World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document Poverty Alleviation and Agriculture Development Demonstration in Poor Areas Project Public Disclosure Authorized Guizhou Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan [Original: May 13, 2015: 1stRevision: May 11, 2018; 2nd Revision: December 28, 2020] 2. Date of General Procurement Notice: November 23, 2015 3. Period covered by this procurement plan: 2021 II. Goods and Works and non-consulting services. Public Disclosure Authorized 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 10million All 2. NCB (Goods) Above US$ 2million All Public Disclosure Authorized 3. ICB (Works) Above US$ 40 million All 4. NCB (Works) Above US$ 10 million All 5. (Non-Consultant Services) Above US$ 2million All [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. Public Disclosure Authorized 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Yes, in procurement manual] 4. Reference to (if any) Project Operational/Procurement Manual: Yes 5. Any Other Special Procurement Arrangements: no 6. Summary of the Procurement Packages planned: [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Descripti Estimated Packag Domesti Review Comments No. on Cost es c by Bank US$ Prefere (Prior / million nce Post) (yes/no) Summary of the ICB (Works) Summary of the ICB (Goods) Summary of the NCB (Works) Summary of the NCB (Goods) Summary 1.73 7 No Post of the Shopping (Works) Summary 0.76 5 No Post of the Shopping (Goods) Summary of the ICB (Non- Consultant Services) Summary of the NCB (Non- Consultant Services) Summary of the Shopping (Non- Consultant Services) Summary of the Direct Contractin g (Works) Summary 0.036 2 No Post Agricultur of the al Direct insuran Selection (Non- ce for Consultant Xishui Services) County III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 1 million 2. Single Source (Firms) Above US$ 1 million 3. Individual Above US$ 300,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_500,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: No 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimated Packages Review Comments of Assignment Cost by Bank US$ million (Prior / Post) Summary of number of contracts that will be let under QCBS Summary 0.38 6 Post of number of contracts that will be let under CQS Summary of number of contracts that will be let under IS Summary 0.16 2 Post of number of contracts that will be let under IC PROCUREMENT China : Poverty Alleviation and Agriculture-based Industry Pilot and Demonstration in Poor Areas Project PLAN General Information Country: China Bank’s Approval Date of the Original Procurement Plan: 2018-05-13 Revised Plan Date(s): (comma delineated, leave blank if none)2021-05-10 Project ID: P133326 GPN Date: Project Name: Poverty Alleviation and Agriculture-based Industry Pilot and Demonstration in Poor Areas Project Loan / Credit No: IBRD / 85090 Executing Agency(ies):Sichuan poverty WORKS Activity Reference No. / Procurement Estimated Actual Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification High SEA/SH Process Prequalification Specific Procurement Bidding Documents Proposal Submission Contract Description Component Review Type Method Document Amount Amount qualification Document / and Recommendation Signed Contract No. Approach Process (Y/N) Risk Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Completion Type (US$) (US$) Documents Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned SCZJGD07 / Zhaojue County Liuhe Township four kg five Pending Public Infrastructure and Request for Single Stage - One 2018-06- 2018-06- 2018-09- villages and other potato IBRD / 85090 Post Limited 118,052.00 0.00 Implementa Services Quotations Envelope 02 26 26 projects rectification Village tion Road (hardening) 1.5 km SCZJGD08 / Zhaojue County Pending four Kam Township, Yi Li Mu Public Infrastructure and Request for Single Stage - One 2018-06- 2018-06- 2018-09- IBRD / 85090 Post Limited 18,016.00 0.00 Implementa village potato production Services Quotations Envelope 02 26 26 tion road 2 kilometers SCZJGD14 / Zhaojue County, Liangshan County, the village Pending of slash fire village, a semi Public Infrastructure and Request for Single Stage - One 2018-06- 2018-06- 2018-09- IBRD / 85090 Post Limited 39,344.00 0.00 Implementa fine wool sheep project, 1.2 Services Quotations Envelope 02 26 26 tion kilometers of new village road. SCZJGD12 / Zhaojue County four open Township good Pending Public Infrastructure and Request for Single Stage - One 2018-06- 2018-06- 2018-09- Valley Village potato project IBRD / 85090 Post Limited 53,115.00 0.00 Implementa Services Quotations Envelope 02 26 26 rectification Village Road tion 1.08 kilometers SCJYG001 / Jinyang Yongsheng konjac farmers' Pending professional cooperatives Public Infrastructure and Single Stage - One 2018-05- 2018-05- 2018-06- 2018-06- 2018-07- 2018-09- IBRD / 85090 Post Request for Bids Open - National 236,098.00 0.00 Implementa remediation village road Services Envelope 20 25 25 26 06 06 tion hardening 3 km project contract SCBTG01 / Construction of Integrated Value Chain Request for Single Stage - One 2018-06- 2018-11- 2018-07- 2018-12- 2018-11- office building in Luocun co- IBRD / 85090 Post Limited 24,590.00 36,411.06 Completed Development Quotations Envelope 27 07 25 13 25 operatives in Bu Tuo County SCBTG10 / Building of co- operative room of co- Integrated Value Chain Request for Single Stage - One 2018-06- 2018-09- 2018-07- 2018-10- 2018-11- IBRD / 85090 Post Limited 24,590.00 30,637.54 Completed operatives in Japanese village Development Quotations Envelope 27 14 25 08 25 in Bu Tuo County SCXYG140 / Xuyong County regulation Village Road Public Infrastructure and Request for Single Stage - One 2018-05- 2018-12- 2018-06- 2019-01- 2018-08- IBRD / 85090 Post Limited 166,256.00 154,291.34 Completed (hardening) 2 km, New Services Quotations Envelope 26 21 20 16 20 Village Road 0.27 km SCXYG143 / Xuyong County Pending regulation Village Road Public Infrastructure and Request for Single Stage - One 2018-05- 2018-06- 2018-08- IBRD / 85090 Post Limited 81,387.00 0.00 Implementa (hardening) 0.73 km, New Services Quotations Envelope 26 20 20 tion Village Road 0.73 km SCXYG145 / A new 1000 mu sweet orange garden drip Public Infrastructure and Single Stage - One 2018-07- 2018-08- 2018-07- 2018-08- 2018-09- 2018-08- 2018-10- 2018-08- 2018-11- 2018-12- IBRD / 85090 Post Request for Bids Open - National 242,689.00 223,045.58 Completed irrigation system in Xuyong Services Envelope 02 30 04 04 30 04 30 12 28 30 County SCXYG49 / Xuyong county has built 60 cubic meters of Pending water pool 3, 200 cubic Public Infrastructure and Request for Single Stage - One 2018-05- 2018-06- 2018-08- IBRD / 85090 Post Limited 80,817.00 0.00 Implementa meters of pool 2, PE 1.8 40 Services Quotations Envelope 27 20 20 tion km 1.8 km, PE 90 90 km 4.2 km SCZJGD09 / Zhaojue County four open Township good Pending Public Infrastructure and Request for Single Stage - One 2018-06- 2018-06- 2018-09- Valley Village potato project IBRD / 85090 Post Limited 196,754.00 0.00 Implementa Services Quotations Envelope 02 26 26 rectification Village Road tion (hardening) 2.5 kilometers SCZJGD10 / haojue County Liuhe Township, the village Pending Public Infrastructure and Request for Single Stage - One 2018-06- 2018-06- 2018-09- of potato in the village of Bo IBRD / 85090 Post Limited 39,351.00 0.00 Implementa Services Quotations Envelope 02 26 26 Luo regulation Village Road tion (hardening) 0.5 km SCZJGD11 / ZhaojueCounty, Pending Damo Township, Dagu Public Infrastructure and Request for Single Stage - One 2018-06- 2018-06- 2018-09- IBRD / 85090 Post Limited 21,820.00 0.00 Implementa Village, Potato Project Services Quotations Envelope 02 26 26 tion Production Road, 2.42 km SCZJGD13 / Zhaojue County, Bowling Township, United Pending Township, Liangshan Semi- Public Infrastructure and Request for Single Stage - One 2018-06- 2018-06- 2018-09- IBRD / 85090 Post Limited 78,702.00 0.00 Implementa finishing Sheep Project, Services Quotations Envelope 02 26 26 tion Renovation, Village Road (hardened), 1 km SCZJGD16 / Zhaojue County, Pending Bowling Township, United Public Infrastructure and Request for Single Stage - One 2018-06- 2018-06- 2018-09- IBRD / 85090 Post Limited 36,064.00 0.00 Implementa Township, Liangshan Semi- Services Quotations Envelope 02 26 26 tion fine Sheep Project 4km SCZJGD17 / Zhaojue County Pending Shaolapo Township Bolige Public Infrastructure and Request for Single Stage - One 2018-06- 2018-06-
Recommended publications
  • Table of Codes for Each Court of Each Level
    Table of Codes for Each Court of Each Level Corresponding Type Chinese Court Region Court Name Administrative Name Code Code Area Supreme People’s Court 最高人民法院 最高法 Higher People's Court of 北京市高级人民 Beijing 京 110000 1 Beijing Municipality 法院 Municipality No. 1 Intermediate People's 北京市第一中级 京 01 2 Court of Beijing Municipality 人民法院 Shijingshan Shijingshan District People’s 北京市石景山区 京 0107 110107 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Haidian District of Haidian District People’s 北京市海淀区人 京 0108 110108 Beijing 1 Court of Beijing Municipality 民法院 Municipality Mentougou Mentougou District People’s 北京市门头沟区 京 0109 110109 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Changping Changping District People’s 北京市昌平区人 京 0114 110114 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Yanqing County People’s 延庆县人民法院 京 0229 110229 Yanqing County 1 Court No. 2 Intermediate People's 北京市第二中级 京 02 2 Court of Beijing Municipality 人民法院 Dongcheng Dongcheng District People’s 北京市东城区人 京 0101 110101 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Xicheng District Xicheng District People’s 北京市西城区人 京 0102 110102 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Fengtai District of Fengtai District People’s 北京市丰台区人 京 0106 110106 Beijing 1 Court of Beijing Municipality 民法院 Municipality 1 Fangshan District Fangshan District People’s 北京市房山区人 京 0111 110111 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Daxing District of Daxing District People’s 北京市大兴区人 京 0115
    [Show full text]
  • World Bank Document
    Poverty Alleviation and Agriculture Development Demonstration in Poor Areas Project sichuan Procurement Plan Public Disclosure Authorized I. General 1. Bank’s approval Date of the procurement Plan [Original: May 13, 2015: 1stRevision: May 11, 2018, 2nd Revision: November 27, 2018] 2. Date of General Procurement Notice: November 23, 2015 3. Period covered by this procurement plan: 2018 II. Goods and Works and non-consulting services. Public Disclosure Authorized 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Threshold Comments US$ 1. ICB and LIB (Goods) Above US$ 10million All 2. NCB (Goods) Above US$ 2million All 3. ICB (Works) Above US$ 40 million All 4. NCB (Works) Above US$ 10 million All Public Disclosure Authorized 5. (Non-Consultant Services) Above US$ 2million All [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Yes, in procurement manual] 4. Reference to (if any) Project Operational/Procurement Manual: Yes Public Disclosure Authorized 5. Any Other Special Procurement Arrangements: no 6. Summary of the Procurement Packages planned: [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. No. Description Estimated Packages Domestic Review Comments Preference Cost by Bank (yes/no) US$ million (Prior / Post) Summary of the ICB (Works) Summary of the ICB (Goods) Summary of the NCB (Works) Summary of the NCB (Goods) Summary of 2.2 23 No Post the Shopping (Works) Summary of 0.062 1 No Post the Shopping (Goods) Summary of the ICB (Non- Consultant Services) Summary of the NCB (Non- Consultant Services) Summary of the Shopping (Non- Consultant Services) III.
    [Show full text]
  • Shan Shui Conservation Center Annual Report 2014
    SHAN SHUI Conservation Center Address: Peking University Conservation Biology Building, 5 Yiheyuan Lu, Haidian Qu, Beijing, 100971, China Tel: +86 1062761034 Fax: +86 1062761035 Email: [email protected] Web: http://www.shanshui.org/ Weibo: http://weibo.com/shanshuibaohu Blog: http://blog.sina.com.cn/shanshuibaohu WeChat: SSbaohu SHAN SHUI Conservation Center 2014 Annual Report The cover background illustration is Nicholas Roerich’s work Courtesy of Lei Bo and Peng Jiansheng from IBE This print uses eco-friendly paper. TABLE OF CONTENTS Who We Are /1 Sanjiangyuan: The Nature Guardians Program /4 Community-based Conservation in Sanjiangyuan /7 Snow Leopard Research and Conservation /8 Conservation Story: One Year with Mother Snow Leopard /9 Sanjiangyuan New Hope Forum /15 Southwestern Mountainous Areas: A New Harmony with Nature /16 Community-based Conservation in the SMAs /19 Conservation Story: Two Bears Showed Up! /20 Bee-PANDA Honey: Conservation in a Jar /22 Forest and Climate Change /23 Conservation Story: Return to Yele /24 Our Land-Trust Conservation Station /25 Forest for Water (FW) /26 The Lancang River: The Lancang Institute / 28 The Lancang River Conservation Fund / 31 Conservation Story: Saving Mt. Aka / 34 The Lancang River Source Tracing and Surveys /38 The Rapid Assessment Program (RAP) in Sanjiangyuan /39 Nature Watch: A Biodiversity Information Platform /40 China Nature Watch 2014 /42 The Nature School /44 Nature Watch Website /46 More About Us /48 Acknowledgments / 50 Who We Are Shan Shui Conservation Center (hereinafter referred to as “Shan Shui”) is a Chinese non- governmental organization dedicated to conservation practices rooted in Chinese society and culture.
    [Show full text]
  • Easychair Preprint Vulnerability Measurement Analysis of Rural
    EasyChair Preprint № 6472 Vulnerability Measurement Analysis of Rural Landscape under Human Disturbance Factors - An empirical analysis from Liangshan Yi Autonomous Prefecture of Sichuan Province, Southwestern China Yang Chen and Ruizhi Zhang EasyChair preprints are intended for rapid dissemination of research results and are integrated with the rest of EasyChair. August 30, 2021 Proceedings of International conference 20xx for spatial planning and sustainable development ISBN:: 9-xxxxxx-xxxxx Copyright@Authors, SPSD conference, Venue Vulnerability Measurement Analysis of Rural Landscape under Human Disturbance Factors -An empirical analysis from Liangshan Yi Autonomous Prefecture of Sichuan Province,Southwestern China Yang Chen* and Ruizhi Zhang School of Architecture and Design, Southwest jiaotong University,Chengdu 610031, China. * Corresponding Author, Email: [email protected] Key words: Landscape pattern, spatial and temporal evolution, driving forces, landscape vulnerability index(LVI), landscape adaptability index (LAI), landscape sensitivity index(LSI), population pressure index(PPI). Abstract: This study Addressed the inadequacy of traditional landscape vulnerability measurement methods in considering human disturbance factors, added the population pressure index, to constructs a rural landscape vulnerability measurement model of "landscape sensitivity index (LSI) - landscape adaptability index (LAI) - population pressure index (PPI)" by combining rural landscape vulnerability characterization.Based on the land use cover data from 2005 to 2015 in Liangshan Yi Autonomous Prefecture,we constructed a rural landscape vulnerability evaluation system and took empirical analysis. we found that :(1) the evaluation model has good feasibility to portray the vulnerability of rural landscape in the study area, and the research findings reflect the actual situation to a certain extent, which can provide a reference for the study of rural landscape vulnerability measurement.
    [Show full text]
  • Mother River Yan Wang Preston for My Father Wang Xingyi and Mother Gao Suying Mother River
    University of Plymouth PEARL https://pearl.plymouth.ac.uk 04 University of Plymouth Research Theses 01 Research Theses Main Collection 2018 YANGTZE THE MOTHER RIVER - Photography, Myth and Deep Mapping Preston, Yan Wang http://hdl.handle.net/10026.1/12225 University of Plymouth All content in PEARL is protected by copyright law. Author manuscripts are made available in accordance with publisher policies. Please cite only the published version using the details provided on the item record or document. In the absence of an open licence (e.g. Creative Commons), permissions for further reuse of content should be sought from the publisher or author. Mother River Yan Wang Preston For my father Wang Xingyi and mother Gao Suying Mother River Yan Wang Preston You come from the snow mountains, the spring tides are your colours; Yangtze, the Long River, is China’s Mother River. You ran towards the East Sea, the mighty waves are your sizes; It is my Mother River. With your sweet milk, you bring up sons and daughters from all ethnic groups; I wish to photograph her, With your strong shoulders, you support the mountains and oceans; from the source to the sea, at a precise interval of every 100 kilometres. We praise the Long River, you are the ever-flowing spring; 6,211 kilometres. We are attached to the Long River, you have the heart of a Mother. 63 shooting locations. You come from the antiquity, washing dust with your great waves; You go towards the future, wakening the universe with your roaring water; With your pure flows, you fertilise our country of flowers; With your vigorous strength, you push our time forward; We praise the Long River, you are the ever-flowing spring; We are attached to the Long River, you have the heart of a Mother.
    [Show full text]
  • Pilot Project of Poverty Reduction Through Industrial Development in China’S Contiguous Impoverished Areas in Sichuan Province
    E4617 V6 REV GHPZ YZ No.3248 Public Disclosure Authorized Pilot Project of Poverty Reduction through Industrial Development in China’s Contiguous Impoverished Areas in Sichuan Province Environmental Impact Assessment Report Public Disclosure Authorized (Copy for Approval) Public Disclosure Authorized Public Disclosure Authorized Administrative Foreign-funded Project Management Center, Poverty Organization Alleviation and Development office of Sichuan Province Institute of Environmental Protection Research of Sichuan Report Prepared by University 1 CONTENT CHAPTER 1 OVERVIEW ............................................................................................................... 4 1.1 Backgrounds ............................................................................................................................. 4 1.2 Conformity Analysis of Project Construction and Related Industrial Policies and Planning ... 7 1.3 Assessment Basis and Standard .............................................................................................. 21 1.4 Category, Rating, Scope and Period of Assessment................................................................ 40 CHAPTER 2 PROJECT OVERVIEW ............................................................................................. 47 2.1 Objectives and Investment of Project ..................................................................................... 47 2.2 Composition and Schedule of Project ....................................................................................
    [Show full text]
  • Taxonomic Revision of the Pternopetalum Delavayi Complex (Apiaceae)
    Ann. Bot. Fennici 45: 105–112 ISSN 0003-3847 (print) ISSN 1797-2442 (online) Helsinki 30 April 2008 © Finnish Zoological and Botanical Publishing Board 2008 Taxonomic revision of the Pternopetalum delavayi complex (Apiaceae) Li-Song Wang State Key Laboratory of Systematics and Evolutionary Botany, Institute of Botany, Chinese Academy of Sciences, Xiangshan, Beijing, 100093, P. R. China ([email protected]), and Graduate School of Chinese Academy of Sciences, Beijing, 100039, P. R. China Received 6 Apr. 2006, revised version received ´20 Mar. 2007, accepted 29 Mar. 2007 Wang, L. S. 2008: Taxonomic revision of the Pternopetalum delavayi complex (Apiaceae). — Ann. Bot. Fennici 45: 105–112. A revision of three endemic Chinese species of Pternopetalum (P. cardiocarpum, P. delavayi and P. sinense), based on herbarium material and field observations, is presented. Examination of critical diagnostic characters showed that there is a single morphologically well-delimited species here treated as P. delavayi. Pternopetalum car- diocarpum and P. sinense are its taxonomic synonyms. Key words: Apiaceae, morphology, nomenclature, Pternopetalum, taxonomy. Introduction 1985), Vascular plants of Hengduan Mountain (Pu 1993), Yunnan Flora (Pu 1997) and Flora of Pternopetalum cardiocarpum (Franchet) Hand.- China (Pu & Phillippe 2005), their taxonomy has Mazz., P. delavayi (Franchet) Hand.-Mazz. and not been critically examined. P. sinense (Franchet) Hand.-Mazz. represent a Pu (1993) and Pu and Phillippe (2005) consid- complex group of perennial herbaceous plants ered that P. sinense and P. cardiocarpum maybe with variable morphological characters. They conspecific withP. molle (Franchet) Hand.-Mazz. are distributed in northwestern Yunnan, south- (the name has been widely misapplied in China) eastern Tibet and western Sichuan, China.
    [Show full text]
  • 2.2 Religious Beliefs and Cultural Characteristics of Ethnic Minorities
    IPP723 World Bank-financed Project Public Disclosure Authorized Pilot Demonstration Project of Contiguous Public Disclosure Authorized Poverty Alleviation through Industrial Development in China’s Poverty-Stricken Areas Action Plan for the Development of Ethnic Minorities Public Disclosure Authorized Foreign Capital Project Management Center, State Council Public Disclosure Authorized Leading Group Office of Poverty Alleviation and Development April 2014 i Contents Abstract ........................................................................................................................... viii 1 Foreword .......................................................................................................................... 1 1.1 Project Background ......................................................................................................... 1 1.2 Project Content ................................................................................................................ 2 1.3 Scope Definition of the Ethnic Minority Development Plan ....................................... 3 1.4 Preparation Goals of the Ethnic Minority Development Plan .................................... 6 1.5 Development Goals for Ethnic Minorities under the Project ..................................... 6 1.6 Summary of Social Evaluation ....................................................................................... 7 2 Overview of Ethnic Minorities in Project Villages ..................................................... 10 2.1 Population
    [Show full text]
  • Multiple Mechanisms Underlie Rapid Expansion of an Invasive Alien Plant
    New Phytologist Research Multiple mechanisms underlie rapid expansion of an invasive alien plant Rui Wang1,2, Jin-Feng Wang3, Zhi-Jing Qiu2, Bin Meng4, Fang-Hao Wan1 and Yin-Zheng Wang2 1State Key Laboratory for Biology of Plant Diseases and Insect Pests, Institute of Plant Protection, Chinese Academy of Agricultural Sciences, Beijing 100094, China; 2State Key Laboratory of Systematic and Evolutionary Botany, Institute of Botany, Chinese Academy of Sciences, Beijing 100093, China; 3State Key Laboratory of Resources and Environmental Information System, Institute of Geographic Sciences and Natural Resources Research, Chinese Academy of Sciences, Beijing 100101, China; 4College of Arts & Science of Beijing Union University, Beijing 100083, China Summary Authors for correspondence: • With growing concerns over serious ecological problems, a particular challenge Yin-Zheng Wang is to reveal the complex mechanisms underlying rapid expansion of invasive spe- Tel: +86 10 62836474 cies. Ageratina adenophora is of particular interest in addressing this question. Email: [email protected] • We used geographic information systems and logistic regression to identify the Fang-Hao Wan geographic and environmental factors contributing to the presence of A. Tel: +86 10 82105927 adenophora. Join-count spatial statistics with reproduction mode examination Email: [email protected] were employed to elucidate the spatiotemporal dispersal mechanisms. Received: 24 October 2010 • Multiple factors have significantly contributed to the rapid expansion of A. Accepted: 3 March 2011 adenophora. Its biological traits, favoring dispersal by water and wind coupled with local spatiotemporally heterogeneous geography and ecology, promote inva- New Phytologist (2011) sion downstream and upstream along river valleys, while other factors associated doi: 10.1111/j.1469-8137.2011.03720.x with human activities facilitate its invasion over high mountains and across river valleys, providing new scope for progressive invasions.
    [Show full text]
  • Resettlement Policy Framework
    RP1662 REV World Bank-financed Poverty Alleviation and Public Disclosure Authorized Agriculture Development Demonstration in Poor Areas Project Public Disclosure Authorized Resettlement Policy Framework Public Disclosure Authorized China State Council Leading Group for Poverty Alleviation and Development Foreign Capital Project Management Center Public Disclosure Authorized November 2014 Table of Contents Executive Summary .................................................................................................... 1 A. Project Overview, Principles and Rationale for a Resettlement Policy Framework.................................................................................................................... 4 B. Framework for Land Acquisition .......................................................................... 7 B1. Objectives and Relevant Terms of the Policy Framework ............................. 7 B2. Preparation and Approval of Resettlement Action Plans ............................... 8 B3. Institutional and Legal Framework .................................................................. 11 B4. Implementation Process.................................................................................... 13 B6. Budget Arrangements........................................................................................ 14 B6. Public Participation and Information Publication ........................................... 14 C. 4. Land Transfers and Use of Land as Shares ........................................... 15 D. Complaint
    [Show full text]
  • TRUSTWORTHY 2020 Corporate Social Responsibility Report
    THE POWER OF BEING TRUSTWORTHY 2020 Corporate Social Responsibility Report Follow Us For More Information New Hope Liuhe Co., Ltd. Chengdu office address: No.376 Jinshi Road, Jinjiang Industrial Park, Chengdu, Sichuan Province Beijing office address: 11F, Block A, T3, Wangjing SOHO, No.10, Wangjing Street, Chaoyang District, Beijing Tele: Fax: E-mail : The present report is available in both online and hard copy The online version is available on the company website at: New Hope Liuhe Co., Ltd. ABOUT THE THE POWER OF BEING TRUSTWORTHY REPORT NEW HOPE LIUHE Introduction Scope of report The present report is the 13th Corporate Social Responsibility Report issued by New Hope Liuhe Co., Ltd. The report covers New Hope Liuhe Co., Ltd. and its subsidiaries. Compilation basis Report data description This report is prepared with reference to GRI Standards issued by the Global Sustainable Standards In the event of discrepancies between the financial data disclosed in this report and the 2020 Annual Report of Council(GSSB), National standards Guidelines for the Preparation of Social Responsibility Reports(GB/T36001- New Hope Liuhe Co., Ltd., the annual report shall prevail; Other data are from internal statistics. Amounts in 2015), Guidelines for the Preparation of Corporate Social Responsibility Reports in China(CASS-CSR4.0) issued by the currencies mentioned in this report are denominated in RMB, unless otherwise specified. Chinese Academy of Social Sciences, the Guidance on Social Responsibility(ISO26000) issued by the International Organization for Standardization(ISO), as well as the relevant requirements of China Securities Regulatory Commission, Shenzhen Stock Exchange,etc., at the same time, based on the industry background, the report highlights the enterprise characteristics.
    [Show full text]
  • World Bank Document
    Poverty Alleviation and Agriculture Development Demonstration in Poor Areas Project Sichuan Procurement Plan Public Disclosure Authorized I. General 1. Bank’s approval Date of the procurement Plan [Original: May 13, 2015: 1stRevision: May 11, 2018; 2nd Revision: November 27, 2018; 3rd Revision: March 22, 2019; 4th Revision: April 4, 2019; 5th Revision: April 29, 2019; 6th Revision: June 24, 2019] 2. Date of General Procurement Notice: November 23, 2015 Public Disclosure Authorized 3. Period covered by this procurement plan: 2019 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Threshold Comments Public Disclosure Authorized US$ 1. ICB and LIB (Goods) Above US$ 10million All 2. NCB (Goods) Above US$ 2million All 3. ICB (Works) Above US$ 40 million All 4. NCB (Works) Above US$ 10 million All 5. (Non-Consultant Services) Above US$ 2million All [Add other methods if necessary] Public Disclosure Authorized 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Yes, in procurement manual] 4. Reference to (if any) Project Operational/Procurement Manual: Yes 5. Any Other Special Procurement Arrangements: no 6. Summary of the Procurement Packages planned: [List the Packages which require Bank’s
    [Show full text]