District – Bijapur, (CG)

Total Page:16

File Type:pdf, Size:1020Kb

District – Bijapur, (CG) PREFEASIBILITY REPORT OF KUCHNUR CORUNDUM MINE, AREA: 3.70 HA Prefeasibility Report of Kuchnur Corundum Mine, Village - Kuchnur, Area – 9.14 Acre (3.70 Ha), District – Bijapur, (C.G.) PRE-FEASIBILITY REPORT 1. SUMMARY Project Corundum Mine Name of Company / Mine Chhattisgarh Mineral Development Owner Corporation Ltd. Location Village Kuchnur Taluka Bhopalpatnam District Bijapur State Chattishgarh 1 Mining Lease Area & Type of Govt. Revenue land and area is 9.14 Acre land (4.580 Ha), forest land of Govt. Revenue land. 2 Geographical co-ordinates Corner Latitude Longitude A 20°58'05.93"N 82°30'22.72"E B 20°58'06.38"N 82°30'27.81"E C 20°58'04.69"N 82°30'28.39"E D 20°58'05.41"N 82°30'28.82"E E 20°58'07.33"N 82°30'28.93"E F 20°58'12.24"N 82°30'27.21"E G 20°58'12.15"N 82°30'26.60"E H 20°58'10.86"N 82°30'26.40"E I 20°58'09.02"N 82°30'27.11"E J 20°58'08.51"N 82°30'23.06"E 3 Name of Small nallah at 200 meters, in South. Rivers/Nallah/Tanks/ Spring/Lakes etc 4 Name of Reserve Forest(s), There is no Reserve forest(s) / Wild life Wild life Sanctuary/ sanctuary / National park present in the National parks etc. project area. 1 | Page PREFEASIBILITY REPORT OF KUCHNUR CORUNDUM MINE, AREA: 3.70 HA 5 Topography of the area The topography of the applied area is almost flat. The general height of the area is around 137 meters from the above from MSL and the highest elevation of the proposed mining lease area is 141 meters above from MSL in North and the lowest elevation measured 137 meters above from MSL in South of the area. The proposed mining area is a forest land of Chhattisgarh Govt. having forest density less than 0.3% and covered with alluvial soil, weathered gneiss rock bearing corundum crystals, under lined by hard granite rock etc. 6 Project Proposal Proposed average rate of production is about 1 tones per year. 7 Name of Mineral mined Corundum 8 Rate of Production (in cubic Based on 250 working days, production meter) per day is about 0.004 tones 9 Mineral Reserve in cubic The estimated geological reserve in the meter area is 22 tones. Mineable reserve is 20 tones 10 Life of mine About 20 years 11 Drilling/ Blasting No drill and blasting proposed for this mining project. 12 Mining method Opencast, semi mechanized method. 13 Ground water table No ground water pollution will be there as intersection the rock or waste/soil dump of this deposit does not contain any harmful ingredients, which could leach down to the water table that is much below the lowest quarrying bench level. 14 Drainage pattern/ water Drainage is controlled by small gullies courses formed due to running rain water along the slope, these gullies area joining the seasonal nallah of the area. 15 Break-up of Land Utilization Total area is 3.70 Ha. Pattern This Govt. Revenue land. Area under excavation is – 1.110 ha 2 | Page PREFEASIBILITY REPORT OF KUCHNUR CORUNDUM MINE, AREA: 3.70 HA 16 Water requirement & Source As much as about 6 KL/D water will be required for quarrying operations including dust suppression along haul road / mine faces, cleaning, washing, drinking as well as plantation. Domestic – 2 KL/D Plantation – 1.5 KL/D Sprinkling – 2.5 KL/D during dry seasons. 17 Solid waste/Tailings Only about 5% waste materials will be generated. This material is nothing but crushed and broken pieces of Corundum. 18 Mining Plan Approval : Date B IJ ( B ST)/CORND/MPLN – 638/NGP Dated – 17/01/2011 19 Cost of project The project is existing one therefore don’t (Rs. Lakhs] require any investment. 20 Any Other (specify) Not applicable Name and address of the Kuchnur Corundum Mine, Village - company Kuchnur, Tahsil - Bhopalpatnam, District - Bijapur, Chhattisgarh Main office Chhattisgarh Mineral Development Corporation Ltd. Address: Sona Khan Bhawan, 2nd Floor, Ring Road No.1, Purena. Post – Ravi Gram, District- Raipur, Chhattisgarh Email [email protected] Prospecting Agency Prospecting is not required as the area is less than 5 ha. Type of Activity Opencast semi mechanized quarry Utilities (Power, water No water required, no power required for Requirement) quarry activity Manpower Requirement Mines Manager 1, Part Time Mining Engineer 1, Mining Mate 2, Supervisor 2, Skilled labor 3, Un-Skilled labor 25, 2. INTRODUCTION OF THE PROJECT / BACKGROUND INFORMATION (i) Identification of Project and Project Proponent. Name of the Project: Kuchnur Corundum Mine, Village - Kuchnur, Tehsi l- Bhopalpatnam, District – Bijapur, Chhattisgarh. 3 | Page PREFEASIBILITY REPORT OF KUCHNUR CORUNDUM MINE, AREA: 3.70 HA Project Proponent Proponent of the project is Chhattisgarh Mineral Development Corporation Ltd., Address: Sona Khan Bhawan, 2nd Floor, Ring Road No.1, Purena, Post – Ravi Gram, District – Raipur, Chhattisgarh. (ii) Brief Description of Nature of the Project. The proposed project is an opencast Corundum deposit and is classified as “Category- B2” by Ministry of Environment, Forest and Climate Change, New Delhi. (iii) Need for the Project and its importance to the country and or region, Corundum a naturally crystallized oxide of aluminium (Al2O3) is next to diamond in hardness. It is largely used in the manufacture of abrasive material. It is also used in a sintered form in the manufacture of special refractory crucibles. On the basis of use the management is mining the corundum is of two grades. Grade-l:- This is semi-precious pink corundum based on visual appearance and ability to take polish. The size of the semi-precious pebbles ranges from 0.6 to 3 cm. Grade-2:- The industrial variety for use as abrasive and refractory material & for manufacturing various abrasives such as grinding wheels, papers, cloth, mortar, wire-drawing and grinding powder. Because of its melting point it finds use for manufacturing special refractories such as spark plug and crucibles. The mineral will be marketed alter grinding to different mesh sizes for use as abrasive. Corundum produced will be dispatched to the abrasive factory. The mineral from pits is washed to remove adhering soil and pieces are picked out. The produce is graded into semi- precious and industrial varieties baized on visual appearance and ability to take polish. The size of the semi-precious pebbles ranges from 0.6mm to 30mm. The semi-precious material is sold to Ratna 4 | Page PREFEASIBILITY REPORT OF KUCHNUR CORUNDUM MINE, AREA: 3.70 HA Parishkar Kendra (Khadigram Udyog Parishad) and other craft centers located at Jagadalpur. The industrial variety is supplied to various local parties. (iv) Demand Supply Gap The demand of Corundum is huge. The raw Corundum also has market to be used It is also used in a sintered form in the manufacture of special refractory crucibles. To fill up the demand, the Corundum mined out from the quarry lease area will be supplied in the open market in raw form. (v) Demand Supply Analysis In order to have the great demand for Corundum the supply is limited. To fulfill the demand of market the mined out Corundum will be supplied in the market. (vi) Employment Generation (Direct and Indirect) Due to the Project. Un-Skilled labor 25, Skilled labor 3 are employed for loading the mined out Corundum on trucks etc and Mining Mate 1 and Mining Engineer 1 are employed for supervision purpose; maintain the record of production and shipment etc. 3. PROJECT DESCRIPTION 3.1 TOPOGRAPHY The area for which Mining Plan is being prepared is located in the. jurisdiction of village - Kuchnur, District - Bijapur ( Old district Dantewada ) of Chhattisgarh. The lease area is located in Survey of India topo-sheet no.- 65 B/5 between the longitude and latitude of 80° 24' 38.4" E to 80° 24' 47.0" E and 18° 52' 11.0" N to 18° 52' 21.4" N. The general height of the area is around 137 meters from the above MSL and the highest elevation of the proposed mining lease area is 141 meters above from MSL in north and the lowest elevation is measured 137 meters above from MSL in south of the area. The proposed mining area is a forest land of Chhattisgarh Govt. having forest density less than 0.3 % and covered with alluvial soil, weathered gneiss rock bearing corundum crystals, under lined by hard granite rock etc. The thickness of alluvial soil in the proposed mining lease varying from 0 to 5 meters. And found in a small part of the of the proposed mining lease area. 5 | Page PREFEASIBILITY REPORT OF KUCHNUR CORUNDUM MINE, AREA: 3.70 HA About 50 nos. of tendu trees found in proposed mining lease area and will not to be cut during mining operation. The applied area is about 1 kms. North West of the nearest village Kuchnur. The main sources of drinking water is dug wells and bore wells. The ground water table is about 20 meters below the general ground level. The lease area is reserve forest land of Chhattisgarh Govt. Surrounding forest land also belongs to the Forest department of Chhattisgarh Govt. The agricultural land of local villagers are far away and grow paddy, gram and some local crops Kodo, Kutki, Kosra, Mandiya etc. depending on the rain water only. Mango, Mahua, Tendu, Bija, Bargad and teak trees are seen extensively in the regional scale. Indravati River is the main river of the area flowing at a distance of 7 kms.
Recommended publications
  • Chief Engineers of At{ States/ Uts Pubtic Works Subject: Stand
    p&M n No. NH- 1501 7 / 33 t2A19 - lllnt r Govennment of India $ Ministry of Road Transport & Highways (Ptanning Zone) Transport Bhawan, 1, Partiarnent street, I.{ew Dethi - 110001 Dated the 16th August, 2019 To 1. The PrincipaL secretaries/ secretaries of atl states/ UTs Pubtic Works Departments dealing with National Highways, other centratty Sponsored Schemes & State Schemes 2. Engineers-in-Chief/ The Chief Engineers of at{ States/ UTs pubtic works Departments deating with National Highways, Other Centpatty Sponsored Schemes 3. The Chairman, Nationa[ Highways Authority of India (NHAI), G-5&6, Sector-10, Dwarka, New Dethi- 1rc075 4. The Managing Director, NHIDCL, 3'd Floor, PTI Buitding, 4-parliament Street, New Dethi - 110001 5. Director General (Border Roads), Seema Sadak Bhawan, 4- partiament Street, New Dethi - 1 10001 6. Att CE ROs / SE ROs Subject: Standard Operating Procedure for installation of kilometer stone as per rationalization in the numbering system of NHs and thereby renumbered NHs- Reg. Sir/ Madam, Ptease find enctosed herewith the Standard Operating Procedure for installation of kilometer stone as per rationalization in the numbering system of NHs and thereby renumbered NHs. State wise sanction ceiting is enclosed at Enclosure-;. is 2' lt requested to bring these to the notice of att concerned for comptiance with immediate effect and untiI further orders. 3- This issues with the concurrence of the Finance wing vide u.o. No. 356/TF-ll, dated 25 and approvat of the competent Authority. rs faithfulty, (5.P. Choudhary) Under Secretary to the rnment of India Tet. No. 01 1-23n9A28 f,nctosure: As above Page 1 of 57 c:\users\Hemont Dfiawan\ Desktop\Finat_sop_NH_km*stone*new_l.JH_ l6.0g.2019.doc - No.
    [Show full text]
  • PROJECT INFORMATION DOSSIER E-Auction of Plots at Neopolis & Golden Mile Layouts by Hyderabad Metropolitan Development Authority
    PROJECT INFORMATION DOSSIER e-auction of plots at Neopolis & Golden Mile layouts by Hyderabad Metropolitan Development Authority auctions.hmda.gov.in June 2021 INTRODUCTION & CONTACT DETAILS ▪ Hyderabad Metropolitan Development Authority (HMDA) is in possession of 7 plots admeasuring over an area of approx. 48.27 acres located at Kokapet and a single plot admeasuring 1.65 acres at Golden Mile Layout, Hyderabad. ▪ HMDA wishes to auction 7 plots in Kokapet layout & 1 plot in Golden Mile layout to prospective investors via an e-auction process through MSTC portal on 15th July 2021 ▪ CBRE South Asia Pvt Ltd. has been appointed by the HMDA as Marketing Consultants for undertaking extensive reach out to interested parties viz., Developers, Investors, HNIs, Corporates, Funds etc., ▪ This information memorandum provides preliminary information to assist interested parties with their assessment of the afore mentioned plots ▪ This information memorandum is produced as a general guide only and does not constitute any valuation advice or an offer for sale or purchase. All parties should undertake and rely on their own independent due diligence investigations and not rely on the information contained in this document to make their investment decisions KEY CONTACTS Hyderabad Metropolitan Development Authority MSTC Limited Marketing Consultants (CBRE) B. Harinath Reddy Vaibhav Jakhodia Renu Purushottam Chief Information Officer – HMDA Senior Associate Director – Consulting & Valuation Advisory Additional General Manager – MSTC Limited, Hyderabad Services Mobile : +91 – 70935 32828 Mobile : +91 – 88844 06412 Email : [email protected] ; Mobile : +91 – 99532 69688 Email : [email protected] [email protected] Email : [email protected] Sai Dutt K.
    [Show full text]
  • Chhattisgarh 24X7 Connected Chhattisgarh
    CHHATTISGARH 24X7 CONNECTED CHHATTISGARH Uttar Pradesh Bihar Jharkhand Madhya Pradesh CHHATTISGARH Maharashtra Odisha Telangana Andhra Pradesh The State of Chhattisgarh has seen rapid progress in road infrastructure development since 2014. A total of Rs. 9,070.02 Cr has been awarded for road works spanning 1,690.92 km in the State in the past four years. The length of National Highways in Chhattisgarh has reached 3,508.4 km in 2018. Construction and upgrading of National Highways and bridges is paving the way for socio-economic progress at a new pace, that is reaching each and every corner of the State, connecting backward areas and creating new opportunities for the people. “When a network of good roads is created, the economy of the country also picks up pace. Roads are veins and arteries of the nation, which help to transform the pace of development and ensure that prosperity reaches the farthest corners of our nation.” NARENDRA MODI Prime Minister “In the past four years, we have expanded the length of Indian National Highways network to 1,26,350 km. The highway sector in the country has seen a 20% growth between 2014 and 2018. Tourist destinations have come closer. Border, tribal and backward areas are being connected seamlessly. Multimodal integration through road, rail and port connectivity is creating socio economic growth and new opportunities for the people. In the coming years, we have planned projects with investments worth over Rs 6 lakh crore, to further expand the world’s second largest road network.” NITIN GADKARI Union
    [Show full text]
  • Bijapur District, Chhattisgarh 2012-13
    For Official use GOVERNMENT OF INDIA MINISTRY OF WATER RESOURCES CENTRAL GROUND WATER BOARD GROUND WATER BROCHURE OF BIJAPUR DISTRICT, CHHATTISGARH 2012-13 Bhairamgarh Bhopalpatanam Bijapur Usoor Regional Director North Central Chhattisgarh Region, Reena Apartment, IInd Floor, NH-43, Pachpedi Naka, Raipur-492001 (C.G.) Ph. No. 0771-2413903, 2413689 E-mail: rdnccr- [email protected] GROUND WATER BROCHURE OF BIJAPUR DISTRICT DISTRICT AT A GLANCE I. General Information: 1. Location :Long (East): 80°14’48” to 81°14’01” : Lat (North): 18°08’20” to 19°24’16” 2. Geographical area : 6552.96 sq.km. 3. Community Development blocks :04no. 4. Villages :738 no 5. Population : 255180 (As per Census 2011) 6. Average annual rainfall(2004) :1450 mm 7. Major physiographic unit :Bastar plateau 8. River Basins and major drainage :Godavari Basin :Major rivers and streams Indravati,Sabri,Dantewadaetc 8. Forest area :4956.64 sq.km ( Nearly 75.6% of geographical area) II. Major Soils 1. Alfisols :Red sandy soils :Red loamy soils III. Principal crops (2005-06) Crop seasons :Two (Kharif and Rabi) 1. Rice :3064ha 2. Pulses :20 ha 3. Wheat :20 ha IV. Irrigation (2004-05) 1. Net sown area :64854 ha 2. Gross irrigated area :3164 ha a) By dug wells :82 no. (60 ha) b) By tube wells :25 no.s (50 ha) c) By tanks/ponds :446 no.s (3025ha) d) By canals : e) By other sources :76 ha V. Geology : Bastar Gneisses& Bengpal Group and Pakhal group (Granite gneiss, Quartzite & Calc-Silicate rocks metasediments Sandstone,Shale and limesstone ) 1 VI. Hydrogeology Water bearing formations :Major formations are porous , fractured& weathered Sandstones, Granite gneisses, etc.
    [Show full text]
  • Paper Title (Use Style: Paper Title)
    Scientific Journal of Impact Factor(SJIF): 3.134 e-ISSN(O): 2348-4470 p-ISSN(P): 2348-6406 International Journal of Advance Engineering and Research Development Volume 2,Issue 9, September -2015 IDENTIFICATION OF VEHICULAR GROWTH AND ITS MANAGEMENT ON NH-202 IN RANGA REDDY DISTRICT Khaja Ahemed1 ,V.Ranjith kumar2 ,Eshrak3 1Research Scholar (M.Tech, T.E), Malla Reddy Engineering College,(Autonomous) Kompally 2 Assistant professor, Malla Reddy Engineering College,(Autonomous) Kompally 3Assistant professor, Malla Reddy Engineering College,(Autonomous) Kompally Abstract — In this paper, a brief practical review is presented on the statistical evidence showing the existing pavement and traffic conditions for extra widening and conversion of lanes and to identify the traffic growth statistics at particular stretches for management of the roads according to the vehicular growths and its management for the essential of future traffic estimation Hence Detailed traffic surveys have been carried out to assess the baseline traffic characteristics on the project road and other major corridors like NH-202, SH-3, SH-17 and SH-9, which come under project influence area. All the data are characterized by a high degree of goods and Passenger vehicular traffic and the analysis of traffic survey data was done for the Identification of Vehicular Growth and Its Management on NH-202 in Ranga Reddy District Keywords—Identification, traffic growth, ranga reddy, NH-202, vehicular growth. I. INTRODUCTION National Highway 202 (NH 202) is a National Highway in India that links Hyderabad in Telangana and Bhopalpatnam in Chhattisgarh. The road till Warangal was already a state highway. It was extended and upgraded to a NH as the shortest route to connect Chhattisgarh to an important city.
    [Show full text]
  • INDIA, SECOND QUARTER 2017: Update on Incidents According to the Armed Conflict Location & Event Data Project (ACLED) Compiled by ACCORD, 19 September 2017
    INDIA, SECOND QUARTER 2017: Update on incidents according to the Armed Conflict Location & Event Data Project (ACLED) compiled by ACCORD, 19 September 2017 National borders: GADM, November 2015a; administrative divisions: GADM, November 2015b; Bhutan/China border status: CIA, 2012; China/India border status: CIA, 2006; Kashmir border status: CIA, 2004; geodata of disputed borders: GADM, November 2015a; Natural Earth, undated; incident data: ACLED, August 2017; coastlines and inland waters: Smith and Wessel, 1 May 2015 Development of conflict incidents from June 2015 to Conflict incidents by category June 2017 category number of incidents sum of fatalities riots/protests 2555 45 battle 205 215 violence against civilians 141 75 remote violence 29 9 strategic developments 16 0 total 2946 344 This table is based on data from the Armed Conflict Location & Event Data Project This graph is based on data from the Armed Conflict Location & Event (datasets used: ACLED, August 2017). Data Project (datasets used: ACLED, February 2017; ACLED, April 2016, and ACLED, August 2017). INDIA, SECOND QUARTER 2017: UPDATE ON INCIDENTS ACCORDING TO THE ARMED CONFLICT LOCATION & EVENT DATA PROJECT (ACLED) COMPILED BY ACCORD, 19 SEPTEMBER 2017 LOCALIZATION OF CONFLICT INCIDENTS Note: The following list is an overview of the incident data included in the ACLED dataset. More details are available in the actual dataset (date, location data, event type, involved actors, information sources, etc.). In the following list, the names of event locations are taken from ACLED, while the administrative region names are taken from GADM data which serves as the basis for the map above. Data on incidents on the Siachen Glacier are not included in this overview.
    [Show full text]
  • 871082021.Pdf
    uoEcj&fnlEcj] 2020 lh-vkj-ih-,Q- lekpkj eq[; laj{kd% bl vad esa MkW- ,-ih- ekgs'ojh] Hkk-iq-ls- egkfuns'kd laikndh; lykgdkj e.My vè;{k% fjiksVZl Jh va'kqeku ;kno] Hkk-iq-ls- 1. dsUnzh; fjtoZ iqfyl cy ds 80000 dkfeZdksa }kjk 2 egkfujh{kd ¼vklwpuk½ jk"Vªh; vaxnku fnol ij vaxnku dh 'kiFk 2. CRPF joins hands with Haryana 3 lnL;% Government for massive plantation Jh lqËkka'kq flag] mi egkfujh{kd Jh nyhi flag vEcs'k] mi egkfujh{kd 3. CRPF establishes world class centre for its Divyang Warriors 4 Jh jktdqekj] dek.MsUV 4. laln geys dh cjlh ij ekuuh; yksd lHkk v/;{k] Jh vkse fcjyk 6 Jh lehj dqekj JhokLro] dek.MsUV us fd;k lhvkjih,Q ;ks)kvksa dh 'kkS;Z xkFkkvksa ds ladyu dk foekspu Jh iky flag f'koky] dek.MsUV 5. ARMA 7 eq[; laiknd % vkfVZdy Jh fçal Hkkj}kt] lgk- dek- 6. o"kkZ ty lap;u % if'peh lsDVj 8 ¼tu laidZ vfèkdkjh½ & lat; vk- ykBdj] Hkk-iq-ls- egkfujh{kd] if'peh lsDVj laiknd % 7. Innovation in Training : Few Perspectives 13 Jh ijost+ vkye] lgk- dek- ¼jk-Hkk-½ - Sh. R. Jay Kumar, Comdt, CRPF Acdy & Sh. Parveen Kumar, DC CRPF Acdy laikndh; lgk;rk % 8. “Kashmir Scenario” - Firoz Ali, Dy. Comdt., RTC, CRPF, RAJGIR 18 ftrsUæ dqekj ¼m-fu-@vk'kqfyfid½ 9. Tribute on Raising Day 20 jkts'k dqekj ¼l-m-fu-@ea-½ - Smt. Lavanya Manoj w/o HC/GD Manoj K, RTC PGM 10. vej toku] cfynku 21 fp=% & goñ x.kir yky mn;] 77 cVkñ psUubZ ¼rfeyukMw½ tu laidZ QksVks lsy] egkfuns'kky; 11.
    [Show full text]
  • The National Highways Act, 1956 ___Arrangement Of
    THE NATIONAL HIGHWAYS ACT, 1956 ________ ARRANGEMENT OF SECTIONS ________ SECTIONS 1. Short title, extent and commencement. 2. Declaration of certain highways to be national highways. 3. Definitions. 3A. Power to acquire land, etc. 3B. Power to enter for survey, etc. 3C. Hearing of objections. 3D. Declaration of acquisition. 3E. Power to take possession. 3F. Right to enter into the land where land has vested in the Central Government. 3G. Determination of amount payable as compensation. 3H. Deposit and payment of amount. 3-I. Competent authority to have certain powers of civil court. 3J. Land Acquisition Act 1 of 1894 not to apply. 4. National highways to vest in the Union. 5. Responsibility for development and maintenance of national highways. 6. Power to issue directions. 7. Fees for services or benefits rendered on national highways. 8. [Omitted.]. 8A. Power of Central Government to enter into agreements for development and maintenance of national highways. 8B. Punishment for mischief by injury to national highway. 9. Power to make rules. 10. Laying of notifications, rules, etc., before Parliament. THE SCHEDULE. 1 THE NATIONAL HIGHWAYS ACT, 1956 ACT NO. 48 OF 1956 [11th September, 1956.] An Act to provide for the declaration of certain highways to be national highways and for matters connected therewith. BE it enacted by Parliament in the Seventh Year of the Republic of India as follows:-- 1. Short title, extent and commencement.—(1) This Act may be called the National Highways Act, 1956. (2) It extends to the whole of India. (3) It shall come into force on such date1 as the Central Government may, by notification in the Official Gazette, appoint.
    [Show full text]
  • Traffic Control Management for Connectivity Roads from Hyderabad to Warangal High Way (NH163)
    ISSN(Online): 2319-8753 ISSN (Print): 2347-6710 International Journal of Innovative Research in Science, Engineering and Technology (A High Impact Factor, Monthly, Peer Reviewed Journal) Visit: www.ijirset.com Vol. 7, Issue 11, November 2018 Traffic Control Management for Connectivity Roads from Hyderabad to Warangal High Way (NH163) Porika Vikasraj, B KALPANA M.Tech, Department of Transportation, Arjun College of Technology & Sciences, Mount Opera Premises, Batasingaram (V), (M), Hayathnagar, Hyderabad, Telangana, India Assistant Professor, Arjun College of Technology & Sciences, Mount Opera Premises, Batasingaram (V), (M), Hayathnagar, Hyderabad, Telangana, India ABSTRACT: Due to the ever increasing need for transportation, there will be increasingly automobile overloads except if some sweeping measures are taken. There are numerous conceivable approaches to diminish blockage, (for example, constructing new streets, new evaluating strategies, move of transport from street to prepare or send, et cetera). In any case, since activity blockage is a squeezing issue that seriously affects both the economy and nature, there unquestionably is a requirement for measures that can be executed on the here and now. In this paper we talk about from a frameworks and control perspective a portion of the techniques that can be utilized to decrease activity clog issues. We will center around Warangal high way (NH 164) and ring streets First we quickly examine the Automated Highway Systems (AHS) structure, which prompts a decrease of activity clog and to a superior utilization of the accessible limit of the transportation organize. Be that as it may, a few impediments still must be defeated before AHS can be executed on an expansive scale.
    [Show full text]
  • District Census Handbook, Bastar
    CENSUS OF INDIA, 1961 MADHYA PRADESH DISTRICT CENSUS HANDBOOK BASTAR . DISTRICT "G. ~.AGATHPATHI OF THE INblAH ADMl.NISTRATIVE SERVICE SUPBRINTEND1!£NT OF CENSUS OPERATIONS. MADHYA P·RADESH PUBLISHED BY THE GOVERNMENT OF MADHYA PRADESH 1964 -, 1961 OENSUS PUBLICATIONS, MADHYA PRADESH (All the Census Publication, of this State will bear Volume No. VIII) PART I General Report including Subsidiary Tables. (in Sub-Parts) PART II-A Genera] Popu4ttion Tables PART II-B Economic Tables (in Sub-parts) PART II-C Cultural and Migration Tables (in Sub-Parts) PART III Household Economic Tables PART IV Housing and Establishment Tables (in­ (in Sub-parts) cluding Subsidiary Tables) and Report PART V Special Tables for Scheduled Castes and (in Sub-parts) Scheduled Tribes PART VI Village Survey Monographs (A Separate Su}>.. part for each Village Surveyed) PART VII Survey of Handicrafts of the State (A Separate Sub-part for each Handicraft Surveyed) PART VIII-A Administration Report - Enumeration PART VIII-B Administration Report-Tabulation PART IX Maps STATE PUBLICATIONS DISTRICT CENSUS: HAND BOOKS District Census Hand·books for each of the 43 Districts in Madhya Pradesh PRE F'.A CE The publication of District Census Hand-books, which was begun in the 1951 Census, represents a significant step in the process of making census statistics available Jor the smaller territoria~ units basic to executive and developmental administration. Apart from the fact that the proper implementation of policy depends o~ the ability of the ft,dministrative authorities concerned to quantify a&curately Ifhe yariables involved, it ~s at these levels that policies get really thoroughly tested; also, policies can fail-and probably have failed-because their statistical baSis was weak.
    [Show full text]
  • Bijapur S D T T
    .. T R U R I n H d P D INDIA . r a . R I v R ti a S a t A a B r v i R N T CHHATTISGARH r a . d a u A R P G A I S C DISTRICT BIJAPUR S D T T A KILOMETRES I Y R S . 4 2 0 4 8 12 16 drava ti R T In A K R o TAHSIL BHAIRAMGARH(PART) A ke r I R. C R A DISTRICT BIJAPUR R D I S T T R CHANGE IN JURISDICTION T I A 2001-2011 N A H C D T DISTRICT BIJAPUR A S R ORCHHA TAHSIL (PART) Da W 4 20 4 8Km ri R A M G A R H A B l v T A H S I L B H A I (PARTLY) ag u E A B H A I R A M G R A R H C . D . B L O C K S T A BHAIRAMGARH T A ! To Geedam E G H A R 3 N 6 R H DISTRICT BIJAPUR N A . A R A i M t T A H S I L a w a D r B H O P A L P A T T N A M n I DISTRICT DAKSHIN BASTAR A H DANTEWADA A BHOPALPATTANAM ! N R G T A H S I L B I J A P U R G R D H G N H H B I J A P U R C .
    [Show full text]
  • District Survey Report Bijapur
    MINERAL RESOURCE DEPARTMENT DIRECTORATE OF GEOLOGY AND MINING CHHATTISGARH DISTRICT SURVEY REPORT BIJAPUR P a g e | 1 INTRODUCTION Bijapur district is one of the Twenty Seven districts of Chhattisgarh State and Bijapur town is the administrative headquarters of this district. It was earlier part of Dantewada District. The Bijapur district occupies the southernmost part of Chhattisgarh state. The district is bound on north by Narayanpur district, on north east by Bastar district, on east by Dantewada district, on southeast by Sukma district of Chhattisgarh state, on south by Telangana state and on west by Maharashtra state. The total area of the district is approximately 6562.48 km2. The four block divisions are Bijapur, Bairamgarh, Bhopalpatnam and Usoor. Most part of the district consists of hills. The loftiest peak of the district is Bailadila or the "Bullock's Hump". It is situated to the south of the Indrawati River and tilts towards north-south. The district is rich in forest. Nearest airport is at Raipur and railway station is at Dantewada. The National Highway that passes Bijapur town is the NH16.By road, Bijapur is linked with Dantewada, Raipur and Vishakhapatnam. It's headquarter is situated at Bijapur which is approximately 90 KMs south from the District Dantewada. River Indrawati the main geographical feature of the district, flows across the southern limit of it with a tortuous course. The District is famous for its rich wildlife as it has very thick cover of forest. Bhairamgarh and Pamed two Wildlife Sanctuary (BWS) is Geographically situated in Bijapur. It is the home for different species of plants, trees, birds and wild animals.
    [Show full text]