T % T

%

M T M F50 Kenn CP % C-LD54-BM04 (Type 2) LD63 13 T LD62 % F 12 F51 Rust Rhyne T 11 % 10 F52 LD61 9 LD60 Little River 8 7 T F53 North End

Broadstone Kingston %

C-LD54-BM05 6 M Rhyne Seymour MM M (Type 3) 5 1 Contains OS data © Crown C-LD54-BM06 T LD59 4 (Type 3) 2 Copyright and database right % F54 3 2020 CP Cranmoor Ham Rhyne LD58 Horsecastle Key Rhyne T Proposed Construction Components and Access % F55 Haul Road LD57 Major Primary Construction Traffic Route T F56 CP % Westmead Major Secondary Construction Traffic Route Rhyne Dismantling Route LD56 T F57 Stowey Rhyne Bellmouth and Reference % C-LD54-BM08

MM (Type 3)

M M Proposed Development C-LD54-BM07 (Type 3) T LD55 Yatton Proposed 400kV T-Pylon Position T % F58 L Proposed 132kV (Special) Lattice Pylon Position

Proposed Temporary Pylon Position LD54 River Yeo % F/ AT Route Lattice Pylon for Removal T F59 % Proposed Route for Temporary Overhead Line Oldbridge River Yeo Proposed Route for 400kV Overhead Line Wick St. Lawrence CP LD53 Proposed Route for 132kV Overhead Line T % F60 F/ AT Route Overhead Line to be dismantled Binhay Rhyne New Rhyne LD52 C-LD39-BM01 (Type 2) T % F61 M M M

M New Rhyne F62 C-LD53-BM01 % Bourton (Type 2) T LD51 F63 % West Hewish River Yeo T LD50 Oldbridge Balls Yeo F64 Congresbury UPDATED VERSION (FROM VOLUME Hewish D 13/04/2021 SB CB CB Rhyne River % 5.26.5) FOR CTMP ADDENDUM CP UPDATED VERSION (FROM VOLUME C 14/09/2020 SB CB CB 5.26.5) FOR CTMP ADDENDUM UPDATED VERSION (FROM VOLUME B 02/07/2015 CB BC BC 5.26.5) FOR DCO SUBMISSION T LD49 Congresbury CP % A 19/01/2015 UPDATED VERSION (FROM VOLUME CB BC BC 5.22.3) FOR DCO SUBMISSION F65 ISSUE DATE COMMENTS DRAWCHK'DAPP'D Puxton Title St. NATIONAL GRID (HINKLEY POINT C F66 %T LD48 Georges CP CONNECTION PROJECT) Oldbridge CONSTRUCTION ROUTES AND River Banwell AT29-BM01 River (Type 2) St Georges MM F67 BELLMOUTH LOCATION PLANS % Puxton Moor T LD47 INSET 9

F68 % % AT25R P AT26 NG INVESTMENT No. APPLICATION No. AT26R Crookwell Banwell CP % AT27 T LD46 P Rhyne A3 Weston-Super-Mare CP % AT28 20897 EN0200001

Rolstone % F69 FIGURE No. DRAWING No. SCALE % Crookwell Way Wick AT27R ANNEX C G1979.2504.9D 1:20,000 Rhyne P T LD45 0 200 400 600 800 1,000 ISSUE Metres Winscombe and F70 SHEET 9 OF 13 D BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONARY OFFICE. © CROWN COPYRIGHT ORDNASNaCnEd SfUoRrVdE CY NPATION%AL GRID LICENSE NO. 100022488

P % T M

MT M

M M T

M T M

T 13 Farleigh F Flax 12 Bourton CP 11 10 CP 9 8 Backwell 7 6

5 Chelvey 1 Contains OS data © Crown Backwell CP 4 Church Town 2 Copyright and database right 3 2020

West Town Key Proposed Construction Components and Access Major Secondary Construction Traffic Route

Kenn Moor Gate

Chelvey Batch

Brockley CP Lower Claverham Brockley

Yatton CP

Brockley Combe Brockley Wood

Westmead Claverham Rhyne

Downside

Cleeve

Cleeve CP Wrington Warren Wrington Warren

UPDATED VERSION (FROM VOLUME D 14/04/2021 SB CB CB 5.26.5) FOR CTMP ADDENDUM UPDATED VERSION (FROM VOLUME C 14/09/2020 SB CB CB 5.26.5) FOR CTMP ADDENDUM UPDATED VERSION (FROM VOLUME B 02/07/2015 CB BC BC 5.26.5) FOR DCO SUBMISSION

A 19/01/2015 UPDATED VERSION (FROM VOLUME CB BC BC 5.22.3) FOR DCO SUBMISSION Wrington CP ISSUE DATE COMMENTS DRAWCHK'DAPP'D King's Wood Title NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT)

CONSTRUCTION ROUTES AND BELLMOUTH LOCATION PLANS INSET 10 Congresbury CP

NG INVESTMENT No. APPLICATION No. A3 20897 EN0200001

FIGURE No. DRAWING No. SCALE

ANNEX C G1979.2504.10D 1:20,000

0 200 400 600 800 1,000 ISSUE Metres BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONARY OFFICE. © CROWN COPYRIGHT ORDNANCE SURVEY NATIONAL GRID LICENSE NO. 100022488 SHEET 10 OF 13 D % T % % % W18 LD87 T % W19 Walton-in-Gordano CP F22 % 13 W20 % F23 T LD86 12 Clapton-in-Gordano CP %% W21 Walton F24 11 St Mary % T Norton's Wood % 10 F25 9 % T W22 LD85 LD83 % 8 F26 % T W23 LD84 F27 % Wraxall and 7 W24 W-Route-BM06 %% W25 Failand CP 6 Middletown W-Route-BM04.1 (Type 1) T LD82 5 The Warren Tickenham (Type 2) West Hill MM Contains OS data © Crown Court Wood CHURCH M C-LD97-BM01 (Type 1) 1 LANE M 4Copyright and database right Tickenham CP M %% W26 Stone-edge 2 COMPOUNDCLEVEDON ROAD T 3 2020 Land Yeo COMPOUND Batch

W-Route-BM04 MM LD81 M

(Type 3) M Middle Yeo Key T % F29 W-Route-BM03 LD80 Proposed Construction Components and Access East Clevedon % W27 (Type 3) LD79 Clevedon CP F30 Haul Road CLEVEDON Tickenham T W28 Moor % % Land Yeo Major Primary Construction Traffic Route Middle Yeo F31 W29 Major Secondary Construction Traffic Route T LD78 % % LD77 W30 Dismantling Route F32 % NAILSEA T % NAILSEA COMPOUND LD76 W31 % Bellmouth and Reference Clevedon Moor W-Route-BM01.1 % MM (Type 1) T C-LD76-BM01 % Proposed Development (Type 2) % W32 T Proposed 400kV T-Pylon Position Ten Feet F34 East End T LD75 F35 Rhyne % % W33 P Proposed 132kV (Special) Lattice Pylon Position Nailsea Moor F36 W34 T LD74 % % Proposed Temporary Pylon Position % W Route Lattice Pylon for Removal F37 Nailsea CP T Backwell LD73 % W35 % F Route Lattice Pylon for Removal

% Common

River Kenn F38 WM -Route-BM00.1 C-LD74-BM01 M Proposed Route for Temporary Overhead Line % (Type 1) (Type 2) T LD72 Proposed Route for 400kV Overhead Line West End % F39 W36 P% ENGINE LANE M Proposed Route for 132kV Overhead Line LD71 T M F40 COMPOUND % LD70 W Route Overhead Line to be dismantled F Route Overhead Line to be dismantled T % F41 LD69 F42 Kenn % Decoypool Proposed Compound /Laydown Area Kenn CP T Rhyne Kenn Moor % F43 Thirteen F44 T Backwell CP Acre Rhyne LD67 % Backwell C-LD70-BM01 LD68 (Type 1) T

Rust Rhyne F45 %

M Chelvey MTM F46 % LD66 LD65 C-LD62-BM01 UPDATED VERSION (FROM VOLUME % F47 D 14/04/2021 SB CB CB T (Type 2) West Town 5.26.5) FOR CTMP ADDENDUM F48 LD64 UPDATED VERSION (FROM VOLUME C 14/09/2020 SB CB CB % 5.26.5) FOR CTMP ADDENDUM T UPDATED VERSION (FROM VOLUME F49 B 02/07/2015 CB BC BC

LD63 % 5.26.5) FOR DCO SUBMISSION

A 19/01/2015 UPDATED VERSION (FROM VOLUME CB BC BC M FM 50 T Kenn Moor 5.22.3) FOR DCO SUBMISSION C-LD54-BM04 (Type 2) % Gate ISSUE DATE COMMENTS DRAWCHK'DAPP'D LD62 T Title F51 % Chelvey Batch F52 NATIONAL GRID (HINKLEY POINT C Rust Rhyne % T LD61 Yatton CP Brockley CP CONNECTION PROJECT) Kingston LD60 Little River Lower Seymour CP Claverham T F53 North End Brockley CONSTRUCTION ROUTES AND

C-LD54-BM05 % M MM M BELLMOUTH LOCATION PLANS (Type 3) INSET 11 C-LD54-BM06 T LD59 (Type 3) % F54 Brockley Cranmoor Horsecastle Combe Rhyne LD58 T F55 Cleeve CP Brockley Wood % NG INVESTMENT No. APPLICATION No. A3 20897 EN0200001 LD57 T F56 FIGURE No. DRAWING No. SCALE % Westmead Claverham Rhyne Wrington CP ANNEX C G1979.2504.11D 1:25,000 LD56 0 250 500 750 1,000 1,250 ISSUE Metres T F57 Stowey Rhyne BACKGROUND MAPPING INFORMATION HAS B%EEN REPRODUCED FROM THE ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONARY OFFICE. © CROWN COPYRIGHT ORDNANCE SCUlReVeEvYe NATIONAL GRID LICENSE NO. 100022488 SHEET 11 OF 13 D

MM

M M

T % %

%

S

Woodhill % G18 13

Drove Rhyne Portbury 12 F5 LD107 11 % % G5, F4 G6, F3 10 % % G7, F2 P-LD101 S% G17 9 W3A % G8, F1 P-LD102A

T 8

% T G9 P-LD102B F6 P-LD10M 0 P M T BW36 % P-LD102C 7 %% W4A T G11 P-LD103 G16 % G10 T G12 P-LD104 6 Dry Hill M P-LD99-BM032 BW UGC ROUTE % G13 G15A % % T L P-LD106 PORTISHEAD P-LD99 T (Type 3) WEST COMPOUND % G15 % T% G14 5 % T BW28 P BW27 F7 W5A 1 P 4 Contains OS data © Crown %% P-LD105 BW UGC ROUTE 2 Copyright and database right EAST COMPOUND 3 P-LD98 2020 West Hill T W-Route-BM12 F8 Pill and % W6A (Type 1)

% Easton-in-Gordano CP Key

M MM M W-Route-BM13 W-Route-BM11 Proposed Construction Components and Access Portishead CP MM (Type 1) (Type 1) W7A Lodway %% Haul Road T F9 SHEEPWAY Sheepway Major Primary Construction Traffic Route P-LD97 F10 COMPOUND % W8 Dismantling Route % Easton-in-Gordano Portbury CP Bellmouth and Reference F11 T P-LD96 % Proposed Development W9 % L Proposed 400kV Standard Lattice Pylon Position Portbury F12 % T P-LD95 T Proposed 400kV T-Pylon Position North Weston W10 % W-Route-BM10 P Proposed 132kV Lattice Platform Pylon Position (Type 1) F13 S Proposed 400kV (Special) Lattice Pylon Position LD94 CASWELL HILL % M M M COMPOUND P-LD94 T Proposed Temporary Pylon Position % W-Route-BM09 W11 F14 (Type 1) % W Route Lattice Pylon for Removal % T W11A % LD93 % F Route Lattice Pylon for Removal W12 LD93 % % G Route Lattice Pylon for Removal Prior's Wood Proposed Route for 400kV Overhead Line F15 Clapton in T LD92 Proposed Route for 132kV Overhead Line Gordano % % W13 Proposed Route for Temporary Overhead Line F16 Weston-in-Gordano CP % W Route Overhead Line to be dismantled LD91 T F Route Overhead Line to be dismantled % W14 F17 G Route Overhead Line to be dismantled Clapton Moor % Clapton-in-Gordano CP LD90 T W15 Proposed Compound /Laydown Area F18 % % Proposed Portishead 132kV Substation Lower Failand Work Area

LD89 T W16

% F19 M UPDATED VERSION (FROM VOLUME M % D 13/04/2021 SB CB CB W-Route-BM07 5.26.5) FOR CTMP ADDENDUM M UPDATED VERSION (FROM VOLUME (Type 2) M W-Route-BM08 C 14/09/2020 SB CB CB (Type 1) 5.26.5) FOR CTMP ADDENDUM UPDATED VERSION (FROM VOLUME F20 B 02/07/2015 CB BC BC % 5.26.5) FOR DCO SUBMISSION LD88 T A 19/01/2015 UPDATED VERSION (FROM VOLUME CB BC BC W17 5.22.3) FOR DCO SUBMISSION ISSUE DATE COMMENTS DRAWCHK'DAPP'D F21 % W18 % % Title LD87 T F22 % W19 NATIONAL GRID (HINKLEY POINT C % Wraxall and CONNECTION PROJECT) W20 % T LD86 Failand CP F23 % CONSTRUCTION ROUTES AND % W21 F24 BELLMOUTH LOCATION PLANS % T LD84 % W22 INSET 12 F25 LD85 % T % W23 F26 % T LD83 Tickenham CP % F27 NG INVESTMENT No. APPLICATION No. % W24 % W25 A3 CLEVEDON ROAD 20897 EN0200001 W-Route-BM04.1 T LD82 COMPOUND FIGURE No. DRAWING No. SCALE (TyWp-eR 2o)ute-BM06 West Hill (Type 1) MM C-LD97-BM01 (Type 1) M 1:20,000 M F28 ANNEX C G1979.2504.12D %% W26 Stone-edge 0 200 400 600 800 1,000 Failand ISSUE CHURCH LANE T Batch Metres BACKGROUND MAPPING INFOCROMMATPIONU HNADS BEEN REPRODUCED FROM THE ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONARY OFFICE. © CROWN COPYRIGHT ORDNANCE SURVEY NATIONAL GRID LICENSE NO. 100022488 SHEET 12 OF 13 D LD81 Nailsea CP

MM

M M

T % % 13 F 12 11 10 SEABANK 9 (SEVERN ROAD)

DA2R COMPOUND 8

LD132 L P M 7 PP BW2RM C-LD127-BM01 6 Seabank-BM01 GA2R (Type 2) (Type 2) 5 Pilning L 1 and Severn M 4 Stuppill LD131 Contains OS data © Crown Beach CP 2 Rhine 3 Copyright and database right 2020 L C-LD125-BM01 LD130 MM (Type 1) Key L LD129 Proposed Construction Components and Access

Haul Road LD128 L Major Primary Construction Traffic Route

C-LD121-BM01

Dismantling Route

(M Type 2) M Almondsbury CP Salt Rhine Bellmouth and Reference LD127 L Proposed Development

Salt Rhine L Proposed 400kV Standard Lattice Pylon Position

P Proposed 132kV (Special) Lattice Pylon Position L LD126 S Proposed 400kV (Special) Lattice Pylon Position

% G Route Lattice Pylon for Removal

L LD125 G Route Overhead Line to be dismantled C-LD119-BM01 (Type 2) Proposed Route for 400kV Overhead Line

M Hallen Proposed Route for 132kV Overhead Line L LD124 Proposed Compound /Laydown Area G31R G31 % P Proposed Seabank 400/132kV Substation Work L LD123 Proposed Avonmouth 132kV Substation Work G30 %

L LD122 G29 % G ROUTE UGC G28 (EAST OF M49) % L COMPOUND KINGS WESTON LANE COMPOUND

G-Route-BML0D3121

G27 % (M Type 3) ST ANDREWS M UPDATED VERSION (FROM VOLUME L LD120 D 13/04/2021 SB CB CB

ROAD COMPOUND G26 G-Route-BM04 5.26.5) FOR CTMP ADDENDUM

M UPDATED VERSION (FROM VOLUME M % M C 14/09/2020 SB CB CB

LD115 L (Type 3) 5.26.5) FOR CTMP ADDENDUM

LD119 L M L M UPDATED VERSION (FROM VOLUME LD116 B 02/07/2015 CB BC BC L LD114 L LD117 G-Route-BM02 5.26.5) FOR DCO SUBMISSION L G25 G-Route(-TByMp0e1 2()Type 1) A 19/01/2015 UPDATED VERSION (FROM VOLUME CB BC BC L LD113 LD118 % 5.22.3) FOR DCO SUBMISSION ISSUE DATE COMMENTS DRAWCHK'DAPP'D G24 G23A % % Title L LD112 G23 Lawrence NATIONAL GRID (HINKLEY POINT C Avonmouth % G22 Weston CONNECTION PROJECT) % L LD111 CONSTRUCTION ROUTES AND G21 % BELLMOUTH LOCATION PLANS L LD110 INSET 13 Coombe Dingle LD109 G20 % L Pill and Easton-in-Gordano CP G19 % NG INVESTMENT No. APPLICATION No. A3 20897 EN0200001 S LD108 FIGURE No. DRAWING No. SCALE % G18 ANNEX C G1979.2504.13D 1:20,000 Portbury 0 200 400 600 800 1,000 ISSUE Drove Rhyne Metres SHEET 13 OF 13 D BPACoKrtGbRuOrUyN CD PMAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONARY OFFICE. © CROWN COPYRIGHT ORDNANCE SURVEY NATIONAL GRID LICENSE NO. 100022488 S%

T % T% % T % %