Download Case Study

Total Page:16

File Type:pdf, Size:1020Kb

Download Case Study Office First IoT-based connected lighting system in the Nordics As part of its plan to use integrated “Interact Office offers us the opportunity IT and communication technologies to use connected LED lighting as part of a broader IT-driven program and gives us a to improve citizen services, the robust infrastructure to support a smarter municipality of Albertslund, Denmark, workspace for our employees.” has installed the first IoT-based Niels Carsten Bluhme, Director of City, Environment, Culture connected lighting system in the & Employment at Albertslund Municipality Nordics in their new office building. Customer challenge Solution With the desire to use the latest technology to drive Through the Interact Office management software, the operational efficiency and support sustainability installation gives building managers unique insights into objectives, the municipality of Albertslund in energy use and space utilization, while enabling office Copenhagen has installed the first IoT-based workers to personalize the office lighting around their connected lighting system in the Nordics in their newly workspace through a smartphone app. The project is a built smart office building. key part of Copenhagen’s Lighting Metropolis initiative Albertslund Municipality believes that the energy- efficient connected office lighting system can act as a platform in the evolution towards using IoT technologies to deliver better insight, management and services. Now that connected lighting infrastructure is in place, additional evolving applications can be added via the Interact Office software. www.interact-lighting.com/office Interact — Making it happen The smart office in Copenhagen features a connected via the sensor network. The connected lighting system LED lighting system with embedded occupancy sensors transmits the data directly via Interact Office software that are integrated in the luminaires. Approximately 400 which is integrated with other building management lights are connected via Cisco switch technology and systems. the connected lighting can also share data acquired Data-driven insights Personal control Data acquired by the sensors The connected lighting system will provide new insights via the gives office workers the ability Interact Office management to control the lighting and other software into the building's use building services via the Interact and operations. Information, Office smartphone app. This such as light levels, energy consumption and room supports the Municipality’s goal of creating a occupancy, will help building managers optimize progressive working environment that increases energy use and improve management of the office employee satisfaction and productivity, ensuring space. that employees feel empowered and have the right light for any given task. Lighting management Space management Take the hassle out of managing Software draws on data your office lighting by remotely collected over the connected monitoring the performance lighting system to create a of all light points across one or more efficient and productive multiple sites, gaining real-time workspace. You’ll also be able to insight into energy consumption, fault detection, capture and analyze building occupancy data to and predictive maintenance. Always have the optimize space and reduce real estate costs over right data on hand to make impactful decisions. time. And release meeting rooms that have been booked but aren’t being utilized. Project details • First IoT-based connected lighting system in the Nordics • Occupancy sensors are integrated with Philips SmartBalance and Philips PowerBalance luminaires • The connected lighting system uses Cisco PoE switches that transmit power and data over standard Ethernet cables Find out how Interact can transform your business www.interact-lighting.com/office © 2018 Signify Holding. All rights reserved. The information provided herein is subject to change, without notice. Signify does not give any representation or warranty as to the accuracy or completeness of the information included herein and shall not be liable for any action in reliance thereon. The information presented in this document is not intended as any commercial offer and does not form part of any quotation or contract, unless otherwise agreed by Signify. All trademarks are owned by Signify Holding or their respective owners..
Recommended publications
  • INNOVATION NETWORK »MORGENSTADT: CITY INSIGHTS« City Report
    City report City of the Future INNOVATION NETWORK »MORGENSTADT: CITY INSIGHTS« »MORGENSTADT: »MORGENSTADT: CITY INSIGHTS« City Report ® INNOVATION NETWORK INNOVATION Project Management City Team Leader Fraunhofer Institute for Dr. Marius Mohr Industrial Engineering IAO Fraunhofer Institute for Nobelstrasse 12 Interfacial Engineering and 70569 Stuttgart Biotechnology IGB Germany Authors Contact Andrea Rößner, Fraunhofer Institute for lndustrial Engineering IAO Alanus von Radecki Arnulf Dinkel, Fraunhofer Institute for Solar Energy Systems ISE Phone +49 711 970-2169 Daniel Hiller, Fraunhofer Institute for High-Speed Dynamics Ernst-Mach-Institut EMI Dominik Noeren, Fraunhofer Institute for Solar Energy Systems ISE COPENHAGEN [email protected] 2013 Hans Erhorn, Fraunhofer Institute for Building Physics IBP Heike Erhorn-Kluttig, Fraunhofer Institute for Building Physics IBP Dr. Marius Mohr, Fraunhofer Institute for lnterfacial Engineering and Biotechnology IGB OPENHAGEN © Fraunhofer-Gesellschaft, München 2013 Sylvia Wahren, Fraunhofer Institute for Manufacturing Engineering and Automation IPA C MORGENSTADT: CITY INSIGHTS (M:CI) Fraunhofer Institute for Industrial Engineering IAO Fraunhofer Institute for Factory Operation and Climate change, energy and resource scarcity, a growing Copenhagen has repeatedly been recognized as one Nobelstrasse 12 Automation IFF world population and aging societies are some of the of the cities with the best quality of life. Green growth 70569 Stuttgart Mailbox 14 53 large challenges of the future. In particular, these challen- and quality of life are the two main elements in Germany 39004 Magdeburg ges must be solved within cities, which today are already Copenhagen’s vision for the future. Copenhagen shall home to more than 50% of the world’s population. An be a leading green lab for sustainable urban solutions.
    [Show full text]
  • Growing Smart Cities in Denmark
    GROWING SMART CITIES IN DENMARK DIGITAL TECHNOLOGY FOR URBAN IMPROVEMENT AND NATIONAL PROSPERITY RESEARCH AND EDITORIAL ABOUT TEAM About Invest in Denmark Léan Doody As part of the Ministry of Foreign Affairs of Denmark, Invest Associate Director – Arup in Denmark is a customized one-stop service for foreign [email protected] companies looking to set up a business in Denmark. Nicola Walt www.investindk.com Principal Consultant – Arup [email protected] About Arup Ina Dimireva Consultant – Arup Arup is an independent consultancy providing professional [email protected] services in management, planning, design and engineering. As a global firm Arup draws on the skills and expertise of Anders Nørskov Director – CEDI nearly 11,000 consultants. Arup’s dedication to exploring [email protected] innovative strategies and looking beyond the constraints of individual specialisms allows the firm to deliver holistic, multi-disciplinary solutions for clients. STEERING COMMITTEE www.arup.com This research was commissioned by: About CEDI CEDI is a consulting company with expertise in public sector digitization in Denmark. CEDI provides strategic consulting Financing partners and steering committee: to the government and the IT industry based on solid insight into the subjects of digitization and technology, extensive knowledge on the administrative and decision-making pro- cesses of government agencies, and a deep understanding of the political agenda. www.cedi.dk Additional participants in the steering committee meetings were the Central Denmark Region, Local Government Den- mark (LGDK) and the municipalities of Aarhus and Vejle. Layout Mads Toft Jensen +45 25143599 [email protected] www.spokespeople.dk ©2016 Arup, CEDI.
    [Show full text]
  • Aalb on 1996 Lisbo Over 2000 Hannov G 2004 Aalborg 2007 Sevilla
    Aalb Lisboon 1996 Hannovover 2000 Aalborgg 2004 Sevilla 2007 +I=:JGDE:6C8DC;:G:C8: DCHJHI6>C67A:8>I>:HIDLCH &."'&B6N'%&% 9JC@:GFJ:!;G6C8: 9Za^kZg^c\HjhiV^cVWaZ8^i^Zh/ I]ZAdXVaAZVYZgh]^e8]VaaZc\Z gVbbZ mmm$Zkda[hgk[(&'&$eh] Organised by: Co-organised by: Table of contents Welcome from the host and the organisers .............................................. p.3 &RQIHUHQFHREMHFWLYHVSDUWLFLSDQWV SURJUDPPHÀRZ ........................... p. 4 Aalborg Commitments Signatory Ceremony ............................................ p. 5 Mayors’ session ........................................................................................ p. 5 Agora ........................................................................................................ p. 6 Side events ............................................................................................... p. 6-7 Programme Wednesday 19 May 2010 ......................................................................... p. 8-10 Thursday 20 May 2010 ............................................................................. p. 11-13 Friday 21 May 2010 .................................................................................. p. 14 Study visits ................................................................................................ p. 15 Cultural events in Dunkerque .................................................................... p. 16-17 Dunkerque 2010: Crossroad for sustainable development ....................... p. 18-19 A green event ..........................................................................................
    [Show full text]
  • Ring 3 Letbane I/S Annual Report 2014 Contents Ring 3 Letbane I/S
    Ring 3 Letbane I/S Annual Report 2014 Contents Ring 3 Letbane I/S Herlev Annual Report 2014 Contents Contents 1.0 Welcome 4 2.0 Directors' Report 8 2.1 Result for the Year 10 2.2 Company Management 14 2.3 Social Responsibility 16 2.4 Construction of a light railway in Ring 3 18 3.0 Annual Accounts 22 3.1 Accounting Policies 24 3.2 Profit and Loss Account 27 3.3 Balance Sheet 28 3.4 Cash Flow Statement 30 3.5 Notes 31 4.0 Board of Directors of Ring 3 Letbane I/S 38 4.1 Board of Directors of Ring 3 Letbane I/S 40 5.0 Endorsements 42 5.1 Management Endorsement 44 5.2 The Independent Auditors' Report 45 6.0 Appendix to the Directors' Report 46 6.1 Long-Term Budget 48 The English text in this document is an unofficial translation of the Danish original. In the event of any inconsistencies, the Danish version shall apply. 3 Welcome Ring 3 Letbane I/S 1.0 Welcome Dear reader, 2014 was a decisive year for the coming The light railway from Lyngby to Ishøj light railway in Greater Copenhagen. The will intersect the S-train network, with Folketing (Parliament) adopted the Act departures every five minutes in daytime on a Light Railway, and the preparatory hours, ensuring passengers a faster and work commenced. The company that simpler journey across the various areas is to undertake the engineering design, of the capital. The municipalities along construction and operation of the light the light railway will have new opportu- railway was established, and the Board nities to develop urban quarters, attract of Directors began the work of setting new employers and create new commu- the framework for the coming light rail- nal and social facilities.
    [Show full text]
  • Country Profile DENMARK
    LG Action Country Profile Collection DENMARK This document reflects the current status on: • Government levels and departments responsible for / working with local governments (LGs). • Main national climate and energy relevant legislation and strategies that impact / has potential to impact cities and towns (also identifying what is legally not possible or difficult)., • National LG networks / associations’ support for local climate and energy action • Potential opportunities to be explored to improve the roll-out of local climate and energy action • A summary on the LG and their networks / associations’ interest and involvement in the Roadmap and advocacy processes. A. CONTEXT 1. Levels of government and their roles: Basic inter-relationship and impact (potential impact for action) Level: Character: Mandates / responsibilities / roles: National Denmark is unitary parliamentary democracy and 5,557,709 inhabitants (2010) constitutional monarchy. 14 counties ( Amtskommuner ) • The county council represents the decision • The counties competences making body and its members are elected for a are related to health care, four years mandate. In addition, it can establish secondary education, special committees and be assisted by several public transport, land and offices. It also appoints the county president. economic development. • The executive committees are elected by the council. They are responsible for the preparation and implementation county council decisions. The mayor of the county heads the council and the county administration. • The county council is also responsible for both the deputies and mayors elections 269 municipalities ( Kommuner ) • • The municipal council members are elected for The competences of the municipalities four years mandate. This deliberative body municipal organizations appoints members of the executive commissions are related to primary • 17 have signed up to the Covenant and it is responsible for set up the budget.
    [Show full text]
  • An Analysis of Institutional Capacity for Climate Change Adaptation in the Copenhagen Area
    Building Capacity for Climate Change Adaptation in the Copenhagen area An analysis of institutional capacity for climate09 change-05-2013 adaptation in the Copenhagen area Prepared by Meherun Nahar Master´s in Urban Planning and Management Department of Development and Planning i Aalborg University, Denmark An analysis of institutional capacity for climate change adaptation in the Copenhagen area Title page Title: An analysis of institutional capacity for climate change adaptation in the Copenhagen area Study: Master´s Thesis in Urban Planning and Management, Aalborg University Project period: 1. February to 13. June 2013 Project group: UPM42013-9 Supervisor: Birgitte Hoffmann Copies: 2 Pages: 99 pages including appendix Appendices: Author: ______________________________ Meherun Nahar ii An analysis of institutional capacity for climate change adaptation in the Copenhagen area Abstract The report is based on the question ´How do different municipalities in HOFOR develop their own plan to implement climate change adaptation?´ Therefore focus will be on to find out what approaches that municipalities follow for climate change adaptation and how they relate these approaches with national adaptation strategy. Moreover the project will identify how municipalities work with other municipalities and how they divide their tasks among them regarding climate change adaptation. Besides, the project will identify how different municipalities cooperate with HOFOR and finally it will investigate how different municipalities engage people and other stakeholders in climate change adaptation. The report is based on multiple case studies where each municipality working with HOFOR is an individual case. The report is an exploratory one. The analysis is based on the interviews of representative persons from different municipalities, HOFOR, Avedøre Wastewater and an water expert, municipality plans and strategies and theories of sustainable urban water management, community resilience and social assessment, institutional theory and governance, power and collaborative planning.
    [Show full text]
  • Press Release
    Press Release February 6, 2018 Philips Lighting installs first commercial Power-over-Ethernet Connected Lighting system for smart offices in the Nordics using Cisco network technology Copenhagen, Denmark – Philips Lighting (Euronext: LIGHT), the world leader in lighting and TDC Erhverv, Denmark’s largest supplier of integrated IT and communication technologies, have installed the first Power-over-Ethernet (PoE) connected lighting system in the Nordics, using Cisco network technology. The Philips lighting system in the newly built smart office in Albertslund Municipality in Copenhagen, Denmark, gives its building managers unique insights into energy use and space utilization, while enabling office workers to personalize their office lighting using a smartphone app. The project is a key landmark in Copenhagen’s Lighting Metropolis initiative. The smart office features a Philips PoE connected lighting system with occupancy sensors integrated with Philips SmartBalance and Philips PowerBalance luminaires. Approximately 400 LED light fixtures are connected to Cisco’s secure networking technology and powered by the small electric charge carried by the network’s Ethernet cables, which also route data acquired by the sensors to the building’s management system. Albertslund Municipality foresees the energy-efficient connected office lighting system as a paradigm shift in public digital management and service. “The new connected lighting system provides us with an infrastructure fit for the digital age. The municipality expects that the results will be promising enough to broaden the use of such technology to other municipality buildings – with the initial focus on buildings used for administration, healthcare and learning. Environments where lighting can be adjusted by staff to meet their needs and have sensor- based functions are becoming increasingly important,” said Niels Carsten Bluhme, Director of City, Environment, Culture & Employment at Albertslund Municipality.
    [Show full text]
  • Get the White Paper Here
    NATURE BASED SOLUTIONS Using rainwater as a resource to create resilient and liveable cities INSIDE THIS WHITE PAPER Managing rainwater with Nature Based Solutions Cross-disciplinary collaboration in climate adaptation Urban recirculation of rainwater 2 Nature Based Solutions Using rainwater as a resource to create resilient and liveable cities Version 2.0 February 2021 Front page photo Climate adaptation at Taasinge Plads in Copenhagen Photo: Kontraframe Editor in Chief State of Green Malene Bering Beitzel, [email protected] Technical Editors Water Vision Denmark / KLAR Utility Hanne Kjær Jørgensen, [email protected] Danish Technological Institute / DNNK, Danish Network for Climate Adaptation Ulrik Hindsberger, [email protected] Contributors 1:1 Landskab Jacob Kamp, [email protected] Amphi Consult Lars Briggs, [email protected] Aarhus Vand Anne Laustsen, [email protected] Aarhus Vand Pia Jacobsen, [email protected] BOGL Dorte Hermann, [email protected] Byggros Louise Hansen, [email protected] City of Copenhagen Lykke Leonardsen, [email protected] City of Copenhagen (Skt. Kjelds Kvarter) René Sommer Lindsay, [email protected] DHI Morten Just Kjølby, [email protected] HOFOR - Greater Copenhagen Water Utility Martin Vester, [email protected] LYTT Architecture Jacob Fischer, [email protected] NCC Brask Michael, [email protected] NIELS LÜTZEN landskabsarkitekter Niels Lützen, [email protected] NIRAS Jan Jeppesen, [email protected] NIRAS Jens Brandt Bering, [email protected] NIRAS Rikke Juul Monberg, [email protected] Novafos Tina Otterstrøm Jensen, [email protected] Pilebyg Vibe Gro Falk, [email protected] Ramboll Martin Zoffmann, [email protected] SLA Kristoffer Holm Pedersen, [email protected] The Climate City Bjarne Rasmussen.
    [Show full text]
  • Resilient Design Properties of a Driverless Transport System
    INTERNATIONAL DESIGN CONFERENCE - DESIGN 2018 https://doi.org/10.21278/idc.2018.0539 RESILIENT DESIGN PROPERTIES OF A DRIVERLESS TRANSPORT SYSTEM M. Wied, J. Oehmen and T. Welo Abstract From its origin in ecology, resilient system properties have attracted wider interest for their applications to man-made systems. Previous research has shown that a simple conceptual model seems to capture much resilience thinking across disciplines and system types. In this paper, we apply that model to study resilient properties in the design and development of an autonomous public transport system, attempting to circumvent the problem of commitment under uncertainty. We identify a number of resilient system properties and classify them by function into six distinct categories. Keywords: complex systems, risk management, project management, design strategy 1. Introduction Many important events in a system’s life cycle cannot be known in advance. Nonetheless, irreversible up-front design commitments have to be made. Addressing the problem of commitment under uncertainty, this paper argues that systems should generally be designed to perform under a wider range of conditions, than traditionally considered. In other words, systems should be more resilient to changing conditions. This problem is part of the wider challenge of implementing design strategy under uncertainty. Originally conceptualised for understanding natural systems, resilient system properties have recently gained wider interest for their application to the design of man-made systems. A
    [Show full text]
  • Hovedstadens Letbane I/S Annual Report 2017 Hovedstadens Letbane I/S Metrovej 5 DK-2300 Copenhagen S CVR Number: 36032499
    Hovedstadens Letbane I/S Annual Report 2017 Hovedstadens Letbane I/S Metrovej 5 DK-2300 Copenhagen S CVR number: 36032499 T +45 3311 1700 E [email protected] Read more about Greater Copenhagen Light Rail at dinletbane.dk Layout, e-Types Printing, GraphicUnit ApS ISBN number: 978-87-92378-29-3 Annual Report 2017 Contents Management’s Report 05 Greater Copenhagen Light Rail’s employees 20 Foreword 05 Greater Copenhagen Light Rail’s Results and Expectations 06 Board of Directors 22 Key Figures for Greater Copenhagen Greater Copenhagen Light Rail’s Light Rail 10 Executive Board 24 Greater Copenhagen Light Rail 12 Annual Accounts 27 The Light Rail and urban development 13 Accounting Policies 28 New station at Delta Park in Profit and Loss Account 31 Vallensbæk Municipality 13 Balance Sheet 32 Statement of Changes in Equity 34 Hovedstadens Letbane I/S Status of the work on the Light Rail 14 Metrovej 5 Cash Flow Statement 36 DK-2300 Copenhagen S Selection of contractors 15 Notes 37 CVR number: 36032499 New quality assurance 16 T +45 3311 1700 Expropriation activities 16 E [email protected] Endorsements 43 Knowledge of the Light Rail 16 Read more about Greater Copenhagen Management Endorsement 43 Light Rail The Light Rail is classified as a at dinletbane.dk megaproject 17 Independent Auditors’ Report 44 Layout, e-Types Printing, GraphicUnit ApS Company Management 19 Appendix to the Management’s Report 49 ISBN number: 978-87-92378-29-3 Greater Copenhagen Light Rail’s Long-Term Budget 50 compliance and CSR Report 20 3 Greater Copenhagen Light Rail at one of the 29 coming stations along the line.
    [Show full text]
  • Deliverable 7.5 Project Stakeholder Dissemination Events
    Project ICT 287534 Start: 2011-09-01 Duration: 36 months Co-funded by the European Commission within the 7th Framework Programme SEMANCO Semantic Tools for Carbon Reduction in Urban Planning Deliverable 7.5 Project Stakeholder Dissemination Events Revision: 6 Due date: 2014-05-31 (m33) Submission date: 2014-06-30 Lead contractor: UoT Dissemination level PU Public x PP Restricted to other program participants (including the Commission Services) RE Restricted to a group specified by the consortium (including the Commission Services) CO Confidential, only for members of the consortium (including the Commission Services) Deliverable Administration & Summary No & name D7.5 Project Stakeholder Dissemination Events Status Final Due M33 Date 2014-05-31 Martin Carpenter (UoT), Tracey Crosbie (UoT), Chris Ennis (UoT), Michael Author(s) Crilly (UoT), David Lynch (NEA), Claire Henderson (NEA), Joan Oliveras (FORUM), Nadeem Niwaz (RAMBOLL), Jane Moustgaard (RAMBOLL) Editor Martin Carpenter (UoT) DoW The DoW description of Task 7.5 is: “This task will involve running three workshops (one in the UK, one in Spain and one in Denmark) with stakeholders involved in energy related issues, such as urban planning, carbon reduction, and energy poverty, to provide information on the tools produced by the project and their functionality in terms of the needs of stakeholders. The NEA will run the workshop in the UK, FORUM will run the workshop in Spain and RAMBOLL will run the workshop in Denmark”. Comments Document history V Date Author Description 1 2014-02-04 Martin Carpenter (UoT), David Initial draft of the deliverable, mostly just Lynch (NEA), Claire Henderson an indicative ToC but also draft event (NEA), Joan Oliveras (CIMNE), plans imported etc.
    [Show full text]
  • Hovedstadens Letbane I/S Annual Report 2018 Annual Report 2018
    Hovedstadens I Letbane Hovedstadens / S Letbane I/S Annual Report 2018 Annual Report 2018 Annual Report 2018 Contents Management’s Report 05 Company Management 23 Foreword 05 Compliance and CSR Report 24 Corporate Governance 24 Key Figures for Social Responsibility 24 Greater Copenhagen Light Rail 06 Employees 25 Board of Greater Copenhagen Light Rail 26 Results and Expectations 08 Attendance of Board Meetings 29 Result for the Year 08 Former Members of the Board 30 Development in Equity 09 Greater Copenhagen Light Rail’s Capital and Long-Term Finances 10 Executive Management 31 Investment in the Light Rail 11 Risk Management 14 Annual Accounts 35 Accounting Policies 36 Hovedstadens Letbane I/S Approval of the Project 15 Profit and Loss Account 39 Metrovej 5 Changes to the Project 16 Balance Sheet 40 DK-2300 Copenhagen S CVR number: 36032499 Statement of Changes in Equity 42 T +45 7242 4500 Status of the Work on the Light Rail 18 Cash Flow Statement 44 E [email protected] Project Communication 20 Notes 45 Read more about Greater Copenhagen Utility relocations 20 Light Rail at dinletbane.dk Expropriations 20 Endorsements 59 Traffic Challenges 21 Management Endorsement 59 Layout, e-Types Printing, GraphicUnit ApS Safety on the Right Track 22 Independent Auditors’ Report 60 ISBN number: 978-87-92378-37-8 Appendix to the Management’s Report 65 EMÆR AN KE V T S Long-Term Budget 66 Tryksag 5041 0473 3 At Glostrup Station, the Light Rail runs down Annual Report 2018 Management’s Report and turns in a loop, allowing easy access to change to a train or bus.
    [Show full text]