Haveri 24X7 Water Supply Project: Initial Environmental Examinatio
Total Page:16
File Type:pdf, Size:1020Kb
Draft Initial Environmental Examination September 2013 IND: North Karnataka Urban Sector Investment Program Tranche 4 – 24x7 Water Supply in Haveri CMC Prepared by Karnataka Urban Infrastructure Development and Finance Corporation, Government of Karnataka for the Asian Development Bank CURRENCY EQUIVALENTS (as of 01 September 2013) Currency unit – rupee (INR) INR1.00 = $.015 $1.00 = INR 66.314 Abbreviations ADB - Asian Development Bank CC - cement concrete CFE - consent for establishment CFO - consent for operation CMC - city municipal council CPCB - Central Pollution Control Board CSS - consultant supervision specialist DSC - design and supervision consultants EA - executing agency EIA - environmental impact assessment EMP - environmental management plan ES - environment specialist GRC - grievance redress committee GRM - grievance redress mechanism HDPE - high density polyethylene IA - implementing agency IEE - initial environmental examination km - kilometers KSPCB - Karnataka State Pollution Control Board KUIDFC - Karnataka Urban Infrastructure Development and Finance Corporation lpcd - liter per capita per day m - meters MFF - multi-tranche financing facility MLD - million liters per day mm - millimeters MoEF - Ministry of Environment and Forest NGO - non-government organization NKUSIP - North Karnataka Urban Sector Improvement Program PIU - project implementation unit PMU - project management unit PVC - polyvinyl chloride RCC - reinforced cement concrete ROW - right of way SEIAA - State Environmental Impact Assessment Authority SPS - Safeguard Policy Statement STP - sewage treatment plant ULB - urban local body WTP - water treatment plant NOTES In this report, "$" refers to US dollars. and ―INR‖ refers to Indian rupees This initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. TABLE OF CONTENTS I. INTRODUCTION 1 A. Background 1 B. Background of IEE 1 C. Environmental Regulatory Compliance 1 D. Scope of IEE 4 E. Report Structure 4 II. DESCRIPTION OF THE PROJECT COMPONENTS 5 A. Need for Infrastructure Improvement in Haveri 5 B. Existing Scenario of Water Supply Facilities in Haveri CMC 5 C. Water Supply System Improvements under Implementation in Haveri CMC 6 D. Proposed 24 X 7 Water Supply System 8 E. Investment Program Implementation Schedule 9 III. DESCRIPTION OF THE ENVIRONMENT 9 IV. SCREENING OF POTENTIAL ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 14 A. Introduction 14 B. Pre-Construction Impacts 15 C. Construction Impacts 16 D. Operation and Maintenance Impacts 22 V. PUBLIC CONSULTATION AND INFORMATION DISCLOSURE 23 A. Overview 23 B. Future Consultation and Disclosure 23 a. Consultation during detailed design 24 b. Consultation during construction 24 C. Project Disclosure 24 D. Redress of Grievances 24 E. Community Participation 25 F. Information Disclosure and Communication 26 VI. ENVIRONMENTAL MANAGEMENT PLAN 26 A. Environmental Management Plan 26 B. Institutional Requirements 45 C. Training Needs 49 D. Monitoring and Reporting 51 E. EMP Implementation Cost 51 VII. FINDINGS AND RECOMMENDATIONS 52 List of Tables Table 1: Applicable Environmental Regulations ....................................................................... 1 Table 2: Access to Basic Services – Water Supply ..................................................................... 6 Table 3: Water Supply Sub-components proposed under Tranche 1 of NKUSIP ........................ 7 Table 4: Proposed 24x7 Water Supply Project Components in Haveri ........................................ 8 Table 5: Mean Maximum and Mean Minimum Temperature (in O C) .......................................... 10 Table 6: Climatological Characteristics of Haveri ...................................................................... 11 Table 7: Groundwater Levels in Haveri (2002 – 2004) .............................................................. 12 Table 8: Groundwater Quality – Haveri (2003) .......................................................................... 12 Table 9: Environmental Management Plan of Anticipated Impacts during Pre Construction ...... 27 Table 10: Environmental Management Plan of Anticipated Impacts during Construction .......... 31 Table 11: Environmental Management Plan of Anticipated Impacts during Operation ............... 43 Table 12: Institutional Roles and Responsibilities ...................................................................... 46 Table 13: Outline Capacity Building Program on EMP Implementation ..................................... 49 Table 14: Cost Estimates to Implement the EMP ...................................................................... 51 List of Figures Figure 1: Grievance Redressal Process .................................................................................... 25 Figure 2: Environmental Safeguards Implementation Arrangement ........................................... 45 List of Appendices 1. National Ambient Air Quality Standards by CPCB 54 2. National Ambient Air Quality Standards in respect of Noise 55 3. Salient Features of Major Labor Laws including Amendments Issued from Time to Time Applicable to Establishments Engaged in Construction of Civil Works 56 4. Sample Outline Spoil Management Plan 58 5. Sample Outline Traffic Management Plan 59 6. Sample Monthly Reporting Format for Construction Supervision Specialist 69 EXECUTIVE SUMMARY 1. The North Karnataka Urban Sector Investment Program (NKUSIP) aims to improve the level, quality and sustainability of basic urban services in selected urban local bodies (ULBs), contributing to improved quality of life among the urban poor. NKUSIP will be implemented over a period of eight year beginning in 2008, and will be funded by a loan via the Multi-tranche Financing Facility (MFF) of the Asian Development Bank (ADB). 2. Haveri 24x7 water supply project is one of the projects proposed in Tranche-4. Water supply is currently intermittent, unreliable and suffers with huge losses and quality issues. ADB requires the consideration of environmental issues in all aspects of the Bank’s operations, and the requirements for Environmental Assessment are described in ADB’s SPS (2009). This Initial Environmental Examination (IEE) addresses components proposed under Tranche 1 which includes water supply components. 3. Categorization. Haveri 24x7 water supply project is classified as Environmental Category B as per the SPS as no significant impacts are envisioned. Accordingly this Initial Environmental Examination (IEE) has been prepared and assesses the environmental impacts and provides mitigation and monitoring measures to ensure no significant impacts as a result of the project. 4. Project Scope. The project is formulated under this investment program to address gaps in water infrastructure in a holistic and integrated manner. The main objective of the Investment Program is to improve water efficiency, security and have an important effect on public health. Investments under this project include (i) bulk water supply improvement works; (ii) rehabilitation of distribution network; and (iii) provision of house service connections. There are no new alignments proposed under this scheme. 5. Implementation Arrangements. Karnataka Urban Infrastructure Development & Finance Corporation (KUIDFC) is the Executing Agency (EA) responsible for overall technical supervision and execution of all projects funded under the investment program. Implementation activities will be overseen by a separate Program Management Unit (PMU). The investment program is divided into four packages, for ease of operation and monitoring. The PMU is headed by an executive program director based in Dharwad and have four deputy program directors, one for each package. A team of senior technical, administrative and financial officials, including a state-level environmental specialist and a regional-level environmental specialist, will assist the PMU in managing and monitoring program implementation activities. Consultant teams are responsible for project planning and management and assuring technical quality of design and construction; and designing the infrastructure and supervising construction; and safeguards preparation. 6. Description of the Environment. Project components are located in Haveri urban area or in its immediate surroundings which were converted into urban use for many years ago, and there is no natural habitat left at these sites. The project sites are located in existing right of ways (RoWs) and government-owned land. There are no protected areas, wetlands, mangroves, or estuaries in or near the project location. There are no forest areas within or near Haveri. Soils are deep, and do not require cutting of rocks for pipe laying. 7. Environmental Management. An environmental management plan (EMP) is included as part of this IEE, which includes (i) mitigation measures for environmental impacts during implementation; (ii) an environmental monitoring program, and the responsible entities for ii mitigating, monitoring, and reporting; (iii) public consultation and information disclosure; and (iv) a grievance redress mechanism.