FY2015 CAR Program 01202015.Xlsx 1 / 44 2/5/2015 \ 4:04 PM FY 2015 DPWH Infrastructure Program Based on GAA Cordillera Administrative Region

Total Page:16

File Type:pdf, Size:1020Kb

FY2015 CAR Program 01202015.Xlsx 1 / 44 2/5/2015 \ 4:04 PM FY 2015 DPWH Infrastructure Program Based on GAA Cordillera Administrative Region FY2015 CAR Program 01202015.xlsx 1 / 44 2/5/2015 \ 4:04 PM FY 2015 DPWH Infrastructure Program Based on GAA Cordillera Administrative Region Released to/ Physical Amount UACS Programs/Activities/Projects Scope of Work To be Target (P'000) Implemented by CORDILLERA ADMINISTRATIVE REGION 10,574,185 ABRA DISTRICT ENGINEERING OFFICE/ Lone Legislative District 868,825 I. PROGRAMS 710,195 1. Operations 710,195 a. MFO 1 - National Road Network Services 687,047 1. Asset Preservation of National Roads 251,306 a. Preventive Maintenance based on Pavement Management System/ Highway 80,706 Development and Management-4 (HDM-4) (Intermittent Sections) - Reblocking of Shattered Blocks (4.5m/block) Secondary Roads 11.273 KM 80,706 165003012300010 1. Abra-Cervantes Rd - Preventive Maintenance 0.323 KM 2,285 Abra DEO/ K0443+000 - K0443+323 Abra DEO 165003012300011 2. Abra-Ilocos Norte Rd - K0409+025 - K0409+854, Preventive Maintenance 10.950 KM 78,421 CAR RO/ K0411+081 - K0411+234, K0414+761 - K0419+000, CAR RO K0421+800 - K0423+456, K0423+472 - K0427+000 b. Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and 125,000 Landslide Arterial Roads - KM 125,000 165003012400001 1. Abra-Kalinga Rd - Slope Protection - KM 125,000 CAR RO/ K0462+470, K0467+550, K0469+900, K0483+070 CAR RO c. Construction/Upgrading/Rehabilitation of Drainage along National Roads 9.353 KM 45,600 165003012600006 1. Abra-Ilocos Norte Rd - Construction/ Rehabilitation of 1.545 KM 7,600 Abra DEO/ K0409+(-690) - K0409+276, Drainage/Protection Works Abra DEO along National Roads K0410+200 - K0410+779 165003012600008 2. Abra-Ilocos Norte Rd - Construction/ Rehabilitation of 1.641 KM 8,000 Abra DEO/ K0413+446 - K0414+000, K0419+928 - K0420+075, Drainage/Protection Works Abra DEO along National Roads K0420+423 - K0421+304, K0423+652 - K0424+000 165003012600007 3. Abra-Ilocos Norte Rd - Construction/ Rehabilitation of 0.600 KM 3,000 Abra DEO/ K0427+140 - K0427+276, K0427+355 - K0427+464, Drainage/Protection Works Abra DEO along National Roads K0428+570 - K0428+925 165003012600004 4. Abra-Ilocos Sur Rd - Construction/ Rehabilitation of 0.329 KM 2,000 Abra DEO/ K0388+652 - K0388+723, K0388+794 - K0388+923, Drainage/Protection Works Abra DEO along National Roads K0389+015 - K0389+144 165003012600005 5. Abra-Ilocos Sur Rd - Construction/ Rehabilitation of 1.506 KM 8,000 Abra DEO/ K0404+682 - K0405+010, K0405+061 - K0405+509, Drainage/Protection Works Abra DEO along National Roads K0406+100 - K0406+827 165003012600001 6. Abra-Kalinga Rd - Construction/ Rehabilitation of 1.000 KM 5,000 Abra DEO/ K0409+892 - K0410+071, Drainage/Protection Works Abra DEO along National Roads K0410+235 - K0411+061 165003012600002 7. Abra-Kalinga Rd - Construction/ Rehabilitation of 1.478 KM 7,000 Abra DEO/ K0424+580 - K0424+874, K0424+920 - K0425+563, Drainage/Protection Works Abra DEO along National Roads K0427+594 - K0427+959, K0428+781 - K0429+000 FY2015 CAR Program 01202015.xlsx 2 / 44 2/5/2015 \ 4:04 PM FY 2015 DPWH Infrastructure Program Based on GAA Cordillera Administrative Region Released to/ Physical Amount UACS Programs/Activities/Projects Scope of Work To be Target (P'000) Implemented by 165003012600003 8. Abra-Kalinga Rd - Construction/ Rehabilitation of 1.254 KM 5,000 Abra DEO/ K0433+500 - K0434+750 Drainage/Protection Works Abra DEO along National Roads 2. Network Development 84,073 a. Widening of National Roads 84,073 Secondary Roads 3.363 KM 84,073 165003010900101 1. Abra-Ilocos Norte Rd - Widening 3.363 KM 84,073 CAR RO/ K0409+000 - K0409+177, K0409+219 - K0409+300, CAR RO K0409+340 - K0409+378, K0409+507 - K0409+604, K0409+731 - K0410+139, K0410+160 - K0410+361, K0410+370 - K0410+779, K0411+051 - K0411+173, K0412+248 - K0412+293, K0413+028 - K0413+359, K414+060 - K0414+155, K0414+764 - K0415+790, (Left Lane), K0409+121 - K0409+276, K0409+460 - K0409+833, K0409+843 - K0410+200, K0410+779 - K0410+838, K0411+051 - K0411+173, K0412+214 - K0412+496, K0413+028 - K0413+688, K0414+000 - K0414+027, K0414+784 - K0415+065, K0415+109 - K0415+533, K0417+794 - K0417+898, K0418+580 - K0418+690, K0418+717 - K0418+793, (Right Lane) 3. Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic 341,668 Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) (Intermittent Sections) Arterial Roads 3.424 KM 102,720 165003011400228 1. Abra-Kalinga Rd - Concreting 3.424 KM 102,720 CAR RO/ K0458+300 - K0458+561, K0483+050 - K0483+200, CAR RO K0487+000 - K0490+070 Secondary Roads 7.960 KM 238,948 165003011500739 1. Abra-Cervantes Rd - Concreting 0.900 KM 27,060 Abra DEO/ K0456+000 - K0456+185, Abra DEO K0457+460 - K0458+175 165003011500740 2. Abra-Ilocos Norte Rd - Concreting 5.930 KM 177,816 Central Office/ Chainage 1131 - Chainage 7058 CAR RO 165003011501087 3. Abra-Ilocos Norte Rd - Concreting 1.130 KM 34,072 Abra DEO/ K0437+760 - K0438+610 Abra DEO 4. Construction and Maintenance of Bridges 1.00 Proj. 10,000 a. Rehabilitation/Major Repair of Permanent Bridges 1.00 Proj. 10,000 165003013200468 1. Baay Br. (B02231LZ) along Abra-Cervantes Rd 1.00 Proj. 10,000 Abra DEO/ Abra DEO b. MFO 3 - Maintenance and Construction Services of Other Infrastructures 23,148 1. Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared 23,148 Tourism Destinations a. To Declared Tourism Destinations 1.20 KM 23,148 165003030300446 1. Access Road leading to Bani Hotspring, Boliney, 1.20 KM 23,148 Central Office/ Abra Abra DEO FY2015 CAR Program 01202015.xlsx 3 / 44 2/5/2015 \ 4:04 PM FY 2015 DPWH Infrastructure Program Based on GAA Cordillera Administrative Region Released to/ Physical Amount UACS Programs/Activities/Projects Scope of Work To be Target (P'000) Implemented by II. PROJECTS 158,630 1. Locally-Funded Projects 158,630 a. Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local 4,000 Projects 1. Buildings and Other Structures 4,000 a. Multipurpose/Facilities 2.00 proj. 4,000 103004010305414 1. Construction/Repair/Rehabilitation/Improvement of 1.00 proj. 2,000 Central Office/ Various Infrastructure including Local Projects - Abra DEO Construction of Office of the Vice President (OVP) - Office Senior Citizens Affairs (OSCA) (Multi-Purpose Building) Center, Licuan-Baay, Abra 103004010305415 2. Construction/Repair/Rehabilitation/Improvement of 1.00 proj. 2,000 Central Office/ Various Infrastructure including Local Projects - Abra DEO Construction of Office of the Vice President (OVP) - Office Senior Citizens Affairs (OSCA) (Multi-Purpose Building) Center, Malibcong, Abra b. National Bridge Construction/Replacement Program (Design and Build Bridges) 41,930 1. Roads and Bridges 41,930 a. National Bridges 1.00 proj. 41,930 165004050200205 1. National Bridge Construction/Replacement (Design 1.00 proj. 41,930 Central Office/ & Build Bridges) - Bridge Construction and UPMO Replacement Program I - Design and Build Bridges for Luzon - Soot Bridge and Approaches Abra-Ilocos Norte Rd, Abra Lone District c. Local Infrastructure Program 112,700 1. Buildings and Other Structures 62,000 a. Multipurpose/Facilities 9.00 proj. 62,000 103004010303422 1. Local Infrastructure Program - Completion of Multi- - 1.00 proj. 10,000 Abra DEO/ Purpose Buildings in Abra Lone District (Bucay, Abra DEO Pe±arrubia, Villaviciosa, Langiden, and San Quintin) 103004010303370 2. Local Infrastructure Program - Construction of Multi- - 1.00 proj. 2,000 Abra DEO/ Purpose Building, Civic Action Center, North Abra DEO Poblacion, San Juan, Abra Lone District 103004010303574 3. Local Infrastructure Program - Rehabilitation of Multi- - 1.00 proj. 1,000 Abra DEO/ Purpose Building (Dolores Municipal Compound), Abra DEO Poblacion, Dolores, Abra Lone District 103004010303369 4. Local Infrastructure Program - Rehabilitation of Multi- - 1.00 proj. 1,000 Abra DEO/ Purpose Building, Poblacion (Dolores Municipal Hall Abra DEO Compound), Dolores, Abra Lone District 103004010303893 5. Local Infrastructure Program - Construction of Multi- 1.00 proj. 11,500 Abra DEO/ Purpose Building, (Pidigan, San Juan, Daquioman, Abra DEO Luba, Lacub, Malibcong, San Quintin, Bangued, Tubo, Sallapadan), Abra Lone District 103004010303894 6. Local Infrastructure Program - Construction of Multi- 1.00 proj. 6,500 Abra DEO/ Purpose Building (Phase II), Bangued, Abra Lone Abra DEO District 103004010305041 7. Local Infrastructure Program - Completion of Multi- 1.00 proj. 10,000 Abra DEO/ Purpose Buildings in Abra Lone District (Danglas, Abra DEO Lagayan, San Juan, Lagangilang, Dolores, and Lacub) 103004010305042 8. Local Infrastructure Program - Completion of Multi- 1.00 proj. 10,000 Abra DEO/ Purpose Buildings in Abra Lone District (Bangued, Abra DEO Pidigan, and Tayum) FY2015 CAR Program 01202015.xlsx 4 / 44 2/5/2015 \ 4:04 PM FY 2015 DPWH Infrastructure Program Based on GAA Cordillera Administrative Region Released to/ Physical Amount UACS Programs/Activities/Projects Scope of Work To be Target (P'000) Implemented by 103004010305043 9. Local Infrastructure Program - Completion of Multi- 1.00 proj. 10,000 Abra DEO/ Purpose Buildings in Abra Lone District (Sallapadan, Abra DEO Baay Licuan, and Tineg) 2. Flood Control and Drainage 18,500 a. Flood Control Structures/Facilities 1.00 proj 10,000 162004020100116 1. Local Infrastructure Program - Construction of Flood 1.00 proj 10,000 Abra DEO/ Control Structure, Barangay Tagaytay-Daoidao, Abra DEO Tineg River, San Juan, Abra Lone District b. Drainage/Protection Works 2.00 proj. 8,500 162004020200130 1. Local Infrastructure Program - Slope Protection - 1.00 proj. 6,500 Abra DEO/ Works (Revetment and Riprapping), Along Tineg Abra DEO River at Barangays Cabcaburao, Tagaytay and Daoidao San Juan, Abra Lone District 162004020200180 2. Local Infrastructure Program - Ripraping or 1.00 proj. 2,000 Abra DEO/ Revetment (Concrete Canal), Pidigan, Abra Lone Abra DEO District 3. Roads and Bridges 32,200 a. Local Roads 4.00 proj. 32,200 165004050301178 1. Local Infrastructure Program - Abualan, Silet, Baug, - 1.00 proj.
Recommended publications
  • Indigenous Peoples/Ethnic Minorities and Poverty Reduction: Regional Report
    INDIGENOUS PEOPLES/ETHNIC MINORITIES AND POVERTY REDUCTION REGIONAL REPORT Roger Plant Environment and Social Safeguard Division Regional and Sustainable Development Department Asian Development Bank, Manila, Philippines June 2002 © Asian Development Bank 2002 All rights reserved Published June 2002 The views and interpretations in this report are those of the author and do not necessarily reflect those of the Asian Development Bank. ISBN No. 971-561-438-8 Publication Stock No. 030702 Published by the Asian Development Bank P.O. Box 789, 0980, Manila, Philippines FOREWORD his publication was prepared in conjunction with an Asian Development Bank (ADB) regional technical assistance (RETA) project on Capacity Building for Indigenous Peoples/ T Ethnic Minority Issues and Poverty Reduction (RETA 5953), covering four developing member countries (DMCs) in the region, namely, Cambodia, Indonesia, Philippines, and Viet Nam. The project is aimed at strengthening national capacities to combat poverty and at improving the quality of ADB’s interventions as they affect indigenous peoples. The project was coordinated and supervised by Dr. Indira Simbolon, Social Development Specialist and Focal Point for Indigenous Peoples, ADB. The project was undertaken by a team headed by the author, Mr. Roger Plant, and composed of consultants from the four participating DMCs. Provincial and national workshops, as well as extensive fieldwork and consultations with high-level government representatives, nongovernment organizations (NGOs), and indigenous peoples themselves, provided the basis for poverty assessment as well as an examination of the law and policy framework and other issues relating to indigenous peoples. Country reports containing the principal findings of the project were presented at a regional workshop held in Manila on 25–26 October 2001, which was attended by representatives from the four participating DMCs, NGOs, ADB, and other finance institutions.
    [Show full text]
  • Municipality of La Trinidad BARANGAY LUBAS
    Republic of the Philippines Province of Benguet Municipality of La Trinidad BARANGAY LUBAS PHYSICAL AND SOCIO-ECONOMIC PROFILE I. PHYSICAL PROFILE Geographic Location Barangay Lubas is located on the southern part of the municipality of La Trinidad. It is bounded on the north by Barangay Tawang and Shilan, to the south by Barangay Ambiong and Balili, to the east by Barangay Shilan, Beckel and Ambiong and to the west by Barangay Tawang and Balili. With the rest of the municipality of La Trinidad, it lies at 16°46’ north latitude and 120° 59 east longitudes. Cordillera Administrative Region MANKAYAN Apayao BAKUN BUGUIAS KIBUNGAN LA TRINIDAD Abra Kalinga KAPANGAN KABAYAN ATOK TUBLAY Mt. Province BOKOD Ifugao BAGUIO CITY Benguet ITOGON TUBA Philippines Benguet Province 1 Sally Republic of the Philippines Province of Benguet Municipality of La Trinidad BARANGAY LUBAS POLITICAL MAP OF BARANGAY LUBAS Not to Scale 2 Sally Republic of the Philippines Province of Benguet Municipality of La Trinidad BARANGAY LUBAS Barangay Tawang Barangay Shilan Barangay Beckel Barangay Balili Barangay Ambiong Prepared by: MPDO La Trinidad under CBMS project, 2013 Land Area The Department of Environment and Natural Resources (DENR) Cadastral survey reveals that the land area of Lubas is 240.5940 hectares. It is the 5th to the smallest barangays in the municipality occupying three percent (3%) of the total land area of La Trinidad. Political Subdivisions The barangay is composed of six sitios namely Rocky Side 1, Rocky Side 2, Inselbeg, Lubas Proper, Pipingew and Guitley. Guitley is the farthest and the highest part of Lubas, connected with the boundaries of Beckel and Ambiong.
    [Show full text]
  • Republic of the Philippines Department of Public Works and Highways
    Republic of the Philippines Department of Public Works and Highways ANNUAL PROCUREMENT PLAN (APP) FOR CY 2014 CORDILLERA ADMINISTRATIVE REGION (CAR) Procurement Project Cost/ Pre- Posting Pre-Bid Submission Post Award No. Contract Package Description Method ABC (Php) Procurement Advertisement Conference and Receipt Bid Evaluation Qualification of Conference of Bids Evaluation Contract CORDILLERA ADMINISTRATIVE REGION (CAR) 001 Mt Province-Ilocos Sur via Tue Rd., Section 1: Public Bidding P 54,930,000.00 Nov. 08, 2013 Nov. 11, 2013 Nov. 20, 2013 Dec. 02, 2013 Dec. 04, 2013 Dec. 09, 2013 Jan. 14, 2014 K0388+900 - K0389+500, K0393+500 - K0393+856; Section 2: K0398+000 - K0398+ 578, K0399+728 - K0399+811; Section 3 K0412+165 - K0412+942, K0413+327 - K0413+354, K0413+368 - K0413+400 002 Gurel-Bokod-Kabayan-Buguias-Abatan Rd., Public Bidding P 60,110,000.00 Nov. 08, 2013 Nov. 11, 2013 Nov. 20, 2013 Dec. 02, 2013 Dec. 04, 2013 Dec. 09, 2013 Jan. 14, 2014 K0352+560-K0353+180, K0353+397-K0354+875 003 Balili-Suyo-Sagada Road Leading to Sagada Caves, Public Bidding P 96,210,000.00 Nov. 08, 2013 Nov. 11, 2013 Nov. 20, 2013 Dec. 02, 2013 Dec. 04, 2013 Dec. 09, 2013 Jan. 14, 2014 Rice Terraces and Water Falls, Bontoc and Sagada, Mt.Province(DSTD) 004 Jct Talubin-Barlig-Natonin-Paracelis-Callacad Public Bidding P 53,780,000.00 Nov. 18, 2013 Nov. 21, 2013 Nov. 28, 2013 Dec. 10, 2013 Dec. 13, 2013 Dec. 17,2013 Jan. 14, 2014 Rd., K0406+922 - K0408+556 005 Maba-ay-Abatan,Bauko road leading to various Public Bidding P 94,560,000.00 Nov.
    [Show full text]
  • NDRRMC Update Re Sitrep No 6 Re TY PEDRING 28 Sep 2011
    B. EFFECTS OF TROPICAL STORM PEDRING 1. AFFECTED POPULATION (TAB A) • Total number of population affected in 349 barangays / 78 municipalities / 17 cities in the 22 provinces of Regions I, II, III, IV-A, IV-B, V, CAR and NCR is: 35,273 families / 171, 570 persons • Total number of population currently served inside and outside evacuation centers is 10,932 families / 52,993 persons INSIDE 153 ECs 9,826 families / 47,709 persons OUTSIDE ECs (relatives/friends) 1,106 families / 5,284 persons 2. CASUALTIES: (TAB B) Dead 18 Injured 13 Missing 35 Rescued/Survivors 108 3. STATUS OF STRANDEES (as of 5:00 PM, 27 September 2011) – PCG (TAB C) • A total of 3,365 passengers; 121 trucks; 31 cars; 45 buses; 212 rolling cargoes; 38 vessels and 20 Mbcs are still stranded in 22 ports while 20 vehicles/ Mbcs are taking shelter in sea ports of affected areas. 4. DAMAGES TO PROPERTIES (TAB D) • Initial cost of damages to 46 school buildings and crops amounted to PhP100,264,840.63: School Buildings (84,060,000.00) and Agriculture (16,204,840.63) 5. STATUS OF LIFELINES: a. ROADS AND BRIDGES CONDITION (TAB E) • As of 8:00 PM, 27 September 2011, total of 61 road sections are reported impassable in Regions I (1), Region II (1), Region III (7), Region IV-A (2), Region V (3), CAR (27) and NCR (20). b. POWER INTERRUPTIONS • National Grid Corporation of the Philippines The following provinces experienced power outage due to damaged NGCP’s transmission facilities and / or damaged distribution utilities of electric cooperatives: Province Percentage of Power Loss Ilocos Norte 24 Nueva Vizcaya 99 Cagayan 51 Isabela 90 La Union 36 Bataan 75 Nueva Ecija 86 Pampanga 33 2 Zambales 95 Benguet 100 Laguna 52 • MERALCO Out of 4,919,012 total customers served by MERALCO, about 20.95% or 1,030,301 consumers are still without power: Area / Province Number of Consumers Metro Manila 695,074 Batangas 27,690 Bulacan 253,894 Cavite 253,894 Laguna 2,256 Pampanga 3,347 Quezon 1,201 Rizal 4,273 6.
    [Show full text]
  • A Discourse-Oriented Grammar of Eastern Bontoc. INSTITUTION Summer Inst
    DOCUMENT RESUME ED 426 594 FL 025 635 AUTHOR Fukuda, Takashi TITLE A Discourse-Oriented Grammar of Eastern Bontoc. INSTITUTION Summer Inst. of Linguistics, Manila (Philippines).; Linguistic Society of the Philippines, Manila. ISBN ISBN-971-18-0314-3 ISSN ISSN-0116-0516 PUB DATE 1997-00-00 NOTE 118p. AVAILABLE FROM SIL, Philippines Branch, Box 2270 CPO, 0199,Manila, Philippines ($13). PUB TYPE Collected Works - Serials (022) JOURNAL CIT Studies in Philippine Linguistics; v10 n1 1997 EDRS PRICE MF01/PC05 Plus Postage. DESCRIPTORS Descriptive Linguistics; Discourse Analysis; Foreign Countries; *Grammar; *Language Patterns; Language Research; Linguistic Theory; Morphology (Languages); *Sentence Structure; Uncommonly Taught Languages IDENTIFIERS *Bontok ABSTRACT The study presents a grammar of Eastern Bontoc, an Austronesian language of the northern Philippines thatincludes five village dialects and has about 8,000 speakers. Data are fromtranscribed recordings of primarily one dialect, gathered in 1977-80. Thediscourse-oriented grammar is outlined in six chapters: an introduction to the language,its speakers and dialects, the scope of the study, and principles ofsegmental phonology and morphophonemics; theoretical considerations concerningdiscourse-level structure, classification of discourse genres, and otherstructural concerns; patterns of structure from word to sentence level; aspectsof behavioral discourse genre; characteristics of expository discourse genre;and conclusions. The appendix contains transcripts and translations.(Contains
    [Show full text]
  • SB-16-CRM-0323-0324 People Vs Magdalena K
    REPUBLIC OF THE PHILIPPINES SANDIGANBAYAN Quezon City Third Division PEOPLE OF THE PHILIPPINES, Crim. Case No. Plaintiff, SB-16-CRM-0323 to 0324 For: Violation of Section 3(e) of Republic Act No. 3019 -versus- MAGDALENA K. LUPOYON, Present: ET AL., Cabotaje-Tang, A.M., PJ., Accused. Chairperson Fernandez, B.,R, J. and Moreno, R.,B, J. PROMULGATED: Tf?62P'V 'R~y ~! Z[;J:2-J x--------------------------------------------------------- DECISION Moreno, J.: Accused Magdalena Kintapan Lupoyon and Albert Tenglab Marafo are charged before this Court with violation of Section 3(e) of Republic Act (R.A.) No. 3019, as amended. The Information reads as follows: That on 26 June 2009 or sometime prior or subsequent thereto, in the Municipality of Barlig, Mountain Province, Philippines, and within the jurisdiction of this Honorable Court; the above named accused, MAGDALENA K. LUPOYON, a high ranking public officer with salary grade 27, being then the Municipal Mayor and ALBERT TENGLAB MARAFO, then Municipal Treasurer, both of the Municipality of Barlig, Mountain Province; while in the performance of their official and/or administrative functions; conspiring with one another, committing the offense in relation to their office, acting with evident bad faith or gross inexcusable negligence; did then and there wilfully, unlawfully and criminally cause undue injury to the Municipality of Barlig, Mountain 1 Province by causing the repair or renovation of the pathway leading to ~ I tt AD i : /-;~ Decision SB-16-CRM-0323-0324 People v. Lupoyon, et 01. x-----------------x Mount Amuyao in the amount of Fifty Thousand Pesos (Php50, 000. 00), without public bidding as required under Section 10 of Republic Act No.
    [Show full text]
  • Human Rights Based Approach to Development As Experienced in Ten Indigenous Communities in the Philippines
    UMAN IGHTS ASED E H R B XPE R PPROACH TO EVELOPMENT IENCED A D H AS XPERIENCED IN E UMAN IN T EN R TEN INDIGENOUS COMMUNITIES I IG NDIGENOUS H TS IN THE HILIPPINES P B ASED C A OMMUNITIES PP R OAC H TO Project Implemented by IN D DINTEG T EVELOPMENT H (Cordillera Indigenous Peoples Legal Center) E P Funded by the H ILIPPINES European Union European Union and the AS International Work Group for Indigenous Affairs Copyright DINTEG First published 2015 Disclaimer: The contents of this publication is the sole responsibility of DINTEG and can in no way be taken to reflect the views of the European Union. Printed by: Rianella Printing Press HUMAN RIGHTS BASED APPROACH TO DEVELOPMENT AS EXPERIENCED IN TEN INDIGENOUS COMMUNITIES IN THE PHILIPPINES To Janjan and Jordan Capion who were massacred together with their anti-mining activist mother, Juvy Capion, on 18 October 2012 in the tri-boundary of Davao del Sur, South Cotabato and Sultan Kudarat where Xstrata – Sagittarius Mining Incorporated is operating. CONTENTS INTRODUCTION I. HUMAN RIGHTS BASED APPROACH TO DEVELOPMENT AS EXPERIENCED IN TEN INDIGENOUS COMMUNITIES IN THE PHILIPPINES A. EXECUTIVE SUMMARY B. THE HUMAN RIGHTS BASED APPROACH TO DEVELOPMENT PROJECT C. ACTUAL IMPLEMENTATION D. PROJECT OUTPUTS, OUTCOMES AND IMPACT E. FACILITAING FACTORS, AREAS OF SHORTCOMINGS AND CONTINUING CHALLENGES F. APPLICATION OF THE SEQUENTIAL STEPS IN HUMAN RIGHTS BASED APPROACH IN THE 10 PILOT AREAS II. EXTERNAL EVALUATION REPORT ON THE LGU ENGAGEMENT COMPONENT OF THE HUMAN RIGHTS BASED APPROACH TO DEVELOPMENT PROJECT G. INTRODUCTION H. RESULTS OF THE EVALUATION I.
    [Show full text]
  • Integrated Natural Resources and Environmental Management Project Bun-Ayan, Camatagan, Capinitan and Supang
    1 Community Management Plan April 2019 PHI: Integrated Natural Resources and Environmental Management Project Bun-Ayan, Camatagan, Capinitan and Supang Prepared by the Barangays of Bun-ayan, Camatagan, Capinitan and Supang of Sabangan, Mountain Province for the Department of Environment and Natural Resources and the Asian Development Bank This community management plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. COMMUNITY MANAGEMENT PLAN Updated April 2019 BUN-AYAN, CAMATAGAN, CAPINITAN AND SUPANG SABANGAN, MOUNTAIN PROVINCE ACRONYMS ADB Asian Development Bank 2 ADSDPP Ancestral Domain Sustainable Development and Protection Plan ANR Assisted Natural Regeneration AO Administrative Order AP Affected Person CADT Certificate of Ancestral Domain Title CAR Cordillera Administrative Region CDA Cooperative Development Authority CF Conservation Farming CIS Communal Irrigation System CLUP Comprehensive Land Use Plan CMP Community Management Plan CP Certificate Precondition CURB Chico Upper River Basin DENR Department of Environment and Natural Resources
    [Show full text]
  • LIST of MUNICIPAL HEALTH OFFICERS Cordillera Administrative Region As of January 7, 2020
    LIST OF MUNICIPAL HEALTH OFFICERS Cordillera Administrative Region As of January 7, 2020 Province/ City Provincial Offices and Municipality Rural Health Units Contact Number Email Address Dr. Maria Christina V. Cabrera (PHO II) 0917-175-952 [email protected] [email protected] / Dr. Alex M. Bayubay (DMO V) [email protected] Bangued MHO: Bangued Dr. Glygoric A. Cortes (MHO) Boliney RHU: 0927-421-2696 Boliney Ms. Princess Mae S. Stimson (PHN) Bucay RHU: 0917-302-6781 Bucay Dr. June G. Aznar (MHO) Bucloc RHU: 0906-572-5201 [email protected] Bucloc Dr. Andrew Chamson M. Bacuso (DTTB) Daguioman RHU: 0927-803-9131 Daguioman Dr. Rellin Gay A. Apelo (DTTB) Danglas RHU: 0905-498-0789 [email protected] Danglas ABRA Dr. Joan Rose G. Lampac (MHO) Dolores RHU: 0917-779-3925 Dolores Dr. Joan Rose G. Lampac (DTTB) Lacub RHU: 0917-801-6914 Lacub Ms. Lea Sharon B. Ibay (PHN) 0916-897-3343 Lagangilang RHU: 0921-668-9667 [email protected] Lagangilang Dr. Ruby Rose L. Orosco (MHO) Lagayan RHU: 0917-895-6744/ 0917-412-4627 [email protected] Lagayan Dr. Melanie Aggudong (DTTB) Langiden RHU: Langiden Dr. Antonio L. Valera (PHO I) La Paz RHU: La Paz Ms. Caroline Afos Parel (OIC- PHN) Licuaan- Licuan_Baay RHU: 0926-916-5646 Baay Dr. Ma. Flavie D. Blanca (MHO) Luba RHU: 0917-825-7359 [email protected] Luba Dr. Anthea Marie R. Gabaoen (MHO) Malibcong RHU: 0917-854-4304/ 0977-177-8740 [email protected] Malibcong Dr. Mira Peace B. Kapuno (MHO) Manabo RHU: Manabo Dr. Joel Beleno (MHO) Peñarrubia RHU: 0906-574-1318 [email protected] Peñarrubia Dr.
    [Show full text]
  • Father Hubert Boumans (1914-1993): “Father Ever Blasting”
    Father Hubert Boumans (1914-1993): “Father Ever Blasting” The CICM “Elenchus Defunctorum” of 2015 mentions the names of 2,342 deceased confreres. Some of them died very young. Two became more than one hundred years old. Among them we have numerous pioneers, fine scholars, and outstanding bishops. Many of them were also generous brothers and priests who never made it to Wikipedia or Facebook. About one confrere belonging to this last group, namely father Hubert Boumans, I will write a few lines. From the end of October 1983 up to the end of April 1988, I was a missionary in Natonin, Mountain Province, Philippines, and a distant neighbor of father Hubert Boumans who was the rector of the mission of Barlig. Father Boumans was born in Ubachsberg, municipality of Voerendaal, Limburg, the Netherlands, on February 10, 1914. At the minor seminary of Sparrendaal, he completed his humanities. He entered the novitiate in 1935, and was dreaming of being a missionary in China. He pronounced his first vows on August 8, 1936. After having finished his philosophical studies and three years of theology, he was ordained a priest on July 25, 1941. The second world war delayed his departure for the Philippines. From August 1944 to April 1946, he was treasurer of the novitiate in the Netherlands. Only on August 9, 1946, was he able to sail for the Pearl of the East. At the end of 1946, he was assigned to Barlig mission which at that time covered also the mission of Natonin. His stay of 41 years in Barlig mission was only interrupted by a four year stay in Dutch Limburg for mission promotion (1955-1959).
    [Show full text]
  • (CSHP) DOLE-Cordillera Administrative Region April 2018
    REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-Cordillera Administrative Region April 2018 Date No. Company Name and Address Project Name Project Owner Approved BALAAN BOEN Kin-iway, Besao, Construction of Patogtog Slope Protection with 1 LGU-BONTOC April 2, 2018 CONSTRUCTION Mountain Province Drainage MERJAN P. HAMBON #74 Bakakeng Norte/ LGU-BAGUIO C/O April 02, 2 GENERAL Construction of Roofing at BCEMS Sur, Baguio City CBAO 2018 CONSTRUCTION #14 Daguitan st., 18PL0032: Rehabilitation of Pinukpuk Junction Flood April 02, 3 JEP CONSTRUCTION Dagupan Centro, DPWH-LKDEO Control 2018 Tabuk City, Kalinga #75J Appl St., Airport CAMIA CONST. 18PC0010: Road Upgrading (Unpaved to Paved) Village., Pengue April 02, 4 DEVELOPMENT Ayaga-Sta.Marcela-Flora-Lasam Road, (22619-23768) DPWH-ASDEO Ruyu, Tuguegarao 2018 CORPORATION – (23777-24448)- (24489-26002), Apayao City, Cagayan 18PB0021: Construction/ Maintenance of Flood B.C. CUERPO 2B E. Rodriguez Sr. Mitigation Structures and Drainage Systems- April 02, 5 CONSTRUCTION Ave. San Juan, DPWH-AFDEO Construction of Karagawan Flood Control, Brgy. 2018 CORPORATION Rodriguez, Rizal Poblacion, Kabugao, Apayao #21 Pucay April 03, 6 JERRISON TIONG Proposed 3-Storey Building with Penthouse Jerrison Tiong Road, Baguio City 2018 18PI0003- Convergence and Special Support Program, Construction/ Improvement of Access Roads leading to PA 399-D Upper Trades, Industries, and Economic Zones, Abatan- April 03, 7 KVC CONSTRUCTION Wangal, La Trinidad, DPWH-AMPDEO Bagnen Road, in support
    [Show full text]
  • Fund Balance FUND BALANCE 22,230,000.00 1 Medina, Narcisa
    Republic of the Philippines Department of Health BAGUIO GENERAL HOSPITAL AND MEDICAL CENTER Gov. Pack Road, Telefax No. (074) 442-3809 DOH - MEDICAL ASSISTANCE PROGRAM As of July 31, 2014 Kind of Amount of Fund No. Name of Patient Address Assistance Assistance Balance YEAR 2014 FUND BALANCE 22,230,000.00 1 Medina, Narcisa Aringay, La Union Hospitalization 7,500.00 22,222,500.00 2 Tulipas, Ma. Morena Estioco Burgos, La Union Hospitalization 19,758.81 22,202,741.19 3 Jonna Mae Rimas Florida Aringay, La Union Hospitalization 29,627.31 22,173,113.88 4 Juliet Pascual Burgos, La Union Hemodialysis 4,400.00 22,168,713.88 5 Agripa, Renato Orosco San Jose, Nueva Ecija Hospitalization 14,559.12 22,154,154.76 6 Santos, Levilyn Beltran San Jose, Nueva Ecija Hospitalization 10,000.00 22,144,154.76 7 Perfecto Miguel Dayag San Jose, Nueva Ecija Hospitalization 10,000.00 22,134,154.76 8 Domingo, Fe De Vera Sison, Pangasinan Hemodailysis 20,000.00 22,114,154.76 9 Cantorna, Rogelio Emralino Binalonan, Pangasinan Hospitalization 15,000.00 22,099,154.76 10 Pepito Cerezoi Pozzorobio, Pangasinan Hospitalization 19,000.00 22,080,154.76 11 Racchel Ann Naces Pozzorobio, Pangasinan Hospitalization 9,000.00 22,071,154.76 12 Dumalsin, Michelle Paccay Lubuagan, Kalinga Hospitalization 6,138.09 22,065,016.67 13 Naganag, Juan Valdez Bulanao, Tabuk, Kalinga Hospitalization 3,070.05 22,061,946.62 14 Biddong, Leonard Andomang Pinulpok, Kalinga Hospitalization 6,000.00 22,055,946.62 15 Saking, Cristina Kitoyen Tabuk, Kalinga Hospitalization 15,000.00 22,040,946.62 16 Jonathan Bulwayan Tanudan, Kalinga Hemodialysis 20,000.00 22,020,946.62 17 Endolyn B.
    [Show full text]