County Council - Planned Road Works This edition of the bulletin as automatically generated on the 19 Mar 2020 NW LEICESTERSHIRE District

For more information about roadworks call our Customer Service Centre: 0116 3050001

Road Name/ Number & Description Contractor/Client Estimated Expected Traffic Notes Location Start Date End Date Management

OCCUPATION ROAD Urgent excavation in highway to Western Power, 6135 NW 16/03/2020 20/03/2020 Traffic Control (Two-Way locate and repair LV cable fault. Leicestershire 17:30:00 Signals)

ALBERT VILLAGE

ATHERSTONE ROAD POSS RECHARGE LCC (Works Promoter) 27/03/2020 27/03/2020 Lane Closure 50MPH / A ROAD / LAYBY / SERVICES / LORRIES Realign and new foundation in verge CHURCH STREET Water mains renewal of Est 980m Asset Creation 22/01/2020 17/04/2020 Road Closure via Directional drill method. Transfer Distribution West of associated services APPLEBY MAGNA

MEASHAM ROAD open excavation for existing main Asset Creation 18/02/2020 18/05/2020 Some Carriageway abandonment in CW and Verge Distribution West Incursion

APPLEBY MAGNA

TOP STREET Water mains renewal of Est 580m Asset Creation 15/02/2020 19/04/2020 Road Closure via Directional drill method. Transfer Distribution West of associated services APPLEBY MAGNA

BATH STREET NMA Defect CLO - Remedial Rein STW Water East 23/03/2020 24/03/2020 Traffic Control (Give and by CLO Job in Carriageway (Block Take) paving ) ASHBY DE LA ZOUCH

LOWER ROAD NMA Defect CLO - Remedial Rein STW Water East 23/03/2020 23/03/2020 Traffic Control (Give and by CLO Job in Carriageway (Hot Take) Rolled Asphalt-30/14 ) ASHBY DE LA ZOUCH

MEASHAM ROAD Gas mains replacement abandon East of England Network 06/03/2020 03/04/2020 Traffic Control (Two-Way 848m 6" CI main and insert 848m EMLDZ S81 Signals) 125mm PEmain to include all ASHBY DE LA ZOUCH transfers and relays EMGA213041 NORTHFIELDS S50 - New Gas Pipe LCC (Section 50/278/184) 01/01/2020 30/06/2020 Road Closure

ASHBY DE LA ZOUCH Road Name/ Number & Description Contractor/Client Estimated Expected Traffic Notes Location Start Date End Date Management

RIDGWAY ROAD Gas mains replacement connection East of England Network 16/03/2020 03/04/2020 Traffic Control (Multi-Way only in conjunction with Tamworth EMLDZ S81 Signals) RoadEMGA213041 ASHBY DE LA ZOUCH

STATION ROAD S50 - New Gas Pipe LCC (Section 50/278/184) 06/03/2020 14/04/2020 Road Closure

ASHBY DE LA ZOUCH

THE CALLIS S50 - New Gas Pipe LCC (Section 50/278/184) 01/01/2020 30/06/2020 Traffic Control (Two-Way Signals)

ASHBY DE LA ZOUCH

FOOTPATH P13 NWL0414 - Temp Diversion of LCC (Section 50/278/184) 09/08/2019 07/02/2021 Road Closure PROW P13 and P11 from South Street, Woodville across Butt Lane ASHBY-DE-LA-ZOUCH and Heather Lane, to ROUNDABOUT AT THE JUNCTION OF Investiagtion and remedial works on Blaby (Legacy) 16/03/2020 28/03/2020 Lane Closure A42, A511 A42 slip roads 20:00:00

ASHBY-DE-LA-ZOUCH

TAMWORTH ROAD EMGA213041-LOCATION OF East of England Network 05/03/2020 15/05/2020 No Carriageway Incursion WELFARE UNIT FOR WORKFORCE EMLDZ S81 IN CONJUNCTION WITHGAS ASHBY-DE-LA-ZOUCH MAINS REPLACEMENT WORKS IN TAMWORTH ROAD Gas mains replacement abandon East of England Network 23/03/2020 21/04/2020 Traffic Control (Multi-Way 187m 6" CI and 3", 6" SI main and EMLDZ S81 Signals) insert187m 63mm and 125mm PE ASHBY-DE-LA-ZOUCH main to include all transfers and BEVERIDGE LANE Two way lights required to coincide LCC (Works Promoter) 25/03/2020 27/03/2020 Traffic Control (Two-Way with Road closure on Franks Rd Signals) (503311) BARDON

DROMINTEE ROAD C/ way patching. Please see job LCC (Works Promoter) 23/03/2020 28/03/2020 Road Closure 503311 for sch. Job 503309 as well. All three jobs needs to be patched BARDON together. FRANKS ROAD C/ way patching. Please see job LCC (Works Promoter) 23/03/2020 28/03/2020 Road Closure 503305 (Dromintee road) and job 503309 ( Tara Street). All the three BARDON jobs needs to be patched together. FRANKS ROAD 2 joint holes in tarmac footway and Western Power, 6135 NW 09/03/2020 20/03/2020 Traffic Control (Two-Way 189m trenching in tarmac footway Leicestershire Signals) and tarmac road for new supply BARDON Road Name/ Number & Description Contractor/Client Estimated Expected Traffic Notes Location Start Date End Date Management

TARA STREET C/ way patching. all attachments on LCC (Works Promoter) 23/03/2020 28/03/2020 Road Closure job 503311. Also job 503305. all three jobs need to be patched BARDON together. LAYBY OFF B5324 WESTBOUND ASHBY SD stone storage if required. LCC (Works Promoter) 01/03/2020 31/08/2020 Some Carriageway ROAD Incursion

BELTON

ASHBY ROAD TM REQUIRED TO PROVIDE SAFE BT - Inc S81 09/03/2020 20/03/2020 Traffic Control (Multi-Way WORKING ZONE FOR Signals) UNDERGROUND CABLING.

BREEDON BRAND Carriageway Resurfacing, lining and LCC (Works Promoter) 23/03/2020 29/03/2020 Road Closure Gully replacements to be completed by 29/03/2020 BREEDON ON THE HILL

BREEDON BRAND Gully replacements to be completed LCC (Works Promoter) 16/03/2020 21/03/2020 Lane Closure by 21/03/20 during day lane closures 08:30:00

BREEDON ON THE HILL

DOCTORS LANE TM REQUIRED TO PROVIDE SAFE BT - Inc S81 09/03/2020 20/03/2020 Traffic Control (Multi-Way WORKING ZONE FOR Signals) UNDERGROUND CABLING. BREEDON ON THE HILL

FROM MAIN STREET TO MOOR LANE TM REQUIRED TO PROVIDE SAFE BT - Inc S81 09/03/2020 20/03/2020 Traffic Control (Multi-Way WORKING ZONE FOR Signals) UNDERGROUND CABLING. BREEDON ON THE HILL

GELSCOE LANE Gully replacements to be completed LCC (Works Promoter) 16/03/2020 21/03/2020 Lane Closure by day lane closures by 21/03/20 08:30:00

BREEDON ON THE HILL

GELSCOE LANE Carriageway Resurfacing, lining and LCC (Works Promoter) 23/03/2020 29/03/2020 Road Closure Gully replacements to be completed by 29/03/20 BREEDON ON THE HILL

MAIN STREET TM REQUIRED TO PROVIDE SAFE BT - Inc S81 09/03/2020 20/03/2020 Traffic Control (Multi-Way WORKING ZONE FOR Signals) UNDERGROUND CABLING. BREEDON ON THE HILL

ROUNDABOUT AT THE JUNCTION OF Gully replacements under daytime LCC (Works Promoter) 16/03/2020 21/03/2020 Lane Closure A453, A42 lane closures 08:30:00

BREEDON ON THE HILL Road Name/ Number & Description Contractor/Client Estimated Expected Traffic Notes Location Start Date End Date Management

ROUNDABOUT AT THE JUNCTION OF Carriageway Resurfacing, lining and LCC (Works Promoter) 23/03/2020 29/03/2020 Road Closure A453, A42 Gully replacements to be completed by 29/03/2020 BREEDON ON THE HILL

THE CRESCENT TM REQUIRED TO PROVIDE SAFE BT - Inc S81 09/03/2020 20/03/2020 Traffic Control (Multi-Way WORKING ZONE FOR Signals) UNDERGROUND CABLING. BREEDON ON THE HILL

THE DOVECOTE TM REQUIRED TO PROVIDE SAFE BT - Inc S81 09/03/2020 20/03/2020 Traffic Control (Multi-Way WORKING ZONE FOR Signals) UNDERGROUND CABLING. BREEDON ON THE HILL

THE GREEN TM REQUIRED TO PROVIDE SAFE BT - Inc S81 09/03/2020 20/03/2020 Traffic Control (Multi-Way WORKING ZONE FOR Signals) UNDERGROUND CABLING. BREEDON ON THE HILL

THE PLATCHETTS TM REQUIRED TO PROVIDE SAFE BT - Inc S81 09/03/2020 20/03/2020 Traffic Control (Multi-Way WORKING ZONE FOR Signals) UNDERGROUND CABLING. BREEDON ON THE HILL

WORTHINGTON LANE TM REQUIRED TO PROVIDE SAFE BT - Inc S81 09/03/2020 20/03/2020 Traffic Control (Multi-Way WORKING ZONE FOR Signals) UNDERGROUND CABLING. BREEDON ON THE HILL

CASTLE HILL Lay 60m of 90mm pe main and Asset Creation 23/03/2020 03/04/2020 Traffic Control (Give and transfer services Lay 60m of 90mm Distribution East Take) pe main and transfer services

HASTINGS STREET LAY NEW DOMESTIC SERVICE East of England Network 24/03/2020 30/03/2020 Traffic Control (Give and FROM MAIN IN THE FARSIDE EMLDZ S81 Take) FOOTWAY FEEDING TOLAND ADJ CASTLE DONINGTON TO 77HASTINGS STREET PARK LANE S50/S278 works - Foul sewer LCC (Section 50/278/184) 09/03/2020 09/04/2020 Road Closure connection

CASTLE DONINGTON

RADFORD MEADOW Boundary box Install & tap main for STW Water East 18/03/2020 20/03/2020 Some Carriageway logg Job in Footway (6mm Bitmac Incursion (Tarmac) ) CASTLE DONINGTON

STATION ROAD working on Station road install 2 x Asset Creation 21/03/2020 22/03/2020 Traffic Control (Multi-Way under pressure hydrants on 3?I Distribution West Signals) main & 6? CI main all works are in CASTLE DONINGTON the carriageway Road Name/ Number & Description Contractor/Client Estimated Expected Traffic Notes Location Start Date End Date Management

TIPNALL ROAD Install external meter in boundary Integra Utility Services 25/03/2020 25/03/2020 Some Carriageway box at depth of under 1.5 meters by Incursion Minimum dig with Permanent CASTLE DONINGTON Reinstatement ABBEY ROAD Water mains renewal of Est 1600m Asset Creation 26/02/2020 27/04/2020 Road Closure via Directional drill method Transfer Distribution West of associated services CHARLEY

B591 FROM ROAD TO Water Retexturing 3591 x 5.8 = LCC (Works Promoter) 21/03/2020 22/03/2020 Road Closure NANPANTAN ROA 20828m2 High Priority 50%. To be completed by 29/03/20. CHARLEY

COPT OAK ROAD Water Retexturing 3591 x 5.8 = LCC (Works Promoter) 21/03/2020 22/03/2020 Road Closure 20828m2 High Priority 50%. To be completed by 29/03/2020. CHARLEY

BAKEWELL STREET LAY NEW DOMESTIC SERVICE East of England Network 27/03/2020 02/04/2020 Traffic Control (Give and 13M FROM MAIN IN NEARSIDE EMLDZ S81 Take) FOOTWAY

BARDON ROAD Excavation, cable laying and jointing. Western Power, 6161 04/03/2020 22/03/2020 Contra-Flow Works in conjunction with Major Projects Hinckley DY661M6161362507F COALVILLE

BRADGATE DRIVE Skip Licence LCC (Permit Authority) 16/03/2020 22/03/2020 Some Carriageway 16:23:41 Incursion

COALVILLE

CHARNWOOD STREET M1 Valve Remediation East of England Network 23/03/2020 02/04/2020 Road Closure EMLDZ S81

COALVILLE

CROPSTON DRIVE to lay new gas service approx 1m in Fulcrum Utility Services 23/03/2020 01/04/2020 No Carriageway Incursion the fw

COALVILLE

CROPSTON DRIVE LAY A NEW GAS SERVICE 13M East of England Network 16/03/2020 20/03/2020 No Carriageway Incursion FROM THE MAIN IN THE FOOTWAY EMLDZ S81

COALVILLE

FOOTPATH N59 Footpath closure for new commercial LCC (Section 50/278/184) 27/02/2020 26/08/2020 Road Closure development NWL0507 COALVILLE Road Name/ Number & Description Contractor/Client Estimated Expected Traffic Notes Location Start Date End Date Management

FOOTPATH N92 Scaffolding - Licence- 788592 LCC (Permit Authority) 19/03/2020 01/04/2020 Some Carriageway 08:36:04 Incursion

COALVILLE

FOOTPATH O21 Urgent excavation in highway to Western Power, 6135 NW 18/03/2020 24/03/2020 No Carriageway Incursion locate and repair LV cable fault. Leicestershire 10:30:00

COALVILLE

FOREST ROAD S184 tie in works from Forest Road LCC (Section 50/278/184) 16/03/2020 20/03/2020 Traffic Control (Two-Way into new Davidsons development Signals)

COALVILLE

GREENHILL ROAD Long Comm Pipe Renew 15mm Job STW Water East 24/03/2020 27/03/2020 Traffic Control (Two-Way in Carriageway (Hot Rolled Asphalt- Signals) 55/10 ) COALVILLE

LONDON ROAD Stop tap Reset lid Job in STW Water East 20/03/2020 20/03/2020 Traffic Control (Two-Way Carriageway (Hot Rolled Asphalt- Signals) 30/14 ) COALVILLE

LONDON ROAD GAS SERVICE DISCONNECTION East of England Network 18/03/2020 20/03/2020 No Carriageway Incursion WITH EXCAVATION UNDER OUR EMLDZ S81 MANDATORY OBLIGATIONTO COALVILLE COMPLY WITH GAS SAFETY MARLBOROUGH SQUARE Suspension of 6 car parking spaces LCC (Section 50/278/184) 06/01/2020 31/03/2020 Road Closure on Marlborough Square

COALVILLE

MEADOW LANE MH cover In H'way SCHEDULING 2 STW Waste 20/03/2020 20/03/2020 Traffic Control (Two-Way WAY REPLACEMENT OF Signals) DEFECTIVE MANHOLE FRAME COALVILLE AND OVER IN CARRIAGEWAY Job MELBOURNE STREET Skip - Licence- 788798 LCC (Permit Authority) 26/03/2020 01/04/2020 Some Carriageway 13:39:18 Incursion

COALVILLE

SMITH CRESCENT Short Comm Pipe Cut Off 15mm STW Water East 25/03/2020 27/03/2020 Traffic Control (Give and Job in Footway (6mm Bitmac Take) (Tarmac) ) COALVILLE

ST SAVIOURS ROAD Provide 1 new pole BT 20/03/2020 23/03/2020 Some Carriageway Incursion

COALVILLE Road Name/ Number & Description Contractor/Client Estimated Expected Traffic Notes Location Start Date End Date Management

STENSON ROAD Install swept tee in footway, extend Virgin Media - Comex 21/03/2020 25/03/2020 Traffic Control (Give and 1m footway and 2m verge towards 2000 (UK) Ltd Take) customer premises COALVILLE

STEPHENSON WAY Excavation, cable Pulling, Jointing, Western Power, 6161 04/03/2020 22/03/2020 Lane Closure backfill and Reinstatement. Works in Major Projects Hinckley conjunction with COALVILLE DY661M6161362505YZZ. WENTWORTH ROAD EMGD200043. GAS MAINS London Network NLLDZ 09/03/2020 20/03/2020 Traffic Control (Two-Way DIVERSION - TO ABANDON 8M OF Signals) 125MM PE LP, 16M OF4" PE LP COALVILLE AND 20M OF 75MM LP PE WITH CLEMENTS GATE 1 joint hole in tarmac footway and 2m Western Power, 6135 NW 23/03/2020 27/03/2020 Road Closure trenching in tarmac road and 6m road Leicestershire crossing in tarmac road for new supply HALL GATE This permit request replaces HMS LCC (Permit Authority) 04/03/2020 24/03/2020 Some Carriageway 784652 as this was logged to a 13:06:28 Incursion duplicate account for Ashby DISEWORTH Scaffolding which had been set up as PAGE LANE Upgrading/reconstruction of existing LCC (Works Promoter) 23/03/2020 08/05/2020 Road Closure PROW. Footway patching and kerbing, edging works. DISEWORTH

THE BOWLEY Skip - Licence- 788044 LCC (Permit Authority) 18/03/2020 24/03/2020 Some Carriageway 13:13:41 Incursion

DISEWORTH

THE WOODCROFT Boundary box Install,Clear to STW Water East 20/03/2020 24/03/2020 Traffic Control (Give and Bou*HV Job in Footway (6mm Bitmac Take) (Tarmac) ) DISEWORTH

ACRESFORD ROAD Temporary Speed restriction 30mph LCC (Section 50/278/184) 10/02/2020 30/03/2020 No Carriageway Incursion for outstanding street lighting works.

DONISTHORPE

ASHBY ROAD S50 - New Gas Pipe LCC (Section 50/278/184) 17/03/2020 24/04/2020 Road Closure

DONISTHORPE

BARKLAM CLOSE Long Comm pipe Renew 25mm Job STW Water East 24/03/2020 27/03/2020 Some Carriageway in Footway (6mm Bitmac (Tarmac) ) Incursion

DONISTHORPE Road Name/ Number & Description Contractor/Client Estimated Expected Traffic Notes Location Start Date End Date Management

FOOTPATH BRIDLEWAY N52 Preparatory earthworks to enable the LCC (Section 50/278/184) 11/06/2019 10/12/2020 Road Closure delivery of large scale residential development AND BATTLEFLAT

FOOTPATH Q64 Footpath Closure to enable the safe LCC (Section 50/278/184) 24/02/2020 04/04/2020 Road Closure carrying out of all works by Bellway as the PROW crosses through the HEATHER site. MAIN STREET NMA Defect CLO - Remedial Rein STW Water East 26/03/2020 27/03/2020 No Carriageway Incursion by CLO Job in Footway (6mm Bitmac (Tarmac) ) HEATHER

FROM CHURCH LANE TO HEMINGTON Water main renewal Water main Asset Creation 12/03/2020 25/03/2020 Road Closure HILL renewal Water main renewal Renew Distribution East 250m of existing water main by the HEMINGTON directional drill method. Transfer 5no MAIN STREET Dig out and transfer missed service Asset Creation 21/03/2020 24/03/2020 Some Carriageway Distribution East Incursion

HEMINGTON

RYCROFT ROAD No excavation: to stand plantsafe Asset Creation 20/12/2019 31/03/2020 No Carriageway Incursion welfare unit for works in area No Distribution East excavation: to stand plantsafe welfare HEMINGTON unit for works in area RYCROFT ROAD Slipline approx 55m of 75mm main Asset Creation 18/03/2020 24/03/2020 Traffic Control (Two-Way and transfer 1no service Slipline Distribution East Signals) approx 55m of 75mm main and HEMINGTON transfer 1no service FOOTPATH N55 Temp TRO- NWL0360 LCC (Section 50/278/184) 10/06/2019 09/12/2020 Some Carriageway Incursion

HUGGLESCOTE

FOOTPATH N86 RSB Footpath diversion LCC (Section 50/278/184) 05/02/2020 05/08/2020 Road Closure

HUGGLESCOTE

FOOTPATH N86 S38 road is being constructed LCC (Section 50/278/184) 13/03/2020 12/03/2021 Road Closure through existing footpath.

HUGGLESCOTE

GRANGE ROAD Excavate Footway / Carriageway / GTC - Future Utility 24/02/2020 29/03/2020 Traffic Control (Two-Way Verge to make New Gas Connection Solutions-GTC direct Signals) and Lay Approx 410m of New PE HUGGLESCOTE Gas Main to Enable New Gas Supply Road Name/ Number & Description Contractor/Client Estimated Expected Traffic Notes Location Start Date End Date Management

PRETORIA ROAD This refers to HMS 784024.115 LCC (Permit Authority) 13/03/2020 19/03/2020 Some Carriageway Pretoria road.. 11:31:40 Incursion

IBSTOCK

STATION ROAD Excavate footway / verge to enable Energy Assets Networks 17/03/2020 23/03/2020 Traffic Control (Two-Way new gas service connection to Plot 1 Ltd Signals) of new development. IBSTOCK

VALLEY ROAD GAS SERVICE DISCONNECTION East of England Network 23/03/2020 25/03/2020 Some Carriageway WITH EXCAVATION UNDER OUR EMLDZ S81 Incursion MANDATORY OBLIGATIONTO IBSTOCK COMPLY WITH GAS SAFETY WOOD ROAD BEND / OHL / TRACTOR TRAFFIC / LCC (Works Promoter) 21/03/2020 21/03/2020 Traffic Control (Stop/Go BUS TRAFFIC / HIGH SPEED ROAD Boards) Install new 6m in verge, no stump on IBSTOCK site. & reconnection by eon BAINBRIGGE ROAD Install 88m of 1 way poly duct in BT 19/03/2020 23/03/2020 No Carriageway Incursion Verge

KEGWORTH

DERBY ROAD Slot cutting/loop detectors in road LCC (Section 50/278/184) 22/03/2020 22/03/2020 Traffic Control (Multi-Way surface Signals)

KEGWORTH

HIGH STREET Scaffolding - Licence- 786821 LCC (Permit Authority) 06/03/2020 19/03/2020 Some Carriageway 15:20:00 Incursion

KEGWORTH

LONG LANE Closure required to install traffic LCC (Section 50/278/184) 09/03/2020 27/03/2020 Road Closure signals to control traffic crossing the Long Lane bridge and carry out KEGWORTH associated works: road widening, LONG LANE RSB - Facilitate S278 works. inc LCC (Section 50/278/184) 03/02/2020 06/04/2020 Some Carriageway diversionary works Incursion

KEGWORTH

HEMINGTON HILL Water main renewal Water main Asset Creation 28/02/2020 20/03/2020 Road Closure renewal Water main renewal Renew Distribution East 250m of existing water main by the LOCKINGTON-HEMINGTON directional drill method. Transfer THE GREEN Gully is blocked approx 8m in a LCC (Works Promoter) 18/03/2020 20/03/2020 Traffic Control (Two-Way straight line from the gully in the 07:55:56 Signals) carriageway inbetween the pub and 22 The Green. The gully has a Road Name/ Number & Description Contractor/Client Estimated Expected Traffic Notes Location Start Date End Date Management

WEST END Trans Std Sew Rep to 225mm 3.0m STW Waste 19/03/2020 25/03/2020 No Carriageway Incursion Await da Dig in footpath to repair to repair sewer Job in Footway (10mm LONG WHATTON Bitmac (Tarmac) ) BOSWORTH ROAD Excavate Carriageway to GTC - Future Utility 23/03/2020 25/03/2020 Traffic Control (Multi-Way Permanently reinstate area left at Solutions-GTC direct Signals) Interim - 4m x 0.4m -10mm tarmac MEASHAM required LEICESTER ROAD RECHARGE LCC (Works Promoter) 27/03/2020 27/03/2020 Traffic Control (Stop/Go 60/30MPH / MAIN ROAD / PARKED Boards) CARS / JUNC / BEND / WPD OH MEASHAM Remove disconnect stump in verge ASHFIELD DRIVE Install external meter in boundary Integra Utility Services 19/03/2020 19/03/2020 Some Carriageway box at depth of under 1.5 meters by Incursion Minimum dig with Permanent MOIRA Reinstatement MEASHAM ROAD S278 works - digging a trench in LCC (Section 50/278/184) 23/03/2020 24/04/2020 Some Carriageway footway for services/reinstatement of Incursion the footway/kerbs. Road narrows MOIRA and ped walkway RAWDON ROAD Drainage scheme Road Closure 3rd LCC (Works Promoter) 24/02/2020 01/05/2020 Road Closure Febuary 2020 till 10th April 2020 07:58:52

MOIRA

FRANCIS LANE Boundary Box Repair Stop visible or STW Water East 18/03/2020 20/03/2020 Traffic Control (Give and significant leakage Job in 10:02:00 Take) Carriageway (10mm Bitmac (Tarmac) ) ASHBY ROAD Bbox Install 25mm and Meter Job in STW Water East 24/03/2020 26/03/2020 Traffic Control (Two-Way Verge (Grass ) Signals)

NORMANTON LE HEATH

CHAPEL STREET Replace 1 jointbox frame and BT 18/03/2020 20/03/2020 No Carriageway Incursion cover(s) (1310mm x 610mm) in Footway

MAIN STREET SOW 5m of 90mm PE to connect New Connections Req 17/03/2020 19/03/2020 Traffic Control (Two-Way onto existing 4"CI main via UPT with East Signals) 80mm outlet OAKTHORPE

STRETTON VIEW Long Comm Pipe Repair 15mm Job STW Water East 26/03/2020 30/03/2020 Some Carriageway in Carriageway (10mm Bitmac Incursion (Tarmac) ) OAKTHORPE Road Name/ Number & Description Contractor/Client Estimated Expected Traffic Notes Location Start Date End Date Management

ZION HILL Boundary box Install & tap main for STW Water East 25/03/2020 27/03/2020 No Carriageway Incursion logg Job in Verge (Grass )

PEGGS GREEN

IBSTOCK ROAD ST FAIL: C&C LCC (Works Promoter) 21/03/2020 21/03/2020 Traffic Control (Stop/Go 40mph / Busy A Road / Traffic Boards) Control Xroads / bus route / HGV RAVENSTONE route RAUNSTONE CLOSE To lay Gas, Water, Electric mains S&R Construction Ltd on 06/03/2020 19/03/2020 Some Carriageway and services to a new development behalf of Energetics Gas Incursion

RAVENSTONE

SWANNINGTON ROAD ST FAIL: Cut and Capped LCC (Works Promoter) 21/03/2020 21/03/2020 Traffic Control (Stop/Go BUSY A ROAD / PARKED CARS / Boards) HGV / BUSES / BT OHLINES / RAVENSTONE BEND IN ROAD / 30MPH MOIRA ROAD Boundary box Install 25mm Job in STW Water East 25/03/2020 27/03/2020 Traffic Control (Two-Way Verge (Grass ) Signals)

SHELLBROOK

MELBOURNE ROAD Boundary box Install & tap main for STW Water East 24/03/2020 26/03/2020 Traffic Control (Two-Way logg Job in Verge (Grass ) Signals)

STAUNTON HAROLD

FOOTPATH P94 Closure of Footpath P94 and P96 - LCC (Section 50/278/184) 24/02/2020 23/08/2020 Road Closure unsafe for members of the public while construction works are underway. HOUGH HILL Boundary box Install & tap main for STW Water East 24/03/2020 24/03/2020 Traffic Control (Two-Way Job in Footway (6mm Bitmac Signals) (Tarmac) ) SWANNINGTON

SPRING LANE gully on the corner of Spring LCC (Works Promoter) 10/03/2020 20/03/2020 Road Closure Lane/Foan Lane gully has an issue 1.4 m in which requires excavation. SWANNINGTON please dig and repair pipe work as MAIN STREET Defect CLO - Remedial Rein by CLO STW Water East 19/03/2020 20/03/2020 Traffic Control (Two-Way Job in Verge (Grass ) Signals)

SWEPSTONE

MOOR LANE Carriageway schemes pool LCC (Works Promoter) 23/03/2020 29/03/2020 Road Closure

TONGE Road Name/ Number & Description Contractor/Client Estimated Expected Traffic Notes Location Start Date End Date Management

MOOR LANE Gully replacements to be completed LCC (Works Promoter) 16/03/2020 21/03/2020 Lane Closure by day lane closures 21/03/2020 13:37:38

TONGE

TONGE LANE TM REQUIRED TO PROVIDE SAFE BT - Inc S81 09/03/2020 20/03/2020 Traffic Control (Multi-Way WORKING ZONE FOR Signals) UNDERGROUND CABLING. TONGE

CITY OF THREE WATERS Bridge reinforcement works. LCC (Works Promoter) 02/03/2020 27/03/2020 Road Closure 08:45:56

WHITWICK

GREEN LANE Std Sew Rep 225mm 3m - PR 02/3 STW Waste 19/03/2020 23/03/2020 Traffic Control (Give and CREW TO CARRY OUT REPAIR ON Take) 150MM VC FOUL SEWER ON FOOTWAY Job in Footway (10mm HERMITAGE ROAD Urgent excavation in highway to Western Power, 6135 NW 15/03/2020 20/03/2020 Traffic Control (Two-Way locate and repair LV cable fault. Leicestershire 22:00:00 Signals)

WHITWICK

LEICESTER ROAD Boundary box Install & tap main for STW Water East 18/03/2020 20/03/2020 Traffic Control (Two-Way logg Job in Carriageway (10mm Signals) Bitmac (Tarmac) ) WHITWICK

LEICESTER ROAD Lining of storm system LCC (Works Promoter) 23/03/2020 25/03/2020 Traffic Control (Multi-Way Signals)

WHITWICK

NORTH STREET The footbridge wooden decking is LCC (Works Promoter) 23/03/2020 27/03/2020 Traffic Control (Two-Way very slippery in wet weather. There Signals) are several planks which are spalled WHITWICK and need replacing. An anti slip mat OAKS ROAD Boundary box Install & tap main for STW Water East 19/03/2020 20/03/2020 Traffic Control (Two-Way logg Job in Verge (Grass ) Signals)

WHITWICK

REMPSTONE ROAD We are installing flood monitoring GC Contract Management 19/03/2020 20/03/2020 Traffic Control (Two-Way equipment in the dirty water system Team- CSO Monitors Signals) to help prevent drains backing up into WORTHINGTON properties and streets. This work will