten Ken-Aral IDA / D0410 Village Investments Post Request for Bids Open - National 258,695.65 205,590.46 Signed 2020-02-24 2020-03-06 2020-02-29 2020-03-06 2020-04-11 2020-08-05 2020-05-11 2020-08-13 2020-06-15 2020-08-20 2020-12-12 Envelope village, Bakai-Ata region, Talas oblast

Page 1 IDA-VIP3-HO-CW-NCB-20-6 / Construction of a Single Stage - One kindergarten A.Ogonbaev IDA / D0410 Village Investments Post Request for Bids Open - National 227,991.99 226,285.69 Signed 2020-02-24 2020-03-06 2020-02-29 2020-03-06 2020-04-11 2020-05-06 2020-05-11 2020-06-09 2020-06-15 2020-07-20 2020-12-12 Envelope village, Talas region, Talas oblast

IDA-VIP3-HO-CW-NCB-20-7 / The device of a sewer collector and connection to a Single Stage - One IDA / D0410 Village Investments Post Request for Bids Open - National 259,730.35 204,040.06 Signed 2020-05-04 2020-08-21 2020-05-09 2020-06-20 2020-09-11 2020-07-20 2020-09-23 2020-08-24 2020-10-15 2021-02-20 city network in Nijnealarcha Envelope village, Alamudun region, Chui oblast

IDA-VIP3-HO-CW-SH-20-7 / Pending Asphalting of the road in Request for Single Stage - One IDA / D0410 Village Investments Post Limited 91,304.35 0.00 Implementat 2020-03-30 2020-05-25 2020-11-21 Dayyrbek village, Issyk-Ata Quotations Envelope ion region, Chui oblast

IDA-VIP3-HO-CW-SH-20-5 / Construction of Library in Request for Single Stage - One IDA / D0410 Village Investments Post Limited 45,652.17 0.00 Canceled 2020-03-30 2020-05-25 2020-11-21 Ottuk village, Naryn region, Quotations Envelope

Naryn oblast

IDA-VIP3-HO-CW-SH-20-4 / Construction of FAP in Chon- Request for Single Stage - One IDA / D0410 Village Investments Post Limited 39,565.00 0.00 Canceled 2020-03-30 2020-05-25 2020-11-21 Tash village, Tyup region, Quotations Envelope

Issyk-Kul oblast

IDA-VIP3-HO-CW-NCB-20-8 / Construction of FAP in Single Stage - One IDA / 56010 Village Investments Post Request for Bids Open - National 76,475.00 79,907.89 Signed 2020-04-24 2020-05-13 2020-04-29 2020-05-12 2020-06-10 2020-06-03 2020-07-10 2020-06-24 2020-07-31 2020-08-03 2020-08-15 Chon-Tash village, Tyup Envelope region, Issyk-Kul oblast

IDA-VIP3-HO-CW-NCB-20-9 / Construction of Library in Single Stage - One IDA / 56010 Village Investments Post Request for Bids Open - National 68,750.00 76,089.19 Signed 2020-04-27 2020-05-13 2020-05-02 2020-05-13 2020-06-13 2020-06-03 2020-07-13 2020-06-24 2020-08-17 2020-08-14 2021-02-13 Ottuk village, Naryn region, Envelope

Naryn oblast

IDA-VIP3-HO-CW-SH-20-1 / Overhaul of school them. Under Request for Single Stage - One Myrzakmatova in Kozhomkul IDA / 56010 Village Investments Post Open - National 35,431.00 0.00 Implementat 2020-02-17 2020-04-02 2020-08-30 Quotations Envelope village, Zhaiyl region, Chui ion oblast

IDA-VIP3-HO-CW-SH-20-2 / Pending Overhaul of kindergarten in Request for Single Stage - One IDA / 56010 Village Investments Post Open - National 65,625.00 0.00 Implementat 2020-02-17 2020-04-13 2020-09-10 Kaldyk village, Zhaiyl Quotations Envelope ion region, Chui oblast

IDA-VIP3-HO-CW-NCB-20- Pending 10 / Construction of GSV in Single Stage - One IDA / D0410 Village Investments Post Request for Bids Open - National 102,958.00 0.00 Implementat 2020-08-26 2020-08-28 2020-09-18 2020-10-18 2020-11-15 2021-04-14 Ak-Dobo village Bakai-Ata Envelope ion Ragion, Talas Oblast

GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

IDA-VIP3-HO-GOODS-SH-20- 3 / personal protective Request for Single Stage - One IDA / D0410 Village Investments Post Limited 99,800.00 115,112.30 Signed 2020-04-24 2020-05-06 2020-05-08 2020-05-26 2020-05-29 equipment for work in the Quotations Envelope centers of COVID-19

Page 2 NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

IDA-VIP3-S-CQ-20-4 / Development of detailed design estimates for the Consultant installation of lighting on Under IDA / D0410 Village Investments Post Qualification Open - National 15,000.00 0.00 2020-07-13 2020-07-14 2020-08-03 2020-09-07 2020-09-14 2020-09-28 2020-12-27 the streets of Zher-Kazar, Implementation Selection Nizhniy-Nooruz, Druzhba Villages, Issyk-Ata Raion, Chuy Oblast

IDA-VIP3-S-CQ-20-5 / development of detailed design estimates for the capital repair of the Consultant drinking water sup-ply Under IDA / D0410 Village Investments Post Qualification Open - National 30,000.00 0.00 2020-07-13 2020-08-13 2020-08-03 2020-09-07 2020-09-14 2020-09-28 2020-12-27 system in Zhyrgalan Village, Implementation Selection Ak-Suy Raion, Issyk-Kul Oblast and in Kadyraly Village, Ak-Talaa Raion, Naryn Oblast

IDA-VIP3-S-CQ-20-6 / development of detailed design estimates for the Consultant capital repair of the building Under IDA / D0410 Village Investments Post Qualification Open - National 15,000.00 0.00 2020-07-13 2020-08-17 2020-08-03 2020-09-07 2020-09-14 2020-09-28 2020-12-27 of the Alen-ka kindergarten Implementation Selection in the village of Predtechenka, Moskovskiy Raion, Chuy Oblast

IDA-VIP-S-CQ-20-7 / development of detailed design estimates for the Consultant construction of the building Pending IDA / D0410 Village Investments Post Qualification Open - National 15,000.00 0.00 2020-07-24 2020-08-07 2020-09-13 2020-09-16 2020-09-18 2020-12-17 for the GFD (Group of Implementation Selection Family Doctors) in Ak-Dobo Village, Bakai-Ata Raion, Talas Oblast

IDA-VIP3-V-CQ-2020-16 / Capacity Building of Local Consultant Under Preparing Audio and Video IDA / D0410 Self-Governments and Post Qualification Open - National 2,000.00 0.00 2020-08-18 2020-09-08 2020-10-13 2020-10-18 2020-10-28 2021-01-26 Implementation Lessons Communities Selection

INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

IDA-VIP3-T-IC-2020-1 / Technical Supervision Engineer (TSE) for Individual Under subproject ‘Construction of IDA / D0410 Village Investments Post Consultant Open 5,600.00 0.00 2020-02-26 2020-02-24 2020-04-15 2020-05-06 2020-06-10 2020-12-07 Implementation FAP in Kyzyl-Zhyldyz Selection village, Zhumgal region, Naryn oblast’

Page 3 IDA-VIP3-T-IC-2020-2 / Technical Supervision Engineer (TSE) for Individual Under subproject ‘Overhaul of IDA / D0410 Village Investments Post Consultant Open 5,600.00 0.00 2020-02-21 2020-02-18 2020-04-10 2020-05-01 2020-06-05 2020-12-02 Implementation school them. Myrzakmatova Selection in Kozhomkul village, Zhaiyl region, Chui oblast’

IDA-VIP3-T-IC-2020-3 / Technical Supervision Engineer (TSE) for Individual Under subproject ‘Overhaul of IDA / D0410 Village Investments Post Consultant Open 5,600.00 0.00 2020-02-21 2020-02-18 2020-04-10 2020-05-01 2020-06-05 2020-12-02 Implementation kindergarten in Kaldyk Selection village, Zhaiyl region, Chui oblast’

IDA-VIP3-T-IC-2020-4 / Technical Supervision Engineer (TSE) for Individual Under subproject “Construction of a IDA / D0410 Village Investments Post Consultant Open 5,600.00 0.00 2020-03-18 2020-03-16 2020-05-06 2020-05-27 2020-07-01 2020-12-28 Implementation kindergarten Ken-Aral Selection village, Bakai-Ata region, Talas oblast”

IDA-VIP3-T-IC-2020-5 / Technical Supervision Engineer (TSE) for Individual subproject “Construction of a IDA / D0410 Village Investments Post Consultant Open 5,600.00 3,211.66 Signed 2020-03-18 2020-03-16 2020-05-06 2020-08-03 2020-05-27 2020-08-04 2020-07-01 2020-08-05 2020-12-28 kindergarten A.Ogonbaev Selection village, Talas region, Talas oblast”

IDA-VIP3-T-IC-2020-6 / Technical Supervision Engineer (TSE) for Individual Under subproject “Construction of a IDA / D0410 Village Investments Post Consultant Open 5,600.00 0.00 2020-03-18 2020-03-16 2020-05-06 2020-05-27 2020-07-01 2020-12-28 Implementation kindergarten for 50 places Selection Zherge-Tal village, Ak-Tala region, Naryn oblast”

IDA-VIP3-T-IC-2020-7 / Technical Supervision Engineer (TSE) for Individual Under subproject “Construction of a IDA / D0410 Village Investments Post Consultant Open 5,600.00 0.00 2020-03-18 2020-03-16 2020-05-06 2020-05-27 2020-07-01 2020-12-28 Implementation kindergarten for 50 places Selection Zher-Kechkyu village, Naryn region, Naryn oblast”

IDA-VIP3-T-IC-2020-8 / Technical Supervision Engineer (TSE) for Individual subproject “Construction of a IDA / D0410 Village Investments Post Consultant Open 7,100.00 4,628.29 Signed 2020-05-19 2020-05-18 2020-07-07 2020-08-03 2020-07-28 2020-08-04 2020-09-01 2020-08-05 2021-02-28 kindergarten for 100 places Selection Ak-Sai village, Ton region, Issyk-Kul oblast”

IDA-VIP3-T-IC-2020-9 / Technical Supervision Engineer (TSE) for Individual subproject “Construction of IDA / D0410 Village Investments Post Consultant Open 7,100.00 5,133.08 Signed 2020-05-19 2020-05-18 2020-07-07 2020-08-03 2020-07-28 2020-08-04 2020-09-01 2020-08-05 2021-02-28 an additional building for Selection "Zhetigen" Kindergarten in Beryu-Bash village, Ak-Suu region, Issyk-Kul oblast”

IDA-VIP3-T-IC-2020-10 / Technical Supervision Engineer (TSE) for Individual Under subproject “Construction of IDA / D0410 Village Investments Post Consultant Open 5,600.00 0.00 2020-05-19 2020-05-18 2020-07-07 2020-07-28 2020-09-01 2021-02-28 Implementation FAP in Tamchy-Bulak Selection village, Kara-Buura region, Talas oblast”

Page 4 IDA-VIP3-T-IC-2020-11 / Technical Supervision Engineer (TSE) for Individual subproject “Construction of IDA / D0410 Village Investments Post Consultant Open 5,600.00 3,460.08 Signed 2020-05-20 2020-05-18 2020-07-08 2020-08-03 2020-07-29 2020-08-04 2020-09-02 2020-08-05 2021-03-01 FAP in Chon-Tash village, Selection Tyup region, Issyk-Kul oblast”

IDA-VIP3-T-IC-2020-12 / Technical Supervision Individual Engineer (TSE) for Under IDA / D0410 Village Investments Post Consultant Open 5,600.00 0.00 2020-05-20 2020-05-18 2020-07-08 2020-07-29 2020-09-02 2021-03-01 subproject “Construction of Implementation Selection Library in Ottuk village, Naryn region, Naryn oblast”

IDA-VIP3-T-IC-2020-13 / Technical Supervision Engineer (TSE) for subproject “The device of a Individual Under sewer collector and IDA / D0410 Village Investments Post Consultant Open 5,600.00 0.00 2020-06-16 2020-05-20 2020-08-04 2020-08-25 2020-09-29 2021-03-28 Implementation connection to a city network Selection in Nijnealarcha village, Alamudun region, Chui oblast”

VIP-S-CQ-20-2 / The geo- referencing to the area design documents (DDE), calculation of the estimated cost of works and materials, and conducting supervision IDA / D0410 Village Investments Post Direct Selection Direct 5,000.00 0.00 Canceled 2020-05-22 2020-08-13 2020-05-29 2020-06-03 2020-08-02 of the facility of Construction of a kindergarten for 50 children in the village of Maimak, Kara-Buura Raion

IDA-VIP3-IC-20-13 / Development Cost Estimate Individual for the Capital Repair of the Under IDA / D0410 Village Investments Post Consultant Open 2,000.00 0.00 2020-07-13 2020-08-18 2020-08-17 2020-08-20 2020-08-26 2020-11-24 building of School Implementation Selection Stravopolovka of Jaiyl Ragion, Chui Region

IDA-VIP-S-DC-20-3 / The geo-referencing to the area of deteiled design documents (DDE), calculation of the estimated cost of works and materials, and conducting IDA / D0410 Village Investments Post Direct Selection Direct 13,500.00 12,195.12 Signed 2020-07-20 2020-07-23 2020-07-27 2020-08-03 2020-08-01 2020-08-15 2020-09-30 supervision of the facility of Construction of a kindergarten for 100 children in the village of Taldy- Suu,IK

IDA-VIP-S-DC-20-8 / author's supervision Construction of an additional building for "Zhetigen" IDA / D0410 Village Investments Post Direct Selection Direct 2,000.00 1,460.18 Signed 2020-07-24 2020-08-13 2020-08-03 2020-08-19 2020-08-07 2020-08-26 2021-03-05 Kindergarten in Beryu-Bash village, Ak-Suu region, Issyk- Kul oblast

IDA-VIP-S-DC-20-9 / Author's supervision of Construction of FAP in IDA / D0410 Village Investments Post Direct Selection Direct 2,000.00 730.09 Signed 2020-07-24 2020-08-13 2020-08-03 2020-08-19 2020-08-06 2020-08-26 2021-01-03 Tamchy-Bulak village, Kara- Buura region, Talas oblast

Page 5 IDA-VIP-S-DC-20-10 / Author's supervision of construction of a IDA / D0410 Village Investments Post Direct Selection Direct 2,000.00 878.40 Signed 2020-07-24 2020-08-13 2020-08-03 2020-08-19 2020-08-06 2020-08-26 2021-01-03 kindergarten A.Ogonbaev village, Talas region, Talas oblast

IDA-VIP-S-DC-20-11 / Author's supervision of construction of a IDA / D0410 Village Investments Post Direct Selection Direct 2,000.00 1,169.07 Signed 2020-07-24 2020-08-13 2020-08-03 2020-08-19 2020-08-06 2020-08-26 2021-01-03 kindergarten Ken-Aral village, Bakai-Ata region, Talas oblast

IDA-VIP-S-DC-20-12 / Autho с r's supervision of onstructio n of a kindergarten Zher-Ke IDA / D0410 Village Investments Post Direct Selection Direct 2,000.00 1,226.87 Signed 2020-07-24 2020-08-13 2020-07-30 2020-08-19 2020-08-07 2020-08-26 2021-01-04 chkyu village, Naryn region, Naryn oblast

IDA-VIP-S-DC-20-13 / Author's supervision of Construction of a IDA / D0410 Village Investments Post Direct Selection Direct 2,000.00 1,746.01 Signed 2020-07-24 2020-08-13 2020-07-30 2020-08-19 2020-08-07 2020-08-26 2021-01-04 kindergarten Zherge-Tal village, Ak-Tala region, Naryn oblast

IDA-VIP-S-DC-20-14 / Author's supervision of Under Construction of a IDA / D0410 Village Investments Post Direct Selection Direct 1,322.00 1,155.89 2020-07-24 2020-08-13 2020-07-30 2020-08-19 2020-08-07 2021-03-05 Implementation kindergarten Ak-Sai village, Ton region, Issyk-Kul oblast

IDA-VIP-S-DC-20-15 / Author's supervision of Under Construction of FAP in Chon- IDA / D0410 Village Investments Post Direct Selection Direct 2,000.00 0.00 2020-07-24 2020-08-13 2020-07-30 2020-08-07 2021-01-04 Implementation Tash village, Tyup region, Issyk-Kul oblast

IDA-VIP-S-DC-20-16 / Author's supervision of Under Construction of Library in IDA / D0410 Village Investments Post Direct Selection Direct 2,000.00 0.00 2020-07-24 2020-08-13 2020-07-30 2020-08-07 2021-01-04 Implementation Ottuk village, Naryn region, Naryn oblast

IDA-VIP-S-DC-20-1 / The geo-referencing to the area of deteiled design documents (DDE), calculation of the estimated cost of works and materials, and conducting IDA / D0410 Village Investments Post Direct Selection Direct 5,500.00 4,728.87 Signed 2020-08-03 2020-08-13 2020-08-09 2020-08-24 2020-08-12 2020-08-26 2020-11-10 supervision of the facility of Construction of a kindergarten for 50 children in the village of Dobolu, Naryn Raio

IDA-VIP-S-DC-20-2 / The geo-referencing to the area design documents (DDE), calculation of the estimated cost of works and materials, and conducting supervision IDA / D0410 Village Investments Post Direct Selection Direct 5,500.00 4,728.87 Signed 2020-08-17 2020-08-24 2020-08-27 2020-08-24 2020-09-05 2020-08-26 2020-12-04 of the facility of Construction of a kindergarten for 50 children in the village of Maimak, Kara-Buura Raion

Page 6 IDA-VIP3-T-IC-2020-14 / Technical supervision consultant for sub projects of Capacity Building of Local Individual the construction of building IDA / D0410 Self-Governments and Post Consultant Open 6,000.00 0.00 Under Review 2020-10-21 2020-10-22 2020-11-12 2020-11-13 2020-11-17 2021-07-15 for a group of family doctors Communities Selection (FGP) in the village Ak- Dobo Talas oblast(3 cycle)

IDA-VIP-S-DC-20-17 / Author's supervision of the construction drainage Pending collector and conection IDA / D0410 Village Investments Post Direct Selection Direct 2,500.00 0.00 2020-10-25 2020-10-27 2020-10-30 2021-03-29 Implementation Bishkek City net in the Chui oblast, Alamudun rajion, Nijnee Ala-Archa

Page 7