Ramechhap (As of 10 May 2017) HRRP

Total Page:16

File Type:pdf, Size:1020Kb

Ramechhap (As of 10 May 2017) HRRP District Profile - Ramechhap (as of 10 May 2017) HRRP This district profile outlines the current activities by partner organisations (POs) in post-earthquake recovery and reconstruction. It is based on 4W and secondary data collected from POs on their recent activities pertaining to housing sector. Further, it captures a wide range of planned, ongoing and completed activities within the HRRP framework. For additional information, please refer to the HRRP dashboard. FACTS AND FIGURES Population: 202,6461 45 VDCs and 2 municipalities Damage Status - Private Structures Type of housing walls Ramechhap National Mud-bonded bricks/stone 95% 41% Cement-bonded bricks/stone 3% 29% Damage Grade (3-5) 49,345 Other 2% 30% Damage Grade (1-2) 9,267 % of households who own 95% 85% Total 58,6122 their housing unit (Census 2011)1 NEWS & UPDATES 1. 50 days mason training to generate 350 skilled masons from 6 former VDC’s of Umakunda gaupalika has been started by Helvetas. In the meantime the training sessions are halted and will resume smoothly after local election. 2. Election campaigns are in full fledge in the district and no such incidents are reported yet. Government officials allocated to conduct election has left district headquarter for their respective polling station from today (10th May 2017). All support staff from NRA has also been deployed in various polling stations of the district. © GWT PARTNERS SUMMARY AND HIGHLIGHTS3 Partner Organisation Implementing Partner(s) ACTED ECARDS 373 2,980 GOAL CDS SHORT TRAINING HCI YSP 4,429 HELVETAS SODEC-N,BDCC,ANS,CMES,TRACE,MTSDI,SBPK VOCATIONAL TRAINING 574 HI UNHCR,CESVI (Targets Achieved) Reached Remaining IOM KFS CMES MCC CDS 104 Demonstration Constructions in 18 VDCs MEDAIR CDS NRCS RRN SABAL 0 VDC with Household WASH Assistance TDH-GER CDS 40,911 beneficiaries enrolled, 94% 39,759 beneficiaries received the 1st Tranche, 91%4 13 partners This table indicates the partner organisations and NPR 584 households provided with Housing Grants by POs their respective implementing partner(s) KEY CONTACTS DAO OFFICE DDC OFFICE NRA District Office DUDBC OFFICE Mr. Surya Bahadur Khatri Mr. Dinesh Raj Pant Mr. Rishi Raj Acharya Mr. Amar Bahadur Thapa Chief District Officer Local Development Officer District Focal Point Division Head Telephone : 048-540088 Telephone: 048-540347 Telephone: 048-540518 Creation Date: 20 May 2017 Sources: 1. CENSUS 2011, 2. NRA, CBS, 3. HRRP 4W (10 May 2017), 4. NRA/MoFALD (20 May 2017) For further information, please contact: District Coordinator Sanjaya Deshar [email protected] Kuber Singh [email protected] District Profile - Ramechhap (as of 10 May 2017) HRRP The coverage of Technical Assistance (TA) is defined according to the presence (planned 0 VDC with all 6 TA Activities and on-going) of the following 6 activities and the VDCs highlighted suggest the summa- 24 VDCs with no TA tion of the activities presented: a. Community/household orientation with more than 1 session 22 VDCs with no TA and b. Continuous Door to door technical assistance (Mobile Technical Support) more than 60% damage c. Short training for Masons (Target achieved) d. Vocation/on the job training for masons (Target achieved) e. Helpdesk/Technical Support Center f. Demonstration construction Disclaimer: The highlighted VDCs indicate that at least one of the aforementioned activities is being conducted/planned by partner organizations, irrespective of the methodology or house- hold level coverage of the activity. For activity c and d, it is highlighted when there are more than 70% of masons trained according to the targets defined by NRA and field surveys. Gumdel Chuchure Goswara Those BamtiBhandar Lakhanpur Rasanalu Tokarpur Kubukasthali GunsiBhadaure Dadhuwa Betali Pritee Doramba Guptesor Dimipokhari Bethan Hiledevi Namadi Phulasi Khadadevi Farpu Bhujee Duragau Khaniyapani Bhadaure Pinkhuri Chanakhu Khimti Majuwa Makadum Puranagau Gelu Rakathum Saipu Tilpung Bhirpani NagaDaha Bijulikot Pakarbas Gothgau Manthali N.P. Deurali Sanghutar Ramechhap N.P. Himganga Rampur Coverage of TA 1 2 3 Wards with no TA Creation Date: 20 May 2017 Sources: 1. CENSUS 2011, 2. NRA, CBS, 3. HRRP 4W (10 May 2017), 4. NRA/MoFALD (20 May 2017) For further information, please contact: District Coordinator Sanjaya Deshar [email protected] Kuber Singh [email protected] .
Recommended publications
  • Nepal Electricity Authority
    NEPAL ELECTRICITY AUTHORITY ENVIRONMENTAL AND SOCIALMANAGEMENT PLAN OF SUPPLY AND INSTALLATION OF DISTRIBUTION PROJECTS (33KV TRANSMISSION LINE) UNDER THE GRID SOLAR AND ENERGY EFFICIECY PROJECT VOLUME II Prepared and Submitted by: Environment and Social Studies Department Kharipati, Bhaktapur Phone No.: 01-6611580, Fax: 01-6611590 Email: [email protected] September, 2018 SIDP Abbreviations and Acronyms ABBREVIATIONS AND ACRONYMS BS : Bikram Sambat (Nepali Era) DADO : District Agriculture Development Office DCC : District Coordination Committee DFO : District Forest Office DoED : Department of Electricity Development ESMF : Environment and Social Management Framework ESMP : Environment and Social Management Plan EPR : Environment Protection Rules, 1997 ESSD : Environment and Social Studies Department GoN : Government of Nepal GSEEP : Grid Tied and Solar Energy Efficiency Project GRC : Grievance Redress Cell GRM : Grievance Redress Mechanism HHs : Households IEE : Initial Environmental Examination MoEWRI : Ministry of Energy, Water Resource and Irrigation MoFE : Ministry of Forest and Environment NEA : Nepal Electricity Authority PAS : Project Affected Settlement PMO : Project Management Office SIDP : Supply and Installation of Distribution Project WB : World Bank Units ha : Hectare km : Kilometer kV : Kilo Volt m2 : Square meter ESMP Report i NEA-ESSD SIDP Table of Contents Table of Contents ABBREVIATIONS AND ACRONYMS ........................................................................................ I 1 INTRODUCTION ............................................................................................................
    [Show full text]
  • Ramechhap HRRP General Coordination Meeting,11Th Dec 2018
    HRRP District Coordination Meeting Minutes Meeting Purpose: HRRP General Coordination Meeting Meeting Date: 11/12/2018 (11th Dec 2018) Meeting Time: 11am – 2pm Meeting Location: Devkota Chowk, Manthali DTO Meeting Hall, Ramechhap Meeting Facilitator: Prakash Bishwakarma Minutes Taken By: Prakash Bishwakarma / Javeed Mohamad Summary of Total: 16 Female:1 Male: 15 participants: Discussion: (Items/Knowledge Shared) GMaLi/HRRP Ramechhap General coordination meeting was chaired by Mr. Krishna lal Piya – GMALI Office Chief, Ramechhap and chief guest was Mr. Shanti prasad Paudel Provincial member of parliament province 3. Agenda: ➢ Welcome/Introduction ➢ Follow up of previous month’s meeting discussion and parking lot ➢ POs update – please share your update packs (PPT) so that can be shared in the meeting minute ➢ AOB Discussion ➢ Welcome and Introduction: Mr. Prakash Bishwakarma- District Coordinator- HRRP welcomed all the participants participated in the General coordination meeting and had a round of the introduction with each other. He also shared the objective and agenda of the General coordination meeting to be discussed in the meeting. ➢ HRRP updates: Mr. Prakash Bishwakarma- District coordinator have a presentation on What HRRP is doing and What HRRP is? Housing Recovery and Reconstruction Platform (HRRP) is working in Nepal to support Government of Nepal (NRA, MOUD/DUDBC, MOFALD) in coordination, Strategic planning, facilitating cooperation with the national and international organizations, the private sector, and public associations involve in recovery and reconstruction after Earthquake in Nepal. In the following ways HRRP Work. -General Coordination -Technical Coordination -Information Management o Collecting 5w data o Manage Training Database o Generate Maps ➢ Partners Update In Ramechhap District there are 6 partner’s organization are actively working in the district based on the reporting to GMALI/HRRP.
    [Show full text]
  • Food Insecurity and Undernutrition in Nepal
    SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics Acknowledgements The completion of both this and the earlier feasibility report follows extensive consultation with the National Planning Commission, Central Bureau of Statistics (CBS), World Food Programme (WFP), UNICEF, World Bank, and New ERA, together with members of the Statistics and Evidence for Policy, Planning and Results (SEPPR) working group from the International Development Partners Group (IDPG) and made up of people from Asian Development Bank (ADB), Department for International Development (DFID), United Nations Development Programme (UNDP), UNICEF and United States Agency for International Development (USAID), WFP, and the World Bank. WFP, UNICEF and the World Bank commissioned this research. The statistical analysis has been undertaken by Professor Stephen Haslett, Systemetrics Research Associates and Institute of Fundamental Sciences, Massey University, New Zealand and Associate Prof Geoffrey Jones, Dr. Maris Isidro and Alison Sefton of the Institute of Fundamental Sciences - Statistics, Massey University, New Zealand. We gratefully acknowledge the considerable assistance provided at all stages by the Central Bureau of Statistics. Special thanks to Bikash Bista, Rudra Suwal, Dilli Raj Joshi, Devendra Karanjit, Bed Dhakal, Lok Khatri and Pushpa Raj Paudel. See Appendix E for the full list of people consulted. First published: December 2014 Design and processed by: Print Communication, 4241355 ISBN: 978-9937-3000-976 Suggested citation: Haslett, S., Jones, G., Isidro, M., and Sefton, A. (2014) Small Area Estimation of Food Insecurity and Undernutrition in Nepal, Central Bureau of Statistics, National Planning Commissions Secretariat, World Food Programme, UNICEF and World Bank, Kathmandu, Nepal, December 2014.
    [Show full text]
  • Psychosocial Intervention for Earthquake Survivors
    PSYCHOSOCIAL INTERVENTION FOR EARTHQUAKE SURVIVORS FINAL REPORT JANUARY 2017 PSYCHOSOCIAL INTERVENTION FOR EARTHQUAKE SURVIVORS Duration June 2015 to December 2016 FOREWORD AND ACKNOWLEDGEMENTS The 2015 earthquakes caused huge losses across 14 hill districts of Nepal. CMC-Nepal subsequently provided psychosocial and mental health support to affected people with funding from more than eight partners. The Swiss Agency for Development and Cooperation (SDC) supported a major emergency mental health and psychosocial response project in Dolakha, Ramechhap and Okhaldhunga districts from June 2015 to December 2016. I would first like to thank the project team for their hard work, dedication and many contributions. The success of the project is because of their hard work and motivation to learn. I thank the psychosocial counsellors and community psychosocial worker (CPSWs) for their dedication to serving the earthquake survivors. They developed their skills and provided psychosocial services to many distressed people. I congratulate them for successfully completing their training on psychosocial counselling (for counsellors) and psychosocial support (for CPSWs) and for their courage to provide support to their clients amidst difficult circumstances. I also thank the Project’s Supervisors (Karuna Kunwar, Madhu Bilash Khanal, Jyotshna Shrestha and Sujita Baniya), and Monitoring Supervisor (Himal Gaire) for their valuable constant backstopping support to the district staff. I thank Dorothee Janssen de Bisthoven (Expat Psychologist and Supervisor) for her help to build the capacity and maintain the morale of the project’s supervisors. Dorothee made a large contribution to building the capacity of the personnel and I express my gratitude and respect for her commitment and support to CMC-N and hope we can receive her support in the future as well.
    [Show full text]
  • Map of Dolakha District Show Ing Proposed Vdcs for Survey
    Annex 3.6 Annex 3.6 Map of Dolakha district showing proposed VDCs for survey Source: NARMA Inception Report A - 53 Annex 3.7 Annex 3.7 Summary of Periodic District Development Plans Outlay Districts Period Vision Objectives Priorities (Rs in 'ooo) Kavrepalanchok 2000/01- Protection of natural Qualitative change in social condition (i) Development of physical 7,021,441 2006/07 resources, health, of people in general and backward class infrastructure; education; (ii) Children education, agriculture (children, women, Dalit, neglected and and women; (iii) Agriculture; (iv) and tourism down trodden) and remote area people Natural heritage; (v) Health services; development in particular; Increase in agricultural (vi) Institutional development and and industrial production; Tourism and development management; (vii) infrastructure development; Proper Tourism; (viii) Industrial management and utilization of natural development; (ix) Development of resources. backward class and region; (x) Sports and culture Sindhuli Mahottari Ramechhap 2000/01 – Sustainable social, Integrated development in (i) Physical infrastructure (road, 2,131,888 2006/07 economic and socio-economic aspects; Overall electricity, communication), sustainable development of district by mobilizing alternative energy, residence and town development (Able, local resources; Development of human development, industry, mining and Prosperous and resources and information system; tourism; (ii) Education, culture and Civilized Capacity enhancement of local bodies sports; (III) Drinking
    [Show full text]
  • VBST Short List
    1 आिेदकको दर्ा ा न륍बर नागररकर्ा न륍बर नाम थायी जि쥍ला गा.वि.स. बािुको नाम ईभेꅍट ID 10002 2632 SUMAN BHATTARAI KATHMANDU KATHMANDU M.N.P. KEDAR PRASAD BHATTARAI 136880 10003 28733 KABIN PRAJAPATI BHAKTAPUR BHAKTAPUR N.P. SITA RAM PRAJAPATI 136882 10008 271060/7240/5583 SUDESH MANANDHAR KATHMANDU KATHMANDU M.N.P. SHREE KRISHNA MANANDHAR 136890 10011 9135 SAMERRR NAKARMI KATHMANDU KATHMANDU M.N.P. BASANTA KUMAR NAKARMI 136943 10014 407/11592 NANI MAYA BASNET DOLAKHA BHIMESWOR N.P. SHREE YAGA BAHADUR BASNET136951 10015 62032/450 USHA ADHIJARI KAVRE PANCHKHAL BHOLA NATH ADHIKARI 136952 10017 411001/71853 MANASH THAPA GULMI TAMGHAS KASHER BAHADUR THAPA 136954 10018 44874 RAJ KUMAR LAMICHHANE PARBAT TILAHAR KRISHNA BAHADUR LAMICHHANE136957 10021 711034/173 KESHAB RAJ BHATTA BAJHANG BANJH JANAK LAL BHATTA 136964 10023 1581 MANDEEP SHRESTHA SIRAHA SIRAHA N.P. KUMAR MAN SHRESTHA 136969 2 आिेदकको दर्ा ा न륍बर नागररकर्ा न륍बर नाम थायी जि쥍ला गा.वि.स. बािुको नाम ईभेꅍट ID 10024 283027/3 SHREE KRISHNA GHARTI LALITPUR GODAWARI DURGA BAHADUR GHARTI 136971 10025 60-01-71-00189 CHANDRA KAMI JUMLA PATARASI JAYA LAL KAMI 136974 10026 151086/205 PRABIN YADAV DHANUSHA MARCHAIJHITAKAIYA JAYA NARAYAN YADAV 136976 10030 1012/81328 SABINA NAGARKOTI KATHMANDU DAANCHHI HARI KRISHNA NAGARKOTI 136984 10032 1039/16713 BIRENDRA PRASAD GUPTABARA KARAIYA SAMBHU SHA KANU 136988 10033 28-01-71-05846 SURESH JOSHI LALITPUR LALITPUR U.M.N.P. RAJU JOSHI 136990 10034 331071/6889 BIJAYA PRASAD YADAV BARA RAUWAHI RAM YAKWAL PRASAD YADAV 136993 10036 071024/932 DIPENDRA BHUJEL DHANKUTA TANKHUWA LOCHAN BAHADUR BHUJEL 136996 10037 28-01-067-01720 SABIN K.C.
    [Show full text]
  • TSLC PMT Result
    Page 62 of 132 Rank Token No SLC/SEE Reg No Name District Palika WardNo Father Mother Village PMTScore Gender TSLC 1 42060 7574O15075 SOBHA BOHARA BOHARA Darchula Rithachaupata 3 HARI SINGH BOHARA BIMA BOHARA AMKUR 890.1 Female 2 39231 7569013048 Sanju Singh Bajura Gotree 9 Gyanendra Singh Jansara Singh Manikanda 902.7 Male 3 40574 7559004049 LOGAJAN BHANDARI Humla ShreeNagar 1 Hari Bhandari Amani Bhandari Bhandari gau 907 Male 4 40374 6560016016 DHANRAJ TAMATA Mugu Dhainakot 8 Bali Tamata Puni kala Tamata Dalitbada 908.2 Male 5 36515 7569004014 BHUVAN BAHADUR BK Bajura Martadi 3 Karna bahadur bk Dhauli lawar Chaurata 908.5 Male 6 43877 6960005019 NANDA SINGH B K Mugu Kotdanda 9 Jaya bahadur tiruwa Muga tiruwa Luee kotdanda mugu 910.4 Male 7 40945 7535076072 Saroj raut kurmi Rautahat GarudaBairiya 7 biswanath raut pramila devi pipariya dostiya 911.3 Male 8 42712 7569023079 NISHA BUDHa Bajura Sappata 6 GAN BAHADUR BUDHA AABHARI BUDHA CHUDARI 911.4 Female 9 35970 7260012119 RAMU TAMATATA Mugu Seri 5 Padam Bahadur Tamata Manamata Tamata Bamkanda 912.6 Female 10 36673 7375025003 Akbar Od Baitadi Pancheswor 3 Ganesh ram od Kalawati od Kalauti 915.4 Male 11 40529 7335011133 PRAMOD KUMAR PANDIT Rautahat Dharhari 5 MISHRI PANDIT URMILA DEVI 915.8 Male 12 42683 7525055002 BIMALA RAI Nuwakot Madanpur 4 Man Bahadur Rai Gauri Maya Rai Ghodghad 915.9 Female 13 42758 7525055016 SABIN AALE MAGAR Nuwakot Madanpur 4 Raj Kumar Aale Magqar Devi Aale Magar Ghodghad 915.9 Male 14 42459 7217094014 SOBHA DHAKAL Dolakha GhangSukathokar 2 Bishnu Prasad Dhakal
    [Show full text]
  • Nepal: Disaster Resilience of Schools Project
    Social Safeguards Due Diligence Report Project Number: 51190-001 February 2020 Nepal: Disaster Resilience of Schools Project Construction of Schools in Ramechhap District (Reconstruction Phase II) Prepared by Central Level Project Implementation Unit (Education) of National Reconstruction Authority for the Asian Development Bank. This Social Safeguards Due Diligence Report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. TABLE OF CONTENTS ABBREVIATIONS ..................................................................................................................... III I. INTRODUCTION ............................................................................................................ 1 II. APPROACH AND METHODOLOGY IN DUE DILIGENCE ............................................ 2 III. SCOPE OF LIKELY IMPACTS OF THE PROJECTS ..................................................... 3 A. INVOLUNTARY RESETTLEMENT ...................................................................................................................... 3 B. INDIGENOUS PEOPLES...................................................................................................................................
    [Show full text]
  • Download 4.67 MB
    Initial Environmental Examination Haldebesi – Dhobi - Dhandebesi Road Rehabilitation and Reconstruction Sub-project July 2017 NEP: Earthquake Emergency Assistance Project Prepared by District Coordination Committee (Ramechhap)- Central Level Project Implementation Unit – Ministry of Federals Affairs and Local Development for the Asian Development Bank. This initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section on ADB’s website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Environmental Assessment Document Initial Environmental Examination (IEE) Haldebesi – Dhobi - Dhandebesi Road Rehabilitation and Reconstruction Sub-project July 2017 NEP: Earthquake Emergency Assistance Project Loan: 3260 Project Number: 49215-001 Prepared by the Government of Nepal for the Asian Development Bank (ADB). This Report is a document of the borrower. The views expressed herein do not necessarilyThe views expressed represent herein those are those of ADB's of the consultantBoard of and Directors, do not necessarily Management, represent or thosestaff ,of and ADB’s may members, Board of Directors, Management, or staff, and may be preliminary in nature. be preliminary in nature. The views expressed herein are those of the consultant and do not necessarily represent those of ADB’s members, Board of Directors, Management, or staff, and may be preliminary in nature.
    [Show full text]
  • Politics of R Esistance
    Politics of Resistance Politics Tis book illustrates an exciting approach to understanding both Indigenous Peoples of Nepal are searching for the state momentous and everyday events in the history of South Asia. It which recognizes and refects their identities. Exclusion of advances notions of rupture and repair to comprehend the afermath indigenous peoples in the ruling apparatus and from resources of natural, social and personal disasters, and demonstrates the of the “modern states,” and absence of their representation and generality of the approach by seeking their historical resolution. belongingness to its structures and processes have been sources Te introduction of rice milling technology in a rural landscape of conficts. Indigenous peoples are engaged in resistance in Bengal,movements the post-cold as the warstate global has been shi factive in international in destroying, relations, instead of the assassinationbuilding, their attempt political, on a economicjournalist and in acultural rented institutions.city house inThe Kathmandu,new constitution the alternate of 2015and simultaneousfailed to address existence the issues, of violencehence the in non-violentongoing movements,struggle for political,a fash feconomic,ood caused and by cultural torrential rights rains and in the plainsdemocratization of Nepal, theof the closure country. of a China-India border afer the army invasionIf the in Tibet,country and belongs the appearance to all, if the of outsiderspeople have in andemocratic ethnic Taru hinterlandvalues, the – indigenous scholars in peoples’ this volume agenda have would analysed become the a origins, common anatomiesagenda and ofdevelopment all. If the state of these is democratic events as andruptures inclusive, and itraised would interestingaddress questions the issue regarding of justice theirto all.
    [Show full text]
  • Poverty Alleviation Fund
    Poverty Alleviation Fund Poverty Alleviation Fund Earthquake Response Program Seven Days Mason Training List of Participants District: Ramechhap S.N Participant Name Address Citizen No Age Gender Contact No. Chhapabot, 1 Palten Tamang 48306 40 Male 9818911615 Rakathum 2 Chamar Dong Chapadi, Rakathum 213052/346 40 Male 9819679014 Dhan Bahadur 3 Chapadi, Rakathum 906 57 Male 9810169447 Tamang 4 Sonam Lama Labhu, Rakathum 40753 46 Male 9861591145 Khanigaun, 5 Chuntui Lama 211052-1222 34 Male 9818911615 Rakathum Dharapani, 6 Ramita Kumari Kadel 461 37 Female 9810216040 Rakathum Gam Bahadur Dharapani, 7 62366 63 Male 9823683500 Shrestha Rakathum 8 Raj Kumar Shrestha Ghatte, Bethan 65411 36 Male 9818722056 Purna Bahadur 9 Chapadi, Rakathum 911 33 Male - Pulami Man Bahadur 10 Chapadi, Rakathum 910 55 Male - Khadka 11 Binod Majhi Chihadi, Bethan 38100 42 Male 9818804256 12 Rajkrishna Shrestha Jugepani, Bethan 3859 47 Male 9802165681 Jakta Bahadur 211047/309 13 Amaldanda, Bethan 62 Male 9807634872 Shrestha 34 Dal Bahadur 14 Lada, Bethan 39066 31 Male 9813258659 Shrestha Dambar Bahadur 15 Ghatte, Bethan 2657 44 Male 9800877224 Tamang Harkha Bahadur 16 Garkot, Bethan 57934 55 Male 9803479249 Magar Karna Bahadur 17 Chapadi, Rakathum 213052/336 50 Male 9840201118 Magar Poverty Alleviation Fund Dhurba Bahadur 18 Lamatol, Bethan 1634/050 57 Male 9817829803 Khatri (Ghimire) Chhapabot, 19 Sanukaji Paudel 48306 49 Male 9818911615 Rakathum 20 Bikram Tamang Chapadi, Rakathum 213052/346 25 Male 9819679014 Ram Bahadur 21 Chapadi, Rakathum 906 43 Male 9810169447
    [Show full text]
  • Housing Recovery & Reconstruction Platform (HRRP) District Meeting
    Housing Recovery & Reconstruction Platform (HRRP) District Meeting Minutes District – Ramechhap Date: 02 February 2016 Venue: Nepal Red Cross Office, Manthali, Ramechhap Time: 01:30 PM Chief Guest: Ramesh Adhikari, DDC Hub Coordinator: Suman Joshi (HRRP) District Focal Point: Debendra Karki (HRRP) [email protected] / 9841516944 Information Manager: Sushil Kakshyapati (HRRP) [email protected] / 9803527578 Attendees: DDC, HRRP, MEDAIR, Kam for Sud, ACTED, CDS, SYS, NRCS and etc. Agenda: 1. Introduction 2. HRRP - Overview and Concept, Objective and Structure 3. Plan and Response of Partner Organizations (POs) 4. Open discussion and mapping POs coverage 5. Updates on partner’s activities and planning related to preparing for reconstruction and partner capacity to assist with the enrollment process 6. Improving coordination among local NGO and INGO 7. AOB The HRRP Coordination Meeting took place at the NRCS Office, Manthali, Ramechhap on 02nd February 2016. The formal meeting started with short introduction and followed by sharing information on current Reconstruction & Recovery plans & progress. A total of 12 participants representing from different organizations were present at the HRRP meeting. Introduction The purpose of the cluster meeting was more to give general idea of HRRP & NRA system for Recovery and Reconstruction to the government representatives & POs. And also to exchange and update information from POs, avoid duplication, facilitate collective approach and joint planning with other partners, share challenges, gaps, and way forwards whereas the meeting was more focused on Recovery and Reconstruction Activities i.e., • Technical Training: Mason/Carpentry/ Building Code implementation/Counseling • Houses Reconstruction • Cash Distribution/ Cash for Work • Social/Community Awareness • Participatory Approach for Safe Shelter Awareness (PASSA) • Build Back Safer (BBS) Ten key Message.
    [Show full text]