Sharing and Dissemination of Environmental Information
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
World Bank Document
Public Disclosure Authorized Environmental Management Plan Public Disclosure Authorized for rehabilitation of secondary road Chalaubani-Signagi-Anaga km 16 - km 22 Public Disclosure Authorized Tbilisi, Georgia July 2012 Public Disclosure Authorized 1 PART 1: GENERAL PROJECT AND SITE INFORMATION INSTITUTIONAL & ADMINISTRATIVE Country Georgia Project title Rehabilitation of secondary road Chalaubani-Signagi-Anaga km 16 - km 22 The existing road pavement of the design section is represented as a damaged asphalt concrete (the main damage Scope of project and type is “alligator” cracks, potholes, settled areas, damages edges), longitudinal and cross parameters are violated. activity There is one bridge located at the section that is in fair condition. The design road is crossed by 9 culverts of different lengths, 2 of which need replacement and 7 has to be rehabilitated. The ditches are to be arranged along the road, and the existing road side ditches need cleaning and upgrading to function. Some technical characteristics of the existing road are as follows: • Roadway width 5-9 m • Carriageway width 5 m • Shoulder width 0-2 m. The design alignment follows the existing route. Aiming at avoiding the encroachment upon the property or land occupation, the transitional curves are designed for the densely populated areas improving the safety and traffic comfort. Institutional WB Project Management Local Counterpart and/or Recipient arrangements (Project Team Leader) Giorgi Tsereteli Signagi Municipality (Name and contacts) Joseph Melitauri RDMRDI Implementation Safeguard Supervision Local Counterpart Local Inspectorate Contractor arrangements WB Supervision Supervision Caucasavtomagistrali Technical Supervisor - (Name and contacts) Darejan Kapanadze RRMSD Ltd. SITE DESCRIPTION Name of site Rehabilitation of secondary road Chalaubani-Signagi-Anaga 16Km-22Km, Kakheti Region, Signagi Municipality Describe site location The project is located in the East Georgia. -
Georgia, Armenia & Azerbaijan
Land Program Rate: $6,195 (per person based on double occupancy) Single Supplement: $1,095 Included: All accommodation, hotel taxes • Meals per itinerary (B=breakfast, L=lunch, D=dinner) • Arrival/departure transfers for pas- sengers arriving/departing on scheduled start/ end days • All land transportation per itinerary including private motor coach throughout the itinerary • Internal airfare between Baku and Tbilisi • Study leader and pre-departure education materials • Special cultural events and extensive sightseeing, includ- ing entrance fees • Welcome and farewell dinners • Services of a tour manager throughout the land program • Gratuities to tour manager, guides and drivers • Comprehensive pre-departure packet Not Included: Travel insurance • Round trip airfare between Baku/Yerevan and USA. Our tour operator MIR Corporation can assist with reservations. • Passport and visa fees • Meals not specified as included in the itinerary • Personal items such as telephone calls, alcohol, laun- dry, excess baggage fees Air Arrangements: Program rates do not include international airfare from/to USA. Because there are a number of flight options available, there is no group flight for this program. Informa- tion on a recommended flight itinerary will be sent by our tour operator upon confirmation. What to Expect: This trip is moderately active due to the substantial distances covered and Club of California The Commonwealth St 555 Post CA 94102 San Francisco, the extensive walking and stair climbing required; parts of the tour will not always be wheelchair - accessible. To reap the full rewards of this adventure, travelers must be able to walk at least a mile a day (with or without the assistance of a cane) and stand for an extended period of time during walking tours and museum visits. -
Wine & Brandy Tour 5 Days
WINE & BRANDY TOUR 5 DAYS Private special escorted tour for individuals and families BEST TIME JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC History and culture of Georgia have always been closely intertwined with winemaking tradition. Wine in local culture is often considered as a symbol of hospitality and friendship. Oldest evidence of winemaking has been recently discovered at the archaeological site near Tbilisi, at the 8000-year old village. Nowadays there are over 500 species of grape in Georgia, while up to 40 of those varieties are used in commercial wine production. 5-day “Wine and Brandy” introduces you to the Georgian wine. Tour takes off in the capital Tbilisi and travels to the major traditional winemaking region of Georgia – Kakheti. On this tour, travelers will be able to sightsee Tbilisi, visit the best wineries of Kakheti region, taste various local types of wine, and take a look at both modern and traditional ways of wine and brandy production of the country. Group will be accompanied by local, professional and experienced guide and driver MAIN HIGHLIGHTS & SITES: TBILISI CITY KAKHETI REGION • Holy Trinity Cathedral • Signagi town • Narikala Fortress 4Th C • Sighnaghi Pheasant’s Tears wine cellar • Legvtakhevi Waterfall • Winery & museum Numisi in Velistsikhe 16th c • Sulfur bathhouse square • Kvareli Wine Tunnels • Shardeni str & Bridge of Peace • Telavi Town • Meidan square • Telavi Farmer’s Bazaar • Georgian National Museum • Tsinandali Residence of Al. Chavchavadze 19th c • Sarajishvili Brandy Factory • Gremi Royal Residence & Castle 16th c • Funicular Train & Mtatsminda Park • Twin’s Wine Cellar and Museum DAY TO DAY ITINERARY 1 DAY Arrival in Tbilisi Airport-Tbilisi City Tour back to the 4th century. -
Tour to Georgia 10 Days /9 Nights
TOUR TO GEORGIA 10 DAYS /9 NIGHTS Day 1: Arrival at Tbilisi Meeting at the airport, transfer to the hotel. Free time. Overnight at the hotel in Tbilisi. Day 2. Tbilisi (B/L/-) Breakfast at the hotel. Tour of the historic part of the city, which begins with a visit to the Metekhi Temple, which is one of the most famous monuments in Tbilisi. This temple was honored in the 13th century, on the very edge of the stony shore of the Kura and the former fortress and residence of the Georgian kings. The first Georgian martyr, Queen Shushanika Ranskaya, was buried under the arches of the Metekhi temple. Inspection of the Tbilisi sulfur baths, which are built in the style of classical oriental architecture. These are low, squat buildings, covered with semicircular domes with large glass openings in the center, serving as windows that illuminate the interior, as the baths themselves are below ground level. In the old days, people here not only bathed, but also talked, lingering until dawn, and the city matchmakers arranged special days on special days. In the baths gave dinner parties, concluded trade deals. Walk on the square Maidan, which was the main shopping area of the city and along small streets known under the common name "Sharden". Narikala Fortress, which is the most ancient monument, a kind of "soul and heart of the city." The date of construction of the fortress is called approximately IV century AD, so it stands from the foundation of the city itself. Later, the fortress was expanded and completed several times. -
Economic Prosperity Initiative
USAID/GEORGIA DO2: Inclusive and Sustainable Economic Growth October 1, 2011 – September 31, 2012 Gagra Municipal (regional) Infrastructure Development (MID) ABKHAZIA # Municipality Region Project Title Gudauta Rehabilitation of Roads 1 Mtskheta 3.852 km; 11 streets : Mtskheta- : Mtanee Rehabilitation of Roads SOKHUMI : : 1$Mestia : 2 Dushet 2.240 km; 7 streets :: : ::: Rehabilitation of Pushkin Gulripshi : 3 Gori street 0.92 km : Chazhashi B l a c k S e a :%, Rehabilitaion of Gorijvari : 4 Gori Shida Kartli road 1.45 km : Lentekhi Rehabilitation of Nationwide Projects: Ochamchire SAMEGRELO- 5 Kareli Sagholasheni-Dvani 12 km : Highway - DCA Basisbank ZEMO SVANETI RACHA-LECHKHUMI rehabilitaiosn Roads in Oni Etseri - DCA Bank Republic Lia*#*# 6 Oni 2.452 km, 5 streets *#Sachino : KVEMO SVANETI Stepantsminda - DCA Alliance Group 1$ Gali *#Mukhuri Tsageri Shatili %, Racha- *#1$ Tsalenjikha Abari Rehabilitation of Headwork Khvanchkara #0#0 Lechkhumi - DCA Crystal Obuji*#*# *#Khabume # 7 Oni of Drinking Water on Oni for Nakipu 0 Likheti 3 400 individuals - Black Sea Regional Transmission ZUGDIDI1$ *# Chkhorotsku1$*# ]^!( Oni Planning Project (Phase 2) Chitatskaro 1$!( Letsurtsume Bareuli #0 - Georgia Education Management Project (EMP) Akhalkhibula AMBROLAURI %,Tsaishi ]^!( *#Lesichine Martvili - Georgia Primary Education Project (G-Pried) MTSKHETA- Khamiskuri%, Kheta Shua*#Zana 1$ - GNEWRC Partnership Program %, Khorshi Perevi SOUTH MTIANETI Khobi *# *#Eki Khoni Tskaltubo Khresili Tkibuli#0 #0 - HICD Plus #0 ]^1$ OSSETIA 1$ 1$!( Menji *#Dzveli -
Evaluation of the Hepatitis C Care Cascade in the Country of Georgia: Monitoring Progress Towards Elimination
IVHEM 2019. November 22-23, 2019, Amsterdam EVALUATION OF THE HEPATITIS C CARE CASCADE IN THE COUNTRY OF GEORGIA: MONITORING PROGRESS TOWARDS ELIMINATION Tengiz Tsertsvadze,1,2 Amiran Gamkrelidze,3 Nikoloz Chkhartishvili,1 Akaki Abutidze,1 Lali Sharvadze,2,4 Maia Butsashvili,5 David Metreveli,6 Lia Gvinjilia,7 Shaun Shadaker,8 Muazzam Nasrullah,8 Tamar Gabunia, 9 Ekaterine Adamia,9 Stefan Zeuzem,10 Nezam Afdhal,11 Sanjeev Arora,12 Karla Thornton,12 Francisco Averhoff8 1Infectious Diseases, AIDS and Clinical Immunology Research Center, Tbilisi, Georgia; 2Ivane Javakhishvili Tbilisi State University, Tbilisi, Georgia; 3National Center for Disease Control and Public Health, Tbilisi, Georgia; 4Hepatology clinic HEPA, Tbilisi, Georgia; 5Health Research Union, Tbilisi, Georgia; 6Medical Center Mrcheveli, Tbilisi, Georgia; 7CDC Foundation, Tbilisi, Georgia; 8Centers for Disease Control and Prevention, Division of Viral Hepatitis National Center for HIV, Hepatitis, STD&TB Prevention, Atlanta, USA; 9Ministry of IDPs, Labour, Health and Social Affairs of Georgia, Tbilisi, Georgia; 10Goethe University Hospital, Frankfurt, Germany; 11Beth Israel Deaconess Medical Center Liver Center, Boston, USA; 12University of New Mexico, Albuquerque, USA Infectious Diseases, AIDS and Clinical Immunology Research Center Disclosure No relevant financial relationship exists Infectious Diseases, AIDS and Clinical Immunology Research Center 12 COUNTRIES WORLDWIDE ON TRACK TO ELIMINATE HEPATITIS C INFECTION BY 2030 Georgia’s HCV elimination program builds on delivering -
Temis Ganvitarebis Qseluri Programa COMMUNITY DEVELOPMENT NETWORK PROGRAM
Community Development Program 3 Temis ganviTarebis qseluri programa COMMUNITY DEVELOPMENT NETWORK PROGRAM 2006-2010 Tbilisi 4 Temis ganviTarebis programa ganxorcielda Community Development Program 5 winasityvaoba IntroductIon gamocemis mizania mokled gagacnoT Cveni organizaciis erT-erTi qseluri programis - `Temis ganviTareba~ yvelaze TvalsaCino miRwevebi da warmatebebi. `saqarTvelos strategiuli kvlevebis da ganviTarebis centri~ 1998 wlidan saqarTvelos regionebSi samoqalaqo institutebis formirebasa da gaZliere- baze muSaobs. am mimarTulebis mniSvnelovani komponentia adgilobrivi lidere- bis sainiciativo jgufebis Seqmna/gaZliereba da mosaxleobis gaaqtiureba, rac, Tavis mxriv, adgilobrivi problemebis efeqturad gadaWris gzas warmoadgens. 2006 wlidan centri gansakuTrebul yuradRebas uTmobs soflis ax- algazrdobas, rac adgilebze axalgazrduli saTemo jgufebis formirebas da gaZlierebas moiazrebs. saTemo axalgazrdul centrebs (sac) programa uwevs finansur da teqnikur dax- marebas, raTa maT, Tavis mxriv, xeli Seuwyon soflis mosax- leobis (gansakuTrebiT axalgazrdebis) mier sakuTari Sesa- Zleblobebis realizebas da adgilebze arsebuli resursis mobilizebiT, adgilobrivi problemebis ukeT mogvarebas. Temis ganviTarebis qseluri programa erTiani midgomiTa da strategiiT mimdinareobs kaxeTisa da guriis regionebis 6 municipalitetSi (ozurgeTis, Coxatauris, siRnaRis, la- godexis, Telavisa da yvarlis municipalitetebi). adgilebze programis saqmianoba adgilobrivi partniori organizaciebis: saqarTvelos demokratiuli ganviTarebis kavSiri (q. ozurgeTi) da saqarTvelos samoqalaqo -
World Bank Document
Document of The World Bank FOR OFFICIAL USE ONLY Public Disclosure Authorized Report No: 66462-GE PROJECT APPRAISAL DOCUMENT ON A PROPOSED CREDIT IN THE AMOUNT OF SDR 25.8 MILLION Public Disclosure Authorized (US$40.00 MILLION EQUIVALENT) AND A PROPOSED LOAN IN THE AMOUNT OF US$30 MILLION TO GEORGIA Public Disclosure Authorized FOR THE SECOND SECONDARY AND LOCAL ROADS PROJECT (SLRP-II) FEBRUARY 21, 2012 Sustainable Development Department South Caucasus Country Unit Europe and Central Asia Region Public Disclosure Authorized This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. CURRENCY EQUIVALENTS (Exchange Rate Effective January 1, 2012) Currency Unit = Georgian Lari (GEL) GEL 1.66 = US$ 1.00 US$1.551 = SDR 1.00 FISCAL YEAR January 1 – December 31 ABBREVIATIONS AND ACRONYMS AADT Average Annual Daily Traffic MCC Millennium Challenge Corporation ADB Asian Development Bank MENR Ministry of Environment and Natural Resources CPS Country Partnership Strategy MESD Ministry of Economy and Sustainable Development EA Environmental Assessment MRDI Ministry of Regional Development and Infrastructure EIB European Investment Bank NBG National Bank of Georgia EIRR Economic Internal Rate of Return NCB National Competitive Bidding EMP Environmental Management Plan NPV Net Present Value ESMF Environmental and Social Management Framework ORAF Operational Risk Assessment Framework FA Financing Agreement PAD -
Dedoplistsqaro Samukhi Mijniskure Vashlovani Signagi
Dedoplistsqaro Samukhi Mijniskure Vashlovani Signagi We will pick you up in Tbilisi and drive to Dedoplistsqaro, to get the permit to travel in this area. We will break for lunch and purchase the food we will need the next days, before we head in the direction Samukhi area via the Pantichara Canyon. We will drop in on one of the farms near our cottage, where we will get the horses we will need the next days from the relatives of our driver. You will gain some impression of the daily life of the shepherds. Driving distance: 350 km We will load our horses and ride to Mijnis Kure and the Alazani river. Its a very beautiful area, and perfect for riding our horses. Distance: 20 kilometer. We will ride to the main ranger station, through a landscape reminiscent of Africa - I almost expect elephants or giraffes to cross our path. We’ll break for lunch halfway up on our way to the ranger station on a platform where you get a far view of the area. Distance: 19 km. We will ride back to our starting place, return the horses, spend more time with the shepherds and watch them work. Distance is about 18 kilometer. We will drive back towards Tbilisi with a stop in Signagi, a town in Georgia's easternmost region of Kakheti. We’ll continue to Signagi, a town in Georgia's Easternmost region of Kakheti. Although it is one of Georgia's smallest towns, Signagi serves as a popular tourist destination due to its location at the heart of Georgia's wine-growing regions, as well as its picturesque landscapes, pastel houses and narrow, cobblestone streets. -
Ten-Year Development Plan for Georgian Gas Transmission Network 2019-2028
TEN-YEAR DEVELOPMENT PLAN FOR GEORGIAN GAS TRANSMISSION NETWORK 2019-2028 Tbilisi 2018 The document represents a 10-year Georgian gas transmission and related infrastructure development plan. It is the continuation of 2016-year edition of “The 10-Year Development Plan for Georgian Gas Transmission Infrastructure 2017-2026’’ and 2017-year edition of “The 10-year Gas Network Development Plan, 2018-2027” considering the actual situation of current period. The 10-Year Gas Network Plan will be discussed and the section covering the short-term plan will be approved by the Ministry of Economy and Sustainable Development of Georgia. Consultations regarding the information used in and information on the project implemen- tation of the 10-Year Gas Network Development Plan can be obtained from GOGC Strategic Planning and Projects Department. Head of the Department: Teimuraz Gochitashvili, Dr. Sci, professor, Tel: + (995 32) 2244040 (414); E-mail: [email protected] 2 Contents Abbreviations ...........................................................................................................................3 Executive summary ..................................................................................................................5 1. Introduction .....................................................................................................................7 1.1. General provisions............................................................................................................ 7 1.2. Formal and methodological basis -
Review of Fisheries and Aquaculture Development Potentials in Georgia
FAO Fisheries and Aquaculture Circular No. 1055/1 REU/C1055/1(En) ISSN 2070-6065 REVIEW OF FISHERIES AND AQUACULTURE DEVELOPMENT POTENTIALS IN GEORGIA Copies of FAO publications can be requested from: Sales and Marketing Group Office of Knowledge Exchange, Research and Extension Food and Agriculture Organization of the United Nations E-mail: [email protected] Fax: +39 06 57053360 Web site: www.fao.org/icatalog/inter-e.htm FAO Fisheries and Aquaculture Circular No. 1055/1 REU/C1055/1 (En) REVIEW OF FISHERIES AND AQUACULTURE DEVELOPMENT POTENTIALS IN GEORGIA by Marina Khavtasi † Senior Specialist Department of Integrated Environmental Management and Biodiversity Ministry of the Environment Protection and Natural Resources Tbilisi, Georgia Marina Makarova Head of Division Water Resources Protection Ministry of the Environment Protection and Natural Resources Tbilisi, Georgia Irina Lomashvili Senior Specialist Department of Integrated Environmental Management and Biodiversity Ministry of the Environment Protection and Natural Resources Tbilisi, Georgia Archil Phartsvania National Consultant Thomas Moth-Poulsen Fishery Officer FAO Regional Office for Europe and Central Asia Budapest, Hungary András Woynarovich FAO Consultant FOOD AND AGRICULTURE ORGANIZATION OF THE UNITED NATIONS Rome, 2010 The designations employed and the presentation of material in this information product do not imply the expression of any opinion whatsoever on the part of the Food and Agriculture Organization of the United Nations (FAO) concerning the legal or development status of any country, territory, city or area or of its authorities, or concerning the delimitation of its frontiers or boundaries. The mention of specific companies or products of manufacturers, whether or not these have been patented, does not imply that these have been endorsed or recommended by FAO in preference to others of a similar nature that are not mentioned. -
Ten-Year Development Plan for Georgian Gas Transmission Network 2018-2027
Ten-Year Development Plan for Georgian Gas Transmission Network 2018-2027 October 2017 1 The document represents a 10-year Georgian gas transmission and related infrastructure development plan. It was prepared on the basis of 2016 and 2017 year editions of “10-Year Development Plan for Georgian Gas Transmission Infrastructure)’’, considering the actual situation of current period. The 10-year Gas Network Development Plan was discussed with the Georgian Gas Transportation Company, presented to the Ministry of Energy of Georgia, the Georgian National Energy Regulatory Commission and other stakeholders. Consultations regarding the information used in and information on the project implementation of the 10-year Gas Network Development Plan can be obtained from GOGC Strategic Planning and Projects Department. Head of the Department: Teimuraz Gochitashvili, Dr. Sci, professor, Tel: +(995 32) 2244040 (414); E-mail: [email protected] 2 Contents Abbreviations ...........................................................................................................................4 Executive summary ..................................................................................................................5 1. Introduction .....................................................................................................................7 1.1. General provisions............................................................................................................ 7 1.2. Formal and methodological basis for preparing the plan ..............................................