Port Lands Planning Framework Figure 6: External Placemaking Factors

Total Page:16

File Type:pdf, Size:1020Kb

Port Lands Planning Framework Figure 6: External Placemaking Factors SECTION 2 THE BIG PICTURE The Port Lands, jutting into Lake Ontario, is strategically located in close proximity to downtown Toronto at the convergence of existing and planned transportation systems. It is a significant city-building opportunity. SECTION 2 2.1 EXTERNAL PLACEMAKING FACTORS Toronto is transforming and growing Gardiner Expressway and the like no other city in North America. Keating Channel Precinct: We are in an exciting time of change The rebuilding of the Gardiner with many significant infrastructure Expressway removes the existing and development projects in the on and off ramps east of the Don works that will advance a progressive River, eliminating a significant barrier city-building agenda. Urban renewal between the Port Lands and the and redevelopment in the Port Lands broader city. The new ramps and will, in part, be defined by a number configuration of the Gardiner west of of external factors that inform the Don River shift the location of the placemaking in the Port Lands. expressway to the north and away from the Keating Channel. This move supports the city-building potential of the Keating Channel Precinct – a planned mixed-use waterfront community that will evolve as a gateway to a revitalized Port Lands. It will also enable unencumbered access to a future water’s edge promenade, and create better conditions for future high-quality open space and pedestrian-friendly environments. The precinct plan for the Keating Channel Precinct lands west of Cherry Street will be revisited as per Council direction in the context of the preferred plan for the Gardiner. 17 Port Lands Planning Framework Figure 6: External Placemaking Factors Relief Line Gardiner East Smart Track/RER External Precincts Waterfront Transit Reset Port Lands Planning Framework 18 SECTION THE BIG PICTURE - 2.1 - EXTERNAL PLACEMAKING FACTORS 4.1.1 A Regeneration Area with Enhanced Direction 2 Higher Order Transit The planning for waterfront transit Infrastructure and the Unilever to date has largely been undertaken Precinct: in a piecemeal fashion. As such, the The City Planning Division has City of Toronto, with the Toronto been advancing the development Transit Commission and Waterfront of a City-wide transit network that Toronto, are currently completing a includes many new higher-order comprehensive review of waterfront transit corridors. A number of these transit initiatives from Long Branch in planned corridors are located within the west to Woodbine Avenue in the close proximity to the Port Lands. A east. A key objective of this initiative new transit hub is proposed in the is to advance an overall vision and vicinity of the existing GO rail corridor, plan for a continuous waterfront consisting of a Smart Track/Regional streetcar line in a dedicated right- Express Rail stop and a Relief Line of-way in the context of current and subway station. These new higher- emerging transit initiatives in the city. order transit lines will not only provide The work advanced as part of the much needed relief to the Yonge Lower Don Lands Infrastructure EA and Subway line, but will also support the the Port Lands and South of Eastern redevelopment of the Unilever Precinct Transportation and Servicing Master into a major new satellite office Plan is informing this initiative. destination supported by retail and services in a compact urban form. It was assumed as part of the Framework process that in time the The prospect of a major new office dedicated transit corridor would be destination is an exciting one. It has constructed to connect to the Port the potential to attract new, well- Lands. Interim measures, such as paid jobs for Torontonians and enable buses in dedicated lanes and rights-of- our economy to flourish. Creating way, may be implemented to provide synergies between the Unilever a higher level of transit service into Precinct and the Port Lands is a the Port Lands until such a time as key consideration in planning and streetcar service is extended eastward coordinating infrastructure investment or southward. The current work being between the Port Lands and South of undertaken as part of Waterfront Transit Eastern areas. Reset will have substantial benefit for the Port Lands, including the potential Waterfront Transit Reset: for comprehensively funding and Transit to the Port Lands is vital constructing a key transit priority route to achieve the overall vision in this into the Port Lands. Framework. The Central Waterfront Secondary Plan (CWSP) calls for early implementation of higher order transit in order to encourage transit-oriented travel patterns for new waterfront residents and employees. The Plan identifies a new waterfront transit network across the Central Waterfront from Exhibition Place to the Port Lands. 19 Port Lands Planning Framework 2.2 THE PORT LANDS AT A GLANCE Revitalization and redevelopment to the shoreline and marsh began of the Port Lands is one chapter in with a series of breakwaters being a much larger story — one that has constructed. The Keating Channel was unfolded over centuries and will constructed along the northern edge continue to evolve for years to come. of the marsh in the late 1890s. There have been a series of successive waves of development that have But it was in 1912 that the transformation contributed to the legacy present of the marsh got underway in today in the Port Lands. earnest with the Toronto Harbour Commissioners’ plan to create a massive Late 19th and Early 20th new industrial district with waterfront Centuries parks. The lake-filling to create most The Port Lands area entirely comprises of the Port Lands and the initial Ship lands that were created in Lake Channel and Turning Basin began in 1916 Ontario and Ashbridge’s Bay Marsh. and was complete by the 1920s. Cousins The Don River originally emptied Quay was created through additional into Ashbridge’s Bay Marsh before lake-filling activities in the 1930s. Initially, entering the Inner Harbour. Starting the Port Lands was envisioned to be a in the 1870s, man-made interventions gateway to shipping for Toronto, but The Port Lands: An Evolving Shoreline Toronto Shoreline 1886 Toronto Shoreline 1920s Toronto Shoreline 1960 Toronto Shoreline Today Toronto Shoreline 2025 Port Lands Planning Framework 20 SECTION THE BIG PICTURE - 2.2 - THE PORT LANDS AT A GLANCE 2 Toronto never gained a stronghold on the Hearn Generating Station and this industry like other Canadian cities. associated hydro-electric infrastructure, as well as the Commissioners Mid 1900s Incinerator. These buildings ushered Starting in the 1950s, a second wave in an era of the Port Lands providing of development began with three important civic uses to serve the important events - construction of the broader city. Leslie Spit, construction of iconic civic infrastructure and the opening of the The opening of the St. Lawrence St. Lawrence Seaway. Seaway in the late 1950s brought with it a renewed hope that Toronto could Since initial work began on the Spit, become a port city. A new marine dredged material from the Keating terminal was constructed on Cousins Channel and Outer Harbour and Quay, and there was a further expansion surplus fill from development sites of the Ship Channel with the excavation within Toronto have contributed to and construction of the Leslie Street further expansion of the Spit. Slip. Once again, these aspirations for the industrial district waned and In the early 1950s, construction began the Port Lands entered an era of little on iconic civic infrastructure with change in the 1980s and 1990s. Innocon Pinewood Toronto Studios Toronto Hydro Service Centre Ships moored in the Port Lands Leslie Street Greening Cherry Street Villiers Street Unwin Avenue 21 Port Lands Planning Framework Figure 7: The Port Lands at a Glance CA R LAW AVENUE STREET MISSIONERS COM D O N RO ADWA Y CHANNEL ING KEAT L CH NE ERRY AN CH S TR E ET SHIP INN ER HAR B OUR R BOU OUTER HAR Heritage Buildings + Structures Hydro Infrastructure Active Port Uses Pinewood Secure Perimeter Ports Toronto Film + Film Related Active Port Edge Existing Parks + Open Spaces Unilever Precint Unilever Precinct Area of Influence Port Lands Planning Framework 22 SECTION THE BIG PICTURE - 2.2 - THE PORT LANDS AT A GLANCE 2 Late 1900s to the present detailed planning for the Central With the Port Lands and other areas Waterfront, including the Port Lands. along the Central Waterfront being largely seen as underutilized in the Planning for the naturalized river valley 1990s, plans started to be developed began in 2004 with the preparation to transform the waterfront with mixed of a terms of reference associated recreational, cultural, commercial and with the Don Mouth Naturalization residential uses and to reconnect the Don of the Port Lands Flood Protection River with the Outer Harbour. In 1990, Project Environmental Assessment the Royal Commission of the Future of (DMNP EA). The 2007 International the Toronto Waterfront (the Crombie Design Competition for the Lower Commission) issued its Watershed Interim Don Lands produced a bold and Report, which recommended green compelling concept for the Lower Don industries and parkland be established in Lands with the re-naturalized river as the Port Lands. Shortly thereafter, a plan a central feature. The DMNP EA for the by the Task Force to Bring Back the Don naturalized river valley and associated was issued, the centerpiece of which was flood protection infrastructure was the re-naturalization and reconnection of completed and approved in 2015. the Don River. Equally important in the evolution of Further planning work ensued through the Port Lands was the development the 1990s and early 2000s with a of production studio infrastructure in number of plans being developed the area. The most notable was the for the Port Lands and broader Film Port development, now Pinewood waterfront.
Recommended publications
  • 3131 Lower Don River West Lower Don River West 4.0 DESCRIPTION
    Lower Don River West Environmental Study Report Remedial Flood Protection Project 4.0 DESCRIPTION OF LOWER DON 4.1 The Don River Watershed The Don River is one of more than sixty rivers and streams flowing south from the Oak Ridges Moraine. The River is approximately 38 km long and outlets into the Keating Channel, which then conveys the flows into Toronto Harbour and Lake Historic Watershed Ontario. The entire drainage basin of the Don urbanization of the river's headwaters in York River is 360 km2. Figure 4.1 and Figure 4.2, on the Region began in the early 1980s and continues following pages, describe the existing and future today. land use conditions within the Don River Watershed. Hydrologic changes in the watershed began when settlers converted the forests to agricultural fields; For 200 years, the Don Watershed has been many streams were denuded even of bank side subject to intense pressures from human vegetation. Urban development then intensified settlement. These have fragmented the river the problems of warmer water temperatures, valley's natural branching pattern; degraded and erosion, and water pollution. Over the years often destroyed its once rich aquatic and during the three waves of urban expansion, the terrestrial wildlife habitat; and polluted its waters Don River mouth, originally an extensive delta with raw sewage, industrial/agricultural marsh, was filled in and the lower portion of the chemicals, metals and other assorted river was straightened. contaminants. Small Don River tributaries were piped and Land clearing, settlement, and urbanization have buried, wetlands were "reclaimed," and springs proceeded in three waves in the Don River were lost.
    [Show full text]
  • ONTARIO HYDRO CA9301039 Nf — 13/73
    ONTARIO HYDRO CA9301039 n f — 13/73 rT m *rr! w~ LET'S GIVE TOMORROW A HAND serves the people of Ontario by supplying reliable electricity services at a competitive price. It provides consumers with information and programs on the wise use of energy and offers customers financial incentives to invest in energy efficient technology. Ontario Hydro has assets of more than S4.i billion, making it one of the largest public utilities in North America. 1 he Corporation employs more than _;.Odd regular and approximately 6.01)0 part-time and temporary staff. Created in M>f> by special provincial statute. Ontario Hydro operates under the Power Corporation Act to deliver electricity throughout Ontario. It also produces and sells steam and hot water as primary products. It regulates Ontario's municipal utilities and. in co-operation with the Canadian Standards Association, is responsible for the inspection and approval of electrical equipment and wiring throughout the province. Ontario Hydro operates 31 hydroelectric, nuclear and fossil-fuelled generating stations as well as a transmis- sion system that distributes power to customers across the province. The Corporation supplies electricity directly to about ^25.000 rural retail customers. It also sells power to .^1 I municipal utilities serving 2.2 million Ontario customers, and provides electricity directly to almost 110 large industrial customers with load requirements in excess of five megawatts. Ontario Hydro is a financially self-sustaining corporation without share capital. Bonds and notes issued by Hydro are guaranteed by the Province of Ontario. The Corporation is governed by a Board of Directors, consisting of up to 1" members.
    [Show full text]
  • Acoustic Telemetry in Toronto Harbour: Assessing Residency, Habitat Selection, and Within-Harbour Movements of Fishes Over a Five-Year Period
    Acoustic telemetry in Toronto Harbour: assessing residency, habitat selection, and within-harbour movements of fishes over a five-year period Jonathan D. Midwood1, Andrew M. Rous2, Susan E. Doka1, and Steven J. Cooke2 1Central and Arctic Region Fisheries and Oceans Canada 867 Lakeshore Road Burlington, ON L7S 1A1 2Carleton University Department of Biology 1125 Colonel By Dr. Ottawa, ON, K1S 5B6 2019 Canadian Technical Report of Fisheries and Aquatic Sciences 3331 1 Canadian Technical Report of Fisheries and Aquatic Sciences Technical reports contain scientific and technical information that contributes to existing knowledge but which is not normally appropriate for primary literature. Technical reports are directed primarily toward a worldwide audience and have an international distribution. No restriction is placed on subject matter and the series reflects the broad interests and policies of Fisheries and Oceans Canada, namely, fisheries and aquatic sciences. Technical reports may be cited as full publications. The correct citation appears above the abstract of each report. Each report is abstracted in the data base Aquatic Sciences and Fisheries Abstracts. Technical reports are produced regionally but are numbered nationally. Requests for individual reports will be filled by the issuing establishment listed on the front cover and title page. Numbers 1-456 in this series were issued as Technical Reports of the Fisheries Research Board of Canada. Numbers 457-714 were issued as Department of the Environment, Fisheries and Marine Service, Research and Development Directorate Technical Reports. Numbers 715-924 were issued as Department of Fisheries and Environment, Fisheries and Marine Service Technical Reports. The current series name was changed with report number 925.
    [Show full text]
  • Land Use Study: Development in Proximity to Rail Operations
    Phase 1 Interim Report Land Use Study: Development in Proximity to Rail Operations City of Toronto Prepared for the City of Toronto by IBI Group and Stantec August 30, 2017 IBI GROUP PHASE 1 INTERIM REPORT LAND USE STUDY: DEVELOPMENT IN PROXIMITY TO RAIL OPERATIONS Prepared for City of Toronto Document Control Page CLIENT: City of Toronto City-Wide Land Use Study: Development in Proximity to Rail PROJECT NAME: Operations Land Use Study: Development in Proximity to Rail Operations REPORT TITLE: Phase 1 Interim Report - DRAFT IBI REFERENCE: 105734 VERSION: V2 - Issued August 30, 2017 J:\105734_RailProximit\10.0 Reports\Phase 1 - Data DIGITAL MASTER: Collection\Task 3 - Interim Report for Phase 1\TTR_CityWideLandUse_Phase1InterimReport_2017-08-30.docx ORIGINATOR: Patrick Garel REVIEWER: Margaret Parkhill, Steve Donald AUTHORIZATION: Lee Sims CIRCULATION LIST: HISTORY: Accessibility This document, as of the date of issuance, is provided in a format compatible with the requirements of the Accessibility for Ontarians with Disabilities Act (AODA), 2005. August 30, 2017 IBI GROUP PHASE 1 INTERIM REPORT LAND USE STUDY: DEVELOPMENT IN PROXIMITY TO RAIL OPERATIONS Prepared for City of Toronto Table of Contents 1 Introduction ......................................................................................................................... 1 1.1 Purpose of Study ..................................................................................................... 2 1.2 Background .............................................................................................................
    [Show full text]
  • Framework Planning
    PORT LANDS PLANNING FRAMEWORK Purpose / Elements of the Planning Framework The Purpose of the Port Lands Planning Framework is to: Elements of the Planning Framework: • Integrate the other planning initiatives currently underway • An overall vision for the Port Lands and development objectives • A connections plan which will identify: • Update and refresh the vision for the Port Lands o Major and intermediate streets o Major pedestrian and cycling facilities • Provide a comprehensive picture of how the area should redevelop over the long-term and o A transit plan that also addresses City Council direction reconcile competing interests • Generalized land use direction • Provide a flexible/adaptable planning regime • Identification of character areas • A parks and open space plan which will define: • Ensure sustainable community building o Green corridors o District / Regional parks • Ensure that public and private investments contribute to the long-term vision and have o Water’s Edge Promenades lasting value • A heritage inventory and direction for listing/designating heritage resources • Provide the basis for Official Plan amendments • Urban design principles and structure plan: o Built form and building typologies • Resolve Ontario Municipal Board appeals of the Central Waterfront Secondary Plan o Special sites (catalyst uses) o Relationship of development to major public spaces o Urban design context for heritage features o Identification of major views • A high -level community services and facilities strategy • Implementation and phasing direction PROCESS WE ARE HERE PHASE 2: PHASE 1: PHASE 3: Vision / Background Recommendations Alternatives CONSULTATION Public Meeting | November 28, 2013 PORT LANDS PLANNING FRAMEWORK Port Lands Acceleration Initiative Plan (PLAI) EASTER N AV.E DON VALLEY PARKWAY EASTERN AVENUE Don River DON RIVER NOD RI REV STREET LESLIE KRAP LAKE SHORE BOULEVARD EAST Port Lands Acceleration Initiative (PLAI) TRLYA DRS The PLAI was initiated in October 2011 to: New River Crossing DON ROADWAY CARLAW AVE.
    [Show full text]
  • Peer Review EA Study Design Billy Bishop Toronto City Airport BBTCA
    Imagine the result Peer Review – EA Study Design Billy Bishop Toronto City Airport (BBTCA) Runway Expansion and Introduction of Jet Aircraft Final Report August 2015 BBTCA Peer Review of EA Study Design Report ACRONYMS AND ABBREVIATIONS ii 1.0 INTRODUCTION 1-1 1.1 Background 1-1 1.2 Current Assignment 1-3 2.0 PEER REVIEW APPROACH 2-1 2.1 Methodology 2-1 3.0 FINDINGS OF PEER REVIEW OF AECOM’S DRAFT STUDY DESIGN REPORT 3-1 3.1 EA Process and Legislation 3-1 3.2 Public Consultation & Stakeholder Engagement 3-1 3.3 Air Quality 3-2 3.4 Public Health 3-5 3.5 Noise 3-6 3.6 Natural Environment 3-10 3.7 Socio-Economic Conditions 3-11 3.8 Land Use & Built Form 3-14 3.9 Marine Physical Conditions and Water Quality 3-15 3.10 Transportation 3-15 3.11 Archaeology & Cultural Heritage 3-18 4.0 SUMMARY RECOMMENDATIONS 4-1 APPENDIX A Presentation Given to the Working Group (22 June 2015) B Presentation of Draft Phase I Peer Review Report Results (13 July 2015) i BBTCA Peer Review of EA Study Design Report ACRONYMS AND ABBREVIATIONS AERMOD Atmospheric Dispersion Modelling System ARCADIS ARCADIS Canada Inc. BBTCA Billy Bishop Toronto City Airport CALPUFF Meteorological and Air Quality Monitoring System CCG Canadian Coast Guard CEAA Canadian Environmental Assessment Act CO Carbon Monoxide COPA Canadian Owners and Pilots Association dBA Decibel Values of Sounds EA Environmental Assessment EC Environment Canada GBE Government Business Enterprise GWC Greater Waterfront Coalition HEAT Habitat and Environmental Assessment Tool INM Integrated Noise Model Ldn Day-Night
    [Show full text]
  • Rapid Transit in Toronto Levyrapidtransit.Ca TABLE of CONTENTS
    The Neptis Foundation has collaborated with Edward J. Levy to publish this history of rapid transit proposals for the City of Toronto. Given Neptis’s focus on regional issues, we have supported Levy’s work because it demon- strates clearly that regional rapid transit cannot function eff ectively without a well-designed network at the core of the region. Toronto does not yet have such a network, as you will discover through the maps and historical photographs in this interactive web-book. We hope the material will contribute to ongoing debates on the need to create such a network. This web-book would not been produced without the vital eff orts of Philippa Campsie and Brent Gilliard, who have worked with Mr. Levy over two years to organize, edit, and present the volumes of text and illustrations. 1 Rapid Transit in Toronto levyrapidtransit.ca TABLE OF CONTENTS 6 INTRODUCTION 7 About this Book 9 Edward J. Levy 11 A Note from the Neptis Foundation 13 Author’s Note 16 Author’s Guiding Principle: The Need for a Network 18 Executive Summary 24 PART ONE: EARLY PLANNING FOR RAPID TRANSIT 1909 – 1945 CHAPTER 1: THE BEGINNING OF RAPID TRANSIT PLANNING IN TORONTO 25 1.0 Summary 26 1.1 The Story Begins 29 1.2 The First Subway Proposal 32 1.3 The Jacobs & Davies Report: Prescient but Premature 34 1.4 Putting the Proposal in Context CHAPTER 2: “The Rapid Transit System of the Future” and a Look Ahead, 1911 – 1913 36 2.0 Summary 37 2.1 The Evolving Vision, 1911 40 2.2 The Arnold Report: The Subway Alternative, 1912 44 2.3 Crossing the Valley CHAPTER 3: R.C.
    [Show full text]
  • Journals of the Legislative Assmbly of the Province of Ontario, 1951, Being the Third and Fourth
    ONTW- JOURNALS OF THE OF THE PROVINCE OF ONTARIO From the 1st of February to 5th of April, 1951 Both Days Inclusive; And from the 24th to the 27th of September, 1951 Both Days Inclusive IN THE FIFTEENTH YEAR OF THE REIGN OF OUR SOVEREIGN LORD KING GEORGE VI BEING THE Third and Fourth Sessions of the Twenty-Third Legislature of Ontario SESSIONS 1951 PRINTED BY ORDER OF THE LEGISLATIVE ASSEMBLY VOL. LXXXV ' iZ., * \ ., ' ! i "r ','T'^M or r; :. u ONTARIO TORONTO Printed and Published by Baptist Johnston, Printer to the King's Most Excellent Majesty 1951 INDEX Journals of the Legislative Assembly, Ontario 15 George VI, 1951 3rd SESSION TWENTY-THIRD LEGISLATURE FEBRUARY 1st APRIL 5th, 1951 \ CTIVE SERVICE ELECTION ACT, 1951, THE: Bill No. 134, introduced and referred to Select Committee on Election Laws, 194. Reported, 223. 2nd Reading, 247. House in Committee, 250. 3rd Reading, 270. Royal Assent, 274. (15 George VI, cap. 1,) ADJOURNMENT OF THE HOUSE: See Legislative Assembly. ADMINISTRATOR OF THE PROVINCE: Recommends resolutions to the House, 55, 95. See also Lieutenant-Governor. ADOLESCENT SCHOOL ATTENDANCE ACT, THE: Question No. 14 as to issue of home permits and employment certificates under, 10. Answered, 177. ADOPTION ACT, THE: 1. Amendment to, forecast in Speech from Throne, 7. 2. Bill No. 51, to amend, introduced, 14. 2nd Reading, 43. House in Committee, 70. 3rd Reading, 74. Royal Assent, 272. (15 George VI, cap. 2.) AGED, HOMES FOR: See Homes for the Aged; also Homes for the Aged Act. AGRICULTURAL COLLEGE: See Ontario Agricultural College. AGRICULTURAL COMMITTEES ACT, THE: Question No.
    [Show full text]
  • History of Toronto from Wikipedia, the Free Encyclopedia the History of Toronto, Ontario, Canada Begins Several Millennia Ago
    History of Toronto From Wikipedia, the free encyclopedia The history of Toronto, Ontario, Canada begins several millennia ago. Archaeological finds in the area have found artifacts of First Nations settlements dating back several thousand years. The Wyandot people were likely the first group to live in the area, followed by the Iroquois. When Europeans first came to Toronto, they found a small village known as Teiaiagon on the banks of the Humber River. Between visits by European explorers, the village was abandoned by the Iroquois, who moved south of Lake Ontario and the Mississaugas, a branch of the Ojibwa settled along the north shore of the lake. The French first set up trading posts in the area, including Fort Rouillé in 1750, which they abandoned as the British conquered French North America. In 1788, the British negotiated the first treaty to take possession of the Toronto area from the Mississaugas. After the United States War of Independence, the area north of Lake Ontario was held by the British who set up the province of Upper Canada in 1791. See also: Name of Toronto https://en.wikipedia.org/wiki/File:DavenportBathurstSoutheast.jpg Davenport Road, as shown here in 1914, does not follow Toronto's standard street grid pattern, as it originated as a First Nations travel route between the Humber River and the Don Valley named Gete-Onigaming, Ojibwe for "at the old portage."[1] Toronto is located on the northern shore of Lake Ontario, and was originally a term of indeterminate geographical location, designating the approximate area of the future city of Toronto on maps dating to the late 17th and early 18th century.
    [Show full text]
  • The Fish Communities of the Toronto Waterfront: Summary and Assessment 1989 - 2005
    THE FISH COMMUNITIES OF THE TORONTO WATERFRONT: SUMMARY AND ASSESSMENT 1989 - 2005 SEPTEMBER 2008 ACKNOWLEDGMENTS The authors wish to thank the many technical staff, past and present, of the Toronto and Region Conservation Authority and Ministry of Natural Resources who diligently collected electrofishing data for the past 16 years. The completion of this report was aided by the Canada Ontario Agreement (COA). 1 Jason P. Dietrich, 1 Allison M. Hennyey, 1 Rick Portiss, 1 Gord MacPherson, 1 Kelly Montgomery and 2 Bruce J. Morrison 1 Toronto and Region Conservation Authority, 5 Shoreham Drive, Downsview, ON, M3N 1S4, Canada 2 Ontario Ministry of Natural Resources, Lake Ontario Fisheries Management Unit, Glenora Fisheries Station, Picton, ON, K0K 2T0, Canada © Toronto and Region Conservation 2008 ABSTRACT Fish community metrics collected for 16 years (1989 — 2005), using standardized electrofishing methods, throughout the greater Toronto region waterfront, were analyzed to ascertain the current state of the fish community with respect to past conditions. Results that continue to indicate a degraded or further degrading environment include an overall reduction in fish abundance, a high composition of benthivores, an increase in invasive species, an increase in generalist species biomass, yet a decrease in specialist species biomass, and a decrease in cool water Electrofishing in the Toronto Harbour thermal guild species biomass in embayments. Results that may indicate a change in a positive community health direction include no significant changes to species richness, a marked increase in diversity in embayments, a decline in non-native species in embayments and open coasts (despite the invasion of round goby), a recent increase in native species biomass, fluctuating native piscivore dynamics, increased walleye abundance, and a reduction in the proportion of degradation tolerant species.
    [Show full text]
  • Lower Don River West Lower Don River West BIBLIOGRAPHY
    Lower Don River West Environmental Study Report Remedial Flood Protection Project BIBLIOGRAPHY Acres & Associated-July 1996, Scoping and Sensitivity Analysis on Flood Protection Options for West Don Lands Site, prepared for ORC. Acres Consulting Services Limited, March 1983, Keating Channel Environmental Assessment, Main Report. Acres Consulting, March 1983, Keating Channel Environmental Assessment Appendix F – Economic Studies. Acres International, March 2004, LDRW Remedial Flood Protection Works Geoenvironmental Information Gap Analysis West Bank – Draft. Agra Earth & Environmental, June 10, 1996, Geotechnical Investigation for Proposed Restoration of the East Bank of the Don River between Lakeshore Boulevard and the CNR Bridge. Angus Environmental Ltd., March 1995, 1995 Assessment of the Environmental Data for the Ataratiri Lands prepared for: Waterfront Regeneration Trust. Archaeological Resource Management Unit, TRCA, January 2004, Draft Cultural Heritage Study for the Environmental Assessment for the Naturalization & Flood Protection for the Lower Don River. Archaeological Services Inc., April 2004, Stage 1 Archaeological Assessment of the East Bayfront, West Donlands and Portlands Areas, City of Toronto. Barrett, Suzanne, James Flagal, Beth Jefferson, Karlk Konze and Ed Mickiewicz, March 1990, Environmental Audit of the Port Industrial Lands and East Bayfront, Natural Heritage, Second Draft. Beak Consultants Ltd and Raven Beck Environmental Ltd., April 1994, Lower Don Lands Site Characterization and Remedial Options Study. C.K. Hurst, April 1978, Dredging and Disposal of Dredged Material from the Keating Channel, Toronto. CH2M Hill, MacViro, July 2003, City of Toronto, Wet Weather Flow Management Master Plan, Combine System Sewershed Final Report. City of Toronto, Bring Back the Don, www.toronto.ca/don. City of Toronto, Obtained 10/16/03, Sustainability and Council’s Strategic Plan, from: www.city.toronto.on.ca/sustainability/strategic_plan.htm.
    [Show full text]
  • Corporate Presentation Guidelines
    February 11, 2020 Port Lands Flood Protection Project Background for the Canadian Energy Regulator (CER) Waterfront Toronto All text information and images are confidential and cannot be shared. 1 Existing TNPI Pipeline Locations TNPI Abandonment and Removal Applications TNPI has submitted applications to CER for the removal of one deactivated pipeline (Phase 1) and for the abandonment and removal of another deactivated pipeline (Phase 2). History and Context Insert map from The Port Lands Flood Port Lands 101 Protection Project (PLFP) occupies a 290 acre context board footprint in downtown Toronto and involves the creation of a new mouth of the Don River to alleviate flooding, raising of grades, rebuilding of roads with upgraded utilities to support the redevelopment of this former industrial Brownfield. 5 Infilling of the Don River marshlands to create the Keating Channel 6 The goal was to establish an industrial port in Toronto to support economic development 7 Over time the primary industrial activities in the Port Lands transitioned from coal storage and distribution and foundries to light manufacturing and petroleum hydrocarbon refining, storage and distribution. Currently it is comprised largely of sparsely used, derelict Brownfield land. 8 The area outlined in blue represents the flooding that is modeled to occur during a “regulatory flood event”. The PLFP project eliminates this flooding, protecting existing homes and businesses and unlocking the remaining underutilized lands for development as new mixed use residential communities. The area west of the Don River was removed from the West Don Lands Flood Protection Landform floodplain by the construction of the West Don Lands Flood Protection Landform in 2010-2013.
    [Show full text]