A420 Botley Road

Total Page:16

File Type:pdf, Size:1020Kb

A420 Botley Road KEY: PLAN 2 New or improved facility Existing facility to be removed New bus lane Proposed on-carriageway cycle route (Mandatory / Advisory) (new or improved existing) AHEAD Proposed off-carriageway segregated ONLY BUS LANE cycle route (new or improved existing) New raised junction entry Proposed off-carriageway un-segregated treatment 58.53 LEFT cycle route (new or improved existing) railings 1.1mh ONLY railings 1.1mh AHEAD BINSEY LN ONLY New raised A420 BUS A34 LANE 58.95 junction entry OSNEY DITCH 58.97 BOTLEY RD KEEP treatment CLEAR KEEP 3 4 5 WEST WAY SOUTHERN BY-PASS 6 CLEAR 59.16 RAILWAY LINE 7 RIVER THAMES 2 railings 0.6mh 59.29 59.32 railings 0.6mh EYNSHAM RD 1 SEACOURT STREAM OSNEY STREAM BULSTAKE STREAM LAMARSH RD 59.49 railings 0.6mh 59.52 railings 0.6mh CUMNOR HILL FERRY HINKSEY RD vp KEY PLAN (showing Plan number) 59.75 59.79 railings 0.6mh 60.86 BUS 60.93 LANE railings 1.0mh 60.95 New section New raised 61.09 SLOW of bus lane junction entry New raised treatment 61.12 junction entry 61.16 ELMS ROAD 61.08 61.07 treatment railings 1.0mh 61.12 61.10 61.13 61.25 railings 1.0mh 61.25 0 10-10-19 First Issue SAC EA railings 1.0mh 61.20 61.21 Rev Date Description Drn Chk'd railings 1.0mh BUS WEST WAY railings 1.0mh New section 61.22 LANE Revisions of mandatory Drawing Originator KEEP cycle lane 61.01 60.92 CLEAR 60.87 61.36 61.11 vp 61.31 LOADING ONLY LOADING railings 1.0mh New section Working On Behalf Of 61.56 61.64 61.64 of mandatory 61.56 BUS LANE 61.75 railings 1.0mh 61.62 cycle lane 61.77 61.74 61.79 WESTMINSTER WAY 61.79 railings 1.0mh 61.91 New raised 61.81 Drawing Status SAP Code 61.84 railings 1.5mh railings 1.0mh 62.02 61.91 junction entry railings 1.5mh 61.90 Issued for Information BUS LANE treatment 61.94 railings 1.0mh Project Name KEEP Botley Road Corridor Improvements 61.99 62.01 railings 1.0mh Existing crossing 62.06 railings 1.5mh converted to Title Original drawing sheet is A3 62.10 62.14 railings 1.5mh staggered crossing railings 1.0mh Statutory Consultation Drawings (Sheet 2 of 5) LOADING ONLY LOADING ELMS PARADE Scale @A3 Drawn by Checked by Approved by 1:1000 SAC MCBC MCBC Drawn Date Checked Date Approved Date 10.10.19 24.10.19 24.10.19 © Crown copyright and database rights 2019 Ordnance Survey 100023343. You are permitted to use this Drawing Number Rev data solely to enable you to respond to, or interact with, the organisation that provided you with the data. You are not permitted to copy, sub-licence, distribute or sell any of this data to third parties in any form. 201760-SKA-HGN-BOT-DR-CH-0008-S2 P0 File location: P:\TZ0020_Oxfordshire\60.Schemes\201760 Botley Road Corridor Improvements\07 Drawings\05 Working Drgs\201760-SKA-HGN-BOT-DR-CH-0007 To 0011-S2 (Stat Consult Drawings).dwg Printed by: Carlisle, Stephen (IS).
Recommended publications
  • Screening Statement on the Determination of the Need for a Strategic Environmental Assessment
    Screening Statement on the determination of the need for a Strategic Environmental Assessment (SEA) in accordance with the Environmental Assessment of Plans and Programmes Regulations 2004 and European Directive 2001/42/EC for the North Hinksey Neighbourhood Development Plan 07/06/2018 SUMMARY In this screening opinion, Vale of White Horse District Council (the ‘Council’) determines that North Hinksey Neighbourhood Development Plan (North Hinksey NDP) does not require a Strategic Environmental Assessment (SEA) or Habitats Regulations Assessment (HRA) appropriate assessment. INTRODUCTION 1. North Hinksey Parish Council has requested that Vale of White Horse (VoWH) District Council ‘screen’ the North Hinksey Neighbourhood Plan, to determine whether there is a requirement for Strategic Environmental Assessment (SEA) and HRA appropriate assessment. This report presents the Council’s Screening Opinion. BACKGROUND 2. One of the basic conditions that a Neighbourhood Plan (NP) must be tested against is whether the making of the NP is compatible with European Union obligations, including requirements under the SEA Directive. The aim of the SEA Directive is: “to contribute to the integration of environmental considerations into the preparation and adoption of plans and programmes with a view to promoting sustainable development, by ensuring that an environmental assessment is carried out of certain plans and programmes which are likely to have significant effects on the environment.” 3. In order to decide whether a proposed NP is likely to have significant environmental effects, and hence requires SEA, it should be ‘screened’ at an early stage, i.e. once the plan remit and objectives have been formulated. 4. Screening is ‘Stage A’ in Government’s six stage approach to SEA for NPs.
    [Show full text]
  • Definitive Map of Public Rights of Way for Oxfordshire Relevant Date: 21St February 2006 Colour SHEET SP 50 NW
    Definitive Map of Public Rights of Way for Oxfordshire Relevant Date: 21st February 2006 Colour SHEET SP 50 NW 50 51 52 53 54 201/10 55 Bayswater Brook Pond 10 Church 10 Farm Parish Church of St Thomas of Canterbury Drain 201/9 201/9 Church Farm Cherwell River 201/12 Vicarage 7092 320/52 201/10 201/13 Cherwell Farm 201/11 0085 Pond Hill Farm 201/3 8784 Cottages Summertown House Woodstock Close Flats Hill Farm 2679 The Bungalow River Cherw Hill Farm Drew House Eaton Collects Court ell Hill Farm 6275 2276 Harris Court Drain Cherwell 294/9 Lodge Drain The Paddox Mulberry Court Drain MILL LANE Catholic Church Of St Gregory And West Grove St Augustine Manor View Avery Court Thamesdown Wood View 201/13 Bayswater Brook HawkswellHouse 201/11 Drain River Cherwell North Oxford Prep School for Boys Telephone Exchange Cavendish Court Pilgrims Oxford and Cranescourt Girls School Ma rtin Court NORTHERN BY-PASS ROAD Hobson Court Elsfield CP Church Hall Hawkswood PH Hill View Farm 1830 4331 6530 294/9 St Michaeland All Angels' Church 320/51 Field Barn Cottage 201/13 North Oxford 7124 Grove House Club Newcombe Court House Charles Ponsonby Dudley Court Woodstock Court Parkway House MILL LANE Summertown Prama River Cherwell House United Reformed Church Bradlands 2115 201/15 Garage MARSTON PARK WAY Manor House Northern House School and Clinic LODGE Robert Library Saunders CUMBERLEGE 294/1 House CLOSE Central Cumberlege Kitchen Oxfam House 294/14 CLOSE House Depot St Edward's School WomensService Royal Headquarters Voluntary Parmoor Court Summer Fields St
    [Show full text]
  • To Download the Oxford Flood Alleviation Scheme Document
    Non-technical Summary of the Environmental Statement March 2018 Prepared by CH2M on behalf of the Environment Agency Oxford Flood Alleviation Scheme Non-technical Summary of the Environmental Statement i Quality Assurance Project name Oxford Flood Alleviation Scheme Project 1B1S reference Date March 2018 Version number 2 Author Corinna Morgan Approvals Name Signature Title [complete using Date Version 497-10 as guidance] Stuart Hedgecott SH Principal 1 Environmental Scientist Phil Marsh PM Project Manager 22.02.18 1 2 EIA Quality Mark This Environmental Statement, and the Environmental Impact Assessment (EIA) carried out to identify the significant environmental effects of the proposed development, was undertaken in line with the EIA Quality Mark Commitments. The EIA Quality Mark is a voluntary scheme, operated by the Institute of Environmental Management and Assessment (IEMA), through which EIA activity is independently reviewed, on an annual basis, to ensure it delivers excellence in the following areas: EIA Management EIA Team Capabilities EIA Regulatory Compliance EIA Context & Influence EIA Content EIA Presentation Improving EIA practice To find out more about the EIA Quality Mark please visit: www.iema.net/qmark Oxford Flood Alleviation Scheme Non-technical Summary of the Environmental Statement ii Non-Technical Summary 1.1 Introduction 1.1.1 Background We, the Environment Agency, together with our local partners, are proposing a flood alleviation scheme (‘the Scheme’) to manage the flood risk to Oxford over the next 100 years. The Scheme will involve lowering parts of the floodplain to create a new channel for holding water, modifying existing rivers and streams, and building new flood walls and embankments in some areas (see Figure 1a and 1b).
    [Show full text]
  • Central Oxford
    Food & Drink Where to Stay Central Oxford dailyinfo.co.uk/venues/hotels D Going Out FARNDON R to Summertown, ring road (A34) to Summertown, ring road (M40) to Victoria Arms, Old Marston K Bath Place Hotel 4-5 Bath Place, Holywell St, OX1 3SU I6 D E F G H I & Marston Ferry Rd J L Historic, comfortable cottage-style rooms in the heart of Oxford. Simpkins Lee dailyinfo.co.uk/venues/restaurants Guest parking. 01865 791812 D Theatre RD AM R round W [email protected] www.bathplace.co.uk PTO for Summertown Map Y H s G alk Cinemas dailyinfo.co.uk/events/cinema OR ’ Cafe Loco The Old Palace, 85/87 St Aldate’s, OX1 1RA H9 UR N e RB e E B Arts venues Open all day, great setting. Find us opposite the Christ Church 24-26 George St, OX1 2AE T F b The Bocardo Hotel G6 R AN Rose & Crown Y n Curzon Cinema G8 e Meadow gates. Mon-Fri: 7.30am-6pm, Sat: 9am-6pm, Sun: 9.30am-6pm C A F Boutique hotel offering excellent accommodation in the heart of W z £ I Lady Margaret Hall New boutique cinema expected to open in Westgate Centre, autumn 2017. D E a Art Galleries 01865 200959 [email protected] B the city centre. 01865 591234 A European L L U M D Lazenbee’s www.goingloco.com RDKINGSTON R Studies dailyinfo.co.uk/events/exhibitions Odeon Cinemas (mainstream and blockbuster films) [email protected] www.thebocardo.co.uk N T O R BANBURY RD Pond L Centre B R Odeon, George St 0871 2244 007 G6 E (St Antony’s) D O D WOODSTOCK RD Oxford E Caffè Ethos off G10 Ethos Hotel and Caffè Ethos off G10 R H Cognitive & R Christ Church Picture Gallery Small charge I8 R T K Odeon, Magdalen St 0871 2244 007 G6 R R C see Ethos Hotel listing, under Where To Stay C O DE Violins Evolutionary O RI 59 and 60 Western Rd, Grandpont, OX1 4LF Latin N A D 300 paintings & 2000 drawings by Old Masters.
    [Show full text]
  • Plan 7 Binsey Lane
    BINSEY LN A420 A34 OSNEY DITCH BOTLEY RD BOTLEY ROAD IMPROVEMENTS - Phase 2 Pl. 3 Pl. 4 Pl. 2 Pl. 5 Pl. 6 Pl. 7 WEST WAY SOUTHERN BY-PASS RAILWAY LINE RIVER THAMES Pl. 1 EYNSHAM RD SEACOURT STREAM OSNEY STREAM LAMARSH RD Plan 7: Binsey Lane to Oxford Railway Station Bridge BULLSTAKE STREAM CUMNOR HILL FERRY HINKSEY RD STATION ENTRANCE KEY: PROPOSED LAYOUT Footway ABBEY ROAD HENRY ROAD HELEN ROAD Carriageway Existing narrow BINSEY LANE mandatory cycle Existing ROGER West Oxford DUDMAN WAY Island, Driveway or Area of lanes Existing pedestrian parking bays Community Centre CRIPLEY ROAD Hardstanding crossing to be Existing traffic lane and New bus Existing pedestrian Existing bus stop refurbished protected cycle lane lay-by crossing to be relocated west to Grass / Verge Area configuration to remain refurbished new lay-by BOTLEY ROAD Existing pedestrian OSNEY vp On-Carriageway Cycle crossing to be vp 58.80 58.05 Facility arch ht. BRIDGE57.96 57.08 KEEP refurbished CLEAR 56.92 57.18 57.21 RAILWAY tp 57.15 STOP BUS Narrow (min. 2m Off-Carriageway Cycle 57.59 57.76 spring ht. 57.40 57.37 55.23 57.37 arch ht. 57.26 57.43 bridge edge 57.78 57.27 57.59 57.27 wide) pedestrian Facility KEEP CLEAR sv sv sv 56.89 BOTLEY ROAD BUS STOP MILL STREET LOOK RIGHT platform 57.10 57.14 56.97 Area of Unsegregated LOOK LEFT LOOK LEFT LOOK Shared Use for Pedestrians LOOK RIGHT FRIDESWIDE BRIDGE STREET & Cyclists NORTH STREET BECKET STREET Traffic lane layout BRIDGE to be re-configured Widened footway Osney Bridge - review of Bus Lane Parking bay to St.
    [Show full text]
  • Unit 1A, Botley Road, Oxford, Ox2 0Hd
    UNIT 1A, BOTLEY ROAD, OXFORD, OX2 0HD FLOOD RISK ASSESSMENT Final Report v1.1 March 2021 Weetwood Services Ltd Suite C22 Joseph’s Well Hanover Walk Leeds LS3 1AB 0113 244 1377 [email protected] www.weetwood.net Unit 1A, Botley Road, Oxford, OX2 0HD Flood Risk Assessment Report Title Unit 1A, Botley Road, Oxford, OX2 0HD Flood Risk Assessment Final Report v1.1 Client Westminster Project Services Limited Date of issue 23 March 2021 Prepared by Kevin Tilford BSc MSc PhD MBA CWEM FCIWEM CEnv Managing Director Checked by: Keely Bonser BSc (Hons) MSc PhD Associate Director Approved by Kevin Tilford BSc MSc PhD MBA CWEM FCIWEM CEnv Managing Director This document has been prepared solely as a Flood Risk Assessment for Westminster Project Services Limited. This report is confidential to Westminster Project Services Limited and Weetwood Services Ltd accepts no responsibility or liability for any use that is made of this document other than by Westminster Project Services Limited for the purposes for which it was originally commissioned and prepared. ©Weetwood 5135/FRA/Final/v1.012021-03-23 www.weetwood.net i Unit 1A, Botley Road, Oxford, OX2 0HD Flood Risk Assessment Contents Signature Sheet i Contents ii List of Tables, Figures & Appendices iii 1 INTRODUCTION............................................................................................................................ 1 1.1 Purpose of Report ....................................................................................................................................................
    [Show full text]
  • City of Streams and Spires a Self Guided Walk Along Oxford’S Waterways
    City of streams and spires A self guided walk along Oxford’s waterways Folly Bridge and island © Webb Aviation www.webbaviation.co.uk Explore a fascinating network of rivers, streams and canals Discover how natural and manmade waterways have shaped the city Learn about the methods used to prevent flooding Find out how water has inspired Oxford’s industry, leisure and literature .discoveringbritain www .org ies of our land the stor scapes throug discovered h walks 2 Contents Introduction 4 Route overview 5 Practical information 6 Detailed route maps 8 Commentary 10 Credits 40 Further information 41 © The Royal Geographical Society with the Institute of British Geographers, London, 2012 Discovering Britain is a project of the Royal Geographical Society (with IBG) The digital and print maps used for Discovering Britain are licensed to the RGS-IBG from Ordnance Survey 3 City of streams and spires Explore Oxford’s fascinating network of waterways Introduction Did you know that the city of Oxford is built on a series of islands? This walk is an opportunity to explore an intricate network of waterways that are often overlooked by visitors to the city. Discover gushing mill streams and pic- turesque flood meadows, walk along an industrial canal and a working river, watch leisure boating and competitive rowing. Look for evidence in the names of neighbourhoods, streets, bridges and Pollarded trees at Rewley pubs giving clues to the watery history of Rory Walsh © RGS-IBG Discovering Britain this city. Discover why convicts from Oxford’s prison built many of Oxford’s canal, locks and other structures.
    [Show full text]
  • The Medieval Period (1205-1540)
    OXFORD ARCHAEOLOGICAL RESOURCE ASSESSMENT 2011 THE MEDIEVAL PERIOD (1205-1540) Compiled by Ruth Beckley and David Radford Version: 30/1/2012 ii Introduction ............................................................................................................... 4 Nature of evidence base.......................................................................................... 4 Notable standing structure surveys ......................................................................... 6 Notable excavations by theme ................................................................................ 6 Key themes.............................................................................................................. 7 The landscape ........................................................................................................... 9 Inheritance............................................................................................................... 9 Chronology (the development of the medieval city) ................................................ 9 Key characteristics of the landscape..................................................................... 10 Urban development................................................................................................. 14 Documentary evidence.......................................................................................... 14 The development of domestic and commercial town houses................................ 14 Archaeological evidence for the principal street
    [Show full text]
  • Groundwater and Flooding in Oxford
    INVESTIGATING THE INTERDEPENDENCIES BETWEEN SURFACE AND GROUNDWATER IN THE OXFORD AREA TO HELP PREDICT THE TIMING AND LOCATION OF GROUNDWATER FLOODING AND TO OPTIMISE FLOOD MITIGATION MEASURES David Macdonald, FGS British Geological Survey Robert Hall, MRICS Environment Agency (NCPMS) David Carden, CEng MICE Black & Veatch Andy Dixon Groundwater Monitoring and Drilling Ltd. Michael Cheetham, FGS British Geological Survey Sharon Cornick, MIEMA Environment Agency (NEAS) Matt Clegg Black & Veatch Key Words: Groundwater, flooding, Oxford Abstract In February 2002, the Environment Agency commenced a study to identify sustainable methods to reduce the flood risk in Oxford. Over 3,600 properties are within the floodplain of the Rivers Thames and Cherwell with a 1% (1 in 100) annual flood exceedance probability. During the early stages of the study, it was recognised that out-of-bank flows from the rivers was the most significant factor but that groundwater flooding could not be ignored. This paper addresses the output of a collaborative project that was set up between the Environment Agency and the British Geological Survey to address the groundwater issues and their impact on flooding. Groundwater level in the shallow gravel aquifer that underlies Oxford responds rapidly to both fluctuations in river level and rainfall. During periods of high rainfall and river level, it is often the emergence of groundwater that is the first sign of flooding for many of the residents. In addition, in recent times, a significant number of properties have suffered flooding from groundwater; fluvial flow was not a factor. Where the latter was significant, the preceding and subsequent high groundwater levels often prolonged the period of flooding.
    [Show full text]
  • 672 15 SD03 Business Case Template
    ENVIMSE500177 Oxford Flood Alleviation Scheme Outline Business Case Version No: 1.2 Date: 13/06/2017 Crown Copyright Version No: 1.2 Date: 13/06/2017 Author: Jane Birks, Richard Harding, Scott Lawrance, Emma Formoy and CH2M. 1 FINANCIAL SCHEME OF DELEGATION (FSoD) APPROVALS 1. Project name Oxford Flood Alleviation Scheme Project ref. Project Code ENVIMSE500177 Start date January 2014 Programme End date July 2027 Hub or Head South For FSOD use only Office Area name Thames FSoD reference Function FCRM FSoD Date 2. % time allocated to Role Name Post Title project Project Sponsor Julia Simpson Deputy Director - Thames 5% Project Director Joanna Larmour Project Director 80% Project Executive Richard Harding Project Executive 80% Project Manager Heather Taylor / Jane Birks Project Manager 100% 3. Risk Potential Assessment (RPA) Category Low Medium High 4. Delegation FSoD schedule Description National – up to Area – up to A1 Projects (includes FCRM revenue) £5m £5m A2 FCRM capital project within approved strategy £100m WLC Defra £10m A3 FCRM capital project outside of approved strategy £100m WLC Defra £5m A5 Consultancy project £500k £500k T2 Corporate Property Projects /acquisitions £5m £5m 5. FSoD value £k Form A FSoD reference F/1516/0122 4,164 Strategic Outline Case (SOC) FSoD reference N/A N/A Full Business Case (FBC) FSoD reference N/A N/A Whole Life Costs (WLC) of Project £286.92m Financial benefits (PV) £1,112.4m Non-financial benefits Yes 6. N/A Low Medium High Required level of Environmental Impact Assessment (EIA) 7. NPAS/LPRG chair Post title Assurance confirmation Date RED AMBER GREEN 8.
    [Show full text]
  • Oxford Flood Alleviation Scheme
    • Oxford Flood Alleviation Scheme Reducing flood risk Enabling a thriving economy Connecting people and the environment Consultation response report Spring 2016 2 Executive summary Introduction This report is a summary of the outcomes from our public consultation, held between 19 January and 1 March 2016, to obtain public views about route options for the Oxford Flood Alleviation Scheme. We ran the consultation online for 6 weeks, within which time we also held 5 public events where we displayed information on the scheme, route options and other subjects such as potential environmental and recreational benefits, funding and maintenance. We ran the consultation online to make it more accessible to a wider and more diverse audience, and held the events in the areas affected by flooding or close to the possible route for the scheme. This included one event held in an active community downstream of the scheme where we knew there was significant interest. We also held meetings with landowners, tenants and interest groups along the possible routes. 876 people visited the drop-in events with 78% telling us the events were useful or very useful. We received over 300 written responses to the consultation from people who attended one of our events or who completed the online consultation. Each submission has been published online and can be read in full at: https://consult.environment-agency.gov.uk/file/3846008 and https://consult.environment-agency.gov.uk/file/3876413 This document outlines how we ran the consultation and summarises the responses. We have also analysed the outcomes, identified the key themes that were expressed and provided our response to these.
    [Show full text]
  • River Thames
    River Thames The River Thames (pronounced /ˈtɛmz/ ( listen) temz) is a major river flowing through southern England. While it is best known because its lower reaches flow through central London, the river flows alongside several other towns and cities, including Oxford, Reading, Henley-on-Thames, Windsor, Kingston Upon Thames and Richmond. The river gives its name to several geographical and political entities including the Thames Valley, a region of England centred around the river between Oxford and west London, the Thames Gateway, the area centred around the tidal Thames, and the Thames Estuary to the east of London. Summary The Thames is the second longest river in the United Kingdom and the longest river entirely in England. It rises at Thames Head in Gloucestershire, and flows into the North Sea at the Thames Estuary. It has a special significance in flowing through London, the capital of the United Kingdom, although London only includes a short part of its course. The river is tidal in London with a rise and fall of 7 metres (23 ft); tides reaching up to Teddington Lock. The catchment area covers a large part of South Eastern and Western England and the river is fed by over 20 tributaries. The river contains over 80 islands, and having both seawater and freshwater stretches, it supports a variety of wildlife. The river has supported human activity from its source to its mouth for thousands of years providing habitation, water power, food and drink. It has also acted as a major highway through the Port of London for international trade, internally along its length and by its connection to the British canal system.
    [Show full text]