69,723 Sq M PANATTONI PARK KIELCE
Total Page:16
File Type:pdf, Size:1020Kb
PANATTONI PLANNED AREA: PARK KIELCE 69,723 sq m Panattoni Park Kielce offers 53,723 sq m of industrial ŁÓDŹ KRAKÓW KIELCE CITY space suitable for light production, logistic and 140 km, 145 min 120 km, 110 min CENTRE e-commerce activities. Konin is the centre of the WARSAW KRAKÓW BALICE 6 km, 10 min energy industry for both its region and the whole 170 km, 120 min AIRPORT of Poland. There are companies such as Roland 130 km, 110 min International Polska Sp. z o.o., Express Polska, Agtos Polska Sp. z o.o. and Pradera Konin Sp. z o.o. S7 3 4 PLANNED 2 1 LOCATION IS KEY WARSZAWA A2/E30 E372 DEVELOPMENT SPACE E77 Panattoni Park Kielce offers 53,723 sq m of industrial space suitable for light production, PL logistic and e-commerce activities. LUBLIN ACCESS E373 Excellent and easy access to the expressway Kielce S7 connecting Kraków, Kielce, Warszawa E372 and Gdańsk. A road node Kielce West connecting roads S7 and 74 is just a few E371 kilometers away. E77 S7 PUBLIC TRANSPORT Existing bus stop providing quick A4/E40 connection to city with 5 bus lines. In 5 km KRAKÓW A4/E40 RZESZÓW distance from Park is a railway station. PANATTONI PARK KIELCE LABOR FORCE Available resources of qualified personnel and a ten percent lower level of KIELCE remuneration in relation to the national average favorably affect the investment attractiveness of the region. There are 10 Excellent and easy access to the universities operating in Kielce educating expressway S7 connecting Kraków, over 20,000 students. Kielce, Warszawa and Gdańsk. BUILDING INFORMATION 3 Building 1 26,269 sq m Building 2 17,419 sq m Raben, Pekaes Building 3 10,044 sq m 4 Building 4 - planned 15,829 sq m WAREHOUSE Column grid 12 m × 22,5 m Clear height 10 m ESFR sprinkler system 2 Light intensity in the hall 200 lux Vive Skylights min 2% Floor loading 5 t/sq m 7 m 5 1 1 Vive OFFICE PREMISES Clear height 2.7 m Light intensity 500 lux Built to suit solution STANDARD TECHNICAL SPECIFICATION 1 SUPPORTING STRUCTURE 2 FLOOR 3 ROOF 4 FAÇADE 5 DOCKS Pad or pilot foundations, Fibre reinforced concrete floor, Corrugated steel sheets, mineral Horizontal sandwich panels 1x electrically operated 3 x 3.2 m insulated plinth panels up PE membrane, cut joints, 18 cm wool insulation, PVC membrane. with mineral wool insulation. dock for each 1,000 sq m of hall. to 30 cm above floor. thick, surface treated with hardener. 6 HALL INSTALLATIONS 7 PRODUCTION UPGRADE 8 OFFICES 9 OUTSIDE AREAS Gas Sahara heaters (OPTIONAL) 2 level custom designed Hard areas from concrete or infrared gas radiators, Increased façade and roof in-built, incl. offices, socials, pavers, sloped for drainage. heating according to norms insulation. locker rooms, day room, excl. for warehousing. furniture and appliance. 3 1 5 7 4 6 2 8 9 Accolade Holding, a.s. Poland Czech Republic [email protected] Warsaw Financial Center (29th floor) [email protected] www.accolade.eu Sokolovská 394/17 +420 220 303 019 Emilii Plater 53 +48 504 424 504 186 00 Prague 8 00-113 Warszawa .