MOTORWAYS, & Route 6 Prishtine - Hani I Elezit Motorway Project, Kosovo AIRPORTS & STADIUMS WATER WORKS, DAMS, PIPELINES & MINING CEMENT PLANTS

INFRASTRUCTURE SELECTED PROJECTS MOTORWAYS, BRIDGES & TUNNELS Morava Corridor Motorway, Serbia 1915 Canakkale , 42°37’9.49”N | 21° 6’56.37”E Prishtine - Hani I Elezit (Route 6) Motorway, Kosovo Route 6 Prishtine - Hani I Elezit Motorway Project, Kosovo Osmangazi Suspension Bridge, Turkey Eurasia , Turkey Western High Speed Diameter Motorway, Russia Morine - Merdare (Route 7) Motorway, Kosovo Rreshen - Kalimash Motorway, Albania Autostrada Transylvania - Romanian Motorway, Romania Bregana – - Dubrovnik Motorway, Ankara – Gerede Motorway, Turkey , Turkey Golden Horn Steel Bridge, Turkey AIRPORTS & STADIUMS Development Of Muscat International Airport, Oman Sheremetyevo International Airport, Terminal 3, Russia FC Shakhtar Shaktar Stadium, Donbass Arena, Ukraine WATER WORKS, DAMS, PIPELINES & MINING CONTENTS The Nassau Cruise Port at Prince George Wharf, Marine Works, The Bahamas Umm Qasr Basra Multi-purpose Terminal (BMT), Iraq 433 MW Namakhvani HPP Cascade, Georgia Derna Desalination Plant, Libya Soussa Desalination Plant, Libya Zawia Desalination Plant, Libya Zuara Desalination Plant, Libya Oued Athmenia Dam, Algeria Aktau Port Rehabilitation, Kazakhstan Kumtor Gold Mine, Kyrgyzstan Koktenkol Molybdenum, Kazakhstan Bekme Dam, Iraq Berke Dam, Turkey Former USSR (CIS) Turkey Natural Gas Pipeline, Iraq - Turkey Crude Oil Pipeline Expansion Benghazi Water Reservoir, Libya Wasia Water Treatment Plant, Saudi Arabia Al Rass Water Supply & Treatment, Saudi Arabia Ras Lanuf New Town (Water Supply & Sewage Systems), Libya Brega New Town Project Water Reservoirs & Piping Works, Libya Al Khafji Phase 2 Desalination Plant, Saudi Arabia Al Medinah Housing (Water Supply & Sewage Systems), Saudi Arabia Istanbul Yenikapi Pretreatment Plant & Pumping Station, Turkey Diyarbakir & Kahramanmaraş drinking & Sewage System, Turkey CEMENT PLANTS Messebo Cement Factory, Ethiopia Benghazi Cement Plant, Libya Hawari Cement Plant, Libya Souq Al-Khamis Cement Plant, Libya Al Khoms Cement Plant, Libya Tasluja Cement Plant, Iraq Kerbela Cement Plant, Iraq Falluja White Cement Plant, Iraq Badoosh Cement Plant, Iraq New Badoosh Cement Plant / Operation & Maintenance, Iraq Rashadiya Cement Plant, Jordan Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 2 FACHSHEETS Page | 2 3 | Page FACTSHEETS 3 ENKA İNŞAAT VE SANAYİ A.Ş.e-mail: [email protected] | web: www.enka.com e-mail:Kubaisa [email protected] Cement | web: Plant, www.enka.com Iraq ENKA İNŞAAT VE SANAYİ A.Ş. MORAVA CORRIDOR MOTORWAY, SERBIA MOTORWAYS, BRIDGES & TUNNELS 1915 CANAKKALE BRIDGE, TURKEY AIRPORTS & STADIUMS PRISHTINE - HANI I ELEZIT (ROUTE 6) MOTORWAY, KOSOVO WATER WORKS, DAMS, PIPELINES & MINING CEMENT PLANTS OSMANGAZI SUSPENSION BRIDGE, TURKEY , TURKEY WESTERN HIGH SPEED DIAMETER MOTORWAY, RUSSIA MORINE - MERDARE (ROUTE 7) MOTORWAY, KOSOVO RRESHEN - KALIMASH MOTORWAY, ALBANIA AUTOSTRADA TRANSYLVANIA - ROMANIAN MOTORWAY, ROMANIA BREGANA – ZAGREB - DUBROVNIK MOTORWAY, CROATIA ANKARA – GEREDE MOTORWAY, TURKEY ISTANBUL METRO, TURKEY GOLDEN HORN STEEL BRIDGE, TURKEY

MOTORWAYS,

BRIDGES & MOTORWAYS,

TUNNELS BRIDGES & TUNNELS

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 4 FACHSHEETS Page | 4 5 | Page FACTSHEETS 5 ENKA İNŞAAT VE SANAYİ A.Ş.e-mail: [email protected] | web: www.enka.com e-mail: [email protected] | web: www.enka.comENKA İNŞAAT VE SANAYİ A.Ş. MORAVA CORRIDOR MOTORWAY PROJECT MORAVA CORRIDOR MOTORWAY PROJECT

PROJECT DESCRIPTION UNIQUE CHALLENGES PROJECT DETAILS On December 5th 2019, ENKA-Bechtel Joint Venture signed a contract with the As per Serbian Design Standards, to enable 130 km/h design speed, the dual-carriageway motorway will be 30 meter LOCATION: Government of Republic of Serbia to design and build 112 km Morava Corridor wide. Single carriageway will compose of 2 x 3.75 m traffic lane, 2.5 m emergency lane, 1.5 m shoulder, 1.5 m edge Pojate-Preljina, Serbia Motorway Project which will connect central Serbia and Pan-European Corridors 10 strip and 2 m median (1.5 m in Section 8 and 9 only), totaling 15 m width and consequently 30 m width (29 m in OWNER / CLIENT: Section 8 and 9 only) for dual-carriageway. Government of the Republic of and 11. Serbia Ministry of , and Infrastructure. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway, with a An extensive telecommunication network (5-G) is planned along the alignment to provide a Digital Corridor for design speed of 130 km/h, from Pojate and the A1 (the North-South motorway in improved connectivity in the region. The project features 10 new interchanges, significant amount of structures PROJECT DURATION: Dec 2019-Dec 2023 central Serbia) through Kruševac ((which used to be the industrial hub of Yugoslavia) crossing highways, railways and challenging Morava river along the route, high embankment fills with extensive and up into Preljina in the north of Čačak. The project runs from east to west in the embankment scour protection works, flood protection measures and long river diversions, dykes and construction CONTRACT TYPE: Lump Sum West Morava River valley and is seen as a key enabler of the economic corridor to of new river bed due to the wide flood plain of West Morava River. Total length of regulation of river beds included the industrial city of Kruševac and its ultimate international connections to Bosnia, within the scope of the project is circa 50 km. CONTRACT VALUE: EUR 745 Million and Macedonia. The motorway connects pan-European Corridors 10 ENKA SCOPE OF SERVICES and 11 and all major towns and cities in a central Serbian region that has a population SIGNIFICANT FEATURES / ACCOMPLISHMENTS: of around 500,000 and includes Cacak, Kraljevo, Vrnjacka Banja, Trstenik, Krusevac ENKA, with its joint-venture partner Bechtel, will design and build 112 km dual-carriageway motorway • Project will connect central and Cicevac. Serbia and Pan-European The scope of the project includes 56 bridges, 29 overpasses, 28 underpasses, over 35 million m3 excavation, over 22 Corridors 10 and 11. Construction of the motorway has started in 2020 and each individual section of the million m3 earth fill, 900,000 m3 concrete, 1.8 million m3 subbase, 1.2 million ton asphalt and 475 km guardrail. • First digital (5G) and widest motorway motorway will be completed within 2.5 years with the total construction period of 4 The project is expected to create around 4,000 jobs at peak, during construction. • Regulation of river beds – 50 years under contract terms and conditions. km Sections 1 to 3 (from Pojate to Krusevac) 27.8 km are planned to be opened to traffic To perform this important Infrastructure Project, ENKA will provide its top level engineering, production, quality, by December 2021. environment, health and safety standards which were gained in more than 60 years of its history.

Sections 8 to 9 (from Adrani to Preljina) 30.7 km are planned to be opened to traffic Commodity UoM Total Commodity UoM Total by December 2022.

Sections 4 to 7 (from Krusevac to Adrani) 53.9 km are planned to be opened to traffic Total Length km 112 Total Concrete m³ 900,000 by December 2023. Total Underpass ea 28 Total Subbase m³ 1.8 Million

Total Overpass ea 29 Total Asphalt ton 1.2 Million

Total Bridge ea 56 Total Guardrail km 475

Major Quantities Total Excavation m³ 35 Million Major Quantities Regulation of River Beds km 50

Total Earth Fill m³ 22 Million

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 6 FACHSHEETS Page | 6 7 | Page FACTSHEETS 7 ENKA İNŞAAT VE SANAYİ A.Ş.e-mail: [email protected] | web: www.enka.com e-mail: [email protected] | web: www.enka.comENKA İNŞAAT VE SANAYİ A.Ş. 1915 ÇANAKKALE BRIDGE 1915 ÇANAKKALE BRIDGE

PROJECT DESCRIPTION PROJECT DETAILS 1915 Çanakkale Bridge World’s Longest Suspension Bridge.

LOCATION: ENKA SCOPE OF SERVICES: Çanakkale, Turkey With a main span of 2,023 m and total length of 4,608 m, 1915 Çanakkale Bridge will be the ADMINISTRATION: longest suspension bridge in the world upon completion. Republic of Turkey Ministry of Transportation and Scopes of ENKA’s subsidiaries, Çimtaş and Kasktaş, under separate subcontracts are as Infrastructure, General Directorate of Highways (KGM) following:

APPOINTED COMPANY: Çimtaş scope of works: ÇOK A.Ş. • All permanent steel components of 1915 Çanakkale Bridge with a total weight of over BRIDGE CONTRACTOR: 100,000 ton are being fabricated by Çimtaş Daelim-Limak-SK E&C-Yapı Merkezi Joint Venture (DLSY JV) • Strict fabrication tolerances have been applied as ±3 mm for Tower Blocks and ±5 mm for Girder Blocks BRIDGE FABRICATOR: Çimtaş Gemlik Works • The tower and deck blocks will be delivered to the installation site by Çimtaş owned 4,400 DWT dynamic positioning vessel “GMK-1” GROUND ASSEMBLER: Çimtaş Module and Shipyard, • Tower and Girder blocks of a suspension bridge have been simultaneously fabricated Kasktaş: Gölcük at the same location for the first time in the world by Çimtaş during the execution of • European Anchor Block, Slope Stability and Barrette Pile Works: SUBCONTRACTOR: Osmangazi Bridge and the same success is being repeated for 1915 Çanakkale Bridge Kasktaş A.Ş. Project. • For a maximum excavation depth of 46 m; slope stability protection shotcrete was applied with ±1 cm construction tolerance. DIVISION OF WORKS: Kasktaş scope of works: ÇIMTAŞ GEMLIK WORKS • European Anchor Block, Slope Stability and Barrette Pile Works consisting of 165,000 • Asian Anchor Block Excavation Support and Barrette Pile Works: Tower panels detailing, supply and fabrication, transportation m³ excavation work; 14,400 m rock bolts; 11,540 m² of shotcrete; 12,000 m secant • A bi-directional preliminary load test was performed on 6,575 mm x 1,200 mm test barrette by using 5 no. of to the Çimtaş Gölcük Module piles; 54 no’s of dewatering wells were executed by Kasktaş. special jacks with a maximum capacity of 5,200 tons. and Shipyard. • Asian Anchor Block Excavation Support and Barrette Pile Works consisting of a 5,700 Girder panels detailing, supply • European Approach Viaduct Soil Improvement and Piling Works: and fabrication, transportation m of secant piled shoring system and a special foundation system with 7 rows of to the Çimtaş Gölcük Module 8,000 m3 barrette piles having a total plan length of 51.5 m and a thickness of 120 cm • Full length wet samples were taken from 27 m long Deep Soil Mixing (DSM) Columns, and Shipyard. were performed by Kasktaş. • 1,500 mm diameter bored pile installations have been completed under Abutment (AE), PE3, PE4, PE5 ÇIMTAŞ GÖLCÜK MODULE & SHIPYARD • The construction of 365 m long European Approach Viaduct Soil Improvement and viaduct foundations and SPE (Side Span Pier) foundations. 72 m long special bored piles, which are one of the Piling Works were undertaken. A total of 120,100 m of deep soil mixing (DSM), 29,900 Ground assembly of tower longest bored piles executed in Turkey; have been installed under SPE (Side Span Pier) areas. Bi-directional panels into tower blocks, trial m³ unreinforced barrette piles; 6,600 m foundation piles with a diameter of 150 cm axial preliminary loading tests have been applied on 2 test piles and tested up to a maximum test load of assembly, painting and delivery and a maximum depth of 70 m work has been completed under PE3, PE4, PE5 and 4,200 tons. to final location. SPE (Side Span Pier) viaduct foundations. Ground assembly of girder • In order to ensure the soft soil layers to be secured against liquefaction and deep-seated slip; 26.5 m long DSM panels into girder blocks, mega- • Berth Structures providing transportation of two continents during construction works columns by means of intersecting cell lines and unreinforced barrette piles up to 67 m depth constitute the block formation, trial assembly, consisting of sheetpile walls were constructed on both European and Asian sides. painting and delivery to final difficult and ambitious applications of the project. All barrette piles were checked by Koden with a verticality location. UNIQUE CHALLENGES of (1/200). KASKTAŞ European Anchor Block: Çimtaş: Slope Stability and Excavation Commodity UoM Total Commodity UoM Total Works • In order to compensate the weld shrinkages, steel structure was modelled in 3 different Excavation m³ 165.000 Sheet Pile m2 2,500 Asian Anchor Block: stages in reverse order as installation, trial assembly and fabrication stages Excavation Support and Barrette • All Pre-cambering methods, multi torch welding processes and automated NDT were Barrette Piles m³ 8.000 Tower Height m 318 Piling Works developed in-house European Approach Viaducts: Unreinforced Barrette Piles m³ 29.900 Number of Tower Blocks ea 146 Soil Improvement and Piling • Vertical Trial Assembly of Tower Blocks is being performed with 3 tower blocks in every Secant Pile m 12.000 Block Weight ton 225-830 Works cycle with a total height of 33 m and with a total weight of 2,000 ton European and Asian Berth • After completion of the block formation works, 128 Girder Blocks will be welded in Dewatering Well ea 54 Tower Total Weight ton 47,000 Structures: Sheetpile Driving and Tie-Rod pairs and transformed into so called “Mega Blocks” in order to reduce the number of Shotcrete m2 11,540 Girder Width m 45 Installation Works lifting and total installation duration Major Quantities Major Quantities Deep Soil Mixing m 120,100 Number of Girder Blocks у eaф 153 PROJECT DURATION: • All “Mega Blocks” with 45m x 48 m dimensions will be transported to the installation 2018 – 2023 site in Çanakkale by Çimtaş Foundation Pile m 6,600 Block Weight ton 300-650 Rock Bolt m 14,400 Girder Total Weight ton 53,000

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 8 FACHSHEETS Page | 8 9 | Page FACTSHEETS 9 ENKA İNŞAAT VE SANAYİ A.Ş.e-mail: [email protected] | web: www.enka.com e-mail: [email protected] | web: www.enka.comENKA İNŞAAT VE SANAYİ A.Ş. PRISTINA - HANI I ELEZIT (ROUTE 6) MOTORWAY PROJECT PRISTINA - HANI I ELEZIT (ROUTE 6) MOTORWAY PROJECT

13 bridges, totaling 8 km were constructed with 1,777 precast, prestressed, posttensioned and hybrid type of beams. 312 thousand m3 of concrete and 70 thousand meter of piles were placed during the construction of bridges. Due to challenging and mountainous terrain, a 5.75 km meter long Lepence Bridge was constructed along a deep narrow valley accommodating Lepence River and Souther Part of Route 10 Railway Track Line. Design and construction of the bridge including very detailed geotechnical investigation is completed in 18 months.

Due to the complex geology on the terrain and deeper soil investigation requirements, geotechnical investigations, including 16,000 meter of boreholes, were carried out with complete attention by a number of teams performing extensive investigations. 200 thousand meter of active and passive anchors with different thickness of shotcrete works have been performed in order to stabilize deep cut slopes along the alignment.

Climate conditions were of a big concern. During March 2016, despite the heavy rainfall, the project team proceeded with its construction works associated with utility relocation as well as earthworks, structures, drainage, surveying, finishing, and manufacture & operations departments.

Utilities along the project were also one of the challenges. The utility lines had been investigated and identified on site. There existed high voltage lines, power lines and various sewage, water supply and irrigation lines. The design and relocation of some utility crosses underneath the motorway had been completed while others had commenced. 350 utility lines have been relocated and handed over to local authorities and service providers on PROJECT DETAILS PROJECT DESCRIPTION behalf of the Employer. The contract for the Pristina-Hani i Elezit Motorway was signed between the Bechtel- LOCATION: ENKA General Partnership (BEGP) and the Ministry of Infrastructure of the Government ENKA SCOPE OF SERVICES Pristina-Hani I Elezit, Kosovo of Kosovo in July 2014. The contract was an EPC contract and BEGP was responsible ENKA, according to the contract, designed, executed and completed the construction works. ENKA, as the Design/ OWNER / CLIENT: for the engineering, procurement and construction of the overall project. Build Contractor, was responsible for completion of the design in accordance with the required European Standards Ministry of Infrastructure the and Specifications. Government of the Republic of It was BEGP’s second project in Kosovo. The motorway project is part of the South– Kosovo East Europe Core Road Network, in which it is referred to as Route 6. The project The number of direct hire personnel reached 3,353 at its peak, including citizens of 13 different countries, citizens PROJECT DURATION: crosses Kosovo from north to south, linking to Pristina in the north and stretching July 2014-Dec 2021 of Kosovo made up 80% of the total. It is one of ENKA’s goals to build a strong quality culture on the project and south as far as Hani i Elezit on the border with North Macedonia. The motorway is train the personnel to ensure that quality and safety are part of their everyday activities. Consequently, BEGP had CONTRACT TYPE: Design & Build expected to have significant strategic and economic benefits. Kosovo is connected provided all the personnel working on the project with training in safety and quality. to Skopje and has access to Corridor 10, facilitating its trade with the rest of the world. CONTRACT VALUE: In addition to completed Pristina-Hani I Elezit Motorway, Employer requested to incorporate 2 interchanges and The economic benefits arel not be limited to Kosovo. EUR 704 Million 1 overpass to the BEGP’s scope. On May 28th 2019, along with the request of the Ministry of Infrastructure and SIGNIFICANT FEATURES / The motorway is part of a European network of roads and is expected to contribute to Transport, the term of completion of the contract for construction of Pristina-Hani I Elezit Motorway was extended ACCOMPLISHMENTS: economic integration throughout the region. The project envisaged the construction for the additional works. • Links Kosovo to North of 65 km of 2x2 carriageway motorway, designed in three stages. The motorway had Macedonia been designed in accordance with Trans-European Motorway (TEM) standards as • By the end of the project, over 8,4 million person-hours well as Croatian standards, and construction works had been done in accordance had been reached without a Commodity UoM Total Commodity UoM Total lost time incident. with the 2011 general technical requirements (GTR) of the Croatian Road Authority.

• More than 22 million direct UNIQUE CHALLENGES Total Length km 65 Total Pile m 67,700 person-hours had been worked. Alignment of the Route 6 Motorway Section 3 crosses many mountainous terrains Total Interchange ea 8 Total Drainage Pipe km 426 • “2016 GRAA (Global Road Achievement Awards) and cliffs. Due to the complex geology on the terrain and deeper soil investigation Total Underpass ea 19 Total Subbase&CTB ton 1.7 Million Winner of the Environmental requirements, geotechnical investigations are being carried out with complete Mitigation category” selected Total Overpass ea 20 Total Asphalt ton 610,000 by IRF (International Road attention by a number of teams performing extensive investigations. 19 million m3 of Total Bridge Length km 8 Total Guardrail m 166,000 Federation) excavation with deepest point 62 m and 11 million m3 of embankments with highest 2 point 24 m were performed during the construction. Major Quantities Total Haul Road km 57 Major Quantities Total Fence m 206,000 Total Excavation m³ 19 Million Actve and Passive Anchors m 200,000

Total Fill m³ 11 Million Regulation of River Beds km 12

Total Concrete m³ 562,000

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 10 FACHSHEETS Page | 10 11 | Page FACTSHEETS 11 ENKA İNŞAAT VE SANAYİe-mail: A.Ş. [email protected] | web: www.enka.com e-mail: [email protected] | web: www.enka.comENKA İNŞAAT VE SANAYİ A.Ş. OSMANGAZI SUSPENSION BRIDGE OSMANGAZI SUSPENSION BRIDGE

PROJECT DETAILS

LOCATION: İzmit, Turkey

DEVELOPER: Investment and Operation Co., Inc.

EPC CONTRACTOR: NÖMAYG JV

BRIDGE CONTRACTOR: IHI Infrastructure Systems & ITOCHU Consortium The World’s Fourth Longest Suspension Bridge 2013 – 2016

BRIDGE FABRICATOR: Çimtaş Gemlik Works 2 PROJECT DESCRIPTION • A total of 14,700 m of diaphragm walls as a box type deep foundation under the South Approach Viaduct (SAV) Footings. GROUND ASSEMBLER: The length of South Approach Viaducts is ~1,380 m and founded on 11 no. of footings placed with 125 m of spacing. Height Çimtaş Module and Shipyard, is a suspension bridge, located at the along the eastern end of viaduct footings varies between 13 m to 57 m. Gölcük of the Sea of Marmara, in close vicinity of Izmit and approximately 50 km southeast of Istanbul, • A soil improvement consisting of 7,500 m of jet grouting under the North Side Span Pier was completed. Turkey. It is the fourth-longest suspension bridge in the world by the length of its central span. SUBCONTRACTOR: Kasktaş A.Ş. The bridge connects the North Eastern and South Eastern coast of the Izmit Bay, significantly UNIQUE CHALLENGES reducing regional travel time. Crossing the bay, the bridge and the connecting highway PROJECT DURATION: Çimtaş: 2012 – 2016 provides three lanes of traffic in each direction. • Total 52,000 tons of steel was fabricated and delivered on time in 18 months although there were considerable amount of CONTRACT TYPE: Bridge has a total length of 2,682 m with a main span of 1,550 m and having total weight of design revisions and change requests from the Client. Unit Rate 52,000 ton. • In order to compensate the weld shrinkages, steel structure was modelled in 3 different stages in reverse order as installation, CONTRACT VALUE: trial assembly and fabrication stages. US$ 955 Million ENKA SCOPE OF SERVICES • All Pre-cambering methods, multi torch welding processes and automated NDT were developed in-house. SIGNIFICANT FEATURES / Scopes of works of ENKA’s subsidiaries, Çimtaş and Kasktaş, under separate subcontracts were • After completion of the block formation works, 52 Girder Blocks were transformed into 26 “Mega Blocks” in order to reduce ACCOMPLISHMENTS: as follows: the installation time. • Tower and Girder blocks of • Dynamic Positioning Vessel GMK-1 was modified in order to transport the “Mega Blocks” to jobsite. a suspension bridge were Çimtaş scope of works: simultaneously fabricated at • ENKA’s fully owned subsidiary Çimtaş performed engineering, fabrication, transportation, Kasktaş: the same location for the first block formation, trial assembly, fit-up and welding works of girder blocks. Accordingly, time in the world. • The Osman Gazi Bridge Project is located in one of the most seismically active regions in the world. Since the project Çimtaş Steel (Gemlik Works) and Çimtaş Module and Shipyard (Gölcük Yard) successfully alignment intersects with the North Anatolian Fault Line, the design of the structures is of special importance. Especially, • Strict fabrication tolerances achieved on time the completion of the fabrication and ground assembly activities for the were applied as ±3 mm for South Anchorage Block and South Approach Viaducts represent the initials in Turkey in terms of civil engineering. Osman Gazi Bridge Project where in total Çimtaş performed: Tower Blocks and ±5 mm for • South Anchorage Block and South Side Span Pier were designed by enabling rectangular shoring system to work together Girder Blocks. • Fabrication of 18,200 tons of tower panels and 33,800 tons of girder panels, thus, with multi-cell shoring system and compatible with the shape of integrated structure. The shape of the plan view of the • Since there was no available completing a total of 52,000 tons welded fabrication. shoring system looks like a guitar. This shoring design is unique not only in Turkey but also in the world. barge to carry out the • Formation and trial assembly of 108 tower blocks comprising of 432 tower panels. transportation of the bridge • Diaphragm walls are implemented as a Box-Type Deep Foundation System under the foundations of South Approach blocks, a Dynamic Positioning • Delivery of the tower blocks to the erection site by “GMK-1”, a 4,400 DWT dynamic Viaducts. Since the location of the project crosses the North Anatolian Fault Line and it lies within the secondary fault Vessel, GMK-1, was built by positioning vessel built by Çimtaş Module and Shipyard. zone, special techniques were used for design and construction of diaphragm walls in order to install continuous horizontal Çimtaş specifically for this reinforcement, which is quite different from the traditional methods. Therefore, the application of the diaphragm wall with project. • Formation and trial assembly of 113 girder blocks each with a size of 35mx25mx5m, comprising 3,246 girder panels. continuous horizontal reinforcement is used for the first time in Turkey. Kasktaş: • Combination of the girder blocks on the ground in pairs, to form so called “Mega Blocks”. • Water Jetted Sheet Pile Under the scope, Çimtaş Steel transformed 52 girder blocks to 26 Mega Blocks. Driving & Extracting • Site erection of the girder blocks where Çimtaş Steel executed the final adjustment • Cantilever Multi-Cell Commodity UoM Total Commodity UoM Total Diaphragm Wall and welding works. Within this scope, Çimtaş also performed a part of the girder block shipments via vessel GMK-1. Sheet Pile m2 12,450 Tower Total Weight ton 18,200 • Box Type Foundation System consisting of Continuous Kasktaş scope of works: Diaphragm Wall m2 28,700 Girder Width m 36 Horizontal Reinforced 2 Diaphragm Wall • At Dry Dock 12,450 m water jetted sheet pile driving and extracting works were completed. Jet Grouting m 7,500 Number of Girder Blocks pcs 113 • Soil Improvement by Jet • At South Anchorage Block, a total of 14,000 m2 cantilever multi-cell diaphragm wall was Tower Height Block Weight Grout Columns successfully executed to enable maximum excavation depth of 16.5 m within an artificial m 252 ton 230-400 Major Quantities Major Quantities fill for the first time in Turkey. Number of Tower Blocks pcs 108 Girder Total Weight ton 33,800

Block Weight ton 130-360

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 12 FACHSHEETS Page | 12 13 | Page FACTSHEETS 13 ENKA İNŞAAT VE SANAYİe-mail: A.Ş. [email protected] | web: www.enka.com e-mail: [email protected] | web: www.enka.comENKA İNŞAAT VE SANAYİ A.Ş. EURASIA TUNNEL WESTERN HIGH SPEED DIAMETER MOTORWAY

PROJECT DESCRIPTION PROJECT DESCRIPTION PROJECT DETAILS PROJECT DETAILS The Eurasia Tunnel connects the Asian and European sides of Istanbul via 5.4-kilometer St Petersburg Western High Speed Diameter (WHSD) Project, is one of the most

Location : Istanbul highway tunnel crossing underneath the seafloor. important Public Private Partnerships (PPP) realized in Russia up to now and has a Location: Turkey strategic importance in St. Petersburg city’s transport system. St. Petersburg, Russia Administration : General Employer: Directorate of Infrastructure ENKA SCOPE OF SERVICES Northern Capital Highway LLC. Investments (AYGM) ENKA SCOPE OF SERVICES Contractor : ENKA’s subsidiary Kasktaş performed the construction of Shoring Systems for TBM -Ic IÇTAS Contractor : Launch and Receiving Structures of Eurasia Tunnel Project: Yapı Merkezi & SK Engineering Foundation piles and diaphragm walls were constructed by ENKA’s subsidiary Subcontractor : 2 Kasktaş A.Ş. Joint Venture (YMSK JV) ATB has a rectangular geometry with 170 m x 25 m and an excavation depth of 39 Kasktaş for 11,6 km of the highway section. In the content of the project; 70,000 m of diaphragm wall were completed. Besides, 52,500 m of foundation piles were executed Project Duration : Subcontractor : m. A two staged shoring system consists of bored piles; supported by anchors. The 2013 – 2014 Kasktaş A.Ş. reinforcement of piles and rock bolts used for TBM face were made of glass fibre. from cofferdams and artificial islands; composed of sheet piled walls and filled with sand material with a limited access and working conditions. These cofferdams were Project Duration : ETB has a rectangular geometry with 70 m x 30 m. A Substation Building with a MAJOR COMPLETED WORKS: 2014 – 2016 located at the viaducts of the bridges and were connected to each other by temporary dimension of 45 m x 45 m and a 600 m-long access road (Cut & Cover Section) are A viaduct of longer than 7 km, access roads. The subcontracted works were executed under challenging nature and Sea Channel Bridge, MAJOR COMPLETED WORKS: also located in the same area, excavation depth is 31 m. A shoring system consists limited operating conditions, where extreme winter temperatures of -30oC and -35oC. Suspension Bridge, Extra dose bridge, European Transition Box (ETB) of diaphragm wall supported by steel and reinforced concrete struts. A 30 m deep Ground and piling works of Diaphragm Wall supported by impervious block, with a dimension of 17 m x 28 m, composed of unreinforced secant 70,000 m2 Diaphragm Wall and r.c. & steel struts, unreinforced 52,500 m Bored Piles, diaphragm walls, jet grout bored piles were constructed along the TBM axis at the receiving area. Moreover, Overpass and Temporary columns and secant piles a grid of underground support system composed of unreinforced diaphragm walls Platforms. The total project length is 11,6 Asian Transition Box (ATB) were also successfully constructed. Glass fibre reinforcement was also used for the km. Excavation Support Works, two diaphragm wall at the TBM receiving face. staged system with secant piles & contiguous piles supported by ground anchors

Yenikapı Underpass and U-Turn Structures, Piling Works

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 14 FACHSHEETS Page | 14 15 | Page FACTSHEETS 15 ENKA İNŞAAT VE SANAYİe-mail: A.Ş. [email protected] | web: www.enka.com e-mail: [email protected] | web: www.enka.comENKA İNŞAAT VE SANAYİ A.Ş. MORINE - MERDARE (ROUTE 7) MOTORWAY PROJECT MORINE - MERDARE (ROUTE 7) MOTORWAY PROJECT

PROJECT DESCRIPTION ENKA SCOPE OF SERVICES PROJECT DETAILS The Morine to Merdare Kosovo Motorway allows the newly founded Kosovo, to The 2x2 carriageway motorway has a total length of 78 km, runs through 6 important regions of Kosovo and strictly LOCATION: become an important pillar at the center of Eastern Europe’s transport system, complies with European standards. The design speed is 120 km/h and there are 9 sections of the project. Morine-Merdare, Kosovo improving the economy and lives of Kosovo’s citizens; as the World Highway magazine The designers are EGIS (France) and IGH (Croatia). BEGP (Bechtel-ENKA General Partnership) was responsible for OWNER / CLIENT: mentioned in their article “Road to prosperity.” The Morine to Merdare Motorway Directorate of Road design management and application of the design. Infrastructure Department spans from the Albanian border to the Serbian border, connecting Kosovo to the Ministry of Transport and Trans-European Motorway and to the ports at Durres (in Albania). Connecting the The works included construction of 15 bridges with a total length of 3,334 m, of which the maximum length is 720 m; Communications Government construction of 58 over and underpasses; 36 million m3 of excavation; 14 million m3 of fill; 2.2 million tons of subbase of Kosovo. newly founded country to the land and sea transportation grids in the region. It is the largest infrastructure project ever undertaken by the Government of Kosovo. and CTB; 392 thousands m3 of concrete and 764 thousands tons of asphalt. PROJECT DURATION: Apr 2010-Dec 2013 In April 2010, the Government of Kosovo authorized the construction of the 78 All materials used for the construction were fully tested, independently verified and approved prior to procurement CONTRACT TYPE: km Route 7 motorway from Morine to just north of the capital city, Pristina. The and installation. The project employed extensive formation for its staff, supervisors, foremen and craft to meet the Design & Build construction began within a month of signing the contract. The first 38 km part was quality requirements. The project also developed and implemented a comprehensive ES&H Management Program CONTRACT VALUE: completed in 18 months and the project was fully completed in less than 44 months. in compliance with the highest international standards. US$ 1.1 Billion This east-west motorway serves as the centre-piece of Kosovo’s national transport SIGNIFICANT FEATURES / ACCOMPLISHMENTS: system and promotes trade and development in Kosovo and throughout. It also improves road safety, and acts as an economic engine to increase investment in the • The largest infrastructure project ever undertaken by the country. The trade route created by the motorway is to contribute to the economic Government of Kosovo integration of the countries from South-eastern Europe, Western Europe, and beyond. • Decorated with the Engineering News Records (ENR) magazine’s UNIQUE CHALLENGES Global Best Competition 2013, “The Best Global Project Award” in the category of “Roads and The Sections 1,2,3 and part of the Section 4, making 38 km altogether were completed Highways” around the world. in 18 months including all design and expropriation, with the highest standards of • Honored with the Colossus of construction. This period is the shortest period of construction for a 38 km motorway Chamber of Civil Engineering in Croatia awarded to the IGH for section built up-to-date. Outstanding Achievements in Transportation Highway Project, The project implemented a world-class safety program and developed strong Morine to Merdare, Kosovo Commodity UoM Total Commodity UoM Total working relationships with all stakeholders and communities that were involved and • Honored with the Bechtel Innovation Award, Borrow impacted by the project. Total Length km 78 Total Fill m³ 14 Million Haulage Management System The project delivered the first 38 km in 18 months with prompt mobilization of • Presented the International Total Interchange ea 11 Total Concrete m³ 392,000 Road Federation (IRF), “Program equipment and personnel, applied the quality management system and safety Management” award in 2012 Total Underpass ea 27 Total Pile m 40,200 procedure, completed segments of the motorway earlier than scheduled dates and • Honored with Green Footprint Total Overpass ea 31 Total Drainage Pipe m 95,432 Awards in 2011, with the reduce/ within budget and achieved all these with support of the Client. recycle/ reuse campaign and Major Quantities Total Bridge Length m 3,334 Major Quantities Total Subbase&CTB ton 2,174,126 environmental awareness and Maximizing the local content was another target of the project. The maximum peak sustainability applications Total Haul Road km 110 Total Asphalt ton 764,000 pioneered across Kosovo. number of employees was 3,734 including subcontractors. 70% of the workforce was Kosovan. Total Excavation m³ 36 Million

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 16 FACHSHEETS Page | 16 17 | Page FACTSHEETS 17 ENKA İNŞAAT VE SANAYİe-mail: A.Ş. [email protected] | web: www.enka.com e-mail: [email protected] | web: www.enka.comENKA İNŞAAT VE SANAYİ A.Ş. RRESHEN - KALIMASH MOTORWAY PROJECT RRESHEN - KALIMASH MOTORWAY PROJECT

PROJECT DESCRIPTION ENKA SCOPE OF SERVICES PROJECT DETAILS This project is the largest public contract ever signed in Albania. Undertaken by ENKA The Motorway is designed as dual carriageways of 2X3.75 m, supplemented with 2-meter emergency shoulder lanes. and Bechtel in September 2006 the Rrëshen-Kalimash Motorway Project is a key The major work items comprise of 34 million m3 of excavation, 13 million m3 of earth filling, 0.5 million m3 of concrete, LOCATION: Rreshen - Kalimash, Albania connection between Durres Port, Albania’s primary harbour on the Adriatic Sea, and 1.6 million tons of subbase and cement treated base and 0.45 million tons of asphalt. The construction of bridges Kosovo. OWNER / CLIENT: and viaducts at an altitude of 5 km in the challenging mountainous terrain of Albania is included in the contractual General Roads Directorate of the The 61 km motorway crosses the mountainous northern region of Albania, linking the works. At Mount Runes, at an altitude of 1,858 m, construction included a 5.5 km long double bore tunnel. Government of Albania - GRD cities of Rrëshen and Kalimash, and is divided into three sections. Its designers are PROJECT DURATION: Scetauroute (France) for Sections 1 and 3, and Italconsult (), for Section 2. Section Oct 2006-Oct 2010 1 is an 18 km long stretch from Rrëshen to Reps, section 2 is 27 km long and travels CONTRACT TYPE: from Reps to Thirra, section 3 connects Thirra and Kolshi and is 15 km long. At Mount Construction & Design Runes, at an altitude of 1,858 m, the construction included a 5.5 km long double bore Management tunnel. CONTRACT VALUE: In addition to the many economic and social benefits, with the construction of US$ 1.1 Billion the motorway, the transportation duration between Tirana and Kosovo border was SIGNIFICANT FEATURES / reduced from 8 hours to 2 hours. ACCOMPLISHMENTS: • The largest public contract UNIQUE CHALLENGES ever signed in Albania • Reduces transportation time The most challenging part of the whole corridor was the segment between Rrëshen from 8 hours to 2 hours and Kalimash, which is around 61 km long. Before the motorway, transportation was provided by poor old mountain road and travel time was eight hours. The Rrëshen - Kalimash Motorway’s main purpose is to serve as a faster and safer route through the mountainous region. Difficult terrain conditions and harsh climate conditions were two big challenges. To cross this difficult terrain, bridges, viaducts and tunnels were designed and constructed. Due to the 800 m of overburden on top of the tunnel, it was not possible to reach anywhere across the tunnel alignment except the entrance and exit locations. In order to reach portals of the tunnel, 17 km of service road were constructed. The Commodity UoM Total Commodity UoM Total service road was closed for 3 months in the year due to the harsh weather conditions. The total service road constructed for this project is 92 km. Total Length km 61 Total Excavation m³ 34 Million

In addition to difficult terrain and harsh climate conditions, geological conditions Total Interchange ea 3 Total Fill m³ 13 Million were not stable and continuous throughout the tunnel and motorway alignment. The enforced engineers had to use more than one method during construction. Total Tunnel Length m 11,000 Total Concrete m³ 501,000 Despite the difficult conditions, the project was completed successfully and the travel Total Underpass ea 3 Total Pile m 1,389 time was reduced from eight hours to two hours. In addition to the great amount of Major Quantities Total Overpass ea 4 Major Quantities Total Drainage Pipe m 16,000 travel time saved, the motorway enabled a safe means of travel in the region. The new route serves to stimulate the economy in Albania’s north-eastern region. Total Bridge Length m 4,420 Total Subbase&CTB ton 1,600,000 Total Haul Road km 92 Total Asphalt ton 455,000

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 18 FACHSHEETS Page | 18 19 | Page FACTSHEETS 19 ENKA İNŞAAT VE SANAYİe-mail: A.Ş. [email protected] | web: www.enka.com e-mail: [email protected] | web: www.enka.comENKA İNŞAAT VE SANAYİ A.Ş. AUTOSTRADA TRANSYLVANIA - ROMANIAN MOTORWAY PROJECT AUTOSTRADA TRANSYLVANIA - ROMANIAN MOTORWAY PROJECT

PROJECT DESCRIPTION ENKA SCOPE OF SERVICES PROJECT DETAILS The Transylvanian Motorway Project is a modern, high speed motorway extending In the 112 km motorway project, scope of works consisted of 63 over and underpasses, 8,140 m long bridges, 16 million m3 of excavation, 13 million m3 of fill, 891 thousand m3 of concrete, 176,000 m of pile, 129,000 m of drainage LOCATION: 415 km from the city of Brasov in central Romania through the major cities of Targu Brasov - Bors, Romania Mures, Cluj-Napoca, Zalau and Oradea and ending at Bors in the north eastern part of pipe, 2.5 million tons of subbase & CTB and 883 thousand tons of asphalt. OWNER / CLIENT: the country on the Romanian-Hungarian Border. ENKA and Bechtel together worked As a result of teamwork, the work hours without a lost time accident reached 11 million person-hours and with National Company of the on two sections of the motorway. Highways and National Roads of providing more than 3,700 hours of work safety & health training for workers, all sections of the project became safe Romania The Transylvanian Motorway has a critical significance in connecting Romania areas in 2012. PROJECT DURATION: to Western Europe and constitutes one of the fundamental parts of the country’s Dec 2003-May 2013 motorway system. The motorway plays an important role in the integration of the CONTRACT TYPE: Romanian economy to the European economic system serving as a major link Construction & Design between the European and Central Asian markets. Management The motorway project yields substantial economical returns for Romania. The new CONTRACT VALUE: US$ 1.7 Billion national highway brings the country’s infrastructure in line with that of its new economic partners in the EU zone. The road eased traffic jams, improved safety, and SIGNIFICANT FEATURES / ACCOMPLISHMENTS: opened up the country to new possibilities for tourism and trade. • Largest infrastructure project of the country • The motorway has critical UNIQUE CHALLENGES significance in connecting Romania to Western Europe ENKA’s scope comprised of design and construction of two sections of 112 km of and constitutes one of the fundamental parts of the Autostrada Transylvania. These Sections of the motorway are passing through country’s motorway system. varying terrain including plains, hills, mountains and valleys requiring the design and construction of more than 60 structures such as bridges and viaducts with a total length of 9,000 m to facilitate the passage of the motorway.

Muddy and weather sensitive soil conditions were the specific construction challenge which required adopting specific construction and execution methods in order to Commodity UoM Total Commodity UoM Total achieve quality and schedule planned. Total Length km 112 Total Fill m³ 13 Million Quick construction of piles is another significant feature of the project. The monthly peak value of pile construction is 17,345 m of piles. Total Interchange ea 5 Total Concrete m³ 891,000 Total Underpass ea 36 Total Pile m 176,295

Total Overpass ea 27 Total Drainage Pipe m 129,000

Major Quantities Total Bridge Length m 8,140 Major Quantities Total Subbase&CTB ton 2,522,000

Total Haul Road km 180 Total Asphalt ton 883,000

Total Excavation m³ 16 Million

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 20 FACHSHEETS Page | 20 21 | Page FACTSHEETS 21 ENKA İNŞAAT VE SANAYİe-mail: A.Ş. [email protected] | web: www.enka.com e-mail: [email protected] | web: www.enka.comENKA İNŞAAT VE SANAYİ A.Ş. BREGANA – ZAGREB - DUBROVNIK MOTORWAY PROJECT BREGANA – ZAGREB - DUBROVNIK MOTORWAY PROJECT

PROJECT DESCRIPTION ENKA SCOPE OF SERVICES PROJECT DETAILS This important motorway project’s total length amounts to 156 km and consists of two Over the construction, 21 million m3 of earthwork were excavated, 0.65 million m3 of concrete were poured, 19 million m3 of fill material were used and 4.6 million tons of subbase and cement treated base, as well as 1.18 million tons of LOCATION: separate sections. Section 1, the 13 km Bregana-Jankomir motorway, is a four-lane link Bregana - Zagreb, Croatia from the capital city Zagreb to the border of Croatia and , and was opened asphalt, were laid. The works also included the construction of bridges and viaducts reaching a length of 8 km. to circulation in December 2000. The other section, the 143 km Bosiljevo-Sveti Rok OWNER / CLIENT: Hrvastske Autoceste (Croatian motorway, linking central Croatia to the Dalmatian Coast, opened in July 2004. Motorways).Consultant: Croatian Civil Engineering Institute The motorway is considered vitally important as it provides the principal link between the Zagreb region in central Croatia and the Dalmatian coast. With this motorway, PROJECT DURATION: Jul 1998-Jul 2004 Croatia’s Dalmatian coast is now integrated with Europe’s central and western highway network. CONTRACT TYPE: Construction & Design The project was an enormous success. ENKA and Bechtel, who had undertaken the Management turnkey construction of the motorway in April 1998, completed the project 14 months CONTRACT VALUE: ahead of schedule, with 4,000 workers employed at the peak of the construction. US$ 955 Million The project is further distinguished for winning the 2004 Croatian Contractor Safety SIGNIFICANT FEATURES / Award, as it was successfully realized without any compromise in quality or safety. ACCOMPLISHMENTS: • Links Croatia and its touristic ENKA assisted the client to facilitate US EXIM Bank and OPIC financing for the project. destinations to Pan-European Transportation Corridor UNIQUE CHALLENGES • Honored with the 2004 Habitat fragmentation occurs when human-made barriers such as roads, railroads, Croatian Contractor Safety Award canals, electric power lines, and pipelines penetrate and divide wildlife habitat. Of these, roads have the most widespread and detrimental impacts. To decrease this impact, in Bregana-Zagreb-Dubrovnik Motorway, 6 wildlife crossings were constructed. ENKA also determined 70 places of sinkholes on the alignment and adopted its construction methodology to cross over them considering all environmental aspects. Commodity UoM Total Commodity UoM Total The project was completed in 14 months ahead of schedule, with 4,000 workers employed at the peak of the construction. The project is further distinguished for Total Length km 156 Total Fill m³ 19 Million winning the 2004 Croatian Contractor Safety Award, as it was successfully realized Total Interchange ea 6 Total Concrete m³ 650,000 without any compromise in quality or safety. Total Underpass ea 38 Total Pile m 3,835

Total Overpass ea 20 Total Drainage Pipe m 388,000

Major Quantities Total Bridge Length m 7,973 Major Quantities Total Subbase&CTB ton 4,620,000

Total Haul Road km 234 Total Asphalt ton 1,180,000

Total Excavation m³ 21 Million

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 22 FACHSHEETS Page | 22 23 | Page FACTSHEETS 23 ENKA İNŞAAT VE SANAYİe-mail: A.Ş. [email protected] | web: www.enka.com e-mail: [email protected] | web: www.enka.comENKA İNŞAAT VE SANAYİ A.Ş. ANKARA – GEREDE MOTORWAY PROJECT ANKARA – GEREDE MOTORWAY PROJECT

The alignment traversed rugged terrain, in some places reaching heights of 1.5 km above sea level. ENKA team mobilized almost 1,500 pieces of heavy construction equipment to accomplish work under difficult weather conditions, including rain that turned fresh excavations into lakes.

ENKA team of international professionals brought the following experience and capabilities to the Ankara–Gerede Motorway project: • Complex, megaproject delivery • Maintaining schedule while traversing remote, rigorous terrain • Recruitment, training, and maintaining of a large local workforce and deployment of mobile camps • Coordination between multiple work sites • Timely handling of significant quantities of excavation, backfill, concrete and steel at multiproject locations • Movement of heavy equipment as necessary

ENKA SCOPE OF SERVICES PROJECT DESCRIPTION The alignment forms a significant part of the Trans-European Motorway (TEM). This part of the motorway system PROJECT DETAILS passes between Gerede and Ankara and around the city of Ankara. It goes through terrain with very difficult and The Gerede-Ankara and Ankara Peripheral motorway project is one of the largest complex geological formations and has been designed in accordance with the highest world standards and infrastructure development projects in Turkey. The total length of the motorway is LOCATION: specifications. Ankara, Turkey 230 km. It forms a significant part of the Trans-European motorway (TEM). As a major

OWNER / CLIENT: link to the Trans-European Motorway connecting Europe with Iran, the motorway is Within the integrated JV, ENKA provided onsite management and supervision, engineering, cost and schedule Ministry of Public Works - vital for transporting goods to and from Middle-Eastern markets. The six- to eight-lane control, procurement, quality assurance/control, testing and startup, and environmental mitigation. The scope also General Directorate of Highways - TCK.Consultant: Scott Wilson high-speed toll way was built in two sections. The first section, a six-lane, 115-kilometre included licensing and permit applications, utility and drainage system relocation, technology transfer, and public Kirkpatrick & Kutlutas Joint segment, connects the capital, Ankara, with the town of Gerede; the second is an outreach, including the management of almost $100 million in specialty subcontractors for the government. With Venture eight-lane, 115 km beltway circling Ankara. It goes through terrain with very difficult almost 6,000 Turkish workers, it was one of our largest international direct-hire jobs. PROJECT DURATION: and complex geological formations and has been designed in accordance with the 3 3 3 Jan 1987-May 1999 Construction works consisted of 163 million m of excavation, 117 million m of fill, 1.2 million m of concrete, 24 highest world standards and specifications. thousand m of pile, 450,000 m of drainage pipe, 16.5 million tons of subbase & CTB and 5.1 million tons of asphalt. CONTRACT TYPE: The project was executed with a peak manpower of 6,296, including the resources Construction & Design ENKA implemented its ‘Zero Accidents’ safety policy on this project as well. The Lost-Time Injury rate for the project Management and expertise of local contracting companies employed as subcontractors. Plant and was 0.98 for a total of 27,449,339 person-hours worked. CONTRACT VALUE: equipment with the total value of US$ 130 Million were used on the project. Resulting US$ 1.5 Billion highway system is critical to Turkey’s future economic standing, providing the final SIGNIFICANT FEATURES / link for freight and other road traffic between Istanbul, Turkey’s European port, and ACCOMPLISHMENTS: Ankara. The Ankara-Gerede Motorway demonstrates the company’s ability to provide Commodity UoM Total Commodity UoM Total • Links Turkey to Trans- everything from crushed rock to sophisticated financing for successful completion European Motorway Corridor to client requirements. • 230 km long Total Length km 230 Total Fill m³ 117 Million • Six to eight lanes ENKA assisted the client to facilitate US EXIM Bank financing for the project. Total Interchange ea 20 Total Concrete m³ 1,240,000

• One of the largest single Total Underpass ea 33 Total Pile m 24,185 construction projects ever undertaken in Turkey UNIQUE CHALLENGES Total Overpass ea 30 Total Drainage Pipe m 450,000 • Almost 6,000 Turkish employees Building the motorway was a challenge. In some sections the road reached heights of Major Quantities Total Bridge Length m 4,237 Major Quantities Total Subbase&CTB ton 16,500,000 3 • Financing package named 1.5 km above sea level and yet our team excavated more than 163 million m of earth Total Haul Road km 345 Total Asphalt ton 5,100,000 the ‘Deal of Year’ by and rock. At peak, excavation reached 6.5 million m3 on August 1990. There was 16.2 Euromoney Trade Finance Total Excavation m³ 163 Million million m3 of embankment, and 4.7 million m3 of embankment was accomplished as a • 27.4 million staff-hours 3 worked peak on August 1990. At the same time, 1.24 million m of concrete was poured for the • Integration of tasks and project and 107 thousand of ton rebar were installed, which includes 63 overpasses hands-on training for local and underpasses, 25 bridges and viaducts and 560 box culverts. Most of the bridges field personnel for an effective workforce that kept are of standard design consisting of concrete piers and precast/prestressed concrete costs low U-beams. 5.1 million tons of asphalt was placed and over 332 thousand tons of asphalt was the record on August 1991. The quantity of crushed aggregate was exceeded on 31 million tons.

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 24 FACHSHEETS Page | 24 25 | Page FACTSHEETS 25 ENKA İNŞAAT VE SANAYİe-mail: A.Ş. [email protected] | web: www.enka.com e-mail: [email protected] | web: www.enka.comENKA İNŞAAT VE SANAYİ A.Ş. ISTANBUL METRO ISTANBUL METRO

PROJECT DESCRIPTION Commodity UoM Total PROJECT DETAILS To construct the first line between Taksim and Levent on the Line M2, ENKA, and its Excavation in Tunnels m³ 464,778 LOCATION: joint venture partners, signed the contract with the Istanbul Metropolitan Municipality Concrete in Tunnels m³ 105,604 Istanbul, Turkey for Stage I, Section II works. Along this subway line, there are three stations (Taksim, OWNER / CLIENT: Osmanbey, Şişli), each with a total length of 180 m. The project is designed to Reinforcing in Tunnels ton 6,730 Istanbul Metropolitan accommodate heavy system, travelling along the double underground Municipality.Consultant: Excavation in Stations m³ 223,875 Yüksel Proje & Geotechnik und tunnels and accompanying facilities. Total length of tunnels is 10,250 m. Diameters Major Quantities Tunnelbau Joint Venture Concrete in Stations m³ 72,361 of tunnels range between 4.20 m to 13.40 m. The major diameter along the route is PROJECT DURATION: 6.20 m. Reinforcing in Stations ton 6,960 Sep 1992-Feb 1998

CONTRACT TYPE: Unit Rate UNIQUE CHALLENGES

CONTRACT VALUE: The Istanbul Metro Project is the first deep excavation in the city centre and it was US$ 145 Million a challenge to construct metro stations in dense areas. Osmanbey and Sisli cut and SIGNIFICANT FEATURES / ACCOMPLISHMENTS: cover stations are located under two major avenues of the city, Halaskargazi Caddesi • First metro line built in Turkey and Buyukdere Caddesi, and engineers gave special attention during construction in order not to cause any traffic congestion.

ENKA SCOPE OF SERVICES

The project scope of works consisted of the construction of 10,250 m of metro tunnel and three stations, each with 180 m of platforms. The “New Austrian Tunnelling Method” was employed in the construction of the tunnels. The project was completed in 1998.

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 26 FACHSHEETS Page | 26 27 | Page FACTSHEETS 27 ENKA İNŞAAT VE SANAYİe-mail: A.Ş. [email protected] | web: www.enka.com e-mail: [email protected] | web: www.enka.comENKA İNŞAAT VE SANAYİ A.Ş. GOLDEN HORN STEEL BRIDGE

PROJECT DESCRIPTION PROJECT DETAILS Haliç Bridge is a highway bridge on the Golden Horn (Turkish: Haliç) in Istanbul, Turkey.

LOCATION: It connects the neighborhoods of Ayvansaray in the southwest and Halıcıoğlu in the Istanbul, Turkey northwest. The bridge carries the motorway D-100. OWNER / CLIENT: Ministry of Public Works - General Directorate of Highways - TCK ENKA SCOPE OF SERVICES

PROJECT DURATION: The fabrication and erection of the New Golden Horn Steel Bridges, ordered by IHI Mar 1994-Jun 1998 of Japan, one of the leading steel bridge contractors, were completed by Çimtaş in 16

CONTRACT TYPE: months, combining advanced engineering expertise with a highly skilled workforce Lump Sum - Turnkey and the latest manufacturing, erection and information technologies. CONTRACT VALUE: Çimtaş US$ 100 Million Gemlik Works fabricated two units of steel bridges over the Golden Horn in Istanbul in 11 months. They had a total weight of 7,340 tons, composed of 74,000 SIGNIFICANT FEATURES / ACCOMPLISHMENTS: steel elements, assembled by 242,000 m of welding and sustaining 462,500 bolt • Fabrication & erection of holes in a configuration of 184 blocks, each of which was 3,2x4,0x9,0 m. 7500 tons Steel Bridge completed in 16 months Following the on-shore preassembly of the blocks, which involved pairing up two blocks into one of 18 m length, erection was also completed in 11 months over eight spans of bolting and welding, with the longest span reaching to 139.5 m and the heaviest lift weighing 100 tons.

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 28 FACHSHEETS Page | 28 29 | Page FACTSHEETS 29 ENKA İNŞAAT VE SANAYİe-mail: A.Ş. [email protected] | web: www.enka.com e-mail: [email protected] | web: www.enka.comENKA İNŞAAT VE SANAYİ A.Ş. DEVELOPMENT OF MUSCAT INTERNATIONAL AIRPORT MAIN

MOTORWAYS, BRIDGES & TUNNELS CONTRACT 3 AIRPORTS & STADIUMS SHEREMETYEVO INTERNATIONAL AIRPORT, TERMINAL 3 WATER WORKS, DAMS, PIPELINES & MINING FC SHAKHTAR SHAKTAR STADIUM, DONBASS ARENA CEMENT PLANTS

aırports & STADIUMS aırports & TADIUMS Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 30 FACHSHEETS Page | 30 31 | Page FACTSHEETS 31 ENKA İNŞAAT VE SANAYİe-mail: A.Ş. [email protected] | web: www.enka.com e-mail: [email protected] | web: www.enka.comENKA İNŞAAT VE SANAYİ A.Ş. DEVELOPMENT OF MUSCAT INTERNATIONAL AIRPORT MAIN CONTRACT 3 DEVELOPMENT OF MUSCAT INTERNATIONAL AIRPORT MAIN CONTRACT 3

Other Buildings (Provisional Sum) Bridges (approx. 1740 m2) • Guardhouse VIP (approx. 50 m2) Surface Car Parking and Associated Roads • OAMC Airside (approx. 12,500 m2) • Shaded car parking for 2000 cars; open car parking for 2000 • Ground Handler Workshop (approx. 8,000 m2) cars, including shaded walkways to PTB • Staff Amenities Building (Maintenance Yard) (approx. 1,154 m2) • Maintenance Yard Gate Building (approx. 2,300 m2) Roads and Car Park Areas 2 PROJECT DESCRIPTION • Waste Management Building (approx. 500 m2) • Asphalt paved, approx. 271,008 m PROJECT DETAILS 2 • Fuel into Plane Operators Building (approx. 2,796 m2) • Hard landscaped, approx. 65,988 m On February 23, 2011, Enka and Co. LLC - Bechtel and Co. LLC – Bahwan Engineering • Soft landscaped approx. 74,662 m2 LOCATION: Company LLC unincorporated consortium (BEB), was awarded the Main Contract Access ramps Muscat, Oman 3 for the development of the Main Terminal Buildings of the Muscat International • 5 post tensioned viaducts, total length of 800 m and max. Hard landscape around Buildings 2 2 • Approximately 18,602 m OWNER / CLIENT: Airport. The design is to be developed on the basis of the design prepared by the span 51 m (Approximately 12,380 m ) Ministry of Transport and COWI-Larsen Joint Venture. The contract is a design and build, lump sum fixed price Communications Public Authority for Civil Aviation. contract, except where any item or work, described as provisional or prime cost, is The Gross closed building area is around 647,480 m2 with capacity for 12 million passengers per annum (mppa) Engineer: COWI-LARSEN subject to adjustments in accordance with the provisions of the contract. Joint Venture (former). extendable to 24 mppa and 36 mppa. Hill International . Project BEB carried out and was fully responsible for the development and completion of Management Consultant: ADPI In addition to the main quantities specified below, the extent of the work also included special equipment installations, the design, procurement, manufacture, supervision, delivery to site, construction, such as a Conveying System, Visual Docking System, Media Mesh, Signage and way finding systems. Integrated PROJECT DURATION: erection, inspection, testing, trial operation, commissioning and maintenance of Feb 2011-Dec 2016 artwork, such as balustrades, glazed escalator sides, glass screens, water features, stone carvings and patterns. equipment and the remediation of defects for the facilities, in accordance with the CONTRACT TYPE: Employer’s Requirements. The work of the consortium also included the installation of MEP systems, such as Rain Water System, Plumbing Lump Sum System (domestic water & sewage systems), Fire Fighting System, Cooling Systems (pipes, valves, supports etc.) CONTRACT VALUE: – Refrigeration, Ventilation / Air Conditioning & Ductwork, Building Management System (BMS), Water Feature & US$ 1.8 Billion UNIQUE CHALLENGES Pools, SCADA (Supervisory Control & Data Acquisition System), Power Distribution, UPS, Internal, External, Arch, SIGNIFICANT FEATURES / Façade and Emergency Lighting, Lighting Control System, Small Power Installations, Fire Alarm, Public Address ACCOMPLISHMENTS: The steel structure of the Passenger Terminal Building consists of extremely heavy System, Car Park & Traffic Management System, Info Display System (containment only), Access Control System • The Development of Muscat 3D curved trusses. The first challenge was production, as the manufacturing of such International Airport project irregular components had its own challenges; however, Çimtaş successfully completed (containment only), CCTV System (containment only), IT Structured Cabling System (containment only). is the largest ever to be undertaken in the history of production. Transportation also presented challenges, due to size limitations and the Oman. components being produced at the Çimtaş factory in one piece, shipped to site in • State of art Passenger pieces and welded back together on site, as a pre-assembled truss ready for lifting Commodity UoM Total Commodity UoM Total Terminal Building into place. As the weight of the trusses was substantial, two crawler cranes of 1,600- • 14 Million person-hours ton capacity were used. The erection was safely completed, notwithstanding the without LTI Concrete Works m³ 470,000 Floors m2 600,000 challenges of an active runway next to the site, together with interface challenges. Rebar Works ton 80,000 Wall covering m2 600,000

Earth Works m³ 4 Million Check-in counters ea 96 ENKA SCOPE OF SERVICES Structural Steel ton 30,000 Boarding Bridges ea 29 The buildings and structures in the contract included: Passenger Terminal Building: Façade m2 135,000 Remote S516Aircraft Stands ea 30 2 2 Enclosed Area – 247,633 m , North, South and West Piers: Approximately 111,633 m , Major Quantities Major Quantities Traffic Concourse: Approximately 71,094 m2, North and South Multistory Car Park: Roofing m2 175,000 Bus-Boarding Lounges ea 10 Approximately 116,318 m2, North and South Multistory Forecourt Buildings and Lift Blockworks m2 225,000 Hotel Room ea 90 Building: Approximately 35,615 m2, Forecourt Plaza: Approximately 37,144 m2, Taxi Drivers Facility Building: Approximately 800 m2

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 32 FACHSHEETS Page | 32 33 | Page FACTSHEETS 33 ENKA İNŞAAT VE SANAYİe-mail: A.Ş. [email protected] | web: www.enka.com e-mail: [email protected] | web: www.enka.comENKA İNŞAAT VE SANAYİ A.Ş. SHEREMETYEVO INTERNATIONAL AIRPORT, TERMINAL 3 SHEREMETYEVO INTERNATIONAL AIRPORT, TERMINAL 3

PROJECT DESCRIPTION UNIQUE CHALLENGES PROJECT DETAILS Sheremetyevo International Airport, one of the largest international airports in the • As the existing airport facilities were in operation throughout construction, extra special care had to be taken with regard to safety, environmental protection and security. LOCATION: Russian Federation, in addition to various Russian airlines, also serves more than 40 Moscow, Russia foreign carriers. Sheremetyevo Airport’s principal carrier is Aeroflot Russian Airlines, • The project was conducted with due diligence, taking into consideration compliance with Russian norms and OWNER / CLIENT: Russia’s largest air carrier, for which Sheremetyevo serves as the base. Initially, the also in accordance with the international (IATA) standards on design and engineering. OAO Terminal Consultant airport had two terminals, Sheremetyevo 1 and Sheremetyevo 2, providing services for • Supply and installation of all of the existing utilities (including provision of power, cold & hot water supply) PROJECT DURATION: domestic and international routes. OAO AEROFLOT decided to build a third terminal beyond the site borders were also included in the General Contractor’s Scope of Works. July 2005-Nov 2011 to serve as Aeroflot’s and its alliances’ international terminal. Terminal 3 has a carrying

CONTRACT TYPE: capacity of up to 12 million passengers annually, and with the terminal in operation, • The refueling system and its connections were included in the General Contractor’s Scope of Works and all Lump Sum - Turnkey Sheremetyevo International Airport complex has reached a total carrying capacity of works including installation, testing and commissioning were conducted while the main systems of the airport CONTRACT VALUE: 3,800 passengers per hour, combining arrivals and departures. ENKA was awarded was operational for other terminals. US$ 767 Million the turnkey design and build contract by JSC TERMINAL in June 2005. • Permanent flyovers and access roads to and from the terminal and construction of all connections were ENKA SCOPE OF SERVICES: The terminal building consisted of a six-floor reinforced concrete building. The conducted without any disturbance to the existing traffic to/from the running terminals. • Engineering footprint of the building is 52,000 m2 and a total construction area is 170,000 m2. • Procurement The height of the terminal building is 38.5 m, and the roof has a steel structure dome • Construction with a diameter of 66 m and a steel main arch with canopies weighing more than Commodity UoM Total 1,800 tons. The building’s facade is composed of glazing, aluminum composite and 2 natural stone. Apart from the terminal building, major work in the contract included 6 storey Terminal Building m 170,000 an apron area of 374,000 m2; a multi-story car park for 4,000 cars; a control tower; 12 3 storey Car park Building m2 83,000

fixed passenger bridges; various car and bus parks; external facilities, such as a water Apron m2 374,000 treatment plant and water supply lines, an MV switch room; infrastructure, including Concrete Works m3 313,732 high voltage cable lines, sewage lines, fiber optic cable ducts; construction of the aircraft refueling system, and hard and soft landscaping. Check-in and passport Rebar Works ton 19,752

counters and the lounge furniture were also included in the contract work. Excavation & Earth Removal m3 420,833 Backfill including gravel, sand m3 608,902

Major Quantities and crushed aggregate, which were all imported Flyover Bridge m2 19,750

Highway m2 46,330

Viaduct m2 5,194

2 Access Roads and Flyovers m 88,000

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 34 FACHSHEETS Page | 34 35 | Page FACTSHEETS 35 ENKA İNŞAAT VE SANAYİe-mail: A.Ş. [email protected] | web: www.enka.com e-mail: [email protected] | web: www.enka.comENKA İNŞAAT VE SANAYİ A.Ş. FC SHAKHTAR SHAKTAR STADIUM, DONBASS ARENA FC SHAKHTAR SHAKTAR STADIUM, DONBASS ARENA

PROJECT DESCRIPTION UNIQUE CHALLENGES PROJECT DETAILS As a prime contractor ENKA began the construction of the stadium in 2006 and Set within the beautiful Leninsky Komsomol Park, this stunning new home for FC SHAKHTAR became a new symbol for Donetsk city, while providing an unforgettable match experience for spectators. LOCATION: completed in 2009. To meet a tight schedule (three years) for erection works of the Donetsk, Ukraine five-star arena over 1,600 people worked on site at peak times. Its bowl design offers a high degree of comfort, as well as improved viewing quality. Immediately adjacent to the OWNER / CLIENT: Turn-key construction of UEFA Elite Class stadium in Donetsk, Ukraine for 52,667 seating areas are a range of facilities catering for every fan’s needs. In addition to adhering to Ukraine’s codes Stadion Shakhtar Limited. Project Designer: Arup Sport visitors, of which 3,680 are VIPs. The stadium is an oval shape with an inclined roof. and standards, the stadium’s design meets the most current internationally recognized safety standards. The roof Inside the stadium there are restaurants, bars, cafes, fast food facilities, a sports includes a large area of translucent sheeting material to improve daylight and sunlight penetration and promote PROJECT DURATION: June 2006-Sep 2009 center, Club Museum and Shops. improved natural turf-growing conditions. Furthermore, large open areas are incorporated into the perimeter of the lower-tier concourse to enable cross ventilation of the pitch. The external elevation of the building provides a CONTRACT TYPE: The eye-catching stadium was designed by Arup Sport, which was the creative seamless glazed facade and a high degree of transparency to the exterior of the building. Lump Sum -Turnkey and inspirational force behind some of the world’s greatest arenas, such as the CONTRACT VALUE: City of Manchester Stadium (Manchester, England), Allianz Arena stadium (Munich, The stadium combines an elegance of form with simplicity of materials. It became a landmark stadium for world US$ 220 Million Germany), the new stadium of Valencia CF (Valencia, Spain), Sydney Football Stadium class players and a worldwide audience. The stadium’s conceptual design was developed to meet the specific ENKA SCOPE OF SERVICES: (Sydney, Australia), Beijing National Stadium (or the Bird’s Nest in Beijing, China) etc. requirements of the club for a natural playing surface, a seating capacity for 51,500 spectators, qualification for • Engineering The total project budget was US$ 400 million. UEFA elite status, VIP suites with segregated viewing areas and underground VIP parking, as well as additional • Procurement facilities such as a club museum, a club shop, a cafeteria and a health club. During the construction, considerable de-watering works were carried out to reduce the level of the underground water table. These were followed up with • Construction CAPACITY piling works to improve the load bearing capacity of the soil by using 400 mm x 400 mm friction piles. The tiers • The total seating capacity of the stadi- • Altogether 180 media representatives comprised a total of 3,400 pre-cast concrete elements. The total amount of concrete used in the works amounted um is 52,667. can always feel at home at the arena’s to 120,000 m3. The roof is a three dimensional, structurally efficient design that appears to float above the building. spacious Conference Room. • There are 290 seats for the media, of The shape inclines towards the south, resting on a dozen 60 m long steel support trusses that were manufactured which 152 are for journalists and 138 • All the restaurants, bars and cafés at and erected by Çimtaş and maneuvered with a giant, 600-ton mobile crane, able to lift steel structures in excess seats for TV commentators (a combi- the stadium combined, total 1,830 of 230 tons. These 12 steel support trusses designed and manufactured by Mero-TSK have a combined weight of nation of 46 commentary boxes). covers. 4,000 tons and carry the space-frame structure of the roof. • A total of 196 places and seats for peo- • The stadium has more than 1,000 car ple with disabilities and their carers parking spaces (245 of which are un- Commodity UoM Total (104 and 92, respectively). derground). • The stadium’s 44 corporate boxes can Concrete m3 160,000 accommodate a total of 915 people. Rebar ton 12,295 Excavation m3 458,761 Cabling km 1,200 Major Quantities Pre-cast Element ea 3,400 Tubular Pile ea 3,248

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 36 FACHSHEETS Page | 36 37 | Page FACTSHEETS 37 ENKA İNŞAAT VE SANAYİe-mail: A.Ş. [email protected] | web: www.enka.com e-mail: [email protected] | web: www.enka.comENKA İNŞAAT VE SANAYİ A.Ş. THE NASSAU CRUISE PORT AT PRINCE GEORGE WHARF, MARINE WORKS, THE BAHAMAS MOTORWAYS, BRIDGES & TUNNELS UMM QASR BASRA MULTI-PURPOSE TERMINAL (BMT), IRAQ AIRPORTS & STADIUMS 433 MW NAMAKHVANI HPP CASCADE, GEORGIA WATER WORKS, DAMS, PIPELINES & MINING DERNA DESALINATION PLANT, LIBYA CEMENT PLANTS SOUSSA DESALINATION PLANT, LIBYA ZAWIA DESALINATION PLANT, LIBYA ZUARA DESALINATION PLANT, LIBYA OUED ATHMENIA DAM, ALGERIA AKTAU PORT REHABILITATION, KAZAKHSTAN KUMTOR GOLD MINE, KYRGYZSTAN KOKTENKOL MOLYBDENUM, KAZAKHSTAN BEKME DAM, IRAQ BERKE DAM, TURKEY FORMER USSR (CIS) TURKEY NATURAL GAS PIPELINE, IRAQ - TURKEY CRUDE OIL PIPELINE EXPANSION BENGHAZI WATER RESERVOIR, LIBYA WASIA WATER TREATMENT PLANT, SAUDI ARABIA AL RASS WATER SUPPLY & TREATMENT SYSTEMS, SAUDI ARABIA RAS LANUF NEW TOWN (WATER SUPPLY & SEWAGE SYSTEMS), LIBYA BREGA NEW TOWN PROJECT WATER RESERVOIRS & PIPING WORKS, LIBYA AL KHAFJI PHASE 2 DESALINATION PLANT, SAUDI ARABIA AL MEDINAH HOUSING (WATER SUPPLY & SEWAGE SYSTEMS), SAUDI ARABIA ISTANBUL YENIKAPI PRETREATMENT PLANT & PUMPING STATION, TURKEY DIYARBAKIR & KAHRAMANMARAŞ DRINKING & SEWAGE SYSTEM, TURKEY

WATER WORKS, & MINING DAMS, PIPELINES WATER WORKS, WATER DAMS, PIPELINES DAMS,

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 &(212) 376 10 00 (pbx)MINING | Fax +90 (212) 272 88 69 Page | 38 39 | Page Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 38 FACHSHEETS FACTSHEETS 39 ENKA İNŞAAT VE SANAYİe-mail: A.Ş. [email protected] | web: www.enka.com e-mail: [email protected] | web: www.enka.comENKA İNŞAAT VE SANAYİ A.Ş. THE NASSAU CRUISE PORT AT PRINCE GEORGE WHARF, MARINE WORKS

PROJECT DESCRIPTION PROJECT DETAILS ENKA was awarded the marine works of the Nassau Cruise Port at Prince George

Wharf in the Bahamas in June 2020 and after the engineering & design stages, first LOCATION: project pile was driven in December 2020. Nassau - The Bahamas

The scope of the project includes EPC works for expansion of existing cruise pier, OWNER / CLIENT: Nassau Cruise Port Ltd combi-wall works on Prince George Wharf, construction of 2 new harbours for tour boats, dredging, expanding the port area by reclaiming and renovating / PROJECT DURATION: Nov 2020 - July 2022 refurbishing of existing piers, and all relevant construction activities. At the same CONTRACT TYPE: time, Environmental Management Plan for the project has been developed by ENKA Lump Sum and the Certificate of Environmental Clearance granted by the Government of the CONTRACT VALUE: Bahamas upon successful submission of the Environmental Management Plan. US$ 109 Million Following the Environmental Clearance, the Construction Permit has been received in November 2020 and another milestone has been achieved in order to start the construction works at site. With the Notice to Proceed received on November 25th, 2020, the construction works started at the project site in December 2020.

Type UoM Total

Dredging for OASIS Class ship 175.000 CY m3 131,733 Reclamation 173,000 CY m3 133,415

Construction of new deck on pile cruise pier 727’ x 100’ m 222 x 30,5

New east marina deck on pile, with berthing for tour boats ea 16

New west marina deck on pile and inner harbor with berthing for ea 15 tour boats m2 13,300 New reclaimed area, 143,000 SF m 610 Combi wall 2,000’ LF ton 4,900 Tubular pile Project Features Project Sheetpile ton 1,087 Tie-rod installation consisting of 204 pieces m 4,088 Pre-stressed Precast Panels in 925 pieces, 3,812 CY m3 2,915 In-situ concrete 7,052 CY m3 5,392

Precast concrete beams, 2,260 CY m3 1,728 Umm Qasr Basra BMT, Container Terminal Yard 5, Quay Wall & Marine Works, iraq Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 40 FACHSHEETS Page | 40 41 | Page FACTSHEETS 41 ENKA İNŞAAT VE SANAYİe-mail: A.Ş. [email protected] | web: www.enka.com e-mail: [email protected] | web: www.enka.comENKA İNŞAAT VE SANAYİ A.Ş. UMM QASR BASRA BMT, CONTAINER TERMINAL YARD 5, QUAY WALL & MARINE WORKS 433 MW NAMAKHVANI HYDRO POWER PLANT CASCADE PROJECT

PROJECT DESCRIPTION PROJECT DESCRIPTION PROJECT DETAILS The Port of Umm Qasr is located approximately 5.2 km south of Basrah. It is the largest ENKA and Norway’s Clean Energy Group were awarded the rights to develop, PROJECT DETAILS

LOCATION: sea and the only deep-water port of Iraq. The port has road links North-West to Basrah construct, own and operate the 433 MW Namakhvani HPP Cascade Project in Umm Qasr, Basra, Iraq and South across the Kuwait border, plus a main line rail link North-West to Basrah. Georgia. A perpetual build-own-operate agreement was signed with the Government LOCATION: Tsalktubo and Tsageri - Georgia OWNER / CLIENT: BMT Umm Qasr Yard-5 is situated at the northern end of the port. of Georgia. Aloreen Company for OWNER / CLIENT: Investment Ltd. ENKA was awarded the contract by Aloreen Company on May 7th 2018. The contract Namakhvani Hydropower Plants Cascade Project will be executed on an Engineering, ENKA Renewables (90% ENKA-owned) PROJECT DURATION: has two effective dates which are NCD (Notice of the Commencement Date) and NTP Procurement and Construction (EPC) lump-sum turnkey basis, and the project will EPC Contractor: ENMAR Dec 2018 - Apr 2021 (Notice to Proceed), and they have been realized on June 27th 2018 and December 3rd be located on the Rioni River in Georgia, starting from Zhoneti village, about 20 Construction B.V.

CONTRACT TYPE: 2018, respectively. km upstream of Kutaisi city center, to Alpana town, located further 35 km on the PROJECT DURATION: Lump Sum upstream. Early Works: March 2020 Engineering, procurement and mobilization works were commenced following Limited Notice to Proceed: CONTRACT VALUE: notification of NCD and construction works were commenced upon notification of November 2020 US$ 82 Million ENKA SCOPE OF SERVICES Commencement: May 2021 NTP. Completion: July 2024 ENKA will build the Namakhvani HPP Cascade Project as the EPC Contractor. Basic/ ENKA SCOPE OF SERVICES Tender design, developed earlier by Studio Pietrangeli was further developed by CONTRACT TYPE: Lump Sum, Turn-key ENKA’s responsibilities under this contract include engineering, procurement and Temelsu and reviewed by Stucky. The 433 MW Namakhvani HPP Cascade Project encompasses two separate HPPs on the Rioni River: the Lower Namakhvani HPP (333 CONTRACT VALUE: construction activities. The works under the 1st part of the project were %100 complete, US$ 800 Million MW) and the Upper Namakhvani HPP (100 MW). In addition, approximately 30 km of Taking Over Certificate was issued as of December 1st 2020. Within the scope of the road, which will be submerged by the reservoir, will be relocated. works on the Part-1, a block work type quay wall was installed at the end of the basin. This is the very first block work type quay wall that was constructed in Iraq and ENKA is proud of being the part of it. As of December 2020, the works of the Part-2 of the project consisting of land side crane beam and bored piles land side crane beam and bored piles were commenced.

Commodity UoM Total

Dredging m3 1,194,457 Commodity UoM Total Commodity UoM Total Backfilling m3 472,392 Estimated Annual Production GWh 1,135 Estimated Annual Production GWh 343 Geotextile m2 30,631 Installed Capacity MW 333 Installed Capacity MW 100 Revetment and scour protection m3 24,499 105 Dam Height m 59 Major Quantities Dam Height m Concrete m3 120,543 Turbine Type Francis Turbine Type Kaplan Namakhvani HPP Namakhvani Installation of Marine Fixtures and Accessories ea 46 HPP Namakhvani Number of Turbines unit 3+1 Number of Turbines unit 2 Major Quantities of Upper Major Quantities of Upper Major Quantities of Lower Major Quantities of Lower Headrace Tunnel Length km 4.4

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 42 FACHSHEETS Page | 42 43 | Page FACTSHEETS 43 ENKA İNŞAAT VE SANAYİe-mail: A.Ş. [email protected] | web: www.enka.com e-mail: [email protected] | web: www.enka.comENKA İNŞAAT VE SANAYİ A.Ş. DERNA DESALINATION PLANT PROJECT (SEA WATER THERMAL (MED-TVC) PLANT) DERNA DESALINATION PLANT PROJECT (SEA WATER THERMAL (MED-TVC) PLANT)

Project site is located in Derna city in the eastern part of Libya in a relatively high populated area. ENKA, while executing the work, successfully managed cultural relations with locals to avoid any clashes and maintained good relations with its neighbors.

Such regional location and high temperatures during summer months created unique challenges for the project workforce peaked at 450 people.

ENKA SCOPE OF SERVICES ENKA has self performed the basic engineering, detail engineering, procurement, construction, commissioning, start-up and performance testing scope for the project utilizing in-house resources on a lump sum turnkey basis. Specific scope of services provided by ENKA included; complete basic and detailed design and engineering of the plant, supply of all balance of plant (BOP) systems and equipment, all civil works including foundations and structural steel, Product Water Tanks (2 x 20,000 m3), Make Up Water Tank (1 x 500 m3), HFO Tanks (1 x 20,000 m3, 1 x 5,000 m3), 2 x 40,000 m3/day sea water intake system including 20 kg/hr electro-chlorination system, 2 x PROJECT DESCRIPTION 1,000 m HDPE offshore sea water intake piping (dia. 1,400 mm), complete interconnecting piping of the plant, fire PROJECT DETAILS fighting system, MV/LV electrical & control and switchgear systems with aux. transformers, instrument and plant air Derna Desalination Plant Project, located in Derna city in eastern part of Libya, was in supply systems, Emergency Diesel Generators, waste collection and treatment system, batteries and UPS System, part of a development plan implemented by General Electricity Company of Libya, in LOCATION: ventilation and air conditioning (HVAC) systems, overhead cranes and maintenance hoists, power plant distributed Derna - Libya the period of 40th Anniversary preparations of Libyan Leader, to cover high demand control system (DCS), mechanical and electrical erection, complete civil and structural works, supply of spare parts, OWNER / CLIENT: of reliable water sources in eastern part of Libya. General Electricity Company of and start-up and commissioning of the plant. ENKA further provided training for the O&M personnel who will be Libya (GECOL) operating and maintaining the plant. The project consisted of engineering, procurement, construction, commissioning PROJECT DURATION: and start-up of a 2 x 20,000 m3/day Water Production Plant with two type of fuel, ENKA scope also covered 9,000 m water distribution DI piping line (dia. 600 mm) with 2 x 10,000 m3 water storage Aug 2006 – Aug 2010 Heavy Fuel Oil (HFO) and Light Fuel Oil (LFO), complete with all Balance of Plant (BOP) tanks. CONTRACT TYPE: systems. Heavy fuel oil (HFO) is used as main fuel for MED Desalination Plant operation Lump Sum Turn Key whereas; light fuel oil (LFO) are used as back-up fuels. The project consisted of a Commodity UoM Total CONTRACT VALUE: redundant sea water intake system of which complete basic and detailed engineering EUR 38 Million Concrete m3 14,200 was included in EPC scope of the project. SIGNIFICANT FEATURES / Structural Steel ton 650 ACCOMPLISHMENTS: Main process and equipment, MED evaporators, boilers and auxiliaries were supplied • 1.1 million man-hours Cabling km 170 by Sidem (Veolia, FR) as consortium partner of the project. • First supply and delivery of Equipment ton 4,800 floating HDPE offshore pipe Major Quantities (dia. 1,400 mm) in total 500 The project included a water distribution network line with water storage tanks. Engineering Hours hrs 81,000 m length on piece bundle from Turkey. First Çanakkale Document Qty. pcs 1,296 channel crossing of HDPE pipe string by floating UNIQUE CHALLENGES method with tug boat in total of 650 m. Derna Desalination Plant is expected to address the growing demand for water in • 600 ton of concrete water intake head erection in 12 m eastern part of the country and supply reliable water to public. depth under seawater. Sea water intake onshore system construction needed micro piling implementation • 6 pcs of concrete blocks, 85 tons each, transportation by to eliminate excessive amount of water flows through subsoil cracks. The micro piling means of floating in 2 miles. system was carefully designed by ENKA to overcome natural difficulties. As part of the EPC Contract, ENKA through its piling specialist subsidiary Kasktaş installed Ø340 mm micro piles in 685 pcs in total.

Offshore portion of sea water system was challenge in eastern Mediterranean Sea under unexpected open sea conditions. Design and implementation of offshore portion were performed with appropriate design margins and redundancy requirements.

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 44 FACHSHEETS Page | 44 45 | Page FACTSHEETS 45 ENKA İNŞAAT VE SANAYİe-mail: A.Ş. [email protected] | web: www.enka.com e-mail: [email protected] | web: www.enka.comENKA İNŞAAT VE SANAYİ A.Ş. SOUSSA DESALINATION PLANT PROJECT (SEA WATER THERMAL (MED-TVC) PLANT) SOUSSA DESALINATION PLANT PROJECT (SEA WATER THERMAL (MED-TVC) PLANT)

ENKA SCOPE OF SERVICES

ENKA has self-performed the basic engineering, detail engineering, procurement, construction, commissioning, start-up and performance testing scope for the project utilizing in-house resources on a lump sum turnkey basis. Specific scope of services provided by ENKA included; complete basic and detailed design and engineering of the plant, supply of all balance of plant (BOP) systems and equipment, all civil works including foundations and PROJECT DESCRIPTION structural steel, Product Water Tanks (2 x 20,000 m3), Make Up Water Tank (1 x 500 m3), HFO Tanks (2 x 5,000 m3), 2 PROJECT DETAILS x 40,000 m3/day sea water intake system including 20 kg/hr electro-chlorination system, 2 x 500 m HDPE offshore Soussa Desalination Plant Project, located in Soussa city in eastern part of Libya, was sea water intake piping (dia. 1,400 mm), complete interconnecting piping of the plant, fire fighting system, MV/ in part of a development plan implemented by General Electricity Company of Libya, LOCATION: LV electrical & control and switchgear systems with aux. transformers, instrument and plant air supply systems, Soussa - Libya in the period of 40th Anniversary preparations of Libyan Leader, to cover high demand Emergency Diesel Generators, waste collection and treatment system, batteries and UPS System, ventilation and OWNER / CLIENT: of reliable water sources in eastern part of Libya. General Electricity Company of air conditioning (HVAC) systems, overhead cranes and maintenance hoists, power plant distributed control system Libya (GECOL) The project consisted of engineering, procurement, construction, commissioning (DCS), mechanical and electrical erection, complete civil and structural works, supply of spare parts, and start-up PROJECT DURATION: and start-up of a 2 x 20,000 m3/day Water Production Plant with two type of fuel, and commissioning of the plant. ENKA further provided training for the O&M personnel who will be operating and Aug 2006 – Aug 2010 Heavy Fuel Oil (HFO) and Light Fuel Oil (LFO), complete with all Balance of Plant (BOP) maintaining the plant. CONTRACT TYPE: systems. Heavy fuel oil (HFO) is used as main fuel for MED Desalination Plant operation Lump Sum Turn Key whereas; light fuel oil (LFO) are used as back-up fuels. The project consisted of a Commodity UoM Total CONTRACT VALUE: redundant sea water intake system, complete basic design and detailed design of EUR 25 Million Concrete m3 11,500 which, was included in EPC Scope of the project. SIGNIFICANT FEATURES / Structural Steel ton 460 ACCOMPLISHMENTS: Main process and equipment, MED evaporators, boilers and auxiliaries were supplied • 1.5 million man-hours Cabling km 147 by Sidem (Veolia, FR) as consortium partner of the Project. • First supply and delivery of Equipment ton 4,000 floating HDPE offshore pipe Major Quantities (dia. 1,400 mm) in total 500 Engineering Hours hrs 65,000 m length on piece bundle UNIQUE CHALLENGES from Turkey. First Çanakkale Document Qty. pcs 1,144 channel crossing of HDPE pipe string by floating Soussa Desalination Plant is expected to address the growing demand for water in method with tug boat in total eastern part of the country and supply reliable water to public. of 650 m. • 600 ton of concrete water Offshore portion of sea water system was challenge in eastern Mediterranean Sea intake head erection in 12 m depth under seawater. under unexpected open sea conditions. 2 x 500 m HDPE pipe string was floated • 6 pcs of concrete blocks, 85 and sank in one piece to be installed on sea bed. Design and implementation of tons each, transportation by offshore portion were performed with appropriate design margins and redundancy means of floating in 2 miles. requirements.

Project site is located in near Soussa city in the eastern part of Libya. ENKA, while executing the work, successfully managed cultural relations with locals to avoid any clashes and maintained good relations with its neighbors.

Such regional location and high temperatures during summer months created unique challenges for the project workforce peaked at 380 employees.

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 46 FACHSHEETS Page | 46 47 | Page FACTSHEETS 47 ENKA İNŞAAT VE SANAYİe-mail: A.Ş. [email protected] | web: www.enka.com e-mail: [email protected] | web: www.enka.comENKA İNŞAAT VE SANAYİ A.Ş. ZAWIA DESALINATION PLANT PROJECT (SEA WATER THERMAL (MED-TVC) PLANT) ZAWIA DESALINATION PLANT PROJECT (SEA WATER THERMAL (MED-TVC) PLANT)

ENKA SCOPE OF SERVICES

ENKA has self performed the basic engineering, detail engineering, procurement, construction, commissioning, start-up and performance testing scope for the project utilizing in-house resources on a lump sum turnkey basis. Specific scope of services provided by ENKA included; complete basic and detailed design and engineering of the plant, supply of all balance of plant (BOP) systems and equipment, all civil works including foundations and structural steel, Product Water Tanks (2 x 20,000 m3), Make Up Water Tank (1 x 500 m3), LFO Tank (1 x 2,500 m3), complete PROJECT DESCRIPTION interconnecting piping of the plant, fire fighting system, MV/LV electrical & control and switchgear systems with PROJECT DETAILS aux. transformers, instrument and plant air supply systems, Emergency Diesel Generators, waste collection and Zawia Desalination Plant Project, located in Zawia city in western part of Libya in 60 treatment system, batteries and UPS System, ventilation and air conditioning (HVAC) systems, overhead cranes and LOCATION: km distance to capital city Tripoli, was in part of a development plan implemented by maintenance hoists, power plant distributed control system (DCS), mechanical and electrical erection, complete Zawia - Libya th General Electricity Company of Libya, in the period of 40 Anniversary preparations civil and structural works, supply of spare parts, and start-up and commissioning of the plant. ENKA further provided OWNER / CLIENT: of Libyan Leader, to cover high demand of reliable water sources in eastern part of training for the O&M personnel who will be operating and maintaining the plant. General Electricity Company of Libya. Libya (GECOL) ENKA scope also covered 142,000 m water distribution DI piping line with 9 pcs of water storage tanks (2 x 20,000 PROJECT DURATION: The project consisted of engineering, procurement, construction, commissioning m3, 5 x 10,000 m3, 1 x 5,000 m3, 1 x 2,500 m3) and 4 pcs of pumping stations. July 2006 – Feb 2012 and start-up of a 4 x 20,000 m3/day Water Production Plant with three type of fuel, CONTRACT TYPE: Heavy Fuel Oil (HFO), NG and Light Fuel Oil (LFO), complete with all Balance of Plant Lump Sum Turn Key (BOP) systems. NG is planned to be used as main fuel for MED Desalination Plant Commodity UoM Total CONTRACT VALUE: operation whereas; heavy fuel oil (HFO) are used as back-up fuels. EUR 62 Million Concrete m3 8,098

SIGNIFICANT FEATURES / Main process and equipment, MED evaporators, boilers and auxiliaries are supplied Structural Steel ton 486 ACCOMPLISHMENTS: by Sidem (Veolia, FR) as consortium partner of the project. • 2.5 million man-hours Cabling km 340 • The largest capacity of The project includes a relatively large water distribution network line in 142 km with Equipment ton 7,900 Desalination Plant Project in Major Quantities Libya water storage tanks and pumping stations. Engineering Hours hrs 48,900

Document Qty. pcs 1,123 UNIQUE CHALLENGES

Zawia Desalination Plant is expected to address the growing demand for water in western part of the country and supply reliable water to public.

Project site is located in Zawia city in the western part of Libya in a highly populated area. ENKA, while executing the work, successfully managed cultural relations with locals to avoid any clashes and maintained good relations with its neighbors.

Soil improvement has to be performed by means of replacement of subsoil with adequate fill material in the project site for foundations of heavy loads.

Such regional location and high temperatures during summer months created unique challenges for the project workforce peaked at 620 employees.

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 48 FACHSHEETS Page | 48 49 | Page FACTSHEETS 49 ENKA İNŞAAT VE SANAYİe-mail: A.Ş. [email protected] | web: www.enka.com e-mail: [email protected] | web: www.enka.comENKA İNŞAAT VE SANAYİ A.Ş. ZUARA DESALINATION PLANT PROJECT (SEA WATER THERMAL (MED-TVC) PLANT) ZUARA DESALINATION PLANT PROJECT (SEA WATER THERMAL (MED-TVC) PLANT)

ENKA SCOPE OF SERVICES

ENKA has self-performed the basic engineering, detail engineering, procurement, construction, commissioning, start-up and performance testing scope for the project utilizing in-house resources on a lump sum turnkey basis. Specific scope of services provided by ENKA included; complete basic and detailed design and engineering of the plant, supply of all balance of plant (BOP) systems and equipment, all civil works including foundations and structural PROJECT DESCRIPTION PROJECT DETAILS steel, Product Water Tanks (2 x 20,000 m3), Make Up Water Tank (1 x 500 m3), LFO Tank (1 x 5,000 m3), complete Zuara Desalination Plant Project, located in near Zuara city within 10 km in western interconnecting piping of the plant, firefighting system, MV/LV electrical & control and switchgear systems with LOCATION: part of Libya, in 100 km distance to capital city Tripoli, was in part of a development aux. transformers, instrument and plant air supply systems, Emergency Diesel Generators, waste collection and Zuara - Libya plan implemented by General Electricity Company of Libya, in the period of 40th treatment system, batteries and UPS System, ventilation and air conditioning (HVAC) systems, overhead cranes and OWNER / CLIENT: Anniversary preparations of Libyan Leader, to cover high demand of reliable water maintenance hoists, power plant distributed control system (DCS), mechanical and electrical erection, complete General Electricity Company of sources in eastern part of Libya. Libya (GECOL) civil and structural works, supply of spare parts, and start-up and commissioning of the plant. ENKA further provided training for the O&M personnel who will be operating and maintaining the plant. PROJECT DURATION: The Project consisted of engineering, procurement, construction, commissioning Mar 2007 – Nov 2010 and start-up of a 2 x 20,000 m3/day Water Production Plant with two type of fuel, CONTRACT TYPE: Heavy Fuel Oil (HFO), and Light Fuel Oil (LFO), complete with all Balance of Plant Lump Sum Turn Key Commodity UoM Total (BOP) systems. HFO is planned to be used as main fuel for MED Desalination Plant CONTRACT VALUE: operation whereas; light fuel oil (LFO) are used as back-up fuels. Concrete m3 4,764 EUR 20.5 Million Structural Steel ton 341 SIGNIFICANT FEATURES / Main process and equipment, MED evaporators, boilers and auxiliaries were supplied ACCOMPLISHMENTS: by Sidem (Veolia, FR) as consortium partner of the Project. Cabling km 185 • 1.1 million man-hours Equipment ton 4,800 Major Quantities UNIQUE CHALLENGES Engineering Hours hrs 28,300 Document Qty. pcs 720 Zuara Desalination Plant is expected to address the growing demand for water in western part of the country and supply reliable water to public.

Project site is located in coast line of Zuara city in the western part of Libya. Soil was weak to withstand heavy loads of the project structures. So ENKA had to perform piling work with dia. 600 mm drill hole in total of 3,696 m in length.

Such regional location and high temperatures during summer months created unique challenges for the project workforce peaked at 280 people.

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 50 FACHSHEETS Page | 50 51 | Page FACTSHEETS 51 ENKA İNŞAAT VE SANAYİe-mail: A.Ş. [email protected] | web: www.enka.com e-mail: [email protected] | web: www.enka.comENKA İNŞAAT VE SANAYİ A.Ş. OUED ATHMENIA DAM OUED ATHMENIA DAM

PROJECT DESCRIPTION ENKA SCOPE OF SERVICES PROJECT DETAILS The construction of the dam project started in August 2002. The dam reservoir is The water treatment plant was awarded to ENKA and Degremont (France) consortium in December 2004. ENKA’s scope of construction works included detail design, material supply, civil and structural construction of the Water LOCATION: located at thirty km northwest of the Constantine Province, in the Mila City in East Constantine / Mila, Algeria Algeria and was a part of the master project named “Transfer of Beni Haroun” which Treatment Plant as well as the leakage tests of the structures. The design, supply, erection and startup of the 3 OWNER / CLIENT: aimed to transfer the water collected from Beni Haroun and Bou Siaba towards raw water supply pipeline were also included in ENKA’s scope of works. The major work items are 1 million m of Ministry of Water Resources - the six cities of Batna, Kenchela, Mila, Oum El Bouaghi, Constantine and Jijel where excavation, 2.4 million m3 of filling, 30,000 m3 of concrete, 40,000 m of drilling and injection. National Agency of Dams the demand for drinking water and agricultural irrigation water has been rapidly The Oued Athmenia Dam Project involved the construction and startup of the dam reservoir and its annex structures PROJECT DURATION: Aug 2002-Mar 2007 increasing. as well as the procurement and installation of hydraulic and electrical equipment in Algeria’s Athmenia-Mila region.

CONTRACT TYPE: The dam has a height of 44 m, a length of 630 m, and a reservoir capacity of 33.6 As of December 2004, the complete hydro mechanical design works, which had been manufactured in Turkey, were Unit Rate 3 million m . It has a combined concrete tunnel and 313 m long, derivation gallery. The accepted by the administration. The final phase was completed in September 2007 as scheduled. The plant has a 3 CONTRACT VALUE: derivation gallery is able to drain the water with a maximum flow rate of 60 m /second. capacity of 270,000 m3 of treated water per day. US$ 45 Million The pipeline capacity is 4 m3/second for the drinking water and 2.5 m3/second for the Major work items entailed 255,000 m3 of excavation, 205,000 m3 of filling, 10,500 m of jet grouting, 1,000 m of SIGNIFICANT FEATURES / irrigation water. The contract included civil engineering works as well as the design, ACCOMPLISHMENTS: piling, 50,000 m3 of concrete, 5,500 tons of rebar, 94,000 m2 of formwork and 500 m of raw water pipeline with supply, erection, and startup of the hydraulic, electric and control equipment. • Provided much needed 1,600 mm diameter steel pipes. water from Beni Haroun and The dam was completed in April 2007, together with the additional projects. Bou Siaba to the six cities of Batna, Kenchela, Mila, Oum El Bouaghi, Constantine and Jijel, where demand UNIQUE CHALLENGES for drinking water and agricultural irrigation water Soil in the region consists of high plasticity clay and under natural conditions had increased rapidly at the time. it was impossible to use it as a fill material in an earthwork dam according to the specifications. For this reason, special treatment method was developed and used by engineers to use clay in earthwork filling. Commodity UoM Total

Dam Height (m) x Length (m) 44 x 600

Tunnel Section (mxm) x length(m) 7.5 x 5.5 x 270

Tunnel Section (mxm) x length(m) 3.25 x 3.25 x 600

Shafts Diameter (m) x Depth (m) Dia2.6 x 25

Caverns Size (mxmxm) 15 x 25 x 12

Major Specifications Depth (m) Length (m) 870

Shaft Linings Depth (m) 25

Steel Liners for Pressure Tunnels Diameter (m) x Length (m) Dia 2.7-2.4-1.6 x 184

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 52 FACHSHEETS Page | 52 53 | Page FACTSHEETS 53 ENKA İNŞAAT VE SANAYİe-mail: A.Ş. [email protected] | web: www.enka.com e-mail: [email protected] | web: www.enka.comENKA İNŞAAT VE SANAYİ A.Ş. AKTAU PORT REHABILITATION PROJECT KUMTOR GOLD MINE

PROJECT DETAILS

LOCATION: Kumtor, Kyrghyzstan

OWNER / CLIENT: Kumtor Gold Company (Cameco & Kyrghyz Gold)

PROJECT DURATION: July 1994-Dec 1996

CONTRACT TYPE: Unit Rate

CONTRACT VALUE: US$ 55 Million

PROJECT DESCRIPTION PROJECT DESCRIPTION ENKA SCOPE OF SERVICES: PROJECT DETAILS Engineering, Procurement, Construction Aktau is Kazakhstan’s main port on the Caspian Sea and serves as the major logistics ENKA and its Canadian partner Kilborn have undertaken EPCM and construction works

LOCATION: base for the offshore oil fields. The ENKA-Bechtel joint venture signed the contract with at Kumtor gold mine site located at 4,200 meters above sea level in Kyrghyzstan. The SIGNIFICANT FEATURES / Aktau, Kazakhstan ACCOMPLISHMENTS: Kazakhstan’s Ministry of Transportation for the Aktau Port rehabiliation project. The project also includes the workshop, office building, process plant, tailings disposal • Kyrgyzstan’s largest OWNER / CLIENT: contract included elevating the port by two meters, replacing all the port utilities, and dam, 42 km of access roads, improvement of the existing roads, river diversions, investment project & Aktau Commercial Sea Port the second-highest gold constructing a new 550 m pile supported quay, a new railroad, a port administation helicopter pist, overhead lines and marshaling yard. mining operation in the PROJECT DURATION: building and a 6,500 m² transit shed as well as additional auxiliary buildings. The port world. May 1997-Sep 1999 had to be kept operational throughout construction, which was completed in Sep CONTRACT TYPE: tember 1999. Unit Rate

CONTRACT VALUE: KOKTENKOL MOLYBDENUM PROJECT US$ 49.3 Million ENKA SCOPE OF SERVICES SIGNIFICANT FEATURES / Civil, structural, electrical works for the new quay, construction of administration ACCOMPLISHMENTS: buildings, roads, and underground structures such as drainage and sewerage PROJECT DETAILS • Kazakhstan’s main port on the Caspian Sea facilities. LOCATION: Koktenkol, Kazakhstan

OWNER / CLIENT: Outotec Finland Oy

PROJECT DURATION: Sep 2012-Aug 2013

CONTRACT TYPE: Lump Sum

CONTRACT VALUE: US$ 1.2 Million

ENKA SCOPE OF SERVICES: Engineering, Cost Estimation

SIGNIFICANT FEATURES / ACCOMPLISHMENTS: • Front End Engineering PROJECT DESCRIPTION Design (FEED) for 20 mtpa capacity Mining Facility ENKA and OUTOTEC successfully completed Front End Engineering Design (FEED) services for Koktenkol Molybdenum Project. The Koktenkol Molybdenum Project was a large open pit molybdenum mine, or processing facilities, and associated infrastructure, located in central Kazakhstan, about 150 km southwest of the city of Karaganda. The mine was planned to process 20 million tons of ore per year.

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 54 FACHSHEETS Page | 54 55 | Page FACTSHEETS 55 ENKA İNŞAAT VE SANAYİe-mail: A.Ş. [email protected] | web: www.enka.com e-mail: [email protected] | web: www.enka.comENKA İNŞAAT VE SANAYİ A.Ş. BEKHME DAM BERKE DAM

PROJECT DESCRIPTION PROJECT DESCRIPTION PROJECT DETAILS PROJECT DETAILS Construction of civil works including supply and erection of the hydraulic steel Project included the phase 1, construction of the diversion tunnel of the Berke Dam

LOCATION: structures for the Bekhme Dam Project and turnkey housing complex comprising on the River Ceyhan as well as the access roads, tunnels & bridges and phase 2, LOCATION: Mosul, Iraq of 350 villas and 17 social facilities such as Guest House, Restaurant, Club House, construction of dam. Adana, Turkey OWNER / CLIENT: Supermarket, Dispensary, Kindergarten, School, Mosque, Bank, Post Office, Laundry OWNER / CLIENT: State Commission for Dams - and Offices. Due to the Gulf crises and the war this project had been stopped Çukurova Electricity Co. Inc. - SCD Ministry of Irrigation ÇEAŞ indefinitely since August 1990, when 32% of the work progress had already been UNIQUE CHALLENGES PROJECT DURATION: PROJECT DURATION: Sep 1986-Aug 1990 completed. With the purpose of capitalizing on the 200 m waterfall height, this dam was Sep 1986-Aug 1990 ENKA SCOPE OF SERVICES constructed in a valley, which was exceedingly steep with highly difficult transportation CONTRACT TYPE: and work conditions. CONTRACT TYPE: Unit Rate Unit Rate ENKA`s scope included detailed engineering, procurement and construction. The CONTRACT VALUE: Dam works consisted of a rock fill dam with an inclined impervious core, circa 600 CONTRACT VALUE: US$ 1.5 Billion US$ 43 Million m long at crest, height 204 m, Fill volume of 37 million m³, a spillway of 8,900 m³/s ENKA SCOPE OF SERVICES SIGNIFICANT FEATURES / capacity, consisting of three tunnels of 12 m diameter and 700 m long with three SIGNIFICANT FEATURES / ACCOMPLISHMENTS: ENKA`s scope included procurement, construction and erection. The works ACCOMPLISHMENTS: radial gates, 2 bottom outlets of total discharge capacity of 750 m³/s, with a length of included the construction of following items: 500 m long derivation tunnel with • The largest Hydroelectric 1,200 m long each 2 diversion tunnels of 12 m diameter and a length of 1,100 m long • The largest Hydroelectric Dam project of Iraq horse-shoe section and 13 m diameter, 5 km long approach roads required for the Dam on Ceyhan River each, 3 concrete lined tailrace tunnels of dia. 12 m and approximately 640 – 710 m dam construction and operation, and constructed by 1.2 million m3 of excavation, 7 long, a conventional underground powerhouse having 6 units with a total capacity of approach tunnels with a total length of 3.5 km, 2 approach bridges, with 3 span, with 1,560 MW and an underground transformer hall and a switchyard hall. a total span of 160 m and made of steel prefabricated panels, underground power stations, power tunnels, rock-bolt galleries, over-crest platform excavations, spillway tunnels and approach tunnels.

Commodity UoM Total Commodity UoM Total Commodity UoM Total

Open Excavation m3 11 Million Tunnel Excavation m3 281,257 Tunnel Excavation m3 25,295

Underground Excavation m3 2.5 Million Road & Other Excavation m3 1.5 Million Concrete Lining m3 39,942

Hydraulic Structures ton 25,000 Tunnel Concrete m3 42,398 Drilling of Grouting m 141,922 Tunnel Tunnels Concrete m3 3 Million Other Concrete m3 14,500 Drilling for Anchors m 15,000 Major Quantities Housing Complex Total Floor Area m2 80,100 Shotcrete ton 16,080 Drilling for Piezometer m 15,217 Major Quantities of Access Major Quantities of Access

Total Asphalt ton 668,100 Consolidated Grouting ton 200 Major Quantities of Diversion Cement Grouting ton 12,448

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 56 FACHSHEETS Page | 56 57 | Page FACTSHEETS 57 ENKA İNŞAAT VE SANAYİe-mail: A.Ş. [email protected] | web: www.enka.com e-mail: [email protected] | web: www.enka.comENKA İNŞAAT VE SANAYİ A.Ş. FORMER USSR (CIS) TURKEY NATURAL GAS PIPELINE BENGHAZI WATER RESERVOIR

PROJECT DESCRIPTION PROJECT DESCRIPTION PROJECT DETAILS PROJECT DETAILS The 842 km, 36-24 inch natural gas pipeline extends from the Bulgarian border of Construction of the civil engineering works and supply, delivery and installation of the

LOCATION: Turkey to Ankara, including a total of 118 km of offshore pipeline between Ambarli- associated electrical and mechanical equipment of circular earthfill holding reservoir LOCATION: From the Bulgarian-Turkish Pendik and Dil Iskelesi-Hersek in the Marmara Sea at a maximum depth of 90 m. Other with a capacity of 4,7 million m3. The reservoir comprises an embankment with 9 m. Benghazi, Libya border to Ankara, Turkey principal works in the contract included a 20 MW compressor station, 11 reducing and Height and 1 km. of crest diameter, inlet and outlet works and a spillway. The circular OWNER / CLIENT: OWNER / CLIENT: metering stations, 9 pig stations, 32 line valves, a dispatching center, 3 maintenance earthfill embankment incorporates an internal sand/gravel system drainage system Great Man-Made River Authority BOTAŞ – Boru Hatları ile Petrol Taşıma A.Ş. (BOTAŞ – center, and telecommunication and telecontrol systems. The pipeline has an annual and has internal slopes lined with a synthetic geomembrane of 150,000 m2. PROJECT DURATION: TransportatIon by Pipelines Inc.) July 1988-Apr 1991 capacity to deliver 14 bcm of natural gas, under 70 barg pressure, into Turkey through PROJECT DURATION: the Ukraine. This is equivalent to 75% of Turkey’s current consumption. The project CONTRACT TYPE: Sep 1986-Sep 1988 Unit Rate was financed though a number of export credit agencies, such as US Exim, JEXIM, ENKA SCOPE OF SERVICES CONTRACT TYPE: Coface and ECGD. The inlet works, outlet works and spillway are constructed of reinforced concrete. CONTRACT VALUE: Unit Rate US$ 65 Million Water is discharged into the reservoir through 3 submerged discharge valves, each CONTRACT VALUE: with a diameter of 2,000 mm, and a weight of 30 tons, supplied and installed by US$ 261 Million ENKA SCOPE OF SERVICES ENKA. Manufacturing and installation of polyurethane coated buried steel pipework, SIGNIFICANT FEATURES / with diameters varying between 2,000 and 4,000 mm lined at site by cement mortar ACCOMPLISHMENTS: Consortium of ENKA/Spie-Capag/Brown and Root entered into a contract with BO- TAŞ for the construction of the Russian natural gas pipeline in September 1986. The and cathodically protected and installation of 8 owner-supplied large valves are • 842 km 24-36” gas pipeline of included. The project also includes installation of a prestressed cylindrical concrete which 118 km part is offshore detail design of the pipeline facilities had been done by Fluor (UK) Ltd. at a max depth of 90 m by-pass pipeline of 4 m diameter and 1,800 m long.

Commodity UoM Total Commodity UoM Total

Off-Shore Pipelaying (90m depth) km 118 Excavation m3 2,1 Million

Compressor Station ea 1x20MW Backfilling m3 450,000

Pig Stations ea 9 Special Filter & Protection Backfilling m3 200,000

Line Valves ea 32 Geomembrane for Slope Protection m2 150,000 Major Quantities

3

Major Quantities Dispatching Center ea 1 Concrete m 20,000

Maintenance Center ea 3 Special Steel Pipes ton 800

Reducing & Metering Station ea 11

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 58 FACHSHEETS Page | 58 59 | Page FACTSHEETS 59 ENKA İNŞAAT VE SANAYİe-mail: A.Ş. [email protected] | web: www.enka.com e-mail: [email protected] | web: www.enka.comENKA İNŞAAT VE SANAYİ A.Ş. IRAQ - TURKEY CRUDE OIL PIPELINE EXPANSION

PROJECT DETAILS PROJECT DESCRIPTION TURKISH PART

LOCATION: ENKA and its partner Toyo Engineering (Japan) undertook the turn-key contract with Iraq -Turkey BOTAŞ, the Turkish state-owned company for pipeline transportation, and completed OWNER / CLIENT: BOTAS Transportation by the construction in October 1984. The project was designed to increase the capacity Pipelines Inc. Turkey(Turkish of the existing 40-inch. 1,000 km crude oil pipeline from 35 to 50 million ton/year. Part) State Organization for Oil The design and construction works were carried out simultaneously in Turkey and Projects - SCOP(Iraqi Part) Iraq. The major work items were the replacement of pumps at existing pump stations, PROJECT DURATION: construction of three new pump stations, installation of booster pumps, construction Mar 1983-Oct 1984 of an 80 km pipeline loop with diameters of 30 and 40 inches, modification of the CONTRACT TYPE: dispatching center, extension of the existing metering station and the installation Lump Sum Turnkey of a fourth metering station, two new pump stations complete with HV and MV CONTRACT VALUE: substations, and fire-fighting, telecontrol and telecommunication, instrumentation, US$ 41 Million (Turkish Part) US$ 29 Million (Iraqi Part) station piping, and cathodic protection systems.

SIGNIFICANT FEATURES / IRAQI PART ACCOMPLISHMENTS: Design and construction of expansion project to increase the capacity of existing 40”, • Expanded the capacity of 1000 km crude oil line from 1,000 km crude oil line from 35 million tons/year to 50 million tons/year. Replacement 35 million t/year to 50 million of pumps and motors at existing stations. Modification of dispatching center. t/year Extension of the metering stations and addition of the 4th metering st. Construction of two new pump stations complete with high voltage substation, MV substation, fire fighting/fire alarm system, telecontrol / telecommunication and instrumentation system, 4 x 3.6 MV, 11 KV pump/motor sets, station piping and cathodic protection systems. Tie-in of new stations to existing pipeline.

ENKA SCOPE OF SERVICES Scope of work included construction of 80 km of pipeline loop with 30” and 40” diameters, replacement of pumps and motors at existing stations Modification of dispatching center, extension of the metering stations and addition of the 4th metering station, construction of five new pump stations complete with high voltage substation. And tie-in of new stations to existing pipeline.

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 60 FACHSHEETS Page | 60 61 | Page FACTSHEETS 61 ENKA İNŞAAT VE SANAYİe-mail: A.Ş. [email protected] | web: www.enka.com e-mail: [email protected] | web: www.enka.comENKA İNŞAAT VE SANAYİ A.Ş. WASIA WATER TREATMENT PLANT RAS LANUF NEW TOWN PROJECT (WATER SUPPLY AND SEWAGE SYSTEMS)

PROJECT DETAILS PROJECT DETAILS

LOCATION: LOCATION: Wasia – Saudi Arabia Ras Lanuf, Libya

OWNER / CLIENT: OWNER / CLIENT: Ministry of Agriculture and Water Secretariat of Heavy Industries, Brega and Ras Lanuf Higher PROJECT DURATION: Committee Oct 1979-May 1982 PROJECT DURATION: CONTRACT TYPE: Feb 1981-May 1985 Lump Sum Turnkey CONTRACT TYPE: CONTRACT VALUE: Lump Sum US$ 40 Million CONTRACT VALUE: US$ 224 Million PROJECT DESCRIPTION PROJECT DESCRIPTION The sewage treatment plant serving for 20,000 people in Ras-Lanuf, a town built in The rapidly increasing demand for fresh water of Riyadh, the capital city of Saudi Arabia, is to be met by two water Libya entirely by ENKA, was equipped with a microstainer system. The system makes supply projects with a combined capacity of 600,000 m3/day. At the same time the present water distribution it possible to use the already treated water as process water. system of Riyadh is being improved, and the new areas are added to the distribution system by a third project. ENKA SCOPE OF SERVICES ENKA SCOPE OF SERVICES Storm Water Drainage System and Water Supply System, 17 km long pipeline with a Architectural, civil and structural design, and construction and erection of a water treatment plant of 200,000 m³ diameter of 400 mm was used to bring water from the nearby industrial area of the per day capacity. Laying of 3,000 tons of ductile iron pipes. Civil and building works for coolers, softeners, filters, ARC to the a/m reservoir. sludge disposal plant, chemical handling buildings, pump houses, administration buildings, workshops and stores. All mechanical and electrical installation works of the above mentioned units including insulation and painting. BREGA NEW TOWN PROJECT WATER RESERVOIRS AND PIPING WORKS AL RASS WATER SUPPLY AND TREATMENT SYSTEMS PROJECT DETAILS

PROJECT DETAILS LOCATION: Marsa El Brega, Libya

LOCATION: OWNER / CLIENT: Al Rass, Saudi Arabia Secretariat of Heavy Industries, Brega and Ras Lanuf Higher OWNER / CLIENT: Committee Ministry of Agriculture and Water PROJECT DURATION: PROJECT DURATION: May 1986-Aug 1993 First Scope: Apr 1985 - Mar 1988 Second Scope: Nov 1985 – July 1987 PROJECT DESCRIPTION The contract was turnkey and comprised two housing projects covering 432,300 m² construction area consisting PROJECT DESCRIPTION of 2,666 single or two-story villas of 18 different types, social buildings, including schools, supermarkets, clinics, Al-Rass water treatment plants in Saudi Arabia is a smaller example of what ENKA was able to accomplish in Wasia. post offices and other service units, cultural centers, soccer fields and tennis courts, roads, complete infrastructure, 60,000 m3/day produces, 10,000 m3 of which is to be distributed with the water system as in terms of the contract, landscaping, telecommunication and interior furnishings of the buildings. and remain portion will be utilised in agriculture. ENKA SCOPE OF SERVICES

ENKA SCOPE OF SERVICES All the infrastructure works such as sewerage system, storm water drainage, irrigation and fire fighting network, potable water network, water tanks have been performed in the framework of this turn-key contract. The total length Scope 1: Design and construction of a water treatment plant. Main works comprised softener building, pumping of the pipes layed is 118,673 m. station, fuel storage tanks, waste water station, wells, administration building and electromechanical works. Scope 2 : Pipe-laying for transmission and distribution network.

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 62 FACHSHEETS Page | 62 63 | Page FACTSHEETS 63 ENKA İNŞAAT VE SANAYİe-mail: A.Ş. [email protected] | web: www.enka.com e-mail: [email protected] | web: www.enka.comENKA İNŞAAT VE SANAYİ A.Ş. AL KHAFJI PHASE 2 DESALINATION PLANT ISTANBUL SEWERAGE PROJECT, YENIKAPI PRETREATMENT PLANT AND PUMPING STATION

PROJECT DETAILS PROJECT DETAILS

LOCATION: LOCATION: Al Khafji, Saudi Arabia İstanbul, Turkey

OWNER / CLIENT: OWNER / CLIENT: Saline Water Conversion General Directorate of Corporation Istanbul Water & Sewerage Administration – İSKİ PROJECT DURATION: Oct 1982-Feb 1986 PROJECT DURATION: Sep 1988-Aug 1988 CONTRACT TYPE: Lump Sum Turnkey

CONTRACT VALUE: US$ 45 Million PROJECT DESCRIPTION

PROJECT DESCRIPTION Construction of the Yenikapı Pretreatment Plant & Pumping Stations, where a significant portion of the Istanbul 3 Single purpose desalination plant to produce 5 million gallons per day desalted water by the evaporation of Arabian Sewerage network converges, had been undertaking by ENKA. The plant processes 1-6 million m water per day. Gulf water based on MSF process and transmission of potable water to the distribution terminals in the town of Al The pump station building was constructed as a caisson on ground level with 36 x 27 m horizontal section and 14 m Khafji and related office buildings and housing compound. height. Later, the building was lowered to 14.2 m below sea level. This difficult process took 40 days of concentrated effort, ENKA SCOPE OF SERVICES after which floor area concrete was laid, making it possible to adjust the level of the building as required. All civil works of the desalination plant. Turn-key construction of sea water intake, outfall and treatment facilities. ENKA SCOPE OF SERVICES Turn-key construction of product water pipeline and facilities for fuel oil supply, storage and handling. Contract consisted of construction of a coarse screen house, a pumping station (influent); pretreatment plant, a Turn-key construction of control buildings, laboratory facilities, maintenance shop, warehouse, office buildings, pumping station (effluent), incoming inceptor, sewers and force mains; fabrication and laying of overflow systems mosque and housing compound including HVAC and fire protection systems. and connecting pipes; construction of roads and firefighting.

AL MEDINAH AL MUNAWWARAH HOUSING (WATER SUPPLY AND SEWAGE SYSTEMS) DIYARBAKIR & KAHRAMANMARAŞ DRINKING AND SEWAGE SYSTEM NETWORK

PROJECT DESCRIPTION PROJECT DETAILS PROJECT DETAILS Construction of the water supply system of Diyarbakır Province LOCATION: LOCATION: Al Medinah, Saudi Arabia Dıyarbakır & Kahramanmaraş, consisting of 67 km pipeline. In the Turkey OWNER / CLIENT: Diyarbakır Province Sewage System Ministry of Public Works and OWNER / CLIENT: which we undertook in 1977, 15 km Housing Province Bank Turkey long collector was completed in an PROJECT DURATION: PROJECT DURATION: extremely hard rocky (basalt) area. Apr 1982-Feb 1988 Dıyarbakır Apr 1982-Apr 1986 The construction was carried in the PROJECT DESCRIPTION CONTRACT TYPE: city. Lump Sum Turnkey Kahramanmaraş Al Medinah Al Munawwarah Housing project was composed of 2,084 villas on an area May 1985-May 1987 Turn-key construction of the sewage of 2,150,000 m2 and related infrastructure works such as potable water and rain water CONTRACT VALUE: US$ 47 Million CONTRACT TYPE: system network and collectors of systems, sewage system and irrigation network. Lump Sum the city of Kahramanmaraş including ENKA SCOPE OF SERVICES manufacturing of pipes with dia. Storm Drainage System: Irrigation System: Between Ø 100 - 1.200 mm. Contract Pipe laying: 12,445 m Pipe laying: 6,468 m, also included drinking water network Pipe diameters: 1,050 mm, 750 mm, 600 mm, 300 mm Pipe diameters: 225 mm, 110 mm, 63 mm of 200 km consisting of Ø 100-800 Water Supply System: Sanitary Sewerage System: mm. Dia pipes. Pipe laying: 28,000 m, Pipe laying: 24,432 m Pipe diameters: 200 mm, 150 mm, 50 mm Pipe diameters: 330 mm, 250 mm, 200 mm, 160 mm.

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 64 FACHSHEETS Page | 64 65 | Page FACTSHEETS 65 ENKA İNŞAAT VE SANAYİe-mail: A.Ş. [email protected] | web: www.enka.com e-mail: [email protected] | web: www.enka.comENKA İNŞAAT VE SANAYİ A.Ş. MESSEBO CEMENT FACTORY, ETHIOPIA MOTORWAYS, BRIDGES & TUNNELS BENGHAZI CEMENT PLANT, LIBYA AIRPORTS & STADIUMS HAWARI CEMENT PLANT, LIBYA WATER WORKS, DAMS, PIPELINES & MINING CEMENT PLANTS SOUQ AL-KHAMIS CEMENT PLANT, LIBYA AL KHOMS CEMENT PLANT, LIBYA TASLUJA CEMENT PLANT, IRAQ KERBELA CEMENT PLANT, IRAQ FALLUJA WHITE CEMENT PLANT, IRAQ BADOOSH CEMENT PLANT, IRAQ NEW BADOOSH CEMENT PLANT / OPERATION & MAINTENANCE, IRAQ RASHADIYA CEMENT PLANT, JORDAN KUBAISA CEMENT PLANT, IRAQ

CEMENT PLANTS CEMENT PLANTS

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 66 FACHSHEETS Page | 66 67 | Page FACTSHEETS 67 ENKA İNŞAAT VE SANAYİe-mail: A.Ş. [email protected] | web: www.enka.com e-mail: [email protected] | web: www.enka.comENKA İNŞAAT VE SANAYİ A.Ş. MESSEBO CEMENT FACTORY HAWARI CEMENT PLANT

PROJECT DETAILS PROJECT DETAILS

LOCATION: LOCATION: Addis Ababa, Ethiopia Benghazi, Libya

OWNER / CLIENT: OWNER / CLIENT: Messebo Building Materials General National Organization Production Share Co. for Industrialisation

PROJECT DURATION: PROJECT DURATION: Feb 1997-Dec 1999 Oct 1975-Nov 1977

CONTRACT TYPE: CONTRACT TYPE: Lump Sum Turnkey Lump Sum

CONTRACT VALUE: CONTRACT VALUE: US$ 45 Million US$ 50 Million

PROJECT DESCRIPTION MAIN QUANTITIES: PROJECT DESCRIPTION Formwork: 103,758 m2 Reinforcing Steel: 2,998 tons Under the project scope, all civil and building works of the cement plant with a 3 The construction of the cement factory started in January 1997 for the client, Messebo Building Materials Production Reinforced Concrete: 33,242 m capacity of 1,000,000 tons/year. Share Company. The plant is located in the northern part of Ethiopia, 7 km from Mekele city.

The project encompassed all the civil and structural works, supply and installation of the structural steel, and the ENKA SCOPE OF SERVICES entire mechanical erection works. The mechanical equipment was provided by F.L.Smith of Denmark. Subcontractor to main civil contractor “Bilfinger Berger”. ENKA was responsible for the 80 % of the civil works. ENKA SCOPE OF SERVICES The annual capacity of the plant is 600,000 tons and it is capable of producing portland cement with or without additives. The project involved 256,000 m3 of excavation and backfill, 44,000 m3 of concrete, 3,700 tons of structural steel, 3,450 tons of reinforcement, 115,000 m2 of formwork, 7,200 tons of mechanical installation and 500 tons of SOUQ AL-KHAMIS CEMENT PLANT electrical installation. The project was completed at the end of 1999. PROJECT DETAILS BENGHAZI CEMENT PLANT LOCATION: Souk Al-Khamis, Libya

PROJECT DETAILS OWNER / CLIENT: General National Organization for Industrialisation LOCATION: Benghazi, Libya PROJECT DURATION: Aug 1974-May 1977 OWNER / CLIENT: General National Organization CONTRACT TYPE: for Industrialization Lump Sum PROJECT DURATION: CONTRACT VALUE: First Extension: US$ 40 Million Mar 1972 - June 1973 Second Extension: MAIN QUANTITIES: PROJECT DESCRIPTION Oct 1974 – June 1976 Formwork: 115,000 m2 Reinforcing Steel: 3,600 tons The project’s scope of works included all civil and building works of a cement plant CONTRACT TYPE: Reinforced Concrete: 37,000 m3 Lump Sum Turnkey with a capacity of 1,000,000 tons/year.

PROJECT DESCRIPTION CONTRACT VALUE: First Extension: US$ 20 Million ENKA SCOPE OF SERVICES Sec. Extension: US$ 25 Million All civil works of a cement plant extension project with a capacity of 600,000 tons/ Subcontractor to main civil contractor “Bilfinger Berger”. The 80 % of the civil works year (First Extension) ENKA SCOPE OF SERVICES: Procurement and Construction was performed by ENKA. All civil works of a cement plant extension project with a capacity of 600,000 tons/ Subcontracting works to “Bilfinger Berger” year (Second Extension)

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 68 FACHSHEETS Page | 68 69 | Page FACTSHEETS 69 ENKA İNŞAAT VE SANAYİe-mail: A.Ş. [email protected] | web: www.enka.com e-mail: [email protected] | web: www.enka.comENKA İNŞAAT VE SANAYİ A.Ş. AL KHOMS CEMENT PLANT KERBELA CEMENT PLANT

PROJECT DETAILS PROJECT DETAILS

LOCATION: LOCATION: Al-Khoms, Libya Kerbela, Iraq

OWNER / CLIENT: OWNER / CLIENT: General National Organization State Organization for for Industrialisation Construction Industries - STOKI

PROJECT DURATION: PROJECT DURATION: Mar 1977-Mar 1979 May 1981-Mar 1985 PROJECT DESCRIPTION First Extension: CONTRACT TYPE: Sep 1981-Aug 1985 Lump Sum Turnkey Cement Plant with a capacity of 1,000,000 tons/year (3,000 tons/day of cement CONTRACT TYPE: CONTRACT VALUE: clinker in one production line). ENKA, as construction contractor, carried out all civil Lump Sum US$ 40 Million and building works related with the cement plant including detailed designs.ENKA’s CONTRACT VALUE: MAIN QUANTITIES: PROJECT DESCRIPTION works consist of raw material crushing, storage and handling unit; clinker production, US$ 48 Million Formwork: 57,000 m2 Reinforcing Steel: 1,700 tons storage and handling unit; central control and laboratory building; fuel oil and gas MAIN QUANTITIES: 3 The scope of works consisted of all civil and building works of a cement plant with a 3 Reinforced Concrete: 30,500 m systems; cement grinding , storage and handiling unit; cement packing, loading Excavation: 266,057 m capacity of 1,000,000 tons/year. Formwork: 170,162 m2 and dispatch unit; electrical power supply system water supply system and auxiliary Reinforced steel: 9,360 tons 3 facilities. Sliding formwork: 368,392 m Concrete: 41,219 m3 ENKA SCOPE OF SERVICES Prestressing wire: 108 tons All civil and building works related with 100 percent extension of Kerbela Cement Subcontractor to main civil contractor “Bilfinger Berger”. ENKA was responsible for Plant. the 80% of the civil works.

TASLUJA CEMENT PLANT FALLUJA WHITE CEMENT PLANT

PROJECT DETAILS PROJECT DETAILS

LOCATION: LOCATION: Tasluja, Iraq Falluja, Iraq

OWNER / CLIENT: OWNER / CLIENT: State Organization for Iraqi Central Cement State Construction Industries – STOKI Enterprise

PROJECT DURATION: PROJECT DURATION: Mar 1981-Jul 1985 Jan 1988-Feb 1990 First Extension: PROJECT DESCRIPTION May 1981-Oct 1985 CONTRACT TYPE: Lump Sum The project’s scope of works included the procurement and construction of all civil CONTRACT TYPE: CONTRACT VALUE: and building works with respect to the cement plant with the capacity of 1,000,000 Lump Sum Turnkey US$ 3.4 Million tons/ year. All civil and building works related with 100 percent extension of Tasluja CONTRACT VALUE: PROJECT DESCRIPTION Cement Plant. US$ 47 Million Technicnical management and consulting, design of preventive maintenance MAIN QUANTITIES: Excavation: 155,248 m3 systems, supervision of spare parts manufacturing, periodical check of equipment ENKA SCOPE OF SERVICES 2 Formwork: 84,080 m and machinery, forn design , etc. Reinforced steel: 3,846 tons ENKA, as construction contractor carried out all civil and building works related with Sliding formwork: 24,476 m2 the cement plant including detailed designs. Concrete: 40,184 m3 ENKA SCOPE OF SERVICES Prestressing wire: 112 tons ENKA’s works consisted of raw material crushing, storage and handling unit; cement ENKA’s wholly owned subsidiary, ENKA Teknik managed and operated Falluja White packing, loading and dispatch unit; electrical power supply system; workshops, Cement for the Client, Central Cement State Enterprise. storage areas; administration building, camp facilities and other auxiliary facilities.

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 70 FACHSHEETS Page | 70 71 | Page FACTSHEETS 71 ENKA İNŞAAT VE SANAYİe-mail: A.Ş. [email protected] | web: www.enka.com e-mail: [email protected] | web: www.enka.comENKA İNŞAAT VE SANAYİ A.Ş. BADOOSH CEMENT PLANT RASHADIYA CEMENT PLANT

PROJECT DETAILS PROJECT DETAILS

LOCATION: LOCATION: Mosul, Iraq Rashadiya, Jordan

OWNER / CLIENT: OWNER / CLIENT: Mosul Public Enterprise for National Planning Commitee – Building Materials South Cement Company Ltd.

PROJECT DURATION: PROJECT DURATION: Oct 1980-Mar 1983 Nov 1981-Jun 1984 PROJECT DESCRIPTION CONTRACT TYPE: CONTRACT TYPE: Lump Sum Turnkey The Rashadiya Cement Plant in Jordan with an annual capacity of 2.000.000 tons/ Lump Sum CONTRACT VALUE: PROJECT DESCRIPTION year were constructed. CONTRACT VALUE: US$ 6.7 Million US$ 42.2 Million The scope of works consisted of design, engineering, fabrication and erection of the MAIN QUANTITIES: MAIN QUANTITIES: Structural Steel: 2,500 tons steel structure works of homogenisation buildings of the cement plant with a 3,000 ENKA SCOPE OF SERVICES Excavation: 130,000 m3 tons daily capacity. Formwork: 144,000 m2 In joint venture with Jordan’s Trocon Co. ENKA executed all civil and building Reinforcing Steel: 5,300 tons works (Main plant building was constructed as heavy steel structure on reinforced Steel Structure: 7,400 tons Concrete: 66,000 m3 ENKA SCOPE OF SERVICES concrete foundations), air-conditioning, all steel structure works erection, fabrication of mechanical steel structure such as ducts, chutes (1,440 tons ) and clinker tower Design, engineering, fabrication and erection of the steel structure works of erection and infrastructure works. homogenisation buildings. Totally 2,500 tons of steel structure works were performed.

NEW BADOOSH CEMENT PLANT / OPERATION & MAINTENANCE KUBAISA CEMENT PLANT

PROJECT DETAILS PROJECT DETAILS

LOCATION: LOCATION: Mosul, Iraq Kubaisa, Iraq

OWNER / CLIENT: OWNER / CLIENT: State Enterprise for Cement in State Organization of Industrial Ninevah/SECIN Projects - SOIP

PROJECT DURATION: PROJECT DURATION: Dec 1981 – Apr 1984 Jan 1986-Oct 1987 Sep 1982 – Apr 1984 PROJECT DESCRIPTION Dec 1982 – Dec 1985 CONTRACT TYPE: Lump Sum Turnkey Maintenance, operation and technical administration of grinding mills (separate CONTRACT TYPE: CONTRACT VALUE: contract). Lump Sum Turnkey US$ 16.9 Million

Maintenance, operation and technical administration of quality control department CONTRACT VALUE: PROJECT DESCRIPTION (separate contract). US$ 3.8 Million US$ 432 Million Turn-key construction of railcar bag and bulk cement loading facilities, heavy oil US$ 11.5 Million Overall maintenance, operation, technical administration of the 2nd extension of unloading system and railway. Badoosh Cement Plant (separate contract). MAIN QUANTITIES: Excavation: 155,248 m3 Formwork: 84,080 m2 ENKA SCOPE OF SERVICES Reinforced steel: 3,846 tons Sliding formwork: 24,476 m2 Between 1986 and 1988, ENKA’s wholly owned subsidiary, ENKA Teknik constructed Concrete: 40,184 m3 the railcar bag and bulk cement loading facilities of the Kubaisa Cement Plant. Prestressing wire: 112 tons

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 72 FACHSHEETS Page | 72 73 | Page FACTSHEETS 73 ENKA İNŞAAT VE SANAYİe-mail: A.Ş. [email protected] | web: www.enka.com e-mail: [email protected] | web: www.enka.comENKA İNŞAAT VE SANAYİ A.Ş. İNŞAAT VE SANAYİ A.Ş. Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul Phone: +90 (212) 376 10 00 (pbx) Fax: +90 (212) 272 88 69 e-mail: [email protected] web: http://www.enka.com