2018-2019 MS4 Annual Report City of Stamford,

TABLE OF CONTENTS

Section Page

INTRODUCTION ...... 1

1.0 CONTACTS LIST ...... 2

2.0 PROGRAM EVALUATION ...... 4

2.1 Stormwater Management Plan (SMP) Objectives ...... 4 2.2 Major Findings ...... 4 2.3 SMP Strengths and Weaknesses ...... 5 2.3.1 EPA Review of the Status of the NPDES Permit ...... 5 2.4 Future Direction of the SMP ...... 5 2.5 NPDES Permit Modification SMP Updates ...... 6

3.0 SUMMARY TABLE OF SMP COMPONENTS ...... 7

4.0 NARRATIVE REPORT ...... 8

4.1 Pollution Prevention Team ...... 8 4.2 Mapping ...... 9 4.3 Control Measures ...... 10 4.3.1 Public Education and Involvement...... 10 4.3.2 Industrial Dischargers ...... 13 4.3.3 Source Controls and Pollution Prevention ...... 13 4.3.4 Land Disturbance and Development ...... 15 4.3.5 Infrastructure Operations and Maintenance ...... 18 4.4 Monitoring Program ...... 27 4.4.1 Dry Weather Outfall Screening for Illicit Discharges ...... 27 4.4.2 Wet Weather Outfall Monitoring ...... 27 4.5 Illicit Discharge Detection and Elimination (IDDE) Program ...... 27 4.5.1 Dry Weather Outfall Screening for Illicit Discharges ...... 28 4.5.2 Illicit Discharge Investigations ...... 28 4.5.3 Illegal Connections ...... 28 4.6 Legal Authority ...... 29 4.6.1 Written Warnings ...... 30 4.6.2 Verbal Warnings ...... 30 5.0 SUMMARY OF PROPOSED SMP MODIFICATIONS ...... 31

6.0 PROGRAM RESOURCES ANALYSIS ...... 32

6.1 Fiscal Analysis ...... 32

i ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

TABLE OF CONTENTS

Section Page

6.2 Staff and Resources ...... 34

APPENDICES

A. Definitions B. Stormwater Management Plan Summary Table C. Updated City Outfall Locations Map D. 2018–19 Spills E. 2018–19 Pesticide, Fertilizer, and Herbicide Use F. 2018–19 Environmental Protection Board Summary Table G. City Staff Training Events Sign-In Sheets H. 2018–19 Catch Basin / Manhole Repairs List I. 2018–19 Culvert Cleaning List J. 2018–19 IDDE Dry Weather Screening Data Summary Table K. 2018–19 IDDE Wet Weather Screening Data Summary Table L. 2018–19 IDDE Follow-up Investigations

ii ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

INTRODUCTION

The City of Stamford (the City) was issued its current NPDES Permit (No. CT0030279) for discharge of stormwater from its municipal separate storm sewer system (MS4) on June 4, 2013. Renewal for this permit was submitted to DEEP on February 6, 2018. This permit requires many actions in order to reduce pollution from stormwater runoff.

This Annual Report (Report) covers the period from July 1, 2018 through June 30, 2019 (Reporting Period). It summarizes the activities conducted and measures taken to comply with the previous and current NPDES Permit during this Reporting Period. This Annual Report was prepared in accordance with the terms and conditions of the NPDES Permit, as well as the Stormwater Management Plan, City of Stamford, Stamford, Connecticut, September 2, 2014 (the SMP).

The 2017–18 MS4 final Annual Report was submitted to CTDEEP on October 3, 2018.

On January 2, 2016, the City submitted an application for modification of its NPDES Permit. The City, in conjunction with the CTDEEP, completed many efforts to work through the requested permit modification items during the 2016-17 fiscal year. Many meetings, phone calls, emails, and letters related to the process were conducted over a period of two (2) years to complete the permit modification process which took a considerable amount effort. CTDEEP worked with the City and the Environmental Protection Agency (EPA) in efforts to complete the process. A NPDES Permit Modification for the City of Stamford was issued by the CTDEEP on August 14, 2017.

On February 6, 2018, the City submitted a permit renewal application for the newly modified NPDES Permit, which was set to expire on June 3, 2018. The City received minimal comments from the CTDEEP’s review of the application and has since submitted all of the requested information. The new permit is pending renewal from CTDEEP.

Notice of Sufficiency from the Connecticut Department of Energy and Environmental Protection (CTDEEP) was received on July 9, 2019. The letter indicates the application is in technical review at this time.

1 ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

1.0 CONTACTS LIST

The following individuals are members of the City’s Stormwater Pollution Prevention Team and have a role in the implementation of the City’s stormwater management program and are in positions that have the potential to impact and improve stormwater quality. All of these individuals are involved in the development of the Stormwater Management Plan (SMP) and/or this Annual Report.

. Thomas Turk, Traffic and Road Maintenance Supervisor, Team Coordinator City of Stamford, Traffic and Road Maintenance 90 Magee Ave, Stamford, CT 06902 Phone: (203) 977-5919 Email: [email protected]

. Tyler Theder, Regulatory Compliance and Administrative Officer City of Stamford, Traffic and Road Maintenance 90 Magee Ave, Stamford, CT 06902 Phone: (203) 977-5281 Email: [email protected]

. Mark McGrath, Director of Operations City of Stamford, Office of Operations 888 Washington Blvd, Stamford, CT 06902 Phone: (203) 977-4141 Email: [email protected]

. Ralph Blessing, Land Use Bureau Chief City of Stamford, Land Use Bureau 888 Washington Blvd, Stamford, CT 06901 Phone: (203) 977-4714 Email: [email protected]

. James Lunney, Zoning Enforcement Officer City of Stamford, Land Use Bureau – Zoning Office 888 Washington Blvd, Stamford, CT 06901 Phone: (203) 977-5944 Email: [email protected]

. Rick Talamelli, Environmental Planner City of Stamford, Land Use Bureau – Environmental Planning Board (EPB) 888 Washington Blvd, Stamford, CT 06901 Phone: (203) 977-4965 Email: [email protected]

. Louis Casolo, City Engineer City of Stamford, Engineering 888 Washington Blvd, Stamford, CT 06901 Phone: (203) 977-5796 Email: [email protected]

. Cindy Barber, GIS Coordinator City of Stamford, Land Use Bureau – Information Technology 888 Washington Blvd, Stamford, CT 06901 Phone: (203) 977-5360 Email: [email protected]

2 ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

. D. Scott Atkin, Principal Anchor Engineering Services, Inc. 41 Sequin Drive, Glastonbury, CT 06033 Phone: (860) 633.8770 Email: [email protected]

. T.J. Therriault, Project Manager / Associate Anchor Engineering Services, Inc. 41 Sequin Drive, Glastonbury, CT 06033 Phone: (860) 633.8770 Email: [email protected]

3 ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

2.0 PROGRAM EVALUATION

2.1 Stormwater Management Plan (SMP) Objectives

The City of Stamford (the City) was issued a NPDES Permit for discharge of stormwater from its municipal separate storm sewer system (MS4) on June 4, 2013. This permit was renewed in February 2018. The new modified permit renewal is pending approval from CTDEEP. The City developed and is implementing a Stormwater Management Plan (SMP) based on the requirements of the NPDES Permit.

The SMP provides the framework for compliance with the terms and conditions of the NPDES Permit with the overall objective of improving the quality of stormwater runoff and protecting the surface waters of the State. The SMP seeks to achieve this objective through: • Establishment of a Pollution Prevention Team • Development of Stormwater Mapping • Establishment and Implementation of Control Measures, including: o Public Education and Involvement o Source Controls for Pollution Prevention o Future Land Disturbance and Development Management o Infrastructure Operations and Maintenance • Establishment and Implementation of an Illicit Discharge Detection and Elimination (IDDE) Program • Establishment and Implementation of a Water Quality Monitoring Program • Establishment and Implementation of Legal Authority to Control Discharges • Establishment and Implementation of Procedures to Coordinate Stormwater Activities between various Departments and Agencies • Maintaining Consistency with Other Plans and Permits

Additional details on each of these of these methods to achieve the objectives of the SMP are presented in the Summary Table of SMP Components (Section 3.0) and the Narrative Report (Section 4.0).

2.2 Major Findings

The objective of the SMP is to improve stormwater runoff quality and protect the surface waters of the State. This discussion of major findings should provide an overall evaluation as to whether stormwater and surface water quality in the City and from the City’s MS4 is improving or degrading in the City.

The major findings during this Reporting Period of the modified NPDES Permit are the steps that the City has taken to implement the permit requirements, including but not limited to: • Continued development of an understanding of the permit requirements and the resources necessary to achieve compliance • Continued allocation of additional resources (personnel, equipment, and budget) to/within the Traffic and Road Maintenance Division to specifically address stormwater management and stormwater runoff quality improvement issues

4 ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

• Continued coordination of the Stormwater Pollution Prevention Team with City Departments for stormwater-related issues • Implementation of the SMP and associated public outreach activities • Continuation of city-wide geographic information system (GIS) mapping related to stormwater infrastructure and management • Continued development of legal authority and zoning regulations to address stormwater discharges and quality • Continued coordination of public outreach with local environmental and business groups • Continued coordination with consultants to assist in the implementation of the SMP and to perform surface water, stormwater, and outfall monitoring

2.3 SMP Strengths and Weaknesses

2.3.1 EPA Review of the Status of the NPDES Permit

Representatives from the US Environmental Protection Agency (EPA) and the CTDEEP visited with members of the City’s Stormwater Pollution Prevention Team on June 15 and 16, 2015 to conduct a compliance audit of the City’s NPDES Permit. The compliance audit included a “five-year look-back” period. After the compliance audit, the EPA indicated that several areas of the permit needed improvement which are outlined in Section 2.3.1 of the 2014 & 2015 Annual Report.

The EPA issued an Administrative Order and Request for Information, regarding the compliance audit, to the City of Stamford on October 1, 2015. The City of Stamford has been working with the EPA of this Reporting Period to address items identified during the compliance audit.

Per the request of the CTDEEP, on September 17, 2018, the City of Stamford provided the CTDEEP with a 52-page document discussing the current status of the findings of the EPA’s Violation and Order for Compliance – Docket No. CWA-01-AO-15-012, September 30, 2015.

2.4 Future Direction of the SMP

The SMP will continue to be evaluated in greater detail as part of the 2018–19 Reporting Period. A component of that evaluation will be a review of goals, schedules, and procedures referenced in the SMP as “to be established” and a detailed analysis of the status of these items.

The City considers the SMP to be a dynamic document and will continue to work towards updating and revising it as conditions and regulations change in an effort to maximize its ability to be utilized as a tool to manage and improve stormwater runoff quality

The City will continue to focus more of its resources in the coming years to achieving compliance with the SMP, particularly in the areas of: • Public education and involvement • Stormwater mapping • Illicit discharge detection and elimination

5 ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

• Control measures • Infrastructure operations and maintenance • Legal authority and regulatory changes • Water quality monitoring

Specific goals or requirements are discussed in the Narrative Report, Section 4.0, of this Annual Report.

The Team Coordinator and Regulatory Compliance and Administrative Officer will continue to be responsible for closely tracking individual activities and events in each of these areas.

2.5 NPDES Permit Modification SMP Updates

On August 14, 2017, a permit modification was issued for the City’s NPDES Permit. During the 2017- 18 Reporting Period, the City reviewed the permit modification for any new requirements. During the 2018-19 Reporting Period, the City received a draft revised SMP from Fuss & O’Neill and will be reviewing and finalizing the SMP during the 2019-20 Reporting Period.

6 ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

3.0 SUMMARY TABLE OF SMP COMPONENTS

The summary table of SMP components is presented in Appendix B. This table concisely presents the stormwater management activities completed within the time period for this Annual Report and documents the City’s compliance with key permit and SMP requirements.

Administrative issues, such as planning activities, program development, and pilot studies, are not discussed in the summary table of SMP components.

7 ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

4.0 NARRATIVE REPORT

4.1 Pollution Prevention Team

The Pollution Prevention Team (Team), Section 1.0, was established to implement the SMP, to keep it up-to-date as conditions and/or regulations change, to maintain the control measures to improve stormwater quality, and to take corrective actions, as necessary. With the issuance of the new NPDES Permit in 2013, the City decided to transfer the majority of the responsibility for compliance with the permit from the SWPCA to the Traffic and Road Maintenance Division.

Much of the first year of the new permit was utilized by the Traffic and Road Maintenance Division becoming familiar with the permit requirements and establishing the necessary schedules, procedures, personnel, equipment, financing, and other resources necessary to successfully implement the permit requirements and the SMP.

The Team that has been established under the current SMP (see Appendix B of the SMP and Section 1.0 of this report) consists of personnel from many City departments whose operations may affect the current and future stormwater quality. Team members supply the City with a wide range of experience and expertise in managing and controlling stormwater runoff quality.

Since 2013, the Team has continued improving their understanding of the new NPDES Permit requirements, communicating these requirements amongst themselves, establishing areas of responsibility and cooperation, brainstorming on public education and control measure ideas, and working with the appropriate legal counsel to establish legal authority and new regulations.

The Team’s activities are coordinated by the Traffic and Road Maintenance Supervisor. Many of the day-to-day stormwater permit compliance activities are managed by the Regulatory Compliance and Administrative Officer; this position was created in early 2014 specifically as a result of the issuance of the current NPDES Permit.

The City has also created and filled five positions under the direction of the Regulatory Compliance and Administrative Officer; the positions include five heavy equipment operators to help operate the vacuum trucks and camera truck for IDDE screening and catch basin and manhole inspections and cleaning.

It is anticipated that the Team will continue these activities during the next year of the discharge permit as well as develop and coordinate additional specific goals with the objective of improving the overall quality of stormwater runoff in the City of Stamford.

8 ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

4.2 Mapping

The City maintains a strong GIS department that can coordinate city-specific, as well as environmental data, available from the DEEP and other sources. Information that has been mapped includes: city roadways, city properties, aerial photography, topography, zoning map, surface water bodies, watershed areas, surface water quality classifications, impaired waters, mapped inland wetlands, mapped tidal wetlands, and the coastal boundary.

The City continues to update and reuse mapping for sanitary sewer lines, stormwater lines, and stormwater outfalls. Mapping efforts have focused on the more developed sections of the City, closest to Long Island Sound, with the most stormwater outfalls mapped south of Interstate 95 and many more mapped between I-95 and the (Connecticut Route 15). Initially, 154 stormwater outfalls were mapped. Several of the initially mapped outfall locations were determined to be inaccurate and 90 MS4 outfalls have been confirmed/identified/mapped. Two of the previous 92 MS4 outfalls were eliminated from the list, outfalls number SON-0021 and SON-0060. These outfalls were removed from the monitoring list because one was identified as the SWPCA’s Facility discharge location and the other was a structure inlet.

The City continued to identify and map new MS4 outfalls in the City throughout the Reporting Period. As of June 30, 2019, the City has mapped 958 outfalls. Efforts were completed to canvas the entire City for identifying outfalls and approximately 95% of the City has been mapped. The City understands that there is continual maintenance being conducted on the stormwater system throughout the city and that the outfall mapping will require constant updating. Current updated outfall mapping is provided in Appendix C.

The City is currently in the process of confirming the accuracy of the outfall locations and whether they are part of the City’s MS4 stormwater system or another entity’s responsibility. Several of the potential new outfalls have been identified as duplicates and others have been noted as inlets or discharges under state DOT control. The City continues communication with the DEEP to identify more specific criteria for the outfalls that will be required for monitoring as part of the IDDE program and the wet weather monitoring. See Section 4.5 and Section 4.4.2 for additional details on the IDDE program and the wet weather monitoring program. A new Interconnected MS4 plan was prepared in June 2016 and is further discussed in Section 4.3.5.10.

This component of the SMP is to be expanded to include the following GIS mapping: • Storm line material and size data • Responsibility, if part of another MS4 stormwater system (such as DOT’s) • Completed and proposed cleaning and repair activities • Outfall discharge monitoring data • IDDE screening and investigation results • Proposed IDDE investigations • Completed and proposed capital projects • Connections to any other public or private storm drainage systems • Drainage areas for each MS4 outfall

9 ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

• Areas served by on-site subsurface disposal areas • Storm drains that do or may receive discharges form underdrain systems

For an update on the impervious cover and directly impervious cover area (DCIA) see Section 4.3.4.1.

4.3 Control Measures

4.3.1 Public Education and Involvement

City residents can contribute to the pollution transported via stormwater by misapplying lawn pesticides, herbicides and fertilizers, littering, dumping pollutants into storm drains, failing to dispose of pet waste properly, and other actions which can be detrimental to the quality of stormwater discharging into water bodies. Many people are unaware that they are polluting when engaged in these activities. Therefore, public education and outreach and public involvement and participation will help minimize the amount of pollution contributed to the City’s water bodies by local residents. Also, public education and outreach coupled with public involvement and participation allows city residents to have a voice with regard to stormwater.

During this Reporting Period, the following public education and involvement activities have been completed: • The City has continued to maintain and update the stormwater section that was previously added to the City of Stamford’s website at http://www.stamfordct.gov/stormwater-management. The website provides basic information about stormwater as well as key contacts within the City of Stamford. Additionally, it provides links to: o The NPDES Permit o The SMP o The MS4 Stormwater Ordinance o The Annual Reports o The household hazardous waste collection events schedule and information on the materials managed o Dog waste management practices o Best management plans for pesticides o Information on preventing stormwater pollution honored o Fall leaf pick up schedule o Christmas tree pick up schedule o How to report a stormwater issue, violation, or complaint The City maintains a Frequently Asked Questions section that includes 25 questions and answers that city residents may view. To date, there have been approximately 4,326 hits on the website. There was a 205% increase in web traffic compared to 2017-2018, which totaled 1,420 hits to the City’s website. • The Regulatory Compliance and Administrative Officer for the City of Stamford, in an effort to aid in the public participation of stormwater management added a link to Stormwater Management Website for the RiverSmart CT project at: https://www.stamfordct.gov/stormwater-management.

10 ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

• In 2014, the department adjusted internal operations to receive and respond to citizen questions and complaints regarding stormwater related issues. The City’s stormwater management department responded to numerous citizen inquiries regarding snow storage, sweeping, catch basin cleaning, and IDDE program during the Reporting Period. • A public meeting was held on August 21, 2019 at 12:00pm for the review of the SMP and the draft 2018-2019 Annual Report. The Notice of Meeting was published in the on August 9, 2019 and August 20, 2019 and was posted on the City’s stormwater management website. The Notice of Meeting was filed with the Town Clerk. There was one (1) attendee at the meeting. No formal questions or comments were submitted by citizens and the meeting lasted nearly two hours. All questions were answered during the course of the meeting and subsequent discussions. • An informational pamphlet on dog waste management was provided to all dog owners at license renewal time. 3,000 pamphlets were provided to the Town Clerk for distribution during the Reporting Period. • Since 2014, the City has installed 60 dog waste dispensers and signs informing park patrons of the need to pick up after their dogs in key parks. These signs refer to the existing municipal dog waste ordinance in the City Charter (Section 111) and the City is installing new signs in hot spot locations, based on field observations. The City’s Parks Department has taken over ordering responsibilities for pet waste bags with the exception of Mill River Park. The budget for pet waste bags was increased from $10,000 dollars to $20,000 dollars during the Reporting Period as these stations have been popular with park visitors. City staff have observed the used bags disposed of in the trash containers throughout the areas with dispensers. No new pet waste stations were installed during this Reporting Period. • The SWPCA provides tours of the City’s wastewater treatment facilities to school children and adults. During the Reporting Period, 289 people attended these tours. As part of the presentation, they discuss stormwater impacts and typically distribute a brochure entitled “What is Your Storm Drain IQ?” • The Mill River Collaborative performs annual clean ups, improvements, and provides educational programming within the City. Approximately 5,455 volunteer hours were provided from over 1,109 individual volunteers during this Reporting Period. These hours included everything from stuffing envelopes, to removing invasive plant species from the meadows, to creating erosion barriers in the river. A specific list of volunteer activities includes: • reinforcing riverbanks using organic biologs • invasive species removal by hand (mugwort, Queen Anne's lace, loosestrife, wild lettuce, white clover, ailanthus, burdock, bindweed) • planting pollinator-attracting flowers • cleaning up litter in and near the river • building rock veins to funnel water away from banks to reduce undercutting • mulching • harvesting native seeds • removing silt around drainage areas • cutting overgrown shrubs and trees • weeding paths, lawns, flower beds, gardens • spreading organic fertilizers (sparingly)

11 ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

• SoundWaters is the leading environmental education organization on Long Island Sound. Over 25,000 students learn and explore with SoundWaters, through education and action, every year. The City and SoundWaters are in the process of coordinating a vacuum truck demonstration for kids in order to strengthen the relationship with the community. • The Mianus Chapter of Trout Unlimited continued their restoration of the Mianus Riverbank by pinning more Christmas trees and adding a hardened access. The effort, spearheaded by the Mianus Chapter, took place of July 13-14, 2018. The Friends of Mianus River Park and the City of Stamford were also contributors. • The Nature Conservancy (TNC), a non-profit organization which promotes environmental conservation, gifted the City’s first bioswale which was approved by the Board of Representatives on May 22, 2019. The bioswale removes contaminants from stormwater surface runoff and compiles with the MS4 permit. Resolution to accept the gift was passed by the Board of Representatives on June 3, 2019. Installation was to be in Rippowam Park and was completed on September 16, 2019. • During this Reporting Period, the City continued to install catch basin medallions throughout the City. These medallions were installed both English and Spanish to help raise public awareness for stormwater quality issues. These medallions are being installed by City staff members or by seasonal employees and are primarily installed on curb-backed catch basins. Currently, the City estimates it has installed medallions on approximately 45% of the City- maintained catch basins. The City has recognized that the medallions are a useful and effective tool and has been great for assisting in educating the public. • The Regulatory Compliance and Administrative Officer for the City has made strides in developing and implementing a program for the future that will allow residents to have access to limited GIS data and be allowed to adopt a catch basin and begin to understand how it is connected to the rivers and streams in the area. • The City has collaborated with a marketing and public relations firm (Catalyst) to develop a new stormwater management mailer/pamphlet to be sent out to provide a guide for regulatory compliance. • During the Reporting Period the City’s Board of Representatives passed an ordinance eliminating the distribution of disposable plastic bags. The City’s hope is for residents to use reusable carryout bags that will help better serve the environment. The city has collected information and resources for businesses to act in compliance with this new ordinance. More information can be found at http://www.stamfordct.gov/plasticbags • The City celebrated Earth Day on 4/22/2019 in the Lobby of Government Center. Tyler Theder set up an enviroscape demo model to educate the public about the ways in which stormwater runs off impervious surfaces and gets into our waterways. Also displayed were catch basin medallions in English and Spanish, which indicate no dumping. Example photos of full catch basins, tracing dye, and pamphlets were used to illustrate education and outreach efforts underway by the Stormwater Management Department. A few hundred people attended the event, which went from 9am – 2pm. • The City’s Recycling and Sanitation Department conducted a Household Hazardous Waste Collection event on Saturday, July 14, 2018 and Saturday, July 13, 2019. • On April 27, 2019, the Stamford Police Department hosted a National Rx Drug Take-Back event. The event collected approximately 476 pounds of unused medicines from residents. As

12 ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

part of the event, the police department provided services for residents to drop off their unused or expired medications. • City staff continued to engage with Downtown Special Services District (DSSD) regarding the condition of their dumpster storage and grease area. The area was professionally cleaned with the reclamation of any wash water used in the process. An emergency spill kit was purchased and provided to DSSD by the City.

4.3.2 Industrial Dischargers

During the 2015 NDPES Permit compliance audit, the EPA indicated that the City is required to educate owners and operators of commercial, industrial, and institutional facilities as to their responsibility to control pollutants in stormwater discharges from their properties into the City’s MS4.

The City’s Stormwater Management Department has obtained a CTDEEP list of stormwater discharge General Permit sites for commercial or industrial activity and has prepare informational outreach materials to target these businesses. The City intends to distribute the materials during the 2019-20 Reporting Period.

4.3.3 Source Controls and Pollution Prevention

4.3.3.1 Motor Oil Collection

The City collects used motor oil and cooking oil at the Katrina Mygatt Recycling Center so that residents will have a place to properly dispose of these materials and to limit the potential for them to be improperly disposed and adversely affect stormwater quality. During the Reporting Period, approximately 3,960-gallons of used motor oil and 2,429-gallons of used cooking oil were collected. The City intends to continue its used motor oil collection activities.

4.3.3.2 Household Hazardous Waste (HHW) and Electronic Waste Collection Programs

The City holds at least one HHW collection day within the City limits each year so that residents will have a place to properly dispose of these materials and to limit the potential for them to be improperly disposed of and potentially affecting stormwater quality. In 2018 and 2019, the City hosted an HHW collection day on July 14, 2018 and July 13, 2019, at the Rippowan School on High Ridge Road. During this Reporting Period 414 households and 151 half-households participated. In addition, Stamford residents can utilize HHW collection days in Darien, Greenwich, New Canaan, Norwalk, Westport, Weston, or Wilton approximately seven other days per year (throughout the spring and fall). The City intends to continue its involvement in these collection events.

The City collects used consumer electronics at the Katrina Mygatt Recycling Center during normal operating hours. Acceptable materials include computers, monitors, televisions, VCRs, DVDs, cell phones, copiers, fax machines, printers, radios, stereos, and small electronics. In addition, inks and toners, rechargeable batteries, lithium ion batteries, vehicle batteries, compact fluorescent light bulbs, and linear lamps are also accepted at the Recycling Center. During the Reporting Period, approximately 3.18 tons

13 ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

of universal wastes and 171 tons of consumer electronics were collected. The City intends to continue its waste electronics collection activities.

4.3.3.3 Spills and Leak

In June 2016, a city-wide Spill Prevention and Response Plan (SPRP) was completed to prevent, contain and clean up spills of oils, petroleum products, and other potentially hazardous materials to minimize stormwater impacts and protect surface waters.

The department responded to 13 spills in excess of five gallons of petroleum products on the City’s roadways and coordinated with first responders (Police, Fire, DEEP) to limit impacts to the City’s MS4. A list of recent spills during the Reporting Period is presented in Appendix D.

For additional information on training for spill prevention and response see Section 4.3.5.1.

4.3.3.4 Pesticide, Herbicide and Fertilizer Use Limitations

The City is required to limit the use of pesticides, herbicides and fertilizers (PHF) in City-owned or operated areas. The City has developed the Best Management Practices (BMPs), found in Appendix G of the SMP, for PHF application in city-owned or operated areas. Further development of standard operating procedures (SOPs) for the use of PHFs is ongoing. It is anticipated that they will be modeled based on the CTDEEP Integrated Pest Management (IPM) Plans. Completion of the PHF SOPs is anticipated during the 2019–20 Reporting Period.

Fertilizers and herbicides are used on the municipal athletic fields, as described in the SMP. Every year, in April, Dimension (18-0-40) is applied to the fields and contains both fertilizer and herbicides. In May, ProPendi (13-0-4) is applied to the fields and contains both herbicides and fertilizer. In September, just fertilizer (25-0-5) is applied to the fields. The City applied a total of 1,530 pounds of nitrogen to the ball parks during the 2018-19 Reporting Period. See Appendix E for a table of the total nitrogen used at the City-owned ball parks.

As required by the NPDES Permit, the City is in the process of establishing reduction goals, including consideration of alternatives, for PHFs being used at City-owned or operated areas, specifically at the municipal athletic fields.

No PHFs are used on city park green spaces.

The Mill River Park/Mill River Collaborative completely avoids the use of synthetic fertilizers. They employ a “feed the soil ecology” program where the soil is infused with sixteen or more species of bacteria and fed with a fish emulsion/kelp/yucca blend as a substitute for traditional fertilizers. Additionally, the Mill River Collaborative maintains its lawns at four inches to build deeper, more drought tolerant root systems. All grass clippings are returned to the lawns and they use organic products, such as soybean meal, to add nitrogen to the soil. The Mill River Collaborative uses minimal herbicides on invasive plant species per DEEP guidelines. They have found that as they continue this program, they require less herbicide use each year.

14 ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

With respect to the City-owned golf courses, the NPDES Permit requires that the City implement practices which achieve a ten percent (10%) reduction in total nitrogen by June 3, 2018. The reduction will be determined by the average annual usage, by weight, of the three years preceding the current NPDES Permit. The current SMP has established the application rates of fertilizers used at the golf courses, which can be found in Appendix B of the SMP.

During the Reporting Period, the Sterling Farms Golf Course used a total of 550 pounds of nitrogen and the E. Gaynor Brennan Municipal Golf Course used a total of 3,637 pounds of nitrogen. The total 4,187 pounds of nitrogen used in the Reporting Period represents a 48.6 percent reduction from the total nitrogen that was used in 2016 (8,145 pounds). See Appendix E for a table of the total nitrogen used at the City-owned golf courses.

The Pollution Prevention Team will work with the golf course staff to help reduce the total amount of nitrogen used at these facilities. It is the City’s intention to establish goals for reducing the amount of PHFs used at all city-owned or operated areas.

4.3.3.5 Salt Storage and Usage

The City stores road salt at the Highway Department (90 Magee Avenue), the Town Yard (106 Haig Avenue), and the Scofieldtown Transfer Station (612 Scofieldtown Road). At each facility, salt is stored on an impervious pad and under a salt shed in accordance with the requirements of the DEEP’s General Permit for the Discharge of Stormwater Associated with Industrial Activities.

The City used approximately 11,775 tons of salt during 13 storms for a combined total of 30.3 inches of snow during the winter of 2018-19. Salt usage quantities will continue to be tracked and the City’s goal is to reduce the amount of salt utilized on its roadways by increasing efficiencies and investigating alternate methods. However, salt usage will continue to vary based on storm frequency and intensity. The winter of 2018-2019 brought significant icing events which the City tackled by developing a Special Hazard Area program for ice control. These areas were especially vulnerable to roadway icing conditions due to a variety of factors including high groundwater table, improper road design, inadequate roadway drainage, residential sump pumps draining to the street, blocked catch basins, and other factors. Salt trucks were deployed to these Special Hazard Areas when nighttime temperatures fell below freezing levels in an effort to maintain safe roadway conditions at all times. In an effort to reduce salt usage, the regulatory compliance officer has worked to correct the factors and field conditions which contribute to water and ice on City roadways.

The City’s brine system was brought back into full service in the fall of 2018 with the 5,000-gallon brine tank located at the Town Yard Facility (105 Haig Ave.). This tank was filled twice during the winter season. See Section 4.3.5.6, Snow Removal, for additional discussion on salt usage.

4.3.4 Land Disturbance and Development

Construction site runoff and post-construction site runoff should be reduced so that water bodies are not receiving additional pollutants or sediment. Sediment causes water bodies to become physically and

15 ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

biologically altered. Decreases in habitat quality can result from significant amounts of sediment covering these habitat areas.

Under the terms of the NPDES Permit, the City of Stamford is required to implement and enforce a program to address construction and post-construction stormwater discharges from land disturbing activities and after site stabilization has been achieved. This program needs to be based on the Connecticut Guidelines for Soil Erosion and Sediment Control (latest edition) and the Connecticut Stormwater Quality Manual (as amended). The City continues working towards developing this program; both documents will be incorporated into the draft changes to the Zoning Regulations.

The City has a well-developed process for ensuring that applicants for building permits have received all appropriate City approvals prior to issuance of a building permit. A copy of the checklist utilized by the Building Official is presented in Appendix J of the SMP. As part of this review and approval process, the Engineering Department reviews stormwater and drainage for proposed developments and site plan revisions.

The site plan review process will continue in the future, but the site-specific stormwater requirements will be better defined once the draft Zoning Regulation changes have been approved and implemented. The NPDES Permit requires the City of Stamford to develop and enforce a program to control stormwater discharges from development and redevelopment activities with one-half acre (21,780 sf) or more of soil disturbance. The one-half acre threshold applies both individually and collectively as part of a larger common plan. Modifications to the Zoning Regulations will include provisions to encourage low impact development (LID) practices to maximize infiltration and minimize stormwater runoff. The regulations will also limit barriers to LID design and construction.

The NPDES Permit requires the City to conduct site-plan review and pre-construction review meetings that incorporate consideration of stormwater controls or management practices to prevent or minimize impacts to water quality. The City currently conducts such meetings internally as part of staff review of many projects. Meetings with developers occur when the project has significant potential for environmental impact.

As part of the application review process, the City is now providing applicant’s with information on the DEEP’s General Permit for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities. Applicants are being told about stormwater management issues at the time building permits Environmental Planning Board and Planning & Zoning signoffs are being obtained. Applicants have been made aware of their responsibility to obtain DEEP Construction Stormwater General Permits. This notification of responsibility has been met with some resistance from the builder / developer community. Therefore, the City is currently exploring alternative ways for providing notification to the builder / developer community.

The City’s building permit process is facilitated electronically through a software package called “View Permit”. The plan is to attach standard text to all applications notifying the applicants of their responsibility, if applicable, to obtain DEEP permits.

16 ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

The NPDES Permit also requires site inspection and enforcement to assess the adequacy of the installation, maintenance, operation, and repair of construction and post-construction control measures. The City’s staff performs site visits when the project is near a wetland or other water body. Current staffing levels limit the opportunities for site inspections to only those projects with the greatest potential for impact to stormwater quality. Site visits frequently occur prior to the issuance of a Certificate of Occupancy.

The City of Stamford’s Environmental Protection Board conducted permit and technical reviews, enforcement and inspections and other land development services. A summary table of the services that they provided during the Reporting Period is included in Appendix F.

The City has requested an extension for addressing the change in zoning regulations. The proposed changes will require more staff from the Engineering Department and the Environmental Protection Board and additional time is required to implement the changes.

During the Reporting Period, the City received a draft copy of the Stormwater Drainage Manual prepared by Fuss & O’Neill. This manual provides a technical framework, stormwater management standards, and design guidance for land development activities.

Additional information on the proposed stormwater ordinance and changes to the Zoning Regulations are presented in Section 4.6, Legal Authority.

4.3.4.1 Impervious Cover

The NPDES Permit calls for completion of DCIA (directly connected impervious area) mapping associated with each MS4 outfall within four years. The City continued the process of estimating the DCIA throughout the City. Sub-meter aerial photogrammetry of the City is being used in determining the DCIA. The initial estimate will be based on the total area of impervious cover, including roadways, driveways, sidewalks, parking lots, and building footprints, that discharge to the MS4. Allocating the amount of the DCIA to each MS4 outfall and evaluating each drainage area to determine if the roof tops are connected to the DCIA will be performed in the next couple of years. Estimates will be revised in the future as development, re-development, or retrofit projects or new information effectively add or remove DCIA to or from the MS4.

The Mayor of the City of Stamford has requested that the Western Connecticut Council of Governments (WestCOG) complete the DCIA mapping. The City’s GIS Department has conducted a pilot study for the Area, which is currently being evaluated by the WestCog. WestCOG and the City of Stamford maintains an ongoing its partnership and continues to develop an innovative demonstration project to create a new semi-automated GIS workflow to determine DCIA within suburban and urban watersheds within Stamford and understand better the effort and technologies involved. This work is in support of the mapping requirements of the NPDES Permit. Five outfalls and corresponding watersheds were selected with different land use mixtures. Impervious cover and DCIA were estimated utilizing previously acquired and very high-resolution planimetric GIS. In addition, an automated watershed delineation method was tested for urban areas. Results show the importance of

17 ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

very detailed field confirmation of the proposed methods and the importance of selecting the proper input data set with accompanying attribute information.

The City has continued efforts to reducing DCIA coverage through LID developments throughout the City. During the Reporting Period, the City was gifted its first bioswale by The Nature Conservancy, a nonprofit which promotes environmental conservation. The bioswale was constructed in the City right- of-way at the west end of Rippowam Park. The purpose of the bioswale is to remove pollution from surface runoff water. This installation was conducted in accordance with the DEEP MS4 permit requirements. The City’s Board of Representatives approved the bioswale project on May 22, 2019 and installation was completed on September 16, 2019.

4.3.5 Infrastructure Operations and Maintenance

Pollution prevention and good housekeeping are critical minimum control measures because they concentrate on municipal operations including the maintenance of other control measures. These activities can make an immediate difference with local water body pollutant levels. Street sweeping and other maintenance activities reduce the amount of sediment, salt and pollutants entering the drainage system thereby minimizing pollutant loads to local water bodies.

4.3.5.1 Employee Training

Employee training is essential for maintaining and increasing the awareness of water quality related issues in the management of any MS4. Training also enables facility staff to have an improved understanding of the stormwater system and how to minimize the impact the facility has on the MS4.

All employees working at City-owned facilities participate in annual training to meet the requirements of the DEEP’s General Permit for the Discharge of Stormwater Associated with Industrial Activity. This annual training includes: • Overview of the NPDES MS4 Permit • Review of the goals and objectives of the SMP • Review of facility Stormwater Pollution Prevention Plan • Review of good housekeeping • Identifying and reporting illicit discharges • Review of spill prevention and response procedures

Training was conducted on June 27 and 28, 2019 for Universal Waste Management, Spill Prevention Control and Countermeasures Plan, and Stormwater Pollution Prevention Plan training. Approximately 22 employees were in attendance from City-owned facilities at this training event.

The City is dedicated to ensuring that its employees continue to gain the necessary knowledge needed for understanding and implementing the SMP in order to increase the quality of the stormwater in the City’s MS4. The City will continue to update and implement its training programs for all employees working at City-owned facilities. A copy of the sign-in sheets for each of the training events is provided in Appendix G.

18 ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

4.3.5.2 Infrastructure Repair and Rehabilitation

It is important that the City make timely repairs to the infrastructure of its MS4 in order to help reduce the discharge of pollutants from the MS4 to the receiving waters. The City is dedicated to giving priority to those projects discharging pollutants to impaired waters or that have other concerns related to the mapping and IDDE process. A schedule for implementation of repairs is developed and updated once the need for the repairs are established.

The SWCPA performs routine maintenance and any necessary repairs on the three stormwater pump stations on an annual basis.

During the Reporting Period, the City received a total of approximately 62.2-inches of liquid equivalent water (LEW). LEW is a measure of liquid precipitation which has fallen to the ground in any precipitation type (rain, sleet, hail, snow, etc.). This data was retrieved from the National Climate Data Center (NCDC) for the Westchester County Airport weather station in New York located immediately west of the City. The precipitation amount received is over 12-inches more than the 1981-2010 climatological average of 49.35-inches for the Westchester Airport. This information is important due to the impact heavy rainfall has on MS4 Permit compliance regarding maintaining City stormwater infrastructure and responding to emergencies that arise after heavy precipitation events.

As of January 1, 2016, the Traffic and Road Maintenance Division is now responsible for tracking the catch basins and stormwater manholes that require repairs. Previous lists of required repairs were maintained by the Engineering Department. The Traffic and Road Maintenance Division will maintain the list of catch basins and stormwater manholes that require repair and will assign that work internally or to independent contractors, as needed. During the Reporting Period, at least 1,929 of 10,566 catch basins were inspected and pumped/cleaned out, as necessary.

The City hired Grasso Companies to conduct infrastructure maintenance and repairs on the MS4 system during this Reporting Period In total, 1,865 linear feet of piping was replaced, 292 catch basin sumps were replaced, 26 catch basin frame grates were replaced, 41 bell traps were installed, 93 manhole covers and frames were replaced, and 5.7 centerline miles were milled and repaved.

The City hired Arnow Construction to conduct drainage work on the MS4 system during this Reporting Period. In total, 3 pipes were repaired, 80 linear feet of piping was repaired, 11 catch basin sumps were replaced, 1 catch basin frame and grate was reset, and 11 manhole frames were replaced. See Section 4.3.5.7 for additional details on catch basin cleaning. A list of 2018-19 catch basin/manhole repairs is presented in Appendix H.

The City also understands that the refinement of the standard operating procedures and good housekeeping practices for the management of the MS4 is essential to improving stormwater quality.

In 2014, the City purchased a camera truck which is used for implementing the IDDE program and for inspecting catch basins, manholes and stormwater piping. The truck was deployed in October 2014 after employees completed the necessary one-week training on the truck and equipment. Initially, the camera

19 ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

truck is being used to inspect areas identified as needing maintenance within the MS4 and has proved to be a valuable asset for mapping/GIS work required by the permit.

The City has hired a private contractor (OneVac) to conduct CCTV work on storm mains and lateral pipes prior to paving operations during the Reporting Period. OneVac assessed approximately 8,825 linear feet of stormwater piping in the City. During this Reporting Period, the City conducted CCTV reports which totaled approximately 1,345 linear feet of piping that was videoed, including storm mains and lateral piping. In total, 10,170 linear feet of stormwater piping was assessed between OneVac and the City. The City has prioritized the areas that it inspects with the camera truck based on flooding issues, complaints about collapsing areas and complaints about illicit discharges. See Section 4.5 for further discussion on the progress of identifying illegal connections in the IDDE program.

Catch basin inspections also include inspecting the condition of catch basin “bells.” Some City catch basins have bells (metal 90-degree bends covering catch basin outlets) to control floatables. Bells are hung on pins set in the side of catch basins. The City continues to install bells on additional catch basins in parts of its MS4 where trash and floatables are a problem. In the 2017-2018 Reporting Period, the City procured two (2) hydraulic cranes for the installation of bells and maintenance to the catch basins. The City also contracted Grasso Construction to assist with infrastructure maintenance. Grasso Construction installed an additional 41 bell traps in City catch basins. The City also installed thirteen (13) bell traps in existing catch basins which had stable hooks. Going forward, the City plans to put a bell in every catch basin. The City currently has approximately thirty (30) extra bells in inventory which will continued to be installed during the 2019–2020 Reporting Period.

The Traffic and Road Maintenance Division has acquired funding in an Environmental Compliance Capital account to make improvements to MS4 piping when property owners cannot, or will not, make repairs in the timeframe provided in the permit.

4.3.5.3 Roadway Maintenance

Roadway maintenance activities can directly affect water quality. An important task of roadway maintenance is keeping the highway drainage system functioning. The City is dedicated to ensuring that routine road maintenance is conducted frequently and that roadside ditches are cleaned and inspected periodically to verify that flow is not being restricted.

A total of 5.7 miles of roadways were paved during the Reporting Period. The City purchased approximately $70,000 worth of asphalt from three different vendors for use in roadway patching of potholes.

4.3.5.4 Sweeping

Properly swept streets are a key element to limiting stormwater impacts as sediment and debris can transport other pollutants into the stormwater system and because copious quantities of these materials can inhibit the proper function of MS4 components. By June 30, 2019 the City swept 10,003 miles of roadway and collected 2,378 tons of street material during the Reporting Period. On average, the City

20 ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

swept each curb mile of roadway 14 times. Supporting documentation regarding the street sweeping activities for the Reporting Period can be provided upon request.

Sidewalk and curbside sweeping is performed weekly in the Downtown Special Services District (DSSD), along 9.5 miles of sidewalk and curbside during this Reporting Period. This work is coordinated and paid for by the DSSD. An estimated 23 tons of materials was removed during this Reporting Period as a part of the sidewalk and curbside sweeping activities.

The NPDES Permit prescribes very specific sweeping schedules for main lines, arteries, main roads and sidewalks in business and commercial districts, residential streets, other streets, and municipal parking lots between March and November of each year. The City has requested relief from the sweeping requirements as per the permit modification. The permit modification language is modeled after the DEEP MS4 general permit, which allows cities the ability to focus sweeping efforts on targeted areas. One goal is to compress the spring sweeping schedule between March 1st and June 30th to maximize the quantity of material collected at the end of the winter season.

The City has been implementing a “Post & Tow” policy where they will be posting sweeping dates and times and subsequently towing away any cars that are parked in the areas posted for sweeping events. This system helps the City to effectively sweep in the areas posted instead of having to sweep around parked cars, missing large areas of the road.

During this Reporting Period, the City also conducted post-event sweeping activities after several Wednesday and Thursday concert series. The amount of materials collected during these events is included in the total tons of street material noted above.

4.3.5.5 Leaf Collection

In 2018, the City’s leaf pickup program was completed by December 14th. Every street in the City is swept clean as a part of this program. A total of 15,261 tons of leaves were collected.

According to the NPDES Permit, the City shall conduct City-wide leaf pickup program annually to be completed by December 15th. The City has established a procedure that breaks the City of Stamford down into three areas (see Appendix L of the SMP for a map of the leaf collection areas): • Area #1 - north of the Merritt Parkway • Area #2 - between Merritt Parkway and I-95 • Area #3 - south of I-95

Leaf pick-up typically begins in mid-November and completed by December 15th. The exact completion date depends on weather conditions and competing demands (snow removal and road salting for staff and equipment). The first snowfall occurred on November 15th which resulted in the City converting trucks from leaf duty to snow duty then back to leaf duty over the course of three days to handle the snow event. It is important to note that the City finishes leaf pick-up even after snow fall. This process takes approximately four weeks of full-time work for all available road maintenance crews.

21 ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

The current leaf disposal policy is that the leaves will be piled at the curb prior to pick-up and off the streets. During the Reporting period, one-thousand doubled sided color flyers were printed and distributed to municipal buildings throughout the city. 20,000 postcard mailers were sent to single family homes, a half-page ad was placed in the Stamford Advocate and on the City’s website, flyers were placed throughout the City to remind the citizens that leaves collected were not to be placed in the roadways. The initial program was to collect bagged leaves only which the outreach campaign advertised. After October 2018, funding was secured to continue the loose-leaf pick-up program. One-thousand flyers were recreated, the City’s website was updated, and another round of 20,000 postcards were distributed to households detailing the loose-leaf pick up program. One (1) ½ page ad was placed in the print version of the Stamford Advocate and presented same info as the bi-lingual flyer. This ad ran twice in twice in the Stamford Advocate Newspaper, 1,000 flyers were distributed throughout the City, and information was posted to the City’s website at www.stamfordct.gov/leafpickup. Communications Director provided updates regarding progress of the city crews as they moved through the City using the Stamford Government Center Facebook page. Additionally, door hangers were used as an enforcement mechanism for any violators of the City’s ordinances.

4.3.5.6 Snow Removal

Timely snow removal and the appropriate application of de-icing materials is another key element to a successful SMP. The City follows the DEEP’s Best Management Practices (BMPs) for Disposal of Snow Accumulation from Roadways and Parking Lot. A copy of this BMP is presented in Appendix L of the SMP. The purpose of the BMPs are to prevent accumulation of sand, other solids, and pollutants in the MS4 and in sensitive areas, such as streams and wetlands.

The NPDES Permit requires that the City implement and refine its SOPs, regarding its snow and ice control operations, to minimize the discharge of pollutants. Goals must be established for the optimization of chemical application rates through the use of automated equipment including zero velocity spreaders, anti-icing and pre-wetting techniques, implementation of pavement management systems and alternate chemicals.

The City is already well on its way to meeting these goals. The Highway Crew continues to perform anti-icing using liquid calcium chloride (brine) to pre-treat city streets with the highest traffic volume. Once the storm begins, patrols are sent throughout the City to monitor road conditions. Hills and intersections are spot treated to minimize chemical usage. The City tracks chemical usage; however, given the variability in the amount of snow and ice that needs to be treated each year, it is difficult to set goals for chemical optimization. As noted in Section 4.3.3.5, the City intends to expand its use of brine trucks for pre-treatment in the future, which will help reduce the road salt usage.

The City continues to minimize its use of de-icing materials. This goal is being pursued in part to respond to shortages of de-icing materials in recent years. Salt is applied only twice for each storm – once at the beginning to prevent ice from binding and once at the end of prevent re-freezing. The regulatory compliance and administrative official has been enforcing illegal discharges of private basement sump pumps into the right-of-way, rather than simply treating these areas with removal of additional de-icing materials.

22 ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

During this Reporting Period, the City compiled a list of Special Hazard Areas which were more prone to icing conditions due to a variety of factors including: high groundwater table, improper roadway design, blocked catch basins, sump pumps from residential properties, and other factors. These areas were checked and treated by City staff whenever temperatures dropped below freezing levels.

During this Reporting Period, the West Beach parking lot was prepared from November through April with haybales, double catch basin filters, etc. in the event that additional snow stockpiling was necessary. This space was not utilized during this Reporting Period.

4.3.5.7 Catch Basin Cleaning

Clogged or overloaded catch basins can lead to unwanted stormwater quality impacts. Catch basin sumps provide a first line of defense in improving stormwater quality. Maintenance and cleaning activities are important to the proper operation of each catch basin.

For the 2018-19 Reporting Period, at least 1,929 catch basins throughout the city were inspected and cleaned on an as needed basis. Approximately 3,163-tons of materials were removed from the basins during the Reporting Period. This equates to 6,326,000 pounds of waste that was captured and processed and did not enter the City’s waterways, streams, rivers, or Long Island Sound.

The City continues to maintain a catch basin inspection, cleaning, and repair program. This program helps to identify and map each MS4 catch basin and determine flow direction, inspect its condition, determine the amount of sediment in each, clean catch basins with less than 50% of their sump capacity available, gather information over time on sediment accumulation rates, and develop a routine maintenance and cleaning schedule as prescribed by the NPDES Permit.

To support this program, the City has obtained or purchased the following equipment: • (3) Vactor vacuum trucks purchased between 2014 and 2015 • (4) Elgin Pelican sweepers purchased between 2008 and 2015 • (1) Rapid View CCTV truck w/ Pipe Logix software – purchased in 2015. CCTV truck has three cameras and a manhole/ stick camera • (2) One‐ton dump trucks on with Stetco hydraulic cranes – purchased in 2016 • (1) Caterpillar mini‐excavator – purchased in 2014 and used for culvert cleaning work • (1) Caterpillar loader / backhoe – purchased around 2010 and used for culvert cleaning work • (~10) One‐ton dump trucks used for typical highway department work • (~25) Large dump trucks – used as necessary for haul away of sediment per culvert cleaning work • (1) Utility truck with a crane and lift gate to assist with catch basin replacement, manhole replacement, stormwater drain medallion installation, curb back bolts, water barrier installation, and spill response.

In 2014, the City hired five heavy equipment operators to support this program for stormwater management and compliance activities (see Section 6.0).

23 ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

The Road Maintenance Department has also retained the services of a contractor that cleans and videos all associated catch basins and storm drains prior to completing roadway paving projects.

Additionally, the City continues implementing a software tracking program using field tablets for tracking catch basin inspection, cleaning and repair progress. The MS4 Front software was brought on-line in October 2014.

The depth of sediment is approximated in the field before each catch basin cleaning. The City using the depth of sediment observed and the time between catch basin cleanings to optimize the cleaning schedule.

4.3.5.8 Culvert Cleaning

During the Reporting Period, the City performed maintenance activities at 37 culverts over approximately 30 days. Various maintenance activities were conducted at the culverts including, but not limited to: stabilizing inlet and outlet areas, cleaning out culvert, removing debris and vegetation from around the culvert, CCTV inspections, excavating culvert discharge area, and wetlands delineation. During the Reporting Period, over 191 cubic yards of soil was removed from the culverts and discharge areas. A list of 2018-19 culverts cleaned is presented in Appendix I.

4.3.5.9 Detention and Retention Ponds

Detention and retention ponds that become overloaded with sediment deposition can negatively impact stormwater quality in the City’s MS4. MS4 Ponds are required to be cleaned out when solids levels reach 50% of design capacity.

A list of detention and retention basins was developed and the City is maintaining an inspection schedule. To date, 77 basins were identified and the City continues its efforts to inspect the basins identified. The detention and retention basins were added to the GIS mapping. Stormwater Management began inspections and maintenance work on these basins during this Reporting Period and is anticipating conducting the remainder of the inspections at each pond during the next Reporting Period. The City is considering utilizing outside contractors to assist with inspections and any follow-up work that may be needed.

4.3.5.10 Interconnected MS4s

Connections of other MS4s to the City’s MS4 can affect the performance of the City’s stormwater system and the quality of its discharges. There are no known interagency agreements between any other municipalities, institutions, or agencies and the City of Stamford. However, it appears that the following municipalities and agencies may be contributing stormwater to the City of Stamford’s MS4: • State of Connecticut (ConnDOT) • Town of New Canaan, CT • Town of Darien, CT • Town of Greenwich, CT • Town of Pound Ridge, NY

24 ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

The Connecticut Department of Transportation (“ConnDOT”) operates several roadways within the City, including: Interstate 95; the Merritt Parkway (Route 15); Long Ridge Road (Route 137); High Ridge Road (Route 104); and Route 1. The City’s MS4 flows into ConnDOT’s MS4 in some locations and ConnDOT’s MS4 flows into the City’s MS4 at other locations. The City communicates with ConnDOT, as needed, primarily when the City receives complaints of clogged ConnDOT storm drains.

The City has mapped out most of the interconnected MS4 areas during the development of the new SMP. A map of the interconnected MS4 areas is provided in Appendix C of the Spill Prevention Response Plan. Currently, there are no interagency agreements established. The City of Stamford will be working with each of the interconnected MS4 municipalities to develop detailed responsibilities for the City of Stamford and for each of the interconnected MS4 municipalities.

4.3.5.11 Referrals

During the Reporting Period, the Stormwater Management Department provided referrals to other City departments and organizations for maintenance and repairs. These referrals are outlined below:

City of Stamford Highway Department • Approximately 20 referrals were provided to the City’s Highway Department for items including: potholes, utility work, contractor trenches, aprons to control stormwater flow, curbing to direct flow and limit erosion, sidewalk trip hazards.

City of Stamford Engineering Bureau • 24 referrals were provided to the City’s Engineering Bureau for items regarding: management and oversight of utility contractors as related to street opening permits issued by the Engineering Bureau, poor trench compaction or failing subbase prior to pavement activities, poor trench compaction at newly installed manholes in city right of way for private development, compromised or failing corrugated metal culvert piping, water and icing over road with no piping installed with the need for easements and piping and drainage design, installation of new catch basins and curbing, non-functioning in-line check valve in existing tidal discharge storm piping, sink holes related to storm pipe issues, roadway ponding after storms, failure to maintain erosion controls on City projects, flooding and drainage issues related to existing curtain drain performance, requesting capital projects to design and install and control roadway damage, failing headwall and eroding roadway at storm culvert. • 5 referrals were completed by the City’s Engineering Bureau for items including: partial completion of Mill Road drainage and paving capital project, culvert piping repair which led to roadway failure, sinking pavement which led to roadway failure, repair and partial removal of obstructed or damaged storm piping which led to roadway flooding, stormwater swale regraded and stabilized.

Sweeping Referrals Provided to Various Entities • Approximately 30-40 referrals were provided to Traffic and Road Maintenance/Highway Department regarding dirt/rock/gravel/debris spilled on roadway, sweeping targeted areas (e.g.

25 ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

roadside swale excavation), General Permit compliance purposes, as related to milling and road paving, leaves, tree debris, heavy trash areas. • Conducted at least twelve (12) post and tow operations. • Conducted targeted sweeping on dozens of streets where Highway Department Supervisors observed trash, debris, sand, gravel, etc.

Stormwater Referrals Provided to the Environmental Planning Board (EPB) • 13 referrals were provided from the EPB for items regarding: building permit work, exterior spray foam and rasping resulting in foams in catch basins, discharge of pollutants to City catch basins, failed erosion and sediment controls on active construction site, tidal or shoreline work as related to existing MS4 discharge points, grading and filling work, custodian maintenance work at City schools, City transportation projects, flooding and drainage related issues, paving work without proper permits. • 9 referrals were provided to the EPB for items regarding: grading and filling with no erosion controls, river and bridge obstructions, tidal and shoreline construction work, tree removals proximate to wetlands.

Referrals Provided to the CTDOT • Fourteen referrals were provided to CTDOT for items regarding: motor vehicle accidents and SpeedyDry not swept up on I-95, performance of CTDOT MS4 drainage infrastructure where interconnected to the City’s MS4, citizen requests to pump and clean catch basins, potholes or failing pavement at CTDOT storm manholes, flooding at railroad overpass at US Route 1 – catch basin grates welded to frames, water on road (State Highway Long Ridge Road), open or damaged CTDOT manhole covers.

Curbing Referrals • The Road maintenance department handles curbing requests and estimates at least 400 were received during the 2018-19 Reporting Period. The average curbing request is about 40 linear feet of asphalt curbing. There were 394 requests completed at 40 feet each, the City installed about 12,000 linear feet of new asphalt curbing during the Reporting Period.

Other Referrals • Referrals made to Eversource: four referrals made regarding utility trenches which were failing, electrical manholes, vaults, and other structures in need of repair. • Referrals made to WPCA: 34 referrals made regarding issues with sanitary infrastructure (damage or paved over manholes), incomplete demolition and abandonment of sanitary chamber in park, asphalt trench or patch failure at new sanitary lateral connection to dwelling, sanitary lateral repair work, sanitary lateral pipe constructed through existing 42” reinforced concrete storm main pipe. • Referrals from WPCA: 19 referrals were received regarding wastewater treatment plant permit exceedances (9 exceedances during monitoring period), reporting issues with stormwater infrastructure (damaged manholes and catch basins), correspondence from the public about regulatory procedure and wastewater/stormwater discharge, food truck washing and cooking oil

26 ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

storage, piping connectivity (storm and sanitary) as related to maintenance work, proper disposal of wash/mop water. • Referrals made to Parks Department: 14 referrals made regarding requests to prune trees, shrubs, vegetation to gain access to catch basins, requests to cut or remove trees for culvert cleaning and swale construction, request to remove or pull out 12” diameter log stuck in stormwater culvert, requests to remove logs and debris at bridges stuck on the upstream side, requests to prune or remove low hanging trees. • Referrals made to City of Stamford Building/Zoning Departments: four referrals were made regarding construction of accessory structure (garage) on top of existing stormwater easement with no permits for structure, demolition work at large multi-family residential tower, demolition work at commercial office space, construction work and excavation proximate to city stormwater easement.

4.4 Monitoring Program

In addition to the screening and monitoring activities associated with the IDDE Program (see Section 4.55), the NPDES Permit calls for stormwater outfall monitoring throughout the life of the permit.

As prescribed in the modified NPDES Permit, the City is no longer required to conduct in-stream samples.

4.4.1 Dry Weather Outfall Screening for Illicit Discharges

Efforts conducted for outfall screening during dry weather conditions are discussed in Section 4.5

4.4.2 Wet Weather Outfall Monitoring

During the Reporting Period, thirty-three (33) wet weather outfalls were sampled. To date, 108 of the 191 known wet weather outfalls were sampled.

Analytical data is submitted to the DEEP via the NetDMR system as the laboratory data is received. Summary tables of the analytical data for the wet weather outfall monitoring are presented in Appendix K.

4.5 Illicit Discharge Detection and Elimination (IDDE) Program

IDDE will lessen the amount of pollutants discharging to local water bodies. Some people unknowingly dump pollutants into the storm drain or have illegal connections to the drainage system. The permit requires inspection of outfalls during dry weather conditions to determine whether illicit discharges are suspected and then to conduct extensive evaluation and follow-up to eliminate the illicit discharges that are found.

27 ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

Additionally, City personnel continue to follow-up on known or suspected illicit discharges as well as any complaints associated with potential illicit discharges through calls to Traffic and Road Maintenance Division or reported via the City’s stormwater management website.

4.5.1 Dry Weather Outfall Screening for Illicit Discharges

As part of the outfall monitoring requirements, during the Reporting Period, 179 outfalls were dry weather screened and 40 of the outfalls screened had flow that was sampled for illicit discharges. To date, 380 of the 958 known outfalls have been screened. Summary tables of the analytical data for the dry weather outfall screening and sampling efforts during the Reporting Period are presented in Appendix J.

The City has started submitting notifications of intent to conduct stormwater monitoring and sampling at privately-owned outfalls throughout the City.

4.5.2 Illicit Discharge Investigations

Additionally, during the Reporting Period, the City continued to utilize Harborwatch / Earthplace to assist efforts related to illicit discharge detection and source identification. Harborwatch was directed to go into the field to gather and analyze samples during wet and dry weather conditions, in an effort to quickly ascertain and isolate suspected illicit discharges, in the interest of public health, safety, and welfare. When there is a discharge of suspected contamination or pollutants in stormwater, efforts to inspect and identify are very time sensitive. In the interest of promptness, these efforts are sometimes directed regardless of precipitation events. In some cases, multiple samples are collected at the same location over an extended time period in an effort to build a more comprehensive data set and gain a better understanding of how precipitation events can impact a discharge. A good example of this occurred in early 2019 when a failing septic field was found to be leaking onto the roadway and ultimately into down gradient catch basins. During the Reporting Period, Harbor Watch was awarded a Five Star and Urban Waters Restoration Grant from the EPA for their efforts to reduce pollutants to numerous watersheds.

Harbor Watch screened 69 locations during this Reporting Period. A flow was observed and samples were collected at 54 of the locations. Harbor Watch submitted a total of 43 samples for analysis. Harbor Watch also produced a Fairfield County River Report which also provided valuable information about the water quality data for the Mianus and Noroton rivers during both wet and dry sampling events which occurred between September 2018 and June 2019. Summary tables of the analytical data for the dry weather outfall screening and sampling efforts are presented in Appendix L.

Through the City’s efforts using the camera truck completed during the Reporting Period, they have identified multiple areas of concern that will receive priority for further IDDE investigations. IDDE investigations will be focused in the same areas as previously identified during the 2018-19 Reporting Period.

4.5.3 Illegal Connections

As a result of the IDDE program the City has identified multiple areas of concern, which will receive further investigation. The City continues to track, identify, and eliminate illegal connections.

28 ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

4.6 Legal Authority

In 2015, the Board of Representatives approved an MS4 Ordinance addressing stormwater management issues that affect NPDES Permit. The legal authorities that were established or are being established with proposed zoning regulation modifications include: • The authority to administer the stormwater management program and all elements of the SMP. • The authority to control the contribution of pollutants to the MS4 by permittees registered under the DEEP’s General Permit for the Discharge of Stormwater Associated with Industrial Activity; by other commercial, industrial, municipal, institutional, or other facilities; and from any site that may affect water quality to the MS4. • The authority to establish ordinances, bylaws, regulations, or other mechanisms to require developers and construction site operators to maintain consistency with the Guidelines for Soil Erosion and Sedimentation Control, the Connecticut Stormwater Quality Manual, and all DEEP stormwater discharge permits issued with the City of Stamford. • The authority to identify existing regulations that may represent barriers to low impact development (LID) practices to minimize the quantity of impervious cover. • The authority to perform inspections, surveillance, and monitoring related to the MS4. • The authority to establish ordinances, bylaws, regulations, or other mechanisms to ensure a developer’s or construction site operator’s proposed use of LID practices by right or exception. • The authority to revise regulations to eliminate or reduce potential barriers to LID. • The authority to perform adequate inspection and maintenance activities to optimize the performance and pollutant removal efficiency of privately-owned retention or detention ponds that discharge to or receive discharge from the City’s MS4. • The authority to control through interagency or inter-jurisdictional agreement, the contribution of pollutants between the City’s MS4 and MS4 owned or operated by others. • The authority to prohibit by statute, ordinance, rules and regulations, permit, easement, contract, or any other means, illicit discharges to its MS4; to require the removal of these discharges; and to assess fines, penalties or cost recoupment for violations. • The authority to control by statute, ordinance, rules and regulations, permit, easement, contract, or any other means, the discharge of spills into its MS4; to prohibit the dumping and disposal of materials into its MS4; and to assess fines, penalties or cost recoupment for violations.

The schedule for establishment of these legal authorities is documented in the NPDES Permit. On March 20, 2015, a final MS4 Ordinance, Ordinance 1153, adding Chapter 201 to the City Charter, became effective. Draft changes to the Zoning Regulations have been prepared and are included in Appendix I of the SMP. These documents have been developed to establish the necessary legal authorities. The public must be provided adequate notice and an appropriate amount of time to participate in the establishment in this legal authority. It is the City’s intention to establish these legal authorities as soon as possible.

To comply with the NPDES Permit, the City is required to have these revisions approved by the Zoning Board and formally incorporated into the Zoning Regulations. The Modifications to Sections 15 of the

29 ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

Zoning Regulations of the City of Stamford is underway and the modifications were sent out to referral to various agencies for comment in the spring of 2015.

The City has requested an extension for addressing the change in zoning regulations. The proposed changes will require more staff from the Engineering Department and the Environmental Protection Board and additional time is required to implement the changes.

Several written and verbal warnings were issued during this Reporting Period as part of the implementation of the City’s new stormwater ordinance. The warnings issued are listed below:

4.6.1 Written Warnings

Written Warnings Issued: 89 Violation: Discharge of water to roadway, confirmed illegal connection to MS4 system, possible illegal connection to MS4 system, confirmed failing on-site sanitary facilities leaking on to roadway, tracking or pushing material on to roadway from contractors yard or residence, contributing pollutants to MS4 system, culvert replacement at driveway apron to right-of-way, drainage easement agreement documents, structures/improvements illegally constructed in right-of- way and impacting drainage structures, required stormwater maintenance work with an easement, access required for on-site investigation dye/smoke test/CCTV work, construction dewatering into catch basin, abatement satisfactorily completed Notes: Doorhanger written warning during leaf pick up program: Approx. 59 doorhangers placed.

4.6.2 Verbal Warnings

Verbal Warnings Issued: 5 Notes: Verbal warnings were issued for items including: dumping mop water on to roadway, power washing with soap, construction dewatering

30 ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

5.0 SUMMARY OF PROPOSED SMP MODIFICATIONS

The SMP was updated and submitted to the DEEP on September 2, 2014. Revisions to the SMP are underway and will be submitted to CTDEEP during the 2019-2020 Reporting Period.

On August 14, 2017, a permit modification was issued for the City’s NPDES Permit. During the 2017-18 Reporting Period, the City reviewed the permit modification for any new requirements and is in the process of updating the SMP accordingly. The new modified permit renewal is pending approval from CTDEEP.

31 ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

6.0 PROGRAM RESOURCES ANALYSIS

6.1 Fiscal Analysis

During this Reporting Period, the City continued to make efforts to secure budget, staffing, and resources necessary to develop and implement the SMP, to comply with the NPDES Permit requirements, and to improve the overall quality of stormwater discharging from its MS4. The City is committed to identifying these details and adequately funding them to achieve compliance with the NPDES Permit as soon as possible.

Some line items in the City’s Capital and Operating Budgets are obviously related to MS4 stormwater compliance, such as the “Environmental Compliance” and “Stormwater Management”. However, there are other line items for infrastructure and other public improvement projects (drainage, catch basin, storm lines, etc.), special projects, and operating expenses that will result in direct improvements to stormwater runoff quality and the quality of discharge from the City’s MS4. For example, the closure of the old Scofieldtown Road Landfill is being performed for specific reasons but should have the added benefit of improving stormwater quality in these areas of the City.

There are also budget line items for vehicle, equipment, and information technology upgrades throughout the City which include Departments with responsibility for stormwater quality improvements and implementation of the SMP.

The Road Maintenance Division has an overall total operating budget of $6,334,447 for Fiscal Year 2019- 2020 ($1,425,544 decrease from the FY 2018-19 Adopted Budget).

The FY 2019-20 operating budget for MS4 stormwater management is $1,184,718 (a decrease of $193,575 from the FY 2018-19 Adopted Budget). The budget for snow removal is $1,319,925 (an increase of $265,730 from FY 2018-19 Adopted Budget).

The operating budget for leaf collection is $301,038 (an increase of $253,555 from FY 2018-2019 Adopted Budget). Originally, the City planned on eliminating loose leaf collection from their leaf pick- up program which reduced the cost of the program. The City’s legislative body was able to secure funding to expand the leaf pick-up program to include loose leaf pick up.

The operating budget for traffic and road maintenance, including: street sweeping, pothole repairs, debris removal and infrastructure improvements is $3,485,736 for Fiscal Year 2019-20 (a decrease of $1,219,765 from the FY 2018-19 Adopted Budget)

The capital budget covers long term projects to provide improvements to the City. These capital projects have the potential to impact the quality of stormwater discharged to waterbodies.

Capital project C56119, Citywide Roadway Correction, was given $200,000 in construction related costs for FY 2019-20. The requested funds are for design work and construction activities associated with the project. The current balance will be used to fund emergency road failure at Cascade Road.

32 ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

Capital project C16012, Citywide Storm Drains, was given $500,000 in construction related costs for FY 2019-20. The requested funds are to complete drainage improvements on Spruce Street, Orchard Street, Leroy Place, Drum Hill Lane, Tod Lane, Bird Song Lane, Newfield Court, and citywide drainage improvements. The current balance will be used to fund drainage improvements at Newfield Avenue, Spruce Street, and Orchard Street.

Capital project 000664, Resilience and Climate Adaptation Implementation, requested $200,000 for FY 2019-20. The requested funds are to address vulnerable coastline communities from weather events due to climate change effects including rising sea levels and the potential for more severe weather events. The City is splitting this project into two tasks: first, map and identify areas where repetitive loss of property has occurred and map public infrastructure vulnerable to weather hazards, and second, create a tree inventory to facilitate preventative tree maintenance to aid in reducing the impact of fallen trees due to weather events.

Capital project C56078, Parks Master Plan Update, requested $200,000 in professional services for FY 2019-20. The requested funds are to create a master plan for the Edward Hunt Complex, “Courtland Park”. The funds would also be used to amend the City zoning map to include parks which are not included in the Master Plan Category 14 Open Space Parks and 22 parks which are not zoned as P, Park District.

Capital project C06352, Open Space Acquisition/Flood Control, requested $500,000 for land acquisition for FY 2019-20. This project is to aid in implementing Master Plan Policy 7L2-a: Acquisition of vulnerable parcels for open space, flood prone vulnerable parcels, and sensitive lands. The funds would be used to acquire priority parcels and easements for Mill River Greenbelt and ecologically vulnerable coastal or wetlands parcels which are vulnerable to flooding among other hazards.

Capital project CP0211, Environmental Compliance, requested $250,000 for construction, equipment acquisition, miscellaneous costs, and professional services for FY 2019-20. This project is required to investigate, assess, and correct drainage systems discharging into waterbodies. This includes Public Services provided by the City and modification of practices in compliance with federal and state regulations.

Capital project 000592, Stormwater System Illicit Discharge Analysis, requested $100,000 for construction and professional services for FY 2019-20. The funds would be used to identify sources of non-stormwater which is discharging into stormwater systems. This project will also eliminate or abate the sources of contamination with corrective measures.

Capital project CP6757, Reconstruction of Stormwater Waste Debris Drop-Off Station, was given $125,000 for construction and professional services for FY 2019-20. The funds will be used to reconstruct the waste debris drop-off station used by the City’s vacuum trucks. The current drop-off station is not functional and cannot handle the amount of waste volume currently being generated from work being performed per the City’s MS4 permit.

Capital project C56182, Street Patch and Resurfacing, was given $3,000,000 from the City and $991,302 from the State in form of a grant for FY 2019-20. The funds will be used to patch and resurface the City’s roadway infrastructure.

33 ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

Capital project C56129, Citywide Manhole and Basin, was given $500,000 for construction for FY 2019- 20. The funds will be used to maintain the over 10,000 catch basins and 5,000 manholes which are located in the City’s road network.

Capital project CP8711, Traffic/Road Paving and Drainage, was given $250,000 for construction for FY 2019-20. The funds will be used to repair or replace any drainage structure which are located in roads which are scheduled to be repaved.

In addition, other Departments, such as Engineering (catch basin and manhole improvements and replacement program), Land Use (environmental reviews), Solid Waste (motor oil recycling and HHW events), SWPCA (stormwater pump operation), and Administration provide services through their capital and operating budgets.

The City’s Annual Capital and Operating Budgets for 2019-2020 are available on the City’s website at http://www.stamfordct.gov/.

It is anticipated that additional funding will be required for the following monitoring activities: • Wet weather sampling of each identified MS4 outfall • IDDE screening and investigations

An increase in funding associated with additional staffing discussed in the next section of this Annual Report, will also be required in coming fiscal years.

6.2 Staff and Resources

The City transferred responsibility for many of the stormwater management tasks and MS4 permit compliance from the SWPCA to the Traffic and Road Maintenance Department with the issuance of the NPDES Permit in June 2013. While evaluating the permit requirements, the Traffic and Road Maintenance Supervisor and Pollution Prevention Team Coordinator, Thomas Turk, began to assess the staff and resources necessary to achieve and maintain compliance. Since Traffic and Road Maintenance Department took over responsibilities for implementing the MS4 permit, several new staff members have been hired, including: • Five heavy equipment operators to complete field work including catch basin identification, investigation, cleaning, and maintenance. These operators are also responsible for assisting with sweeping, snow removal, leaf pickup and other activities designed to improve the quality of stormwater runoff.

Over the course of the Reporting Period, the Stormwater Department assessed these new staffing levels as the SMP was being implemented and additional schedules and goals are continuously being generated to meet the demands of the City’s MS4.

In addition to these individuals, the Traffic and Road Maintenance Division maintains a work force of skilled operators, laborers, administrative, support, and management personnel that provide many of the direct services outlined in this report, such as: catch basin maintenance, roadway sweeping, leaf pickup,

34 ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

snow removal, and infrastructure improvements and maintenance. They are also available to assist on other stormwater management projects, as directed.

Several other City Departments provide personnel to support compliance with the NPDES Permit and implementation of the SMP, including Engineering, Land Use, Planning, Zoning, Environmental Protection, Information Technology (GIS), SWPCA, Solid Waste, Recreation and Leisure Services, Parks, Parking & Transportation, Fleet Maintenance, Legal, and the Fire Department.

During the next year of implementation of the SMP and the new municipal stormwater ordinance and the changes to the Zoning Regulations, City Departments will be better able to assess the adequacies of their staffing levels with the added MS4 permit compliance requirements. As discussed during the compliance audit conducted by the EPA (see Section 2.3.1) and the City’s own assessments, it is anticipated that additional staffing may be necessary in the following areas: • Information Technology – There is a substantial amount of stormwater mapping and information management to be set up and managed, particularly during the first several years of the permit. The City needs to finalize the outfall identification mapping, and confirmation process and begin the DCIA analysis. • Engineering and Land Use Offices – Additional staff is required to perform technical review of land use permits due to volume and complexity of work. Performing site inspections before permit issuance, during construction, and prior to Certificate of Occupancy are a critical component for compliance. • Stormwater Management Department – Additional staff is required (Heavy Equipment Operators) to operate vacuum trucks, the camera truck, and equipment to maintain storm drainage piping. The addition of an Office Support Specialist (OSS) is required in the Stormwater Management Department to assist with data collection, record keeping, and correspondence requirements. New types of data are being generated in the field and it must be properly managed so that it can be put into effective use.

Once the revised Zoning Regulations have been enacted, there will be a need for additional construction site inspections, retention and detention basin inspections and maintenance, stormwater infrastructure (swales, ditches, storm drain lines, etc.) inspections and maintenance, post-construction inspections and maintenance, and illicit discharge detection and elimination program implementation. Additional staffing will be necessary to complete these tasks; the City’s ability to complete these activities in the past has been hampered due to limited staff resources.

As mentioned in Section 4.3.5.7, the City recently started implementing a software tracking program using field tablets for tracking catch basin inspection, cleaning and repair progress. The MS4 Front software was brought on-line in October 2014.

Additional software and equipment needs will be assessed during the coming year and requested in the City’s next fiscal year budget.

35 ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

APPENDIX A

DEFINITIONS

ANCHOR Engineering Services, Inc.

2018-2019 MS4 Annual Report City of Stamford, Connecticut

DEFINITIONS

“BMPs” or “Best Management Practices” means either structural or engineered control devices and systems (e.g. retention ponds) to treat polluted stormwater, as well as operational or procedural practices (e.g. minimizing use of chemical fertilizers and pesticides).

"Commissioner" means the commissioner as defined by section 22a-2(b) of the Connecticut General Statutes.

“CTDEEP” or “DEEP” means the Connecticut Department of Energy and Environmental Protection, whose mission is to conserve, improve and protect the air, water and other natural resources and environment of the State of Connecticut while fostering sustainable development.

“DCIA” or "Directly Connected Impervious Area" means that part of the total impervious area that is hydraulically connected to the City of Stamford’s MS4. DCIA typically includes streets, sidewalks, driveways, parking lots, and roof tops. DCIA typically does not include isolated impervious areas that are not hydraulically connected to the MS4 or otherwise drain to a pervious area.

“EPA” means the Environmental Protection Agency, whose mission is to protect human health and the environment.

“EPB” means the City of Stamford’s Environmental Protection Board.

“GIS” or “Geographic Information System” is a system designed to capture, store, manipulate, analyze, manage, and present all types of spatial or geographical data.

“HHW” or “Household Hazardous Waste” means post-consumer waste which qualifies as hazardous waste when discarded. It includes household chemicals and other substances for which the owner no longer has a use, such as consumer products sold for home care, personal care, automotive care, pest control and other purposes.

“IDDE” or “Illicit Discharge Detection and Elimination” means a program to detect and eliminate existing illicit discharges and to prevent future illicit discharges.

“IDDP” or “Illicit Discharge Detection Protocol” means a protocol established to identify, prioritize and investigate separate storm sewer catchments for suspected illicit discharges of pollutants.

"Illicit Discharge" means any discharge to the MS4 that is not composed entirely of stormwater, with the exception of discharges authorized by another NPDES Permit, or discharges described in the "Non- Stormwater Discharges" section (Section 4(A)(3)) of the permit.

"Impaired Waters" means those surface waters of the state designated by the Commissioner as impaired pursuant to Section 303(d) of the Clean Water Act and as identified in the most recent State of Connecticut Integrated Water Quality Report.

ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

“LID” or “Low Impact Development” means land planning and engineering design approach to manage stormwater runoff. LID emphasizes conservation and use of on-site natural features to protect water quality.

"MS4"’ or "Municipal Separate Storm Sewer System" means a conveyance, or system of conveyances, including roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, man- made channels, or storm drains, which is or are (i) owned or operated by a state, city, town, , county, parish, district, association, or other public body (created by or pursuant to state law) having jurisdiction over disposal of sewage, industrial wastes, stormwater, or other wastes, including special districts under state law such as sewer districts, flood control districts or drainage districts, or similar districts, or an Indian tribe or an authorized Indian tribal organization, or a designated and approved management agency under section 208 of the CWA that discharges to waters of the state; (ii) designed or used for collecting or conveying stormwater; (iii) which is not a combined sewer; and (iv) which is not part of a POTW.

“NOV” or “Notice of Violation” means a notice provided by the CTDEEP informing the permittee that a violation of law has occurred.

“NPDES Permit” or “National Pollutant Discharge Elimination System Permit” means the program authorized by the Clean Water Act which controls water pollution by regulating point sources that discharge pollutants into waters of the United States.

“Outfall” means the discharge point of a waste stream into a body of water.

“PHFs” means pesticides, herbicides and fertilizers.

"Point Source" means any discernible, confined and discrete conveyance (including, but not limited to any pipe, ditch, channel, tunnel, conduit, discrete fissure, container, rolling stock, concentrated animal feeding operation, landfill leachate collection system, vessel or other floating craft) from which pollutants are or may be discharged.

“POTW” or “Publicly Owned Treatment Works” means sewage treatment plants.

“Reporting Period” refers to the period of time that the Annual Report is based on. In this report it pertains to July 1, 2015 through June 30, 2016.

“SMP” or “Stormwater Management Plan” sets forth a program to provide for the implementation of specific control measures, stormwater monitoring, illicit discharge detection and elimination, and other appropriate means to control the quality of the authorized discharge.

“SPRP”, “SP&R Plan” or “Spill Prevention and Response Plan” means a plan to prevent, contain and respond to spills entering the MS4.

ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

"Stormwater" means waters consisting of rainfall runoff, including snow or ice melt during a rain event, and drainage of such runoff.

“SWPCA” or “Stamford Water Pollution Control Authority” controls the City of Stamford Water Pollution Control Facility, which processes wastewater from the City and the neighboring Town of Darien, and discharges clean water into the East Branch of Stamford Harbor.

ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

APPENDIX B

STORMWATER MANAGEMENT PLAN SUMMARY TABLE

ANCHOR Engineering Services, Inc.

2017-2018 MS4 Annual Report City of Stamford, Connecticut

Annual SMP Summary Table July 1, 2018 - June 30, 2019

Status Complete / Activity Description # Actions Scheduled # Actions Completed Comments on Activities Incomplete as of June 30th 1. Education 1.1 City and Government 1.1.1 Training As needed Complete 2 Training was conducted on 6/27/19 and 6/28/19 for Universal Waste Management, Spill Prevention Control and Countermeasures Plan, and Stormwater Pollution Prevention Plan training. 1.2 Public 1.2.1 Annual Information Meeting Annually Complete 1 2019 meeting was held on 8/21/2019. 1.2.2 Annual SMP Review and Comments Annually On-Going As needed NPDES Permit. During the 2018-19 Reporting Period, the City will be reviewing the permit modification for any new requirements and will be updating the SMP accordingly. The Cityhas received a draft copy of the SMP prepared by Fuss & O'Neill. 1.2.3 HHW Collection At least Annually Complete 1 HHW Collection held on 7/14/18 & 7/13/19 at the Rippowam Middle School. Stamford citizens may also use HHW collection days in seven neighboring towns each year.

1.2.4 Pet Waste Control As needed On-Going As needed 3,000 pamphlets were provided to the Town Clerk for distribution Spring 2019. Since 2013, the City has installed 60 dog waste dispensers and signs. Approximately $15,000 was spent on dog waste disposal bags during the Reporting Period and City staff have observed used bags disposed of in the trash containers throughout the areas with dispensers. Parks Department will take over budget item to purchase bags in FY 2019-20. They will budget $20,000 to cover their anticipated use. Current price of bags has increased, but at current pricing, they could purchase 250,000 bags in FY 2019- 20.

1.2.5 Distribution of Educational Information As needed Complete On-going No stormwater flyers were distributed throughout the City for this annual reporting period. Typically, Stormwater Management are distributed throughout the City with the December tax bills. The City has continued to maintain and update the stormwater section of the City's website.

1.2.6 Catch Basin Medallions As needed In-Progress - Medallions are being installed by City staff members or by seasonal employees and volunteers and are primarily installed on curb-backed catch basins throughout three areas targeted in the southern part of the City, and in parks, and downtown areas with the most pedestrian traffic. Currently, the City has installed medallions on approximately 45-50% of the City- maintained catch basins.

2. Public Involvement

ANCHOR Engineering Services, Inc. 2017-2018 MS4 Annual Report City of Stamford, Connecticut

Annual SMP Summary Table July 1, 2018 - June 30, 2019

Status Complete / Activity Description # Actions Scheduled # Actions Completed Comments on Activities Incomplete as of June 30th 2.1 Mill River Collaborative (MRC) On-going Complete 5,455 volunteer hours Making improvements to the Mill River Park through joint efforts the MRC. 2.2 SoundWaters in Cove Park On-going On-Going - Over 25,000 students learn and explore with SoundWaters, through education and action, every year. 2.3 Educational Outreach On-going On-Going - The City is in the process of collaborating with other middle schools throughout the City to expand this outreach program.

2.4 Harbor Watch On-Going On-Going - Harbor Watch, a division of Earthplace, a not-for-profit organization, was retained by the City, to conduct the dry weather outfall sampling as part of the IDDE program. They were awarded a Five Star and Urban Waters Restoration grant for their work with pollution identification and source tracing projects in the City. 3. Mapping 3.1 Initial Outfall, Sampling, Roadway, Receiving Waters, Watersheds On-going until all are identified On-Going - As of June 30, 2018, the City has mapped 958 outfalls. Stormwater mapping is approximately 95% complete. The City is currently in the process of confirming the accuracy of the outfall locations. Several of the potential new outfalls were identified as duplicates and others were noted as inlets or discharges under state DOT control. The city will continue to update mapping as needed to reflect current field conditions.

3.2 IDDE Mapping - Infrastructure, Findings, Data, Activities, Projects On-going until all are identified On-Going - The City continues to try to identify more specific criteria for the outfalls that will be required for monitoring as part of the IDDE program and the wet weather monitoring. The Harbor Watch non-profit organization has continued to assist the City with identifying sources of illicit discharges in the area. 3.3 Establish DC IA 25% of total area per year On-Going - 4. Infrastructure Operations & Maintenance 4.1 Infrastructure Repair & Rehab On-going On-going As needed A schedule for implementation of repairs is maintained by the Engineering Dept. and updated as needed / as items are completed. 4.2 Roadway Maintenance On-going On-going As needed The City is dedicated to ensuring that routine road maintenance is conducted frequently and that roadside ditches are cleaned and inspected periodically to verify that flow is not being restricted. During the Reporting Period, the City repaved approximately 5.7 miles of roadway as part of its road maintenance program. 4.3 Street Sweeping On-going On-going As needed During 2018-2019, the City swept over 8,770 miles of streets and collected over 2,378 tons of non-leaf materials.

ANCHOR Engineering Services, Inc. 2017-2018 MS4 Annual Report City of Stamford, Connecticut

Annual SMP Summary Table July 1, 2018 - June 30, 2019

Status Complete / Activity Description # Actions Scheduled # Actions Completed Comments on Activities Incomplete as of June 30th 4.4 Sidewalk Sweeping See Appendix K of the SMP On-going - Sidewalk sweeping occurs in the downtown area, as described in the SMP and is coordinated and paid for by the DSSD (downtown special services district). An estimated 23 tons of materials are removed on an annual basis.

4.5 Leaf Collection At least Annually Complete 1 Leaf collection was completed for 2018 by December 14th and approximately 15,261 tons of leaves and debris were collected. 4.6 Snow Removal As needed Complete - Snow removal completed as necessary for 2018 and 2019.

4.7 Catch Basin Cleaning On-going On-going 1,929 In 2018-2019, the City cleaned at least 1,929 of it's ~11,000 catch basins and removed approximately 3,163 tons of material. 4.7.1 Vectorborne Disease Prevention On-going On-going As needed The City's Department of Health has conducted larvicide activities in catch basins during the Reporting Period. These activities focus on disease prevention by reducing the population of mosquito larve found in stormwater drainage structures. Application of larvicide within City catch basins was scheduled to start on June 3, 2019.

4.8 City Owned Detention & Retention Pond Inspections Annually On-going - The City continues its efforts to inspect the basins identified.

4.9 Interconnected MS4s On-going On-going - The City has mapped out most of the interconnected MS4 areas during the development of the new SPRP. A map of the interconnected MS4 areas is provided in Appendix C of the Spill Prevention Response Plan. 4.10 Piping On-going On-going 136 During this Reporting Period, the City continued to conduct CCTV reports, which totaled approximately 10,170 linear feet of piping that was videoed, including storm mains and lateral piping. 4.11 Culverts On-going On-going 37 The City performed maintenance activities at 37 culverts over approximately 30 days. 5. Stormwater Monitoring 5.1 Wet Weather Outfall Old/Known Outfalls All outfalls within first two years On-going 93% Completed Thirty-three (33) wet weather outfalls were sampled. To date, 108 of the 191 know wet weather outfalls were sampled.

6. IDDE 6.1 Dry Weather Outfall Screening for Illicit Discharges 25% of known MS4 outfalls per year On-going On-going 179 outfalls were dry weather screened with 40 samples collected at locations with flow observed. To date, 380 of the 958 known outfalls have been screened. 6.2 Outfall Verification (Post-IDDP) As needed - - No post-IDDP efforts completed at this time.

ANCHOR Engineering Services, Inc. 2017-2018 MS4 Annual Report City of Stamford, Connecticut

Annual SMP Summary Table July 1, 2018 - June 30, 2019

Status Complete / Activity Description # Actions Scheduled # Actions Completed Comments on Activities Incomplete as of June 30th 6.3 Harbor Watch On-going On-going On-going The non-profit organization was awarded a Five Star Urban Waters Restoration grant for their work with the City to identify potential pollutant sources which discharge into the Noroton River watershed. 7. Legal Authority 7.1 Permits As needed On-Going As needed All permits to be signed off by each individual City department, including: Coastal Management, Environmental Protection, Flood Plain, Traffic Dept., Engineering Dept., DOT, and Zoning. 7.1.1 Zoning Department As needed On-Going As needed The City has requested an extension for addressing the change in zoning regulations. The proposed changes will require more staff from the Engineering Department and the Environmental Protection Board and additional time is required to implement the changes. 7.2 Ordinances 7.2.1 Stormwater Management As needed On-going As needed On March 20, 2015, a final MS4 Ordinance, Ordinance 1153, adding Chapter 201 to the City Charter, became effective.

7.2.2 LID As needed On-going As needed The proposed changes to the zoning regulations will ensure that LID practices are allowable. There are no known zoning, site planning or street design regulations that would be an impediment to using LID practices.

7.3 Site Review, Inspection and Monitoring Activities As needed On-going As needed proximity to a wetland or other water body. Current staffing levels limit the opportunities for site inspections to only those projects with the greatest potential for impact to stormwater quality. Site visits frequently occur prior to the issuance of a Certificate of Occupancy (CO). Appendix G provides a table of the services provided by the EPB, including permitting reviews and site inspections.

7.4 Eliminate Barriers On-going On-going - The City has well-established procedures for coordinating municipal departments review and approval of land disturbances and development projects. 7.5 Private Retention/Detention Ponds On-going On-going - Access to privately-owned detention and retention ponds is addressed in the Stormwater Ordinance. 7.6 Interconnections On-going On-going - Research by City staff has revealed that no formal interagency stormwater agreements exist at this time. If agreements are deemed necessary, they will be discussed in the next annual report. Historically, ConnDOT maintains all State roads. 7.6 Plastic Bags As needed On-going On-going As of May 3, 2019, the City has passed an ordinance eliminating the distribution of disposable bags.

ANCHOR Engineering Services, Inc. 2017-2018 MS4 Annual Report City of Stamford, Connecticut

Annual SMP Summary Table July 1, 2018 - June 30, 2019

Status Complete / Activity Description # Actions Scheduled # Actions Completed Comments on Activities Incomplete as of June 30th 8. Monitor PHFs 8.1 City Parks On-going On-Going - In 2018-19, the City did not fertilize park green space. 8.2 PHF Use in Ball Fields On-going On-Going - In 2018-19, the City applied a total of 1,530 pounds of nitrogen to the ball parks. 8.3 Sterling Farms Golf Course Nitrogen Monitoring On-going On-Going - Total Nitrogen applied in 2018-19: 550 pounds 8.4 E. Gaynor Brennan Municipal Golf Course Nitrogen Monitoring On-going On-Going - Total Nitrogen applied in 2018-19: 3,637 pounds 9. Other Program Items 9.1 Establish SPRPs As needed On-Going - In June 2016, a city-wide SPRP was completed. 9.2 Review & Modify Current SMP Annually - - It is anticipated that an executed SMP will submitted to the CTDEEP as soon as possible. The updated SMP will be based on the modified permit and will reflect the current levels of resources available to support the permit goals.

HHW - Household Hazardous Waste SMP - Stormwater Management Plan DCIA - Directly Connected Impervious Area BMP - Best Management Practices LID - Low Impact Development PHF - Pesticides, Herbicides and Fertilizers SPRP - Spill Prevention and Response Plan

ANCHOR Engineering Services, Inc. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

APPENDIX C

UPDATED CITY OUTFALL LOCATIONS MAP

ANCHOR Engineering Services, Inc.

R CK D " BLAC"K RO " T C CRA IG " "

AY DR FAIRW " L TR RY RD D E NT R " L VE CO AB " B ST S U ING S L D A GREENS CIR RI P C Y " T Y I " IN R R T T

N " ROLLING RIDGE RD U " O C " C O D V R E Y N R " T T " N R E N V Y "L O L C N S S A L

B A OU LDE C RO B L R MA TRINI "O D YAPPLE RD TY PASS N

N

" Y

" G

D L E E E CH L O H N ILL DR W R O D " O TA

D NGLE

N WO

" R O L D D L " N MCINTOS " W " H C O D T

D R B R A O L

W

E A C " O " E G O C M K

D L L R I K D R D K S " D " R R I C N M T L I ON RD M T G OCK RIM O W O R M D E N N W L R I AK N R O G E S DR O G H L N P S N " S " L U L R R O R I A D T D " S " N I D G N I L O C F S E P D L " W R M L R E O " AK VIE PPL G E D D LN AYA RA R R M S E " PL P B R

N I N E R L PAR G L D SONA " " GE A " H W RD I " STONE " L D FENC B " D E LN CK ERR E"PL L R R L " A Y D D P L L R L P T HI L R " B Y R P N " Z D N E A A E E BR " S E N " " B T D E " " G A R N A " I D P " " I " R Y W W E D I C R L E N R E D L S H D " B L L A I L L P G A I A I M CKB RY R R ER V D H E LN H " SPRUC E D DR E E BLUE H Y Y " EM L L S I A P NG N P A S W P U L P R A A D A " E L " H K INE RD R L R G K R ERS " " O MER D

E N R D N G IL R O OL A " E E " R DE O " ND K N D " " " R " V L S FA M R R B R " D O A M A " D K M R C I O E

E I N N R

G D R L DR

R G " ESID E L E C L ID S S G B K Y

A D P

H R H N K W " I R I

E E B C D I

H A R N R W A N

A " L

" O G IR " T D Y R R IN ID H RVO

G H I E U D E R L S Y E Y B " L R

T E R S LN O D R M O A O E H R M K K S R IL C E " D N I CLUB L L UN R R G R D V G O E L D A "O Y L A " N D "

L L R

R "E T R " L I Y D R C "

L N E B E N " D K A L R B

R R W BRIAR BRAE RD R N A K D " O " " B G B E DR " H G C N O ID IL A I D " R S L H A R " E W

L I R S P R " S A " L D B

Y " D LL R G I N N

M I B N R W

" D R E

D RD " W O D " ILL R A M " O N

R E E O A D "" A R N " B H " D T R I O O N A B " D E " G N " " R L A G N R O RA IA J W Y B D ED OLD IRC MILL RD R DR G H R " B D D " O E D " R O R W W

R " N E N D R O E B F E L L O D E N R D " I D L D " N K I L I " D A L I S "A D S

N A

S R " H " R O

L M E S A R E L R D I LN L W S O T T U DL IO E G D L U L D K HI O E LL R N " N R W D N I M A " " O E O H

" D T AL G S A E

IN X " D T A

I ND R T " R

R " R A D " L L " R T G " H N O

O D R R L L D URE E N LA G R E W DG ID N LE BI O R O TTER CT W SWEE O G M " T L " " R O N D N R " M O R O D D I D D L T Y D R E N R L D E R L RL T R E L E K ST R L WE L " " T M O C EA G Y " " " L " DO T O S W N " " " R L X " L R T I L " O A " A F D S A U U " DS R ROUND R LA Q E KE R H L D E " N L " U " T " L N T " L T " E " E D T I R

D SHO S N " R G G " "T E " U " R L S NSET RD H T R R E C O TR C ID FOX RIDG N O D G D H C L S " R K E " " " E A K" R E F D R T R D R I " N A R T S

D H O I E H D W S M L " O A G I D N K O R " I L M O " M R G A D A R W O " E O O T H O O " X T H W D R I H R G N R L O " I C S D

G L L U D R F D K D A D R T I R H R R L E O B L D HI R D H R R

D D N N T T X SUNSE C I Y U R T A D

RO L O " " " G R E F T

E D H E K

" " " S R O OXWOOD RD F N D " O IR D " F N OAK C U R O PI R " X S OD RD B H O IL " D W E L F " NTAIN A " O E U WO R LM T LN G O D O E N U " K O I M O TH IC D R " CR P D " D W

E " PRINCESS R " "

H " D CT R A " D D R Q BRACCHI DR E MATHER " U " " C R E AKE D H G R AVILA RID ND D GE RD I R D D " D R R R " E " R " B D K W EN R G TW N H R D

OO D O

S N O " R A I D

A L O K B T

R R C R W D D I N H E P O Y E N E R I O B

IV U R S I O V E TA I C I R I H M O N C G S A

R KY H E H "D E K LINE E L S R O D E L M" N R E N N D W N D " P R A R " C I R T D L O A E B T " N E D I A P N K V I D Y " E H N C O P A YCLO O A O TR NDREAS H " L O W

NA D N N A KO R RD IL N D W I " I L A C N F " G R S FO R O T D " CK F IL RD D LN O " C R ON LN NORTHW ED C RIMM IND AR W " " " K" OO FRO DR D S D W G C " RD " T ILDW N O P R O I D O O R N WOO D T R H D E WILD D RD N IL D R S R D " " E L A D LAWRENCE H U S P D G B K I H IN C R L H U NE L D Y R S A I " R R V E Y " " LN K " A IL L " D A R L C C N N I D N O E

D R R D

R L

H " N K G I R " C H " M O IC O S H " R C " ERICKSO KYMEA A " N DR K DOW E N DR " L A D RMS RD I R ON R FA D B D I O D M B " N C R I M RD S P M " RM I I " S FA D O L L O K R D N L E T" TRY N Y Y D " R " COUN R " R R " D SS M R T S R O R ID D Y CR E R R D P E " " D " " D " O A A R " A R R R N I Y U N D B E L K S L V D C O ERY M O R R O D ERRY R W A D A R T R C D D N "Y DR G D R S R A D L N A Y A L I L S D O I R H M O C R L L V E J N I N L R K " A R L " A K M G E A D R H " N U " " " C W L D F A R W D N P O S W B D N L S A E A R I " I T D A R D " C E T K R K L R R I H E E G D " TT W L O M L F N R N S W E E T N R

C R A S N A W I G A B R R A N R L

R O E

D " L L C N O M D D I M K D L D

Y I E T

N I E

V " " R I L L R D P

" A L D M

P A P " " I E DS C L " A N R G H E D IR E R " I S N H O I BEN F C " NINGTON K T T W " R A " CT O D N OULDER G C M U B B " RO N S F I H L IR O O L K N I C DR R M E N I N " " D D

O P R T R " S S KSPUR R D LA CO WOOD DR " H USI AKE AV NS R" R D L IL D R AND SCADE RD I " R A V L D C EAS IL E T H

R B " T A C N "

K E

D " R A D " D K RD C ROC R R " S L D E N " A T L C L I L HE " R E M S C L R " T " E D D Y H H W L N R " I U G " S A W O G E T I F "S H H D L Y " D I I H L A L M H L

R D T R A A R R W A D T U B V L R

D R OO H S V K L D " N A

I L D L N R N E R G I D I

" T

Y R L L M

LE ID I " L G K D O S A H

A E R N V C C D H " T

E R R U R N L " EP ES D" COL E

E T D E E H D D RD E T L N

H IM I G " " B N C E E " B R MILL W D L O I N L

C O " IM IR R L

W " T

T T A

B S A R D N

" U R A A R

L P D D " " H " H LE RD "

R I T OKDA

K L RO T L B

T L C

R " E N C T " N Y U D D N R A " " " O " ST I E HE G L R R A L " D C EO K CYP L " R G E RESS G S DR

A CK " " I V D ISIN E " R " D HU " " E R C LN " A D P D T G R " M U E O L A N E E O R E E D R W TT D B BIR T U R R R D S S B OO D ON " L KD G J L A L E LN I " H O B M U LEY RD R C R OD AN K D O C " D W H L " LN E E R " A D B E ELL N " PB D E P AM " W C " R R L

" N E O " E R R D O D " N Y H " OLW D U " D D N RIVER DR " R LU MANO B K A R AN " " D MIDDLE RIDGE R DR D " L " " RD LN D G ZA R N D A E L R H L U I B W I H L E

A " N S " M B " B B U " E T T T LN W JANES LN " E"RNU L P " T "" U QUA N G RRY RD

R N R " S E E L "E T C N O BR " T IE "" " U" F L R OOD I N FORESTW DR B E L R N G OLD LO D L LOG IN GGING RD D R OLD T N G O D I K V L JA J N " R W O E C U E S " T R D LN D N D O N B R R R A R E " N A " D E " R K H E G D

D I U R C D

D I L D R " R B

Y

O

T D D

Y R H A AR

D G

D G K I R L R " DAVEN

N H POR O T E " Y D FAR R M LN N E

A

N G " A " Q L UA R " RR I Y C N R W M R D H L " O L Y LN T R Y OLL E A N

W A N " L R P LYNAM RD F L H A I A N M M T E N K L FAR " R T M R

D A L R E N C R A

O R E N

D L F T S " O

D P L " R D E I H P N T

D N F N O L G H " R H T L N R R W O M E D N H L E I O E V I B D L X R F I E A E I DI N T V P L L H A R K O O R L Y R A E N D S BI D D N G U IA " G O D M S D " O " E A N I R K D D N CR V R ES " E E T A O B

K D LN D N SMO L " D

R R R L O T " L D LN A RD IL O G H C IN C O R DEM MPO

" K DR D O S BLU E Z O WH E R G R IT ID ORT RID O E GE DAVENP D

R " FO " R DR

W

D " IR X E " D C R G AK D D B

N " R G O M O " I

B L

" R O E

D A O T T D

C P

A N G B IN E E

G I G K T

N G H I W I G U L

N O R L

D R T R T O E I A D M R P O N

R D D Z AR E " O R K

GW O VA R

OOD LN L A R " O N I LN W A N

L D C N L E " N E I " N R " " " D L G " F V B L R O IN N T " " O D ROC Y " X I H

K R T D R F E T L " "" " O " R IN E L

N F G T MI L T DRO S R R C T

O L KS DR IN TON RA C B L K C MB O R D L R D P R E

" D A R N R

E U E L N E E M E

V K N L E V O

" A E M A A D D W R M D H N L M P N E G

D R R L I R F

R O " O N J W E N

UN D P E D

L N I

E D A O S R E N E P N E A D I L P E D R F E P R V V E G E D R O N D J N D R R R B BA G A D D R M W I " W O R " A D A A Z D R O N S D D O F T R R F W W L H E O

N

K " T U L "

A T " B O D OGW N R C N LN F D OO L D R D O O OE E R C W A SE SH N O R O I L OR " I " I " R D H S R K E B U R S M Y K

G B R C O IL T E

" R L W T O R T

I S R I " N R D D

D A B R W E F " A " A OU R L A D R B R L " RD H AY U I " C R " S L W O W L H N D N O A A F N O " R R R S D H T O I E L V A S L L " L N T D I " I N S " " " E Y N CE D " " R R W T Y H A L W R K D L T ITT PAR O U R N IL MER B N S O R U " Y L M D A R B D IV B " E D I N B N " R O " E " " H O I NO O RT O E R K HW O G W I " F R D W D

R U D U T RD D D R L T R "

O " C L N " S L L "L " M I E A RR N " W " " IT BA G "L T P " N " PHEA

A E S

RK BA A RC G Y W LAY N KWA AY D DR PAR EN RD

T T H D D T E RI I E

D I " MER GH R " PARR T N L I Y C H R D U R " G T N E N " D R P K A D ER R R D N H C K A " L E I A O D N L L BUX R I L P U TON FA P U R I N RM R D N ARR G D D N N D Y RD K E E " R R " S AV ED THUND N T E K ER

HILL D A O

R B

D " R O "

R

E R

P R E W

V E B N I A D G

O

L K D R E S E I "

EDAR T O

E C G " R C "H R OW D D

" E E C

D PAT R E H W H D ED E V A B

D I S G

E R E R

G T E G M ID A I ER D

L P C R E E R R

T H H S D A R R N R E R N U Y T O W T N A ER N " C S L O N AL R E S IN " L" T S IR H T U U G D ER K M R R L A E D D K WA N O Q D " R L IR R R T R D " E D R " W MI I S A D

" L D R D E L RD E H S D O R " R C E S E L E K R R R K P G LN " U M N IN A V E E O I R L D " " V X " D A P R R N E B H L " O U L F IN "

V " A N R T T O T

Y WI O E R WHIT " O I N V

D G J TER R E S E O R M A L A T Y N V N K

N A D D D R R A L LN I R L D L S S R N T E

N B U U E L T T E N " R R R N I D N E D E R N T O U N W C A D A L T E " V Y U R M M L H INE C N X ERA H R A L " T E A D L D C D " L W A T G N R N R A G "

E B O R " D N A F " R LN W C

L D I K ROSS RD

N L L I E

M " O

C " R

L V C O R N N O

C H

A L S E I

O U N H I A R

D E S " NT B

R R D R N E M " L I T H G O " G "W R E H V T E A A K S O L " I L E R E D M R M I D D D O O AL E K E R O N TBI R " " E A " R A ED F O L V R D E IT E E D T N M T H R T L W " E K P S T R IL B R A E L O D A E I D " L P L P N LN N P E R N P C Y

A " A B W HER L P S LN I T E SA CT T M T UN D A T S R R K P E C R O R D E " L O R L R B

D A " D O E " N E R E " M R N I D " L IL E " EW L O E H N D L L F R R W L V I N IE D R SS N L K O C D D B R A A S C " D R " " H " D R E N R E D L R O N Y D L A R V J LOUGHRA R " L A E L E A " L D G A SWEET BRIAR E D G E RD

R N BA C I T " W R B N " N D L N S " C A " R C I

K R R L OW " Y A W " R D " D R S R K R O O N O A O T F C L C RN VIN D L R O Y T A H W E S D X C N O H

R C S R O R R " N A E E A E S B O D E D O R KE G C J I R B W W I MIL IND L U V " F L O P L L " B N

B IN " H M R L I S " T H O R L OK G E B E R R O

RD L O D A W I R M Y R H

BR A R"R A ER B " H N S A

O R D D M D R R " R E L I E DR E N E I L M R " O E O N L L S O V " D U Y A D " " K L M D N P A C N R N D L R IR C L R A R C DEEP SPRING LN

E N " A L D C N B R D D B D A C C E U U L M D E " ILL O IR E R L LO M BR R E T O " F R D C B I OK T ONA O CT R A F D R TA M N R " D L R N " " S N D W " " U M A Y E RD R N " A B L E R D E P D R

A C L M N

W D E E " N S L W S D

C UN A "

R A P

M R D O

O R A

I D A D A

Y N O P T L CE R X R

R R S D

H I N

D C E T

E N A D P O L IA M N L

L L C L P N M O N R " "

D G E YW O L N IN A T

A L ST D E T

CRY AL R C E R I R L T N N

N D A A E F " G K A T Y L H I I E A AM DR A K RD L N R V D L I " N I W D R E Y RD O

R W V B L D O H L L " R O SANDY E N

G LN D O D T L A S R L E

L NE R N N N BAR N R " E D L L " W H R I D B

H O R N L R K O

IG C H A H " J O W R N D

H L ASH

TO D " R T L D N C R I L L " D

NE RD C T

T D R E R P E " U U R A U T E T L A W D R E M R IL V V " T L

T D E E " T

N L R

B E " E T R I E I Y " R E N L D

R "" A T S A M B R L R I

N A N H

O R " E I F R H M L R V A L A I O L H D V R I " O D T R R A S H D " S L I A N H G R W T I R F E T A D I T D S R M U WOO O AR O " D O LN I F G T D H W D M I R S L D C S RD E

H E E W R R D W W O D O L " D " R B E H D " R

R D " D A "

R AY T U O O C R R D V ES D R L BI R

Y D U E N A S R IR " O C O" A C D

I L HOO R S E

T A B

D W L S S D

N P S A R E H

T I U

E H T N N A L " N WAMPSC O S

L S O D E " W W H A N T R N

" S E A E " T" L " G T O L L L E

O L E R R L R D

C L V BO H O U L D R D RD O TON T

N I A I P S ST W

D E I "

R D HO K W T G S V L " D C L W

" NI E M

S VE R E G E C " L A E S A R A W E A L P E V E

R OA K P O E N D Y " " E D P D P R R H W E I V A

" E

" S M D D R O A M F T G M " " C E A O

D " L R D R M D A K

L A H N A I R O H H P C U I

L I E R R L M DD " O E I E

I L L M D L C O N

I " T K O

L O R K A B F H N I

L C A R M T R

H R R P

N N T HAM M A L B D G D U H N T O W G

S E P I L R U A O

A N R R C T E I M I O Y W E B S L W H R A N T

T M O C K C O O O L

A T R E H

W C P D L B S R O S R D O I

" OO K

D B M W C Y N " H A A R G

U W T K A D IR O D T E

B V R N W

" A D E

R E D R D

R G R S M O R C A A

O " W " E P D RID O R O " N B G L Y R R V O R B D

X I " R E O R T B IC A W O D L D I E Y R

E O R I N R R K I U L O " W R DG W E U D N K O K R L L R N H D E D S E C S L

L H Y P I C E P K P N V A Y A G O D O L M " M H E L V A O L O LE

R " M E A R N U A A " U K N B D M V K E I B U K P A R L AV O T M A L U

B E E L I M B W A L R G C D U " I G T T W I P O D E R LU R " T N R R D I E G D A A H N C W L R D D VE I " " B L R I E H E E " " E R L T L O S D D V K V R L Y L R I N N A N O R L N R D D R I X W R A T " D N A B E "

R E

D A I E R O S E " V W " " E E R D

A W E E T I E U D C E R E K P D N G O V E N I

Y J " R N E E T A O S N D

G X L Y U O P A V A N I R O V E

D M R D O E L I R P D P

D A E C D D R N H D

M I U R

" E M R AC N C

W K I R H " S G G R K T O " I G CLOSE R RE FL D C T D G T O I "" "

N A L O R OR RE " R D I L K H L N D D A S L L A V A D C M R W C E R T E

R P E I E O E P T M B C R Y T O C D " S S H E

E K " W " E E N " R D ST " D A E Y " A W S B U G E A G E D " E M P D S O R A A O R M " D O RI B R H E OO I L W AN P L S I K S L T V R R N R W P T B LN R R D E R IE S " D S R

M E

W I E

R G D K R " " R N K P "

" S G R

D L

A E O S D L O

L E M D E

T N A E W U I N L LB " G

E E O M " E

K D E R E D E L O " NISE PL RR I O

R A G D R D Y L

R N I D S

D I L D O A T E B T " H D

N V A I " R R R A E " C

U R E L L R O E S L S O E G C D W R L R

R D D E N E O G S V

N D R E A E I

A E L I F Y O R V P " " N A R I M N O O E A Y T U P

N P M H L E C O L V W W H LB

L E T G S V S E O D O P Y L A G R I

N V " D N R U L A R W " A " Y A E E E L D L E S R A W N T B D T S V G I D D O W O E R " N P D " M R H G R S T E " E " H R N V "

C E W I U N IR Y A ERLOO E I B E " S K L E D R L V P L R W E E T E L L D L O S " T H

I G L W N R A T I L D N D U S C L S N O W L N S G

D C P L N D H P N L A E D W R I R L I U A D R T T A A U I L LO C A H " N N LN D T R L R H N H G G R R L L T U A V " U O R T E L I H " Z E I D B

E L O O

" R P G N E S "

C H E G C T F R

R I L A R C

A D " M K C T W H S L P E R T L H A I R I R V R R "

S O O L E

R D R L L R L " I E O K G A E " D E A A W O D L NA T C T G N P T " W E P L W " A R I R P E A " N P S " " " S S D V B O E T T T D T D D " "D Y RE O P K E W O R " NA N N K TOP L P R R PP R G C O ST A C S N G A D C R S T E V E R L " E " N E E R M E Y R E A E G N C N R E L L R R A W " A N L G G " N W I A A ES R N AY R G A R " ES K O N T A V O I T H N W R D I S F D A T WO WI E T D O ID T S R O D O Y E T " G R D U V G G A H R " L R D R E I R E E C R EL I S D E P LL T R " E R L A " E W W L N R D D D W H C R L N IT L R D E " S N L L K E B D I L I D O H

V I R Z Y O D " D C O DE H " H R IT S S

O T

O " L R O R E N N T " E O M T

T V " A " E O R CL F W S

L " R

S K " B R E

NS N D

E N E

L L R

ANK S IN CU W B L G A S T B T K H

P O M R L E I N N

W O N D A R " R S D EG W G S N D C T E M " R R O N A T Y R S E IV L ER I I O ST I C N E O B ANTO HILL D V E W L N R V O L V E " A R D E L V B

L R K R N N O N R R N A A " P I H " A R O D A L IL

K G L D E L L P Y A L L E " C E B N V

D T I O Y R

R K R O N D SILV E H E L R R E U D C W H B D IL V I " N L S B G N A A D R E L N T N N R U N FO O O NE " O K F E O N R W TT AH E T I D O EY R " E N C T L " Y N W R ST L W N A C Y H W " D C E ES N T T IS E R LEN A TW A E TL ST D " R O S E V E G O T R R F O D D A P R S B " R L " D W D " L A T D R D S D V E O

E R ST R " I O A A G E I V N R C I W D V V N K A Y N O E W A L K L A A A " F P E V E D D E S E E L E L H W

I O L K P R R N L R G J O B I D V H O O I D IG V N H H CLEA CASE S N H R W I E C K DR C A A D C L N " " I E D F Y " R A G L T I P F D N R N R N R H T L V K " T I " B S C IC LU R A O R F D R C E T A E BE T A P O E B S RRY S S L D E C L T O E E O V D R RD L H D " Y IE L W P A R LVIE G E R S K R W L R H D STI A AV W R A U R D R E A A E V I E U R R R R I S S H E D V W I B B G " V O U R N U A TURN E T W A E S D ER N ERR R A D D N N V Y R D A T A R E T A B H K N I E B E VI O S M E O ST O S J G D N " U I C A R L O S B E R L " " L T E H B D " N E C P D I W V E E E I N J H V A O V R O A O A T F N A W R H TE UR B A F C IE RR NE F R A E G R " AC R W Y D V E D R K R E AV R L Y R E D E R E ST C A V P R A E A O E N DIC O N TO E O L O D E R GD DD M A S RD " D D D L L B S T " EN N V H R C R S WE O RD E E O SGA M R H R E C O R TE " C S T K I T LE D U L O W D A BEL S C S L D N LTO I R W W S A M " AV E N V T " T N P S N A E N E E " R " " T E V P G R E K G D S N R A O O S E D X I A D H S N N N T A O I I E M R R L D H S H L D E S A D O N R R C I P N R " R N A D S R H JO B

N DU N " S R G L L E H R L N B Y D F M I A W O O C " Z A A I A F A R

L C S O H P R E E " R S V R B N D O T A E T B S M E

S T E C T S

L E I P N " F R RD L T Y H T

O P L " A O A A S L A

A T V V

E N L P B E V R L B R " I D N R

C A A E L N H R E "

V L E B P L G D

P E A E N E A P E O E P L L C PLE O E D V B B R S A A E D N " D D E V E R S E A F W T B N R H A R M L R W D " A F " T C E

W Y J NE O T E V H O W S I Y R T A F O B

N W K I J C R E I E D N REED L H

N " G PL A L A

O T OAKLAWN R D T D

L V R A AVE W C FI

A H E " E L D T L

R R D R C N " D

E

S E L W P

N R H T

" V L E A V

L I C V A O D K N

I G N

T E E L

G O D D " S T E N

E WE " I C E S E V C " W R C O

S I A G L

W T R E A L V

V D H T W E O

E R E L

IL N S I E AN " L G N H A F L L D T R S

S

B C D I S T E V T W

A A F

I N D D T R W A E R K P O T C N " GE LN O

O L C G IN O O W R K D S

" L A EN I L V R A L R D DO N D " I " O O R H O C I " E L E M E L E V N R O O O E R E K V D R D O R G N R M A A R D H S D M W B

E F U E K E R D B A A N

RD Y IR L R T E D N V L L U R D L

R WEST P E A E

" N L N G E A T S D A E S D P R D W Z T I AU D V A E D L R N R R O " I N O D B W R L N O L T D D Y D A R T O WEST L L D F " B R E M " V R B V S

" A R L I L " O R D IG O S " M S E I O H

E T E

W R O H P R N N D S D H L A

G D E F N R R T L D G T P AN I T T D N V L C N N I I S I S T IS B A S R OIL E A M R S L V O A P R OM E L D E L S E V M L D D H R B R D A A H A U P R L T BR T W N E N O H OO RANE RD R " R C G K C N S E C T R R R D I D " D T D A S O L U

U V H L V S L N I O D

U C S O B N A T IA

A E A M R A V U O D S N N I E I " M T S E V R D M U V

O E F D C

C IT N R S R N L RIDGE RD D I E R S

T A D A C O T W T R L K N V L C D R B N A E A S

K A CR E S R D K R N O U H O ANE RD R " T D N R D C E S O

O C S I T A N E G T E V T D " L " B L I A R A N B E P L O S U N V T S E O R T M AV A L E LL L A C E S N M O I B L U L E H E" S ST NE RD R E T H L W D B WE O D R R A C " D R R T E S N " G L D E S A P " O R N V E O V OP O E D Z L S N G O E D L E AR S T " T Y G M F L T T " A IN A E V E A S C R M O I L U I E R A R F T " P P R F O R " N HILL U N V S N O E N R K D L D R E A D R D S V D D LA T I N R L W ONE A D N R RK O O S S W I D S O T F R O N S L T N T S I R N R I B D C E D M E CIR A L A E L N D D N N I R A L M O L S City of Stamford " " N L R D T P D R R W E O U C I " N O D LOU R F E H ST A N W FORE VE M L E WN A " FIE L P G I ST LA LN LDS I R I T L " VE FORE TONE D N IO L R WN A TE H E E N "" LA R D T G N G R E " Y R A L " O P D E " N E R " W R E L N ST O A TH L A H E B D EIG R V " " A L E

E W D Y " E T " D R IN S

R D A Y V R W W B R R E A R X R D T B I H S H

R S A V A E O O D R R S I A W N M

E E E N T L B E K D R I A B " D V D E L O A O M R ER CE D R G B E R E R R AN R R R O T O I E E T L S E R

" S L I H P E C " A O N F T O T R D R T T A L B ID O D B C F E N S K E E R D D B D R S F L M L O " R " F " A B D D P E U I U O L D R V L U AH C P A L G L IR R E A C H E V N D L L R HY E M R A A A D D S E M D UR R O N E A E R B I D V I A E S H R R SEVENTH ST N S V E E CO T R N W R B E " F E I Outfalls E R S N I AYB D IDG L G E B C T E E E

L R L ST R T E N R M G L R L L E I V E S R E C T D

W O E G U I BRIDGE ST T N R L " O E " HA L S R IO " N E R G N E " O C R A O S S D O "" LO T H Y W N CO T R C IA WI "

ME M HESTE L R P NG CT T R E A ST D IN S

VI E L

E ST N H D C TH CE I "P IX T N L D

Y D S T L P I

R AV A R S E V R R N L E L E K

E L R R P E T E I M L O

N E W C C E R O C O O E L T ODM L P G H R ER N E O T R P L I V A E N P N Y RD TH ST V IA B P " FIF I F L M N M IFTH V R M W ST A D E D O A L L A L " W G T L L E L T H R I E S O S H V P K P T F E A C A IFT C C

E E H M R S L S P D LM T PL I I

A L Y K O O D V " R E W M K " R as of June 30, 2019 H " R ST O L O " " E FOU A U C U

S R H RT T R T H H URT ST T H G A H P " H C " FO R A R O S U A

I H D L L P S A E Y I R " H W S L B LL R T LN A C E

" O S S R M C P S E RO R H C L

D B PL N T C T " U N R K E N H E A T A R T A R RITAN S S H N

U C PU N T LE

M O G E L E K C N A L " E E E R

H G T O T T U

P T N L V R T P C E E D IN M T B I F E

S CE T HI R R W G R R R

E T D S R N T A T PL THIR D IE O E E S T A O T O W O N P

R L O V

N D C L V E R A L S D E D R F M A

W E K I C

I L F D R R E

R S I G W N R A

O T HACKETT Y E P

O " VU C T M R W A D S E C " E O H S R O

I A O C I N T IR G O R G O

LE CIR S M IN R K K V C S M R H R

" DR AR R F P

Y T I S S LN COND ST S A A

I SE V M R A

E K C PL T S C E P R E T

N T RE L R E

O E E E I A S AV W L L C E

D L " B R V FA S E

E A UC N L A T P

R ET T D T " D L R T S R T

W Y ST S R T

B R H E A P W I O

H O L D B

L I A U O A R B D E C E K Y BA " S T L "

R ID T R V A D I E E D V S D O E Y T T T ST " S E T H C D CT FIRST ST K A O A F Y G L M E E N ENN S S LM S R RE D E R T E V O BU I D A E E L R O B A A Y E K E R S E T N O V R P R R L I L N V T " CIR O L E E A V S A C N E E R A U G F D S B R L C F O V V A O N L C " ND A UR V E R T L I F T I S H E VI ST N D Y I V E P A E G T W I A A A

E N T L N R C V L N AVE L G D E Map Key E A A C S A I L O K N T R W C D E T N S " N OAK ST O O B O L G " O A R E W H C W C L M N O O T I R W O I I O

C T G N LC E O N O F O H V E R T P H O A D

N R W A C H S LIN EM K L T D M E

Y S EN IL P L M O L B D L Y L

A C L W A A E E V T

R E P E E W V W O B H G F L E V L

R A R L N E F E O C W V HOY A P A K N T NO W T ST N EN O

X E A D V R" A X A TH A K T A

P D N ST E E V

O I A V R V E R R E N L L S C P P

A A L E L O T A Y V O E L N T I L R G S L L A D

E B E OO R H H P S S YW O D R LL A E O

R B L HO W I F N E T C T T E R A H C D S N I A N R

K E P "

S A U

Y I ST " H M E L N H S N N O UT O P O N N O N E M C C O T L H

W ST G Y Y T L A N K I S E T V D E R H T A A V S S V

R N A T R W A R E R W L T A O I C S S A D A D L I L D L I R CT T R P V H L E O U N L E

D A E I H E R A E L S D W T O H O B H L L C T D V D G " IS R Y E N S S T D O R A S EN W U I E N T S T E NO A W T W B RT A P C E D H T C T R A ST N R S A R R R D TO L E T " O S V N M N " T R O A O D L E A L N N S S R S T V D L ERN A B A W V E ON T W V I N PL E M S H E Outfalls (958 points) L T N N AN L " E N H V LEY S LE A Z N N V O A A E D T A T A T N EL T T O S D O A T H D E A R L H C M T R I T S L LT T L A T ON N L U T A I D A T T VE U D E R A

G L

N A H H T T R R S O C R S U T N L E L L N S S O G T I K N I C R I L T S S A T S M S S T T Y O H E E N T E L A L A R I H S O R M S A L P D M S T R R H D R D N S NCE U W H N U C B A L I T I W W N R R E O O L E A E T E Z D O KP S A P L E M O I L O S S H N H G N I V N W L D M B W I N D U R A E K F T O L E C E F C A R R BR P O R E L T A S N F P I R R E E H O O D L P C H O T O T A N N V L A Y S T S D E R M H O T A P S A S E U I D E IT T P B O O LE LT M A S V O W E R R R O E L L R V E O W V L P I T E Y N L B L T " F N L N I L V A A LY I A P AZ B G G R V A T R T N A S A R YROC V R D P Hydrology L P T U S L T O S E K E L A AV T O T T A T R P I E E S T Y E R S D L N L E HI S S S E C LL E G G D E N H C R T LE S IN UR L T T S E O N S F T U N N E H D W L Y C N N I ST E E V I D L O E R I G A T R R B S T U " C H R D R H R D Y IL T S P H S L KING F O D ST E L P AKER T L R L S L TT PL O Y H D S L C I A E P E V E E M N E H S T N T I A L W T R E LE O N T L L E N U L T S I E D V L S A O G A W R S ST D A P L J R S L S A W M S L L Y N E R W T D K PL E SMIT E Y R E U I H R A I M S R Y N A RD T R E C D " P M I A T V S D I V S E V N A M A V D T R IN E N L R C A N Y T E R F D T A M M G Y S E " K O D N S G O R S I S V R S S A T T N I T R P S R M O E U E E T N L F A A T E L U S T U E R Y N M S LU T K A T I W G T O P G " M P V L O T T S O L C R L T D E L L I O H T T R D R H L L D R S E S A D R I H I P O L P M L D I W S R I N IL R W L L T T I R T U Parks E A E L T R T R O E Y E T " R N F I S " P C E W V D T A I N B S D B A V A O M E F S MAIN R N I I " ST T A T N R K A N E L T S E D C A C L A P C " R T O T S I P S E L K I E " P L N T R M T T D E S M S P B L S L H O E A A T HE R C S R O A E R O C R T G Y I U D E W F " W L R E DA R R L D A N U E E N B R D M S T E

A U B H S B V R L Y L R T E A A E L M V O A U E M D I R N K A E R N A H I P B A A N T R E N A V V P B A P V L D N U T N S T Z P A R D F R D C RA L R E A D E T H E E A A U A R A DE B L Y S N E O T S M A N A E H R V N A S T I D T G E " L T L L T N A S Y S L K L E E W T O L V A T C P T O N S E S W D L V B T S E H O E N T N S L R E A W A S IE ST T R T D K M R S R C L R G IN E R A L U C V

A " D P S E Y E I M S E C I E A T L W E N L C N I L R N T A E V H B T M T N O " A T I N O " O A V E S T N W E E S S L A T N C B L R T I L D N A D V " LV L R D L N I S E A A T D S IN I

A S V E R L T A U Y R E S Y A N L E T A T H I-95 & Merritt Pkwy S A E T R M E M A Q G F V O S H " Z V N E E N E S C S R R E R R P C A A V R I E I W L R K Y S I T T E G C HE S I A D C C K L RM A S R T A S H S H E A AN T W N DIS V A M L H R S M U R E AI ST D E T A N N Y E O R S V ST AI N A N D M N R E L A R V D P S E P N E " S H G A E D C E

O A E D R T LV E " RE P S E IV B R B L ST IA T T I L I SE L T AIN N V S R N S V ES E M H E C L R IO D TR M R E H R A I N D I C IL O G O N R E H L TR ST Y V D T V M T E S O L V R E M A T O G T R T N T P E N L

S I I C D A O D L B T S T T S L L A P E R T D IN " I X L S R FE TERS " O N C TA O T TE H E S AV DE O 95 E N R O O H R E R W A O M A S A N L V R L O S E L O Major Arterials E A E L L O " T W I P " G R I " L W E D H V M Y ES R K O W S T E F D A A S E G R C O URSU CIR R P T LA PL D H

R N E G E S A R A R T T V O TL D D R R R R I N S A N O A OU A

D E M Y E W R K N C O T D

N A S A S A V T ST E Y L G R W B H D M T S I T E W E S L L U A A A IS TE 5 Y E D X R TA E 9 T L S O W R T O V S AT T T N S D " D S T R N O RST R IA C " R H E D A Y NTE Y F P I C A A M D T R R R R A W L M S F R

A E T T O P B S R E E V L V A O E S T T R E " N " S R T C N D F ST TAYLOR ST N E R CH

U A M INTERSTATE 95 T M O S BIR T O W R R O T R L H B O H H S E A L B W T U E A I N NG E A U L A A H W D N LI G Y LOW P E E S R E A AR R U K E K J N R O O T A R V S ST M E V N C C T H T B G L T S S M S A A Y O K L E " L S P A T W E B O I O D N Y N H W R R L E A O R N O H R R F P C R L S A V W " T D All Other Roads H M " A E B A W T A W A M A T H I L A " P V T I E N T R A S TION T C M T L S D V TA S E F L E S S O T A J FF IA L O U D E S T N ER R S M E " H R R " S E

" A

B N " K Y I E S

A O L F M ON E E T

O V O U Y S L T E E T P T D E V

S N S L A Y E LL O A G L A HO

L D K E S W S U I C D X A T

T T O DO R D O COVE U S P K N I O E W D C O D

S Q A R L O E D W D Y K O O CIR

L U E O P R "

T D W L O R A E ST W J L

E T V W C T S W V E V E A

IN D A O E L " K R E L L V K L C A V

S S E R N

H H M A O S B S T T G E A C U V P S P N E A E E E E T T N " U N T D N A L I L R D W V S O S V I V D A Y N E S M S K E L I E K S A N T T R M A A L R S I V " A E A R T I T M " O S A N S T T S H T A N N T V U R D R E T A L G N A Railroads I D K E ST Y G E P D S W S A S L V T T A O E T E S E S R L S P S E S E S E I L V E L S T M S S D T I T B O W T E L A T T H A S W V T L N Y F E C A L L L A V S P B O S Y VA M S S I N E D N I " R N L K O K D I N F R L S N DL S T D I H L E O E A E T R O O L M LL B " T S A R U D R T C O T G D R F V R " E T A Y Y J W T P S H D S T A I T T R A B A T H A E O G L T O S D N P S R ED B T H S W WE P N C R D H N R O

A I VE R S C E D S A S SA A R R E C N S I R IR

H C T N C A S R W I R L I W M T C Y R E U L E T A OV L E E S R W E V R

E O N O Y I R A T

A O S N D C V P W A O UMP ST D N G K A I E N L NG K S T A T N D

S N T D " T D A A O V N T L S B I E W TA S L " T D V TIO B L E A N RD O E R E O R R N S D B E E W D D B E R H L W S A E E V E W N N M G " L N AR E A T " T D D V P A T R W I A EL CT L A A E Y L D " A S A S M H S T M R S C E N C D T " AN IR R EP E E W G K Y O L L L T O K NS V I S H U V F IT ST A E E N R N S R C E A I H E D " I I I P O O E L S E W F AV " L F M O T A E V D M M R K G E N L R R D U S M E W V W IV A R R K EL E T E T A S I E O R M A E L S D N A C R W S T S S D T A T D E E A D D W U D U T A P O T F R R D

S E S E V H " E B W O C O

E P I I " O B S

T C L E S A A L R D R S

D O D L IM T N B A F PA ER N V A T " D E F E E R I C K F

" R L C B A R

R P ST K T I O

A U ST A R H N C W V E

A B O O N L V S V N RK S L A O

T S PA E S I

N A G O O H A COMM D U N R H

V D D I L D B

E " E E " R R " C N L L A IS O L EN A L H L R U E U VE A R D P W C R K L A N E S N A T L E M L D D T G H " S U D O M O W O P E T V E I S T S E E N G U IFIC S N A C E N L H PAC I T A L A L O " N N T " S A M T E T V A C S N S W A E W Y B G S M M S VE C IR S N R O L T T R O I E T O D A B D E L O S AS S T P D S I A E V D A S T E N JAME D W

P R P S S R E T V

I A A R ST O Q ANO O

A M N P U T H A I D L R LA M C S R S C L Y " D E T I R L I " T R F K H E L S

O E W I M B E F

S C S P E LI U OR ST C

B R ARB O O H P H P E L L L A M V Y L R E S U LE T E Y N A T R K S RD R Y A T N T RT S V K T I P E U D O N R L S N T V O C T " G N O " " A I D E S T M R S E O B C B L O R C E G T S T W Y T LU Y F R B O " A R R " R R L R S E " R B O G A Y S C V W O B O " L P A E I E E A W M V E L N N T N B V AN L R L I W O E S H V E M AL E E V E E E D G E S " T A O AT IN O L G A A L E W " B R S E W L L E N S V O I V I E U L D L B ST I D I L L A E A A T S R C W C L A V V " S R D S W T D V A H C C E A E " O A L H A C A L T N " " U C E N R E N G I " " W W E I R L T E A E F O S F I E S S P S H V R M T S P I L T T I D E S A A H N L F U " E R E E T S U S O W T D A L S " R B E E S L " O E L B I L N D L H T R S Y N C O D " N T S I S " D N T " S R R R O B E R O R U D UR M E N W K E E O R P D E O V D T V D P I C N L " E I R W N L H M U A E E S A T A E N V V I S " D A R C E R V IN A T I TO E E A Y K E P " R K A C CT GA S R A P LL L IP O L W A A N P W L L NT O " O R IS E R L R W R D O D T V N A A B D " S A M R W " W R D R "" W H N N D " E T D O A S O I RD DA U N L V R E VE S G I W R N L P O OR L E N E I D E O T D U " I E R E O V N H E H W W V A Q W S N P U R O V A L H N O I D M A N C

O S N A A H RBOR D E E B GY A R W I G P PSY H ALL ROQU E T U D ACE OIS V K R RD L " M R " MOT S A B N R T H A S L COO A " O R D NDG K R W " D USE R D W HO " MIT IL T E CHELL ST N N T E I A " "K O LANE G H LL DR R P IC KOR D Y D E " N JOSHUA R S L V AUL K A DWO S D OD RD E SLOCUM DOWN C G R S A L VE A DOCK

N L L I D E A E " L M U W Y R E HIT A E N KA TAKE N T R N M N A ER LA

ST N W G ARK R R I R A D U TH ALPH REA U R ST D D S P C Q D

P " H N F I C E A V M T C A L O L R H H L E Y C O F O RA E L S S O P SEY RD W C O I TER N A N N FIELD R Y " D O

U E D D G V RD A R

D Y E

S GURLEY RD L SAGAMORE

A RD

R E

R D

S O R

M N Y I N

A OCE E A L N DR H E G

P S A L L " S

O RALSEY O

D RD S O W

D

R OCEAN DR W

T

" T

O S

C T

E T A

V S M

A E

E

F SEA N W B V

O EA

A A C

R H

P R D D

P

E I R A

A H V

L W E S ROC E KLEDGE R D S R

D S

N N E A R HOBSO E N ST C N F SOUND O A AVE R V

L D "

P

E

L

D

L I

I

S

H

T

T

H

S

G

E I

R R

" C B FAIRVIEW E AVE OCEAN E V FAIRV V IEW AVE A VIEW DR " A

L E

R IG W N

H E V

M R A

A

T A

P D

HOUSE L I R D P

E I N

" A R S

H

Notes: Map created by Ciy of Stamford, CT GIS staff for MS4 A

WAY M

S

O S E

F A E N C

E M R R O W A ES R R TMINS D D TE T R L N N S D N A annual reporting. Questions regarding this map should be A R E V C O

S

R E VERPLANK G AVE directed to the City of Stamford MS4 program. O

R

D R map created 10/21/2019. K W C R O D R N EA E C " L O D D " A S " 2018-2019 MS4 Annual Report City of Stamford, Connecticut

APPENDIX D

2018–19 SPILLS OF FIVE GALLONS OR MORE

ANCHOR Engineering Services, Inc.

City of Stamford - No. CT0030279 Spills and Leaks 7/1/18 - 6/30/2019 Date Address / Location Material Spilled Quantity Released Receiving Stream 7/10/2018 Cummings Park North Unknown petroleum product Unknown Long Island Sound / Westcott Cove Tradebe to recover and dispose of oily booms (Fuel oil or diesel fuel) from related to 3/2018 incident at DIS-50. discharge 3/2018. .

7/10/2018 Haig Ave. at Crestview Ave. Hydraulic oil 20 Gal. Long Island Sound City of Stamford loader ruptured hydraulic line on roadway. Spill was contained and did not enter storm drain system. Sorbent material and sand applied to area of spill. Sorbent material swept and cleaned 7/10/18. No impact to receiving waters.

10/9/2018 804 Atlantic St. Hydraulic oil unknown West Branch / Stamford Harbor / City of Stamford sweeper ruptured hydraulic line Long Island Sound on roadway. Spill was contained and did not enter storm drain system. Sorbent material and sand applied to area of spill. Sorbent material swept and cleaned 10/9/18. No impact to receiving waters.

10/16/2018 Bateman Way Transformer Oil 120 - 180 Gal. Stamford Harbor / Long Island CT DEEP Case No: 2018-05481. T. Theder Sound contacted by WPCA. Private contractor (Vitti Excavating) moving large excavator with boom extended and pulled down utility poles and transformers, causing them to rupture. Material did enter catch basin but did not reach WPCA pump station. Abatement by contractor at owners expense. No impact to receiving waters.

10/23/2018 Bedford Street Parking Area Oil / Grease unknown Long Island Sound Stamford DSSD and co-op contracted Transclean to power wash and recover all wash waters.

12/7/2018 Indian Hill Rd. at Bayberry Hydraulic oil 20 Gal. Long Island Sound City of Stamford loader ruptured hydraulic line on roadway. Spill was contained and did not enter storm drain system. Sorbent material and sand applied to area of spill. Sorbent material swept and cleaned. No impact to receiving waters.

1 1/5/2019 71 Pine Hill Ave. Motor Oil 10 Gal. Long Island Sound CT DEEP Case No: 2019-00064. Oil into storm drain. Follow up by Stamford Fire Dept. and CT DEEP. CB on private property. Unknown impact to receiving waters. 2/11/2019 18 Ken Court #2 Fuel Oil unknown Long Island Sound CT DEEP Case No: 2019-01538. In ground tank failure. No free product. No impact to receiving waters. 2/14/2019 250 Hope St. Petroleum / Gasoline unknown Long Island Sound CT DEEP Case No: 2019-00728. In ground tank failure. Sheen on groundwater. No impact to receiving water. 2/28/2019 2453 West Ave. Diesel Fuel 10 Gal. Long Island Sound CT DEEP Case No: 2019-00979. Overfill at Fed Ex. Discharge to ground surface. Cleaned. 2/28/2019 243West Ave. Diesel Fuel 5 Gal. Long Island Sound CT DEEP Case No: 2019-00974. Sanded and swept. 3/4/2019 Hope St. at Colonial Rd. Antifreeze 2 Gal. Long Island Sound CT DEEP Case No: 2019-01023. CT Transit MVA. Sanded, swept and cleaned. Not in CB's. No impact to receiving waters. 3/4/2019 25 Big Oak Lane Transformer Oil 5 Gal. Long Island Sound CT DEEP Case No: 2019-01034. Clean Harbors contacted for abatement. 3/4/2019 684 Long Ridge Rd. Motor vehicle fluids 10 Gal. Long Island Sound CT DEEP Case No: 2019-01035. Cleaned - contracted with Herbert Recovery. 3/22/2019 63 Hickory Way Petroleum 10 Gal. Long Island Sound CT DEEP Case No: 2019-01301. Transfer line failure - Hoffman Fuel. CB's affected. Abatement performed by contractor. No impact to receiving waters. Stormwater Management Dept. pumped, cleaned CB's 3/26/2019.

3/22/2019 39 Grenhart Rd. Petroleum unknown Long Island Sound CT DEEP Case No: 2019-01307. UST removal of OWS. No free product. Soil remediation required. No impact to receiving waters. 3/25/2019 360 Thunder Hill Dr. Diesel Fuel 30 Gal. Rippowam River CT DEEP Case No: 2019-01348. Ruptured saddle tank. No CB's this area. No impact to receiving waters.

3/25/2019 360 Thunder Hill Dr. Diesel Fuel 30 Gal. Rippowam River CT DEEP Case No: 2019-01348. Ruptured saddle tank. No CB's this area. No impact to receiving waters.

3/26/2019 28 Bell St. #2 Fuel Oil unknown Rippowam River CT DEEP Case No:2019-01355. In ground tank failure. No impact to receiving waters.

2 4/15/2019 I-95 NB between exits 6 &7 Motor vehicle fluids and chlorine Unknown Rippowam River CT DEEP Case No: 2019-01692. Tractor trailer bleach rollover. CT Tank removal contracted to abate spill. No known impacts to receiving waters.

4/23/2019 300 Main St. Hydraulic oil 1 Gal. Rippowam River CT DEEP Case No: 2019-01833. Hose failure. Sanded and swept. Clean Harbors assisted.

5/1/2019 626 Rd. Transformer Oil 3 Gal. Westcott Cove / Long Island Sound CT DEEP Case No: 2019-01962. Eversource workstation spill - container failure discharge to ground surface. Clean up and abatement by contractor on behalf of Eversource. No impact to receiving waters.

5/4/2019 105 Harbor Drive Petroleum product unknown Stamford Harbor / Long Island CT DEEP Case No: 2019-02014. Reported small Sound - East Branch amount of gasoline around vessels in marina. USCG notified. Unknown impact to receiving waters. 5/8/2019 11 Leon Place Diesel Fuel and Gasoline 275 UST Long Island Sound CT DEEP Case No: 2019-02094. In ground tank failure. No free product, pumped out. No impact to receiving waters.

5/21/2019 67 West Broad St. Grease / Cooking Oil Spill 30 gal. Rippowam River CT DEEP Case No: 2019-02291. 30 gal. container used cooking oil / grease knocked over in parking lot. T. Theder was contacted Fire Dept. to provide sand for traction and to contain spill and safe off the areas to prevent additional tracking by vehicles. Spill was contained to area adjacent to parking lot. Tradebe contacted by restaurant owner to properly abate spill. Grease / oil did not enter drainage structures. No impact to receiving waters. T. Theder scheduled follow up inspection on 6/4/19 w/ restaurant owner, City of Stamford Health Dept. and City of Stamford WPCA Fats, Oils, and Grease (FOG) inspector.

3 Fire Department

Hazmat List by Incident

Alarm Date Between {07/01/2018} And {06/30/2019}

Chemical Name Container Qty Released Released Into 18-0008339 09/17/2018 19:05:52 Transmission Fluid 1 Liters

18-0008366 09/18/2018 15:58:25 Natural gas 1 Parts per Air

18-0008951 10/06/2018 11:08:23 Miscellaneous Automotive Waste Drum 10 Gallons Ground

18-0009688 10/29/2018 17:52:41 Ethylene glycol 1 Gallons Ground

18-0010114 11/12/2018 14:04:23 Mobile Property Involved: 11 Automobile, passenger car, ambulance, race car Gasoline 64 Ounces (liquid)

18-0010361 11/20/2018 09:05:41 Mobile Property Involved: 20 Freight road transport vehicle, Other diesel fuel UN#:1202 Vehicle fuel tank 25 Gallons

18-0010861 12/06/2018 11:45:30 Motor Oil 1 Gallons Confined, no

19-0002013 03/06/2019 17:23:31 Fuel oil #2 5 Gallons Ground

19-0002577 03/25/2019 16:52:18 Mobile Property Involved: 21 General use truck, dump truck, fire apparatus Diseal Vehicle fuel tank 30 Gallons Ground

09/25/2019 13:11 Page 1 Fire Department

Hazmat List by Incident

Alarm Date Between {07/01/2018} And {06/30/2019}

Chemical Name Container Qty Released Released Into 19-0002603 03/26/2019 20:44:04 Carbon monoxide UN#:1016 8 Parts per

19-0003127 04/14/2019 15:17:05 Natural gas 1 Parts per Confined, no

19-0004400 05/26/2019 12:57:45 Natural gas Machinery or process 1000 Parts per Air Carbon monoxide UN#:1016 None 7 Parts per Air

09/25/2019 13:11 Page 2 2018-2019 MS4 Annual Report City of Stamford, Connecticut

APPENDIX E

2018–19 PESTICIDE, FERTILIZER, AND HERBICIDE USE

ANCHOR Engineering Services, Inc.

2018-2019 MS4 Annual Report City of Stamford, Connecticut

APPENDIX F

2018–19 ENVIRONMENTAL PROTECTION BOARD SUMMARY TABLE

ANCHOR Engineering Services, Inc.

ENVIRONMENTAL PROTECTION BOARD

The Environmental Protection Board (EPB) is organized by ordinance as a multi-purpose City agency combining the duties and responsibilities of: 1) a local Inland Wetlands and Watercourses Agency, 2) a local Conservation Commission, and 3) a local Flood and Erosion Control Board. The EPB has regulatory responsibilities, including issuing special permits for development activities on properties having inland wetlands and watercourses, buffer/setback areas, and designated flood hazard areas. The EPB also has advisory responsibilities, providing review, technical assistance and comment on the potential impact of subdivisions, coastal site plan reviews, site plan reviews, variances, special exceptions, drainage/erosion control plans, utility installations, and other related matters. Information/comments are disseminated to City Boards, Commissions, Departments, professional consultants and members of the public. Finally, the EPB has stewardship responsibilities, including recommendations for the creation and subsequent monitoring of open space areas and public points of access to Stamford’s waterfront and shoreline areas. EPB Staff (Executive Director/Environmental Planner – 1 and Environmental Analyst – 2) in cooperation with other City departments, inspects development projects to ensure conformance with issued permits/approvals and City standards, acts as the designated liaison with State and Federal officials on matters of wetland/floodplain/coastal management, and administers the City’s participation in the Federal Emergency Management Agency’s Community Rating System (CRS).

In Fiscal Year 2018-19, EPB’s staff members (combined full and part time employees) responded to 4,400 public inquiries during its regular office hours, reviewed 1,438 applications for building/septic permit, and evaluated 106 formal applications from the various Land Use Boards. In addition, EPB staff participated in the review and/or inspection of numerous public/private projects of value and interest to the City including:

Greenwich Avenue – Mill River Collaborative - Mill River Park Middle Corridor Project Green and Hanrahan Streets – City of Stamford – Mill River Park North Phase 2 Wedgemere Road - City of Stamford WPCA - Sanitary Sewer Extension Woodway Road – Aquarion Water Company for the Woodway Country Club, Inc. Scofieldtown Road - Bethany Assembly for Artis Senior Living, LLC

West Main Street - The Home Depot Southfield Avenue - Davenport/Stamford Landing – Boatyard Southfield Avenue – Davenport Landing – Residential Building/Roadway Improvements

Project monitoring and enforcement remained a priority for the department. EPB Staff also performed essential functions in the development of regulations pertinent to Stamford’s MS4 Program (“Municipal Separate Storm Sewer System”), participated in the formulation of a uniform “Drainage Manual”, improved efforts to update pertinent resource layers in the City’s Geographic Information System (GIS), enhanced the EPB website, contributed to the continued evaluation of the City’s on-line building permit system, and maintained/enhanced Stamford’s excellent standing in FEMA’s CRS (Community Rating System) Program. Performance Summary - Fiscal Years 2009-19

Activity Service Output by Fiscal Year

2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 Customer Service:

Office Visits: 3354 4483 4783 4798 4900 4832 4912 4568 4146 4400 Building/Septic Permit Reviews: 1222 1342 1642 1584 1505 1462 1540 1355(a) 1318 1438

Administration:

General Program Administration: 336 364 307 414 373 347 372 416 414 416 Referrals: 143 150 158 121 171 159 157 194 210 191 Outgoing E-Mails (Various) NA NA NA NA NA NA NA NA NA 3830

Permitting/Technical Review:

Coastal Site Plan/Zoning Apps. 13 15 20 19 16 26 23 30 29 19 Wetland/EPB SPR Applications: 27 38 35 41 28 28 34 28 40 30 Subdivision Applications: 02 03 03 03 05 09 07 02 03 01 ZBA Applications: 68 55 63 71 66 51 66 52 48 56 Site Plan Review Applications: 39 46 55 106 99 117 128 119 124 160

Enforcement/Inspection:

Project Monitoring/Compliance: 79 82 87 81 95 93 106 119 135 129 General Enforcement Activity: 58 56 59 28 25 30 64 43 71 69 Complaints/Citizen Services: 35 34 39 37 46 220 249 280 380 172(c)

Special Projects:

CRS Program: 18 18 18 18(b) 18 18 18 18 22(b) 24 GIS Updates 00 00 00 01 01 01 01 01 01 01 Public Outreach 01 01 01 02 03 04 02 02 02 02 MS4, Drainage Manual, Web and 00 00 00 00 01 01 01 01 03 06 Regulation Change

*The information summarized above is based upon an examination of written correspondence (chronological) files and existing data base entries for the period 7/1/18 to 6/30/19. Omitted from the reporting are telephone entries, facsimile transmissions, undocumented field inspections, inspections conducted in conjunction with the review of development applications, and other related activities.

(a) Reflects new/improved streamlined policies/procedures to reduce the specific types of building permit applications and follow up reviews conducted by EPB Staff. (b) Five (5) Year Recertification. (c) Reflects modifications to Fix-it-Stamford referral process. 2018-2019 MS4 Annual Report City of Stamford, Connecticut

APPENDIX G

CITY STAFF TRAINING EVENTS SIGN-IN SHEETS

ANCHOR Engineering Services, Inc.

• FUSS&O'NEILL

Employee Training Universal Waste, Used Oil and CT Regulated Wastes Management Procedures and Emergency Response Procedures City of Stamford - Highway Department Date of Training: June 27, 2019

Attendees Sign-In: Name Company / Work Printed Function 1

2

3

4

5

6

7

8

9

10

Training Location: City of Stamford - Highway Department 100 Magee Avenue Stamford, CT

Resources: US Environmental Protection Agency (EPA) Regulations of 40 CFR 262.34(a)(4) and 265.16 Regulations of Connecticut State Agencies (RCSA) Section 22a-449( c)-102(a)(1) Universal \X1aste, Used Oil and CT Regulated Waste Training Power Point Presentation (by F&O) Waste Training - Supplementary Handouts (by F&O)

Training Facilitator: John Siedel, CHMM, OHST

_.42__,,_~~~-~------• Fuss & O'Neill, Inc Printed Name s~·-

\\private\dfs\ProjectData\P2005\0296\1360\Training - SWPl'P _Sl'CC_ er Reg W & Univ W\Training 2019\Univ & CT Reg Waste Training - fJ FUSS&O'NEILL

Employee Training Stormwater Pollution Prevention Plan (SWPPP) City of Stamford - Highway Department Date of Training: June 27, 2019

Attendees Sign-In: Name Company/ Work Printed Function 1

2

3

4 :) O{ 5

6

7

8

9

10

Training Location: City of Stamford - Highway Department 100 Magee Avenue Stamford, CT Resources: General Permit for the Discharge of Stonnwater Associated with Industrial Activities Connecticut General Statures (CGS) Section 22a-430-3b: Site's Stormwater Pollution Prevention Plan (SWPPP) SWPPP Training Power Point Presentation (by F&O) S\'\IPPP Training - Supplementary Handouts (by F&O)

Training Facilitator: John Siedel, CHMM, OHST

_-;/4_~~-'1?1,_1,,f_,_4u__ c/d , Fuss & O'Neill, Inc Printed Name /signature

\\privatc\dfs\ProjcctData\P2005\0296\l360\Training- SWl'PP_ SPCC_Cr Reg W & Univ W\Tra, ining 2019\SWl'PP Training- Sign In 6-27- fJ FUSS&O'NEILL

Employee Training Spill Prevention Control and Countermeasure (SPCC) Plan City of Stamford - Highway Department Date of Training: June 27, 2019

Attendees Sign-In: Name Company / Work Printed Function 1 ~~L, Sk """' a.ue.t e« 2 J,-~ fo1 3 6 s () p e/2'\JJ~ 4 S\-o('()~\« 5 ¼ef- 6 y'U:.)L- ~ vi~~- 7 .,, ...... ;f{o\WrtO \ -n \-0 Y\U-cci'"C _s-,\o •VV\. 8

9

10

Training Location: City of Stamford - Highway Department 100 Magee A venue Stamford, CT

Resources: US Environmental Protection Agency (EPA) regulations of 40 CFR 112: Site's Spill Prevention Control and Countermeasures (SPCC) Plan SPCC Training Power Point Presentation (by F&O) SPCC Training- Supplementary Handouts (by F&O)

Training Facilitator: John Siedel CHMM, OHST

1

--~-+--· ~~--~~.,,u_dd__,__ , Fuss & O'Neill, Inc Printed Name Si~-

\\private\dfs\ProjectData\P2005\0296\1360\Training - SWPPP_SPCC_ CT Reg W & Univ W\Training 2019\SPCC Training - Sign In 6-27- , ' fJ FUSS&O'NEILL

Employee Training Spill Prevention Control and Countermeasure (SPCC) Plan City of Stamford - Highway Department Date of Training: June 28, 2019

Attendees Sign-In: Name Company / Work Printed Function 1

2

3

4

5

6

7 \\ r r 8 r\,-.,L fv\A-t-lf.~v 9

10

Training Location: City of Stamford - Highway Department 100 Magee Avenue Stamford, CT

Resources: US Environmental Protection Agency (EPA) regulations of 40 CFR 112: Site's Spill Prevention Control and Countermeasures (SPCC) Plan SPCC Training Power Point Presentation (by F&O) SPCC Training - Supplementary Handouts (by F&O)

Training Facilitator: John Siedel CHMM, OHST

__. _,,_::::i;_~_· _b~---· , Fuss & O'Neill, Inc · Printed Name ~lure

\\privatc\dfs\ProjeclData\P2005\0296\B60\Training- SWPPP _SPCC_Cr Reg W & Univ W\Training, 2019\SPCC Training- Sign In 6-28- ' FUSS&O'NEILL

Employee Training Spill Prevention Control and Countermeasure (SPCC) Plan City of Stamford - Highway Department Date of Training: June 28, 2019

Attendees Sign-In: Name Name Company / Work Printed Si ned Function 1

2

3

4

5

6

7

8

9

10

Training Location: City of Stamford - Highway Department 100 Magee Avenue Stamford, CT

Resources: US Environmental Protection Agency (EPA) regulations of 40 CFR 112: Site's Spill Prevention Control and Countermeasures (SPCC) Plan SPCC Training Power Point Presentation (by F&O) SPCC Training - Supplementary Handouts (by F&O)

Training Facilitator: John Siedel CHMM, OHST

-~~~~-~.,...,_._~~~~-· , Fuss & O'Neill, Inc Printed Name /4.-

\\private\clfs\ProjectData\P2005\0296\B60\Training- SWPPP_SPCC_Cr Reg W & Univ W\Training 2019\SPCC Training- Sign In 6-28- > fJ FUSS&O'NEILL

Employee Training Universal Waste, Used Oil and CT Regulated Wastes Management Procedures and Emergency Response Procedures City of Stamford - Highway Department Date of Training: June 28, 2019

Attendees Sign-In: Company / Work Function 1

2

3

4

5

6

7 \'\. I

8 h,L \..\ ,c.;.\.\ w I'\ 'i ~ 9

10

Training Location: City of Stamford - Highway Department 100 Magee Avenue Stamford, CT

Resources: US Environmental Protection Agency (EPA) Regulations of 40 CFR 262.34(a)( 4) and 265.16 Regulations of Connecticut State Agencies (RCSA) Section 22a-449(c)-102(a)(1) Universal Waste, Used Oil and CT Regulated Waste Training Power Point Presentation (by F&O) \Xlaste Training - Supplementary Handouts (by F&O)

Training Facilitator: John Siedel CI-IMM, OHST

0 6i1r0 Su:dt/ -~---=c:7_-£-,_=+'- _d _;,.__~__/,j , Fuss & O'Neill, Inc Printed Name Si~

\\private\dfs\ProjectData\1'2005\0296\B60\Training - SW PPP _SPCC_ CT Reg W & Univ W\Univ & CT Reg Waste Training - Sign In 0 FUSS&O'NEILL

Employee Training Universal Waste, Used Oil and CT Regulated Wastes Management Procedures and Emergency Response Procedures City of Stamford - Highway Department Date of Training: June 28, 2019

Attendees Sign-In: Name Name Company / Work Printed Si ned Function 1

2

3

4

5

6

7

8

9

10

Training Location: City of Stamford - Highway Department 100 Magee Avenue Stamford, CT

Resources: US Environmental Protection Agency (EPA) Regulations of 40 CFR 262.34(a)(4) and 265.16 Regulations of Connecticut State Agencies (RCSA) Section 22a-449(c)-102(a)(1) Universal Waste, Used Oil and CT Regulated Waste Training Power Point Presentation (by F&O) Waste Training - Supplementary Handouts (by F&O)

Training Facilitator: John Siedel CHMM, OHST

_.dtz-r--~· --~------' Fuss & O'Neill, Inc Printed Name ~

\\private\dfs\ProjectData\P2005\0296\B60\Training- SWPPP_ SPCC_CT Reg W & Univ W\Univ & CT Reg Waste Training- Sign In _ fJ FUSS&O'NEILL

Employee Training Stormwater Pollution Prevention Plan (SWPPP) City of Stamford - Highway Department Date of Training: June 28, 2019

Attendees Sign-In: Name Name Company / Work Printed Si ned Function 1

2

3 l l I ( 4

5

6

7

8 \'\ I r

9

10

Training Location: City of Stamford - Highway Department 100 Magee A venue Stamford, CT Resources: General Permit for the Discharge of Stormwater Associated with Industrial Activities Connecticut General Statures (CGS) Section 22a-430-3b: Site's Stormwater Pollution Prevention Plan (SWPPP) S\"X'PPP Training Power Point Presentation (by F&O) SWPPP Training - Supplementary Handouts (by F&O)

Training Facilitator: John Siedel, CHMM, OHST

-~r--.{£___c..c.~~~~-~--- , Fuss & O'Neill, Inc Printed Name /Signature

\\private\dfs\Projec1Data\P2005\0296\B60\Training- SWPPP_SPCC_C'f Reg W & Univ W\Training 2019\SWPPP Training- Sign In 6-28- > ' fJ FUSS&O'NEILL

Employee Training Stormwater Pollution Prevention Plan (SWPPP) City of Stamford - Highway Department Date of Training: June 28, 2019

Attendees Sign-In: Name Name Company / Work Printed Si ned Function 1 2 Eb 3

4

5

6

7

8

9

10

Training Location: City of Stamford - Highway Department 100 Magee Avenue Stamford, CT Resources: General Perm.it for the Discharge of Stormwater Associated with Industrial Activities Connecticut General Statures (CGS) Section 22a-430-3b: Site's Stormwater Pollution Prevention Plan (SWPPP) S\X'PPP Training Power Point Presentation (by F&O) SWPPP Training - Supplementary Handouts (by F&O)

Training Facilitator: John Siedel, CHMM, OHST

_· ---+--~--L~--- ~------• Fuss & O'Neill, Inc Printed Name ~urc

\\private\dfs\ProjectData\P2005\0296\B60\Training- SWPPP_SPCC_C'f Reg W & Univ W\Training 2019\SWPPP Training- Sign In 6-28- 2018-2019 MS4 Annual Report City of Stamford, Connecticut

APPENDIX H

2018–19 CATCH BASIN / MANHOLE REPAIRS LIST

ANCHOR Engineering Services, Inc.

December 2015 - February 2018 Catch Basin & Manhole Repair List

Repair Repair Completion CRS # Date Location/Address Complaint Status Date Date Status Date Contractor Comments Costs 01/05/16 2700 Bedford St Basin repair Sent to Reliable 07/15/15 01/05/16 Basin is repaired 01/05/16 Reliable 01/04/16 Holcomb and Coolidge Ave Deteriorated corrugated metal pipe Sent to Reliable 07/23/215 01/04/16 Pipe repaired 01/04/16 Reliable Pipe has been replaced/sink hole repaired 01/04/16 Parking lot of Boccuzzi/Southfield Park Manhole interior masonry is failing Sent to Reliable 08/04/15 01/04/16 Manhole Repaired 01/04/16 Reliable 01/05/16 82 Akbar Rd Basin repair Sent to Reliable 08/21/15 01/05/16 Basin is repaired 01/05/16 Reliable 01/05/16 40 Dann Basin repair Sent to Reliable 08/26/15 01/05/16 Basin is repaired 01/05/16 Reliable 01/04/16 39 Waterbury Ave Basin repair Sent to Reliable 08/27/15 01/04/16 Basin is repaired 01/04/16 Reliable 01/05/16 24 Sawmill Basin repair Sent to Reliable 08/30/15 01/05/16 Basin is repaired 01/05/16 Reliable 01/04/16 21 Waverly Place (on Wilson St.) Basin collapse/need repair Sent to Reliable 08/31/15 01/04/16 Basin is repaired 01/04/16 Reliable 01/04/16 Baxter Ave (Across from I-95) Basin repair Sent to Reliable 09/04/15 01/04/16 Basin is repaired 01/04/16 Reliable 01/04/16 135 Breezyhill Basin repair Sent to Reliable 09/28/15 01/04/16 Basin is repaired 01/04/16 Reliable 01/04/16 106 Haig Ave Basin repair Sent to Reliable 10/04/15 01/04/16 Basin is repaired 01/04/16 Reliable 01/05/16 155 Johnathan Drive Basin repair Sent to Reliable 10/07/15 01/05/16 Basin is repaired 01/05/16 Reliable Basin needs new frame w/6" ht. curb back 01/04/16 Brooklawn Ave Basin repair Sent to Reliable 10/15/15 01/04/16 Basin is repaired 01/04/16 Reliable Drywell was filled with process/gravel and 01/04/16 90 Magee Ave Dry well collapse Inhouse 11/06/15 01/04/16 Drywell filled 01/04/16 Highways asphalted W470204-112415 01/06/16 1128 Cove Rd Basin repair Sent to Reliable 12/18/15 01/04/16 Basin is repaired 01/04/16 Reliable 01/04/16 Camp Ave Replace basin grate City Garage 12/29/15 01/04/16 Grate raplaced 01/04/16 Highways W471257-122915 01/04/16 20 Heather Drive Replace basin grate City Garage 12/29/15 01/04/16 Grate raplaced 01/04/16 Highways W471256-122915 01/04/16 7 Lynam Court Replace basin grate CitySent Garage to 12/29/15 01/04/16 Grate raplaced 01/04/16 Highways 01/06/16 59 Liberty Street Callpsed stormpipe Engineering 01/04/16 W468846-100915 01/06/16 177 Ocean Drive East Basin needs repair Sent to Reliable 01/07/16 01/25/16 Basin is repaired 02/22/16 Reliable W467766-090715 01/06/16 Intersection of Shippan Ave & Rippowan Rd Basin needs repair Sent to Reliable 01/07/16 01/25/16 Basin is repaired 02/03/16 Reliable 01/06/16 Cummings Park adjacent to Soundview Ave Manhole need to be raised to match adjacent asphalt walk height Sent to Reliable 01/07/16 01/25/16 Manhole Repaired 02/22/16 Reliable 01/06/16 162 Fairfield Ave Basin grate need to be reset Sent to Reliable 01/07/16 01/25/16 Basin is repaired 02/03/16 Reliable 42 Hamilton Ave (Corner of Cullodan & Hamilton W471211-122415 01/06/16 Ave) Basin sunken/flat top of basin repair Sent to Reliable 01/07/16 01/25/16 Basin is repaired 02/03/16 Reliable 01/06/16 67 Finney Lane Basin collapse/need repair Sent to Reliable 01/07/16 01/25/16 Basin is repaired 02/22/16 Reliable 01/06/16 87 Richmond Hill Ave Basin to 2'/need repair Sent to Reliable 01/07/16 01/25/16 Basin is repaired 02/22/16 Reliable 01/06/16 67 Crystal St Basin undermining & collapsing Sent to Reliable 01/07/16 01/25/16 Basin is repaired 02/03/16 Reliable 01/06/16 12 Owen Street Basin sunken/needs repair Sent to Reliable 01/07/16 01/25/16 Basin is repaired 02/23/16 Reliable W470773-121115 01/06/16 Hope Street adjacent to Splash Car Wash Manhole is sinking/Need to be raised Sent to Reliable 01/07/16 02/29/16 Manhole Repaired 03/01/16 Reliable 01/06/16 68 Willow Brook Ave Manhole ring is cracked/need repair Sent to Reliable 01/07/16 01/06/16 381 High Clear Road Basin needs repair Sent to Reliable 02/03/16 02/03/16 Basin is repaired 03/06/16 Reliable 12/29/15 47 Boxwood Manhole cover & frame repair Sent to Reliable 02/03/16 as of 10/17/2017 W471586-010816 12/29/15 40 Boxwood Basin grate repair Sent to Reliable 02/03/16 as of 10/17/2017 12/29/15 95 Liberty Basin collasp Sent to Reliable W471556-010716 12/29/15 25 Akbar Basin grate repair City Garage W471557-010716 12/29/15 98 Brook Run Basin repair Sent to Reliable 02/03/16 02/03/16 Basin is repaired 03/08/16 Reliable W471558-010716 01/06/16 Across from 160 High Clear Basin repair Sent to Reliable 02/03/16 05/22/18 W471559-010716 01/06/16 255 Ocean Drive E Basin grate repair City Garage W471560-010716 01/06/16 19 Hobson Basin grate repair City Garage

W471563-010716 01/06/16 Intersection of Cold Spring & Washington Blvd Basin grate repair City Garage W471562-010716 01/06/16 124 Cold Spring Basin grate repair City Garage W471564-010716 01/06/16 12 Severence Basin grate repair City Garage 01/06/16 33 W. Main Basin grate repair City Garage W471566-010716 01/06/16 Knox Rd @ Newfield Ave Basin grate repair City Garage 01/06/16 262 Haig Ave Basin grate repair City Garage W471567-010716 01/06/16 345 Haig Ave Basin grate repair City Garage W4715678-010716 01/06/16 72 Spruce Street Basin grate repair Sent to Reliable. Eng. Bureau 5/24/1902/03/16 W471412-010416 01/04/16 78 White Birch Lane Basin collapse/need repair Sent to Reliable 02/03/16 02/03/16 Basin is repaired 03/06/16 Reliable W471528-010716 01/07/16 Weedhill Ave 2 failing grates of Elmer Street City Garage W471529-010716 01/07/16 Elmer Street Replace basin grate City Garage Replace grate cornor of Elmer and Weedhill W471546-010716 01/07/16 Gray Farms Replace basin grate City Garage W471548-010716 01/07/16 71 Campbell Dr Replace basin grate City Garage W471550-070716 01/07/16 44 Crestwood Dr Replace basin grate City Garage W471551-010716 01/07/16 91 Crestwood Dr Double basin repair Sent to Reliable 02/03/16 05/22/18 W471552-010716 01/07/16 140 Crestwood Dr Replace basin grate City Garage W471554-010716 01/07/16 312 Loveland Rd Replace basin grate City Garage W471553-010716 01/07/16 140 Crestwood Dr Replace basin grate City Garage 01/11/15 Across from 56 Manor Basin collapse/need repair Sent to Reliable 02/03/16 05/31/18 01/12/16 33 Brodwood Basin collapse/need repair Sent to Reliable 02/03/16 01/14/16 Corner of Riverbank dr & Riverbank Rd Double basin repair Sent to Reliable 02/03/16 02/03/16 Basin is repaired 01/15/16 Turn of River Rd & Talmage Basin repair Sent to Reliable 02/03/16 02/03/16 Basin is repaired 03/08/16 Reliable Before #8 01/20/16 55 Laurel Rd Basin failing Sent to Reliable 02/03/16 02/03/16 Basin is repaired 03/21/16 Reliable 01/21/16 26 Fahey Street Double basin failing Sent to Reliable 02/03/16 02/03/16 Basin is repaired 03/15/16 Reliable 02/01/16 37 Soundview Ave Basin failing Sent to Reliable 02/03/16 02/01/16 26 Sunset off Bouton Street W Basin repair Sent to Reliable 02/03/16 W472352-020216 02/03/16 24 Fairmont Ave Basin collapse/need repair Sent to Reliable 02/03/16 05/22/18 02/03/16 Across 82 Snow Cystal Ln Basin repair Sent to Reliable 02/03/16 as of 10/17/2017 02/03/16 114 Woodchuck Rd Basin repair Sent to Reliable 02/03/16 Must build sump/has not sump 02/09/16 Lafayette & Crstal Street Basin repair Sent to Roger Arnow 02/09/16 02/09/16 Basin is repaired 02/09/16 Roger Arnow 03/01/16 75 Selleck Street Basin repair Sent to Reliable 04/18/16 05/19/16 Basin is repaired 05/23/16 Reliable 03/01/16 Hamilton Ave (under railroad bridge) Basin repair Sent to Reliable 04/18/16 05/15/16 Basin is repaired 05/23/16 Reliable 03/01/16 Across from 77 Selleck Street Basin repair Sent to Reliable 04/18/16 05/19/16 Basin is repaired 05/25/16 Reliable 03/01/16 Bangall Road Basin repair Sent to Reliable 04/18/16 05/20/16 Basin is repaired 05/20/16 Reliable W492636-080717 03/01/16 115 Akbar Basin repair Sent to Arnow 10/23/17 11/27/17 03/01/16 34 Fahey Street Basin repair Sent to Reliable 04/18/16 05/18/16 Basin is repaired 05/20/16 Reliable 03/02/16 Vanbuskirk Basin repairs Sent to Reliable 04/18/16 05/16/16 Basin is repaired 05/25/16 Reliable 03/02/16 Across from 8 Talmage Basin repair 03/04/16 42 Three Lakes Drive Basin repair Sent to Reliable 03/10/16 03/14/16 Basin is repaired 03/14/16 Reliable W469806-111215 03/04/16 57 Jessup Street Basin repair Sent to Reliable 03/10/16 03/21/16 Basin is repaired 03/10/16 Reliable W467100-081215 03/04/16 25 Cedar Heights Road Basin repair Sent to Reliable 03/10/16 03/21/16 Basin is repaired 03/14/16 Reliable 03/04/16 36 Cedar Heights Road Basin repair Sent to Reliable 03/10/16 03/21/16 Basin is repaired 03/14/16 Reliable 03/04/16 26 Cedar Heights Road Basin repair Sent to Reliable 03/10/16 03/21/16 Basin is repaired 03/14/16 Reliable 03/04/16 83 Three Lakes Drive Basin repair W473640-030416 03/06/16 Katydid @ Old Loging Basin collapse/need repair Sent to Reliable 04/18/16 05/16/16 Basin is repaired 05/19/16 Reliable W470780-121115 03/07/16 28 Dunn Ave Manhole too high. Inspected - not a safety issue at this time. Closed

Page 1 W470780-121115 03/07/16 47 & 44 Dunn Ave Manhole too high. Inspected - not a safety issue at this time. Closed Coordinate WPCA's manhole repair #47 W473816-031016 03/10/16 1508 High Ridge Road Manhole repair W469045-101615 03/11/16 24 Mary Violet Road Basin collapse/need repair Sent to Reliable 3/11/2016 3/21/2016 Basin is repaired 03/21/16 Reliable W472840-021616 03/14/16 467 West Main Street Manhole sinking - STATE ROAD - DOT RESPONSIBILITY 03/14/16 61 West Hill Circle Basin repair Sent to Reliable 4/18/2016 5/16/2016 Basin is repaired 05/23/16 Reliable Frame is broken and interior masonry is failing 03/14/16 41 Severance Drive Replace basin grates City Garage 4/14/2016 4/14/2016 Grate raplaced 04/14/16 City Garage W473969-031516 03/15/16 81 Rollingwood Drive Manhole repair 03/15/16 929 River Bank Road Basin repair Sent to Reliable 4/18/2016 5/18/2016 Basin is repaired 05/20/16 Reliable W473875-031116 03/16/16 22 Knapp St Replace curb backing City Garage 3/16/2016 3/16/2016 Curb back replaced 03/16/16 Highways W474033-031616 03/16/16 34 Hazelwood Lane Replace basin grate City Garage 3/16/2016 3/16/2016 Grate raplaced 03/16/16 Highways W474035-031616 03/21/16 9 Saddle Rock Road Replace basin grate City Garage 3/21/2016 3/21/2016 Grate raplaced 03/21/16 Highways 03/21/16 256 Haig Ave Basin repair Sent to Reliable 2/3/2016 2/3/2016 Basin is repaired 03/15/16 Reliable 03/22/16 90 New England Ave Basin repair Sent to Reliable 2/3/2016 2/3/2016 Basin is repaired 03/09/16 Reliable 03/22/16 70 New England Ave Basin repair Sent to Reliable 2/3/2016 2/3/2016 Basin is repaired 03/09/16 Reliable 03/22/16 Shippan Ave Basin repair Sent to Reliable 2/3/2016 2/3/2016 Basin is repaired 03/09/16 Reliable 03/22/16 1260 Westover Road Basin repair Sent to Reliable 2/3/2016 2/3/2016 Basin is repaired 03/06/16 Reliable 03/22/16 670 Hope St Basin repair Sent to Reliable 2/3/2016 2/3/2016 Basin is repaired 3/6/2016 Reliable 03/22/16 43 Three Lakes Drive Basin repair Sent to Reliable 2/3/2016 2/3/2016 Basin is repaired 3/6/2016 Reliable W474284-032516 03/25/16 Lyman Rd & Lyman Ct Basin repair 04/01/16 Lockwood Bridge Basin collapse/need repair Sent to Reliable 4/18/2016 5/17/2016 Basin is repaired 5/20/2016 Reliable 04/13/16 10 Lolly Lane Basin Repair Repaired by Grasso Apr-17

04/18/16 47 Bridge Street Basin repair Sent to Reliable 4/18/2016 4/18/2016 Basin is repaired 5/23/2016 Reliable It's in the right lane - the travel lane - of bridge st W475110-042216 04/26/16 70 Chestnut Hill Lane Basin repair Sent to Roger Arnow 4/26/2016 5/18/2016 Basin is repaired 5/19/2016 Roger Arnow W475106-042216 04/26/16 North State St. & Atlantic by I-95 ramp Basin need to be raised Sent to Roger Arnow 4/26/2016 5/18/2016 Basin is repaired 5/19/2016 Roger Arnow W475104-042216 04/26/16 78 Fawn Drive Basin repair W474865-04146 04/26/16 47 Bridge Street Basin repair 10/20/2017 W47466-040716 04/26/16 72 Palmer Street Manhole cover & frame repair 04/26/16 24 Westminister Rd Basin repair Sent to Arnow 10/23/2017 The masonry on the interior of the catch basin 04/26/16 83 Redmont Rd Basin repair. B. Denison inspected 4/2019 no repairs needed. sump is failing W474284-032516 04/26/16 Lynam Rd Basin repair W474179-032116 04/26/16 321 Janes Lane Basin repair Repaired by Grasso 04/26/16 63 Vincent Ave Manhole repair Sent to Roger Arnow 6/6/2016 6/20/2016 Basin is repaired 6/20/2016 Roger Arnow 04/26/16 806 East Main & Lafayette Basin repair Basin is repaired W474719-041016 05/24/16 87 PINE Hill Ave Basin collapse/need repair repaired as of: 2/26/2018 W473900-031316 05/24/16 Corner of Lancaster and Shadow Ridge Rd Basin collapse/need repair W473352-022616 05/24/16 Intersection of Seaside Ave & Sylvan Knoll Rd Basin repair W473046-022116 05/24/16 191 Skyview Drive Basin repair 06/06/16 71 Rippowam Rd Basin repair Sent to Roger Arnow 6/9/2016 6/20/2016 Basin is repaired 6/20/2016 Roger Arnow W477075-062116 06/21/16 Third Street Basin grate repair

06/23/16 20 Lafayette/North State Street Side - PRIORITY Basin repair Sent to Grasso/Arnow6/1/17-12/5/17 5/15/2018 Deteriotating masonry in the basin sum has 06/30/16 373 Stamford Ave Basin repair resulted in a hole opening up in the asphalt W477434-063016 07/01/16 81 West North Street Basin repair Sent to Grasso 6/1/2017 07/04/16 Corner of Liberty & Stillwater Basin repair Sent to Arnow 07/05/16 Hope & Fahey Double basin repair Sent to Roger Arnow 7/20/2016 7/20/2016 Basin is repaired 7/26/2016 Roger Arnow 07/20/16 Ely @ Culloden Basin repair Sent to Roger Arnow 7/26/2016 7/26/2016 Basin is repaired 7/26/2016 Roger Arnow W476541-060816 09/07/16 58 Boxwood Drive Basin repair Sent to Roger Arnow 12/1/2016 12/1/2016 Basin is repaired 12/26/2016 Roger Arnow W479161-080916 09/07/16 35 West Broad Street Basin repair Sent to Roger Arnow 10/10/2016 10/10/2016 Basin is repaired 10/13/2016 Roger Arnow 09/07/16 180 Broad Street Basin repair Sent to Roger Arnow 10/10/2016 10/10/2016 Basin is repaired 10/14/2016 Roger Arnow W478719-072816 09/07/16 125 Coolidge Ave Basin repair Sent to Roger Arnow 12/1/2016 12/1/2016 Basin is repaired 12/28/2016 Roger Arnow W478589-072616 09/07/16 87 Pine Hill Ave Basin repair Sent to Roger Arnow 12/1/2016 12/1/2016 Basin is repaired 12/28/2016 Roger Arnow W479742-082316 09/07/16 16 Dzamba Grove Basin repair W477700-070716 W510099-101018 W509830-100318 W517741-053119 W517701-053019 W517590-052819 W519807-072119 W519703-071819 09/07/16 23 Hidden Brook Basin repair. Water barrier placed 10/2018 Sent to Arnow 9/13/2019 9/30/2019 09/07/016 80 Spruce Street Basin repair Engineering Bureau 5/24/2019 09/07/16 Intersection of Interlaken & Lakeside Basin repair - replace w/ precast sump and replace storm pipe across st. TT emailed to Arnow May-15 09/07/16 25 Division Street Basin repair. Roadway removed, fill placed around cb, hay bale and silt sac on cb. Part of const. site. complete 9/26/2018 Deteriorating masonry in the basin sump W479731-082316 09/07/16 311 Janes Lane Basin repair Repaired by Grasso Apr-15 W479740-082316 09/07/16 48 New England Drive Basin repair W479521-081716 09/07/16 90 Van Buskirk Ave at Sachem Place Basin repair Sent to Arnow 5/17/187/1/2018 W479518-081716 09/07/16 Corner of Westcott Basin repair W479526-081716 09/07/16 100 Feet in on R off Hunting Ridge Manhole sinking W479520-081716 09/07/16 Rockledge 150 Feet in on L Basin repair 09/07/16 Haig Ave across from Nyselius Basin repair Sent to Grasso 7/17/2017 8/23/2017 repaired by grasso W478640-072716 09/07/16 Clearview Ave @ Knickerbocker Ave Basin repair Sent to Arnow 5/12/2017 9/6/2017 W481036-092616 09/29/16 Ocean Drive W & Stamford Avenue Basin repair Sent to Roger Arnow 12/29/2016 12/29/2016 Basin is repaired 1/6/2017 Roger Arnow W479997-082616 08/26/16 42 Treat Ave @ Corner of Collidge Basin repair Sent to Roger Arnow 12/29/2016 12/29/2016 Basin is repaired 12/28/2016 Roger Arnow W479743-082316 W502207-032718; W509243-091418 W518304-061819 08/23/16 24 Benstone Street Basin repair. Barrel placed 3/28/18. PRIORITY PER BURWICK AND SPADACCINI - COMPLETE BY 12/30/19 Sent to Arnow 7/15/2019 7/26/2019 08/24/16 Corner of Vineyard & Hunting Lane Basin repair Sent to Roger Arnow 12/1/2016 12/1/2016 Basin is repaired 12/9/2016 Roger Arnow 08/24/16 79 Hunting Lane Manhole sinking 08/25/16 71 Vinyard Lane Manhole sinking W479519-081716 08/31/16 95 Hobson St Basin repair - road plate installed 2/22/2018 - PRIORITY Sent to Arnow 3/26/2018 4/7/2018 W480620-091316 09/13/16 65 Northhill St Basin repair W475081-042216 05/06/16 North State Street & Elm Street Manhole sinking W476239-052716 05/27/16 180 Lockwood Ave Manhole sinking referred to WPCA 5/27/18 W476258-053116 05/31/16 Bell Street Manhole sinking 11/18/16 97 Gary Rd Manhole sinking Sent to Roger Arnow 11/18/2016 11/18/2016 Basin is repaired 11/21/2016 Roger Arnow W478292-071916 07/21/16 29 Redmont Road MH Repair - Hole in ring Sent to Portanova 12/6/2017 W478452-072216 07/25/16 West Broad Street Basin repair Sent to Roger Arnow10/1/2016 10/1/2016 Basin is Repaired 10/14/2016 Roger Arnow 07/25/16 Broad & Hanraham Basin repair Roger Arnow Basin needs to be raised 2" W478588-072616 07/26/16 Corner ot East Main & Blachley Rd Basin repair Sent to Roger Arnow 11/2/2017 Roger Arnow W478693-072816 07/28/16 Atlantic Street Manhole sinking Sent to Roger Arnow7/29/2016 7/29/2016 Manholes repaired 8/22/2016 Roger Arnow 3 Manholes need to be repaired 10/10/16 633 Hope Street Basin repair Sent to Roger Arnow10/10/2016 10/10/2016 Basin is repaired 10/31/2016 Roger Arnow Raised basin to grade W502271-032918 12/01/16 60 Quaker Ridge Rd - PRIORITY Basin repair Sent to Arnow 4/9/2018 4/18/2018

Page 2 12/01/16 39 Holocomb Basin repair 12/01/16 181 Thorn Ridge Rd Basin repair 12/01/16 Hobson 150' in from Street Basin repair Sent to Roger Arnow12/29/2016 2/1/2017 Basin repaired, needs curbing, asph, backfill &seed Roger Arnow 2 Basins to be repaired across from one another 12/01/16 Magee Ave (Solid Waste) Basin repair - Vac truck decant area Sent to Roger Arnow10/1/2016 10/1/2016 Basin is repaired 10/7/2016 Roger Arnow 12/01/16 Mill River Street Basin repair Sent to Roger Arnow12/1/2016 12/1/2016 Basin is repaired 12/19/2016 Roger Arnow W484281-011717 01/30/17 70 Friar Tuck Lane Basin repair (TT) Sent to Arnow 01/31/17 100 Magee Ave (Recycling Center) Basin repair (TT) Sent to Grasso 02/01/17 1 Harbor View Ave (Solid Waste) Basin repair (TT) Near semi scale/ seawall 02/01/17 Davenport St at Greenwich Ave Basin repair (TT) Near WPCA pump station 02/01/17 152 Willowbrook Ave Basin repair (TT) - high priority Sent to Grasso 6/1/2017 02/08/17 300 Soundview Ave MH repair (TT) - covered by asphalt - Danella hit Sent to Arnow 2/10/2017 MH repaired-arnow furnished labor 02/08/17 369 Rock Rimmon Rd. @ Mill Rd. Basin repair (TT) - raise frame and add another top & curb 02/13/17 51 Orange St Basin repair (TT) may need new frame / frame adjustments Sent to Arnow 7/21/2017 02/13/17 100 Magee Ave -behind VM Basin repair (TT) - masonry and reset frame Sent to Grasso 02/13/17 100 Magee Ave - VM by middle bays Basin repair (TT) hole next to CB Sent to Grasso 02/15/17 128/129 Fieldstone Road Basin repair (TT) need to reset cast iron frame & top Sent to Arnow 9/11/2017 10/20/2017 W485643-022117 02/21/17 11 Trailing Rock Lane Manhole sinking (TT) MH masonry needs to be rebuilt Sent to Arnow Mahnole is repaired -TT provided frame W485598-021717 02/22/17 Hope & Mary Violet Lane Manhole repair (TT) Cracked ring - verified storm by J.Corn B. Denison Verified complete4/28/2017 02/23/17 706 Bedford St Basin repair (TT) reported by Todd Johnson 02/24/17 Bedford St. Annex Surface Parking Area Basin repair (TT) Masonry work required. Double CB repair Sent to Arnow 3/15/2017 Arnow to return to use hot asphalt to finish job. Job complete 4/13/17. 02/27/17 Rocky Rapids Rd at Riverbank -S./&North Side of rd. Basin repair (TT) Masonry work required - reported by J. Hart / B. Denison 02/27/17 1290 Summer St Basin repair (TT) Masonry work and change out frame top Repaired by Grasso W477785-070916 02/27/17 174/176 Roxbury Rd. Basin repair (TT) Masonry work reqd - road plate installed 1yr Sent to Arnow - repaired by grasso 3/29/2017 02/27/17 Cummings Park Rd. in P.lot by softball field Basin repair (TT) Masonry work reqd - road plate installed 1yr Sent to Grasso-repaired6/1/2017 by arnow rep'd 10/10/17 02/27/17 86 Crestwood Drive Buried stormwater MH - needs to be excavated and raised Sent to Arnow 2/27/2017 3/13/2017 Manhole is repaired (Verified by TT) W487871-041917 W514877-031919 02/27/17 1093 Rocky Rapids Road - Mead School Basin repair (TT) Masonry work req'd - basin top sinking Sent to Grasso 6/1/2017 W485902-022417 02/28/17 32 Dagmar Road Basin repair (TT) Masonry work req'd - hole next to CB Sent to Arnow 7/21/2017 12/9/2017 02/28/17 144 Myrtle Ave on Frederick St. Basin repair (TT) Masonry work req'd - hole next to CB - change hartford style top Repaired by Fucci UTW 2/6/2018 02/28/17 325 Bedford St @ Latham Park -E. Curb line Basin repair (TT) Masonry work req'd - hole next to CB -Plated - Priority Repair Sent to Arnow 3/9/2017 3/22/2017 In progress as of 3/20/17 W521928-091719 03/02/17 40 Eljays Lane Basin repair (TT) Masonry work req'd - hole next to CB W505454-060918, W506360-070518 W515955-041319 03/06/17 131 Davenport Ridge Lane Basin Repair (TT) Masonry work req'd - hole next to CB - PRIORITY Sent to Grasso 8/23/2019 03/06/17 339 Hope St. @ Church St. Basin repair (TT) PRIORITY - Masonry work req'd - basin sinking Sent to Arnow 3/28/2017 03/06/17 356 Riverbank Rd. -West side of road Change Basin top, raise to finish grade, install minor curbing to direct flow W486191 03/06/17 85 Summit Ridge Road Buried stormwater MH - needs to be excavated and raised Sent to Arnow 7/21/2017 03/10/17 W. North St @ Rachelle Ave. Buried stormwater MH - needs to be excavated and raised - men painted MH Sent to Arnow/then portanova7/21/2017 complete 11/30/17 03/15/15 Pulaski St. at E. Side of Bridge Manhole repair (TT) Damaged ring - middle of road Sent to Arnow 3/15/2017 3/20/2017 Manhole is repaired 03/20/17 Richmond Hill Ave @ Rose Park Ave Basin repair (TT) reported by D. Hoyt - plated - HIGH PRIORITY Sent to Grasso 6/1/2017 03/21/17 130 Gary Road MH repair (TT) - cracked ring - dislodged by plow - reported by WPCA Sent to Grasso (paving) 03/29/17 54 Munko Drive Basin repair (TT) masonry work req'd - hole next to CB Sent to Arnow 7/21/2017 10/4/2017 03/29/17 88 Catoona Lane Basin repair (TT) masonry work req'd - hole next to CB 04/05/17 19 Wild Horse Rd Basin repair (TT) masonry work req'd - hole next to CB - HIGH PRIORITY Sent to Grasso 6/1/2017 7/27/2017 04/03/17 638 Duffy St. at Cove Road Basin repair (TT) masonry work req'd - cb frame sinking Sent to Arnow 5/17/2018 7/1/2018 04/07/17 346 Hope St. @ Pine Hill on Corner Basin repair (TT) masonry work req'd - cb frame sinking TT phone call to Arnow 4/7/2017 4/19/2017 W505562-061218 W513987-022419 W520997-081819 04/07/17 190 Quarry Road Basin repair (TT) masonry work req'd - hole next to CB 11/30/2016. PRIORITY W487471-040617 04/07/17 64 Blue Rock Drive Basin repair (TT) masonry work req'd - hole next to cb 04/11/17 179 Palmers Hill Rd - N. side of Street Basin repair (TT) masonry work req'd - sinking - referral from L. Casolo & Ernie - HIGH PRIORITY Sent to Grasso 6/1/2017 7/27/2017 04/13/17 227 Cedar Heights Road Basin repair (TT) masonry work req's - reported by B. Denison Sent to Arnow 4/9/2018 5/10/2017 W487700-041217; W503509-042718 W512291-122318 W508978-090718 W506781-071318 04/13/17 16 Albert Place Basin repair (TT) masonry work req'd - cone placed by J. Cornelio. PRIORITY Sent to Arnow 5/17/2018 W487854-041917 04/19/17 In Alley behind 41 Bank St. Basin repair (TT) masonry work req'd - barrel placed by B. Denison TT emailed to Arnow 4/28/2017 04/19/17 1620 Newfield Ave. at Eden Rd Basin repair (TT) masonry work req'd - cone placed by B. Denison Sent to Grasso. Sent6/1/2017 Arnow / 10/5/17 04/26/17 Cold Spring at Washington Blvd. Basin repar (TT) frame loose - reported by R. Frattarolli TT emailed to Arnow 5/15/2017 W487873-041917 04/26/17 25 Gurley Rd. Basin repair (TT) masonry work req'd - as per CSR and per J. Cornelio 05/03/17 37 Interlaken Rd. Basin repair (TT) masonry work req'd - hole next to CB - reported by J. Hoyt sent to Arnow 10/5/2017 11/14/2017 05/03/17 44 River Hill Drive Basin repair (TT) masonry work req'd - hole next to CB - repoted by J. Hart 05/08/17 90 Richmond Hill Ave. Storm MH Repair (TT) cracked ring - requested locking MH -reported by B. Denison TT emailed to Arnow W517346-052119 05/11/17 91 Rolling Wood Basin repair (TT) masonry work req'd - hole next to CB - reported by J. Hoyt. Barrel 5/21/19. 05/16/17 206 Lynam Road Basin repair (TT) masonry work req'd - hole next to CB - reported by B.Denison - replace 10' of RCP pipe in fromSent CB to - PRIORITYArnow/ referred10/23/2017 to frank engineering11/29/2017 11/14/17 05/17/17 556 Glenbrook Road @Cowing Place Basin repair (TT) masonry work req'd - cb frame sinking sent to arnow 12/5/2017 W500879-030218,W498891-011618,W488883-05161705/17/17 20 Gregory Street Basin repair (TT) replace CB top - frame is loose - reported by B. Denison. Plated 2/16/18 Reffered to Eng. 3/21/184/27/2018 05/17/16 3 St. Charles Ave. Basin repair (TT) masonry work req'd - cb frame sinking 05/17/16 86 St. Charles Ave. Storm Pipe Repair (TT) Jet nozzle became stuck - terminated and abandonded Sent to Arnow - pipe repaired and recovered6/1/2017 05/18/17 31 Sweet Briar Ct. Basin Repair (TT) masonry work req'd - reported by B. Denison - E. Orgera - HIGH PRIORITY Sent to Grasso 6/1/2017 7/27/2017 W516623-050119 05/22/17 65 Arden Lane Basin Repair (TT) masonry work req'd - reported by B. Denison W496305-111217; W506659-071118 05/25/17 24 Mill Spring Lane Basin Repair (TT) masonry work req'd - reported by B. Denison Sent to Arnow 10/4/2018 1/4/2019 05/30/17 14 Cricket Lane (2 cb's - corner lot) Basin Repair (TT) masonry work req'd - reported by J.Cornelio sent to Arnow 10/5/2017 05/30/17 60 Acre View Drive Basin Repair (TT) masonry work req'd - reported by J.Cornelio sent to Arnow 10/5/2017 05/30/17 60 Acre View Drive MH Repair - (TT) needs new "standard size" ring and cover - reported by J. Cornelio sent to Arnow 10/5/2017 05/30/17 44 Fenway St. @ H.S. Parking Lot Basin Repair (TT) masonry work req'd - reported by B. Denison sent to Arnow 3/26/2018 4/7/2018 05/30/17 401 Shippan Ave. Basin Repair (TT) curb back missing - change top to cast iron - reported by B. denison 05/30/17 13 Fenway St. Basin Repair (TT) needs new CB top & masonry failing 05/30/17 295 Haig Ave. at Nyselius Ave. Basin Repair (TT) Masonry Failing - CB at E. curb line @sleepy hollow park sent to grasso 8/28/2017 05/30/17 39 Waterbury Ave. Remove and replace CB sump - TT to CCTV pipe, add MH at "T" intersection - see photos W494544-092517 05/31/17 6 Donata Lane Basin Repair (TT) masonry work req'd - reported by B. Denison 06/02/17 17 Forest St Basin Repairs (TT) (1) @ ROW entry and double (2) cbs near entry to garage sent to grasso 8/1/2017 9/1/2017 W489963-060617 06/07/17 97 Ocean Drive West Basin Repair (TT) needs new CB top. Water Barrier Placed 5/9/19 - legal claim. PRIORITY Sent to Arnow 9/13/2019 W476951-061716 06/07/17 25 Cantwell Ave Basin Repair (TT) masonry work req'd.W489827-060417 06/08/17 880 East Main (E.Main & Crystal) Basin Repair (TT) masory work req'd - reported by j. hoyt - barrel placed 6/8/17. PLATED PRIORITY 06/08/17 12 Bennett St. Basin Repair (TT) masonry work req'd - reported by J.Hoyt - Barrel placed 6/8/17. Water barrier placed 3/1/18 Sent to Arnow 4/9/2018 4/27/2018 06/08/17 115 Ocean Drive East Basin Repair (TT) masonry work req'd - reported by B. Denison. Reported J. Taylor 5/6/19 06/08/17 740 Atlantic St Basin Repair (TT) masonry work req'd - low priority - eng. Dept to realign intersection Grasso Repair 5/8/2018 06/09/17 11 West North St - infront of Cloonan School Basin Repair (TT) masonry work req'd - reported by J. Hart - barrel place 06/09/17 73 Southfield Ave. Basin Repair (TT) masonry work req'd - change out to flat top - demo sidwalk and slope to drain Repaired by Grasso 11/29/2017 12/5/2017 W510349-101718 06/12/17 893 Long Ridge Road Basin Repair (TT) masonry work req'd - hole next to basin - barrel placed. TT verified barrel 2/21/18 W501750-031918; W502357-040218; 06/12/17 67 Hastings Lane Basin Repair (TT) masonry work req'd - hole next to basin - cone placed. Double CB. Getting BAD sent to Arnow 4/27/2018 5/17/2018

Page 3 Sent to Arnow 10/4/2018 06/12/17 100 Research Drive Basin Repair (TT) masonry work req'd - hole next to basin - cone placed - reported by J. Hoyt Sent to Arnow 1/3/2019 1/30/2019 06/21/17 502 Fairfield Ave Basin Repair (TT) masonry work req'd - masonry collapsing - reported by J. Hoyt 06/22/17 52 Skyview Drive Basin Repair (TT) masonry work req'd -masonry work req'd. TT to refer to eng. - need 320 lf of pipe + 3 MH's. Barrel 9/6/19 06/23/17 29 Arthur Place Basin Repair (TT) and MH repair - cracked ring - PRIORITY Sent to Arnow 10/23/2017 11/29/2017 07/13/17 139 Ursula Place Basin Repair (TT) - masonry work req'd - hole next to basin - barrel placed W51840-041019 W516894-050819 07/18/17 Ardmore Rd. - Across from Fed Ex Basin Repair (TT) masonry work req'd - hole next to basin - reported by J.Cornelio. Water barrier. PLATED Sent to Arnow 9/13/2019 07/21/17 868 E. Main St. on Quintard Terr. Basin Repair (TT) basin top stuck under curb back. Needs new grate/frame 07/24/17 177 Wire Mill Rd Basin Repair (TT) basin collapsing. J. Moore placed water barrier 2/16/18. Sent to Arnow 4/9/2018 4/21/2018 W491948-072517; W508392-082018 07/25/17 71 Campbell Dr Basin Repair (TT) basin collapsing. 07/26/17 355 Atlantic St MH Repair (TT) per PD dispatch, MH keeps flipping - J. Corn & D.Hoyt tried to secure Emergency - sent to Arnow8/28/2017 07/27/17 3001 Summer St. on Bedford St Basin Repair (TT) exposed rebar @ cb, in left turn lane from bedford to summer st. Repaired by Grasso 10/1/2017 07/27/17 150 Atlantic St. - Vets Park Raise MH to finish grade to faciliate CCTV and jet work - PRIORITY Arnow Work 8/10/2017 9/10/2017 07/27/17 259 Main St. Basin Repair (TT) small hole next to CB Sent to Grasso 3/20/2018 4/2/2018 W506857-071518 W511595-120318 08/02/17 86 Clay Hill Rd. Basin repair (TT) hole next to CB. B. Denison placed barrel. PRIORITY Sent to Arnow 1/3/2019 1/18/2019 08/03/17 76 Woodridge Drive Basin Repair (TT) small hole next to CB - PRIORITY sent to Arnow 10/5/2017 11/10/2017 08/03/17 116 Woodridge Drive Basin repair (TT) double CB - BIG hole next to CB - PRIORITY sent to Arnow 10/5/2017 11/10/2017 W481796-101816 W483664-122116 W494711-092817 W500343-022018 W517239-051719 W518525-062519 W518527-062519 W520833-081419 08/03/17 10 Horshoe Lane on Thornridge Drive Basin repair (TT) masonry work req'd - cb frame sinking. Water barrier placed 2/21/19 Sent to Grasso 8/23/2019 9/9/2019 W504657-052218 08/03/17 52 Wesgate Basin Repair (TT) basin collapsing. Reported again 5/22/18. PRIORITY 08/09/17 25 Perna Lane Basin Repair (TT) Masonry work req'd - basin failing. Reported again WPCA 5/17/18. 08/10/17 73 Lincoln Ave. Basin Repair (TT) basin collapsing - reported by J. Hoyt W509656-092718 08/11/17 73 Flint Rock Road Basin Repair (TT). PLATED 8/31/18. Sent to Grasso 8/23/2019 08/11/17 11 Iron Gate Road Basin Repair (TT) 08/10/17 6 Sheridan St. Basin Repair (TT) top is no good - needs repair asap - reported by J. hoyt W516559-043019 08/14/17 Across from 26 Tupper Drive Basin Repair (TT). TT cone 7/2019. Water Barrier 8/17/19 08/21/17 Shippan Ave and Elm St. MH Repair (TT) - MH asphalted 8/21/17 - needs new riser / ring and to be reset Sent to Portanova 11/15/2017 12/4/2017 08/21/17 929 Newfield Ave. MH Repair (TT) Storm MH sinking Sent to Portanova 12/6/2017 12/20/2017 08/28/17 770 Pacific St @ Belden St. - School Entrance Basin Repair (TT) Masonry work req'd - hole next to CB Sent to Arnow 3/26/2018 4/27/2018 W507403-072518 08/28/17 27 Wells Ave. Basin Repair (TT) Masonry work req'd - hole next to CB. Barrel placed 7/26 Sent to Arnow 1/3/2019 1/14/2019 08/30/17 Ursula Place at Dale St. Basin Repair (TT) Masonry work req'd - hole next to CB 12/5/2017 W506186-062818 Sent to Arnow 10/4/18, W509565-092518 08/31/17 296 Sundance Road Basin Repair (TT) Masonry work req'd - hole next to CB - PRIORITY Sent to Arnow 11/7/18 1/18/2019 09/01/17 443 Glenbrook Road Basin Repair (TT) Masonry work req'd - hole next to CB Sent to Grasso 10/25/2017 2/6/2018 09/07/17 Intersection of Fox Hill and Fox Ridge Rd. Basin Repair (TT) masonry work req'd - hole next to CB W497045-120317 09/07/17 54 West Hill Circle Basin Repair (TT) masonry work req'd - hole next to CB PRIORITY. Water barrier placed 3/19/19 09/07/17 90 Sutton Dr. Basin Repair (TT) small square basin - should be changed out 09/07/17 5 Judy Lane Basin Repair (TT) masonry work req'd - hole next to CB 09/07/17 North State Street at Train Station Manhole Repair - trip hazzard - cut back concrete and install new MH Sent to Portanova 12/6/2017 09/12/17 103 West Broad Basin Repair - masonry failing - reported by J. Hart Sent to Grasso 12/15/2018 1/30/2019 09/12/17 Rocky Rapids Rd at Riverbank -South side of rd. Basin Repair - masonry failing - reported by B. Denison W500350-022018 09/18/17 30 Piave Street Basin Repair - CB sinking - Barrel placed 2/22/2018 - PRIORITY sent to arnow 3/26/2018 4/9/2018 W512987-011819 09/18/17 35 Plymouth Basin Repair - CB sinking - Flat top in driveway 09/27/17 46 Bartlett Ln Basin Repair - (tt) masonry work req'd 09/27/17 Opposite 20 Aspen Lane Basin Repair - (tt) masonry work req'd - and CCTV lateral pipe 09/29/17 31 Joan Road Basin Repair - (TT) masonry work req'd W504773-052418; W506300-070318; W506886-071618 09/29/17 94 Middle Ridge Road Basin Repair - (TT) Double CB repair - masonry work req'd - PRIORITY Sent to Arnow 8/20/2018 9/10/2018 10/03/17 47 Burwood Ave. Basin Repair (TT) masonry work req'd - Sent to Grasso/Arnow10/25/17-12/5/1712/20/2017 10/04/17 29 Bartlett Lane Basin repair (TT) hole next to CB 10/10/17 167 Old North Stamford Road Basin repair (TT) basin collapsing Repaired by Grasso (Oaklawn project)12/21/2018 10/11/17 80 Winding Brook Lane Basin repair - hole next to CB - barrel placed. Resident called TT and left VM 10/3/17. tt returned call 10/16/17 Sent to Arnow 10/23/2017 11/13/2017 W509802-100218 10/13/17 10 Howard Rd at Intersection of Tod Ln Basin repair - hole next to CB - needs repairs sent to arnow 12/5/2017 10/17/17 Daskam Crystal Lafayette Intersection MH Repair - sinking MH per B. Denison - PRIORITY 10/20/17 4 Division St Basin Repair - hole next to basin. Roadway closed, basin eliminated. 1/20/2019 10/23/17 261 Main St. - McFaddens Basin Repair - hole next to basin - reported by A. Turner Sent to Grasso 4/2/2018 4/18/2018 10/23/17 524 Glenbrook Road - Nic's Pizza Basin Repair - hole next to basin - reported by B. Dension Sent to Grasso 10/26/2017 11/20/2017 W504792-052518 10/23/17 307 Weed Ave Basin Repair - hole next to basin - hartford style Cb Sent to Grasso 8/5/2019 8/20/2019 10/26/17 102 Acre View Basin Repair - hole next to basin - reported by B. Dension Sent to Arnow 10/26/2017 11/20/2017 W495875-103117 11/01/17 59 Euclid Ave. Basin Repair - hole next to basin - barrel placed 11/1/17 J. Hoyt - needs Post and Tow for access Sent to Arnow 12/5/2017 12/20/2017 11/03/17 1544 Bedford St - at intersection of third Basin Repair - hole next to basin - barrel placed 11/3/17 B. Dension Sent to Arnow 5/17/2018 6/8/2018 11/03/17 201 Broad St. at Grove - in median on Broad Basin Repair - basin sinking. Both basins need repair. Sent to Grasso 5/4/2018 7/1/2018 11/03/17 187 Main St. on Washington Blvd - Tiernans Basin Repair on Washington Blvd. - Granite Curb Back has tipped - trip hazzard - tt to sent to CDOT completed by DOT 3/24/2018 W506758-071218 W514956-032019 W514962-032019 11/15/17 965 Sunset Road at Intersection of Princess Ct. Basin Repair - hit during leaf pick up - reported by J. Hart. PRIOITY 11/28/17 97 Ocean Drive West - East side of st. Near parking lot Basin Repair - hole next to basin - reported by B. Dension 11/29/17 124 Clovelly Rd. Basin Repair - basin sinking Sent to Grasso 5/16/2018 11/16/17 219 Glenbrook Road MH Repair - buried storm MH Sent to Portanova 11/30/2017 12/5/2017 11/30/17 10 Evergreen Court at Clover Hill MH Repair - sinking MH per J. Hoyt 11/30/17 91 Bentwood Drive CB Repair - Sinking CB - reported T. Theder 3/1/16 W503789-050318 W516624-050119 W518653-062719 11/30/17 43 Settlers Trail CB Repair - Sinking CB - reported T. Theder 3/17/16. Two cones placed. PRIORITY 11/30/17 100 Woodway Road MH Repair - buried storm MH Sent to Arnow 9/19/2019 10/1/2019 w497018-120117 12/01/17 9 West Main St. CB Repair - sinking CB. Check and repair frame - asphalt to meet top of frame W493049-081617 W513888-022119 W515644-040719 08/16/17 87 Fishing Trail CB Repair - 2 holes next to CB - cones placed over holes. Water barrier placed 2/22/19 12/04/17 15 Dzamba Grove MH Repair - broken frame - needs replacement - barrel in road Sent to Portanova 2/1/2018 3/8/2018 12/06/17 223 Glenbrook Rd. Buried MH - TT crew to CCTV and locate Sent to Portanova 11/30/2017 12/5/2017 W516532-042919 W519324-071219 12/07/17 46 Oxford Court CB Repair - conc. flat top frame broken - reported by B. Denison - barrel placed PRIORITY Sent to Grasso 7/24/2019 8/20/2019 12/08/17 51 Kenilworth Drive E. CB Repair - Replace hartford style frame and grate - may need new precast sump. Hole in grate 12/08/17 Across Street from 83 Kenilworth Drive E. CB Repair - Failing Sump - big hole. Needs new sump. BD cone 6/7/19. Water barrier 7/9/19.

Page 4 12/08/17 29 Beach View Drive CB Repair - Hartford Style frame frozen in place - needs new frame and grate 12/09/17 153 thunderhill Drive CB Repair - grate and frame frozen in place. Replace frame & grate. 12/09/17 168 thunderhill Drive CB Repair - replace hartford style frame and grate. 12/11/17 11 Ocean View Drive MH Repair - needs new frame - frame cracked and broken by plow Sent to Arnow 12/11/17 12/13/17 12/11/17 213 Fairview Ave. at O.D.W. MH Repair - needs new frame - cover does not stay on Sent to Arnow 12/11/17 12/13/17 12/11/17 228 West Lane MH Repair - needs new frame - cover does not stay on Sent to Arnow 12/11/17 12/13/17 12/14/17 50 Kensington Road MH Repair - needs new frame - cracked and broken by plow. Sent to Portanova 2/5/2018 3/9/2018 12/26/17 46 Laurel Road CB Repair - Basin sinking. Reported A.Turner-Barrel placed 8/20/19 12/28/17 198 East Middle Patent Road CB Repair - Broken grate. Old style square grate and frame. Replace w/ new precast. 01/05/18 131 Davenport Ridge Lane MH Repair - needs new frame/ring. Cone placed 1/8/17 Sent to Portanova 2/1/2018 3/8/2018 01/11/18 64 Palmers Hill Road - CLC Trench Drain Repair / Removal - need to meet on site to reivew Repaired by Grasso 12/20/2018 01/17/18 31 Sussex Place CB Repair - Hole located behind CB - double sump, failing block, needs rebuild. Barrel placed 1/17/18 F. Vonella 1/19/2018 2/8/2018 W502271-032918 01/19/18 59 Quaker Ridge Road CB Repair - Hole located behind CB - double sump, failing block, needs rebuild. Barrel placed 1/17/18 Sent to Arnow 4/9/2018 4/18/2018 01/24/18 986 Bedford Street CB Repair - Hole located in front of CB, left lane, northbound. 2 water barriers placed 1/24/18 Sent to Arnow 1/24/2017 2/2/2018 01/25/18 31 Sutton Place MH Repair - buried storm MH. Danella contacted MH. Painted in field - needs to be raised 01/25/18 58 Sutton Drive West MH Repair - buried storm MH. Danella contacted MH. Painted in field - needs to be raised 01/25/18 46 Rapids Road CB Repair - Hole located in front of CB Sent to Arnow/Sent1/24/17&4/25/18 to Arnow 5/10/2018 W509250-091418; W509249-091418 01/31/18 85 Riverside Ave. CB Repair - Hole located in front of CB. Double CB. barrel placed 1/31/18-PRIORITY W520129-072819 02/02/18 Bartlett Arboretum - entry drive CB Repair - Actually 2 cb's in need of repair - Hole located next to CB. Cone placed. TT inspected 2/2/18. 02/02/18 85 Urban St. on Revonah Ave. MH Repair - sinking MH. Sent to Portanova 2/5/2018 4/9/2018 W515537-040419 02/06/18 96 Summit Ridge CB Repair - hole next to cb. Barrel placed 4/5/19. 02/06/18 Across from 1318 Bedford St. CB Repair - hole next to cb - reported by B. Denison. Place Barrel 1/18/19. PRIORITY Sent to Arnow 7/15/2019 8/1/2019 02/06/18 1648 Shippan Ave. Broken Curb back - give to Arnow W500331-022018 02/16/18 76 Bennett (on Lawton Ave.) CB Repair - concrete curb back - grate dropped in - open hole. Road plate installed 2/16/18. PRIORITY Sent to Arnow 3/26/2018 4/20/2018 02/16/18 21 Broad St. by Target Crosswalk MH Repair - sinking MH - from P. Montanaro. D. Portanova to verify it is storm - then repair Sent to Portanova/Grasso4/11/2018 10/1/2018 02/16/18 4 Pulaski St. MH Repair - damaged frame / ring. Sent to Portanova 2/16/2018 3/6/2018 02/20/18 907 Long Ridge Rd at Maltbie Ave. MH Repair - damaged frame / ring. - Road plate placed 2/22/18 Sent to Portanova 2/20/2018 6/11/2018 W500408-022118 02/21/18 106 Redmont Road CB Repair - hole next to CB will need new precast sump box Sent to Arnow 4/27/2018 5/17/2018 02/21/18 105 Cove Road CB Repair - sinking CB right side of road - at driveway Sent to Arnow 4/27/2018 5/21/2018 W500381-022018 02/22/18 25 Chesterfield Road CB Repair - sinking CB 02/22/18 776 Cove Road CB Repair - sinking flat top Sent to Arnow 4/27/2018 5/25/2018 02/26/18 429 Eden Road CB Repair - hole next to CB - placed cone - reported by B. Denison W500846-030118 03/02/18 2 Dunn Ave. at Cedar Heights Rd. CB Repair - hole next to CB. Double CB. Barrel in place. Sent to Arnow 4/9/2018 5/4/2018 03/07/18 416 Vine Road CB Repair - Needs new top and frame - existing frame is broken. Water Barrier placed 5/9/19 Sent to Grasso 8/5/2019 8/12/2019 03/07/18 Transfer Station - north side near canal MH Repair - needs new heavy duty ring - 32" cover - PRIORITY Sent to Portanova 3/21/2018 4/18/2017 03/07/18 Dundee Rd. at Timber Mill Road CB Repair - basin collapsed - reported by M. Scaturchio- PRIORITY 03/07/18 327 Dundee Rd. CB Repair - hole next to CB / basin collapsing - reported by M. Scaturchio - PRIORITY 03/08/18 61 Strawberry Hill Court - in front of Tully Center MH Repair - hit by plow - needs new frame Sent to Portanova 3/8/2018 3/9/2018 03/08/18 389 Ocean Drive West MH Repair - hit by plow - needs new frame Sent to Portanova 3/21/2018 4/17/2018 03/12/18 274 Quary Road CB Repair - grate dropped in - check to see if we can repair w/ new grate 03/12/18 21 Bridge St. CB Repair - hole reported next to CB - barrel placed 3/12/18. PRIORITY 1/14/2019 Sent to Arnow 5/22/2019 7/1/2019 W501348-030918 03/12/18 36 Sunset Court CB Repair - hole reported next to CB - front of frame caved in. barrel 3/12/18. 2 water barriers 9/25/18. PRIORITY 03/12/18 125 Waterbury Ave. CB Repair - conc. Frame and sump crumbled block.barrel 3/12/18. Plated 8/29/18. adjusted plate 4/1/19PRIORITYSent to Grasso 8/27/2019 9/4/2019 03/12/18 109 Waterbury Ave. CB Repair - basin collapsing - barrel placed 3/12/18 Sent to Grasso 8/27/2019 9/6/2019 03/13/18 6 Judy Lane @ Hamilton MH Repair - buried MH - CCTV confirmed 3/1/18 and painted 03/19/18 Clark St. - East curb line CB Repair - hole next to cb. Cone placed. Road plate placed 3/19/18 Sent to Grasso 3/21/2018 3/26/2018 W503423-042618 03/21/18 205 Greenwich Ave. CB Repair - hole next to cb. PRIORITY as per T. Turk email 4/3/18 sent to arnow 4/27/2018 5/4/2018 03/21/18 15 Hunting Ridge Rd. @ Long Ridge Rd. in island CB Repair - barrel placed 3/21/18. Reported J. Hoyt. PLATED 8 /8/19 PRIORITY Sent to Arnow 9/13/2019 03/22/18 64 Smith Street MH Repair - hit by plow - needs new frame Sent to Portanova 3/22/2018 3/26/2018 04/02/18 102 Mountain Wood Road MH Repair. Ring/frame hit by J. Hoyt w/ plow. Frame sinking by 3" - needs to be reset and raised. Sent to Portanova 4/2/2018 4/19/2018 04/02/18 147 Mountain Wood Road MH Repair. Ring/frame hit by J. Hoyt w/ plow. OPEN HOLE. MH Cover in bottom of MH. Sent to Portanova 4/2/2018 4/19/2018 W502460-040418; W504396-051618; Sent to Portanova 7/10/2018 W508991-090718; Sent to Arnow 10/3/18 W509368-091918 04/02/18 30 / 26 Wallace Street MH Repair. Ring/frame damaged. 1/2 of ring is missing. Needs replacement. PRIORITY Sent to Arnow 10/16/2018 10/30/2018 W509243-091418 04/09/18 6 Applebee Rd. on Benstone St. CB Repair required. Email from F. Patise engineering re: Oaklawn work. Double CB. Barrel placed 4/9/18 Sent to Arnow 7/15/2019 7/26/2019 04/10/18 155 Jonathan Drive MH Repair - sinking MH - frame needs to be reset - K. Cuevas 04/11/18 Across from 42 Cove Road - S. side of street CB Repair reqd. Hole next to cb reported Turner. Theder inspected 4/11 unable to protect. PRIORITY Sent to Arnow 4/27/2018 5/23/2018 Sent to Arnow 10/4/2018 W503105-041818 04/18/18 54 Research Drive CB Repair reqd. Hole next to cb reported PD. BD placed barrel. TT plated 7/2/18 - PRIORITY Sent to Arnow 1/3/19 1/30/2019 W508749-083118; CB Repair reqd. Hole next to cb. Reported by Denison - barrel placed. 2 water barriers placed 9/19/18 W509340-091818 04/18/18 4 Wampanaw Ave. PRIORITY Sent to Arnow 1/3/2019 1/30/2019

Sent to Portanova 7/6/2018 04/20/18 135 Downs Ave. Sandbags in storm MH on beach. Need confined space entry and remove. Sent to OneVac 12/5/18 12/15/2018 04/20/18 59 West Broad St. CB Repair - hole next to CB. Barrel Placed 4/20/18. PRIORITY Sent to Arnow 5/17/2018 6/8/2018 04/20/18 45 Valley Road CB Repair. ROAD PLATE INSTALLED PRIORITY Sent to Arnow 5/22/2019 7/11/2019 04/21/18 535 Newfield Ave. MH Repair - paved over. Raise to finish grade. Sent to Pnova/Sent4/21/18-5/22/18 to Arnow 5/25/2018 04/21/18 555 Newfield Ave. MH Repair - paved over. Raise to finish grade. Sent to Pnova/Sent4/21/18-5/22/18 to Arnow 5/25/2018 04/21/18 535 Newfield Ave. on Fairland St. CB Repair - not collapsing, but many brick and block in sump. Structure is compromised. T. Theder inspected W506702-071118 04/25/18 28 Blue Ridge Drive CB Repair - hole in conc.Frame.needs repairs.B.Denison inspected 4/25. BD barrel 7/12/18. PRIORITY 05/03/18 15 Flint Rock on Den Road CB Repair - hole next to basin - b. denison left barrel Sent to Grasso 8/23/2019 W517708-053119 05/04/18 25 Highline Trail South CB Repair - reported by B. Dension. Cone in place as of 5/31/19. 05/04/18 1093 Shippan Ave, MH Repair - 4" riser on top of frame is loose and rattling - remove riser and frame, add brick, reset. Sent to Portanova 5/7/2018 6/20/2018 05/08/18 10 Rushmore Circle CB Repair - hole next to CB reported by B. Denison 05/08/18 86 Pine Hill Ave. MH Repair - buried MH - CCTV confirmed 5/7/18 and painted. Also remove 2 cmu's in MH at 60 Pine Hill 05/09/18 31 Brodwood CB Repair - hole next to CB reported by B. Denison - see also 33 brodwood 05/09/18 1607 Bedford St. on Third Street CB Repair - hole next to CB, masonry failing - reported by E. Orgera - PRIORITY Sent to Arnow 5/17/2018 7/1/2018 W509262-091518 05/14/18 5 Leona Drive CB Repair - hole next to CB, double sump. JC placed barrel 5/14. Service request 9/17/18 W504214-051318 W521713-091019 05/15/18 24 Wright Street CB Repair - hole next to CB. B. Denison placed barrel 5/15 05/16/18 233 Shelter Rock Road MH and piping Repair. Replace 12" lateral as per CCTV. PRIORITY Sent to Arnow 8/20/2018 10/20/2018 05/17/18 2 Owen St. on McMullen St CB Repair - hole next to CB. B. Denison placed barrel 5/17 05/21/18 22 Knapp St Convert double curb back CB's to flat tops. Curb back replaced 2016, 2018, 1/5/2019 1/14/2019 05/14/18 2586 Summer St on Eighth Street CB Repair - hole next to CB. TT left cones 5/10/18, Road plate installed 5/18/18. P Dispatch. Sent to Arnow 1/3/2019 7/2/2019 W504425-051718 05/21/18 178 North State Street MH Repair - left side/ south side of roadway. Frame/Cover not flush with roadway. Reset 05/21/18 West Beach Parking Lot - south side of lot CB Repair - hole next to CB - TT oberved. Water barrier placed 5/22/18. PRIORITY Sent to Eng. Sent to5/24/18 Arnow -4/9/19 5/1/2019 W504062-050918 05/22/18 45 Pleasant St CB Repair - hole next to CB - B. Denison inspected.P&T 7/13/18 for road plate. PLATED PRIORITY Sent to Arnow 11/7/2018 1/14/2019 W504794-052518 05/25/18 45 Rockledge on Ocean Drive East CB Repair - hole next to CB - B. Denison inspected. 05/30/18 1 Harbor View Ave (Solid Waste) MH Repair - reset/repair MH at bottom of transfer station ramp - oer request of D. Colleluori/T.Turk Sent to Arnow 7/24/2019 8/17/2019 W504977-053018 W515785-040919 05/31/18 20 Florence Court CB Repair - hole next to CB - B. Denison inspected. Barrel placed 4/10/19. W505271-060518 05/31/18 6 Sanford Lane CB Repair - hole next to CB - B. Denison inspected. T. Theder placed barrel 7/18/18 Sent to Grasso 2/14/2019 4/15/2019 W506978-071718 05/31/18 286 West Broad at Delaware Ave. CB Repair - hole next to CB - B. Denison inspected. Reported by big Mo. Barrel 7/26 Sent to Grasso 9/15/2018 11/7/2018

Page 5 05/31/18 74 Colonial Road CB Repair - hole next to CB - B. Denison inspected. Upgraded from cone to tall cone 11/2/18. 06/06/18 379 Shippan Ave CB Repair - hole next to CB. Reported by WPCA - cone placed. Barrel 7/26/18 W505235-060518 06/07/18 164 Richmond Hill Ave. CB Repair - loose frame and damaged masonry. Reset existing frame. 6/7/2018 6/8/2017 06/11/18 707 Shippan Ave. CB Repair - hole next to cb - reported by A. Turner. Hartford Style CB Sent to Arnow 2/1/2019 3/1/2019 06/11/18 37 Clifford Ave. at Rome Place CB Repair - hole next to cb - reported by A. Trichillo W505721-061518; W508057-080818 06/19/18 39 Laurel Road at Spring Hill Lane CB Repair - hole next to cb - PRIORITY. 2 water barriers placed 8/14/18 Sent to Arnow 8/20/2018 9/5/2018 W506273-062918; W506595-071018 06/20/18 Knapp St. and Carroll St. Intersection MH Repair - frame cracked / broken - reported by J. Hoyt Sent to Arnow 10/4/2018 10/16/2018 W505897-062018; W507890-080618 W508350-081918; W508572-082618; 06/20/18 44 Soundview Ave. CB Repair - basin sinking Sent to Arnow 8/20/2018 10/29/2018 06/21/18 Across from 25 Second St. CB Repair - Hole next to CB. Barrel placed 6/21/18. Water barrier placed 6/29/18 06/26/18 59 Barmore Drive West CB Repair - Hole next to CB. Water Barrier placed 6/26/18 W506363-070518 07/06/18 191 Willowbrook Ave. CB Repair - Hole next to CB. Barrel placed BD 7/6/18. Needs road plate. Plate installed 7/10/18.PRIORITY Sent to Arnow 10/23/18,11/7/1812/17/2018 07/06/18 119 Mountain Wood Road CB Repair - Hole next to CB. Cone placed 7/6/18 BD. Low priority. Sent Portanova 7/6/2018 07/06/18 Glenbrook Road at Daskam MH Repair - frame cracked / broken - referred by WPCA. Sent to Grasso 10/15/2018 11/13/2018 W511146-111518 W516655-050219 W519143-071019 W520928-081619 07/11/18 79 Taylor Street CB Repair - basin collapsed - reported by A. Turner. Theder placed cone 5/30/19 Sent to Grasso 9/4/2019 W506829-071418 W517727-053119 W517027-051319 W517010-051219 W516856-050819 07/16/18 21 Hardesty Road at Den Rd. CB Repair - basin collapsed - reported by B. Dension. Barrel placed 7/16/18 Sent to Grasso 8/23/2019 W506829-071418 W517727-053119 W517027-051319 W517010-051219 W516856-050819 06/03/18 Opposite 21 Hardesty Rd. CB Repair - open hole behind CB. Reported J. Hoyt 4/19/19. Cone placed in hole. Sent to Grasso 8/23/2019 07/16/18 Train Station CB Repair - hole next to CB reported by Orazio. Barrel placed 7/25 W506886-071618 07/16/18 8 Middle Ridge Road CB Repair - hole next to CB. B. Denison to inspect. Sent to Arnow 8/20/2018 9/10/2018 W506890-071618 07/16/18 70 Erickson Drive CB Repair - holes@CB-both sides. Barrels placed. PRIORITYCalled Margarita 2/4/19,5/7/19, 7/29/19,8/1/19 Sent to Arnow 9/13/2019 07/16/18 192 Saddle Hill Road CB Repair - hole next to CB. A. Turner reported. Filled w/ asphalt. 07/23/18 11 Cypress Drive MH Repair - needs to be cut out and raised to fin. Grade 07/23/18 12 Weed Hill Ave. MH Repair - needs to be cut out and raised to fin. Grade. South Side of Road W508097- 080918(2) W513518-020719 CB Repair - hole next to CB reported by B. Denison. Orange marker placed/observed TT 8/15/18. Barrel W508154-081218 08/14/18 29 Rosano Road placed 3/21/19. PLATED 7/2/19. Sent to Arnow 9/13/2019 08/14/18 150 Richmond Hill Ave. eastbound lane at park MH Repair - needs new frame (replace with locking MH cover) W507493-072718 08/14/18 202 Skyview Drive CB Repair - sink hole next to CB. 08/17/18 192 Sundance Road CB Repair - Masonry collapsing - angled grate 11/7/2018 W508261-081518 08/17/18 230 Hope Street CB Repair - Hartford Style, hole next to CB - Priority 10/4/18 08/20/18 1607 Bedford St. CB Repair - plated / w/ Barrell - TT to see barry. PLATED PRIORITY Sent to Arnow 11/7/18 12/19/2018 08/20/18 Brookside Ave. at Riverview Drive MH Repair - needs new frame - open hole - cracked frame Sent to Arnow 1/3/2019 1/30/2019 08/20/18 60 West Broad Street MH Repair - needs new frame and new cover. - open hole - cracked frame Sent to Grasso 9/15/2018 11/1/2018 08/21/18 11 Mitzi Road at Gray Farms Rd. CB Repair - basin collapsed 08/24/18 Across from 1665 Hope Street CB Repair - Conc. Frame loose and fused to grate. Fieldstone sump. Needs precast. Barrel 8/24/18 08/24/18 2 Valley View Drive CB Repair - hole next to CB. Conc frame, failing masonry. Barrel placed 8/24/18 08/24/18 117 Flint Rock CB Repair - hole next to CB. Conc frame, failing masonry. Barrel placed 8/24/18. PLATED 8/30/18 Sent to Grasso 8/23/2019 W517155-051519 08/30/18 103 Iron Gate Road CB Repair - basin collapsing. Placed cone 8/30/18 08/31/18 14 Hubbard Court CB Repair - basin collapsing. Placed barrel 8/31/18 Sent to Arnow 7/31/2019 8/5/2019 W508861-090518 W510780-110118 W516561-043019 09/05/18 73 Berrian Road CB Repair - basin collapsing. Placed barrel 9/5/18. Double CB. Service request by aquarion. PRIORITY Sent to Grasso 7/15/2019 7/26/2019 09/06/18 60 Lanark Road at ODE CB Repair - basin collapsing. Placed barrel 9/6/18 09/06/18 59 Lanark Road on ODE CB Repair - Hole next to CB. Placed barrel 9/6/18 09/11/18 759 Atlantic Street CB Repair - Hole next to CB. Has a barrel as of 9/13/18 W509203-091318 09/14/18 197 Stamford Ave CB Repair - Hole next to CB. Double CB. Barrel placed 9/13/18 10/16/18 W509858-100318 09/19/18 323 Cove Road CB Repair - Hole next to CB. Barrel placed 9/19/18 Sent to Arnow 11/7/18 1/14/2019 W474164-032116 09/21/18 9 Howes Ave. CB Repair - Hole next to CB. B. Denison - Barrel placed 9/19/18 W509255-091518 W519818-072119 09/21/18 21 Bradley Place CB Repair - Hole next to CB. B. Denison - Barrel placed 9/19/18 W509119-091218 09/21/18 218 Willowbrook Ave. CB Repair - Hole next to CB. Sent to Arnow 11/7/2018 12/17/2018 10/09/18 Pumping Station Rd. at WPCA MH Repair - B. Denison Painted - Ring / Cover fused - needs to be replaced WPCA repaired 12/20/2018 10/30/18 560 Rock Rimmon Road Pipe repair - jet nozzle stuck in pipe defect - had to terminate hose - PRIORITY W521576-090519 11/02/18 527 Glenbrook Rd. CB Repair - Hole next to CB - barrel placed 11/2/18 B. Dension 11/02/18 119 Ralsey Rd @ Ralsey Rd. South MH Repair - replace with locking MH cover. Cover came off during high tide during storm 11/16/18 3 Seaview Ave. MH Repair - damaged by plow. Sent to Arnow 11/16/2018 11/26/2018 11/16/18 City Garage 90 Magee - OWS MH Frames(2) MH Repair - damaged by plow. Sent to Arnow 1/3/2019 1/29/2019 11/26/18 209 Lynam Road MH Repair - damaged by loader during leaf pick up Sent to Arnow 1/3/2019 1/29/2019 11/27/18 177 Fifth St. Piping repair - Heavy roots HDPE 5' east of MH, install new 15" pipe from MH on curb to ex. MH @ centerline 11/27/18 96 White Birch Lane Piping repair - Offset pipe w/ root ball - replace 14'LF 12" pipe w/ SDR 35 11/27/18 37 Woolsey Rd. at Sagamore MH Repair - frame badly cracked. Needs repair. Sent to Arnow 1/3/2019 1/29/2019 11/27/18 223 Haig Ave. CB Repair - continue to monitor - sinking 1"-2" No cone req'd. 11/30/18 53 Ken Ct. CB Repair - reset top - damaged during leaf pick up 12/04/18 NW corner Bedford St. Garage Surface Pkg. CB Repair - Double CB - top and frame loose. Needs stand pipe in sump. M. Kraineak reported W510087-100918 12/04/18 2 Cider Mill Rd. CB Repair - white water barrier on CB. Hole next to CB. W511814-120918 W518372-061919 12/10/18 87 Den Rd. CB Repair - Basin sinking / collapsing - needs repair. B.Dension to place barrel 12/10/18 12/10/18 282 Eden Road CB Repair - Basin sinking / collapsing - needs repair. B.Denison placed barrel 12/10/18 12/10/18 264 Hubbard Ave. CB Repair - Basin sinking / collapsing - needs repair. B. Denison placed barrel 12/10/18 Sent to Grasso 3/1/2019 4/29/2013 12/11/18 38 Wilson St. CB Repair - Basin sinking - down 8" B. Denison placed barrel 12/12/18 45 Van Buskirk Ave. MH Repair - MH Paved over - TT located and painted - MH access needed for IDDE work. Raise to fin. Grade Sent to Arnow 1/3/2019 1/15/2019 12/19/18 91 Hope at Howes Ave. CB Repair - hole next to CB. Denison placed barrel 12/19/18 12/19/18 69 Forest Lawn Ave. CB Repair - needs new frame - curb back bolts not lining up 12/19/18 W519585-071619 12/26/18 43 Myano Lane CB Repair - Holes next to CB - B. Denison placed barrel 12/26/18 01/08/19 345 Stamford Ave. MH Repair - MH Paved over - TT located and painted -Raise to fin. Grade W518288-061719 W512952-011719 W512450-123018 01/18/19 88 Malvern Rd. CB Repair - Hole next to CB - B. Denison to place barrel 1/18/19

Page 6 01/18/19 On Main St at Greyrock Place CB Repair - basin top has settled - Place water barrier 01/30/19 486 Roxbury Rd. Needs 12" culvert under driveway - existing 12" CMP rotted and cannot jet Sent to Arnow 2/18/2019 01/30/19 75 Weed Hill Ave. Connect 11/2" dia poly into back of CB Sent to Arnow 2/20/2019 3/22/2019 02/12/19 65 Glenbrook Road CB Repair - open hole next to cb. Bad spot. B.D. left Barrel 2/11/19 W513604-021119 02/12/19 45 Mill Valley Road CB Repair - basin collapsing. Sent to Arnow 2/14/2019 2/26/2019 02/18/19 204 Joffre Ave. CB Repair - basin collapsing - hole next to CB. Barrel placed 2/18/19 02/18/19 91 Rogers Road MH Repair - hit by plow - no frame. Barrel placed 2/13/19. BD barrel 8/19/19. W514723-031519 W517766-053119 W518649-062719 W518793-070219 W518795-070219 02/18/19 291 Chestnut Hill Road on W. Haviland Ln. CB Repair - hole next to CB. Barrel placed 2/13/19. Water barrier placed 6/3/19. W518525-062519 W518527-062519 02/20/19 75 Thornridge Dr. CB Repair - hole next to CB. Cone placed 2/20/19 - continue to monitor Sent to Grasso 8/23/2019 9/9/2019 02/20/19 1 Little John Lane MH Repair - Barrel placed as of 2/13/19. Reported again WPCA 8/2/19 W513885-022119 W521256-082619 02/25/19 81 Houston Terrace CB Repair - grate unsupported and collapsing. Barrel placed 2/25/19 Sent to Grasso 8/27/2019 9/5/2019 W513968-022319 02/25/19 105 Snow Crystal Lane CB Repair - small hole next to CB. BD left cone 2/25/19 02/26/19 95 Elmcroft Road CB Repair - Frame is damaged - across street from school - change out frame - inspected M.Scat2/25/19 03/03/19 296 Silver Hill Lane MH Repair - Cover popped out during plowing - frame damaged 03/04/19 86 Ocean Drive East MH Repair - Frame broken - middle of road - needs repair Sent to Arnow 3/5/2019 3/6/2019 03/08/19 8 Talmadge Lane CB Repair - Hole next to double CB. Barrel placed 3/8/19 03/10/19 654 Hope St. on Edgewood Ave. CB Repair - Rotted frame - double conc. Curb back. Needs total replacement. Barrel placed 3/10/19 03/14/19 112 Michael St. CB Repair - Needs new frame - curb back broken off frame - change out W519601-071719 03/14/19 35 Rockridge Lane CB Repair - hole next to CB at driveway apron. PLATED 3/13/19 03/14/19 24 Mathews St. CB Repair - Reported collapsed - low priority 03/15/19 112 Woodmere Rd. CB Repair - hole next to CB. BD placed barrel. 03/20/19 Opposite 21 Spring Hill CB Repair - frame is damaged. Low priority. W515909-041219 W517432-052319 W514997-032119 03/21/19 92 Camp Ave. on Garland St. CB Repair - hole next to CB. PLATED 3/21/19 Sent to Arnow 6/3/2019 6/10/2019 03/22/19 72 Alvord Lane at Catoona CB Repair - holes next to CB. Barrel placed 3/22/19. PRIORITY. Adjust location of cb - move around corner Sent to Arnow 5/22/2019 7/10/2019 03/25/19 Rock Rimmon Road at Scofieldtown CB Repair - basin collapsed 3/25/19. Barrel placed 3/25/19. W515068-032419 03/25/19 20 Pell Place CB Repair - cracks next to corner of cb. Low priority. W515393-040119 W515518-040419 03/25/19 81 Rippowam Rd. at Wampanaw Ave. CB Repair - hole next to basin. BD placed barrel 3/25/19 W514908-031919 03/27/19 308 High Ridge Rd. at Colony Court CB Repair - hole next to basin. BD placed cone 3/25/19 04/01/19 Across from 680 Erskine Rd. CB Repair - Sweeper dropped into CB. PLATED 4/1/19 PRIORITY 04/02/19 130 Redmont Rd. CB Repair - hole next to CB. Water barrier placed 4/2/19 PLATED 04/04/19 36 McClean Rd. CB Repair - hole next to CB. Barrel placed 4/2/19. 04/05/19 21 Myano Court CB Repair - hole in lawn behind CB. Barrel placed 4/2/19. 04/09/19 655 Westhill Rd. Culvert Repair - hole in CMP culvert 12" or 15". Cone placed 4/2/19. 04/10/19 Opposite 69/63 Fenway St. CB Repair - hole next to cb - barrel placed 4/10/19. W516948-050919 W515816-041019 04/12/19 Hoyt St Stamford Corners near Wash Blvd. CB Repair - hole next to cb at garage entry - BD barrel placed 4/12/19. PRIORITY 04/23/19 Pulaski St. at Wash. Blvd MH Repair - Frame damaged and needs emergency replacment. Sent to Arnow 4/23/2019 W517348-052119 W521873-091519 04/25/19 157 Sweet Briar Road CB Repair - hole next to CB. 04/25/19 59 Parry Court CB Repair - hole next to CB - low priority small hole. 04/23/19 Cummings Park near Concession Stand Sinkhole in parking lot. PLATED. Waterbarrier. Referred to Engineering and WPCA for repair. Not stormwater issue. 04/26/19 37 Brownley Drive CB Repair - hole next to CB. Barrel W516436-042619 04/26/19 44 Norman Rd. CB Repair - Conc. Frame collapsed. Water barrier placed. 04/26/19 40 / 28 Brownley Drive CB Repair - hole next to CB. Cone 04/30/19 637 Shippan Ave CB Repair - old style CB - no curb back. Minimum needs new cast iron grate and frame W516498-042919 04/30/19 8 Jeanne Court CB Repair - hole next to CB. Cone Sent to Grasso 8/23/2019 9/9/2019 W518525-062519 W518527-062519 04/30/19 57 Thornridge Drive CB Repair - hole next to CB. Cone Sent to Grasso 8/23/2019 W516291-042319 04/30/19 15 Golf View Circle CB Repair - collapsing concrete flat top at driveway. PLATED Sent to Arnow 7/31/2019 8/19/2019 W516595-043019 05/01/19 91 West Hill Circle CB Repair - hole next to CB. Barrel Placed 5/1/19 W516260-042319 05/01/19 112 Pine Hill Ave. CB Repair - conc. Curb back - frame separated from conc. Reported Lotz. Barrel placed 5/1/19 W516623-050119 05/01/19 70 Arden Lane CB Repair - hole next to CB. W515119-032519 W518793-070219 W518795-070219 05/01/19 270 Haviland Road CB Repair - CB paved over. SMD removed asphalt, placed barrel and barrier.New sump reqd, raise to grade. W515119-032519 05/01/19 Across from 270 Haviland Road CB Repair - CB located off road and too low. New sump to grade and curbing req'd. paved over W518236-061619 05/07/19 40 Minivale Road CB Repair - hole next to CB. Barrel placed 5/7/19. PRIORITY - PAVING Sent to Arnow 9/13/2019 9/18/2019 W517090-051419 05/15/19 37 Erskine Road CB Repair - hole next to CB.Cone 5/14/19. PLATED 5/15/19 Sent to Arnow 9/13/2019 05/15/19 55 Clovelly Road CB Repair - CB tilted and sinking. Water barrier 5/15/19. Reported A. Turner W517138-051519 W519603-071719 05/16/19 70 Gurley Rd. CB Repair - Hole next to CB. T.Theder left cone 5/15/19. 05/21/19 711 Canal St. MH Repair - Emergency call by PD. Ring broken, cover unstable. Sent to Arnow 5/20/2019 05/23/19 310 Halliwell Dr. CB Relocate to low point on Emery Dr. East. Per L. Burwick, MMG PRIORITY BY SPRING 2020 W516655-050219 05/30/19 18 Taylor St. CB Repair - Reset frame and curb back needs bolts. T.Theder left cone 5/30/19 Sent to Grasso 9/4/2019 9/13/2019 W517949-060619 06/07/19 26 Connecticut Ave. CB Repair - CB sinking - B. Denison left barrel 05/31/19 43 Highview Ave. CB Repair - Double CB, block masonry deteriorated. Road milled in advance of paving. Sent to Arnow 6/3/2019 6/10/2019 05/31/19 55 Highview Ave. @ intersection Overlook Pl. MH Repair - buried MH - exposed by milling in advance of paving Sent to Arnow 6/3/2019 6/10/2019 05/31/19 182 Highview Ave. MH Repair - damaged and cracked frame. In advance of paving Sent to Arnow 6/3/2019 6/19/2019 06/07/19 133 Columbus Pl. at River Place CB Repair - hole next to CB. In advance of paving Sent to Arnow 6/10/2019 6/19/2019 06/10/19 50 MacArthur Lane CB Repair - hole next to CB. Cone on hole 6/7/19 06/10/19 35 Tremont Ave. at Field St. CB Repair - collapsed CB. Barrel placed 6/10/19. Reported J.Hoyt. 06/06/19 72 Camp Ave. on Ceretta St. CB Repair - Double CB, block masonry deteriorated. Road milled in advance of paving. Sent to Arnow 6/6/2019 6/10/2019 W518237-061619 06/19/19 130 Henry St. on Garden St. CB Repair - hole next to CB. Cone placed 6/10/19 06/19/19 89 Toms Rd. CB Repair - collapsing CB. Reported J.Taylor. PLATED 6/19/19 Sent to Arnow 7/15/2019 8/20/2019 06/19/19 32 Club Court CB Repair - hole next to CB. Reported J.Taylor 06/19/19 Across from 192 North St. CB Repair - hole next to CB. Reported J.Taylor 06/20/19 33 Stephen St. MH Repair - Needs new frame and cover. Road Milled. Sent to Arnow 6/7/2019 6/26/2019 06/20/19 102 Liberty St CB Repair - hole next to CB exposed after road milled. Reported T. Theder Sent to Arnow 6/20/2019 6/26/2019 06/27/19 225 Summer St. CB Repair - Mortar joints and parge interior of sump - building owner reports water in basement Sent Arnow/Sent Grasso7/15/2019 9/6/2019 T. Theder called owner 225 summer 9/9/19 and advised work was complete.

Page 7 2018-2019 MS4 Annual Report City of Stamford, Connecticut

APPENDIX I

2018–19 CULVERT CLEANING LIST

ANCHOR Engineering Services, Inc.

City of Stamford - No. CT0030279 Open Drainage Channel (Culvert Cleaning and Backhoe Work) 7/1/18 - 6/30/2019

Date Address / Location Duration Manpower Quan. Of Material Removed Receiving Stream Notes 7/9/2018 265 Silver Hill Ln 1/3 Day 2 men stetco hydrualic appx. 1 cubic yard Rippowam River removed logs and debris at culvert inlet. crane and vac truck 7/12/2018 Howard Road 1 Day 3 men, vac truck, stetco appx. 6 cubic yards Mianus River stormwater inlet pipe on west side of road buried and not draining properly. Excavated with stetco and vac truck. Restored proper 7/17/2018 44 East Cross Road 1 Day 4 men, Stetco hydraulic appx. 1 cubic yard Norton River Stormwaterflow. bar screen inlet cleared from leaves, logs, and crane and Vac truck accumulated debris. Proper flow restored. 7/25/2018 16 Westhill Ln. 1 Day 2 men stetco hydrualic appx. 1 cubic yard Rippowam River Cleared debris and stump bottom of swale crane and vac truck 8/28/2018 Lakeside drive 3 Days 4 men,mini excavator and appx. 25 cubic yards Rippowam River create leakoff under fence to drain puddle at roadway to reservoir. small dump trucks Coordination with Aquarion. 10/4/2018 180 Riverbank Rd. 1/3 Day 3 men,stetco hydraulic appx. 1 cubic yard Rippowam River cleared inlet piping crane and vac truck 10/9/2018 53 & 71 Arrowhead Dr. 1 Day 3 men stetco hydrualic appx. 2 cubic yards Rippowam River Cleared culvert inlets crane and vac truck 10/11/2018 53 & 71 Arrowhead Dr. 1 Day 3 men,mini excavator and appx. 3 cubic yards Rippowam River Cleared culvert inlets and rip rap small dump trucks 10/24/2018 138 Rocky Rapids Rd. 2 Day 3 men,mini excavator and appx. 3 cubic yards Rippowam River Cleared culvert inlets and rip rap small dump trucks 10/26/2018 12 Woodbrook Dr. 1/3 Day 3 men,mini excavator and appx. 1 cubic yard Noroton River Cleared inlet at Woodbrook and Eden Rd. small dump trucks 10/26/2018 1271 Riverbank Rd. 1/3 Day 3 men,mini excavator and appx. 2 cubic yards Rippowam River Remove and haul away pile of fill near CB and cut trench / leakoff small dump trucks to inlet headwall opposite #1233 Riverbank Rd. 10/29/2018 180 Riverbank Rd. 1/3 Day 3 men,mini excavator and n/a Rippowam River added rip rap both sides of stream small dump trucks 10/29/2018 1510 Riverbank Rd. 1/3 Day 3 men,mini excavator and appx. 5 cubic yards Rippowam River Cleared leak off, headwall, and culvert inlet small dump trucks 10/29/2018 135 Sawmill Rd. 1/3 Day 3 men,mini excavator and appx. 1 cubic yard Rippowam River Cleared outlet piping small dump trucks 11/6/2018 65 White Birch Ln 1/2 Day 2 men stetco hydrualic appx. 1 cubic yard Rippowam River removed logs and debris at culvert inlet. crane 11/6/2018 265 Silver Hill Ln 1/2 Day 2 men stetco hydrualic appx. 1 cubic yard Rippowam River removed logs and debris at culvert inlet. crane 12/18/2018 1271 Rock Rimmon Rd. 1 Day 3 men stetco hydrualic appx. 3 cubic yards Rippowam River Saw cut edge of asphalt road, exposed spring, stabalized edge of crane road w/ surge and gravel 12/19/2018 1654 Long Ridge Rd. at Butternut 1 Day 3 men back hoe and small appx. 1 cubic yard Rippowam River adjusted rip rap at leak off to ensure water removed from Ln. dump trucks roadway. 1/3/2019 369 Rock Rimmon Rd. 1 Day 2 men, vac truck, stetco appx. 1 cubic yard Rippowam River cleared logs and debris from culvert inlet. hydraulic crane 1/7/2019 386 June Rd. 1 Day 5 men, loader, small dump appx. 3 cubic yards Mianus River removed logs, cut in swale, restored leakoff, added rip rap trucks

1 1/11/2019 141 Den Rd. 3 Days 5 men, loader, small dump appx. 5 cubic yards Rippowam River Excavated roadside swale, prep for pipe work trucks 1/14/2019 415 Farms Rd. 1 Day 4 men, loader, small dump n/a Rippowam River added rip rap at guard rail to limit roadway erosion. trucks 1/15/2019 28 Mill Rd. 1/3 Day 6 men, loader, small dump appx. 2 cubic yards Rippowam River scraped road, cleared leak off trucks 1/15/2019 188 Slice Dr. 1/3 Day 6 men, loader, small dump appx. 1 cubic yard Rippowam River scraped road, cleared leak off trucks 1/15/2019 120 Hobson St. 1/3 Day 6 men, loader, small dump appx. 4 cubic yards Long Island Sound scraped road - sand from coastal storms trucks 1/15/2019 266 Willowbrook Ave. 1/3 Day 6 men, loader, small dump appx. 1 cubic yard Long Island Sound scraped road - sand from coastal storms trucks 1/16/2019 Opposite #180 Wildwood Rd. 1 Day 4 men, loader, small dump n/a Rippowam River added rip rap at road leak off to prevent further erosion. trucks 1/30/2019 123 Lawton Ave 1/2 Day 3 men, stetco hydraulic appx. 2 cubic yards Noroton River cleared logs and debris from bar screen drainage inlet at sleepy crane hollow park. 2/4/2019 432 Carriage Dr. 1 Day 3 men, backhoe, small appx. 4 cubic yards Rippowam River cleared logs and debris from culvert inlet. dump trucks 2/6/2019 Bracchi Drive 2 Days 5 men, mini excavator and appx. 10 cubic yards Rippowam River stormwater swale filled in. Removed sediment and debris. Towed small dump trucks abandoned car prior to work. 2/15/2019 53 & 71 Arrowhead Dr. 1 Day 3 men, vac truck, stetco appx. 3 cubic yards Rippowam River Cleared culvert inlets from logs and debris.

2/25/2019 611 Westover Rd. 1 Day 3 men, loader and small n/a Minaus River added rip rap to culvert inlet dump trucks 3/15/2019 371 Taconic Road 3 Days 5 men, mini excavator and appx. 20 cubic yards Mianus River excavated roadside swale to ensure water off of road. small dump trucks 3/18/2019 589 Den Road 1/2 Days 6 men, mini excavator and appx. 1 cubic yard Rippowam River used mini ex to explore for pipe under roadway. None found. small dump trucks Referrred to Engineering deparment. 3/19/2019 Old Long Ridge Road 4 Days 5 men, mini excavator and appx. 40 cubic yards Rippowam River created two roadside swales. Removed illegally placed paving work small dump trucks by utility company resulting in heavy water flow on road. Fabric and rip rap at base of swales. 3/21/2019 Laurel Road 1 Day 4 men, Stetco hydraulic appx. 6 cubic yards Rippowam River Clean out at 4 stormwater inlets crane and Vac truck 5/6/2019 Bangall Rd. 3 Days 6 men, backhoe, loader appx. 30 cubic yards and boulders Rippowam River Excavated roadside swale, seed and hay and dump trucks

2 2018-2019 MS4 Annual Report City of Stamford, Connecticut

APPENDIX J

2018–19 IDDE DRY WEATHER SCREENING DATA SUMMARY TABLE

ANCHOR Engineering Services, Inc.

Permit Outfall Condition Time Flow Follow-up Time Flow Ammonia Chlorine Conductivity Salinity Potassium D.O Turbidity Temp MBAs Escherichia Total Fecal Total ID Level Date Sampled (gal/min) Date Sampled (gal/sec) (mg/L) (mg/L) (umhos/cm) (g/kg) (mg/L) pH (mg/L) (NTU) (oC) (mg/L) Coli Coliforms Coliforms Enterococcus Phosphorus Nitrogen DIS-2 Fair 6/27/2019 14:15 0 DIS-11 Poor 6/27/2019 10:56 6 0.25 0.04 17178 - 134 7.26 2.11 22.4 1.5 3870 >24200 4350 20 DIS-14 Good 6/27/2019 11:29 7 0 0.02 710 0.341 3.6 7.59 5.97 17.9 0.25 591 3450 345 121 DIS-15 Good 6/27/2019 12:12 1.5 0 0.03 1135 0.578 4.5 7.96 5.2 20.9 0.5 262 7700 211 144 DIS-17 Good 6/27/2019 13:32 6 0 0 24219 - 179 7.48 2.51 22.7 2 888 >24200 650 350 DIS-19 Fair 6/12/2019 15:33 2 0.25 0.05 2133 1.084 16.1 8.02 7.2 20 0.25 84 >24200 109 504 DIS-24 Good 2/6/2019 12:01 3 0.25 0.01 7096 3.795 6.7 7.5 10.48 0.68 6.7 1 475 4610 DIS-55 Fair 2/6/2019 10:37 0 DIS-240 Good 6/12/2019 12;00 2 0 0.1 389 0.19 2.2 8.09 10.11 0.21 16.38 0.25 110 6130 DIS-280 Good 2/6/2019 15:05 3 0.5 0 213 0.14 4.0 6.73 11.27 0.63 10.42 0.25 30 141 DIS-353 Good 2/6/2019 10:54 4 0.25 0 961 0.467 3.4 7.87 10.6 1.98 9.6 0.75 384 1840 959 631 DIS-405 Good 1/11/2019 12:55 0 DIS-432 Good 1/11/2019 13:22 0 9/19/2019 11:50 0 n/a DIS-435 Good 1/11/2019 9:20 0 n/a DIS-572 Good 6/12/2019 0 DIS-654 Good 1/17/2019 12:53 0 9/20/2019 10:20 0 n/a DIS-655 Good 1/17/2019 13:02 3 0.25 0.02 369 0.177 4.1 7.37 21.13 0.39 2.5 0.25 1310 2720 DIS-663 Poor 1/11/2019 10:35 0 n/a DIS-664 Poor 1/11/2019 10:30 0 n/a DIS-665 Fair 1/11/2019 10:05 3 6.5 2.2 2350 1.22 31.7 7.14 7.29 7.44 11.41 0.25 <10 10 0.167 15.6 DIS-727 Good 6/12/2019 12:35 0.5 0.25 0 640 8.13 10.89 0.46 17.71 0.25 DIS-753 Good 2/6/2019 14:06 1 0 0 214 0.15 3.8 7.63 11.65 0.01 8.9 0.25 <10 <10 DIS-764 Poor 6/12/2019 13:05 DIS-765 Good 6/12/2019 13:20 1 0.25 0.1 284 0.15 1.7 8.32 9.79 0.4 20.21 0.25 5480 >24200 DIS-819 Good 1/17/2019 11:11 5 0.25 0.01 237 0.112 2.3 7.54 23.66 1.32 3.5 0.5 10 275 DIS-832 Good 1/17/2019 12:04 0.1 0 0 470 0.213 4.6 7.02 19.44 0 2.3 <0.25 61 >24200 DIS-866

DIS-867 Good 2/6/2019 13:14 0

DIS-868 Good 2/6/2019 13:20 10 0 2.2 202 0.14 4.0 7.07 11.62 0.62 9.46 0.25 63 644 DIS-916 Good 6/12/2019 11:45 0 DIS-917 Good 6/12/2019 12:17 0 DIS-927 Good 6/12/2019 12:55 10 0.25 0.08 7394 4.138 41.6 7.74 5.65 23.2 0.25 882 >24200 798 691 DIS-934 Good 1/17/2019 10:24 1.5 0.25 0 715 0.345 1.5 7.2 20.77 0.07 7.8 <0.25 <10 85 DIS-935 Good 1/17/2019 9:58 0.2 0 0.03 915 0.444 1.7 7.3 21.94 0 7 0.25 <10 52 DIS-949 Fair 6/12/2019 11:04 3 0.25 0.03 19755 - 270 7.49 3.57 20.2 0.25 52 3260 41 10 DIS-982 Poor 1/17/2019 9:46 0 9/20/2019 9:50 0 n/a DIS-991 Good 2/6/2019 12:10 3 0.25 0.04 739 3.682 5.9 2 10 85 DIS-993 Good 6/12/2019 14:58 1.5 0.25 0.04 14070 8.41 100 7.82 6.83 23.5 0.25 836 >24200 689 1310 DIS-996 Fair 6/12/2019 12:15 0 DIS-1002 Good 1/17/2019 12:45 0 9/20/2019 10:13 0 n/a DIS-1003 Good 1/17/2019 12:36 0 9/20/2019 10:10 0 n/a DIS-1103 Good 1/17/2019 12:36 0 9/20/2019 10:10 0 n/a DIS-1114 Good 1/17/2019 12:28 0 9/20/2019 10:05 0 n/a DIS-1116 Good 1/17/2019 10:48 0.5 0.25 0.04 659 0.315 3.7 7.31 21.53 0.66 1.1 0.25 41 598

DIS-1129 Good 1/17/2019 11:48 0 n/a

DIS-1130 Good 1/17/2019 11:36 0 n/a DIS-1191 Good 1/11/2019 13:40 15 0.06 2.2 454 0.22 7.85 12.52 1.74 0.25 20 538 DIS-1214 Fair 1/17/2019 9:32 0 9/20/2019 9:54 0 n/a DIS-1222 Poor 2/6/2019 10:30 0 DIS-1224 Poor 2/6/2019 10:17 0 DIS-1225 Good 2/6/2019 10:22 0 DIS-1247 Good 1/11/2019 13:08 0 n/a DIS-1277 Good 2/6/2019 9:51 0 9/19/2019 9:26 0 DIS-1278 Good 2/6/2019 11:27 0 DIS-1280 Poor 2/6/2019 10:11 0 DIS-1283 Good 2/6/2019 10:11 0 9/19/2019 9:12 0 DIS-1284 Fair 2/6/2019 10:11 0 DIS-1286 UKN 2/6/2019 10:44 0 9/19/2019 9:21 0 DIS-1288 Good 2/6/2019 11:48 0 DIS-1289 Good 2/6/2019 10:13 0 9/19/2019 8:50 0.5 0 0.04 32603 - 249 6.87 3.29 18.4 2 3450 >24200 771 272 DIS-1347 Good 1/11/2019 9:27 0 n/a DIS-1412 Good 6/12/2019 10:50 0 DIS-1434 Good 1/11/2019 12:02 0.13 0 0.08 471 0.23 3.2 7.71 10.11 0.1 7.56 0.25 10 63 DIS-1458 Good 1/11/2019 12:01 5 0 0.13 456 0.22 2.9 7.43 12.45 0.28 3.15 0.25 74 631 DIS-1469 UKN 6/12/2019 11:45 DIS-16N Good 6/27/2019 12:52 6 0 0.06 704 0.351 3.7 7.18 6.32 0.21 18.3 0.25 20 1350 <10 <10 DIS-16S Fair 6/27/2019 12:42 0 DIS-36S Good 6/12/2019 11:10 1 0.25 0.3 561 7.81 8.67 12.3 18.64 0.25 DIS-UNK1 Good 2/6/2019 10:06 0 DIS-UNK2 Good 2/6/2019 10:07 5 0.25 1.33 1221 0.61 5.2 8.99 11.92 0.25 14.06 0.25 10 185 538 41 2018-2019 MS4 Annual Report City of Stamford, Connecticut

APPENDIX K

2018–19 WET WEATHER SCREENING DATA SUMMARY TABLE

ANCHOR Engineering Services, Inc.

General Information Rain Event Sample Info Field Parameter Lab Data Turbidity Permit Sample Condition Up Gradient Direct Time Since Turbidity Upstream Conductivity Escherichia Total Fecal SON # Outfall ID Status Status Condition Level Sample Discharge Amount (in) Previous Event Initial Date Time SF Photo (NTU) (NTU) pH (S.U) Temperature D.O (mg/l) (umhos/cm) Coli Coliforms Colilforms Enterococcus Phosphorus Total Nitrogen Impairment 1.44 4 days DRS 1/24/2019 10:00 Yes 10 31 SON-0036 DIS-30 30 SF Good No Yes 0.65 6 days EAA 6/15/2015 9:44 Yes 7.03 19.94 7.64 603 13000 >24200 >2000 14140 0.19 1.08 Bacteria SON-0095 DIS-55 55 SF Good No Yes 1.44 4 days DRS 1/24/2019 7:54 Yes <10 272 Bacteria DIS-67 67 SF Good No Yes 0.48 4 days KLM 6/18/2019 14:35 No 1 0.74 Other Pollutant of Concern 1.44 4 days BJL 1/24/2019 8:44 Yes 11.7 13.7 SON-0058 DIS-84 84 SF Good No Yes 1.23 7 days 5/5/2017 Yes 7.68 10.89 8.57 345 4610 >24200 >2000 1660 0.39 2.26 Other Pollutant of Concern 1.44 4 days BJL 1/24/2019 11:54 Yes 7.78 11.7 SON-0063 DIS-94 94 SF Good No Yes 0.65 4 days 6/1/2015 No 14.5 7.85 17.52 8.05 374 7270 >24200 >2000 9800 0.11 0.67 1.44 4 days BJL 1/24/2019 12:13 Yes 29.5 6.18 SON-0064 DIS-95 95 SF Good No Yes 0.65 6 days EAA 6/15/2015 7:40 Yes 7.59 20.49 9.24 114 24200 >24200 >2000 >24200 0.43 4.6 Other Pollutant of Concern 1.44 4 days BJL 1/24/2019 11:10 Yes 25 5.87 SON-0065 DIS-96 96 SF Good No Yes 0.65 6 days EAA 6/15/2015 8:15 Yes 7.61 21.41 3.25 109 17300 >24200 >2000 24200 0.19 1.49 Other Pollutant of Concern 1.44 4 days BJL 1/24/2019 13:12 Yes 22.6 6.71 SON-0067 DIS-98 98 SF IE Good No Yes 0.65 6 days EAA 6/15/2015 7:10 No 7.71 21.49 6.19 319 4610 >24200 >2000 5790 0.1 0.74 Other Pollutant of Concern SON-0085 DIS-130 130 SF Fair No Yes 1.44 4 days DRS 1/24/2019 8:39 Yes 7.74 14.91 8.75 544 17330 >24200 52 228 Bacteria 1.44 4 days DRS 1/24/2019 8:26 No <10 216 SON-0087 DIS-132 132 SF Good No Yes 0.29 13 days SWZ 12/2/2015 12:15 Yes 7.38 9.98 9.37 435 >24200 >24200 >2000 24200 0.86 1.24 Bacteria DIS-180 180 SF Good No Yes 0.48 4 Days KLM 6/18/2019 12:05 No 8.25 1.72 Other Pollutant of Concern DIS-181 181 SF Good No Yes 0.48 4 Days KLM 6/18/2019 12:10 No 1.47 1.23 Other Pollutant of Concern DIS-204 204 SF Good No Yes 1.44 4 days BJL 1/24/2019 7:57 Yes 7.4 8.94 Other Pollutant of Concern DIS-205 205 SF Good No Yes 1.44 4 days BJL 1/24/2019 8:18 Yes 17.1 17.1 Other Pollutant of Concern DIS-240 240 SF Good No Yes 0.48 4 days KLM 6/18/2019 13:10 No 1.79 1.64 Other Pollutant of Concern SON-0109 DIS-727 727 SF Good No Yes 0.48 4 Days KLM 6/18/2019 12:56 No 6.88 2.05 Other Pollutant of Concern DIS-769 769 SF Good No Yes 0.48 4 Days KLM 6/18/2019 12:40 No 2.02 1.56 Other Pollutant of Concern DIS-770 770 SF Good No Yes 0.48 4 Days KLM 6/18/2019 12:43 No 0.12 1.49 Other Pollutant of Concern DIS-830 830 SF Good No Yes 0.48 4 Days KLM 6/18/2019 11:50 No 1.41 1.16 Other Pollutant of Concern DIS-936 936 SF Good No Yes 0.48 4 Days KLM 6/18/2019 13:43 No 0 1.07 Other Pollutant of Concern DIS-937 937 SF Good No Yes 0.48 4 Days KLM 6/18/2019 13:35 No 0.28 1.23 Other Pollutant of Concern DIS-938 938 SF Good No Yes 0.48 4 Days KLM 6/18/2019 13:52 No 0.21 0.96 Other Pollutant of Concern SON-0129 DIS-996 996 SF Good No Yes 0.48 4 Days KLM 6/18/2019 13;00 No 2.31 1.62 Other Pollutant of Concern SON-0135 DIS-1277 1277 SF Good No Yes 1.44 4 days DRS 1/24/2019 7:38 Yes 75 226 Bacteria DIS-1282 1282 SF Good No Yes 1.44 4 days DRS 1/24/2019 9:25 Yes <10 20 Bacteria DIS-1283 1283 SF Good No Yes 1.44 4 days DRS 1/24/2019 9:11 Yes 63 1470 Bacteria DIS-1285 1285 SF Good No Yes 1.44 4 days DRS 1/24/2019 8:52 Yes 106 3970 Bacteria DIS-1286 1286 NFEF UW Fair No No 1.44 4 days DRS 1/24/2019 0.339583333 Yes Bacteria 1.44 4 days DRS 1/24/2019 9:42 Yes 41 3650 DIS-1289 1289 SF Good No Yes 0.65 4 days 6/1/2015 No 17330 >2000 >24200 0.15 1.09 Bacteria DIS-1412 1412 SF Good No Yes 0.48 4 Days KLM 6/18/2019 14:15 No 2.13 2.40 Other Pollutant of Concern DIS-1445 1445 SF Good No Yes 0.48 4 Days KLM 6/18/2019 14:22 no 1.22 1.11 2018-2019 MS4 Annual Report City of Stamford, Connecticut

APPENDIX L

2018–19 IDDE FOLLOW-UP INVESTIGATIONS

ANCHOR Engineering Services, Inc.

Total E. coli Dissolved Total Coliform Total Coliform Total E. coli Enterococcus Enterococcus Conductivity Water Turbidity Chlorine Surfactants Potassium Ammonia Total Sample Coliform Positive E. coli E. coli Reported Enterococcus Enterococccus Site Name Date Time Oxygen pH E. coli Enterococcus Positive Large Positive Small Coliform Positive Positive Large Positive Small NOTES µmho/cm Temp ° C (NTU) (mg/L) (ppt) (mg/L) (mg/L) Coliform Volume Reported Large MPN MPN MPN Reported MPN mg/L Wells Wells MPN Small Wells Wells Wells MPN Wells Sewage smell. Dye test showing up under ice. Dye prevented any test with color change. Took bacteria and ammonia sample Berrian Road 1/16/19 1010 n/a n/a n/a n/a n/a n/a n/a n/a 3.00 >24195.7 24195.70 n/a 10 49 48 >2419.6 #VALUE! 49 47 2419.6 24195.7 downstream of dye in slushy area. Orange Street 1/16/19 1052 10.5 2676 7.5 n/a n/a n/a n/a n/a n/a 1203.33 10.89 n/a 100 49 41 1203.3 1203.3 9 1 10.9 10.9 Left side of road when looking up at Long Ridge Tavern. Considerable flow but flat against the road. Ditch to side look ssolid Old Long Ridge Road Left 1/16/19 1122 n/a n/a n/a 3.66 6.2 0 0.25 7 0.50 1119.87 9.69 n/a 100 49 40 1119.9 1119.9 8 1 9.7 9.7 but is very deep with water. Right side of road when looking up at Long Ridge Tavern. Old Long Ridge Road Right 1/16/19 1122 n/a n/a n/a 17.8 7 0.03 0.75 6 0.25 2419.57 1.00 n/a 100 49 47 2419.6 2419.6 1 0 1.0 1.0 Considerabel flow but flat on road. MH6108 1/16/19 1242 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a Dry Too shallow to sample. No flow in, edges around base are vet but shallow. Appeared to have some water in exit pipe but there was MH6110 1/16/19 1245 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a no visible flow.

Side pipe flowing but could not get side flow sample because car was parked over the catchbasin where flow was discharging from. MH7572 1/16/19 1253 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 118.96 50 29 11 59.5 119.0 No grey water observed as we did when previously sampled. MH7573 1/16/19 1300 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a Dry. Small damp area but no flow. Side pipe flowing but could not get sample. Catchbasin where pipe MH695 1/16/19 1306 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 43.33 100 22 11 43.3 43.3 is coming from was stagnant with a bell. MH696 1/16/19 1322 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 726.99 100 49 33 727.0 727.0 Side pipe flowing Sampled flow in catchbasin. Pipe in catchbaisin had steady trickle. MH696CB 1/16/19 1327 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 2.98 100 0 3 3.0 3.0 Appeared to be pulsing (Josh observation) MH7577 1/16/19 1314 8.7 1418 10.9 n/a n/a n/a n/a n/a n/a n/a n/a >2419.6 100 49 48 >2419.6 >2419.6

Taken at same spot as previous samples (slightly downstream of DIS-50 1/16/19 1333 8.99 1450 10.9 0.94 6.9 0 0.25 10 0 n/a n/a >2419.6 100 49 48 >2419.6 >2419.6 outfall). Pond below outfall appeared blue/grey. Long Ridge Road 1/29/19 1235 n/a n/a n/a 3.28 5.9 0 0.25 7 0.00 238.22 <1 n/a 100 48 17 238.2 238.2 0 0 <1 <1 Long Ridge Road 1213 1/29/19 1300 n/a n/a n/a 59.5 6 0 2 10 3.00 >24195.7 >24195.7 10 49 48 >2419.6 #VALUE! 49 48 >2419.6 #VALUE!

Taken near same point originally sampled on 1/16/19. Had to Berrian Road 2/25/19 1031 n/a n/a n/a n/a n/a n/a n/a n/a 0.25 >24195.7 9208.40 10 49 48 >2419.6 #VALUE! 49 37 920.8 9208.4 sample closer to discharg point due to debris in the road. Taken at the discharge point where water was coming out of the Berrian Road (at bubbling point) 2/25/19 1044 n/a n/a n/a n/a n/a n/a n/a n/a 0.25 >2419.6 >2419.6 100 49 48 >2419.6 >2419.6 49 48 >2419.6 >2419.6 ground/pavement at end of driveway. Berrian Road 4/2/19 1012 n/a n/a n/a n/a n/a n/a n/a n/a 3.00 >241960 >241960 1 49 48 >2419.6 #VALUE! 49 48 >2419.6 #VALUE! Grey water/grey coloring to pavement. Odor observed Berrian Road (at bubbling point) 4/2/19 1012 n/a n/a n/a n/a n/a n/a n/a n/a 3.00 >241960 >241960 1 49 48 >2419.6 #VALUE! 49 48 >2419.6 #VALUE! Grey water/grey coloring to pavement. Odor observed 113 Redmont Road 5/1/19 1203 n/a n/a n/a n/a n/a n/a n/a n/a 0.00 >2419.6 2419.57 100 49 48 >2419.6 >2419.6 49 47 2419.6 2419.6

Berrian Road 5/28/19 1012 On data sheet at #134 Berrian Road. DRY. No sample collected. MH2671 5/28/19 1015 0.00 15531.20 2098.20 10 49 44 1553.1 15531.2 48 14 209.8 2098.2 MH2670 5/28/19 1023 0.00 >4839.2 689.60 50 49 48 >2419.6 #VALUE! 49 20 344.8 689.6 MH2062 5/28/19 1030 0.00 3106.24 976.88 50 49 44 1553.1 3106.2 49 26 488.4 976.9 #44 Berrian Road. Toilet paper spotted In basin. Slightly cloudy/discolored water. Volume was entered as 10mL when it should have been 1mL originally. Data based on a 10mL volume was originally sent to Tyler Theder. Results were still indicative of MH#3 5/28/19 948 0 3 3.00 >24195.7 198629.00 1 49 48 >2419.6 #VALUE! 49 46 1986.3 198629.0 sewage. MH7598 7/25/19 1056 >2419.6 >2419.6 100 49 48 >2419.6 >2419.6 49 48 >2419.6 >2419.6 Flow from side pipe unable to isolate for sample. MH731 7/25/19 1047 >2419.6 >2419.6 100 49 48 >2419.6 >2419.6 49 48 >2419.6 >2419.6 Could really be MH7601 MH731P 7/25/19 1048 >2419.6 816.41 0.00 100 49 48 >2419.6 >2419.6 49 35 816.4 816.4 Side pipe flowing into MH731 flowing from Ursula Place

MH317 7/25/19 1042 Did not open because rim kept lifting out of the ground as well. MH7603 7/25/19 1036 >2419.6 >2419.6 100 49 48 >2419.6 >2419.6 49 48 >2419.6 >2419.6 MH344 7/25/19 1029 >2419.6 1119.87 100 49 48 >2419.6 >2419.6 49 40 1119.9 1119.9 Flow in from both sides 146 Cold Spring Road 7/25/19 1005 <0.25 Surfactants only. We did observe foam at the site. MH3 7/25/19 932 0.01 0.25 0.25 #VALUE! 37.38 50 49 48 >2419.6 #VALUE! 15 1 18.7 37.4 Stagnant water. Sampled anyway DIS-205-B 7/25/19 1115 #VALUE! 259.26 50 49 48 >2419.6 #VALUE! 44 11 129.6 259.3 Taken from MH on hope street. Outfall had river water up high into it but we could still observe DIS-84 7/25/19 1127 >2419.6 517.21 100 49 48 >2419.6 >2419.6 49 27 517.2 517.2 flow out. Fence blocking access to the manholes. DIS-1412-A 7/25/19 1137 Damp but no flow

DIS-78 7/29/19 1141 >2419.6 1046.24 100 49 48 >2419.6 >2419.6 49 39 1046.2 1046.2 DIS-79 7/29/19 1142 #VALUE! 1095.00 50 49 48 >2419.6 #VALUE! 49 28 547.5 1095.0 Did not observe bubbling as Tyler had described. There was a small puddle that dried up. Only a small sample for ammonia was able to Wedgemere 8/5/19 1240 0.00 be collected.

Daffodil 10/9/19 1151 3.00 29866.00 4638.00 1 48 22 298.7 29866.0 29 3 46.4 4638.0 Tried doing surfactants but the sample malfunctioned in the field. Physical Flow Estimation Conductivity Turbidity DO pH (pH Chlorine Surfactants as Potassium Ammonia Fecal Coliform E. coli Enterococci Site Date Time Photo Condition Other Defects Illicit Discharges Flow (gallon/second) (µS) (NTU) (mg/L) Units) (mg/L) Temp (°C) (MBAS) (ppm) (mg/L) (mg/L) (CFU/100mL) (CFU/100mL) (MPN/100mL) Notes Bubbles, may be Medium, tide going Outlet 9/10/2018 937 Yes n/a n/a natural Yes out 1492 14.9 7.71 7.1 0 16.6 0.25 9 0.25 53000 18000 46110 Sampled during rain event >0.1

Sampled during rain event >0.1. Green tint observed in surfactants test which is unusual - possibly related Moderate, tide going to heavily sedimented sample. Water depth was very Pond 9/10/2018 945 Yes n/a n/a None Yes out 3663 53.4 0.53 7.8 0.15 17 0.5 16 0.25 70000 21000 48840 low, approximately 0.5 inches. Moderate, tide going Stream 9/10/2018 959 No n/a n/a None Yes out 399.6 15.5 8.37 7 0 17.2 0.25 4 0.25 164000 42000 >24196 Sampled during rain event >0.1

Sampled during rain event >0.1. Took sample slightly downstream of outfall where turned into the stream. DIS-50 9/10/2018 1002 Yes Intact none Oil sheen present Yes Moderate 355.6 19 8.81 7 0 17.4 0.25 2 0 217000 64000 >24196 Outfall was half filled with water (see photo) MH646 9/10/2018 1115 No n/a n/a none Yes Heavy 75.5 16.4 9.84 6.9 0 17.3 0.25 2 0 151000 23000 n/a Sampled during rain event >0.1 MH7576 9/10/2018 1120 No n/a n/a none Yes Heavy 64.5 25.9 9.69 7.1 0 17.0 0.25 2 0 141000 19000 n/a Sampled during rain event >0.1 Sampled during rain event >0.1. Green tint observed MH7596 9/10/2018 1128 No n/a n/a none Yes Heavy 117.2 44.9 8.83 7.3 0.01 17.5 0.25 2 0 128000 26000 n/a in surfactants test which is unusual.

Water looks viscous, DIS916 10/17/2018 1129 Yes Intact none slight sheen on surface Yes Moderate 38200 1.57 4.93 7.3 0.03 17.2 2 620 0 50 40 216 Pump Station (West Beach) 10/17/2018 1205 no Intact none none No Stagnant 2131 6.21 2.61 6.8 0.11 19.6 0.25 40 0 350 170 193 Taken from wet well inside pump station MH5688 10/17/2018 1039 no Intact None none No Stagnant 1206 9.27 1.3 6.7 0.09 20.3 0.25 50 0 280 160 275 Trickle flowing in, Foam present on outgoing pipe MH3840 10/17/2018 1034 no Intact none surface Yes submerged 1060 5.4 1.95 6.4 0.1 20.3 0.25 36 0 690 580 131

Trickle flowing in from side pipe but no obvious flow exiting. Two pvc side pipes (one blue and one white), both MH3839 10/17/2018 1240 No Intact none no Yes Exit pipe submerged? 635 n/a 2.65 n/a n/a 20 n/a n/a 0 600 590 146 have flow (small trickle) Two side pipes, one to CB in road had trickle, other pointing towards driveway had no flow. Flow at bottom of basin appeared to flow away from the MH3838 10/17/2018 1247 No Intact none none Yes Low 719 n/a 4.41 n/a n/a 19.8 n/a n/a 0 1000 800 187 outfall towards Mohegan Ave. MH420 10/17/2018 1110 No Intact none non Yes Moderate 1264 12.9 7.36 7.4 0 17.4 0.25 71 0 780 270 2160 MH922 10/17/2018 1140 no Intact none no yes Slow steady 1430 n/a 5.9 n/a n/a 17.1 n/a n/a 0 6100 1100 1850 MH921 10/17/2018 1154 no Intact none Discoloration Yes Steady medium 973 n/a 7.4 n/a n/a 17.7 n/a n/a 0 7200 3200 5560 MH918 10/17/2018 1206 No Intact none Discoloration Yes Relatively low 799 n/a 7.46 n/a n/a 18.4 n/a n/a 0 8200 2700 2010 Very brown sample MH669 10/17/2018 1212 No Intact none Discoloration Yes Moderate 1041 n/a 7.2 n/a n/a 18.4 n/a n/a 0 6400 1300 1930 Orange Brown sample MH668 10/17/2018 1220 no Intact none Discoloration Yes n/a 1071 n/a 7.01 n/a n/a 18 n/a n/a 0 3700 900 3640 Orange Brown sample Unable to access. Any sample would have been just the receiving waters and not an accurate depiction of DIS1447 10/17/2018 1110 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a outfall.

Took sample slightly downstream of outfall where Water had a blue turned into the stream (same spot where sampled in DIS50 12/12/2018 821 no Intact none green hue yes Low 1255 2.65 8.38 7.1 0 12.1 0.25 35 0 n/a n/a 309 September). Outfall was partially submerged. MH7577 12/12/2018 850 n/a n/a n/a n/a n/a n/a 1464 n/a 8.05 n/a n/a 12.4 n/a n/a n/a n/a n/a 309

Chunky and discolored Discharge observed coming out of the downstream substance discharging catchbasin pipe. Discolored and thick. Took this MH695 12/12/2018 858 n/a n/a n/a from catchbasin Yes Low n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 10 sample above possible illicit discharge.

Chunky and discolored Discharge observed coming out of the downstream substance discharging catchbasin pipe. Discolored and thick. Took this MH695 Below 12/12/2018 859 n/a n/a n/a from catchbasin Yes Low n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 118 sample inline/slightly below possible illicit discharge. Main line and all inputing catchbain pipes are dry. Small pool of water behind a cement blob in the middle of the main line. There is room for water to MH7573 12/12/2018 917 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a flow around cement blob.

Main line had small trickel entering manhole, grey in color. Water pooling in middle of the line, but still observed flow out of manhole through main line. MH7572 12/12/2018 922 n/a n/a n/a Grey water Yes Trickle n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 15520 Catchbasin from direction of #54 had flow. Side pipe (small pvc) flowing into catchbasin. Sample MH7572 CBSP 12/12/2018 927 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a <10 taken directly from pipe discharge. Small trickel from catchbasin pipe. Small pipe found in MH696 12/12/2018 954 n/a n/a n/a n/a Yes Moderate n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 170 catchbasin that was dripping. MH6108 12/12/2018 1022 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a