the },T{Izoram Gazette Published by Authoritv
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Request for Proposal Vol-III
Request For Proposal Vol-III For Construction of Two Lane Road on NH Specifications From Paletwa to India-Myanmar Border (Zorinpui) from km 0.00 to km 109.2 in Chin State of Myanmar on Engineering, Procurement & Construction Mode Detailed Project Report MINSTRY OF EXTERNAL AFFAIRS NEW DELHI February, 2016 Preparation of Detailed Engineering Project Report for Two Lane Road from Paletwa to Zorinpui (India Myanmar Border) in Chin State of Myanmar CONTENTS S.no. Description Pages 0.0 EXECUTIVE SUMMARY 0-1 to 0-13 1.0 INTRODUCTION 1-1 to 1-5 1.1 General 1-1 1.2 Project Background 1-1 1.3 Scope of Consultancy 1-3 1.4 Project Objectives 1-4 1.5 Report Structures 1-4 2.0 METHODOLOGY ADOPTED 2-1 to 2-4 2.1 Introduction 2-1 2.2 Highway Planning/Design 2-2 2.3 Topographic Map Study 2-3 2.4 Traffic Study 2-3 2.5 Pavement Option Study 2-3 2.6 Geotechnical & Material Investigation 2-3 2.7 Environmental Impact Assessment 2-4 2.8 Bridges &Culverts 2-4 3.0 PROJECT DESCRIPTION 3-1 to 3-12 3.1 General 3-1 3.2 Project Road 3-1 3.3 Geology 3-2 3.4 Rivers/Streams/Water Crisis 3-2 3.5 Climate 3-2 3.6 Socio Economic Profile 3-3 4.0 ENGINEERING SURVEYS AND INVESTIGATIONS 4-1 to 4-17 4.1 General 4-1 4.2 Reconnaissance 4-1 4.3 Population 4-1 4.4 Topographic survey 4-7 4.5 Material Investigations 4-7 4.6 Sub – Soil Investigations for Bridges 4-16 Contents i Detailed Project Report Preparation of Detailed Engineering Project Report for Two Lane Road from Paletwa to Zorinpui (India Myanmar Border) in Chin State of Myanmar 5.0 DESIGN STANDARDS AND PROPOSED CROSS 5-1 -
2020 Special Issue
Journal Home page : www.jeb.co.in « E-mail : [email protected] Original Research Journal of Environmental Biology TM p-ISSN: 0254-8704 e-ISSN: 2394-0379 JEB CODEN: JEBIDP DOI : http://doi.org/10.22438/jeb/4(SI)/MS_1903 Plagiarism Detector Grammarly Ichthyofauna of Dampa Tiger Reserve Rivers, Mizoram, North-Eastern India Lalramliana1*, M.C. Zirkunga1 and S. Lalronunga2 1Department of Zoology, Pachhunga University College, , Aizawl-796 001, India 2Systematics and Toxicology Laboratory, Department of Zoology, Mizoram University, Aizawl – 796 004, India *Corresponding Author Email : [email protected] Paper received: 04.02.2020 Revised received: 03.07.2020 Accepted: 10.07.2020 Abstract Aim: The present study was undertaken to assess the fish biodiversity in buffer zone of rivers of the Dampa Tiger Reserve, Mizoram, India and to evaluate whether the protected river area provides some benefits to riverine fish biodiversity. Methodology: Surveys were conducted in different Rivers including the buffer zone of Dampa Tiger Reserve during the period of November, 2013 to May, 2014 and October, 2019. Fishes were caught using different fishing nets and gears. Collected fish specimens were identified to the lowest possible taxon using taxonomic keys. Specimens were deposited to the Pachhunga University College Museum of Fishes (PUCMF) and some specimens to Zoological Survey of India (ZSI) Kolkata. Shannon-Wiener diversity index was calculated. Results: A total of 50 species belonging to 6 orders, 18 families and 34 genera were collected. The order Cypriniformes dominated the collections comprising 50% of the total fish species collected. The survey resulted in the description of 2 new fishOnline species, viz. -
Pseudolaguvia Virgulata, from Mizoram, India
http://sciencevision.info Sci Vis 10 (2), 73 Research Report April-June, 2010 ISSN 0975-6175 On the new catfish, Pseudolaguvia virgulata, from Mizoram, India Lalramliana Department of Zoology, Pachhunga University College, Mizoram University, Aizawl 796001, India A new species of catfish was recently identi- fied from some major rivers of Mizoram. Heok Hee Ng and Lalramliana named the new catfish Pseudolaguvia virgulata, after its distinctively striped colour pattern (virgulata = “striped” in Latin). Besides its distinctive colour pattern, which consists of pale stripes running along the entire length of the body, a pale y-shaped marking on the head and brown stripes running through the caudal fin lobes, the new catfish also differs from congeners in other characters. These in- clude: head width 21.2–24.4% standard length; pectoral-fin length 28.5–29.1% standard length; length of dorsal-fin base 17.2–19.9% standard length; dorsal-spine length 21.5–24.0% standard length; serrated anterior edge of dorsal spine; thoracic adhesive apparatus reaching beyond base of last pectoral-fin ray; body depth at anus 14.5–17.4% standard length; length of adipose- fin base 12.9–15.0% standard length; caudal peduncle length 18.2–20.2% standard length; caudal peduncle depth 7.8–9.7 % standard length; snout length 48.0–54.9% head length; interorbital distance 29.3–35.2% head length; 29 –30 vertebrae. Pseudolaguvia virgulata was collected from river system, one of the three rivers that form clear, shallow, moderately flowing streams with the Ganges Delta. a predominantly sandy bottom. -
Project Staff
Project Staff Thanhlupuia : Research Officer Ruth Lalrinsangi : Inspector of Statistics Lalrinawma : Inspector of Statistics Zorammawii Colney : Software i/c Lalrintluanga : Software i/c Vanlalruati : Statistical Cell Contents Page No. 1. Foreword - (i) 2. Preface - (ii) 3. Message - (iii) 4. Notification - (iv) Part-A (Abstract) 1. Dept. of School Education, Mizoram 2009-2010 at a Glance - 1 2. Number of schools by management - 2 3. Enrolment of students by management-wise - 3 4. Number of teachers by management-wise - 4 5. Abstract of Primary Schools under Educational Sub-Divisions - 5-9 6. Abstract of Middle Schools under Educational Sub-Divisions - 10-16 7. Abstract of High Schools under Educational Districts - 17-18 8. Abstract of Higher Secondary Schools under Educational Districts - 19-23 Part-B (List of Schools with number of teachers and enrolment of students) PRIMARY SCHOOLS: Aizawl District 1.SDEO, AizawlEast - 25-30 2.SDEO, AizawlSouth - 31-33 3.SDEO, AizawlWest - 34-38 4. SDEO, Darlawn - 39-41 5.SDEO, Saitual - 42-43 Champhai District 6.SDEO, Champhai - 44-47 7. SDEO, Khawzawl - 48-50 Kolasib District 8. SDEO, Kolasib - 51-53 9. SDEO, Kawnpui - 54-55 Lawngtlai District 10. EO, CADC - 56-59 11. EO, LADC - 60-64 Lunglei District 12.SDEO, LungleiNorth - 65-67 13.SDEO, LungleiSouth - 68-70 14.SDEO, Lungsen - 71-74 15. SDEO, Hnahthial - 75-76 Mamit District 16. SDEO, Mamit - 77-78 17. SDEO, Kawrthah - 79-80 18.SDEO, WestPhaileng - 81-83 Saiha District 19. EO, MADC - 84-87 Serchhip District 20. SDEO, Serchhip - 88-89 21. SDEO, North Vanlaiphai - 90 22.SDEO, Thenzawl - 91 MIDDLE SCHOOLS: Aizawl District 23.SDEO, Aizawl East - 93-97 24.SDEO, AizawlSouth - 98-99 25. -
AHEC-IITR/SHP Data Base/July 2016 202 MIZORAM IDENTIFIED FUTURE PROJECTS
MIZORAM PROJECTS COMMISSIONED Sl no. Name of District Unit Total Net Design Turbine Commissionin Grid/ Units Remarks Project Capacity Capacity Head Discharge Schedule Voltage/ Generated (no.xkW) kW m (cumecs) Type Make Isolated 12 3 4 567 8 910111213 1 Kau-Tlabung 2x1500 3000 200 2005 ROR 2 Khawiva 3x350 1170 110 1 Horz. Turgo Impulse Jyoti 1988 ROR 3 Laililui 1x15 150 Jyoti 1993 ROR 4 Lao 1x15 150 13 Horz. Tubular Jyoti 1992 ROR 5 Leiva 1x50 50 2000 ROR 6 Maicham Saiha 2x1000 2000 150 1 Horz. Turgo Impulse Jyoti 1996 ROR 7 Ramrilui 2x1500 3000 1997 ROR 8 Serilui-A Aizwal 1x500+2x250 1000 148 0.04 Horz. Turgo Impulse Jyoti 1992 ROR 9 Tuila Aizwal 2x15 30 4 0.02 Horz. Tubular Jyoti 1987 ROR 10 Tuipanglui 2x1500 3000 243 2 Horz. Turgo Impulse 2004 ROR 11 Tuipui Aizwal 2x250 2500 75 1 Horz. Francis Flovel 1991 ROR 12 Tuirivang Aizwal 3x100 300 28 Horz. Francis Jyoti 1989 ROR 13 Tuisumpui Aizwal 3x150 450 40 1 Horz. Francis Jyoti 1992 ROR 14 Vavralui 1x50 170 1997 ROR 15 Teirei 2x1500 3000 42 8 Horz. Francis 1999 ROR 16 Tuidum Aizwal 1500 1992 ROR 17 Maicham-II Saiha 2x1500 3000 2007 ROR 18 Serilui-B Aizwal 3x4000 12000 Total = 36470 AHEC-IITR/SHP Data Base/July 2016 202 MIZORAM IDENTIFIED FUTURE PROJECTS Sl no. Name of Name of Name of Category Name of Capacity Head Discharge Remarks Verified Project State District of Proj river/ in in in * canal kW m m3/sec 1 Ainaklui Mizoram Chhimtuipui ROR 50 40 Under Investigation 2 Bualanukham Mizoram Chhimtuipui ROR 50 22 Under Investigation 3 Chawngte Mizoram ROR 150 30 Under Investigation 4 Cheului Mizoram Chhimtuipui ROR 50 40 Under Investigation 5 Chiahpui Mizoram Aizawl ROR 20 20 Under Investigation 6 Chikurlui Mizoram Chhimtuipui ROR 15 20 Under Investigation 7 Chunghkum Mizoram ROR 100 100 Under Investigation 8 Dhaleswari -I Mizoram DB Dhaleswari Brk. -
The Mizoram Gazette Published by Authority
The Mizoram Gazette EXTRA ·ORDINARY Published by Authority REGN. NO. N.E.-313 (MZ) Rs. 2/- per Issue VOL. XXX" Aizawl. Wednesday, 26.4.2006, Valsakha 6, S.E. 1928, Issue No. 103 NOTfCATION No. B. 14016/3/02-LAD/VC, the 18th April, 2006. In exercise of the powers co nferred by Section 7(1 )(2), Section 15 and Section 22(1) of the Lusbai Hills District (Village Councils) Act, 1953, as amended from time to time, the Gover- nor of Mizoram is pleased to approve Executive Body of the following Village Councils as shown in the enclosed Annexure within Cha mphai District. R. Sangliankhuma, Addl. Secretary, Local Administration Department. ANNEXURE CHAMPHAI DISTRICT -........------;-------- ----- 1 2 3 4 I4-KHAWBUNG Ale 1. Buang 1. Tinlinga· President 2. Thangchhinga Vice President & Treasurer 3. K. Lalzawngliana Secretary 4. ParlaV\oma Crier Ex-103/20C6 2 1 2 3 4 2. Bungzung J. Lalringzuala President 2. Lalpianfa Vice Pr�sider.t 3. La]zapa Trt:asurer 4. Lalhmingliana Secretary 5. Sangkhuma Crier 3. Bulfekzawl 1. Vanlalrin ga President 2. Chhunkhuma Vice Presifient 3. Chh un tb angvunga Treasurer 4. Laltums2nga Seer etary 5. I. F. }.'Iallga Crier 4. Chawngtui -E' Not yet formed Executive Body 5. Dungtlang 1. H. Laldin gliana President ., .. C. Zalawma Vice President 3. K. LaIthlamuana Treasurer 4. C. Lalzama Secretary 5. Kaprothanga Crier l 6. Farkawn 1. Lalslama President 2. Manghupa Vice President 3. Engm av. ia Treasurer 4. Ljansailova Secretary 5. Lalrawna Crier 7. Hruaikawn 1. C. Hranghleikapa President 2. Sangtinkulha Vice President 3. Sa ngtha n gpuia Treasurer 4 . -
2020-2021 Institutional Best Practice
INTERNAL QUALITY ASSURANCE CELL (IQAC) GOVERNMENT J. THANKIMA COLLEGE 2020-2021 ACADEMIC SESSION BEST PRACTICE 1 UTILIZATION OF ICT AND ONLINE CLASSES 1. Title of the Practice: Utilization of ICT and Online Classes ▪ The sudden outbreak of Corona Virus worldwide with the inclusion of Mizoram has resulted in the suspension of the Conventional face to face Classroom teaching, with effect from March, 2020. However, classes were continued through online mode for the benefit of the student- learners. Zoom classes and power point presentations with audio were carried out as much as possible. Classes were also conducted through WhatsApp messengers, which also act as an instrument for announcement and monitoring the students on a daily basis. 2. Objectives of the practice: ▪ Due to the current global health emergency, the daily routine and learning habits have probably been disrupted enormously. The inability to continue with the conventional mode of teaching after March, 2020, faculties are compelled to continue with online mode of teaching. The Institution and faculties aim at restructuring the system of teaching-learning method. ▪ Hence, online classes have been integrated into existing academic structure and process. Time Table was sorted by AEC for the convenience of conducting online classes, and classes were conducted accordingly in these unprecedented times so as to achieve and accomplish certain pre-defined, pre- existing learning goals. The objective is student-centric and in tandem with the college teaching norms: ▪ Online classes for the overall benefit of the students- i.e., making use of online tools for effective learning and effective time management during the pandemic. -
Mizoram Education (Transfer and Posting of School Teachers) Rules
The Mizoral111~Gazette~' EXTRA ORDINARY, ' ' •.. ,- '. ,I Published by Authoritv' REGN. NO. N.E.-313 (MZ) Rs. 2/- per Issue Vol. XXXV Aizawl, W~dnesday, 26.4.2006, Vaihsakha 6, S.E. 1928, Issue No. 104 No .A. 23022/5/2006 EDN, the 12th April, 2006. In exercise of th,e power con• erred by clause (xxxv) of sub-section (2) of sectidh 30 of the Mizoram Educa• tion Act, 2e03 (Act No. 5 of .2003), the Governor of Mizoram" is pleased to make the [allowing rules, namely :- . 1. SnORT TITLE? EXTENT AND COMMENCEMENT : (1) These Rules may be called the Mizoram Education (Transfer and . Posting of School Teachers) Rules, 2006, (2) It shall extend to the whole of Mizoram in respect of Elementary ,Educdtion and Secondary£ducation, except Chakllla Autonomous District, Lai Autonomou3 District and Mara Autohomous Dis• trict in respect of Elementary Education 'only. (3) These rul es shall com::: into force from til~ date of notificati on in the Mizoram Gazette. 2. IN THESE RULES, UNLESS THE CONTEXT OTHERWISE REQUIRES : ;- (1')' "Act" means MizoramEducati~n Act, 2003 (Act No. 5 of 2003) (2) ""Appropriate AuthoJity" shall mean the authority.as specified in Rule 9; (3) "District" means the jurisdiction area prescribed by tb.e Government of District Education Officer; (4) "Elementary School" means Primary Schools and Middle Schools~ (5) "Government" means the Government of Mizoram. (€i) "Sanctioned strellgth'>"me'<lDSth.t' number of posts 'of teachers as a 'particular School as Sanctiolled by the Government., -', , (-7) "Schedule" m6anl~a Schedul~ appended .,to these Rule·s; -l"fl' Ex-l04/2006 2 (8) "Secondary School" means High Schools and Higher Secondary Schools. -
SDEO CHAMPHAI Sl
SELECTED CANDIDATES FOR TEMPORARY ENGAGEMENT OF MIDDLE SCHOOL HINDI TEACHERS UNDER CSS WITH PLACE OF POSTING, 2020-2021 UNDER SDEO CHAMPHAI Sl. Name of Name and Address Qualification Remarks Name Of School Place of Posting No Training Hindi General Lalkhawngaihkimi Praveen Hindi Shikshan 1 D/o Nghakliana HSSLC Govt Vangchhia M/S SDEO Champhai (Mizoram) Diploma Khuangthing H/No V-57 Jenny Lalrinmawii Praveen Hindi Shikshan 2 D/o B.Chhuahkhama HSSLC Govt Hmunhmeltha M/S SDEO Champhai (Mizoram) Diploma Hmunhmeltha, Champhai Lynda Zomuanpuii Praveen Hindi Shikshak Govt Middle School,New 3 D/o M.Liana HSSLC SDEO Champhai (Mizoram) Diploma Hruaikawn Bungkawn AW-31(A) C.Zalianpari Praveen 4 D/o C.Lalmuana B.A Parangat Govt Mualkawi M/S SDEO Champhai (Mizoram) Mualkawi,Champhai District Lalhriattiri D/o Kepliana Praveen Hindi Shikshak 5 HSSLC Thekpui UPS SDEO Champhai Farkawn,Theirekawn (Mizoram) Diploma Champhai Dist. Nangkapliana Praveen Hindi Shikshak 6 S/o SB Sawngkhawzama HSSLC Govt. Border M/S, Sesih SDEO Champhai (Mizoram) Diploma Ramhlun South, H/No Y-106 S.Kapkhandova Praveen Hindi Shikshan 7 S/o S.Hauzanang B.A Govt Melbuk M/S SDEO Champhai (Mizoram) Praveen Melbuk, Champhai F.Zodinpuii Praveen Hindi Shikshak 8 D/o Tlangchhana HSSLC Govt Khuangleng M/S SDEO Champhai (Mizoram) Diploma Khuangleng James Lalmalsawma S/o Siamhnuna Praveen Hindi Shikshak 9 HSSLC Presby.Eng.School,Hnahlan SDEO Champhai Durtlang Leitan, Ramthar (Mizoram) Diploma H/No LV/C-74 Vungsailiani Praveen Hindi Shikshak 10 D/o Ngindothanga HSSLC Govt Leisenzo M/S SDEO -
3669 Ha Project Cost
0 AREA : 3669 Ha Project Cost : 550.35 Lakhs Hmawngbuchhuah, Kakichhuah, Sabualtlang. Prepared by, DO, Soil & Water Conservation Deptt. 1 INDEX CHAPTER Page No. 1. Introduction ------------------------------------------3 2. Project Profile ------------------------------------------8 3. Basic Information of Project Villages ------------------------------------------13 4. Participatory Rural Appraisal ------------------------------------------14 5. Problem Typology ------------------------------------------15 6. Project Intervention Plan ------------------------------------------18 7. DPR Plan Abstract ------------------------------------------19 8. Preparatory Phase. ------------------------------------------20 9. Work Plan Details ------------------------------------------21 10. Consolidation and Withdrawal Phase. ----------------------------------23 11. Capacity Building Institute Identified ----------------------------------24 12. Institutional & Capacity building Plan ----------------------------------25 13. Basic Profile of the project location -------- -------------------------27 14. Maps of the project ----------------------------------28 15. Institutional mechanism& Agreements. ----------------------------------32 16. SWOT Analysis of PIA. ----------------------------------33 17. PIA & Watershed Committee details. ----------------------------------34 18. Convergence Plans. ----------------------------------35 19. Expected Outcomes. ----------------------------------37 20. Expected Estimate Outcomes. ----------------------------------39 -
SELESIH 2 AIZAWL EAST Aizawl
Sl No DCSO Village_Name_EN FPS_ShopName_EN 1 AIZAWL EAST Aizawl (NT) SELESIH 2 AIZAWL EAST Aizawl (NT) DURTLANG NORTH 3 AIZAWL EAST Aizawl (NT) DURTLANG - I 4 AIZAWL EAST Aizawl (NT) DURTLANG - II 5 AIZAWL EAST Aizawl (NT) DURTLANG LEITAN - I 6 AIZAWL EAST Aizawl (NT) DURTLANG LEITAN - II 7 AIZAWL EAST Aizawl (NT) BAWNGKAWN - I 8 AIZAWL EAST Aizawl (NT) BAWNGKAWN - II 9 AIZAWL EAST Aizawl (NT) BAWNGKAWN - III 10 AIZAWL EAST Aizawl (NT) BAWNGKAWN SOUTH 11 AIZAWL EAST Aizawl (NT) CHALTLANG - I 12 AIZAWL EAST Aizawl (NT) CHALTLANG - II 13 AIZAWL EAST Aizawl (NT) CHALTLANG - III 14 AIZAWL EAST Aizawl (NT) CHALTLANG -IV 15 AIZAWL EAST Aizawl (NT) LAIPUITLANG 16 AIZAWL EAST Aizawl (NT) RAMHLUN NORTH - I 17 AIZAWL EAST Aizawl (NT) RAMHLUN NORTH - II 18 AIZAWL EAST Aizawl (NT) RAMHLUN NORTH - III 19 AIZAWL EAST Aizawl (NT) RAMHLUN SPORT COMPLEX 20 AIZAWL EAST Aizawl (NT) RAMHLUN VENGTHAR - I 21 AIZAWL EAST Aizawl (NT) RAMHLUN VENGTHAR - II 22 AIZAWL EAST Aizawl (NT) RAMHLUN SOUTH - I 23 AIZAWL EAST Aizawl (NT) RAMHLUN SOUTH - II 24 AIZAWL EAST Aizawl (NT) RAMHLUN SOUTH - III 25 AIZAWL EAST Aizawl (NT) RAMTHAR NORTH 26 AIZAWL EAST Aizawl (NT) RAMTHAR - I 27 AIZAWL EAST Aizawl (NT) RAMTHAR - II 28 AIZAWL EAST Aizawl (NT) AIZAWL VENGLAI 29 AIZAWL EAST Aizawl (NT) RAMHLUN VENGLAI 30 AIZAWL EAST Aizawl (NT) CHANMARI EAST - I 31 AIZAWL EAST Aizawl (NT) CHANMARI EAST - II 32 AIZAWL EAST Aizawl (NT) CHANMARI WEST - I 33 AIZAWL EAST Aizawl (NT) CHANMARI WEST - II 34 AIZAWL EAST Aizawl (NT) CHANMARI WEST - III 35 AIZAWL EAST Aizawl (NT) EDENTHAR 36 AIZAWL -
Improvement and Development of Transport Infrastructure in the North East for Th E National Transport Development Policy Com Mittee
GOVERNMENT OF INDIA PLANNING COMMISSION NATIONAL TRANSPORT DEVELOPMENT POLICY COMMITTEE (NTDPC) REP ORT O F THE WORKING GROUP ON IMPROVEMENT AND DEVELOPMENT OF TRANSPORT INFRASTRUCTURE IN THE NORTH EAST FOR TH E NATIONAL TRANSPORT DEVELOPMENT POLICY COM MITTEE June, 2012 COMPOSITION OF THE WORKING GROUP Shri Vivek Sahai, Former Chairman, Railway 1 Chairman Board 2 Shri B.N. Puri, Member Secretary, NTDPC Member Chairman Inland Waterways Authority of India 3 Member (IWAI) or her representative Director General, Roads, Ministry of Road 4 Member Transport & Highways Director General, Boarder Roads Organisation 5 Member (BRO) Shri Rohit Nandan, Joint Secretary, Ministry of 6 Member Civil Aviation 7 Joint Secretary (BSM), Ministry of External Affairs Member 8 Executive Director (Projects), Railway Board Member Prof. Mahendra P. Lama, Vice Chancellor, 9 Member University of Sikkim 10 Representative of North East Council (NEC) Member Representative of Planning Commission, 11 Member Transport Division 12 Representative of Customs & Excise Board Member Representative of Asian Institute of Transport 13 Member Development (AITD) Ms. Jayashree Mukherjee, Joint Secretary, 14 Convenor DONER TERMS OF REFERNECE 1) To assess the Transport Infrastructure Deficit in the North East Region. 2) To assess the role of each mode of transport for improving the accessibility and mobility of both people and goods. 3) To make recommendations for provision of transport infrastructure and facilities keeping in view: a. the role of each mode of transport b. the requirement of traffic demand, particularly, that relating to movement of essential commodities c. need to ensure balance between the ability of transport to serve economic development of the region and to conserve enerdgy, protect environment, promote safety and sustain good quality of life.