
Poverty Alleviation and Agriculture Development Demonstration in Poor Areas Project Public Disclosure Authorized Guizhou Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan [Original: May 13, 2015: 1stRevision: May 11, 2018; 2nd Revision: December 28, 2020] 2. Date of General Procurement Notice: November 23, 2015 3. Period covered by this procurement plan: 2021 II. Goods and Works and non-consulting services. Public Disclosure Authorized 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 10million All 2. NCB (Goods) Above US$ 2million All Public Disclosure Authorized 3. ICB (Works) Above US$ 40 million All 4. NCB (Works) Above US$ 10 million All 5. (Non-Consultant Services) Above US$ 2million All [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. Public Disclosure Authorized 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Yes, in procurement manual] 4. Reference to (if any) Project Operational/Procurement Manual: Yes 5. Any Other Special Procurement Arrangements: no 6. Summary of the Procurement Packages planned: [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Descripti Estimated Packag Domesti Review Comments No. on Cost es c by Bank US$ Prefere (Prior / million nce Post) (yes/no) Summary of the ICB (Works) Summary of the ICB (Goods) Summary of the NCB (Works) Summary of the NCB (Goods) Summary 1.73 7 No Post of the Shopping (Works) Summary 0.76 5 No Post of the Shopping (Goods) Summary of the ICB (Non- Consultant Services) Summary of the NCB (Non- Consultant Services) Summary of the Shopping (Non- Consultant Services) Summary of the Direct Contractin g (Works) Summary 0.036 2 No Post Agricultur of the al Direct insuran Selection (Non- ce for Consultant Xishui Services) County III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 1 million 2. Single Source (Firms) Above US$ 1 million 3. Individual Above US$ 300,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_500,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: No 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimated Packages Review Comments of Assignment Cost by Bank US$ million (Prior / Post) Summary of number of contracts that will be let under QCBS Summary 0.38 6 Post of number of contracts that will be let under CQS Summary of number of contracts that will be let under IS Summary 0.16 2 Post of number of contracts that will be let under IC PROCUREMENT China : Poverty Alleviation and Agriculture-based Industry Pilot and Demonstration in Poor Areas Project PLAN General Information Country: China Bank’s Approval Date of the Original Procurement Plan: 2018-05-13 Revised Plan Date(s): (comma delineated, leave blank if none)2021-05-10 Project ID: P133326 GPN Date: Project Name: Poverty Alleviation and Agriculture-based Industry Pilot and Demonstration in Poor Areas Project Loan / Credit No: IBRD / 85090 Executing Agency(ies):Sichuan poverty WORKS Activity Reference No. / Procurement Estimated Actual Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification High SEA/SH Process Prequalification Specific Procurement Bidding Documents Proposal Submission Contract Description Component Review Type Method Document Amount Amount qualification Document / and Recommendation Signed Contract No. Approach Process (Y/N) Risk Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Completion Type (US$) (US$) Documents Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned SCZJGD07 / Zhaojue County Liuhe Township four kg five Pending Public Infrastructure and Request for Single Stage - One 2018-06- 2018-06- 2018-09- villages and other potato IBRD / 85090 Post Limited 118,052.00 0.00 Implementa Services Quotations Envelope 02 26 26 projects rectification Village tion Road (hardening) 1.5 km SCZJGD08 / Zhaojue County Pending four Kam Township, Yi Li Mu Public Infrastructure and Request for Single Stage - One 2018-06- 2018-06- 2018-09- IBRD / 85090 Post Limited 18,016.00 0.00 Implementa village potato production Services Quotations Envelope 02 26 26 tion road 2 kilometers SCZJGD14 / Zhaojue County, Liangshan County, the village Pending of slash fire village, a semi Public Infrastructure and Request for Single Stage - One 2018-06- 2018-06- 2018-09- IBRD / 85090 Post Limited 39,344.00 0.00 Implementa fine wool sheep project, 1.2 Services Quotations Envelope 02 26 26 tion kilometers of new village road. SCZJGD12 / Zhaojue County four open Township good Pending Public Infrastructure and Request for Single Stage - One 2018-06- 2018-06- 2018-09- Valley Village potato project IBRD / 85090 Post Limited 53,115.00 0.00 Implementa Services Quotations Envelope 02 26 26 rectification Village Road tion 1.08 kilometers SCJYG001 / Jinyang Yongsheng konjac farmers' Pending professional cooperatives Public Infrastructure and Single Stage - One 2018-05- 2018-05- 2018-06- 2018-06- 2018-07- 2018-09- IBRD / 85090 Post Request for Bids Open - National 236,098.00 0.00 Implementa remediation village road Services Envelope 20 25 25 26 06 06 tion hardening 3 km project contract SCBTG01 / Construction of Integrated Value Chain Request for Single Stage - One 2018-06- 2018-11- 2018-07- 2018-12- 2018-11- office building in Luocun co- IBRD / 85090 Post Limited 24,590.00 36,411.06 Completed Development Quotations Envelope 27 07 25 13 25 operatives in Bu Tuo County SCBTG10 / Building of co- operative room of co- Integrated Value Chain Request for Single Stage - One 2018-06- 2018-09- 2018-07- 2018-10- 2018-11- IBRD / 85090 Post Limited 24,590.00 30,637.54 Completed operatives in Japanese village Development Quotations Envelope 27 14 25 08 25 in Bu Tuo County SCXYG140 / Xuyong County regulation Village Road Public Infrastructure and Request for Single Stage - One 2018-05- 2018-12- 2018-06- 2019-01- 2018-08- IBRD / 85090 Post Limited 166,256.00 154,291.34 Completed (hardening) 2 km, New Services Quotations Envelope 26 21 20 16 20 Village Road 0.27 km SCXYG143 / Xuyong County Pending regulation Village Road Public Infrastructure and Request for Single Stage - One 2018-05- 2018-06- 2018-08- IBRD / 85090 Post Limited 81,387.00 0.00 Implementa (hardening) 0.73 km, New Services Quotations Envelope 26 20 20 tion Village Road 0.73 km SCXYG145 / A new 1000 mu sweet orange garden drip Public Infrastructure and Single Stage - One 2018-07- 2018-08- 2018-07- 2018-08- 2018-09- 2018-08- 2018-10- 2018-08- 2018-11- 2018-12- IBRD / 85090 Post Request for Bids Open - National 242,689.00 223,045.58 Completed irrigation system in Xuyong Services Envelope 02 30 04 04 30 04 30 12 28 30 County SCXYG49 / Xuyong county has built 60 cubic meters of Pending water pool 3, 200 cubic Public Infrastructure and Request for Single Stage - One 2018-05- 2018-06- 2018-08- IBRD / 85090 Post Limited 80,817.00 0.00 Implementa meters of pool 2, PE 1.8 40 Services Quotations Envelope 27 20 20 tion km 1.8 km, PE 90 90 km 4.2 km SCZJGD09 / Zhaojue County four open Township good Pending Public Infrastructure and Request for Single Stage - One 2018-06- 2018-06- 2018-09- Valley Village potato project IBRD / 85090 Post Limited 196,754.00 0.00 Implementa Services Quotations Envelope 02 26 26 rectification Village Road tion (hardening) 2.5 kilometers SCZJGD10 / haojue County Liuhe Township, the village Pending Public Infrastructure and Request for Single Stage - One 2018-06- 2018-06- 2018-09- of potato in the village of Bo IBRD / 85090 Post Limited 39,351.00 0.00 Implementa Services Quotations Envelope 02 26 26 Luo regulation Village Road tion (hardening) 0.5 km SCZJGD11 / ZhaojueCounty, Pending Damo Township, Dagu Public Infrastructure and Request for Single Stage - One 2018-06- 2018-06- 2018-09- IBRD / 85090 Post Limited 21,820.00 0.00 Implementa Village, Potato Project Services Quotations Envelope 02 26 26 tion Production Road, 2.42 km SCZJGD13 / Zhaojue County, Bowling Township, United Pending Township, Liangshan Semi- Public Infrastructure and Request for Single Stage - One 2018-06- 2018-06- 2018-09- IBRD / 85090 Post Limited 78,702.00 0.00 Implementa finishing Sheep Project, Services Quotations Envelope 02 26 26 tion Renovation, Village Road (hardened), 1 km SCZJGD16 / Zhaojue County, Pending Bowling Township, United Public Infrastructure and Request for Single Stage - One 2018-06- 2018-06- 2018-09- IBRD / 85090 Post Limited 36,064.00 0.00 Implementa Township, Liangshan Semi- Services Quotations Envelope 02 26 26 tion fine Sheep Project 4km SCZJGD17 / Zhaojue County Pending Shaolapo Township Bolige Public Infrastructure and Request for Single Stage - One 2018-06- 2018-06-
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages18 Page
-
File Size-