Work Underway to Deliver Trans-Pennine Route Upgrade

Total Page:16

File Type:pdf, Size:1020Kb

Work Underway to Deliver Trans-Pennine Route Upgrade Work underway to deliver Trans-Pennine Route Upgrade March 18, 2021 The next engineering work as part of the Trans-Pennine Route Upgrade is set to start in April, with Network Rail revealing that initial work to electrify the line will begin in Manchester next month. Work to reconstruct a rail embankment in Miles Platting is already underway. The next step will involve piling between Collyhurst and Miles Platting to install steel pipes that will eventually support posts and overhead electric wires between Manchester and Stalybridge. Transport for the North has been an ardent supporter of the project to significantly overhaul the 76-mile railway from Manchester to York via Huddersfield and Leeds. It’s included as a key route in TfN’s Strategic Transport Plan and supporting infrastructure pipeline. Whilst early construction work on the project has been heralded as positive progress, the full scope of investment in the project is still to be revealed by Government. David Hoggarth, Strategic Rail Director at Transport for the North, said: “Upgrading the existing Trans- Pennine route has long been seen as a key building block in delivering a better rail network for the North. It’s finally underway after years in the planning and – once delivered – it’ll speed up journeys, increase reliability and connect communities along the line much better than today.” However, the full extent of the project isn’t yet confirmed and is expected to be included in the Government’s upcoming Integrated Rail Plan. Transport for the North has repeatedly made the case for electrification of the full line to help cut carbon emissions, as well as providing additional track capacity to relieve bottlenecks; improving stations to make them more accessible; and facilitating a shift of growing east-west freight flows from congested roads to rail. David Hoggarth added: “It’s critical we have better rail links across the Pennines and TRU – alongside a fully new line via Bradford as part of Northern Powerhouse Rail – will provide just that. Fully electrifying the existing line and freeing up capability to move freight from our ports onto rail would support our mission to make journeys in the North greener and more sustainable. “Through everything, passengers must come first. It’s essential that, as this long-promised project gets underway, all those involved in the programme do everything possible to minimise disruption for travellers and we will be working closely with the rail industry and our partners on this throughout the course of its delivery.” To note: Piling work is scheduled to begin between Collyhurst and Miles Platting on Saturday 24 April. Network Rail has confirmed that an online community event has been organised for Wednesday 14 April, from 6pm-7pm, for local residents to find out more. Those who wish to attend are advised to visit: www.networkrail.co.uk/manchester-improvements Photo credit: Transport for the North.
Recommended publications
  • Investment Programme 2 3
    TRANSPORT FOR THE Investment Programme 2 3 Introduction Developing the Investment Programme Transport for the North’s (TfN’s) Strategic Transport Plan sets out an ambitious vision for how transport can support transformational, inclusive growth in the This initial version of the Investment Programme builds North of England through to 2050. This accompanying Investment Programme on the strategic rail and road schemes previously comprises TfN’s advice to the Government on the long-term, multimodal priorities announced, and draws on the Integrated and Smart Travel programme, the Long Term Rail Strategy, the Strategic for enhanced pan-Northern connectivity. Outline Business Case for Northern Powerhouse Rail, the Major Road Network for the North, and the work done to date on the Strategic Development Corridors identified in the Strategic Transport Plan. It is important to consider future investments and decisions As with the Strategic Transport Plan, the Investment strategically, ensuring that infrastructure not only provides Programme has a horizon year of 2050, to align with the the basics for the economy, but also actively supports the Northern Powerhouse Independent Economic Review, long-term national interests. The Strategic Transport Plan and sets out TfN’s view of the appropriate pipeline of and this Investment Programme do just that, by ensuring investment in strategic transport to deliver those plans. that the North’s existing and future economic assets and This will enable TfN and its Partners to secure funding and clusters are better connected. delivery of the right schemes at the right time. The successful delivery of the Investment Programme will The Investment Programme aims to provide greater require continuous close working with TfN’s Constituent certainty for Local Transport and Highway Authorities Authority Partners, the national Delivery Partners (Highways to deliver complementary investment.
    [Show full text]
  • Tfn Monthly Operating Report
    Transport for the North Monthly Operating Report December 2019 1 Contents Page Introduction Summary from the Chief Executive 3 Programme Summary Northern Powerhouse Rail (NPR) 4-5 Integrated & Smart Ticketing (IST) 6-7 Strategic Development Corridors (SDCs) 8-9 Strategic Rail 10-11 Operations Summary 12-14 Financial Performance Financial Update 15-16 Activity Dashboard 17 HR Update 18 KPIs (Key Performance 19-22 Indicators) 2 Introduction Summary from the Chief Executive December was a short working month for many due to the Christmas and New Year break. However, work has continued during December across all TfN programmes. The key issue in December has been reliability on the rail network. As such the main focus of Strategic Rail has been the performance of operators following the December 2019 timetable change. TfN is working closely with the Rail North Partnership to ensure operators take appropriate mitigating actions to reduce the passenger impact and improve performance to acceptable levels. Activity to improve the operation of the network in the longer term is also ongoing. Work includes the development of a plan for disaggregating the Long Term Rail Strategy in to specific Delivery Plans, and work on Central Manchester Capacity, in relation to which a report was prepared for the January Board and an officer/member working group established to review short-term changes to services through the corridor. NPR ended their calendar year positively and to schedule, but the team are preparing for a busy early 2020 with engineering design, cost estimating, and model development works planned for completion in the first few months of the year, ready to support sifting process that will support subsequent partner decision making.
    [Show full text]
  • NIC-RNA-Tfn-Submission-Final.Pdf
    Executive Summary Transport for the North (TfN), the UK’s first statutory sub-national transport body, published its Strategic Transport Plan in 2019. This sets out a 30 year strategy and outline investment programme to increase the North’s economic prosperity through developing our transport provision. Developing and investing in the North’s rail network is central to this and our approach is guided by the Long Term Rail Strategy that is part of the Strategic Transport Plan. This identifies sets out why change is needed, what that change should be and how that change should be delivered, based on five themes: Connectivity, Capacity, Customer, Community and Cost Effectiveness. This approach is supported by a series of conditional outputs and desirable minimum standards that define what rail needs to provide. The North of England has a complex rail network that provides access to, from and between major population centres and their hinterlands, international gateways, rural communities and logistics centres. Although extensive, the North’s network is mainly a mixed-use, predominantly two-track railway, with all types of passenger and freight services often utilising the same track. It is this characteristic which acts as one of the key limiting factors to the planning and delivery of rail services in the North. Despite this, rail use in the North has grown significantly and rail is at the heart of both the levelling up agenda and responding to the climate emergency and the Paris agreement on decarbonisation. Whilst we understand the focus on capacity and connectivity for this NIC inquiry, the North’ rail network is already constrained by reliability and lacks resilience.
    [Show full text]
  • Transport for the North a Blueprint for Devolving and Integrating Transport Powers in England
    REPORT TRANSPORT FOR THE NORTH A BLUEPRINT FOR DEVOLVING AND INTEGRATING TRANSPORT POWERS IN ENGLAND Ed Cox and Luke Raikes March 2015 © IPPR North 2015 Institute for Public Policy Research ABOUT IPPR NORTH IPPR North is IPPR’s dedicated thinktank for the North of England. supported by With its head office in Manchester and representatives in Newcastle, IPPR North’s research, together with our stimulating and varied events programme, seeks to produce innovative policy ideas for fair, democratic and sustainable communities across the North of England. IPPR North specialises in regional economics, localism and community policy. Our approach is collaborative and we benefit from extensive sub-national networks, regional associates, and a strong track record of engaging with policymakers at regional, sub-regional and local levels. IPPR North 2nd Floor, 3 Hardman Square Spinningfields, Manchester M3 3EB T: +44 (0)161 457 0535 E: [email protected] www.ippr.org/north Registered charity no. 800065 This paper was first published in March 2015. © 2015 The contents and opinions expressed in this paper are those of the authors only. NEW IDEAS for CHANGE CONTENTS Summary ............................................................................................................1 Background: the rationale and development of Transport for the North .................. 1 Purpose, objectives and vision ............................................................................... 1 Timetable and blueprint for development ..............................................................
    [Show full text]
  • RAIL NEEDS ASSESSMENT for the MIDLANDS and the NORTH Final Report
    RAIL NEEDS ASSESSMENT FOR THE MIDLANDS AND THE NORTH Final report December 2020 National Infrastructure Commission | Rail Needs Assessment for the Midlands and the North - Final report Contents The Commission 3 Foreword 5 Infographic 7 In brief 8 Executive summary 9 1.Background 21 2. Rail and economic outcomes in the Midlands and the North 24 3. A core pipeline and an adaptive approach 35 4. Developing packages of rail investments 39 5. Comparison of packages 51 6. Long term commitments and shorter term wins 64 Annex A. The package focussing on upgrades 72 Annex B. The package prioritising regional links 78 Annex C. The package prioritising long distance links 86 Acknowledgements 94 Endnotes 97 2 National Infrastructure Commission | Rail Needs Assessment for the Midlands and the North - Final report The Commission The Commission’s remit The Commission provides the government with impartial, expert advice on major long term infrastructure challenges. Its remit covers all sectors of economic infrastructure: energy, transport, water and wastewater (drainage and sewerage), waste, flood risk management and digital communications. While the Commission considers the potential interactions between its infrastructure recommendations and housing supply, housing itself is not in its remit. Also, out of the scope of the Commission are social infrastructure, such as schools, hospitals or prisons, agriculture, and land use. The Commission’s objectives are to support sustainable economic growth across all regions of the UK, improve competitiveness,
    [Show full text]
  • Transport Plan for the Humber
    Transport Plan for the Humber CONTENTS 1 INTRODUCTION AND CONTEXT 1 Local context .......................................................................................................................................................... 1 Policy context ......................................................................................................................................................... 1 2 HUMBER TRANSPORT NETWORKS AND ASSETS 4 Ports .......................................................................................................................................................................... 4 Airports .................................................................................................................................................................... 5 Road and Rail .......................................................................................................................................................... 5 3 CHANGING GOVERNANCE LANDSCAPE 8 Transport for the North ...................................................................................................................................... 8 Devolution of powers to local areas ................................................................................................................. 9 4 RECENT SUCCESS AND DELIVERY 10 Overview ............................................................................................................................................................... 10 Local Growth Fund Schemes ...........................................................................................................................
    [Show full text]
  • Transport for the North Draft Strategic Transport Plan PDF 122 KB
    LIVERPOOL CITY REGION COMBINED AUTHORITY To: The Chair and Members of the Transport Committee Meeting: 5 April 2018 Authority/Authorities Affected: All EXEMPT/CONFIDENTIAL ITEM: No REPORT OF THE LEAD OFFICER: TRANSPORT TRANSPORT FOR THE NORTH DRAFT STRATEGIC TRANSPORT PLAN 1. PURPOSE OF REPORT 1.1 This report alerts Members to a consultation by Transport for the North on its Draft Strategic Transport Plan. The Strategic Transport Plan, once agreed, will become a statutory document, with Transport for the North becoming the first Sub-National Transport Body on 1 April 2018. A response to the consultation has been prepared by officers of Merseytravel with input from the local authorities and the Local Enterprise Partnership. 1.2 The Draft Strategic Transport Plan was published on 16 January 2018, with a closing date of 17 April 2018. The Liverpool City Region Combined Authority meets on 20 April 2018, Officers have therefore agreed with Transport for the North that the response as endorsed by the Transport Committee (subject to any amendments proposed by Members) may be submitted as a holding response, but will also consider any further changes requested by the Combined Authority following its meeting. 2. RECOMMENDATIONS It is recommended that Members of the Transport Committee (a) note the establishment of Transport for the North as a statutory body as of 1 April 2018; (b) consider the response to the consultation on the Draft Strategic Transport Plan (as set out in Appendix 2); (c) subject to any changes proposed by Transport Committee, endorse it for submission to Transport for the North as a holding response; and (d) agree for it to be submitted to the Combined Authority for endorsement.
    [Show full text]
  • Agenda Document for North East Joint Transport Committee, 18/06/2019
    Public Document Pack North East Joint Transport Committee Tuesday, 18th June, 2019 at 2.00 pm Meeting to be held in the Reception Room, South Shields Town Hall AGENDA Page No 1. Appointment of Chair and Vice Chair for the Municipal Year 2019/20 2. Apologies for Absence 3. Declarations of Interest Please remember to declare any personal interest where appropriate both verbally and by recording it on the relevant form (to be handed to the Democratic Services Officer). Please also remember to leave the meeting where any personal interest requires this. 4. Minutes of the previous meeting held on 19 March 2019 5 - 10 5. Appointments to Tyne and Wear Sub Committee; JTC Overview and 11 - 20 Scrutiny Committee and JTC Audit Committee, including the Appointment of Chairs and Vice Chairs for the Municipal Year 2019/20 6. Programme of Committee Meetings for the 2019/20 Municipal Year 21 - 26 7. Regional Transport Update 27 - 56 8. Capital Programme Outturn 57 - 68 9. Revenue Budget 2018/19 Outturn 69 - 80 10. Nexus Fleet Replacement Programme 81 - 84 11. Transforming Cities Fund - Tranche 2 Bid 85 - 106 12. Discharge of Transport Functions by Durham County Council 107 - 114 13. Date and Time of Next Meeting Tuesday 16 July 2019 at 2pm, Gateshead Civic Centre. Contact Officer: Emma Reynard Tel: 0191 433 2280 E-mail: [email protected] To All Members 2 Agenda Item 4 1 North East Joint Transport Committee DRAFT MINUTES TO BE APPROVED 19 March 2019 Meeting held Committee Room, Gateshead Civic Centre, Regent Street, Gateshead, NE8 1HH Present: Councillor: M Gannon (Chair) Councillors: N Forbes, C Marshall, G Miller, C Johnson, W Daley and M Walsh 32 APOLOGIES FOR ABSENCE Apologies were received from Mayor Redfern, Councillor Jackson and Helen Golightly.
    [Show full text]
  • CENTRAL PENNINES - STRATEGIC DEVELOPMENT CORRIDOR Product 17 - Environmental Appraisal Report
    Transport for the North (TfN) CENTRAL PENNINES - STRATEGIC DEVELOPMENT CORRIDOR Product 17 - Environmental Appraisal Report 70034363_EAR FEBRUARY 2019 RESTRICTED Transport for the North (TfN) CENTRAL PENNINES - STRATEGIC DEVELOPMENT CORRIDOR Product 17 - Environmental Appraisal Report RESTRICTED PROJECT NO. 70034363 OUR REF. NO. 70034363_EAR DATE: FEBRUARY 2019 WSP Three White Rose Office Park Millshaw Park Lane Leeds LS11 0DL Phone: +44 113 395 6200 Fax: +44 113 395 6201 WSP.com QUALITY CONTROL Issue/revision First issue Revision 1 Revision 2 Revision 3 Revision 5 Remarks First Draft for Second Draft Third Draft for Fourth Draft for Final Issue TfN Comment for Comment Comment Comment Date June 2018 July 2018 September January 2019 February 2019 2018 Prepared by Thomas Gold Thomas Gold Thomas Gold Thomas Gold Thomas Gold Signature Checked by Kevin Stubbs Kevin Stubbs Kevin Stubbs Kevin Stubbs Kevin Stubbs Signature Authorised by Gary Rowland Gary Rowland Gary Rowland Gary Rowland Gary Rowland Signature Project 70034363 70034363 70034363 70034363 70034363 number Report number 70034363_EAR 70034363_EAR 70034363_EAR 70034363_EAR 70034363_EAR File reference V1 V2 V3 V4 V5 CENTRAL PENNINES - STRATEGIC DEVELOPMENT CORRIDOR WSP Project No.: 70034363 | Our Ref No.: 70034363_EAR February 2019 Transport for the North (TfN) CONTENTS 1. INTRODUCTION 1 1.1. BACKGROUND 1 1.2. PURPOSE OF REPORT 2 1.3. STRUCTURE OF REPORT 3 2. PROJECT DEFINITION 4 2.1. STUDY CONTEXT 4 2.2. CENTRAL PENNINES CORRIDOR 6 2.3. ENVIRONMENTAL ASSETS 7 3. OUTLINE OF APPROACH TO THE ENVIRONMENT 9 3.1. ENVIRONMENTAL APPRAISAL AT THE PLAN, PROGRAMME AND INTERVENTION LEVEL 9 3.2. ENVIRONMENTAL INPUTS TO DEVELOPMENT OF THE STRATEGIC OUTLINE PROGRAMME (SOP) 10 3.3.
    [Show full text]
  • Liverpool City Region Combined Authority
    LIVERPOOL CITY REGION COMBINED AUTHORITY To: The Metro Mayor and Members of the Combined Authority Meeting: 16 November 2018 Authority/Authorities Affected: All EXEMPT/CONFIDENTIAL ITEM: No REPORT OF THE DIRECTOR OF INTEGRATED TRANSPORT AND THE PORTFOLIO HOLDER: TRANSPORT AND AIR QUALITY HIGH SPEED 2 AND NORTHERN POWERHOUSE RAIL UPDATE 1. PURPOSE OF REPORT 1.1 To update the Combined Authority on the work being conducted by Transport for the North, including; 1.2 An update on the work being done by both the Liverpool City Region and Transport for the North to make the case for Northern Powerhouse Rail and an enhanced High Speed 2 link to Liverpool. 2. RECOMMENDATIONS 2.1 It is recommended that the Liverpool City Region Combined Authority note the report. 3. BACKGROUND 3.1 Transport for the North and Northern Powerhouse Rail 3.1.1 Transport for the North (TfN) is the first statutory sub-national transport body in the United Kingdom, officially receiving its statutory powers on 1stApril 2018. TfN brings together 19 local transport authorities (including four Mayoral Combined Authorities and two Combined Authorities), enabling the North to speak with one voice on the transport infrastructure investment needed to deliver transformational growth and rebalance the UK economy. 3.1.2 The 2016 Northern Powerhouse Independent Economic Review (NPIER - https://www.transportforthenorth.com/wp-content/uploads/Northern- Powerhouse-Independent-Economic-Review-Executive-Summary.pdf) identified that transformed transport connectivity – both between the North‟s core cities and elsewhere across the North – would be a key enabler for transformed economic growth. 3.1.3 Northern Powerhouse Rail (NPR) has been identified as a key way of achieving the transformed passenger connectivity between cities, with the NPR conditional outputs emulating the levels of frequency and journey time achieved in economically successful areas elsewhere in the world.
    [Show full text]
  • Transport for the North – Incorporation As a Sub- National Transport Body
    Transport for the North – Incorporation as a Sub- National Transport Body 1. Purpose of the Report 1.1 The purpose of this report is for Members to consent to the making of Regulations by the Secretary of State to establish Transport for the North as a Sub –National Transport Body under section 102E of the Local Transport Act 2008. The consent of each Constituent Authority is required to the making of Regulations by the Secretary of State. 1.2 Members are also asked to approve in principle the transfer of Rail North Limited to TfN following its inauguration and the signing of a new Rail Franchise Management Agreement with TfN replicating as far as possible the arrangements entered into in respect of Rail North Limited. 2. Background 2.1 Getting transport right is central to achieving the Northern Powerhouse ambition which is itself central to a successful UK industrial strategy. A world class transport system linking towns and cities across the North will create a unified economic area, attracting new business, improving productivity in the North and thereby rebalancing the UK economy. 2.2 There has been long term underperformance of the Northern economy when compared with other parts of the UK. There is a significant economic performance gap between the North and the rest of the UK economy – a difference in income of £4,800 per person in 2014, compared with the national average, and £22,500 compared with London. Having been on a downward trend since the early 2000s, the gap has widened since the 2008/09 recession.
    [Show full text]
  • Summary of Government's Position
    House of Lords Economic Affairs Committee Inquiry: “Rethinking High Speed 2” Government Response 1. This document is provided by the Department for Transport on behalf of the Government in response to the House of Lords Economic Affairs Committee inquiry named “Rethinking High Speed 2”. 2. The Government welcomes the Committee’s thorough report and have organised our responses in the same sections as the Committee’s report. Summary of Government’s position 3. This section sets out the summary of the Government’s position and also provides the Government’s response to paragraphs 14 and 23 set out in the Committee’s summary of conclusions and recommendations. 4. The strategic case for High Speed 2 (HS2) is about increasing capacity and improving connections between major towns and cities, thereby boosting productivity and economic growth, and helping to make the North and Midlands more attractive business locations. It is an integral part of the Government’s plans to build a stronger, more balanced economy capable of delivering lasting growth and widely shared prosperity. HS2 will form the backbone of the nation’s future rail network; is required to deliver the emerging vision for Northern Powerhouse Rail developed with Transport for the North; and will be integrated with wider investments and enhancements in our rail network. 5. Parliament voted overwhelmingly in favour of HS2, with the Third Reading of the Phase One Act in February 2017 receiving 399 votes to 42 in the House of Commons. Since then, the Government and HS2 Ltd have made progress: • 9,000 jobs are supported by the project already, this is expected to rise to over 30,000 at peak construction.
    [Show full text]