Community Agricultural Resource Management and Competitiveness Project Ii
Total Page:16
File Type:pdf, Size:1020Kb
AGRICULTURE DEVELOPMENT FUND COMMUNITY AGRICULTURAL RESOURCE MANAGEMENT AND COMPETITIVENESS PROJECT II COMPONENT 1: COMMUNITY PASTURE AND LIVESTOCK MANAGEMENT SYSTEM ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN CONSTRUCTION OF PASTURES STOCK WATERING SYSTEM IN TOLORS VILLAGE OF SISIAN COMMUNITY OF THE RA SYUNIK MARZ November 2018 PART 1: GENERAL PROJECT AND SITE INFORMATION INSTITUTIONAL AND ADMINISTRATIVE Country Republic of Armenia Name of the Project Second Community Agricultural Resource Management and Competitiveness Subproject Title Construction of pasture stock-watering system in Tolors community of the RA Syunik marz Scope of (sub)project and The main purpose of the sub-project is the improvement of pasture stock- activity watering system in Tolors village, providing sufficient water supply for 200 cattle and 420 sheep and goat directly in the pasture. The following construction activities will be implemented under the proposed sub-project: Construction of one water catchment Construction of two discharge chamber, one pressure braking chamber Construction of inlet water pipeline 47 m (D= 50x100mm - Py=1.0 Mpa) Construction of one metallic trough with 30 m length Gravel covered bypass road 300 m with 3,5 m length Construction of 30 m2 herdsmen’s’ shelter Fence 52 m length The design for pastures watering network has been developed by the ANUSHIK JRER LLC design company under the contract concluded with Agricultural Development Found Institutional/implementation Task Team Leader Safeguard Specialists arrangements (co-TTL if applicable) (env., soc.) (World Bank) Bekzod Shamsiev Darejan Kapanadze Arusyak Alaverdyan Sophia Georgieva Institutional/implementation Implementing entity Safeguards Works provider arrangements supervisor Agriculture (if external to (to be selected) (Borrower) Development Fund Implementing Entity) N/A SITE DESCRIPTION Name of site Tolors village, Sisian community, Syunik marz Site location and description The sub-project implementation area is located at a distance of 220 km from Yerevan and 5 km from Tolors village of Sisian community. The absolute maximum height of the construction site is 2032.0. The pipeline will pass through the communal lands, particularly through 0,2 ha pasture areas in the outskirts of the village. Thus, during construction, the Project will temporary use 0,2 ha land, and this land will become usable for the community again being reinstated after completion of construction works, without any restriction of land use or access. Temporary access will be provided during construction to ensure continued mobility of livestock and herders. No part of the pipelines will pass through a private land or through lands used by illegal users. This was checked and verified via the community cadastral map and field surveys. As the construction activities will be carried out in the remote pastures, in the outskirts of the village, there is no need for temporary closure of roads, and as there are no private houses nearby, no temporary disturbance to residents may occur during the construction activities. No tree removal is anticipated. The natural relief and landscape will be recovered after construction works. Land title and user right The land required for the sub-project implementation belongs to the holder(s) Community on which the Reference provided by the Sisian Community Mayor (based on the Community cadastral map survey) is attached. Description of geographic, The sub-project site is located in Tolors village of Sisian community of the RA physical, biological, Syunik marz. The pastures, where the construction site is located are on the geological, hydrographic and altitude of 1833 m. above sea level. socio-economic context Climatic conditions of the Tolors possesses is mild mountainous. The winter is cold, snowy, temperature on winter about 16-20 C. The summer is warm, few clouds, comparatively humid weather. Precipitation is not abundant, 400- 450mm on the lake surface, up to 1000 in the mountains Tolors village due to the consolidation process in November 2017 was included in Sisian community of the RA Syunik marz. The area of Sisian community is 111631 ha, and the population is 30575, while the area of Tolors village of Sisian community is 2015 ha and the population is 450 of whom 222 men and 228 women, overall 116 households. 2.7% of the overall population of the Republic involved in the migration processes is from Syunik marz. Of the overall population of the Republic not returning and returning to the Republic, Syunik marz population is 3.9% and 1.1% respectively. Poverty rate of Syunik marz is 4.7% within the overall poverty rate of the Republic. In Tolors village, there are 6 families in the family benefit system, 53 pensioners and persons with disability. In Tolors Community Pasture User Association Consumer Cooperative established under the CARMAC II Project there are 55 members of whom 3 women and 4 youth; 5 representatives of vulnerable groups as per Project vulnerability criteria (pensioners, persons with disability, family benefit system recipients, etc.). There are 85 household involved in livestock farming of which 11 are women- headed and 8 are youth-headed households. There are approximately 1378 ha pasture areas in the community. Agriculture is the main source of livelihood for the village population, and livestock farming and crop farming are their main occupation. The main income source of the households is sales of livestock products, i.e. meat, milk and other dairy products, as well as other agricultural products. However, they mention the meat market is unstable. In the village, there are school and medical point. Of monuments of history and culture, there is Saint Hripsime Church and Monument dedicated to the Victims of World War II. Infrastructure development, including drinking water network upgrading, stock-watering system construction and obtaining agricultural machinery is the key to the development of the village as per Tolors Community Development Program for 2017-2021. Locations and distance for If additional soil is required to close the trenches or grading the nearby area, material sourcing, especially such additional soil has to be delivered by Contractors from the place aggregates, water, stones provided by the community. Gravel and stones may be purchased and delivered by the Contractor. Contractor may choose to extract natural construction materials himself, in which case contractor must obtain an extraction license prior to commencement of extraction. Water for construction works will be provided with mobile water tanks. Waterway will be connected to the new water connection point for which Sisian community has to obtain water use permits form the Ministry of Nature Protection (MoNP) of the RA. LEGISLATION National & local legislation & Permits required for accomplishing the works planned under the sub-project: permits that apply to project Construction license to be possessed by Construction Contractor; activity Construction permit to be obtained by the Construction Contractor from Sisian municipality; Reference of submission of Water use permits provided from MoNP to Tolors village; Written consent for disposal of construction waste to be obtained by Construction Contractor from the Sisian Community Mayor; Agreement on the disposal of excess material obtained from Sisian Community Mayor; Land ownership Reference provided by the Sisian Community Mayor. PUBLIC CONSULTATION When / where the public Public consultation on the present draft ESMP will be carried out in Tolors consultation process took village of Sisian community of the RA Syunik marz in Mid March, 2018. place Minutes of meeting and the List of participants will be attached to the ESMP. ATTACHMENTS 1. Site cadastral map, photos; 2. Reference from Sisian Community Mayor on the ownership of lands; 3. Minutes of public consultation meeting, photos (to be provided); 4. Construction permit (to be provided); 5. Reference of submission of Water use permits provided from MoNP to Tolors village; 6. Agreement for construction waste disposal, obtained from Sisian Community Mayor; 7. Agreement on the disposal of excess material obtained from Sisian Community Mayor (to be provided if required). PART 2: SAFEGUARDS SCREENING AND TRIGGERS ENVIRONMENTAL / SOCIAL SCREENING FOR SAFEGUARDS TRIGGERS Activity/Issue Status Triggered Actions 1. Infrastructure rehabilitation [x] Yes [ ] No If “Yes”, see Section A below 2. New construction of small [x] Yes [ ] No If “Yes”, see Section A infrastructure below 3. Impacts on surface drainage system [ ] Yes [x] No If “Yes”, see Section B below 4. Impacts on historic / cultural [ ] Yes [x] No If “Yes”, see Section C Will the site heritage below activity include/involve 5. Handling hazardous / toxic [ ] Yes [x ] No If “Yes”, see Section D any of the materials1 below following? 6. Impacts on forests, wetlands, [ ] Yes [x] No If “Yes”, see Section E below protected areas 7. Risk of unexploded ordinance [ ] Yes [x] No If “Yes”, see Section F below (UXO) 8. Risks for traffic and pedestrians [ ] Yes [x] No If “Yes”, see Section G below 9. Impacts on land property and use [ ] Yes [x] No If “Yes”, see Section H below 10. Social risk [x] Yes [ ] No If “Yes”, see Section I below 1 Toxic / hazardous material includes but is not limited to asbestos, toxic paints, noxious solvents, removal of lead paint, etc. PART 3: MITIGATION MEASURES ACTIVITY PARAMETER MITIGATION MEASURES 0. General Public (a) Local authorities and communities have been notified of upcoming