Titan II GLV - Gemini Launch Vehicle

Total Page:16

File Type:pdf, Size:1020Kb

Titan II GLV - Gemini Launch Vehicle Reviews reviews Titan II GLV - Gemini Launch Vehicle New Ware both the rectangular and circu- 1:144 scale lar interstage blast ports – a very $45 prominent part of the Titan II. mek.kosmo.cz/newware All of these gaps are provided molded into the first stage. ew Ware models There is no need to mess with has released a suite photoetched parts, or fudge the of five 1:144 Titan II effect with decals or paint. Most missiles. Three model of the holes are flashed over to the production ICBM aid in the casting process and andN two reentry body tests, one will require only minor cleanup. with a satellite launch shroud The second stage is one piece, and, for manned spaceflight which includes the rest of the fans, a Gemini space capsule. interstage ring. This interstage Given my past experience with section is cast as hollow to New Ware kits, I snatched up make room for the second stage a Gemini version the second I engine. After the kit is assem- heard about it. bled, you might have to use a again, New Ware thoughtfully My kit contains 26 resin parts, flashlight and a hand mirror to provided a second set. The one piece of photoetched metal see the engine bell, but you will engine bells are hollow and and three small decal sheets. know it’s there. have delicate ring detail. Included are an extra first The twin–motored Titan II The Gemini capsule is another stage engine bell, a spare set engine is made up of seven fantastic piece of casting. Every of engines, and a spare engine parts. It will be challenge to tiny undulation is represented 12 frame. Also included is a set of clean the flash out of the finely- along the many facets of the four ullage motors that are not cast engine frame, but New command module. There are needed for the Gemini rocket Ware has provided an extra as details for the windows, maneu- (these are necessary for the a backup. The engines include vering and attitude control satellite launch version of this all major details including both thrusters, and even the drogue kit). All of the resin is perfectly discharge lines, starter, exhaust chute door on the nose. My only cast with no visible air bubbles and oil cooler. Care will be criticism of the kit is that there or any other blemishes. As these needed to separate the engines is no decal provided for the kits are hand made, I can’t say from the casting block, but black stripes that ran along the for sure that the extra parts will The 1:144 New be in every box. Ware Titan II GLV The main rocket body is in is a complete kit. three sections. The first stage With its excellent is in two pieces with remark- casting, full set ably fine detail for the scalloped of decals, and facets that run the length of the launch stand, body, external conduits, and there will be longerons. The bottom half no need to go accurately portrays the bottom sifting through fuel tank dome with supports the spares box or for the engine assembly, as well scratch-building as oxidizer and fuel suction missing detail. lines that will mate up with the two engines. The top section of the first stage includes the top dome of the oxidizer tank. In a brilliant piece of casting, New Ware accurately models 12 ipms/usa journal • july + august 2013 The second stage combines a recessed interstage which makes room for the engine nozzle (left). The two-part first sage has built-in blast port holes (center), fuel tank and engine mounts (right). length of the service module. sheet includes the painting kit. It is easily the best Titan II However, these can be sourced and decal placement guide on GLV on the market. The kit is from Xtradecal’s XPS1 black one-to-one profile and unrolled expertly conceived and exe- stripes or a similar set. views. Two enlarged scrap views cuted. The attention to details The three small decal sheets show painting and decal place- that could have easily been provide stencils for all 10 ment for the Gemini capsule. ignored or minimized makes Gemini launches. The sheet But wait, there’s more! New this kit a winner. The included contains two each of a United Ware has included a four-piece launch platform is a real plus. States flag and “United States” launch platform for the Titian II. Unlike so many “garage” kits, stenciling that will go on the This is a tremendous improve- your heart won’t shrivel and Gemini capsule. ment over drilling a hole sputter upon opening the box. The instructions for the kit through the center nozzle and In fact, it might grow three sizes are professionally drawn, well shoving a brass rod into the mis- that day. New Ware already detailed and include a brief his- sile body to prop up the model. makes nice Mercury-Redstone 13 tory on the booster and its use Of course, with its side-by-side and Mercury-Atlas kits – easily with the Gemini program. All twin engines, the Titan II lacks a the best in their class. Should parts placement is clear, with convenient place to drill such a I hold my breath for a three- no arrows vaguely pointing in hole. Problem solved! foot 1:144 New Ware Saturn V? the direction of where the part Real space fans will be Perhaps not. should be glued. The engine delighted with New Ware’s new assembly alone is shown is nine wares. Their Titian II Gemini – John Heck enlarged scrap views. A second launch vehicle is a first rate IPMS # 42855 Surface detail of the missile body and the minute corrugations on the Gemini capsule are crisp and subtle. ipms/usa journal • july + august 2013 13.
Recommended publications
  • Space Administration
    https://ntrs.nasa.gov/search.jsp?R=19700024651 2020-03-23T18:20:34+00:00Z TO THE CONGRESSOF THE UNITEDSTATES : Transmitted herewith is the Twenty-first Semiannual Repol* of the National Aeronautics and Space Administration. Twen~-first SEMIANNUAL REPORT TO CONGRESS JANUARY 1 - JUNE 30, 1969 NATIONAL AERONAUTICS AND SPACE ADMINISTRATION WASHINGTON, D. C. 20546 Editors: G. B. DeGennaro, H. H. Milton, W. E. Boardman, Office of Public Affairs; Art work: A. Jordan, T. L. Lindsey, Office of Organiza- tion and Management. For sale by the Superintendent of Documents, U.S. Government Printing Office Washington, D.C. 20402-Price $1.25 THE PRESIDENT May 27,1970 The White House I submit this Twenty-First Semiannual Report of the National Aeronautics and Space Aldministration to you for transmitttal to Congress in accordance with section 206(a) of the National Aero- nautics and Space Act of 1958. It reports on aotivities which took place betiween January 1 and June 30, 1969. During this time, the Nation's space program moved forward on schedule. ApolIo 9 and 10 demonstrated the ability of ;the man- ned Lunar Module to operate in earth and lunar orbit and its 'eadi- ness to attempt the lunar landing. Unmanned observatory and ex- plorer class satellites carried on scientific studies of the regions surrounding the Earth, the Moon, and the Sun; a Biosatellite oarwing complex biological science experiment was orbited; and sophisticated weather satellites and advanced commercial com- munications spacecraft became operational. Advanced research projects expanded knowledge of space flighk and spacecraft engi- neering as well as of aeronautics.
    [Show full text]
  • Progress Report on Apollo Program
    PROGRESS REPORT ON APOLLO PROGRAM Michael Collins, LCol. USAF (M) Astronaut NASA-MANNED SPACECRAFT CENTER It is a great pleasure to be here today and to greet you hardy suMvors of the pool party. I will do my best to avoid loud noises and bright colors during my status report. Since the last SETP Symposium, the Apollo Program has been quite busy in a number of different areas. (Figure 1) My problem is to sift through this information and to talk only about those things of most interest to you. First, to review briefly our hardware, we are talking about two different spacecraft and two different boosters. (Figure 2) The Command Module is that part of the stack COLLINS which makes the complete round trip to the moon. Attached to it is the Service Module, containing expendables and a 20,000 pound thrust engine for maneuverability. The Lunar Module will be carried on later flights and is the landing vehicle and active rendezvous partner. The uprated Saturn I can put the Command and Service Modules into earth orbit; the Saturn V is required when the Lunar Module is added. Since the last symposium, we have flown the Command and Service Modules twice and the Lunar Module once, all unmanned. Apollo 4, the first Saturn V flight, was launched in November 1967. (Figure 3) The Saturn V did a beautiful, i.e. nominal, job of putting the spacecraft into earth parking orbit. After a coast period, the third stage (S-IVB by McDonnell Douglas) was ignited a second time, achieving a highly elliptical orbit.
    [Show full text]
  • L AUNCH SYSTEMS Databk7 Collected.Book Page 18 Monday, September 14, 2009 2:53 PM Databk7 Collected.Book Page 19 Monday, September 14, 2009 2:53 PM
    databk7_collected.book Page 17 Monday, September 14, 2009 2:53 PM CHAPTER TWO L AUNCH SYSTEMS databk7_collected.book Page 18 Monday, September 14, 2009 2:53 PM databk7_collected.book Page 19 Monday, September 14, 2009 2:53 PM CHAPTER TWO L AUNCH SYSTEMS Introduction Launch systems provide access to space, necessary for the majority of NASA’s activities. During the decade from 1989–1998, NASA used two types of launch systems, one consisting of several families of expendable launch vehicles (ELV) and the second consisting of the world’s only partially reusable launch system—the Space Shuttle. A significant challenge NASA faced during the decade was the development of technologies needed to design and implement a new reusable launch system that would prove less expensive than the Shuttle. Although some attempts seemed promising, none succeeded. This chapter addresses most subjects relating to access to space and space transportation. It discusses and describes ELVs, the Space Shuttle in its launch vehicle function, and NASA’s attempts to develop new launch systems. Tables relating to each launch vehicle’s characteristics are included. The other functions of the Space Shuttle—as a scientific laboratory, staging area for repair missions, and a prime element of the Space Station program—are discussed in the next chapter, Human Spaceflight. This chapter also provides a brief review of launch systems in the past decade, an overview of policy relating to launch systems, a summary of the management of NASA’s launch systems programs, and tables of funding data. The Last Decade Reviewed (1979–1988) From 1979 through 1988, NASA used families of ELVs that had seen service during the previous decade.
    [Show full text]
  • Atlas Launch System Mission Planner's Guide, Atlas V Addendum
    ATLAS Atlas Launch System Mission Planner’s Guide, Atlas V Addendum FOREWORD This Atlas V Addendum supplements the current version of the Atlas Launch System Mission Plan- ner’s Guide (AMPG) and presents the initial vehicle capabilities for the newly available Atlas V launch system. Atlas V’s multiple vehicle configurations and performance levels can provide the optimum match for a range of customer requirements at the lowest cost. The performance data are presented in sufficient detail for preliminary assessment of the Atlas V vehicle family for your missions. This guide, in combination with the AMPG, includes essential technical and programmatic data for preliminary mission planning and spacecraft design. Interface data are in sufficient detail to assess a first-order compatibility. This guide contains current information on Lockheed Martin’s plans for Atlas V launch services. It is subject to change as Atlas V development progresses, and will be revised peri- odically. Potential users of Atlas V launch service are encouraged to contact the offices listed below to obtain the latest technical and program status information for the Atlas V development. For technical and business development inquiries, contact: COMMERCIAL BUSINESS U.S. GOVERNMENT INQUIRIES BUSINESS INQUIRIES Telephone: (691) 645-6400 Telephone: (303) 977-5250 Fax: (619) 645-6500 Fax: (303) 971-2472 Postal Address: Postal Address: International Launch Services, Inc. Commercial Launch Services, Inc. P.O. Box 124670 P.O. Box 179 San Diego, CA 92112-4670 Denver, CO 80201 Street Address: Street Address: International Launch Services, Inc. Commercial Launch Services, Inc. 101 West Broadway P.O. Box 179 Suite 2000 MS DC1400 San Diego, CA 92101 12999 Deer Creek Canyon Road Littleton, CO 80127-5146 A current version of this document can be found, in electronic form, on the Internet at: http://www.ilslaunch.com ii ATLAS LAUNCH SYSTEM MISSION PLANNER’S GUIDE ATLAS V ADDENDUM (AVMPG) REVISIONS Revision Date Rev No.
    [Show full text]
  • Centaur D-1A Pamphlet (1973)
    • l:Intf.LN3~ UO!S!A!O 9:JedsoJ8t/ J!eAUOJ ''o'l:I3N3~ S:::ml\l'o'NAC ... ) Imagination has been the hallmark of the Cen­ taur program since its inception. Centaur was the vehicle selected to satisfy man's quest for knowledge in space. Already it has sent Survey­ or to probe the moon's surface. Mariner to chart the planet Mars, the Orbiti ng Astronomical Observatory to scan the stars without inter­ ference from the earth's atmosphere, and Pioneer to Jupiter and beyond. Centaur will also be called upon to launch other spacecraft to continue to unlock the secrets of the planets, such as Mariner for Venus and Mercury in 1973, Viking Orbiter/Lander spacecraft to Mars in 1975, and advanced Mariners to Jupiter and Saturn in 1977. Centaur has not only flown scientific missions but also ones with application for solving more tangible problems, such as Applications Tech­ nology Satellites and the Intelsat communica­ tions satellite. Centaur has also been chosen to deliver domestic and military communication satellites to synchronous orbit beginning in 1975. Because man's curiosity will never be satisfied, Convair Aerospace stands ready to respond to the challenges of tomorrow with the same imag­ inative design and quality craftsmanship embod­ ied in Centaur. K. E. Newton Vice President & Program Director Launch Vehicle Programs CONTENTS INTRODUCTION Introduction A little over a decade ago, Centaur began the first evolutionary steps from conventional Centaur Structure and Major Systems 3 Structure 4 rocketry to the high-energy-fueled vehicles of Propulsion 5 oxygen/hydrogen. Centaur faced numerous Reaction Control 6 problems, many of them demanding solutions Guidance 7 beyond the then current state of the art.
    [Show full text]
  • Launch Options for the Future: a Buyer's Guide (Part 7 Of
    — Chapter 3 Enhanced Baseline CONTENTS , Page Improving the Shuttle . 27 Advanced Solid Rocket Motors (ASRMs) . 27 Liquid Rocket Boosters (LRBs) . 28 Lighter Tanks . 29 Improving Shuttle Ground Operations . 29 Improving Existing ELVs . 29 Delta . 30 Atlas-Centaur . ● ● . .* . 30 Titan . ● . ✎ ✎ . 30 Capability . ✎ . ✎ ✎ . ● ✎ ✎ . 30 Table 3-1. Theoretical Lift Capability of Enhanced U.S. Launch Systems. 31 Chapter 3 Enhanced Baseline The ENHANCED BASELINE option is the U.S. Government’s “Best Buy” if . it desires a space program with current or slightly greater levels of activity. By making in- cremental improvements to existing launch vehicles, production and launch facilities, the U.S. could increase its launch capacity to about 1.4 million pounds per year to LEO. The investment required would be low compared to building new vehicles; however, the ade- quacy of the resulting fleet resiliency and dependability is uncertain. This option would not provide the low launch costs (e.g. 10 percent of current costs) sought for SDI deploy- ment or an aggressive civilian space initiative, like a piloted mission to Mars, IMPROVING THE SHUTTLE The Shuttle, though a remarkable tech- . reducing the number of factory joints and nological achievement, never achieved its in- the number of parts, tended payload capacity and recent safety . designing the ASRMs so that the Space modifications have further degraded its per- Shuttle Main Engines no longer need to formance by approximately 4,800 pounds. be throttled during the region of maxi- Advanced Solid Rocket Motors (ASRMs) or mum dynamic pressure, Liquid Rocket Boosters (LRBs) have the potential to restore some of this perfor- ● replacing asbestos-bearing materials, mance; studies on both are underway.
    [Show full text]
  • The Evolving Launch Vehicle Market Supply and the Effect on Future NASA Missions
    Presented at the 2007 ISPA/SCEA Joint Annual International Conference and Workshop - www.iceaaonline.com The Evolving Launch Vehicle Market Supply and the Effect on Future NASA Missions Presented at the 2007 ISPA/SCEA Joint International Conference & Workshop June 12-15, New Orleans, LA Bob Bitten, Debra Emmons, Claude Freaner 1 Presented at the 2007 ISPA/SCEA Joint Annual International Conference and Workshop - www.iceaaonline.com Abstract • The upcoming retirement of the Delta II family of launch vehicles leaves a performance gap between small expendable launch vehicles, such as the Pegasus and Taurus, and large vehicles, such as the Delta IV and Atlas V families • This performance gap may lead to a variety of progressions including – large satellites that utilize the full capability of the larger launch vehicles, – medium size satellites that would require dual manifesting on the larger vehicles or – smaller satellites missions that would require a large number of smaller launch vehicles • This paper offers some comparative costs of co-manifesting single- instrument missions on a Delta IV/Atlas V, versus placing several instruments on a larger bus and using a Delta IV/Atlas V, as well as considering smaller, single instrument missions launched on a Minotaur or Taurus • This paper presents the results of a parametric study investigating the cost- effectiveness of different alternatives and their effect on future NASA missions that fall into the Small Explorer (SMEX), Medium Explorer (MIDEX), Earth System Science Pathfinder (ESSP), Discovery,
    [Show full text]
  • A Tool for Preliminary Design of Rockets Aerospace Engineering
    A Tool for Preliminary Design of Rockets Diogo Marques Gaspar Thesis to obtain the Master of Science Degree in Aerospace Engineering Supervisor : Professor Paulo Jorge Soares Gil Examination Committee Chairperson: Professor Fernando José Parracho Lau Supervisor: Professor Paulo Jorge Soares Gil Members of the Committee: Professor João Manuel Gonçalves de Sousa Oliveira July 2014 ii Dedicated to my Mother iii iv Acknowledgments To my supervisor Professor Paulo Gil for the opportunity to work on this interesting subject and for all his support and patience. To my family, in particular to my parents and brothers for all the support and affection since ever. To my friends: from IST for all the companionship in all this years and from Coimbra for the fellowship since I remember. To my teammates for all the victories and good moments. v vi Resumo A unica´ forma que a humanidade ate´ agora conseguiu encontrar para explorar o espac¸o e´ atraves´ do uso de rockets, vulgarmente conhecidos como foguetoes,˜ responsaveis´ por transportar cargas da Terra para o Espac¸o. O principal objectivo no design de rockets e´ diminuir o peso na descolagem e maximizar o payload ratio i.e. aumentar a capacidade de carga util´ ao seu alcance. A latitude e o local de lanc¸amento, a orbita´ desejada, as caracter´ısticas de propulsao˜ e estruturais sao˜ constrangimentos ao projecto do foguetao.˜ As trajectorias´ dos foguetoes˜ estao˜ permanentemente a ser optimizadas, devido a necessidade de aumento da carga util´ transportada e reduc¸ao˜ do combust´ıvel consumido. E´ um processo utilizado nas fases iniciais do design de uma missao,˜ que afecta partes cruciais do planeamento, desde a concepc¸ao˜ do ve´ıculo ate´ aos seus objectivos globais.
    [Show full text]
  • TABLE of CONTENTS SECTION PAGE Executive Summary 02
    TABLE OF CONTENTS SECTION PAGE Executive Summary 02 Acronym Listing 04 I. Authority and Purpose 05 II. Summary of Facts 06 III. Statement of Opinion 19 IV. Index of Tabs 26 LIST OF FIGURES FIGURE TITLE PAGE 1. Titan IV B 07 2. Centaur Upper Stage 07 3. Milstar Satellite 08 4. Intended vs. Actual Orbit 10 5. Software Process Flow Diagram 13 6. Pitch, Roll, & Yaw Errors 16 7. Titan IV B/Centaur Configuration 25 EXECUTIVE SUMMARY On 30 April 1999, at 12:30 hours EDT, a Lockheed Martin Astronautics Titan IV B configuration vehicle (Titan IV B-32), with a Titan Centaur upper stage (TC-14), launched from Space Launch Complex 40, at Cape Canaveral Air Station, Florida. The mission was to place a Milstar satellite in geosynchronous orbit. The flight performance of the Titan solid rocket motor upgrades and core vehicle was nominal. The Centaur separated from the Titan IV B approximately nine minutes and twelve seconds after lift-off. The vehicle began experiencing instability about the roll axis during the first burn. That instability was greatly magnified during Centaur’s second main engine burn, coupling each time into yaw and pitch, and resulting in uncontrolled vehicle tumbling. The Centaur attempted to compensate for those attitude errors by using its Reaction Control System, which ultimately depleted available propellant during the transfer orbit coast phase. The third engine burn terminated early due to the tumbling vehicle motion. As a result of the anomalous events, the Milstar satellite was placed in a low elliptical final orbit, as opposed to the intended geosynchronous orbit.
    [Show full text]
  • N AS a Facts
    National Aeronautics and Space Administration NASA’s Launch Services Program he Launch Services Program (LSP) manufacturing, launch operations and rockets for launching Earth-orbit and Twas established at Kennedy Space countdown management, and providing interplanetary missions. Center for NASA’s acquisition and added quality and mission assurance in In September 2010, NASA’s Launch program management of expendable lieu of the requirement for the launch Services (NLS) contract was extended launch vehicle (ELV) missions. A skillful service provider to obtain a commercial by the agency for 10 years, through NASA/contractor team is in place to launch license. 2020, with the award of four indefinite meet the mission of the Launch Ser- Primary launch sites are Cape Canav- delivery/indefinite quantity contracts. The vices Program, which exists to provide eral Air Force Station (CCAFS) in Florida, expendable launch vehicles that NASA leadership, expertise and cost-effective and Vandenberg Air Force Base (VAFB) has available for its science, Earth-orbit services in the commercial arena to in California. and interplanetary missions are United satisfy agencywide space transporta- Other launch locations are NASA’s Launch Alliance’s (ULA) Atlas V and tion requirements and maximize the Wallops Flight Facility in Virginia, the Delta II, Space X’s Falcon 1 and 9, opportunity for mission success. Kwajalein Atoll in the South Pacific’s Orbital Sciences Corp.’s Pegasus and facts The principal objectives of the LSP Republic of the Marshall Islands, and Taurus XL, and Lockheed Martin Space are to provide safe, reliable, cost-effec- Kodiak Island in Alaska. Systems Co.’s Athena I and II.
    [Show full text]
  • Mission Task Checklist
    MISSION TASK CHECKLIST Entryway Discovery (page 2) Astronaut Encounter (page 3) Astronaut Autograph (page 3) Where in the World? (page 4) Mission Patch (page 5) Wild Neighbors (page 6) NASA Speak (page 7) Journey To Mars: Explorers Wanted (page 7) The Orion spacecraft is the Science On A Sphere (page 8) crew vehicle NASA is Move the Galaxy (page 8) currently developing for future deep-space missions. Mapping Survey (page 9) Crew Conference (page 10) Shuttle Launch Experience (page 15) EXPEDITION Bus Tour (page16) Touch the Moon (page16) LOGBOOK Energy for the Future (page 11-12) From Sketchpad to Launchpad (page 13) Team Name: ______________________________ ISS Live! (page 14) Rocket Garden Rap (page 17) Commander (teacher): ______________________ Rocket Search (page 18) Pilot (chaperone): __________________________ Mission Specialist 1 (MS1): ________________________ For more cool information and activities, visit www.nasa.gov and click on the “For Students” tab! Mission Specialist 2 (MS2): ________________________ Mission Specialist 3 (MS3): ________________________ Mission Specialist 4 (MS4): ________________________ MISSION TASK: Rocket Search LOCATION: Rocket Garden Expedition 321 YOU ARE GO FOR LAUNCH The rockets on display here are real, space worthy rockets left over from the early days of space exploration. Unlike the space shuttle, they are all “expendable” rockets, which means they were designed to be used only once. Some of these were Welcome the Kennedy Space Center Visitor Complex, the only place surplus, while others were designed for missions that were later canceled. on Earth where human beings have left the planet, traveled to Find the following items in the Rocket Garden and in the Word Search puzzle.
    [Show full text]
  • THE EARLY APOLLO PROGRAM Project Apollo Was an American Space Project Which Landed People on the Moon and Brought Them Safely Back to Earth
    AIAA AEROSPACE M ICRO-LESSON Easily digestible Aerospace Principles revealed for K-12 Students and Educators. These lessons will be sent on a bi-weekly basis and allow grade-level focused learning. - AIAA STEM K-12 Committee. THE EARLY APOLLO PROGRAM Project Apollo was an American space project which landed people on the Moon and brought them safely back to Earth. Most people know about Apollo 1, in which three astronauts lost their lives in a fire during a countdown rehearsal, and about Apollo 8, which flew to the Moon, orbited around it, and returned to Earth. Just about everybody knows about Apollo 11, which first landed astronauts on the Moon. But what happened in between these missions? This lesson explores the lesser-known but still essential building blocks of the later missions’ success. Next Generation Science Standards (NGSS): ● Discipline: Engineering Design ● Crosscutting Concept: Systems and System Models ● Science & Engineering Practice: Constructing Explanations and Designing Solutions GRADES K-2 K-2-ETS1-1. Ask questions, make observations, and gather information about a situation people want to change to define a simple problem that can be solved through the development of a new or improved object or tool. NASA engineers knew that Apollo astronauts would need special training to succeed in their missions to the moon, but how could they train under conditions similar to those the crew would encounter? One answer was to send them to places with barren areas and volcanic features that were like what they expected to find on the lunar surface. The astronauts received geology training as well as practicing maneuvers in their spacesuits and driving a replica of the GRADES K-2 (CONTINUED) lunar rover vehicle.
    [Show full text]