Beni-Darbang Road Sub-Project

Total Page:16

File Type:pdf, Size:1020Kb

Beni-Darbang Road Sub-Project Initial Environmental Examination (IEE) of Beni-Darbang Road Sub-project Beni-Darbang Road in Myagdi District Submitted to: Ministry of Local Development Government of Nepal Submitted by: District Development Committee Myagdi, Beni July /2007 TABLE OF CONTENTS ABBREVIATIONS ................................................................................................................................ I EXECUTIVE SUMMARY (NEPALI)………………………………………………………………..II EXECUTIVE SUMMARY (ENGLISH) ........................................................................................... VI SALIENT FEATURES ......................................................................................................................... X Description Page 1.0 INTRODUCTION .................................................................................................................... 1 1.1 BACKGROUND ........................................................................................................................ 1 1.2 RELEVANCY OF THE PROPOSAL .............................................................................................. 1 1.3 NAME AND ADDRESS OF THE PROPONENT .............................................................................. 2 1.4 DESCRIPTION OF THE PROPOSAL ............................................................................................. 2 1.5 CONSTRUCTION APPROACH ................................................................................................... 5 1.6 OBJECTIVES ........................................................................................................................... 5 1.7 METHODOLOGY ADOPTED ...................................................................................................... 5 2.0 REVIEW OF RELEVANT ACTS, REGULATIONS AND GUIDELINES ....................... 9 3.0 EXISTING ENVIRONMENTAL CONDITION ................................................................. 13 3.1 PHYSICAL ENVIRONMENT .................................................................................................... 13 3.2 BIOLOGICAL ENVIRONMENT ................................................................................................ 14 3.3 SOCIO-ECONOMIC AND CULTURAL ENVIRONMENT .............................................................. 15 4.0 PROJECT ALTERNATIVES ............................................................................................... 20 4.1 NO ACTION OPTION .............................................................................................................. 20 4.2 PROPOSAL ALTERNATIVES ................................................................................................... 20 4.3 ALTERNATIVE DESIGN AND CONSTRUCTION APPROACH ..................................................... 20 4.4 ALTERNATIVE SCHEDULE AND PROCESS ............................................................................... 20 4.5 ALTERNATIVE RESOURCES .................................................................................................. 21 5.0 IDENTIFICATION AND ASSESSMENT OF IMPACTS ................................................. 22 5.1 BENEFICIAL IMPACTS ........................................................................................................... 22 5.2 ADVERSE IMPACTS ............................................................................................................... 24 6.0 MITIGATION MEASURES ................................................................................................. 28 6.1 MITIGATION MEASURES DURING PRE-CONSTRUCTION PHASE ............................................. 28 6.2 BENEFIT AUGMENTATION MEASURES .................................................................................. 28 6.3 ADVERSE IMPACTS MITIGATION MEASURES ........................................................................ 30 7.0 ENVIRONMENTAL MANAGEMENT PLAN ................................................................... 34 7.1 INSTITUTIONS AND THEIR ROLES .......................................................................................... 34 7.2 REPORTING AND DOCUMENTATION ...................................................................................... 35 7.3 ENVIRONMENTAL MANAGEMENT PLAN ............................................................................... 36 7.4 MITIGATION COST ................................................................................................................ 38 7.5 IMPLEMENTATION OF MITIGATION MEASURES .................................................................... 39 7.6 ENVIRONMENTAL MONITORING ........................................................................................... 40 8.0 CONCLUSION AND RECOMMENDATIONS ................................................................. 44 9.0 MISCELLANEOUS ............................................................................................................... 45 Beni-Darbang Road, Myagdi Initial Environmental Examination (IEE) Tables Page TABLE 1.1 PROJECT ACTIVITIES OF THE PROPOSED BENI-DARBANG ROAD SECTION ............................ 3 TABLE 3.1 TOPOGRAPHY, GEOLOGY AND SOIL TYPE ALONG THE ROAD ............................................. 13 TABLE 3.2 SUMMARY OF STREAMS ALONG THE ROAD ALIGNMENT .................................................... 14 TABLE 3.3 SUMMARY OF LAND USE PATTERN ALONG THE ROAD ALIGNMENT .................................... 14 TABLE 3.4 COMMUNITY FOREST ALONG THE ROAD ALIGNMENT ........................................................ 15 TABLE 3.5 SETTLEMENTS AND POPULATION WITHIN THE ZOI OF ROAD ALIGNMENT ........................... 15 TABLE 5.1. EVALUATION OF IDENTIFIED ENVIRONMENTAL IMPACTS ................................................. 27 TABLE 7.1 FRAMEWORK OF IMPLEMENTING ENVIRONMENTAL MANAGEMENT PLAN........................ 36 TABLE 7.2. COST ESTIMATE FOR ENVIRONMENTAL ENHANCEMENT AND MITIGATION MEASURES .... 39 TABLE 7.3 ENVIRONMENTAL MONITORING COST .............................................................................. 41 TABLE 7.4 FRAMEWORK FOR MONITORING ENVIRONMENTAL ISSUES ............................................... 42 Figures Page FIGURE 1.1. MAP OF NEPAL SHOWING THE LOCATION OF BENI-DARBANG IN MYAGDI DISTRICT ......... 3 FIGURE 1.2. MAP SHOWING BENI-DARBANG ROAD IN MYAGDI DISTRICT .............................................. 4 FIGURE 1.3. MAP SHOWING BENI-DARBANG ROAD ALIGNMENT ............................................................ 4 FIGURE 7.1. ENVIRONMENTAL MANAGEMENT ORGANIZATION STRUCTURE ....................................... 36 ANNEXES Annex I Terms of Reference for IEE study Annex II Abstract of cost Annex III DRILP Environmental Checklist Annex IV Public notice Annex V Deed of enquiry (muchulka) Annex VI Name of the organizations Annex VII List of persons contacted Annex VIII Recommendation letters from Municipality and VDCs Annex IX a. Distribution of household by major occupation b. Summary of public services and infrastructures according to settlement c. Land holding pattern of settlements within ZoI d. Number of households belonging to different food security category Annex X List of tress Annex XI Minimization of slope cutting and preservation of vegetation cover Annex XII Photograph Beni-Darbang Road, Myagdi Initial Environmental Examination (IEE) ABBREVIATIONS ADB Asian Development Bank Ha Hectare AP Affected Person Hh Household BG Building Group IEE Initial Environmental Examination Ch Chainage Km Kilometer CBO Community Based Organization LDO Local Development Officer CDC Compensation Determination LEP Labour based, environment friendly Committee and participatory CEA Country Environmental Analysis LRMP Land Resource Management Project CF Community Forest M meter CFUG Community Forest Users Group MoPE Ministry of Population and CISC Central Implementation Support Environment Consultants MoEST Ministry of Environment, Science CITES Convention on International Trade and Technology in Endangered Species of Flora and Ml Milliliter Fauna MLD Ministry of Local Development DADO District Agriculture NGO Non-Governmental Organization Development Office NRs Nepali Rupees DDC District Development Committee NTFPs Non timber forest products DFO District Forest Office/Officer OP Operational Plan DG Director General PAM Project Administrative DISC District Implementation Support Memorandum Consultants PCU Project Coordination Unit DIT District Implementation Team RES Rapid Environmental Screening DoLIDAR Department of Local Infrastructure RIDP Rural Infrastructure Development Development and Agricultural Project Roads RP Resettlement Plan DPO District Project Office RS Resettlement Survey DRCC District Road Coordination SF Special Fund Committee SA Social Appraisal DSCO District Soil Conservation Office SDC Swiss Agency for Development and DTO District Technical Office Cooperation DRILP Decentralized Rural Infrastructure SM Social Mobilizer and Livelihood Project SMC Social Mobilization Coordinator DTMP District Transport Master Plan TA Technical Assistance EA Environmental Assistant/Assessment ToR Terms of Reference EAS Environmental Assessment TWS Technical Walkover Survey Specialist VDC Village Development Committee EIA Environmental Impact Assessment VWRCC Village Works and Road EMP Environmental Management Plan Construction Committee EMS Environmental Management ZoI Zone of Influence Section EPA Environmental Protection Act EPR Environmental Protection Rules ESD Environment Screening Document FGD Focus Group
Recommended publications
  • Rahughat Hydroelectricity Project Boosting Cross Border Electricity Trade in BBIN/M Region: Dialogue Leading to Actions, 19 Jan 2018, New Delhi
    A Case Study Rahughat Hydroelectricity Project Boosting Cross Border Electricity Trade in BBIN/M Region: Dialogue Leading to Actions, 19 Jan 2018, New Delhi Dikshya Singh Research Officer South Asia Watch on Trade, Economics and Environment BACKGROUND • Nepal's energy imports from India (2016- 17): 2,175.04GWh (22.35 pc growth) • Power Trade Agreement 2014 between Nepal and India not limited to trading of electricity, it specifically encourages investment between the two countries in power sector • Indian promoters hold 85 pc of total licenses issued • Three export-oriented projects in pipeline: 900 MW Arun III (PDA completed); 900 MW Upper Karnali; 600 MW Upper Marshyangdi II 2 Contd… • Objective: To assess the overall socio-economic benefits or costs accrued to the local community brought about by energy cooperation • Rationale for selecting Rahughat HEP Energy cooperation: debt financing Ex-ante study so project under construction necessary 3 SALIENT FEATURES OF THE PROJECT* Installed • 2x20 MW • Myagdi district, 300km from capacity Location Kathmandu; 100 km from Pokhara Airport Transmission • LILO of 220KV transmission line from Dana substation to Kusma at Line PH gantry 600m Affected • Myagdi district: Dangnam, Jhi, Rakhupiple, Patlekhet, Ghatan; VDCs Parbat district: Mallaj Majhphant Access road • 12.5 km • Galeshwor, Mauwaphant, Dagnam, Affected Bagaincha, Bukla, Goluk, settlements Dharkharka, Jhi, Bhirkuna and Project Cost • US$ 84 million Nepane villages Total annual Land • 29.39 hectare energy • 247.89 GWh acquired generation
    [Show full text]
  • Title Study on Landslide Dam Failure Due to Sliding and Overtopping
    Study on Landslide Dam Failure Due to Sliding and Title Overtopping( Dissertation_全文 ) Author(s) Awal, Ripendra Citation 京都大学 Issue Date 2008-09-24 URL https://doi.org/10.14989/doctor.k14136 Right Type Thesis or Dissertation Textversion author Kyoto University Study on Landslide Dam Failure Due to Sliding and Overtopping By Ripendra Awal 2008 Abstract Landslides and debris flows due to heavy rains or earthquakes may block a river flow and create landslide dam naturally. Formation and failure of landslide dam are one of the significant natural hazards in the mountainous area all over the world. Recent predictions of climate change suggest that many part of world will experience a higher frequency of extreme rainfall events and increase in the number and intensity of typhoons, cyclones and hurricanes will produce a rising danger of landslides in future. So, the formation and failure of landslide dams and flash flood events in mountains area will be also increased by global climate change. Landslide dam may cause inundation in the upstream area and potential dam failure may cause downstream flooding. The comparisons of peak discharge for some events of natural dam failure in Nepal indicate that the peak discharge may be many times greater than that triggered by any normal rainfall. Since the failure of landslide dam may be catastrophic to downstream area, the resulting outflow hydrograph has to be predicted in order to determine possible inundation area and other hazards. Prediction of outflow hydrograph plays a vital role in both structural and non-structural countermeasures including evacuation to cope with landslide dam failure.
    [Show full text]
  • European Bulletin of Himalayan Research 27: 67-125 (2004)
    Realities and Images of Nepal’s Maoists after the Attack on Beni1 Kiyoko Ogura 1. The background to Maoist military attacks on district head- quarters “Political power grows out of the barrel of a gun” – Mao Tse-Tung’s slogan grabs the reader’s attention at the top of its website.2 As the slogan indicates, the Communist Party of Nepal (Maoist) has been giving priority to strengthening and expanding its armed front since they started the People’s War on 13 February 1996. When they launched the People’s War by attacking some police posts in remote areas, they held only home-made guns and khukuris in their hands. Today they are equipped with more modern weapons such as AK-47s, 81-mm mortars, and LMGs (Light Machine Guns) purchased from abroad or looted from the security forces. The Maoists now are not merely strengthening their military actions, such as ambushing and raiding the security forces, but also murdering their political “enemies” and abducting civilians, using their guns to force them to participate in their political programmes. 1.1. The initial stages of the People’s War The Maoists developed their army step by step from 1996. The following paragraph outlines how they developed their army during the initial period of three years on the basis of an interview with a Central Committee member of the CPN (Maoist), who was in charge of Rolpa, Rukum, and Jajarkot districts (the Maoists’ base area since the beginning). It was given to Li Onesto, an American journalist from the Revolutionary Worker, in 1999 (Onesto 1999b).
    [Show full text]
  • ZSL National Red List of Nepal's Birds Volume 5
    The Status of Nepal's Birds: The National Red List Series Volume 5 Published by: The Zoological Society of London, Regent’s Park, London, NW1 4RY, UK Copyright: ©Zoological Society of London and Contributors 2016. All Rights reserved. The use and reproduction of any part of this publication is welcomed for non-commercial purposes only, provided that the source is acknowledged. ISBN: 978-0-900881-75-6 Citation: Inskipp C., Baral H. S., Phuyal S., Bhatt T. R., Khatiwada M., Inskipp, T, Khatiwada A., Gurung S., Singh P. B., Murray L., Poudyal L. and Amin R. (2016) The status of Nepal's Birds: The national red list series. Zoological Society of London, UK. Keywords: Nepal, biodiversity, threatened species, conservation, birds, Red List. Front Cover Back Cover Otus bakkamoena Aceros nipalensis A pair of Collared Scops Owls; owls are A pair of Rufous-necked Hornbills; species highly threatened especially by persecution Hodgson first described for science Raj Man Singh / Brian Hodgson and sadly now extinct in Nepal. Raj Man Singh / Brian Hodgson The designation of geographical entities in this book, and the presentation of the material, do not imply the expression of any opinion whatsoever on the part of participating organizations concerning the legal status of any country, territory, or area, or of its authorities, or concerning the delimitation of its frontiers or boundaries. The views expressed in this publication do not necessarily reflect those of any participating organizations. Notes on front and back cover design: The watercolours reproduced on the covers and within this book are taken from the notebooks of Brian Houghton Hodgson (1800-1894).
    [Show full text]
  • Gandaki Province
    2020 PROVINCIAL PROFILES GANDAKI PROVINCE Surveillance, Point of Entry Risk Communication and and Rapid Response Community Engagement Operations Support Laboratory Capacity and Logistics Infection Prevention and Control & Partner Clinical Management Coordination Government of Nepal Ministry of Health and Population Contents Surveillance, Point of Entry 3 and Rapid Response Laboratory Capacity 11 Infection Prevention and 19 Control & Clinical Management Risk Communication and Community Engagement 25 Operations Support 29 and Logistics Partner Coordination 35 PROVINCIAL PROFILES: BAGMATI PROVINCE 3 1 SURVEILLANCE, POINT OF ENTRY AND RAPID RESPONSE 4 PROVINCIAL PROFILES: GANDAKI PROVINCE SURVEILLANCE, POINT OF ENTRY AND RAPID RESPONSE COVID-19: How things stand in Nepal’s provinces and the epidemiological significance 1 of the coronavirus disease 1.1 BACKGROUND incidence/prevalence of the cases, both as aggregate reported numbers The provincial epidemiological profile and population denominations. In is meant to provide a snapshot of the addition, some insights over evolving COVID-19 situation in Nepal. The major patterns—such as changes in age at parameters in this profile narrative are risk and proportion of females in total depicted in accompanying graphics, cases—were also captured, as were which consist of panels of posters the trends of Test Positivity Rates and that highlight the case burden, trend, distribution of symptom production, as geographic distribution and person- well as cases with comorbidity. related risk factors. 1.4 MAJOR Information 1.2 METHODOLOGY OBSERVATIONS AND was The major data sets for the COVID-19 TRENDS supplemented situation updates have been Nepal had very few cases of by active CICT obtained from laboratories that laboratory-confirmed COVID-19 till teams and conduct PCR tests.
    [Show full text]
  • From Mustang to Gorakhpur: the Central Himalayan Desakota Corridor
    PART II F3 Case Study From Mustang to Gorakhpur: The Central Himalayan Desakota Corridor The report has four sections. The first section describes the general features of the study area and its socioeconomic base. The second section deals with the ecosystems and poverty along in the corridor. The third section discusses the ongoing desakota phenomenon. At the end of the report we present existing gaps in dealing with poverty and ecosystem services within climate change scenario in the desakota region and research questions. Regional Description The Mustang Gorakhapur corridor extends from the Tibetan Plateau to the Indo Gangetic plain of South Asia. The region varies in altitude of more than 7000 m to less than 100 m in a horizontal distance of less than 150 km. The corridor includes the western development region of Nepal and north Eastern Uttar Pradesh of India. It passes through major physiographic zones of South Asia: the trans Himalayan plateau, high Himalaya, the Midhills, the Chure, bhabar and the Tarai (map 1). The region is home of Annapurna and Dhaulagiri mountain ranges separated by the Kali Gandaki gorge. The Kali Gandaki River flows between the two ranges forming the deepest gorge in the world. About two thirds of the upper part of the corridor falls in Nepal while a third (the lower part) is in Uttar Pradesh. In Nepal, the corridor encompasses a total of fifteen districts. The lower part of the region is northern east Uttar Pradesh and its five districts. The characteristic of the corridor is presented in Table 1. Map 1: Mustang-Gorakhpur Corridor .
    [Show full text]
  • Open Defecation Free (ODF) Status of Magdi District of Nepal After Three Years of Declaration: a Cross-Sectional Study
    International Journal of Health Sciences and Research www.ijhsr.org ISSN: 2249-9571 Original Research Article Open Defecation Free (ODF) Status of Magdi District of Nepal after Three Years of Declaration: A Cross-Sectional Study Bal Kumari Pun Magar1*, Hari Prasad Kaphle2,3,*,#, Neena Gupta4# 1Public Health Scholar, 2Lecturer, 3PhD Scholar, 4Associate Professor, *School of Health and Allied Sciences, Pokhara University, Lekhnath-12, Kaski, Nepal. #Faculty of Health Sciences, Sam Higginbottom Institute of Agriculture, Technology and Sciences (Deemed-to be-University), Allahabad - 211007, UP, India. Corresponding Author: Hari Prasad Kaphle Received: 05/08/2016 Revised: 22/08/2016 Accepted: 23/08/2016 ABSTRACT Introduction: Lack of sanitation facilities is a serious health risk and obliges people to practice open defecation, thereby increasing the risk of disease transmission. The aim of this study was to assess the status of coverage, use, operation and maintenance of latrine of Myagdi district after three years of declaration of Open Defecation Free. Methods: A community based cross sectional descriptive study was conducted among 506 households in Myagdi districts. Information was collected through face to face interview by using semi structure interview schedule and observation of status of latrine carried by using observation checklist. Results: There was availability of latrine in most of the households (90.1%) out of which nearly two- third of the households had latrines that met criteria of sanitary latrine. Latrine used was observed in majority of the households and most (97.6%) of the family members washed their hands with soap water after defecation. Only 2% of the households were defecated openly.
    [Show full text]
  • Assessment of Drinking Water Quality at Myagdi District, Western Nepal
    Assessment of Drinking Water Quality at Myagdi District, Western Nepal Western Regional Research Grant Final Report Submitted by: Mr. Jagannath Aryal Mr. Nawraj Sapkota Ms. Bina Gautam Submitted to: Nepal Health Research Council Ram Shah Path, Kathmandu, Nepal July, 2010 Assessment of Drinking Water Quality at Myagdi District, Western Nepal Western Regional Research Grant Final Report Submitted by: Mr. Jagannath Aryal, Principal Investigator, Mr. Nawraj Sapkota, Co-Investigator and Ms. Bina Gautam, Co-Investigator Research Advisors Prof. Dr. Chop Lal Bhusal and Mr. Meghnath Dhimal Submitted to: Nepal Health Research Council Ram Shah Path, Kathmandu, Nepal July, 2010 ACKNOWLEDGEMENTS We express our sincere gratitude to Nepal Health Research Council (NHRC), Executive Board for providing us the opportunity of research grant on Assessment of Drinking Water Quality at Myagdi district, Western Nepal. We are thankful to Research Advisors Prof. Dr. Chop Lal Bhusal, Executive Chairman and Mr. Meghnath Dhimal, Environmental Health Research Officer, Nepal Health Research Council, for their continuous support and valuable suggestion during the study. We would like to express our gratitude thanks to Associate Prof. Surya Bahadur G.C, Principal, Mount Annapurna Campus, Phulbari, Pokhara for providing us laboratory facilities during entire research period. We would like to express our gratitude to Associate Prof. Dr Dwij Raj Bhatta, Head, Central Department of Microbiology for his continuous support to complete this research work in time. We are thankful to Associate Prof. Dr. Kedar Rijal, Head of Department and all faculty members, Central Department of Environment Science, Tribhuvan University, Kirtipur, for their technical support and valuable suggestions whenever it was needed.
    [Show full text]
  • Rapid Needs Assessment Was the Information Presented in This Report Was Done
    Follow-up Needs Assessment Report (1 month on) – Plan International Nepal Earthquake in Nepal 1. General information: Name and the nature of the disaster Earthquake 7.8 magnitude on 25th May and 7.3 magnitude earthquake on 12th May – Nepal Date/s on which the rapid needs assessment was The information presented in this report was done. taken from Plan assessments, the DDRC, other agencies assessments. Date on which the rapid needs assessment report is 25, 26, 27 and 28th of April 2015. being written. Additional information added 30th April 2015. Full name, job title, e-mail and phone number of the Lindsey Evans lindsey.evans@plan- team leader/ person writing the report. international.org and Katie Tong [email protected] 2. Situation Overview 2.1 Nature and intensity of the emergency On 25 April a 7.8 magnitude earthquake struck 77 kilometers (48 miles) northwest of Nepal's capital Kathmandu on 25 Apr 2015. This was followed by a second earthquake measuring 7.3 on 12 May1. The epicenter for the second earthquake was South-East of Kodari (Sindhupalchowk District), 76 km northeast of Kathmandu - an area already affected by the 25th April Earthquake (OCHA, 12 May 2015). Aftershocks ranging between 4 and 6.3 in magnitude continue to cause landslides potentially cutting off road access to remote locations. Children and their families continue to live in informal settlements, either unable to return home due to the damaged or destroyed households or unwilling due to fear of further aftershocks. In addition the monsoon season which is due to start early June will present increased logistical challenges for agencies providing relief and recovery interventions.
    [Show full text]
  • CHITWAN-ANNAPURNA LANDSCAPE: a RAPID ASSESSMENT Published in August 2013 by WWF Nepal
    Hariyo Ban Program CHITWAN-ANNAPURNA LANDSCAPE: A RAPID ASSESSMENT Published in August 2013 by WWF Nepal Any reproduction of this publication in full or in part must mention the title and credit the above-mentioned publisher as the copyright owner. Citation: WWF Nepal 2013. Chitwan Annapurna Landscape (CHAL): A Rapid Assessment, Nepal, August 2013 Cover photo: © Neyret & Benastar / WWF-Canon Gerald S. Cubitt / WWF-Canon Simon de TREY-WHITE / WWF-UK James W. Thorsell / WWF-Canon Michel Gunther / WWF-Canon WWF Nepal, Hariyo Ban Program / Pallavi Dhakal Disclaimer This report is made possible by the generous support of the American people through the United States Agency for International Development (USAID). The contents are the responsibility of Kathmandu Forestry College (KAFCOL) and do not necessarily reflect the views of WWF, USAID or the United States Government. © WWF Nepal. All rights reserved. WWF Nepal, PO Box: 7660 Baluwatar, Kathmandu, Nepal T: +977 1 4434820, F: +977 1 4438458 [email protected] www.wwfnepal.org/hariyobanprogram Hariyo Ban Program CHITWAN-ANNAPURNA LANDSCAPE: A RAPID ASSESSMENT Foreword With its diverse topographical, geographical and climatic variation, Nepal is rich in biodiversity and ecosystem services. It boasts a large diversity of flora and fauna at genetic, species and ecosystem levels. Nepal has several critical sites and wetlands including the fragile Churia ecosystem. These critical sites and biodiversity are subjected to various anthropogenic and climatic threats. Several bilateral partners and donors are working in partnership with the Government of Nepal to conserve Nepal’s rich natural heritage. USAID funded Hariyo Ban Program, implemented by a consortium of four partners with WWF Nepal leading alongside CARE Nepal, FECOFUN and NTNC, is working towards reducing the adverse impacts of climate change, threats to biodiversity and improving livelihoods of the people in Nepal.
    [Show full text]
  • Communist Party of Nepal (Maoist) – CPN (M)
    Communist Party of Nepal (Maoist) – CPN (M) P.G. Rajamohan Institute for Conflict Management Formation repercussions.3 Some splinter groups of the communist party and prominent leftist Communist Party of Nepal (Maoist) is a leaders like Keshar Jung Rayamajhi have splinter group from the revolutionary been pro-palace and were supportive of the party-less Panchayat system while Communist parties alliance- Communist other groups were active in the struggle Party of Nepal (Unity Centre) (established in May 1991) - during mid-1994, formed for the re-establishment of multi-party under the leadership Pushpa Kamal Dahal democracy, under the umbrella organization United National People’s alias Prachanda.1 At the same time, the Movement (UNPM). After the restoration political front of the Unity Centre– United People’s Front of Nepal (UPFN), which of democracy and 1991 Parliamentary had 9 Members of Parliament in Nepal, election, Communist Party of Nepal also divided into two groups. The UPFN (Unity Centre) emerged as the third largest party in the Parliament, next to faction, led by Baburam Bhattarai Nepali Congress and Communist Party of expressed their willingness and support to 4 work with Communist Party of Nepal Nepal (UML). Ideological confrontation (Maoists) under the leadership of Pushpa and dissatisfaction over the multi-party democratic system under constitutional Kamal Dahal.2 The alliance of two monarchy among the CPN (Unity Centre) revolutionary factions -CPN (M) - was not recognized by the Election Commission to leaders led to the disintegration of the contest in the 1994 parliamentary mid- revolutionary and political front split into term election. They stayed outside and two factions.
    [Show full text]
  • District Inventory Map of Rural Road Network 4.1
    District Transport Master Plan (DTMP): Baglung Final Report CHAPTER IV: DISTRICT INVENTORY MAP OF RURAL ROAD NETWORK 4.1 Existing Transport Situation Baglung district has no air transport service to complement the surface transport facilities. Surface transport facilities through Pushplal Raj Marg (Midhill), Kaligandaki Bridge-Baglung Road, Baglung- Myagdi District Border Road, Darling (District Border)-Dhara (MH Junction)-Dhorpatan (Uttar Gnga R) Road district road and village roads are notably increasing in the district. The length of Strategic Road Network that in Baglung district is summarized below: Table 4.1: List of National Highway/Feeder Roads SN Highway/Feeder road Total length (KM) 1 Pushplal Raj Marg (Midhill) 149.0 2 Kaligandaki Bridge-Baglung Road 4.17 3 Baglung-Myagdi District Border Road 7.42 4 Darling (District Border)-Dhara (MH 52.0 Junction)-Dhorpatan (Uttar Gnga R) Road Source: Statistics of Strategic Road Network, DoR, 2009\10 Brief description of all transport linkages i.e. National highway, Feeder road, and District District Transport Master Plan (DTMP): Baglung Final Report 4.2 Summary of District Roads “A” Table 4.2: Summary of District Roads “A” Road status Surface condition Serviceability (all Required (blacktopped/gravel/ Total (good/fair/poor) weather/fair weather) intervention (Km) Total existing earthen) Road code Road name length length Upgrading/ (Km) Black Fair Gravel Earthen Good Fair Poor All weather New top weather Rehab 45A001R Baglung-Kusmisera Road 21 21 21 21 21 21 0 Kusmisera-Namduk-Bareng-Hugdikhola-
    [Show full text]