TWO ROCKS MARINA MASTER PLAN

Prepared for Department of Transport 13 February 2020 1

2

4 3 5

8 4

6

7 4 10 11

9 13 14 12 15

20

16 5 19 17

6 3 18 5 22 23 21

24

25 26 15 27

3 29

28

4 5 4

30 31

POPE STREET 32

33

34 3 37 35 38 28

36 39

Legend 1 Future emergency 25 Protected swimming zone access 26 Beach 29 41 40 2 Ocean pool 27 Bridge and decked zone 3 Amenities 28 Pedestrian Plaza with 4 Public access parking Restaurants and boardwalk

5 Parkland with shelters, BBQ 29 Public pens facilities and seating 30 Food, beverage and retail 6 Fuel facility 5 31 Entry landscaping 7 Breakwater 32 Realigned entry road 22 8 Landmark feature 33 Clear vista to the water 9 Commercial jetty 34 Bridge link connecting to 4 10 Receival facilities rooftop of building. Lift access to lower street level 11 Yard for accessibility.

12 100m commercial wharf with 35 Short stay accommodation boat lifter with parking 42

13 Boat stacker for 200 vessels 36 Public access boardwalk 15 14 Commercial pens 37 Public berth

15 Tree lined shared use path 38 Paved connection from town centre to waterside 43 16 Boat ramp parking 39 Landscaping to improve 17 Boat ramps heritage wall amenity 44 18 Sea Rescue 40 Link to town centre plaza and 5 22 King Nepture sculpture 4 19 Staircase to Sovereign Drive 41 Terraced lawn 20 Commercial buildings 42 Landmark rock and recreation 21 Yacht club area 5 22 Playground 43 Residential development lots 45 23 Access ramp to beach 44 Commercial development opportunity 24 Focal stage area 45 New access road and footpath

Yield Summary

Total car parking bays: 914

Total boat trailer parking bays: 320

Total boat pens: 564

TWO ROCKS MARINATwo Rocks EXPANSION Marina Master Plan MASTER PLAN 0 20 80 160m Revision Date Scale Client Project Name Drawing D 25.09.19 1:2000@A0 Department of Transport Two Rocks Town Centre Marina Expansion Two Rocks Marina Two Rocks, WA Master Plan Master Plan

Indicative layout only - not for construction. \\proj01\PER\013795-61A-P\Working\Adobe\InDesign\Stage_2_Masterplan_Updates\191114_Masterplan_A0_1to2000.indd Executive Summary

The Two Rocks Marina Master Plan provides a long term Broadly, the master plan is organised in four precincts (from framework for the Marina’s future development. As an important north to south): strategic asset in ’s growing northern corridor, a long term _ Northern marine industry precicnt, comprising the boat plan for employment, recreation and amenity is needed to help stacking facilities, crayfishing receivals and yard space inform future planning, design and decision making. _ Recreational boating precinct, containing the car parking and boat ramps, Sea Rescue, yacht club and associated amenities The master plan has been prepared using a consultative buildings engagement process with the Two Rocks Marina Reference _ Tourism and commercial precinct, comprising the beach and Group, Department of Transport and technical consultants. The commercial hub plan was initiated in response to the need to replace or refurbish _ Local neighbourhood precinct, offering potential for residential failing infrastructure, and to ensure these works will be development in association with a new parkland. consistent with the long term plan for the marina. The Master plan is an aspirational long-term vision for the future In development of the master plan, a range of options were of the marina. To achieve the ultimate vision, the master plan prepared, taking account of identified opportunities and identifies numerous ‘projects’, generally independent of each constraints that exist for the site. Both the Department of other; but that can each contribute to ongoing improvements in Transport and Reference Group recognise the need for the the marina over time. There is no current funding commitment marina to remain a working harbour, a place that supports the to undertake such an ambitious redevelopment, and as such this local fishing industry, and enables community access to the document contemplates the projects which can reasonably be waterfront. programmed now. A range of transitional activities are also planned, to enable ongoing functioning of the marina whilst the The following vision was established for the project: vision strategy is further developed, and to provide some short term wins for the local community. Two Rocks is an Oceanside village; the heart of tourism and maritime activity in the north-west, a centre of excellence for The redevelopment of the marina over time is an exciting fresh local produce and a place for the whole community, new opportunity for Perth’s northern suburbs. While the exact timing and existing. relies on funding availability, there remain plentiful opportunities for the marina to refresh and renew, and this Implementation To support the vision, eight master planning principles have been Plan provides a road map to ensuring the facility continues to established. These will be used to consider future development improve and become the heart of the community once again. and planning proposals within the project area, thus ensuring a cohesive outcome:

1. A working harbour 2. A community asset 3. Flexible over the long term 4. A regional destination 5. Responding to the marine environment 6. Delivering safe and efficient access 7. Celebrating the rocks 8. Building on the beachside heritage and character

Using these principles, a master plan has been developed by the stakeholder community, taking into account their expectations and priorities. The plan incorporates seven key initiatives.

The key initiatives are:

1. A new protected swimming beach 2. A central tourism hub 3. A new marina boulevard and improved connectivity 4. A connected waterfront park 5. A southern park and neighbourhood precinct 6. An expanded recreational boating precinct 7. A maritime industry hub

HASSELL © 2019 Prepared by Hassell for Department of Transport

Front cover image Source: https://www.atlantisbeach.com.au/ Document control fishing-near-two-rocks/ Rev Date Approved by Description

Contact 20.12.18 SD Report template outline Anthony Brookfield Principal [email protected] 01 01.03.18 SD Master Plan Report (DRAFT) Scott Davies Senior Associate 02 20.03.19 SD Incorporating DoT Comments [email protected] 03 04.04.19 SD Incorporating DoT Comments HASSELL Level 1 Commonwealth Bank Building 04 14.11.19 AB Masterplan Updates 242 Murray Street 05 13.02.20 AB Masterplan Updates Perth, Australia 6000 T +61 8 6477 6000 hassellstudio.com @HASSELL_Studio HASSELL Limited

Two Rocks Marina Master Plan Contents

Section 01 Introduction and Background 01 02 Stakeholder Consultation 11 03 Opportunities and Challenges Analysis 15 04 Master Plan Principles 21 05 The Master Plan Concept 25 06 Implementation 30

HASSELL © 2019 Two Rocks Marina Master Plan Section 01 Introduction and Background

HASSELL 1 © 2019 01 TWO ROCKS LOCALSTRUCTURE PLAN (MARCH 2014)

STUDY AREA

TWO ROCKS TOWN CENTRE STRUCTURE PLAN (MARCH 2014)

EXISTING BREAKWATER

ROCKS

ROCKS

2 Two Rocks Marina Figure 1: Existing Two Rocks contextMaster Plan Report 01 Introduction and Background

Two Rocks Marina Project Area

The Two Rocks Marina is an important social, economic and The project focuses on the Two Rocks Marina, including cultural asset for the Two Rocks community, as well as more surrounding affected land and marine environment. The project broadly, for the future North-West Corridor population. As a area comprises 38 hectares. The project considers the working harbour, it is one of the few pieces of strategic relationship between the marina and adjacent land, including infrastructure in Perth’s northern corridor, and so provides an the existing coastal reserve and town centre. important base for employment, recreation and associated services. The study area, being focused on the marina and coastal environment, is set at beach level and below the sand dunes Located immediately adjacent to the Two Rocks town centre, upon which sit much of existing Two Rocks. Immediately to the collectively these two precincts form the cultural and activity east, the Two Rocks Town Centre provides existing shopping and hub for the area. The composition and relationship of the marina commercial services for the local community. A structure plan and town centre therefore need to be carefully considered. for the town centre was approved in March 2014 and envisages a Similarly, the existing community has a strong relationship to the broader, mixed use precinct containing commercial, residential, project area, using it as a place of employment, recreation and short stay and open space functions. The marina master plan community activities. The marina is utilised by the The Two seeks to complement the role of the town centre. Rocks Sun City Yacht Club, the Volunteer Sea Rescue and also provides a safe launching point for recreational craft with the The study area comprises land in public ownership - in the case existing boat ramps in the south of the marina. of the marina, by the Department of Transport; with other land parcels in control of the City of and State Government In addition, the marina helps serve Western Australia’s departments. The master plan establishes a long term crayfishing industry, it being at the southern extent of the framework for these organisations to work together to progress crayfish’ natural feeding and grazing area. The crayfishing planning and development outcomes. industry is a half a billion dollar industry in WA* and an important aspect of the local economy. A number of crayfishing To that end, part of the study area is subject to Bush Forever boats and associated service craft are based at Two Rocks. The designation. This covers the coastal dunes, as well as the marina also benefits from commercial marine services, which existing marina hard infrastructure. The Bush Forever provide supporting maintenance and servicing facilities for the designation needs to be reviewed as part of the ongoing project marine industry. planning.

*Source: westernrocklobster.org The study area is accessed principally by Pope Street, which directly services the existing marine industry area, as well as from Jordan Street and linking to Australis Drive. This road network, contained within the study area, accommodates primarily light vehicles accessing the marina boat ramp and associated marine industry businesses. Truck access is required for marine industry use on a periodic basis.

Pedestrian connections are also available from the town centre to the marina. These are via steps in the limestone wall structure, accounting for the substantial level difference between town centre and marina. Universal access between the town centre and marina is currently not provided.

HASSELL 3 © 2019 01 Introduction and Background

Images showing the former Atlantis Marine Park in Two Rocks

4 Two Rocks Marina Master Plan Report 01 Introduction and Background

A Long Term Plan

The Department of Transport is responsible for management, maintenance and future planning of the Two Rocks Marina. The Department assumed management responsibility of the facility in 2014, following many years of private management. Upon taking over the facility, a comprehensive asset and maintenance review was undertaken, with a number of immediate actions identified, including reinforcements to the existing marina breakwaters, upgrades to jetties, removal of abandoned boats and associated security fencing.

Many of the urgent replacement works have now been completed, or are ongoing. This process has highlighted the need for a longer term, strategic vision, to provide guidance on future design and development of the marina. The plan needs to account for a range of ongoing challenges around the operation of the marina, the age and quality of existing buildings, and potential long term expansion, to help bolster the capacity of the local marine industry as well as offer improved tourist and recreational amenities. The long term plan provides context for government’s investment in infrastructure replacement, upgrades and improvements to meet the needs of users. The master plan will therefore guide medium and long term investment into the harbour.

HASSELL 5 © 2019 NORTH TWO ROCKS LOCAL STRUCTURE PLAN EAST TWO ROCKS LOCAL STRUCTURE PLAN

TWO ROCKS LOCAL STRUCTURE PLAN

ATLANTIS MARINE PARK

YANCHEP CITY STRUCTURE PLAN

STRATEGY As more people move into the Two PLANS Rocks area, its importance as a place

TOWN of employment, industry, recreation and hospitality intensifies. Use of the TOWN CENTRE marina and its ageing facilities will OUTER also increase and it is recognised the RESIDENTIAL AREA current conditions of the facilities will FUTURE CENTRE not serve future needs. MAJOR ROAD DEVELOPMENT EXTENT 6 Two Rocks Marina ATLANTIS MARINE PARK Master Plan Report Figure 2: District Context 01 Introduction and RIMAR P Y FO RM Background S O 23% F TECHNICIANS & E TRADES WORKERS M P 14.5% L LABOURERS O 12% Y MACHINERY M OPERATORS E N

11.5% T

0

5 ADMINISTRATIVE

3

= D

I WORKERS

b

e

W

? 8.5%

s

u

t SALES WORKERS

a

t

s -

The Case for Change t 10% n

S e

COMMUNITY AND O

m

U y

o

R

l

C p

PERSONAL SERVICES E

m

:

e e

F

/ / /

o

o

When initially developed in the 1970s, Two Rocks was a distinct r

o e

r WORKERS c

e

a

n

s

n

t

a

I

D

w

coastal village beyond Perth’s urban fringe. Its separation from / T T T

u

w w

a .

o

m

R

o

o

c

c

.

k

d

i s

.

E e

l

i

m

f

Perth forged a unique community and sense of place. The Two o p

r

l

o p

/ /

y

/ / /

:

m

s e p t n t t h S : t s a u

Rocks marina has contributed significantly to that identity, along t with the former Atlantis Marine Park (shown left); this area is part of the Two Rocks Town Centre Structure Plan. POPU CKS LATI RO ON O : 4 With Perth’s continued urban expansion, Two Rocks is W ,1 T 2 increasingly part of Perth’s urban fabric. The strategic G 2 IN importance of the marina is identified in the State Goverment’s T S I Perth and Peel at 3.5 million and the North West Sub Regional X Planning Framework as an employment and recreation hub. E

The is forecast to grow from approximately 220,000 people in 2019 to around 413,000 people by 2041

(source: Forecast id). Two Rocks itself is forecast to grow from

0

4,122 to nearly 21,000 people (the area of growth shown on 3

3

=

D

S I

O b

e Figure 2 District Context). As more people move into the area, its U

R W

? C

s

E

a

:

e

F

r

importance as a place of employment, industry, recreation and o a

r

-

e t

s c

a a

c s

t e

r

I

o hospitality intensifies. Use of the marina and its ageing facilities D

f

-

T T T

t

w w

u

o

o

b

R

a a o

/ / /

c

o

k

o

s r

: will also increase and it is recognised the current conditions of e

h

n

t

n

t

a

p

s w

/

:

/ / /

u

/ /

f a . o r m e o c c a . s d i . the facilities will not serve future needs. t

To provide services, employment, amenity and housing choice, OPULATION ‘activity centres’ are provided for in the planning framework for S P : 21 K ,00 the coastal corridor. The existing Two Rocks town centre is OC 0 R supported by a structure plan, with additional centres being O W planned in the future that will provide sub-regional and district T 1 4 services. The Town Centre structure plan provides for a range of 0 land uses including additional retail, residential and aged care. 2 Any development within the marina should complement the town centre, so that both are understood by the community as a

united activity centre precinct.

0

In that context, the structural framework of the marina needs to 3

3

=

D

S I

O

be reviewed. A long term master plan is required to provide a b e U

R W

? C

s

E

a

:

e

F

framework for the future arrangement of the marina. r

o a

r

-

e t

s c

a a

c s

t e

r

I

o D

f

-

T T T

t

w w

u

o

o

b

R

a a o

/ / /

c

o

k

o

s r

: e

h

n

t

n

t

a

p

s w

/

:

/ / /

u

/ /

f a . o r m e o c c a . s d i . t

AST 2041 REC FO LD O H E S U EXISTING O HOUSEHOLDS H 1,137

0

S 3

O 3

U

= R

D

I

C

b

E

e

:

W F

?

o s

FORECAST r g e

c n

i

l a

l

s

e

HOUSEHOLDS 2041 t

w

I

D d

-

T T T

s

w w

d

l

o

o

R

h

o

e 6,524

c s

k

u

s o

P h

-

o

n p

o

u i

t

l

a

a

l

t

i

u o

p n

o

,

h p

/

o

o

u

o s

r

e

e

h

n

o

n

l

a

d

s

w

/

a

u n

a

d

.

d

m

w

o

c

e

.

l

d

l i

i

. n

t

g

s

s a : c h e t r t o p f / / s : / / /

HASSELL 7 © 2019 01 Introduction and Background

Two Rocks and its harbour is an important asset for the existing Project Genesis and emerging communities of the north west corridor. It is a place of strategic employment, with opportunity to expand to Upon the Department of Transport assuming responsibility for address emerging sectors such as tourism, research and the marina 2014, a number of refurbishment projects education. The harbour’s ongoing function as a place of work and commenced. This included a $6m “rescue package” and industry is therefore important - particularly within the context significant additional financial commitments from government of relatively few areas of employment potential within the local for maintenance and repairs to failing infrastructure. region.

This work triggered the formation of the Two Rocks Marina Reference Group, established to help the Department of Transport consider the long term vision for the marina, with a view to creating local jobs. Through engagement with the Two Rocks Marina Reference Group, the need for a long term master plan was identified.

8 Two Rocks Marina Birdman Rally at Two Rocks Marina,Master 1970s. Plan Report 01 Introduction and Background

What we are hoping to achieve with the master plan Two Rocks Marina Vision: The intent of the master plan is to capture ideas which establish a common long term vision shared with the community. It is a framework for the overall arrangement of the marina, Two Rocks is an oceanside village; establishing its key structuring elements such as road networks, the heart of tourism and maritime intended land uses, recreation spaces, infrastructure and amenities. Because the master plan provides a long term activity in the north-west, a centre of framework, this can guide future design and planning that excellence for fresh local produce, and addresses each area in more detail. a place for the whole community, new The master plan provides stakeholders, government and the and existing. community an understanding of the future intent of the marina, identifying key precincts within which detailed planning can occur. It will inform investment decisions in maintenance and upgrades.

HASSELL 9 Aerial photograph showing the existing© 2019 Two Rocks Marina

Section 02 Community and Stakeholder Input

02 02 Community and Stakeholder Input

Visioning

The master plan has been prepared using a collaborative process with the Two Rocks Marina Reference Group, Department of Transport and its expert consultants. This included inputs from marine and coastal engineers.

The visioning process commenced in late 2017 with the announcement of a Reference Group to develop a vision for the long term expansion of the marina. The Reference Group met over the course of 2018, considering typical marina design principles and requirements, the technical studies , user needs and the quality of the existing assets.

Once the basis for design was understood,a workshopping process was undertaken which encouraged the Reference Group to identify long term priorities, help define a vision, and establish the preferred long term layout of the marina.

Following the initial workshop sessions, three draft master plan options were prepared for review by the Two Rocks Marina Reference Group and Department of Transport. Options were tested and refined from three to two, where another workshop was held with the Reference Group. I I J J E F F B A C D G H Consideration of the options crystallised stakeholder preferences for the marina’s long G H

FUTURE DEVELOPMENT 16 term, with significant convergence of ideas amongst the group. This allowed a number16 16 of refinements to be identified, which have been captured in the final master plan. 15 A detailed summary of all Reference Group meetings and workshop outcomes can be15 15 found on the project website. THERE IS AN APPROXIMATE 10 METRE LEVEL CHANGE BETWEEN SOVEREIGN DRIVE AND THE HARBOUR CAR PARK 14 14 14

Sovereign Drive ND CH IES A ALLE 13 13 www.transport.wa.gov.au/projects/two-rocks-marina-upgrade.asp NIT NG 13 U ES RT O ID 12 P E 12 P N POTENTIAL FOR T O RECLAMATION GOOD DEPTHS I FOR NAVIGATION F 11 11 VIEWS IE 11 NNING PR D LA IN 10 10 P C 10 A IP LEVEL CHANGE N L I E 9 9 R 9 S EXISTING HARBOUR RESERVE Pope Street INA R SHALLOW A R E NAVIGATION/ A CONTAMINANTS Q WAYFINDING M U CONFUSING M COMMERCIAL D I LEASE AREA EXISTING TOWN CENTRE 8 8 R 8 E E IL M  STEPS A 1 E 7 7 T 7 N STEPS E SHALLOW  BEDROCK

T CHARNWOOD RESERVE

D LEISURE S SAILING ZONE STEPS 6 6 BOAT 6 2 RAMP 5 5 5

 Jordan Street

SEA GRASS

Lisford Avenue

VIEWS 4 4 : S 4 IES EAG UD R T A LEGEND S S  NODE 3 3 3 S ACCESS POINT L Toilet block  JUNCTION and park A A SEA GRASS

TWO ROCKS C N : UNDE FUTURE DEVELOPMENT ’ I AND IT ‘A RS 2 2 S 2 ERODING BEACH D E A P T N A

IT S LEISURE SAILINGO AREA N ROADS

E S H H S D

E S

R E C I

T K N 1 1 1 O H

E T S R G

T

3 S

O

I I J J E F E F B B A C D A C D G H O G H I

O W P N

P N

O

A R

L T

4 P

U

R N

E 5

I T

T

S

I

E

A

S M

12 Two Rocks Marina Master Plan Report Scheme 1_ Summary Scheme 2_ Summary Scheme 3_ Summary The long term vision for Two Rocks Marina aims to create a place which There are similarities to the three schematic options with the introduction Option 3 three envisions a more urban approach to the marina facilitates recreational and commercial boating alongside vibrant land of a new Esplanade Drive, waterfront park paralleling the heritage wall development with the central hub complemented by an entertainment uses for locals and visitors to enjoy. and the creation of an activated hub at the heart of the marina consistent wharf-side environment instead of a centralised beach. The central hub with all layouts. Scheme 2 explores some further options in zoning, land- has built form orientated north south providing generous public realm Scheme 1 creates a re-energised heart to an expanded Two Rocks marina use and articulation. connections to the water. Alongside the short stay accommodation are benefitting from its close connection to the town centre. Reclaimed and commercial buildings with retail and F&B leading to a tavern which is redeveloped harbour land will accommodate short stay accommodation, The central hub is again populated by short stay accommodation, retail/ located adjacent to a ferry stop. In the north west of the central hub is a parking and a number of commercial buildings which can include a variety F&B outlets and amenities with a legible and attractive public realm. The dedicated cray fish market, demonstration and restaurant zone which of food and beverage and retail outlets. Public access through the area is northern edge follows the form created by the existing breakwater includes open and covered market space to allow the purchase of fish facilitated by waterside boardwalks and laneways. A re-modelled Pope encouraging north west views through built form. Fishing boats moor and to view the operations. Street improves the legibility and allows sightlines through the harbour to within the commercial zone to the north of the Yacht Club. the water. To the north of the tavern a development lot is included for an The location of the boat ramps and parking to the very north of the aquaculture facility. Sea rescue is also located in this zone. Similar to To the north is a major new town beach. Enclosed by an amenity bridge expanded marina provides flexibility for the scale of its provision moving option 2 the boat ramp and parking is positioned to the very north of the the beach and associated parkland and facilities offers an attractive forward and also allows a quicker access for boats to access the ocean. marina with the commercial maintenance zone to its south. resource for families. On the northern perimeter of the bridge is a development zone which can include a re-positioned Yacht Club facility, A northern turning circle for tankers is introduced, which also includes To the north of the breakwater is an ocean pool facility which would 28 restaurant and parking. Central to the beach is a flexible activity parking. This parking could be utilised by people wishing to access the benefit from the shelter provided by the breakwater and allow unimpeded platform and jetty. The beach will become a major attractor to the marina northern beach. views to the north and west. The ocean pool would be supported by and is supported by expansive parking areas to the west. parking and amenity buildings. The central beach zone is complemented by parkland, boardwalk, To the north of the beach is the boat ramp/parking zone with 8 lanes and amenities and nearby parking. It connects to the centralised location of In the southern section a small beach is retained alongside a parkland Landmark ocean pool facility over 350 vehicle spaces. The very northern portion of the marina is the Yacht Club, which is combined with the sea rescue facility. which wraps around the large rock. The extension of the breakwater in inhabited by the commercial boat 20repair and storage zone including boat this area is seen as the most practical and affordable solution for stackers for 200 boats, boat lifter, yard and maintenance shed. A turn In the southern section of the marina the large sea rock is retained within managing the sea wrack. A new parkland in this location with playground, around parking zone is included to allow fuel and emergency vehicles to a parkland. This parkland includes a beach, ocean pool amenity, cafe, toilets and parking would be a great addition to the amenity of the 22 23 turn southwards. Sea rescue is located in the northern zone. An playground and cafe and associated parking. town. emergency vehicular track route is anticipated to access the north part of the marina from a spur off Sovereign Drive. A significant landmark feature is added to the master plan; one which references the cultural history of Two Rocks. A decked walkway and 23 The southern portion of the marina includes a reconfigured breakwater to platform is aligned between the Neptune Statue and southern marina manage the problematic sea wrack deposits. A new parkland is created water forming a high level connection and bridge. This feature could be a Potential landmark at the breakwater’s endto the east of the marina edge with a new access road, parking and major drawcard to the region, creating striking views. It also could pedestrian connections through the heritage listed wall to the town potentially see the re-emergence of the Birdman events! 25 centre and future residential properties.19 The large rock feature is retained in water with a new parkland included between the expanded 28 breakwater and the new access road, which loops in from the south at a new junction with Lisford Avenue. 21 17 18 Within the water between 450-500 boat pens are included. Ferries can access the heart of the marina. In this option the crayfish boats also access the heart of the marina to bring life and vibrancy and demonstrate 26 23 24 41 Placement of the commercial boat zone to the north the working nature of the harbour. 02 Community and provides efficient access out to sea. Stakeholder Input

Amenity block 27 22 21 16 15 21 20 Esplanade Drive to include an avenue of 19 20 trees, and shared pathways KSHOP ‘ R B’ 14 O : Fuelling lay-by W TE 19 18 17 N S It is anticipated 8 boat ramps will be required as the A T L I population in the region increases. Expansive17 parking 12 P N and circulation area, as well as 22amenities, are required to 12 13 11 R G 18 Flexible boat maintenance and fishing industry zone service the boat ramps. E O 16 T P S T

A

I

O 14 13 15

M N

10 S 8 14 15 6 16

9 11 Turning zone for large A new ‘Esplanade Drive’ can service the marina and The positioning of the beach within the centre of the maintenance vehicles on accommodate avenues of trees ad parallel parking. marina is supported by an analysis of water quality. This Urban edge to the waterfront the breakwater area is seen as good for the regular8 flushing of water from 12 the ocean to the marina. N ON Sovereign Drive N TW Sovereign Drive N THR Sovereign Drive The new bridge creates exciting opportunities to TIO E TIO O TIO EE OP OP 9 OP integrate active features such as stages, decks, H 11 H H TC TC 33 TC shelters, slides and play zones. E E E Parking zone located on existing asphalt surface and K K K 7 S 13 9 10 S S tucked into the existing dunes. 10 7 6 5 7 8 Generous linking public open space 27 Pope St 5 Pope St Pope St between wharf and site entry 6 1 1 Traffic engineering studies are required1 to appraise the 6 5 4 6 most suitable junction at the arrival point to the marina. Public open space at the higher level to have Reclamation of the shallow water between the Public access jetty. a refreshed treatment with improved amenity existing harbour land and breakwater will create 2 taking in the marina views a viable development zone to host the amenities 2 3 3 and attractions for visitors and locals. 2 3 The short stay accommodation lots are positioned centrally, adjacent to the marina amenities.

Perimeter boardwalk providing access to boat pens and 24 creating a walking circuit 4 32 29 4 Potential investigation for pedestrian bridge connecting 31 commercial precinct to the breakwater

Waterside parkland with terraced lawns, boat pen drop off and new road with parallel parking Feature architectural and urban design element linking the water to Neptune

30 Legend There is a significant opportunity between the heritage wallPublic and open the water’sspace formed edge to from re-locate reclamation the expansive Re aligned entry road 23 Amenity/admin building and 26 1 New public open space on the breakwater reclaimed from parking and create a newin shallowwaterside water park. zone The park could 24 yard 30 2 Clear vista to the water shallow water providing a destination space include boardwalks, jetty amenities, parking, trees, 28 24 Maintenance shed 31 27 shelters, terraced lawns, play features and improved 3 Short stay accommodation with parking 25 Fuel tanker turning, parking, 29 pedestrian walkways. amenities 24 26 4 Public access Legend Legend boardwalk 26 Breakwater 23

1 Re aligned entry road 19 Maintenance shed 1 Re aligned entry road 2021 Ocean22 pool complex 5 Food, beverage and retail with 27 Breakwater 25 29 20 UED P laneway connections 2 Clear vista to the water 20 Boat ramp parking 2 Clear vista to the water 21 Breakwater IN R 26 33 30 32 31 In the long term the Yacht Club could be re-located into T OC 28 Vehicle access track for 18 6 ON E 6 Fishing boat drop off with emergencies/maintenance 3 Short stay accommodation 21 8 boat ramps 3 Short stay accommodation 22 16 15Breakwater14 a facility within the heart of the marina benefiting from C S market hall and restaurant with parking S with parking 23 10 12 access to pens, the beach and the ocean. : overlooking New road including on street 22 Beach 33 Landmark11 feature Feature rock retained within parkland – 29 23 9 R parking 4 Public access boardwalk 4 Public access boardwalk potential climbing wall E 16 25 27 7 Charter ferry stop 23 Retained dunes 24 New parkland8 F 30 Waterside landscaping with 5 Food, beverage and retail with 5 Food , beverage and retail 6 30 E 8 Terracing to the beach lawns, shelters, shade, laneway connections 24 New road with landscaping, with laneway connections 25 Two Rocks feature6 surrounded 5 7 R amenities, trees etc boardwalk, amenities and tree by parkland 1

9 Beach landscaping with 6 Fishing boat drop off with 6 Fishing boat drop38 off with P 2 31 PUBLIC lawns, shelters, shade, 31 Parking market hall and restaurant 25 Beach market hall and restaurant 39 Beach 36 26 A

amenities, trees etc overlooking the water overlooking O G G P 3 N T 32 32 Cafe deck lookout zone 26 ParklandN I IO Yacht club 28

I 27 4 F N CONSULTATION E 10 Parking 7 Charter ferry stop S 7 Charter ferry stop 33

E 34

37 27 3

33 Two Rocks feature surrounded RBreakwater 35 34 28 Playground 11 Beach by water 8 Terracing to the water 8 Tavern and parking 32 4 28 Breakwater 29 New road 12 Central flexible activity space 34 Lawn 9 Beach landscaping with 9 Aquaculture and sea rescue Lisford Ave 40 Lisford Ave Lisford Ave lawns, shelters,An attractive shade, new public29 openParking space can be created in the southern 30 Parking 29 Legend 36 13 Jetty bridge with platforms 35 Shelter lookout node amenities, trees etc 101 Re alignedParking entry road 22 Fuel lay-by portion of the marina which includes amenity lawns, large playground, 2 Clear vista to the water 23 Amenity building 30 Two Rocks feature in parkland 3 Short stay accommodation 24 Boat ramp parking 31 Connection to Neptune37 with with parking 25 Sea rescue 14 Yacht club 36 Boardwalk 10 Parkingcafe, boardwalks amongst the dunal landscape. Look outs and shelters are 114 Public accessService boardwalk yard jetty 26 8no. boat ramps 5 Food, beverage and retail with 38 31 Pool laneway connections 27 BBQ shelter included as are toilet blocks and parking. This area will have a relaxed feel 6 Public access parking 28 Parking and amenity building New southern access road connecting 15 Food, beverage and retail 37 Parkland 11 Beach 127 Entry landscapingService with bio- 29 Breakwaterwharf with fuel jetty 32 New road with landscaping, retention pond 8 30 Ocean pool 39 with a sense32 of beingNew road in an including expansive on landscapestreet setting. Amenity buildingand boat lifter 9 31 Landmark feature boardwalk and amenities to Lisford Avenue Bridge and decked zone 41 32 Connection from town centre 16 New road including on street 38 Amenities and shelters 12 Esplanade Drive including on parking 10 Protected swimming zone to waterside 40

11 Beach 33 Jetty parking and multi- parking street parking 13 Maintenancepurpose amenity buildingshed and 33 Cafe 12 Focal stage area 34 Shelters and landscaping to 13 Terraced lawn with shade improve heritage wall 42 39 Parking 33 Path linking town centre to trees amenity/adminactivation and amenity building 7 14 Access ramp to beach 35 Waterside park with seating, Boat ramp parking 13 Parking beach shelters, terracing, planting Boat pen access / gatehouse 43 17 15 Playground 36 Terraced lawn Playground 1416 Cafe and amenitiesBoat stacker 40 37 Cafe and deck 17 Commercial jetty 38 Landmark rock 8 boat ramps 14 Yacht club Boat pen access / gatehouse 18 Receival facilities, viewing Boat pen areas 18 zone and restaurant 39 Beach 41 Fuel filling lay-by 1519 100m commercialBoat wharf with ramp 40 Playground parking boat lifter 41 Yacht club with parking Sea rescue Cafe Boat pen areas 20 Yard with secure fencing 19 15 between boat lifter/ stacker & 42 Parkland Boat lifter water lease commercial fisheries 43 New access road Boat pen access / gatehouse 1621 Boat stacker8 boat ramps Retained dune system 16 Boat stacker Boat lifter water lease 20 TWO ROCKS Boat pen areas MARINA17 Esplanade EXPANSION_ Dr Boat stacker Yard OPTION 21 17 0 20 80 160m Revision Date Scale Client Project Name Drawing A 07.12.18 1:2000@A0 Department of Transport Two Rocks Town Centre Marina pansion 18 Retained dune system Two Rocks, WA Option 1 22 Fuel, boat lifter and service 18 Service wharf with fuel jetty, RRED CO wharf boat lifter 19 Parking Indicative layout only - not for construction. \\proj01\per\013795-61A-P\Working\Adobe\InDesign\181206_Masterplan Options12_A0_1to2000.indd FE N E CE PR P T

TWO ROCKS TWO ROCKS TWO ROCKS MARINA EXPANSION_ MARINA EXPANSION_ MARINA EXPANSION_ SCHEME SCHEME SCHEME 3 0 20 80 160m Revision Date0 20 80 Scale 160m ClientRevision ProjectDate Name0 20 80 DrawingScale8 160m ClientRevision ProjectDate Name DrawingScale Client Project Name Drawing A, For discussion 17 October 2018 1:2000@A0 DepartmentA, For discussion of Transport Two17 Rocks October Town 2018 Centre SK_011:2000@A0 DepartmentA, For discussion of Transport Two17 Rocks October Town 2018 Centre SK_021:2000@A0 Department of Transport Two Rocks Town Centre SK_03 B, For discussion 26 October 2018 B, For discussion Two26 Rocks, October WA 2018 B, For discussion Two26 Rocks, October WA 2018 Two Rocks, WA

Legend 1 Re aligned entry road 22 Fuel lay-by 2 Clear vista to the water 23 Amenity building

3 Short stay accommodation 24 Boat ramp parking with parking 25 Sea rescue 4 Public access boardwalk 26 8no. boat ramps 5 Food, beverage and retail with laneway connections 27 BBQ shelter

6 Public access parking 28 Parking and amenity building

7 Entry landscaping with bio- 29 Breakwater retention pond 8 30 Beach Amenity building Indicative layout9 only - not for31 construction.Landmark feature Indicative layout\\proj01\per\013795-61A-P\Working\Adobe\InDesign\Masterplan only - not for construction. Options A0_1to2000.indd Indicative layout\\proj01\per\013795-61A-P\Working\Adobe\InDesign\Masterplan only - not for construction. Options A0_1to2000.indd \\proj01\per\013795-61A-P\Working\Adobe\InDesign\Masterplan Options A0_1to2000.indd Bridge and decked zone 32 Connection from town centre 10 Protected swimming zone to waterside

11 Beach 33 Jetty parking and multi- purpose amenity building 12 Focal stage area 34 Shelters and landscaping to 13 Terraced lawn with shade improve heritage wall trees activation and amenity

14 Access ramp to beach 35 Waterside park with seating, shelters, terracing, planting 15 Playground 36 Terraced lawn 16 Yacht club 37 Cafe 17 Commercial jetty HASSELL 38 Landmark rock 13 18 Receival facilities, viewing zone and restaurant 39 Restaurant

19 100m commercial wharf with 40 Beach boat lifter 41 Playground 20 Yard with secure fencing © 2019 between boat lifter/ stacker & 42 Parklands commercial fisheries 43 Residential development lots 21 Boat stacker 44 New access road

TWO ROCKS MARINA EXPANSION_ OPTION 0 20 80 160m Revision Date Scale Client Project Name Drawing A 07.12.18 1:2000@A0 Department of Transport Two Rocks Town Centre Marina pansion Two Rocks, WA Option 2

Indicative layout only - not for construction. \\proj01\per\013795-61A-P\Working\Adobe\InDesign\181206_Masterplan Options12_A0_1to2000.indd 14 Two Rocks Marina Master Plan Report Section 03 Opportunities and Challenges Analysis

HASSELL 15 © 2019 03 03 Opportunities and Challenges Analysis

7

POTENTIAL FOR RECLAMATION

GOOD DEPTHS FOR NAVIGATION 8 3 14

5 16 10

SHALLOW NAVIGATION / 8 CONTAMINANTS 9

1 11

15 2 4 ATLANTIS

STEPS

CHARNWOOD LEISURE RESERVE SAILING ZONE

17 12

4

3 13 6 7

5

18

Figure 3: Opportunities and challenges plan

16 Two Rocks Marina Master Plan Report 03 Opportunities and Challenges Analysis

This table outlines a brief description of the opportunities and challenges identified by the project team and Two Rocks Marina Reference Group. These are represented spatially on the opportunities and challenges plan (opposite). These matters need to be addressed in the master plan.

Opportunities Challenges 1. Supporting Local Industry 9. Access and Parking _ Improve arrangement of marine industry area and its access _ Current entry road is confusing to wharf / jetties _ Parking areas are poorly arranged and inefficiently designed _ Improve access to marine industry area _ Footpaths lack shade and seating _ Opportunity for tourism and hospitality uses that complement the town centre and capture benefit from waterside location 10. Entry Impression _ Provide ongoing commercial fishing access to the marina _ Security fencing is visually unappealing

2. Links and Relationship to Town Centre 11. Separation from Town Centre _ Provide improved pedestrian access to the town centre _ Marina arrangement turns its back on the town centre – there _ Marina arrangement complements the future town centre should be better integration. form 12. Comfort 3. Address Coastal Management Processes _ Lack of shade and tree planting _ Design future infrastructure to minimise seagrass mounding _ Lack of amenities for marina users, such as toilets / change on beaches rooms _ Design future infrastructure to help minimise beach erosion _ Lack of amenities near boat ramp

4. Two Rocks as Destination 13. Seagrass Buildup _ Improve recreation amenities such as pedestrian and cycle _ Existing marina wall helps trap seagrass on the beach, paths, seat and shade areas, barbecue facilities and parks causing odour problems _ Respect the ‘rocks’ as part of Two Rocks identity _ Create a hospitality ‘offer’ with restaurants and cafes 14. Beach Erosion North of Sea Wall _ Beach below Sovereign Drive is eroding 5. Clearer Entries _ Improve the entry road and visual appearance of the marina 15. Marina Water Depths _ Depths vary across the marina seafloor, with some areas being 6. Microclimate unnavigable for larger boats _ Opportunity for future design to mitigate against strong south westerly winds and summer sun in identified locations to 16. Marine Industry Constrained allow comfortable people spaces _ Conflict of movement between marine uses _ Existing marina buildings in poor state 7. Bush Forever _ Existing marina buildings do not suit current industry practice _ Opportunity to review the designation of Bush Forever over existing marina hardstand and sea walls 17. Marina water quality _ Opportunity to enhance management and conservation of _ Need to ensure any marina expansion considers water dune areas circulation and replenishment

8. Topography and Level Changes 18. Existing Dog Beach _ Significant level changes between the town centre, residential _ Marina expansion may impact on access to the existing dog areas and the marina allow for views to be preserved and beach amenity impacts to be managed

HASSELL 17 © 2019 03 Opportunities and Challenges Analysis

25m

20m

15m

10m

5m

0m

01 1:500

Upper level shopping centre to waterfront car park

Two large retaining walls act as a barrier between the town centre and the waterfront.

25m

20m

15m

10m

5m

0m

02 1:500

Sovereign Drive to Pope Street car park

Roughly 10 metres grade separation between Sovereign Drive and the marina and beach. 0 5 10 20m

0 5 10 20m

02

01 20 Two Rocks Marina Master Plan Report Section 04 Master Plan Principles

HASSELL 21 © 2019 04 04 Master Plan Principles

To support the vision, eight master planning principles have been established. These will be used to consider future development and planning proposals within the project area, thus ensuring a cohesive outcome:

A Working Harbour A Community Asset

Two Rocks Marina will continue to support marine industries and Two Rocks Marina will be welcoming to the community through job creation, through access to water and landside spaces. provision of recreation spaces and access to the water.

Flexible over the Long Term A Regional Destination

The marina will be designed so that land uses and activities are The marina provides facilities and services for the surrounding functional, fit for purpose and arranged to minimise visual region associated with its marine function, such as boat ramps, impact. Elements need to adhere to broader spatial precincts tourism and hospitality uses and marine industry for but be flexible over time to respond to emerging trends and employment. needs.

22 Two Rocks Marina Master Plan Report 04 Master Plan Principles

Responding to the Marine Environment Delivering Safe and Efficient Access

Marina design will work with coastal movement processes, The marina area will be designed to provide continuous helping to mitigate against erosion and seagrass build up. pedestrian and cycle access north and south along and provide clear access for vehicles to areas of parking / marine industry.

Celebrating the Rocks Building on the beachside heritage and character

Marina design will ensure the ‘two rocks’ are retained as distinct The marina will be designed to be a comfortable and attractive landscape elements contributing to the local identity. place. It will contain activities, facilities and uses that continue Two Rocks culture of fun, relaxed and recreational activities.

HASSELL 23 © 2019

Section 05 The Master Plan Concept

05 1

2

4 3 5

8 4

6

7 4 10 11

9 13 14 12 15

20

16 5 19 17

6 3 18 5 22 23 21

24

25 26 15 27

3 29

28

4 5 4

30 31

POPE STREET 32

33

34 3 37 35 38 28

36 39

Legend 1 Future emergency 25 Protected swimming zone access 26 Beach 29 41 40 2 Ocean pool 27 Bridge and decked zone 3 Amenities 28 Pedestrian Plaza with 4 Public access parking Restaurants and boardwalk

5 Parkland with shelters, BBQ 29 Public pens facilities and seating 30 Food, beverage and retail 6 Fuel facility 5 31 Entry landscaping 7 Breakwater 32 Realigned entry road 22 8 Landmark feature 33 Clear vista to the water 9 Commercial jetty 34 Bridge link connecting to 4 10 Receival facilities rooftop of building. Lift access to lower street level 11 Yard for accessibility.

12 100m commercial wharf with 35 Short stay accommodation boat lifter with parking 42

13 Boat stacker for 200 vessels 36 Public access boardwalk 15 14 Commercial pens 37 Public berth

15 Tree lined shared use path 38 Paved connection from town centre to waterside 43 16 Boat ramp parking 39 Landscaping to improve 17 Boat ramps heritage wall amenity 44 18 Sea Rescue 40 Link to town centre plaza and 5 22 King Nepture sculpture 4 19 Staircase to Sovereign Drive 41 Terraced lawn 20 Commercial buildings 42 Landmark rock and recreation 21 Yacht club area 5 22 Playground 43 Residential development lots 45 23 Access ramp to beach 44 Commercial development opportunity 24 Focal stage area 45 New access road and footpath

Yield Summary

Total car parking bays: 914

Total boat trailer parking bays: 320

Total boat pens: 564

Figure 4: Two Rocks Marina Master Plan TWO ROCKS MARINA EXPANSION Two Rocks Marina MASTER26 PLAN Master Plan Report 0 20 80 160m Revision Date Scale Client Project Name Drawing D 25.09.19 1:2000@A0 Department of Transport Two Rocks Town Centre Marina Expansion Two Rocks, WA Master Plan

Indicative layout only - not for construction. \\proj01\PER\013795-61A-P\Working\Adobe\InDesign\Stage_2_Masterplan_Updates\191114_Masterplan_A0_1to2000.indd 05 The Master Plan Concept

The Concept The Key Moves

The master plan concept is the culmination of an extensive Through engagement with the Two Rocks Marina Reference engagement process undertaken by the Department of Transport Group, Department of Transport and expert consultants, seven with its key stakeholders, represented by the Two Rocks Marina key moves have been identified for the marina’s long term. Each Reference Group. The master plan establishes a framework for one aims to deliver on the key objectives and vision for the Two future development of the marina and allows the Department to Rocks Marina. effect short term improvements without impeding the longer term vision. Short term improvements have already been 1. A New Protected Swimming Beach identified and are set out in the subsequent implementation In recognition of WA’s relationship with the water and chapter. acknowledging the beaches removed as a result of expansion, a new marina beach is identified central to the project area. The The engagement process established a core set of ideas, which size and location of the beach is based on case study form the ten key moves outlined below. comparison with other Department of Transport marinas, including Hillarys, its relationship to the adjacent future ‘tourism Long term Marina and Employment Capacity and restaurant hub’ and an area required to provide a secure The basis for long term expansion of the marina relates to two foundation for retention of beach sand. The marina beach is key fundamentals within Perth’s north west corridor. Firstly – the supported by adjacent car parking, pedestrian access to population is growing rapidly and will require access to regional Sovereign Drive and a boardwalk extension to create a safe recreation amenities that marinas can provide; secondly and swimming environment away from boat movements. Associated most importantly, people living in the north west corridor require shade, play, seating and barbecue nodes are located nearby. access to jobs within a convenient distance from home. Expansion of the marina enables a sustainable pathway forward Considerations for local marine and fishing industries. _ Provide universal access to the beach and park areas. _ Separate boat movements from any swimming zone. Considerations _ Provide opportunities for complementary activities and _ Focus expansion to the north of the existing marina to account community celebration, such as with a focal stage area. for underlying seabed depths and conditions. _ Ensure design will result in suitable water quality. _ Provide sufficient area for anticipated demand for boat ramp access and mooring pens based on the region’s identified 2. A Central Tourism and Restaurant Hub population growth. A tourism and restaurant hub located centrally within the project _ Where possible utilise existing marina infrastructure to provide area will allow improved activity and connectivity relationships a staging launchpad. The existing seawalls are continued along with the existing town centre. It will allow the marina to be a current alignments; existing marine industry hardstand is used destination beyond boating activities, ensuring it has relevance for future building zones – for short stay accommodation and to the broader regional population. Boardwalks allow users to food and beverage activities. enjoy the marina environment and move continually around it. _ Design the southern extension of the sea wall to help minimise Short stay accommodation offers benefits for boat users seagrass build up. requiring overnight stay, or as a tourist destination more broadly. _ Design of the northern extension needs to mitigate against The food and beverage offer enables local seafood to be enjoyed, erosion impacts to residential property. and any associated ‘experience centre’ to be established. A public berth is located off the hub, offering potential for ferry connections to Rottnest, or short term visitor berthing. Importantly, space is provided for economic activity and jobs. Exact building heights need to be further tested, however a scale that promotes pedestrian comfort and protects views from the existing Two Rocks town centre and residential neighbourhood is an appropriate consideration. This may be generally three storeys.

Considerations _ Buildings designed and arranged to provide views through to the water, and especially from Pope Street. _ Building scale limited to ensure continued views for existing residents along Sovereign Drive. _ Any car parking to be provided centrally, allowing continual pedestrian movement around the hub. _ Connection pathways provided up to the existing town centre. _ Buildings designed to provide areas shielded from strong breezes.

HASSELL 27 © 2019 05 The Master Plan Concept

3. A New Marina Boulevard and Improved Connectivity 4. A Connected Waterfront Park A key organising element to the master plan is the new marina Running north to south throughout the project area, a connected boulevard. This road provides pedestrian, cyclist and vehicle series of park spaces is provided, offering substantial public access to the various landside parts of the marina. It is amenity. Containing a variety of activity spaces ad areas, the connected to Jordan Street and Marcon Street in the south, with park provides public access and enjoyment of the marina. The potential for emergency vehicle access from Sovereign Drive. It intent is to greatly improve comfort and amenity of the marina is intended that public vehicle access to the marina will remain area, which is currently a harsh environment with extensive hard via Pope street, or the connection from Marcon Street onto Two stand areas and limited shade. Barbecue and seating nodes will Rocks Road. The new marina boulevard will be designed to be provided throughout, with a number of boardwalk nodes contain shade tree planting, embayed parking, a shared use path providing access to boat pens. Play spaces and passive lawn and lighting. In the north, a turn around facility is provided for areas will provide opportunity for young and old to enjoy Two vehicles. Rocks marina.

A number of pedestrian connections are provided within the As a means of compensating for lost access to existing beach as master plan to offer improved integration between the marina a result of marina expansion, potential for an ocean pool is and town centre area. The primary connection in the short term identified at the northern edge of the marina. This location was will be a level crossing from the town centre to a new central determined with the input of the Reference Group, and would be plaza & boardwalk. Owing to the difference in level, with the supported with adjacent car parking. The pool could be town centre being higher than the marina area, pedestrian incorporated into the northern sea wall design, and other public pathways connect to existing stairs in the heritage listed wall amenities also included, such as access for fishing. and then integrate with ramps and stairs in the new development. There is also potential for a universally accessible Considerations pedestrian bridge identified, offering opportunities for an _ Provide a continual shared path and boardwalk system, elevated lookout precinct. allowing public access throughout. _ Provide a restaurant and deck nodes at points along the Considerations foreshore park. _ Pedestrians and cyclists will be safely and comfortably _ Integrate drainage functions into landscape design. accommodated with tree planting, lighting and ample path _ Evenly disperse seating throughout, with barbecue and shade areas. focused around key park locations. _ Road to be designed to accommodate vehicles and trucks _ Design of the northern seawall to provide potential for public servicing marine industry and tourism hub. access and ongoing safety. _ Further investigation required for any future emergency vehicle _ Ocean pool subject to further detailed investigation, requiring access to Sovereign Drive. longer term consideration of the coastal environment and _ Integrate pedestrian connections with existing stair locations management and maintenance regimes. in the town centre wall. _ Highlight the pedestrian crossings of the marina boulevard to 5. A Southern Park and Neighbourhood Precinct help slow traffic. Public realm amenities culminate at the southern edge of the _ Staged Infrastructure upgrades to meet current and future marina with a new park. A playground, turf areas and demand for a safe boating and harbour precinct. commercial development opportunity are complemented with areas of parking and pedestrian footpaths. To the east of the new marina boulevard, the potential for residential development lots has been identified. This would allow passive surveillance and a degree of activity at the southern edge of the marina, and allow a smooth transition to future residential development within the town centre. The potential for residential lots requires further investigation, particularly with regard to the designation of the existing coastal reservation, City of Wanneroo controlled land and relationship to future development east of Jordan Street.

Considerations _ Further investigation required for identified residential development lots, including designation of Bush Forever land. _ Provide a commercial lease opportunity within the parkland enabling activation, passive surveillance and amenity for park users.

28 Two Rocks Marina Master Plan Report 05 The Master Plan Concept

6. An Expanded Recreational Boating Precinct A critical component of the marina master plan is long term provision for boat ramps and associated car parking demand. Eight boat ramps are provided for, a number expected to cater for the increasing population over time. A substantial car and trailer parking area is provided immediately adjacent to the boat ramps. The car parking area can also be used by visitors to the beach, yacht club and adjacent commercial buildings. The Sun City Yacht Club is provided with a long term lease opportunity adjacent to pens and the boat ramps. The Volunteer Sea Rescue is also provided a location with good oversight of the boat ramps and boating lanes. Toilets and shower/changeroom facilities are provided for boat users.

Considerations _ Provide boat trailer parking bays to accommodate for 8 boat ramps as required by the Australian Standards _ Provide flexible opportunities for recreational clubs and community facilities including boat and fishing clubs, yacht club and sea rescue.

7. A Marine Industry Hub A zone for marine industry is provided in the north of the master plan area. A substantial secured yard offers space for boat lifting and maintenance of large vessels. A large boat stacker for approximately 200 vessels is accommodated, along with associated office space for marine businesses. A receivals depot provides ongoing certainty for the local crayfishing industry, with associated commercial jetty and pens providing ease of access. A fuel facility and turnaround for fuel trucks is incorporated, with fuel tanks located below ground to minimise visual impacts. Area is provided around the marine industry zone for screening planting.

Considerations _ Consider opportunities to enable short and long range views throughout. _ Improve waterfront access throughout the precinct whilst managing secure access where it is required. _ Introduce better urban water management tools to control water quality.

HASSELL 29 © 2019 30 Two Rocks Marina Master Plan Report Section 06 Implementation

HASSELL 31 © 2019 06 06 Implementation

Implementation Plan

The Two Rocks Marina Master plan (the Master plan) is an aspirational long-term vision for the future of the marina. To achieve the ultimate vision, the master plan identifies numerous ‘projects’, generally independent of each other; but that can each contribute to ongoing improvements in the marina over time.

Several of the projects are located in areas that are currently part of the water body. Figure 5 shows the Master plan overlain with the existing boundary and land area of the marina, clearly identifying a number of key projects that require substantial reclamation and breakwater construction in order to be implemented.

There are also several projects that are implicit in the design but not shown. For example, the upgrading of infrastructure and the provision of adequate underground services are fundamental elements of the marina to achieve the long term vision.

Finally, there are several elements that will require ongoing design discussions before being implemented. An example includes the long-term location of the Yacht Club, which is currently in the southern area of the marina. The existing location provides the optimal training ground for new sailors, in well protected water, whilst a longer term growth scenario could consider an additional or alternative location to the north with direct access to pens that is typical of yacht clubs elsewhere. These types of projects have been provided as much flexibility as possible in the Master Plan to allow for decision making at the relevant time.

32 Two Rocks Marina Master Plan Report 06 Implementation

Existing land and sea wall extent

Figure 5: The Master Plan and Coastline Overlay

HASSELL 33 © 2019 06 Implementation

f r o m p a g e 1 3

Project Priorities PRECINCT PLANS The master plan represents a collection of diverse stakeholder interests and the implementation strategy is defined to achieve a balanced approach to meet all stakeholder interests. The implementation priorities are therefore informed by the following criteria, which are each essential considerations for the State in delivering best practice marina facilities. TRANSITION TO Priority Maintenance – for infrastructure improvements in the marina that are deemed VISION to be of an urgent or critical nature to maintain functional and safe operations of the marina. In many cases these projects will be undertaken as necessary, but may also stimulate investment in other projects. IMMEDIATE Community Benefit PROJECTS – projects that meet a priority need as expressed by the community. These can include small projects that assist in the enjoyment of the marina such as seating and benches, or larger projects such as the development of entertainment and recreational sites or facilities.

Commercial Needs – those projects that deliver a commercial benefit to the marina, such as maritime industry infrastructure and boating infrastructure, but can also include commercial development for cafes and restaurants. SHORT TERM PROJECTS Governance – projects that are necessary for the responsible management of the marina, to ensure it meets the needs of the community and industry and establishes a high quality and enduring investment in the marina.

Essential Infrastructure – those projects that are considered essential in marinas, and without which the marina cannot achieve its full potential. These projects may include infrastructure upgrades and extensions to the breakwaters to enable other development and may also SHORT - include staged interim infrastructure before longer term expansion. MEDIUM TERM PROJECTS Land and Water Site Assembly – the availability of the land and marina area required to deliver projects. This is significant in the context of Two Rocks Marina, where most of the long-term projects will be in areas that are currently in water and/or outside of the existing marina reserve boundary.

MEDIUM TERM PROJECTS

34 Two Rocks Marina Master Plan Report 06 Implementation

A significant renewal of infrastructure is also likely in this Timeframes second stage of development, with pen jetties A-E generally requiring staged replacement in the coming years. These boats There is no current commitment from government to undertake will be temporarily located in a new ‘R’ Jetty location until a the full extent of the proposed redevelopment and as such this longer term commercial pen solution is completed adjacent the Implementation Plan contemplates some projects which can be wharf. During this phase, the public will have high visibility of programmed now and which will begin to deliver the activation commercial fishing boats, adding to the relationship between and community goals of the long term vision. the community and the business activity of the marina. Delivery time frames for the identified projects are broken down into Immediate, Short Term, Short-Medium Term and Medium During this timeframe, Department of Transport will be TRANSITION TO Term, reflecting realistic business case process, design, undertaking southern breakwater investigations and preliminary VISION approvals and construction timeframes, and the logical delivery design, to support the preparation of the necessary approvals of projects in relation to land and site assembly. Projects are documentation for environment, town planning and land tenure subject to State Government funding priorities. approvals.

A single ‘Long-term’ project is noted. This project embodies Short-Medium Term Projects multiple projects that will be required to deliver the northern Short-Medium term projects deliver substantial improvement to expansion of the marina. A second implementation strategy will the user experience in the marina, including the provision of a be required at a time when the likelihood of the expansion is central plaza and arrival point that links the marina to the upper more imminent. lands of the town centre. The development of this node will support commercial and retail opportunities for private industry Immediate Projects and a harbour managers office, but will also be a significant first There are several projects including repairs to the breakwater, step in setting the long-term character of the marina. demolition planning and replacement for the existing marine industry buildings and new floating jetties that are already This plaza will be supported by much improved access underway due to priority maintenance needs. These projects infrastructure including pathways and road upgrades, a have already been communicated to the broader community. performance space and will be supported by landscaping, In addition, the Department of Transport has recently completed seating and shade. a condition assessment of ‘P’ Jetty, and it has been determined that ‘P’ Jetty requires replacement. To ensure continuity of pen Jetties A-E are located in an area comprising shallower water availability, the ‘P’ Jetty works will include construction of a new and some bedrock, which is not ideal for mooring. As these ‘R’ Jetty to the south. ‘R’ Jetty will accommodate some future jetties are relocated in the previous stage, the reclamation of growth and serve as a temporary pen facility during repairs and that area is now possible. The reclaimed are will be used to replacements to the commercial pens (jetties A-E). prepare for long term land development and may include an Immediate projects are likely to be either complete or expanded area for boat servicing, storage and boat lifting, or for substantially complete within the next 2 years. new boat ramps if additional ramp capacity is required before the northern expansion occurs. This area will be highly flexible, until the northern expansion occurs when maritime commercial Short Term Projects activities are permanently relocated. Beyond the critical immediate projects, the Department of Transport will look to deliver core infrastructure to support the Dependant on approvals timeframes, it will also be possible to growing marina economy. The improvement of underground prepare detailed design for the southern breakwater expansion services and marina pathways, as well as construction of pen and recreation precinct during this stage, setting the stage for a holder amenities and public ablutions within a landscaped area significantly improved southern precinct at the marina. will establish the nucleus of the central hub in the marina, near to the existing marine industry area. Medium Term Projects A second precinct will also be established in the south adjacent Medium term projects set the basis for longer term and much to the boat launching ramps, to significantly improve the more substantial expansion. These projects will complete the community experience in this location. The southern precinct southern vision for the marina and include the construction of will include upgrades to the waters edge pathway, barbecue the southern breakwater expansion and the resolution of the nodes, seating, shelter and public ablutions. seagrass wrack concerns, as well as the resolution of the Yacht Club location. The design of the both areas will be such that the spaces can be utilised for casual relaxation whilst being serviced to support An opportunity exists to work with the Yacht Club to achieve an temporary activities such as food trucks. The central hub will improved facility that provides for long term operation of the also provide a suitable development site for private industry club in a more optimal arrangement, which may include should there be interest in commercial development (for separate training and senior club facilities. This will need to be example; café/restaurant, chandlery etc). resolved as this stage of the marina expansion.

HASSELL 35 © 2019 06 Implementation

*Note: Not all projects are identified on the plan as they are underground or administrative in nature.

R

N H M Projects

The projects identified during the master B plan process are shown in Figure 6 and an F analysis of the projects against the C K priority criteria is included in Table 1. The project list is not finite and detailed planning may resolve additional projects to meet needs and enable future D development. This analysis illustrates the complexity of the various projects, the importance of timing and staging, and offers a realistic implementation plan to achieve the aspirational vision for the future of the marina. G

The redevelopment of the marina over Q time is an exciting opportunity for Perth’s northern suburbs. While the exact timing relies on funding availability, there remain plentiful opportunities for the marina to refresh and renew, and this Implementation Plan provides a road map to ensuring the facility continues to P improve and become the heart of the community once again. I

Detailed concepts for short term activation projects can be found in Figure 7 and Table 2. Figure 6: Overall Implementation Plan

36 Two Rocks Marina Master Plan Report 06 Implementation

Table 1: Master Plan Projects

Legend Project/Development Timing Maintenance Priority Community Benefit Commercial Needs Governance Essential Infrastructure Upon Relies

A* Services preliminary design I

B# Demolition of Building A & B I

C# Development of new receivals building I Project B P Jetty Redevelopment & R Jetty construction (partial D# length, could include 25m vessels pens to support I commercial vessels

E* Services upgrade and pathway improvements S Project A

Pen holder amenities, public ablutions, harbour F# S Project E management and landscaped area Pathway upgrades, landscaping, barbecues, seating, G# S Project E shelter and public ablutions H Replace jetties A-E and complete dredging S Project D

I Southern breakwater investigation S Commence southern breakwater approvals J* documentation - environmental and planning, land S Project H tenure Public plaza/arrival point connecting upper and lower K# SM Project E lands to developing marina hub

L* # Procure new commercial/retail opportunities SM Project K

Upgrade to entrance road, linemarking and waters M# SM Project K edge pathways Reclamation to the northern extents to prepare land for longer term development; N (i) boat service area; SM Project G (ii) boat ramp if demand requires; or (iii) for increased boat lifter area, commercial leases Southern breakwater expansion and recreation O* SM Project H precinct detailed design Construct Southern Breakwater and Recreation P M Project N Precinct Relocation of Yacht Club and New Commercial Q M Project O opportunities

R Planning Northern breakwater and harbour expansion L

* Not all projects are identified on the plan as they are underground or administrative in nature

# See Figure 7 for detailed concepts

Timing I Immediate (0-2 years) S Short Term SM Short-Medium Term M Medium term (>15 Years) L Projects not listed but unlikely to commence without extension to northern breakwater. Long Term

HASSELL 37 © 2019 06 Implementation

M

H

C F

K B

D

Short and Short-Medium Term Activation Projects

Short and Short-Medium term projects have been identified that will deliver infrastructure to activate and energise the marina.

The delivery of an exciting central plaza, G amenities cafes and restaurants in a landscaped area create a community focus to the marina, whilst a second precinct in the south adjacent to the boat launching ramps including barbecues, seating and shelter will significantly improve the community experience in this area.

The projects may evolve as funding becomes available, but these small projects will begin to build a strong community at the harbour and underpin the vision for the future of the marina. Figure 7: Short Term Activation Plan

38 Two Rocks Marina Master Plan Report Table 2: Master Plan Projects

Legend Project/Development Timing Maintenance Priority Community Benefit Commercial Needs Governance Essential Infrastructure Upon Relies

A* Services preliminary design I

B Demolition of Building A & B I

C Development of new receivals building I Project B P Jetty Redevelopment & R Jetty construction (partial D length, could include 25m vessels pens to support I commercial vessels

E* Services upgrade and pathway improvements S Project A

Pen holder amenities, public ablutions, harbour F S Project E management and landscaped area Pathway upgrades, landscaping, barbecues, seating, G S Project E shelter and public ablutions H Remove jetties A-E and reclaim for future use S Project D Public plaza/arrival point connecting upper and lower K SM Project E lands to developing marina hub

L* Procure new commercial/retail opportunities SM Project K

Upgrade to entrance road, linemarking and waters M SM Project K edge pathways * Not all projects are identified on the plan as they are underground or administrative in nature

HASSELL 39 © 2019 Australia China United Kingdom

Adelaide Hong Kong London HASSELL HASSELL HASSELL Level 1 22F, 169 Electric Road 1 Curtain Place 82 Waymouth Street North Point Hong Kong London EC2A 3AN United Kingdom Adelaide SA T +852 2552 9098 T +44 20 7490 7669 Australia 5000 E [email protected] E [email protected] T +61 8 8220 5000 E [email protected] Shanghai United States of America HASSELL Brisbane 12F base 45 Caoxi North Road San Francisco HASSELL Xuhui District HASSELL 36 Warry Street Shanghai 200030 China Level 7 Fortitude Valley QLD T +8621 5456 3666 650 California Street Australia 4006 E [email protected] San Francisco CA 94108 T +61 7 3914 4000 United States of America E [email protected] South East Asia T +1 415 860 7067 E [email protected] Melbourne Singapore HASSELL HASSELL 61 Little Collins Street 33 Tras Street #02-01 Melbourne VIC 078973 Singapore Australia 3000 T +65 6224 4688 T +61 3 8102 3000 E [email protected] E [email protected]

Perth HASSELL Level 1 Commonwealth Bank Building 242 Murray Street Perth WA Australia 6000 T +61 8 6477 6000 E [email protected]

Sydney HASSELL Level 2 Pier 8/9, 23 Hickson Road Sydney NSW Australia 2000 T +61 2 9101 2000 E [email protected]