Japanese Society of Steel Construction

Total Page:16

File Type:pdf, Size:1020Kb

Japanese Society of Steel Construction No. 53 April 2018 STEEL CONSTRUCTION TODAY & TOMORROW http://www.jisf.or.jp/en/activity/sctt/index.html Special Issue Japanese Society of Steel Construction JSSC Commendations for Outstanding Achievements in 2017 • JSSC Awards 1 Osman Gazi Bridge in Turkey • Outstanding Achievement Awards 3 Shinjuku Toho Building 4 [Tokyo Garden Terrace Kioicho] Kioi Tower • Thesis Awards TM&ⒸTOHO CO., LTD. 5 Relationship of Macro Stress and Maximum Principal Stress on Electro-slag Weld Zone 6 Fatigue Crack Growth Rate of Steel under Large Cyclic Strain and Its Application Feature Articles: Japanese Steel Construction Technologies 7 Passenger Terminal of New Doha International Airport 10 Taipei Nanshan Plaza Project in Taiwan 13 Tsubasa Bridge in Cambodia Special Article: Stainless Steel 16 Lean Duplex Stainless Steel for Selective Water Intake Facility 18 JSSC International Events Back cover Message from JSSC International Committee Chairman Published Jointly by The Japan Iron and Steel Federation Japanese Society of Steel Construction JSSC Commendations for Outstanding Achievement in 2017—JSSC Awards Osman Gazi Bridge in Turkey Prize-winner: IHI Infrastructure Systems Co., Ltd. Fig. 1 General Arrangement of Osman Gazi Bridge Project Overview [Unit: mm] The Osman Gazi Bridge named in hon- 120 000 2 682 000 105 000 or of Osman I (1259-1326, who founded 92 050 566 000 1 550 000 566 000 67 250 the Ottoman Empire in 1299), locates in North side span Main span South side span North side North tower Main span South tower South side northwest Turkey and carries the Ge- span pier span pier +EL.63.050 +EL.63.050 bze-Orhangazi-Bursa-Izmir motorway (stiffening girder) +EL.252.000 +EL.80.330 (cable) +EL.252.000 (stiffening girder) +EL.57.500 (cable) +EL.77.080 +EL.57.500 (cable) across the Sea of Marmara at the Bay of (stiffening girder) +EL.24.000 +EL.33.023 Izmit between the Diliskelesi Peninsula on the north and the Hersek Peninsula on South tower North anchorage North tower Navigation clearance (height) 64 300 foundation South anchorage the south. foundation Istanbul Navigation clearance (width) 1 000 000 +MSL.+0.401 Bursa The bridge, contracted to IHI Infra- Legends EL. : Elevation (unit: m) structure Systems Co., Ltd. (IIS) on an MSL. : Mean sea level (unit: m) EJ. : Expansion joint EPC (Engineering, Procurement and Construction) basis, was constructed with a 1,550 m main span making it the fourth longest suspension bridge in the world. The scale of the bridge and the tight construction schedule in the EPC contract required the state-of-the-art and sustainable design, well-proven con- struction methods adapted to the techni- cal challenges and financial success for the project. (Refer to Fig. 1) Construction was started in January 2013 and the bridge opened to traffic on July 1st, 2016 only within 3.5 years. More than 83,000 tons of steel has been used and 200,000 m3 of concrete has been cast in total. (See Photos 1 and 2) Engineering Challenges Photo 1 Aerial view of Osman Gazi Bridge Since the bridge locates in a high seis- mic zone where magnitude 7.4 Kocaeli Earthquake took place in 1999 along the North Anatolian Fault (NAF), high dura- bility against huge seismic events is re- quired with achieving very fast and safe construction. To realize this requirement, IHI has managed and collaborated with a number of subcontractors in more than 10 countries and overcome many engi- neering challenges. The tower foundations are concrete caissons placed 40 m below sea level on a gravel bed over soil strengthened by 195 nos. of the steel inclusion piles per tower (Fig. 2). The tower foundation is allowed to move by releasing friction, functioning as an isolation system during a huge earthquake (return period of 2,500 Photo 2 South anchorage area and the bridge years). The NAF is running close to the bridge site, around 2 km away from the The two towers are 252 m high, each son fabrication work and the tower fabri- south anchorage area, and the south an- consisting of two single-celled box legs cation work, although the concrete tow- chorage is in the secondary fault zone. It with two cross beams. The steel towers ers are common for the long-span bridges is the first case in the world in which this have been chosen to minimize the whole in the world except for in Japan where isolation system is applied to the suspen- construction period by overlapping the technology of the steel towers has been sion bridges. foundation work at the seabed, the cais- developed. Each tower leg is divided in- 1 Steel Construction Today & Tomorrow April 2018 Fig. 2 Schematic Image of Tower Foundation Photo 4 Main cable erection by PPWS method the fabrication shops or on site to super- vise the fabrication work and superstruc- ture construction works. The purpose of this supervision is not only to construct the bridge with high quality based on Japan’s experiences but also to transfer their knowledge to Turkey and to con- tribute to Turkey’s technology develop- Photo 5 Deck erection by lifting device ment. Furthermore, the project welcomed vices for erection (Photo 5). To achieve many internship students from Turkey Photo 3 Tower block erection by floating crane further shortening of the construction and abroad and site visits by local chil- period, the typical 2 blocks in the main dren who will play important roles in the to 22 blocks, erected by floating crane span were connected into a 50 m long future. (Photo 6) for the lower half and by jib-climbing block by welding at the fabrication shop. crane for the upper half and connected This reduces the number of on-site weld- Acknowledgement each other by combined method of weld- ing joints (thus welding work) and the The authors are deeply grateful to KGM ing and HSFG bolt connection (Photo 3). period between the deck closure to the (General Directorate of Highway, MOT The main cables are made of a pre- traffic opening into only 2 months. Turkey) and OTOYOL YATIRIM VE IS- fabricated parallel wire strand (PPWS), LETME A.S for guiding us to a success- each consisting of 127 high strength steel Contribution to Social Develop- ful completion and their permission on wires of 5.91 mm in diameter and having ment publication of this paper. ■ a breaking strength of 1,760 MPa. 110 In the project, more than 100 Japanese PPWS per one main cable are spanned engineers were stationed in Turkey at between the cable anchorages and 2 ex- tra PPWS are placed between the tower and the cable anchorage on both sides. It is the biggest diameter of the wires used in the PPWS method in the past suspen- sion bridges and it makes the anchorag- es at both ends smaller for less concrete volume and shorter construction period. (See Photo 4) The deck is a hexagonal closed steel box girder with a width of 30.1 m and a depth of 4.75 m and is carrying three lanes of highway traffic in each direc- tion. The walkway for maintenance vehi- cles with a width of 2.9 m is at both sides of the steel deck similar to the 1st and the 2nd Bosporus Bridges. The deck is divided into 117 segments of 25 m length typically due to the capacity of lifting de- Photo 6 View at tower top April 2018 Steel Construction Today & Tomorrow 2 —Outstanding Achievement Awards Shinjuku Toho Building Prize-winner: Takenaka Corporation The Shinjuku Toho Building is a com- two conflicting requirements, extra high- Development of an Improved Non- plex building that accommodates a mov- strength concrete-filled steel tube (CFT) scallop On-site Welding Method ie theater, shops and a hotel. Featuring columns were adopted that employ 780 In the construction of high-rise steel- a slender façade, it has 30 stories above N/mm2-grade high-strength steel and Fc frame buildings, it is essential to secure ground and a height of 130.25 m. The 100 N/mm2-grade concrete. This facili- the soundness of column-beam joints. building was completed in 2015 in Shi- tated the successful control of horizontal Concerning the design of the Shinju- juku-ku, Tokyo. (Photo 1) stiffness between the low-rise and high- ku Toho Building, we developed an rise sections during earthquakes (Fig. 1). “improved non-scallop on-site weld- Response Control Using Extra As the inner diaphragm plate had nev- ing method” as the new beam end detail High-strength CFT and New er been used for electro-slag welding of (Fig. 2). With this method, the plastic de- Diaphragm Plate Specifications columns employing 780 N/mm2-grade formation capacity of the column-beam The ratio of height to width of the high- high-strength steel, there was some con- joints can be improved by filling up on- rise section of the building is quite large, cern regarding the securement of weld- site weld scallops by means of welding 6.8 at maximum, and further the horizon- ing quality. Then, full-scale welding and without the expansion of beam ends. tal stiffness of the low-rise section differs tests were carried out on the electro-slag After tests using full-scale T-shaped greatly from that of the high-rise section. welds to establish a steel column manu- specimens were conducted on the new- Because of this, the horizontal deforma- facturing method that would secure the ly-developed welding method in order to tion of the high-rise section becomes required Charpy value, 27J or higher confirm the high deformation capacity of large during earthquakes (Fig.
Recommended publications
  • Ramazan'in Işiği Güzel Camilerden Yansiyor
    ACITAN VE SARSAN SES: TOUCHING AND SHAKING VOICE: BUIKA HEDEF KİTLESİNİ DİNLEYEN KAZANIR THE ONES WHO LISTEN TO THE TARGET MASS WIN BU HOBİLERE DİKKAT! PAY ATTENTION TO THESE HOBBIES! FARKLI DAMAK TATLARININ LEZZET ELÇİSİ THE FLAVOR AMBASSADOR OF DIFFERENT TASTES F A N T A S T İ K C O Ğ R A F Y A , BÜYÜLEYİCİ TARİH: FANTASTIC GEOGRAPHY AND CAPTIVATING HISTORY: MALTA RAMAZAN’IN IŞIĞI GÜZEL CAMİLERDEN YANSIYOR BEAUTIFUL MOSQUES REFLECT THE LIGHT OF THE RAMADAN HONG KONG VE BRUCE LEE HEYKELİ / HONG KONG AND BRUCE LEE STATUE İÇİNDEKİLER / CONTENTS 18 KENTLER VE SEMBOLLER CITIES AND SYMBOLS Hong Kong ve Bruce Lee heykeli Hong Kong and Bruce Lee statue 22 RÖPORTAJ INTERVIEW Acıtan ve sarsan ses: Touching and shaking voice: Buika 28 KAPAK COVER Ramazan’ın ışığı güzel camilerden yansıyor Beautiful mosques reflect the light of the Ramadan 34 SAĞLIK HEALTH Attığınız her adımla hastalıklara bariyer koyun Block illnesses with each step you take 0 2 8 0 3 4 0 4 0 40 ŞEFLERİN MUTFAĞI CHEFS’ KITCHEN Farklı damak tatlarının lezzet elçisi The flavor ambassador of different tastes 44 GEZİ TRAVEL Fantastik coğrafya, büyüleyici tarih: Fantastic geography and captivating history: Malta 50 HOBİ HOBBY Bu hobilere dikkat! 0 4 4 Pay attention to these hobbies! 0 0 2 raillife HAZİRAN / JUNE 2016 Bir kuyumcu ustalığıyla, çay lizlerinin altın değerindeki en üst yapraklarından özel olarak harmanlandı. İÇİNDEKİLER / CONTENTS 54 GİRİŞİM INITIATIVE Hedef kitlesini dinleyen kazanır The ones who listen to the target mass win 58 ZANAAT CRAFT Ünlü üstatların enstrümanı onun elinden çıkıyor He makes instruments for famous musicians 62 TARİH HISTORY Hem fatih hem yavuz hem kanuni: II.
    [Show full text]
  • IZMIT Bay Suspension Bridge – Wind Induced Vibrations
    39th IABSE Symposium – Engineering the Future September 21-23 2017, Vancouver, Canada IZMIT Bay Suspension Bridge – Wind Induced Vibrations Manabu INOUE, Yusuke TAKAI, Mecit Kerem UZUN IHI Infrastructure Systems Co., Ltd., Istanbul, TURKEY Takeshi KAWAKAMI IHI Infrastructure Systems Co., Ltd., Tokyo, JAPAN Contact: [email protected] Abstract This paper describes the studies and the countermeasures against the vibrations on the cables of IZMIT Bay bridge (now named “Osman Gazi Bridge”) in Turkey. First, the vibrations observed in the structure are summarized together with the data measured on site by accelerometers, GPS etc. Through studies about the efficiency of possible anti-vibration devices, appropriate considerations have been adopted and those are working very properly so far. Keywords: IZMIT Bay Bridge, Cable system, Wind-induced vibration, Anti-vibration device a depth of 4.75 m. It is carrying three lanes of 1 Introduction highway traffic in each direction. The walkway for The IZMIT Bay Bridge (now named “Osman Gazi maintenance cars with a width of 2.9 m is at both Bridge” in honor of Osman I (1259 - 1326) who sides of the steel deck as similar to 1st and 2nd founded the Ottoman Empire in 1299) located in Bosporus bridges. northwest Turkey. It consists of the North The tower is 236.4 m high steel structure due to the Approach Viaduct, the Suspension Bridge and the high seismic demands and short construction time. South Approach Viaduct, and carries the Gebze- The tower consist of closed box section legs Orhangazi-Bursa-Izmir motorway across the Sea of inclined by about 1:80 and two rectangular closed Marmara at the Bay of Izmit between the Diliskelesi box cross beams in the middle and at the top.
    [Show full text]
  • Sektörüm Dergisi 89. Sayı-Haziran2018
    INDEXINDEX 172 28 242 4. Rekabete Hazır mısın-2 / Nurşah SUNAY 74. Çiftçilere Elektrik Desteği Geliyor 134. Yeni Nesil Türbinler Türkiye’nin.. 6-8. Aydınlatma ve Kent Estetiği / Ahmet SOYLU 76. Dikili Tip Kabinetin Yeni İsmi; Evoline 136-137. Elektrik Dağıtımında.. 10-12. Kurumların Dijital İK Süreçlerindeki En Hassas 77. Enerjisa Enerji, Eşarj ile Türkiye’yi.. 138. Bu Bisiklet Hem Obeziteden Kurtarıyor.. Noktası “Doğru Çözüm Kararı” / Kadri DEMİR 78. Sanayiciye Elektrik Şoku 140. Aksa Jeneratör Yönünü.. 14. Döviz Kredisi Kullananlar Nelere Dikkat Etmeli / 80. Sanayi Kenti Güneş’ten Kazanacak 142. OMG Samsun Elektrik Santrali.. Hikmet BAYDAR 82. Dijital Esnaf Olmanın 7 Kuralı 144. Güneş Enerjisi Sistemleri Hakkında.. 16. Yüksek Teknolojiye Sahip Kaçak Akım Röleleri-1 / 84. Audi E-Tron Faraday Kafesi’nde.. 145. DHL, Eaton İçin Modern ve.. Serdar AKSOY 85. Prysmian Kablo, Data Center 2018’de.. 146. Kırbıyık İçecek Elektrik Faturasını.. 18. İlaç Yatırım Projesinin Uygulama Adımları-5 / 86. Güneş Enerjisi Potansiyelimiz.. 148-149. Günsan’dan Piyasayı Dönüştürecek.. Namık YENER 88-89. Sabancı Üniversitesi “Sanayi Odaklı.. 150-152. Enerji Arz Güvenliği İçin Sıra Biyokütle’de 20. Bilgisayarın Kısa Tarihi-3 / Ekrem KARATAŞ 90. Özbekistan’ ın Enerjisi Aksa’ya Emanet 153. Türkiye Enerji Sektörü, 24. Uluslararası.. 22. 7143 Sayılı Torba Yasa Önemli / Savaş KONCA 92. Berdan Civata’ya Finlandiya.. 154-156. Osram Bahçecilik Startupına.. 24. Borpanel, TEBİF Fuarı’nda da.. 93. Zorlu Solar Vestel Çatısına 80MW GES Kuracak 158-160. Zumtobel ve Avusturyalı Enerji Firması.. 26-28. Kardeş Elektrik, ISO 27001 Bilgi Güvenliği.. 94-96. EDS Solar Kiremit İle Çatılarınız Yüzde 25.. 162-164. Yarının Aydınlatma Teknolojileri.. 30. Plastik Sektöründen İlk Çeyrekte.
    [Show full text]
  • Ship Building, Ship Repair and Maintenance, Ship Conversion and Steel Structure Fabrication
    SHIP BUILDING, SHIP REPAIR AND MAINTENANCE, SHIP CONVERSION AND STEEL STRUCTURE FABRICATION Kaya YASAR, Sales Manager (New building and Special Projects), Gemak RECENT SHIPBUILDING & INDUSTRIAL INTRODUCTION PROJECTS Since 1969, Gemak Group has been maintaining It is based on innovation, excellent use of its reliable position, and is noted in Turkey and technology and engineering capability. With its advanced manufacturing infrastructure, the around the world for its wide range of skills and company is positioned as a leading company in technical expertise. Among its strengths are: experience in managing shipbuilding and high quality large steel complex and sophisticated ship building, ability to constructions. In 50 years of experience in engineering solutions, provide solutions with well experienced, multi- Gemak is proud of being of service to its clients. disciplinary engineering capacity and well Having built up a new client portfolio of foreign ship organized & automated large scale fabrication owners together with good experience in building Gemak has the vision to be the best in class and facilities. customized and sophisticated ships to a high preferred partner on a worldwide basis for quality standard, Gemak is confident of meeting demanding projects in the steel fabrication Gemak Group activities are spread over the the most demanding requests and requirements in industry, marine and offshore vessel building, Gemak Tuzla Shipyard, Gemak TGE Shipyard, ship building. marine conversion projects, marine vessel repair Neta Steel & Pipe Fabrication and Gemak Altınova and maintenance. Shipyard with a total of 336,000m2 of fabrication Moreover, 50 years of vast experience in various space. fields related mainly to the shipping industry has Gemak´s standard is well-proven and known to its positioned Gemak Group as a major player in the clients.
    [Show full text]
  • Economic Corridors in Asia: Paradigm of Integration? a Reflection for Latin America
    SORAYA CARO VARGAS (EDITOR) Economic Corridors in Asia: Paradigm of Integration? A Reflection for Latin America Universidad Externado de Colombia Economic corridors in Asia : paradigm of integration? A reflection for Latin America / Alexánder Arciniegas Carreño [y otros] ; Soraya Caro Vargas, editor. -- Bogotá : Universidad Externado de Colombia. 2020. 459 páginas : ilustraciones, mapas, gráficos ; 21 cm. Incluye referencias bibliográficas. ISBN: 9789587903812 1. Cooperación internacional -- América Latina 2. Cooperación internacional -- Asia 3. Crecimiento económico -- América Latina 4. Crecimiento económico -- Asia 5. Globalización 6. Geopolítica 7. Infraestructura (Economía) I. Caro Var-gas, Soraya, editor II. Universidad Externado de Colombia III. Título 337 SCDD 21 Catalogación en la fuente -- Universidad Externado de Colombia. Biblioteca. MRJ. junio de 2020 ISBN 978-958-790-381-2 © 2020, SORAYA CARO VARGAS (EDITOR) © 2020, UNIVERSIDAD EXTERNADO DE COLOMBIA Calle 12 n.º 1-17 este, Bogotá Teléfono (57-1) 342 0288 [email protected] www.uexternado.edu.co Primera edición: junio de 2020 Diseño de cubierta: Departamento de Publicaciones Corrección de estilo (español): Luis Fernando García Núñez Corrección de estilo (inglés): Michael Forrest Composición: María Libia Rubiano Impresión: Xpress Estudio Gráfico y Digital S.A.S. - Xpress Kimpres Tiraje de 1 a 1.000 ejemplares Impreso en Colombia Printed in Colombia Prohibida la reproducción o cita impresa o electrónica total o parcial de esta obra, sin autorización expresa y por escrito del Departamento de Publicaciones de la Universidad Externado de Colombia. Las opiniones expresadas en esta obra son responsabilidad de los autores. Quiero agradecer al doctor Roberto Hinestrosa Rey, decano de la Facultad de Finanzas, Gobierno y Relaciones Inter- nacionales por su constante apoyo a esta iniciativa.
    [Show full text]
  • Wind Analysis of the Bosphorus Suspension Bridge: Numerical and Experimental Investigation
    Wind Analysis of the Bosphorus Suspension Bridge: Numerical and Experimental Investigation Selcuk Bas1, 2, Nurdan M. Apaydin3, Alper Ilki4 and F. Necati Catbas5 1 Department of Civil Engineering, Bartin University, Bartin, Turkey 2 Graduate School of Science, Engineering and Technology, Istanbul Technical University, Istanbul Turkey 2 Department of Structures, General Directorate of Turkish State Highways, Ankara, Turkey 3 Department of Civil Engineering, Istanbul Technical University, Istanbul Turkey 4 Civil, Environmental and Construction Engineering, University of Central Florida, Florida, USA ABSTRACT: Long-span suspension bridges are subjected to various loading events in their life- cycle. Along with operational loads, they have experiences on extreme loads, such as earthquake, wind, marathon etc. Of all these extreme events, wind is the most critical one, which in turn design considerations of the structural components of long-span bridges are adopted according to wind load. Based on these considerations, wind-induced behavior of the Bosphorus Bridge is presented in this study. For this aim, the extreme wind events that happened in April 18 2012 is considered and the data obtained from the Structural Health Monitoring system-SHMs of the bridge during the event are utilized for experimental analysis. Conducting certain data processing methods to make the SHM data more identifiable on the basis on modal characteristics of the bridge, the response of the bridge to the strong wind event are determined. For numerical investigation on wind behavior of the bridge, 3-D full-scale shell finite element model (FE) of the bridge is established and the sophisticated FE model is verified with the SHM data from the extreme wind event.
    [Show full text]
  • Prestigious Projects Prestigious P Linking Turkey
    HIGH QUALITY PRESTIGIOUS PROJECTS STANDARDS PRESTIGIOUS PROJECTS LINKING TURKEY TO THE FUTURE MENTS STADIUMS TUNNELS SHOPPING CENTERS RESIDENCES HIGH QUALITY MINES STANDARDS TECHNOLOGY WIDE PRODUCT R Türk Prysmian Kablo ve Sistemleri A.Ş. 2017 ANNUAL REPORT 2017 ANNUAL REPORT Türk Prysmian Kablo ve Sistemleri A.Ş. 2017 ANNUAL REPORT 1 2 2017 ANNUAL REPORT Türk Prysmian Kablo ve Sistemleri A.Ş. CONTENTS Preliminary Information 4-5 Message from the CEO 6-7 Türk Prysmian Kablo ve Sistemleri A.Ş. at a Glance 8 Organizational Structure 9 Company Boards 10-11 Board Members 12-13 Managers 14 Sales Structure 15 Prestigious Project References Directors’ Report 16 2017 Economic Overview 17 2018 Economic Expectations 18 2017 Sector Evaluation 19 R&D Activities 20 Attention! All Cables Are Not The Same... 21 Corporate Social Responsibility 22-23 Financial Analysis 24 The Statement of Responsibility & Dividend Distribution Proposal 25 Ordinary General Assembly Agenda Auditors’ Reports 26 Independent Auditor’s Report Related to the Annual Report 27-69 Independent Auditor’s Report on Consolidated Financial Statements Principles 70-81 Compliance Report 82-84 Türk Prysmian Ethical Code 3 PRELIMINARY INFORMATION � MESSAGE FROM THE CEO Dear Shareholders, Since the founding of our company in 1964, we have been leading the Turkish cable industry, with important accomplishments in the business. Inspired by our motto “Linking Turkey to the Future” which we have announced in 2011, we are making significant contributions to Turkey’s industrialization with our innovative products and investments. After a very tough year, both economically and politically, there were also positive developments both in Turkey and around the world in 2017.
    [Show full text]
  • Mega Projects
    Mega Projects Marmaray: Marmaray is an undersea railway tunnel linking the Asian and European sides of Istanbul, and its first phase has been in operation since October 2013, the 90th anniversary of the Republic of Turkey. Marmaray makes a significant contribution to Istanbul’s railway network, with connections to the Istanbul metro and the high-speed railway line between Istanbul and Ankara. Marmaray has carried more than 120 million passengers since its inauguration. Third Bosphorus Bridge and North Marmara Highway: Istanbul’s third Bosphorus bridge (Yavuz Sultan Selim Bridge) links Istanbul’s European and Asian sides. It was designed as a hybrid bridge, and as such holds the distinction as the world’s widest and longest combined road and rail bridge. The bridge is part of the North Marmara Highway project, stretching from Adapazarı, Sakarya to Tekirdag. Once fully operational, the project will further ease the burden on the existing two bridges spanning the Bosphorus and provide a transit corridor for freight transportation that bypasses the busy city center. The project has created around 6,000 jobs and the construction activities have added an annual TRY 1.75 billion to the economy. Eurasia Tunnel: The tunnel enables motor vehicles to travel between Asia and Europe via a highway tunnel running underneath the Marmara seabed. The 3.34 km-long two- deck undersea tunnel will have a daily capacity of 120,000 vehicles and will significantly cut the distance between Kazlicesme on the European side and Goztepe on the Asian side of Istanbul. It is expected to be open by the end of 2016.
    [Show full text]
  • Review of Total Emission of Transit Ships in the Dardanelle
    Mersin, K.: Review of Total Emission of Transit Ships in the Dardanelle ... THERMAL SCIENCE: Year 2020, Vol. 24, Suppl. 1, pp. S391-S398 S391 REVIEW OF TOTAL EMISSION OF TRANSIT SHIPS IN THE DARDANELLE WHICH INCLUDING POSSIBLE CO2 EMISSION OF 1915 CANAKKALE BRIDGE by Kadir MERSIN* International Logistics and Transportation Department, Istanbul Gelisim University, Istanbul, Turkey Original scientific paper https://doi.org/10.2298/TSCI20S1391M Canakkale Strait (Dardanelles), is one of two straits that have Turkey with Bospho- rus. This strait, which has a length of 38 miles, provides the connection of coun- tries with a coast to the Black Sea to the Mediterranean. 43454 ships pass through the strait annually. According to 2019 data, 45.33% general cargo ship, 21.43% bulk carrier, 21.78% tanker, 6.43% container, 0.65% ro-ro, and 0.61% passenger ship, and 3.77% other type of ship passed. Therefore, by including the Canakkale 1915 bridge which will be completed in 2023, the six most frequent ship types were examined and their emission values were calculated in this study. Key words: ship emission, Dardanelle, Canakkale Bridge, CO2 emission Introduction International maritime trade is the greenest form of transportation compared to other modes of transport and emits the lowest CO2 emission per unit load per kilometer but, it is re- sponsible for 3.3% of global CO2 emissions [1]. According to fuel consumption, CO2, NOx, and SOx emissions from exhaust gas emis- sions from ships correspond to approximately 2%, 11%, and 4% of global anthropogenic emis- sions [2]. This rate is at a considerable level.
    [Show full text]
  • The Projects and Construction Review
    The TheProjects Cartels and Leniency and Review Construction Review Reproduced with permission from Law Business Research Ltd. Sixth Edition This article was first published in The Cartels and Leniency Review, 2nd edition (published in January 2014 – editor Christine A Varney). Editor ForJúlio further informationCésar Bueno please email [email protected] Law Business Research The Projects and Construction Review Reproduced with permission from Law Business Research Ltd. This article was first published in The Projects and Construction Review, 6th edition (published in July 2016 – editor Júlio César Bueno). For further information please email [email protected] The Projects and Construction Review Sixth Edition Editor Júlio César Bueno Law Business Research Ltd PUBLISHER Gideon Roberton SENIOR BUSINESS DEVELOPMENT MANAGER Nick Barette BUSINESS DEVELOPMENT MANAGER Thomas Lee SENIOR ACCOUNT MANAGERS Felicity Bown, Joel Woods ACCOUNT MANAGERS Jessica Parsons, Adam Bara-Laskowski, Jesse Rae Farragher MARKETING COORDINATOR Rebecca Mogridge EDITORIAL ASSISTANT Sophie Arkell HEAD OF PRODUCTION Adam Myers PRODUCTION EDITOR Janina Godowska SUBEDITOR Joanne Morley CHIEF EXECUTIVE OFFICER Paul Howarth Published in the United Kingdom by Law Business Research Ltd, London 87 Lancaster Road, London, W11 1QQ, UK © 2016 Law Business Research Ltd www.TheLawReviews.co.uk No photocopying: copyright licences do not apply. The information provided in this publication is general and may not apply in a specific situation, nor does it necessarily represent the views of authors’ firms or their clients. Legal advice should always be sought before taking any legal action based on the information provided. The publishers accept no responsibility for any acts or omissions contained herein. Although the information provided is accurate as of July 2016, be advised that this is a developing area.
    [Show full text]
  • Oyak Çi̇mento A.Ş
    OYAK ANNUAL REPORT 2019 ANNUAL OYAK ANNUAL REPORT 2019 OYAK used recycled paper in the printing of this report in order to contribute to the ecosystem. www.oyak.com.tr As Turkey’s largest occupational pension fund, OYAK aims to secure the future of its members while contributing to the national economy. We accept challenges as a part of our job. In fact, the challenges we face serve as a driving force behind our success. We are a special group. We have reached to the strong position where we are today by supporting each other and focusing on the same goal. We have a long road ahead as we continue adding value to the lives of 418,455 OYAK members and the 83 million people in our country. We are rewarded for the accomplishments that we have achieved over time. Step by step, we become more encouraged and more powerful as we move forward on our path to sustainable success. Everyday, we are preparing for the future. We keep pace with technology, digitalize our business processes, adapt to the digital transformation and enhance synergy among our Group Companies. We are well aware of our responsibilities. We are here to ensure that our members continue their lives in a proud and dignified way when they retire without any loss to their standard of living. We do whatever it takes to achieve that key objective. That is why we say “We go above and beyond.” WE ARE Since its inception in 1961, OYAK manages PROUD OF OUR CONTRIBUTIONS all savings of the members of the Turkish TO THE TURKISH Armed Forces serving at all places that the ECONOMY Turkish flag is flying, under the title of trustee according to the principles of profitability, efficiency and corporate investment.
    [Show full text]
  • Annual Report
    2016 ANNUAL REPORT To become great; you will not compliment anybody, you will not deceive anybody, you will see whatever the real goal is for the country and walk to that destination. Everybody will be against you; everybody will try to throw you off the track. However, you will resist them, they will put endless obstacles in front of you as well. You will overcome these obstacles accounting yourself little, not great, weak, toolless, nothing and believing that no one will help you. CONTENTS 04 ABOUT US 06 08 BOARD OF TRUSTEES HEAD OF BOARD OF TRUSTEES Cem MELİKOĞLU 10 GENERAL MANAGER Alper ERALP 14 MARITIME SECTOR 44 76 INDUSTRY AND CERTIFICATION SECTOR TRAINING SERVICES 84 TURK LOYDU FOUNDATION’S ACTIVITIES ABOUT US Turk Loydu Health, Security, Environment and Quality Policy Türk Loydu is committed to; • Ensuring independence, impartiality, confidentiality and reliability, • Complying with “Türk Loydu Code of Ethics”, • Delivering services in accordance with applicable legislation, rules, standards as well as the terms and conditions specified by customers, • Contributing to safety of life and property and environmental protection by means of the rules developed and services performed, • Maintaining its national and international recognitions in compliance with Health, Safety, Environment and Quality standards, • Ensuring customer satisfaction by offering on-time and equally accessible service to all customers according to their expectations, • Ensuring effective training and qualification system to maintain a high level of technical personnel, Our Vision • Managing of risks associated with service processes, • Providing a healthy and safe environment and To become the first preferred international classification adequate resources to personnel in order to prevent and certification society that powered by powered by injuries, ill health and to ensure their safety, its own rules and knowledge and expertise.
    [Show full text]