(CSHP) DOLE-Cordillera Administrative Region April 2017

Total Page:16

File Type:pdf, Size:1020Kb

(CSHP) DOLE-Cordillera Administrative Region April 2017 REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-Cordillera Administrative Region April 2017 Date No. Company Name and Address Project Name Project Owner Approved CY 2016 Basic Educational Facilities Fund ( BEFF- Batch Camatagan, JBA CONSTRUCTION 12) Provision of Techvoc Workshop Buildings/ Laboratories March 31, 1 Sabangan, Mt. DPWH-MPDEO AND BUILDERS for Senior High School- Paracelis Technical & Vocational 2017 Province High School, Paracelis, Mt. Province 17PL0038 Construction and Maintenance of Bridge along Balinag St., Purok 4, National Roads- Rehabilitation/ Major Repair of Permanent March 31, 2 MGSR CONSTRUCTION Bulanao, Tabuk City, Bridges: Taniok Bridge along Mt. Province Bdry. - Calanan- DPWH-KDEO 2017 Kalinga Pinukpuk- Abbut Road ( Calanan- Pinukpuk Section) Tabuk, Kalinga Asset Preservation of National Roads- Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National #14 Daguitan St., Roads including drainage based on Pavement March 31, 3 JEP CONSTRUCTION Dagupan Centro, DPWH-LKDEO Management System/ HDM4: Malalao National Road ( 2017 Tabuk City , Kalinga Agbannag- Malalao- Bulo Section) KO518+920- KO519+178, Tabuk City, Kalinga 17PL0032 Construction and Maintenance of Bridge along Purok 3, Provincial National Roads- Rehabilitation/ Major Repair of Permanent March 31, 4 D.C.E CONSTRUCTION Road, Bulanao, Bridges: Baligatan Bridge (B00926LZ) along Kalinga- DPWH-LKDEO 2017 Tabuk City, Kalinga Cagayan Road ( Calanan- Enrile Section) Tabuk City, Kalinga 17PL0011, Package 2: Construction and Maintenance of Purok 3, Provincial Bridge along National Roads- Rehabilitation/ Major Repair March 31, 5 D.C.E CONSTRUCTION Road, Bulanao, of Permanent Bridges: a) Cogawe Bridge (B00983LZ) DPWH-LKDEO 2017 Tabuk City, Kalinga along Tabuk- Banawe via Tanudan-Barlig Road, Tabuk City, Kalinga Page 1 of 18 REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-Cordillera Administrative Region April 2017 Date No. Company Name and Address Project Name Project Owner Approved 17PL0031, Package 2: Construction and Maintenance of Purok 3, Provincial Bridge along National Roads- Rehabilitation/ Major Repair March 31, 6 D.C.E CONSTRUCTION Road, Bulanao, of Permanent Bridges:Camalog Bridge (B02118LZ) along DPWH-LKDEO 2017 Tabuk City, Kalinga Mt. Province Bdry.- Calanan- Pinukpuk- Abbut Road (Calanan- Pinukpuk Section), Pinukpuk, Kalinga 17PB0002: Construction and Maintenance of Bridges along 43 N. Balinag St. TRIBU DESIGN AND National Roads- Retrofitting/ Strengthening of Permanent March 31, 7 Bulanao, Tabuk City, DPWH-AFDEO CONSTRUCTION Bridges- Mabubua Bridge ( BO2241LZ) along Abbut - 2017 Kalinga Conner Road B.D. OLOWAN #38-C Upper March 31, 8 CONSTRUCTION AND Brookside, Baguio Construction of Lualhati Fire Sub Station LGU- Baguio 2017 SUPPLY City B.D. OLOWAN #38-C Upper March 31, 9 CONSTRUCTION AND Brookside, Baguio Assessor's Office Renovation c/o CBAO LGU- Baguio 2017 SUPPLY City B.D. OLOWAN #38-C Upper March 31, 10 CONSTRUCTION AND Brookside, Baguio Construction of Drainage Canal c/o CEO LGU- Baguio 2017 SUPPLY City 17PD0023: Contract Name: Construction and B.D. OLOWAN #38-C Upper Maintenance of Bridges along National Roads: Retrofitting/ March 31, 11 CONSTRUCTION AND Brookside, Baguio DPWH-BCDEO Strenghtening of Permanent Bridges- Leonard Wd. Br. 2017 SUPPLY City (BO2618LZ) along Leonard Wood Rd. B.D. OLOWAN #38-C Upper "Improvement of Basketball Court" ( Installation of gates w/ Imelda Marcos March 31, 12 CONSTRUCTION AND Brookside, Baguio Lock, Const of CR installation of fence, Rehab of Fence at Barangay 2017 SUPPLY City Imelda Marcos Brgy.) #14 Daguitan St., Contract Id: 17PL0057, Reblocking along Kalinga - March 31, 13 JEP CONSTRUCTION Dagupan Centro, Cagayan Road ( as per BOM Findings) Eleb Section, DPWH-LKDEO 2017 Tabuk City , Kalinga Tabuk City, Kalinga Page 2 of 18 REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-Cordillera Administrative Region April 2017 Date No. Company Name and Address Project Name Project Owner Approved Contract Id: 17PL0069, Rehabilitation and Improvement of PCCP along Bulo and Malalao National Road, ( #14 Daguitan St., KO509+784-KO514+204.6-KO514+236, Burubor & Soto March 31, 14 JEP CONSTRUCTION Dagupan Centro, Section & B.) Rehabilitation and Reblocking of Damaged DPWH-LKDEO 2017 Tabuk City , Kalinga PCCP ( Rectification of Defects) along Bulanao- Paracelis Road, ko499+062-ko514+150 I.S Bulanao-Cudal Section, Tabuk City, Kalinga PMD CONSTRUCTION 134 Appas , Tabuk 17PL0008- Construction (Completion) KAELCO- KSU- March 31, 15 DPWH-LKDEO AND SUPPLIES City, Kalinga NFA Barangay Road 2017 SOUTHLAND Amduntog Asipulo, Rehabilitation/ Maintenance of DILG Building PNP- IPPO March 31, 16 CONSTRUCTION AND DPWH-IFDEO Ifugao Building 2017 SUPPLIES 172 Crystal Cave, Repair and Upgrading of DILG Barangay Center (Multi- March 31, 17 4X4 CONSTRUCTION DILG-CAR Baguio City Purpose Building), Engineers Hill 2017 Rehabilitation/ Restoration of Damaged PCCP ( BLESSING BUILDERS Purok 4, Bulanao, Embankment) of sinking pavement and removal of slides March 31, 18 AND CONSTRUCTION DPWH-LKDEO Tabuk, Kalinga along Pinukpuk Junction- Abbut Road (I.S), Pinukpuk, 2017 SUPPLY Kalinga 17PO0004: Road Upgrading (Unpaved to Paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading CAMIA CONSTRUCTIN 393 Gomez St. Carig, Paved Road Standards (HDM-4 project analysis) Ayaga- 19 DEVELOPMENT Tuguegarao City, DPWH-CAR April 4, 2017 Sta. Marcela- Flora- Lasam Road, Chainage 12937- CORPORATION Cagayan Chainage 14620, Chainage 14694- Chainage 16628, Chainage 16636- Chainage 18019, Flora, Apayao C.R. DOMINGO 142 National CONSTRUCTION AND Rehabilitation of Pula- Cawayan- Camandag- Duli Farm to 20 Highway, Brgy. 3, DPWH-IFDEO April 4, 2017 POWER Market to Market Road san Mateo, Isabela DEVELOPMENT, INC Page 3 of 18 REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-Cordillera Administrative Region April 2017 Date No. Company Name and Address Project Name Project Owner Approved RHOB CONSTRUCTION 523 San Vicente, a) Concreting of Paterno Street and b) Rehabilitation of 21 AND ENGINEERING LGU-Baguio April 4, 2017 Baguio City Paterno Street to Include Drainage Canal SERVICES RHOB CONSTRUCTION 523 San Vicente, Rehabilitation of Sewerline at Otek Street ( Otek Business 22 AND ENGINEERING LGU-Baguio April 4, 2017 Baguio City Center to chanum Street) SERVICES Road Upgrading (Unpaved to Paved) based on Gravel VALLEY Road Strategies, Traffic Benchmark for Upgrading Paved IB43, Betag, La 23 CONSTRUCTION AND Road Standards (HDM-4 project analysis) Acop- DPWH-BSDEO April 4, 2017 Trinidad, Benguet AGGREGATES Kapangan- Kibungan- Bakun Road, ( KO336+226- KO337+105, KO337+193-KO337+208) 17PD0004 Contract Package 1: Asset Preservation of National Roads- Rehabilitation / Reconstruction of National TANGO ROMEO Roads with Slips, slope collapse and landslide: a) GENERAL Construction of Road Slope Protection - Structure- Kennon COSNTRUCTION AND #12 Spring Subd., road, KO242+510-KO242+740 b)Construction of Road 24 GOLDRICH San Luis Village, Asin DPWH-BCDEO April 4, 2017 slope protection structure- Quirini H-way( Baguio- Bauang), CONSTRUCTION AND Road, Baguio City KO299+(-148)- KO299+ (-105); C) Rehabilitation/ Major TRAIDING (JOINT Repair of road slope protection structure-Easern Link VENTURE) circumferential Road, KO249+467-KO249+510; KO247+976-KO248+010 #80 Purok 2 Fencing and Introduction of other Improvement of the well B.B. LAT-IW LGU-Baguio c/o 25 Sunnyside Fairview, with proper drainage Near Garcia's Residence at Purok April 4, 2017 CONSTRUCTION CEO Baguio City Magsaysay #80 Purok 2 B.B. LAT-IW LGU-Baguio c/o 26 Sunnyside Fairview, Construction of Tanod Outpost April 4, 2017 CONSTRUCTION CEO Baguio City OMENGAN 2nd Floor, OCDC Road Upgrading (Unpaved to Paved) based on Gravel 27 CONSTRUCTION AND Building, Poblacion, Road Strategies, Traffic Benchmark for Upgrading Paved DPWH-CAR April 4, 2017 DEVELOPMENT Tabuk City, Kalinga Road Standards (HDM-4 project analysis) Jct Talubin- Page 4 of 18 REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-Cordillera Administrative Region April 2017 Date No. Company Name and Address Project Name Project Owner Approved CORPORATION Barlig- Natonin- Paracelis- Calaccad Road, KO455+155- KO457+069 ROMA CONSTRUCTION Road Upgrading (Unpaved to Paved) based on Gravel AND DEVELOPMENT Daguitan St., Road Strategies, Traffic Benchmark for Upgrading Paved 28 CORPORATION/JEP Dagupan Centro, Road Standards (HDM-4 project analysis) Jct Talubin- DPWH-CAR April 4, 2017 CONSTRUCTION JOINT Tabuk City, Kalinga Barlig- Natonin- Paracelis- Calaccad Road, Chainage 458- VENTURE (JV) Chainage 2720, chainage 2940- Chainage 4480 SUMAG BUILDERS Supang, Sabangan, 29 Improvement of the Third Floor of the Bontoc Public Market PGO-Mt. Province April 6, 2017 CONSTRUCTION Mt. Province 5th Floor Extension POLO ENGINEERING & Pineshill Building, Maintenance/ Installation of Road signs along road and 30 DPWH-BFDEO April 6, 2017 CONSTRUCTION KM5 Balili La Marcos Highway Trinidad, Benguet 17P00041 Assest Preservation of National Road- Rehabilitation/ Reconstruction of National Roads with slips, Slope Collapse ans landslides Banaue- Mayoyao- A. Lista- Isabela, Boundary Road KO344+339-KO344+369, DL CERVANTES KO345+817- KO345+837, KO346+694- KO346+724, CONSTRUCTION KO348+606-KO348+628, KO360+690-KO360+725, CORPORATION/ Ibulao, Baguinge, KO360+718- KO360+728, KO361+004- KO361+015, 31 BUGANI DPWH-CAR April
Recommended publications
  • Indigenous Peoples/Ethnic Minorities and Poverty Reduction: Regional Report
    INDIGENOUS PEOPLES/ETHNIC MINORITIES AND POVERTY REDUCTION REGIONAL REPORT Roger Plant Environment and Social Safeguard Division Regional and Sustainable Development Department Asian Development Bank, Manila, Philippines June 2002 © Asian Development Bank 2002 All rights reserved Published June 2002 The views and interpretations in this report are those of the author and do not necessarily reflect those of the Asian Development Bank. ISBN No. 971-561-438-8 Publication Stock No. 030702 Published by the Asian Development Bank P.O. Box 789, 0980, Manila, Philippines FOREWORD his publication was prepared in conjunction with an Asian Development Bank (ADB) regional technical assistance (RETA) project on Capacity Building for Indigenous Peoples/ T Ethnic Minority Issues and Poverty Reduction (RETA 5953), covering four developing member countries (DMCs) in the region, namely, Cambodia, Indonesia, Philippines, and Viet Nam. The project is aimed at strengthening national capacities to combat poverty and at improving the quality of ADB’s interventions as they affect indigenous peoples. The project was coordinated and supervised by Dr. Indira Simbolon, Social Development Specialist and Focal Point for Indigenous Peoples, ADB. The project was undertaken by a team headed by the author, Mr. Roger Plant, and composed of consultants from the four participating DMCs. Provincial and national workshops, as well as extensive fieldwork and consultations with high-level government representatives, nongovernment organizations (NGOs), and indigenous peoples themselves, provided the basis for poverty assessment as well as an examination of the law and policy framework and other issues relating to indigenous peoples. Country reports containing the principal findings of the project were presented at a regional workshop held in Manila on 25–26 October 2001, which was attended by representatives from the four participating DMCs, NGOs, ADB, and other finance institutions.
    [Show full text]
  • Municipality of La Trinidad BARANGAY LUBAS
    Republic of the Philippines Province of Benguet Municipality of La Trinidad BARANGAY LUBAS PHYSICAL AND SOCIO-ECONOMIC PROFILE I. PHYSICAL PROFILE Geographic Location Barangay Lubas is located on the southern part of the municipality of La Trinidad. It is bounded on the north by Barangay Tawang and Shilan, to the south by Barangay Ambiong and Balili, to the east by Barangay Shilan, Beckel and Ambiong and to the west by Barangay Tawang and Balili. With the rest of the municipality of La Trinidad, it lies at 16°46’ north latitude and 120° 59 east longitudes. Cordillera Administrative Region MANKAYAN Apayao BAKUN BUGUIAS KIBUNGAN LA TRINIDAD Abra Kalinga KAPANGAN KABAYAN ATOK TUBLAY Mt. Province BOKOD Ifugao BAGUIO CITY Benguet ITOGON TUBA Philippines Benguet Province 1 Sally Republic of the Philippines Province of Benguet Municipality of La Trinidad BARANGAY LUBAS POLITICAL MAP OF BARANGAY LUBAS Not to Scale 2 Sally Republic of the Philippines Province of Benguet Municipality of La Trinidad BARANGAY LUBAS Barangay Tawang Barangay Shilan Barangay Beckel Barangay Balili Barangay Ambiong Prepared by: MPDO La Trinidad under CBMS project, 2013 Land Area The Department of Environment and Natural Resources (DENR) Cadastral survey reveals that the land area of Lubas is 240.5940 hectares. It is the 5th to the smallest barangays in the municipality occupying three percent (3%) of the total land area of La Trinidad. Political Subdivisions The barangay is composed of six sitios namely Rocky Side 1, Rocky Side 2, Inselbeg, Lubas Proper, Pipingew and Guitley. Guitley is the farthest and the highest part of Lubas, connected with the boundaries of Beckel and Ambiong.
    [Show full text]
  • Republic of the Philippines Department of Public Works and Highways
    Republic of the Philippines Department of Public Works and Highways ANNUAL PROCUREMENT PLAN (APP) FOR CY 2014 CORDILLERA ADMINISTRATIVE REGION (CAR) Procurement Project Cost/ Pre- Posting Pre-Bid Submission Post Award No. Contract Package Description Method ABC (Php) Procurement Advertisement Conference and Receipt Bid Evaluation Qualification of Conference of Bids Evaluation Contract CORDILLERA ADMINISTRATIVE REGION (CAR) 001 Mt Province-Ilocos Sur via Tue Rd., Section 1: Public Bidding P 54,930,000.00 Nov. 08, 2013 Nov. 11, 2013 Nov. 20, 2013 Dec. 02, 2013 Dec. 04, 2013 Dec. 09, 2013 Jan. 14, 2014 K0388+900 - K0389+500, K0393+500 - K0393+856; Section 2: K0398+000 - K0398+ 578, K0399+728 - K0399+811; Section 3 K0412+165 - K0412+942, K0413+327 - K0413+354, K0413+368 - K0413+400 002 Gurel-Bokod-Kabayan-Buguias-Abatan Rd., Public Bidding P 60,110,000.00 Nov. 08, 2013 Nov. 11, 2013 Nov. 20, 2013 Dec. 02, 2013 Dec. 04, 2013 Dec. 09, 2013 Jan. 14, 2014 K0352+560-K0353+180, K0353+397-K0354+875 003 Balili-Suyo-Sagada Road Leading to Sagada Caves, Public Bidding P 96,210,000.00 Nov. 08, 2013 Nov. 11, 2013 Nov. 20, 2013 Dec. 02, 2013 Dec. 04, 2013 Dec. 09, 2013 Jan. 14, 2014 Rice Terraces and Water Falls, Bontoc and Sagada, Mt.Province(DSTD) 004 Jct Talubin-Barlig-Natonin-Paracelis-Callacad Public Bidding P 53,780,000.00 Nov. 18, 2013 Nov. 21, 2013 Nov. 28, 2013 Dec. 10, 2013 Dec. 13, 2013 Dec. 17,2013 Jan. 14, 2014 Rd., K0406+922 - K0408+556 005 Maba-ay-Abatan,Bauko road leading to various Public Bidding P 94,560,000.00 Nov.
    [Show full text]
  • NDRRMC Update Re Sitrep No 6 Re TY PEDRING 28 Sep 2011
    B. EFFECTS OF TROPICAL STORM PEDRING 1. AFFECTED POPULATION (TAB A) • Total number of population affected in 349 barangays / 78 municipalities / 17 cities in the 22 provinces of Regions I, II, III, IV-A, IV-B, V, CAR and NCR is: 35,273 families / 171, 570 persons • Total number of population currently served inside and outside evacuation centers is 10,932 families / 52,993 persons INSIDE 153 ECs 9,826 families / 47,709 persons OUTSIDE ECs (relatives/friends) 1,106 families / 5,284 persons 2. CASUALTIES: (TAB B) Dead 18 Injured 13 Missing 35 Rescued/Survivors 108 3. STATUS OF STRANDEES (as of 5:00 PM, 27 September 2011) – PCG (TAB C) • A total of 3,365 passengers; 121 trucks; 31 cars; 45 buses; 212 rolling cargoes; 38 vessels and 20 Mbcs are still stranded in 22 ports while 20 vehicles/ Mbcs are taking shelter in sea ports of affected areas. 4. DAMAGES TO PROPERTIES (TAB D) • Initial cost of damages to 46 school buildings and crops amounted to PhP100,264,840.63: School Buildings (84,060,000.00) and Agriculture (16,204,840.63) 5. STATUS OF LIFELINES: a. ROADS AND BRIDGES CONDITION (TAB E) • As of 8:00 PM, 27 September 2011, total of 61 road sections are reported impassable in Regions I (1), Region II (1), Region III (7), Region IV-A (2), Region V (3), CAR (27) and NCR (20). b. POWER INTERRUPTIONS • National Grid Corporation of the Philippines The following provinces experienced power outage due to damaged NGCP’s transmission facilities and / or damaged distribution utilities of electric cooperatives: Province Percentage of Power Loss Ilocos Norte 24 Nueva Vizcaya 99 Cagayan 51 Isabela 90 La Union 36 Bataan 75 Nueva Ecija 86 Pampanga 33 2 Zambales 95 Benguet 100 Laguna 52 • MERALCO Out of 4,919,012 total customers served by MERALCO, about 20.95% or 1,030,301 consumers are still without power: Area / Province Number of Consumers Metro Manila 695,074 Batangas 27,690 Bulacan 253,894 Cavite 253,894 Laguna 2,256 Pampanga 3,347 Quezon 1,201 Rizal 4,273 6.
    [Show full text]
  • FY2015 CAR Program 01202015.Xlsx 1 / 44 2/5/2015 \ 4:04 PM FY 2015 DPWH Infrastructure Program Based on GAA Cordillera Administrative Region
    FY2015 CAR Program 01202015.xlsx 1 / 44 2/5/2015 \ 4:04 PM FY 2015 DPWH Infrastructure Program Based on GAA Cordillera Administrative Region Released to/ Physical Amount UACS Programs/Activities/Projects Scope of Work To be Target (P'000) Implemented by CORDILLERA ADMINISTRATIVE REGION 10,574,185 ABRA DISTRICT ENGINEERING OFFICE/ Lone Legislative District 868,825 I. PROGRAMS 710,195 1. Operations 710,195 a. MFO 1 - National Road Network Services 687,047 1. Asset Preservation of National Roads 251,306 a. Preventive Maintenance based on Pavement Management System/ Highway 80,706 Development and Management-4 (HDM-4) (Intermittent Sections) - Reblocking of Shattered Blocks (4.5m/block) Secondary Roads 11.273 KM 80,706 165003012300010 1. Abra-Cervantes Rd - Preventive Maintenance 0.323 KM 2,285 Abra DEO/ K0443+000 - K0443+323 Abra DEO 165003012300011 2. Abra-Ilocos Norte Rd - K0409+025 - K0409+854, Preventive Maintenance 10.950 KM 78,421 CAR RO/ K0411+081 - K0411+234, K0414+761 - K0419+000, CAR RO K0421+800 - K0423+456, K0423+472 - K0427+000 b. Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and 125,000 Landslide Arterial Roads - KM 125,000 165003012400001 1. Abra-Kalinga Rd - Slope Protection - KM 125,000 CAR RO/ K0462+470, K0467+550, K0469+900, K0483+070 CAR RO c. Construction/Upgrading/Rehabilitation of Drainage along National Roads 9.353 KM 45,600 165003012600006 1. Abra-Ilocos Norte Rd - Construction/ Rehabilitation of 1.545 KM 7,600 Abra DEO/ K0409+(-690) - K0409+276, Drainage/Protection Works Abra DEO along National Roads K0410+200 - K0410+779 165003012600008 2.
    [Show full text]
  • A Discourse-Oriented Grammar of Eastern Bontoc. INSTITUTION Summer Inst
    DOCUMENT RESUME ED 426 594 FL 025 635 AUTHOR Fukuda, Takashi TITLE A Discourse-Oriented Grammar of Eastern Bontoc. INSTITUTION Summer Inst. of Linguistics, Manila (Philippines).; Linguistic Society of the Philippines, Manila. ISBN ISBN-971-18-0314-3 ISSN ISSN-0116-0516 PUB DATE 1997-00-00 NOTE 118p. AVAILABLE FROM SIL, Philippines Branch, Box 2270 CPO, 0199,Manila, Philippines ($13). PUB TYPE Collected Works - Serials (022) JOURNAL CIT Studies in Philippine Linguistics; v10 n1 1997 EDRS PRICE MF01/PC05 Plus Postage. DESCRIPTORS Descriptive Linguistics; Discourse Analysis; Foreign Countries; *Grammar; *Language Patterns; Language Research; Linguistic Theory; Morphology (Languages); *Sentence Structure; Uncommonly Taught Languages IDENTIFIERS *Bontok ABSTRACT The study presents a grammar of Eastern Bontoc, an Austronesian language of the northern Philippines thatincludes five village dialects and has about 8,000 speakers. Data are fromtranscribed recordings of primarily one dialect, gathered in 1977-80. Thediscourse-oriented grammar is outlined in six chapters: an introduction to the language,its speakers and dialects, the scope of the study, and principles ofsegmental phonology and morphophonemics; theoretical considerations concerningdiscourse-level structure, classification of discourse genres, and otherstructural concerns; patterns of structure from word to sentence level; aspectsof behavioral discourse genre; characteristics of expository discourse genre;and conclusions. The appendix contains transcripts and translations.(Contains
    [Show full text]
  • SB-16-CRM-0323-0324 People Vs Magdalena K
    REPUBLIC OF THE PHILIPPINES SANDIGANBAYAN Quezon City Third Division PEOPLE OF THE PHILIPPINES, Crim. Case No. Plaintiff, SB-16-CRM-0323 to 0324 For: Violation of Section 3(e) of Republic Act No. 3019 -versus- MAGDALENA K. LUPOYON, Present: ET AL., Cabotaje-Tang, A.M., PJ., Accused. Chairperson Fernandez, B.,R, J. and Moreno, R.,B, J. PROMULGATED: Tf?62P'V 'R~y ~! Z[;J:2-J x--------------------------------------------------------- DECISION Moreno, J.: Accused Magdalena Kintapan Lupoyon and Albert Tenglab Marafo are charged before this Court with violation of Section 3(e) of Republic Act (R.A.) No. 3019, as amended. The Information reads as follows: That on 26 June 2009 or sometime prior or subsequent thereto, in the Municipality of Barlig, Mountain Province, Philippines, and within the jurisdiction of this Honorable Court; the above named accused, MAGDALENA K. LUPOYON, a high ranking public officer with salary grade 27, being then the Municipal Mayor and ALBERT TENGLAB MARAFO, then Municipal Treasurer, both of the Municipality of Barlig, Mountain Province; while in the performance of their official and/or administrative functions; conspiring with one another, committing the offense in relation to their office, acting with evident bad faith or gross inexcusable negligence; did then and there wilfully, unlawfully and criminally cause undue injury to the Municipality of Barlig, Mountain 1 Province by causing the repair or renovation of the pathway leading to ~ I tt AD i : /-;~ Decision SB-16-CRM-0323-0324 People v. Lupoyon, et 01. x-----------------x Mount Amuyao in the amount of Fifty Thousand Pesos (Php50, 000. 00), without public bidding as required under Section 10 of Republic Act No.
    [Show full text]
  • Human Rights Based Approach to Development As Experienced in Ten Indigenous Communities in the Philippines
    UMAN IGHTS ASED E H R B XPE R PPROACH TO EVELOPMENT IENCED A D H AS XPERIENCED IN E UMAN IN T EN R TEN INDIGENOUS COMMUNITIES I IG NDIGENOUS H TS IN THE HILIPPINES P B ASED C A OMMUNITIES PP R OAC H TO Project Implemented by IN D DINTEG T EVELOPMENT H (Cordillera Indigenous Peoples Legal Center) E P Funded by the H ILIPPINES European Union European Union and the AS International Work Group for Indigenous Affairs Copyright DINTEG First published 2015 Disclaimer: The contents of this publication is the sole responsibility of DINTEG and can in no way be taken to reflect the views of the European Union. Printed by: Rianella Printing Press HUMAN RIGHTS BASED APPROACH TO DEVELOPMENT AS EXPERIENCED IN TEN INDIGENOUS COMMUNITIES IN THE PHILIPPINES To Janjan and Jordan Capion who were massacred together with their anti-mining activist mother, Juvy Capion, on 18 October 2012 in the tri-boundary of Davao del Sur, South Cotabato and Sultan Kudarat where Xstrata – Sagittarius Mining Incorporated is operating. CONTENTS INTRODUCTION I. HUMAN RIGHTS BASED APPROACH TO DEVELOPMENT AS EXPERIENCED IN TEN INDIGENOUS COMMUNITIES IN THE PHILIPPINES A. EXECUTIVE SUMMARY B. THE HUMAN RIGHTS BASED APPROACH TO DEVELOPMENT PROJECT C. ACTUAL IMPLEMENTATION D. PROJECT OUTPUTS, OUTCOMES AND IMPACT E. FACILITAING FACTORS, AREAS OF SHORTCOMINGS AND CONTINUING CHALLENGES F. APPLICATION OF THE SEQUENTIAL STEPS IN HUMAN RIGHTS BASED APPROACH IN THE 10 PILOT AREAS II. EXTERNAL EVALUATION REPORT ON THE LGU ENGAGEMENT COMPONENT OF THE HUMAN RIGHTS BASED APPROACH TO DEVELOPMENT PROJECT G. INTRODUCTION H. RESULTS OF THE EVALUATION I.
    [Show full text]
  • Integrated Natural Resources and Environmental Management Project Bun-Ayan, Camatagan, Capinitan and Supang
    1 Community Management Plan April 2019 PHI: Integrated Natural Resources and Environmental Management Project Bun-Ayan, Camatagan, Capinitan and Supang Prepared by the Barangays of Bun-ayan, Camatagan, Capinitan and Supang of Sabangan, Mountain Province for the Department of Environment and Natural Resources and the Asian Development Bank This community management plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. COMMUNITY MANAGEMENT PLAN Updated April 2019 BUN-AYAN, CAMATAGAN, CAPINITAN AND SUPANG SABANGAN, MOUNTAIN PROVINCE ACRONYMS ADB Asian Development Bank 2 ADSDPP Ancestral Domain Sustainable Development and Protection Plan ANR Assisted Natural Regeneration AO Administrative Order AP Affected Person CADT Certificate of Ancestral Domain Title CAR Cordillera Administrative Region CDA Cooperative Development Authority CF Conservation Farming CIS Communal Irrigation System CLUP Comprehensive Land Use Plan CMP Community Management Plan CP Certificate Precondition CURB Chico Upper River Basin DENR Department of Environment and Natural Resources
    [Show full text]
  • LIST of MUNICIPAL HEALTH OFFICERS Cordillera Administrative Region As of January 7, 2020
    LIST OF MUNICIPAL HEALTH OFFICERS Cordillera Administrative Region As of January 7, 2020 Province/ City Provincial Offices and Municipality Rural Health Units Contact Number Email Address Dr. Maria Christina V. Cabrera (PHO II) 0917-175-952 [email protected] [email protected] / Dr. Alex M. Bayubay (DMO V) [email protected] Bangued MHO: Bangued Dr. Glygoric A. Cortes (MHO) Boliney RHU: 0927-421-2696 Boliney Ms. Princess Mae S. Stimson (PHN) Bucay RHU: 0917-302-6781 Bucay Dr. June G. Aznar (MHO) Bucloc RHU: 0906-572-5201 [email protected] Bucloc Dr. Andrew Chamson M. Bacuso (DTTB) Daguioman RHU: 0927-803-9131 Daguioman Dr. Rellin Gay A. Apelo (DTTB) Danglas RHU: 0905-498-0789 [email protected] Danglas ABRA Dr. Joan Rose G. Lampac (MHO) Dolores RHU: 0917-779-3925 Dolores Dr. Joan Rose G. Lampac (DTTB) Lacub RHU: 0917-801-6914 Lacub Ms. Lea Sharon B. Ibay (PHN) 0916-897-3343 Lagangilang RHU: 0921-668-9667 [email protected] Lagangilang Dr. Ruby Rose L. Orosco (MHO) Lagayan RHU: 0917-895-6744/ 0917-412-4627 [email protected] Lagayan Dr. Melanie Aggudong (DTTB) Langiden RHU: Langiden Dr. Antonio L. Valera (PHO I) La Paz RHU: La Paz Ms. Caroline Afos Parel (OIC- PHN) Licuaan- Licuan_Baay RHU: 0926-916-5646 Baay Dr. Ma. Flavie D. Blanca (MHO) Luba RHU: 0917-825-7359 [email protected] Luba Dr. Anthea Marie R. Gabaoen (MHO) Malibcong RHU: 0917-854-4304/ 0977-177-8740 [email protected] Malibcong Dr. Mira Peace B. Kapuno (MHO) Manabo RHU: Manabo Dr. Joel Beleno (MHO) Peñarrubia RHU: 0906-574-1318 [email protected] Peñarrubia Dr.
    [Show full text]
  • Father Hubert Boumans (1914-1993): “Father Ever Blasting”
    Father Hubert Boumans (1914-1993): “Father Ever Blasting” The CICM “Elenchus Defunctorum” of 2015 mentions the names of 2,342 deceased confreres. Some of them died very young. Two became more than one hundred years old. Among them we have numerous pioneers, fine scholars, and outstanding bishops. Many of them were also generous brothers and priests who never made it to Wikipedia or Facebook. About one confrere belonging to this last group, namely father Hubert Boumans, I will write a few lines. From the end of October 1983 up to the end of April 1988, I was a missionary in Natonin, Mountain Province, Philippines, and a distant neighbor of father Hubert Boumans who was the rector of the mission of Barlig. Father Boumans was born in Ubachsberg, municipality of Voerendaal, Limburg, the Netherlands, on February 10, 1914. At the minor seminary of Sparrendaal, he completed his humanities. He entered the novitiate in 1935, and was dreaming of being a missionary in China. He pronounced his first vows on August 8, 1936. After having finished his philosophical studies and three years of theology, he was ordained a priest on July 25, 1941. The second world war delayed his departure for the Philippines. From August 1944 to April 1946, he was treasurer of the novitiate in the Netherlands. Only on August 9, 1946, was he able to sail for the Pearl of the East. At the end of 1946, he was assigned to Barlig mission which at that time covered also the mission of Natonin. His stay of 41 years in Barlig mission was only interrupted by a four year stay in Dutch Limburg for mission promotion (1955-1959).
    [Show full text]
  • (CSHP) DOLE-Cordillera Administrative Region April 2018
    REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-Cordillera Administrative Region April 2018 Date No. Company Name and Address Project Name Project Owner Approved BALAAN BOEN Kin-iway, Besao, Construction of Patogtog Slope Protection with 1 LGU-BONTOC April 2, 2018 CONSTRUCTION Mountain Province Drainage MERJAN P. HAMBON #74 Bakakeng Norte/ LGU-BAGUIO C/O April 02, 2 GENERAL Construction of Roofing at BCEMS Sur, Baguio City CBAO 2018 CONSTRUCTION #14 Daguitan st., 18PL0032: Rehabilitation of Pinukpuk Junction Flood April 02, 3 JEP CONSTRUCTION Dagupan Centro, DPWH-LKDEO Control 2018 Tabuk City, Kalinga #75J Appl St., Airport CAMIA CONST. 18PC0010: Road Upgrading (Unpaved to Paved) Village., Pengue April 02, 4 DEVELOPMENT Ayaga-Sta.Marcela-Flora-Lasam Road, (22619-23768) DPWH-ASDEO Ruyu, Tuguegarao 2018 CORPORATION – (23777-24448)- (24489-26002), Apayao City, Cagayan 18PB0021: Construction/ Maintenance of Flood B.C. CUERPO 2B E. Rodriguez Sr. Mitigation Structures and Drainage Systems- April 02, 5 CONSTRUCTION Ave. San Juan, DPWH-AFDEO Construction of Karagawan Flood Control, Brgy. 2018 CORPORATION Rodriguez, Rizal Poblacion, Kabugao, Apayao #21 Pucay April 03, 6 JERRISON TIONG Proposed 3-Storey Building with Penthouse Jerrison Tiong Road, Baguio City 2018 18PI0003- Convergence and Special Support Program, Construction/ Improvement of Access Roads leading to PA 399-D Upper Trades, Industries, and Economic Zones, Abatan- April 03, 7 KVC CONSTRUCTION Wangal, La Trinidad, DPWH-AMPDEO Bagnen Road, in support
    [Show full text]