Jsd/Not/12477/3 28 Jul

Total Page:16

File Type:pdf, Size:1020Kb

Jsd/Not/12477/3 28 Jul JOINT PROJECT (JP) 9102 AUSTRALIAN DEFENCE SATELLITE COMMUNICATIONS SYSTEM JSD/NOT/12477/3 28 JUL - Notice - Capability Acquisition and Sustainment Group This notice provides updated information regarding the Joint Project (JP) 9102 (Project) in respect of the proposed Industry Briefing (and one-on-one discussions with potential prime contractors), which was planned to be held on 2 April 2020, in conjunction with the timing of the 36th Space Symposium (30 March – 2 April 2020) in Colorado Springs, Colorado, USA. With the recent postponement of the Space Symposium and as a result of travel restrictions relating to the Coronavirus/COVID-19 pandemic the Industry Briefing is cancelled. The Project intends to reschedule the Industry Briefing (and one-on-one discussions with potential prime contractors) at a suitable opportunity. Closing Date: 3:00 PM Tuesday 28 July 2020 Enquiries: Project Director JP9102, Email: [email protected] Copies of Notice: www.tenders.gov.au COUNTER IMPROVISED THREAT GRAND CHALLENGE PHASE 2: INTEGRATION CIT - GC PH2 20 APR - Request for Proposal - Defence Support and Reform Group The Counter Improvised Threat Grand Challenge (CIT - GC) of the Next Generation Technologies Fund is entering a Phase 2 challenge aimed at realising leap ahead technologies for Countering Improvised Threats by research, engineering and development in Australia. The improvised threats facing Australia and our coalition partners have a number of features that range in complexity and can now operate in all environments (under or on the surface of sea, beneath and on land and in the air). Threat actors who design and manufacture improvised threats can exploit available technologies or create specific, purpose developed technologies for control, deployment, initiation and kinetic effect. The improvised threat is dynamic, and is evolving rapidly to improve performance or in response to countermeasures. These features dictate that a next generation Counter Improvised Threat system must in turn be able to detect a wide range of threats and then match and employ suitable effectors under appropriate response control systems. A Counter Improvised Threat system needs to be agile and capable of fast evolution. The Grand Challenge is to demonstrate an integrated system that can detect and neutralise improvised threats on a complex joint battlespace with minimal risk to Defence personnel and civilians. Closing Date: 2:00 PM Monday 20 April 2020 Enquiries: NGTF Theme Leader - CIT-GC, Tel: (08) 7389 5424, Email: WCSD-PLCIT@dst. defence.gov.au Copies of RFP: www.tenders.gov.au DW 579 • 19 March 2020 | PAGE 1 ADM'S Defence Week Edition - This publication is copyright and may not be reproduced in whole or part without the permission of the publisher This information is subject to change and should be verified on the relevant tender website BUILDING WORKS - BLAMEY BARRACKS NSW EST03336 24 APR - Request for Tender - Medium Works Contract (EWP MEWC -1 2014) - Project No: EST03336 The Department of Defence is seeking tenders from suitably qualified contractors for a project that involves construction of new toilet facilities in the Field Training Area and demolition of redundant structures at various locations at Blamey Barracks NSW. Industry Briefing: An Industry Briefing will be held at Blamey Barracks, Camp Road, Kapooka NSW from 10:00 AM to 12:30 PM on Thursday 2 April 2020. Tenderers must contact the Enquiries Officer by 5:00 PM on Tuesday 31 March 2020 if wishing to attend. Works to be completed within 14 weeks of contract execution. The preferred contractor will be employed under the Medium Works Contract (Construct only). Closing Date: 12:00 PM Friday 24 April 2020 Enquiries: Bruce Sheridan, Tel: (03) 9672 6666, Email: [email protected] Copies of RFT: www.tenders.gov.au TRAINING FACILITY, STORAGE AND SITE REMEDIATION - PUCKAPUNYAL VIC EST03626 30 APR - Request for Tender - Medium Works Contract (EWP MEWC -1 2014) - Project No: EST03626 The Department of Defence is seeking tenders from suitably qualified contractors for a project that involves the construction of a new grenade training facility including road, building and fencing work, and a new explosive waste management storage, and demolition of existing grenade training facility including environmental remediation in Puckapunyal range. Industry Briefing: An Industry Briefing will be held at Puckapunyal Military Area Vic from 11:00 AM to 2:00 PM on Wednesday 15 April 2020. Tenderers must contact the Enquiries Officer by 5:00 PM on Friday 10 April 2020 if wishing to attend. The preferred contractor will be employed under the Medium Works Contract (Construct only). Closing Date: 12:00 PM Thursday 30 April 2020 Enquiries: John Hendrawan, Tel: (03) 9672 6666, Email: [email protected] Copies of RFT: www.tenders.gov.au NATIONAL AIRCRAFT PAVEMENT MAINTENANCE PROGRAM 2020 -2026 - REQUEST FOR TENDER - MEDIUM WORKS CONTRACTS AZ 6246 7 MAY - Request for Tender - Defence Support and Reform Group The Department of Defence is seeking tenders from suitably experienced entities to undertake the role of Contractor for routine (mainly annual or biennial) Aircraft Pavement Maintenance Works at Defence's 28 sealed airfields. The routine scope of works performed under this contract are large quantities of minor pavement maintenance tasks such as asphalt patching, concrete slab repairs, DW 579 • 19 March 2020 | PAGE 2 ADM'S Defence Week Edition - This publication is copyright and may not be reproduced in whole or part without the permission of the publisher This information is subject to change and should be verified on the relevant tender website joint sealing, asphalt surface treatments and occasional larger airfield maintenance tasks. The National Aircraft Pavement Maintenance Program will be tendered in four discrete geographical construction packages as follows with Tenderers able to elect to tender for one or more packages: • Construction Package 1 (QLD): RAAF Base Amberley, AAC Oakey, Samuel Hill Airfield, RAAF Base Scherger, RAAF Base Townsville, Williamson Airfield and Wyoming Airfield; • Construction Package 2 (NSW/VIC): HMAS Albatross (Nowra Airfield), RAAF Base East Sale, Holsworthy Luscombe Airfield, Jervis Bay Airfield, Puckapunyal Airfield, RAAF Base Richmond, RAAF Base Wagga Wagga, RAAF Base Williamtown and RAAF Williams(Point Cook); • Construction Package 3 (NT/SA): RAAF Base Darwin, RAAF Base Edinburgh, Mount Bundey Airfield, Robertson Barracks, RAAF Base Tindal and RAAF Base Woomera; • Construction Package 4 (WA): Bindoon Airfield, RAAF Base Curtin, RAAF Base Gin Gin, RAAF Base Learmonth, RAAF Base Pearce and HMAS Stirling. Each construction package will be contracted for a period of three (3) years with additional works continuing for a possible further three (3) years (up to six [6] years in total) at the absolute discretion of Defence. Industry Briefing: An Industry Briefing will be held in Canberra ACT on Wednesday 8 April 2020. Estimated Value: From $5,000,000 to $30,000,000 Closing Date: 12:00 PM Thursday 7 May 2020 Enquiries: Glen Heyward (Aurecon Group), Tel: (07) 3173 8000, Fax: (07) 3173 8001, Email: bne. [email protected] Copies of RFT: www.tenders.gov.au LIVE IN ACCOMMODATION BUILDING REFURBISHMENT - LATCHFORD BARRACKS, BONEGILLA VIC EST03902 20 MAR Ext. From 16 Mar - Request for Tender - Medium Works Contract (EWP MEWC -1 2014) - Project No: EST03902 The Department of Defence is seeking tenders from suitably qualified contractors for a project that involves the refurbishment and remediation of 14 accommodation buildings across Latchford Barracks, Bonegilla Vic. The works include carpet replacement, curtain replacement, installation of tamper-proof self-closers to doors, installation of padlock style locking to wardrobes, internal paint and external paint to buildings. In addition to the above, one building also requires replacement of shower doors to ablution in the building. Industry Briefing: An Industry Briefing will be held at Gaza Ridge Barracks (Main Entrance Visitors Carpark), Murray Valley Highway, North Bandiana Vic from 10:00 AM to 12:30 PM on Tuesday 25 February 2020. Tenderers must contact the Enquiries Officer by 5:00 PM on Monday 17 February 2020 if wishing to attend. Works to be completed within 40 weeks of contract execution. The preferred contractor will be employed under the Medium Works Contract (Construct only). DW 579 • 19 March 2020 | PAGE 3 ADM'S Defence Week Edition - This publication is copyright and may not be reproduced in whole or part without the permission of the publisher This information is subject to change and should be verified on the relevant tender website Closing Date: 12:00 PM Friday 20 March 2020 Enquiries: Kristine Dennis, Tel: (02) 6274 0729, Email: [email protected] Copies of RFT: www.tenders.gov.au LAND 154 PHASE 4 - PERSONAL FORCE PROTECTION ELECTRONIC COUNTERMEASURES RFI/JSD/9668/1 24 MAR Ext. From 17 Mar - Request for Information - Capability Acquisition and Sustainment Group Personal Force Protection Electronic Countermeasures (Personal FPECM) is a capability to protect individuals from Remote Controlled Improvised Explosive Devices (RCIEDs). Personal FPECM is part of the Land 154 Joint Counter IED Program Phase 4. The Capability Manager (Army) is seeking Personal FPECM for use by Australian Defence Force (ADF) personnel in operational areas where RCIEDs are a threat. Users for Personal FPECM may include personnel in Army, Special Forces, RAAF and Navy. The RFI is intended
Recommended publications
  • WBACC Annual Report 2013
    Wreck Bay Aboriginal Community Council Annual Report 2013 –2014 Cover image: Mary’s Bay looking towards Summercloud Bay © Commonwealth of Australia 2014 ISSN 1832-5181 The contents of this Annual Report and Statement of Accounts are protected by the provisions of the Copyright Act 1968. The document is produced solely for the purposes of reporting to its members as required by law and the report or any part of this report must not be reproduced or published without the express written permission of the Wreck Bay Aboriginal Community Council. Address: Wreck Bay Aboriginal Community Council Administration Building 5 Bunaan Close WRECK BAY JBT 2540 www.wbacc.gov.au Contact Officer: Mal Hansen, CEO Publisher: Wreck Bay Aboriginal Community Council Designer: LG2 designers Wreck Bay Aboriginal Community Council Annual Report 2013–2014 iii iv Wreck Bay Aboriginal Community Council Annual Report 2013–2014 Contents Contents v Statements vi Wreck Bay Aboriginal Community Council 1 Our Vision 1 Our Goals 1 Overview 2 Wreck Bay Aboriginal Community Council 3 Membership 3 Land Ownership/Management 7 Functions 8 Wreck Bay Village 9 Wreck Bay Community 9 Timeline 10 Wreck Bay Aboriginal Community Council 11 Board Members 16 Wreck Bay Aboriginal Community Council 17 Board Meetings 1st July 2013 to 30 June 2014 20 WBACC Report 22 Chairman’s Report 23 The year in retrospect 23 Governance 23 Community Service 25 Land Management 27 The Way Ahead 28 Chief Executive Officer’s Report 29 Funding Grants and other income 30 Contracts 30 Further Operational Activities
    [Show full text]
  • Shire of Derby/West Kimberley Local Planning Strategy Was Endorsed by the Western Australian Planning Commission in April 2013
    The Shire of Derby/West Kimberley Local Planning Strategy was endorsed by the Western Australian Planning Commission in April 2013. Disclaimer This document has been published by the Shire of Derby/West Kimberley. Any representation, statement, opinion or advice expressed or implied in this publication is made in good faith and on the basis that the Shire, its employees and agents are not liable for any damage or loss whatsoever which may occur as a result of action taken or not taken (as the case may be) in respect of any representation, statement, opinion or advice referred to herein. Professional advice should be obtained before applying the information contained in this document to particular circumstances. one introduction 1 1.1 Overview of locality 2 1.2 Elements of a Local Planning Strategy 2 1.3 Local Planning Strategy process 3 1.4 Consultation process 3 two key issues 5 three strategic plan 9 3.1 Objective of the Strategic Plan 9 3.2 Strategies and Actions – Derby 10 3.3 Strategies and Actions – Fitzroy Crossing and Fitzroy Valley 12 3.4 Strategies and Actions – Camballin and remote Aboriginal communities 12 3.5 Land for heritage, culture and the environment 13 3.6 Natural Resource Management (shire context) 14 3.7 Mining, pastoral and agricultural lands 14 3.8 Tourism 15 four implementation, monitoring and review 17 five state and regional planning context 21 5.1 State Planning Strategy 21 5.2 Liveable Neighbourhoods 22 5.3 State Planning Policies 23 5.4 Kimberley Transport Towards 2020 (1997) 25 5.5 Roads 2025 Regional Road
    [Show full text]
  • Air Force Trades Contents Introduction to the Take Your Trade Further in the Air Force
    AIR FORCE TRADES CONTENTS INTRODUCTION TO THE TAKE YOUR TRADE FURTHER IN THE AIR FORCE .................................4 QUALIFIED TRADES ...........................................................................12 AIR FORCE TRADES AIRCRAFT SPRAY PAINTER ...............................................................13 ELECTRICIAN ....................................................................................14 It may come as a surprise to you but the Air Force has a lot to offer tradies in a vast variety of jobs. Becoming FITTER & TURNER .............................................................................15 part of one of Australia’s most dynamic organisations will give you the opportunity to work on some of the TRAINEESHIPS ..................................................................................16 most advanced aircraft and sophisticated equipment available. You’ll be in an environment where you will be AIRCRAFT ARMAMENT TECHNICIAN .................................................17 challenged and have an opportunity to gain new skills, or even further the skills you already have. AERONAUTICAL LIFE SUPPORT FITTER .............................................18 AIRCRAFT TECHNICIAN .....................................................................19 AVIONICS TECHNICIAN ......................................................................20 CARPENTER ......................................................................................21 COMMUNICATION ELECTRONIC TECHNICIAN ....................................22
    [Show full text]
  • The Australian Naval Architect
    THE AUSTRALIAN NAVAL ARCHITECT Volume 22 Number 3 August 2018 HMAS Adelaide preparing to embark United States Marine Corps amphibious assault vehicles during Exercise Rim of the Pacific 18 (RIMPAC 2018), Hawaii, in July. HMAS Adelaide unexpectedly took a lead role in the amphibious phase of RIMPAC when the US Navy assault ship planned for that role suffered mechanical problems and remained in Pearl Harbour for most of the exercise. HMAS Adelaide led HMA Ships Success, Melbourne and Toowoomba across the Pacific to take part in this major exercise which involved 25 nations, 46 surface ships, five submarines, 17 land forces, and more than 200 aircraft and 25 000 personnel. This major international exercise is held every two years (RAN photograph) THE AUSTRALIAN NAVAL ARCHITECT Journal of The Royal Institution of Naval Architects (Australian Division) Volume 22 Number 3 August 2018 Cover Photo: CONTENTS An impression of BAE Systems’ Global Com- 2 From the Division President bat Ship — Australia, selected as the preferred 3 Editorial design for Australia’s new frigates 4 Letter to the Editor (Image courtesy Department of Defence) 4 Coming Events The Australian Naval Architect is published four times per 5 News from the Sections year. All correspondence and advertising copy should be 15 Classification Society News sent to: The Editor 17 From the Crows Nest The Australian Naval Architect 18 General News c/o RINA PO Box No. 462 36 The Acquisition of a Multi-role Aviation Jamison Centre, ACT 2614 Training Vessel for the Royal Australian AUSTRALIA Navy — Alex Robbins email: [email protected] 39 Upgrade or Replace: A Cost Comparison The deadline for the next edition of The Australian Na- val Architect (Vol.
    [Show full text]
  • Submission by John Donahoo
    The Secretary Senate Foreign Affairs, Defence and Trade Committee PO Box 6100 Parliament House CANBERRA ACT 2600 Sent by Email to: [email protected] CONTAMINATION OF AUSTRALIAN DEFENCE FORCE FACILITIES FROM THE USE OF FIRE FIGHTING FOAMS Attached is my submission to the Senate Foreign Affairs, Defence and Trade Committee on the above referred matter. My submission only addresses the contamination at RAAF Base Williamtown and the surrounding areas. Yours faithfully John Donahoo FIE(Aust) MEDOWIE NSW 2318 14 December 2015 Attachment: Submission by John Donahoo SUBMISSION BY JOHN DONAHOO CONTAMINATION OF RAAF BASE WILLIAMTOWN AND SURROUNDING AREAS BY AQUEOUS FILM FORMING FOAM (AFFF) Introduction If a natural disaster occurred in some faraway land that many Australians have never heard about, our Federal Government would be the first to chip in ten or twenty million dollars in relief funding. However, a situation has arisen where a Commonwealth made disaster has occurred here in our own backyard, and both our Federal and State Governments have yet to grab this problem by the throat and properly look after their own people. In the past, the Federal Government has been quick to criticise insurance companies for being slow to approve insurance claims after natural disasters. In this case, as the Commonwealth carries its own insurance, and as they are clearly liable for compensation, then they should heed their own advice and commence negotiating properly and expeditiously with all affected landowners and leaseholders. Normally a running commentary is not provided by government agencies when they are dealing with a problem. However, in this case where a very difficult problem has arisen, that is exactly what they should have done, and should be now doing.
    [Show full text]
  • AIP Australia PART 1 – GENERAL (GEN)
    AIP Australia 21 MAY 2020 GEN 0.1 - 1 PART 1 – GENERAL (GEN) GEN 0. GEN 0.1 PREFACE 1. NAME OF PUBLISHING AUTHORITY Pursuant to Air Services Regulation 4.12, the Aeronautical Information Publication (AIP) Australia is published by the Aeronautical Information Service (AIS), Airservices Australia. 2. APPLICABLE ICAO DOCUMENTS 2.1 AIP Australia is prepared in accordance with the Standards and Recommended Practices (SARPS) of the following ICAO documents: Facilitation – Annex 9 Aerodromes – Annex 14 Aeronautical Information Services – Annex 15 Aeronautical Information Services Manual (Doc 8126-AN/872) Aeronautical Charts – Annex 4 Aeronautical Chart Manual (Doc 8697-AN/889/2) 3. INTEGRATED AIP AUSTRALIA – DOCUMENTS INVOLVED 3.1 The elements of the Integrated Aeronautical Information Package include: a. Integrated AIP Australia and related amendment service; b. AIP Supplements; c. AIC; d. NOTAM and pre-flight information bulletins (PIB); and e. checklists and lists of valid NOTAM. 3.2 Integrated AIP Australia is provided through the medium of the following documents and charts: – AIP Book – En Route Supplement Australia (ERSA) – Departures and Approach Procedures (East and West) - (DAP EAST & DAP WEST) – AIP Supplement (SUP) – NOTAM 103 GEN 0.1 - 2 21 MAY 2020 AIP Australia – Aeronautical Information Circular (AIC) – Terminal Area Chart (TAC) – En Route Chart (High and Low) – (ERC-H & ERC-L) – Planning Chart Australia (PCA) – Visual Navigation Chart (VNC) – Visual Terminal Chart (VTC) – Designated Airspace Handbook – (DAH) 3.3 The primary document in the Integrated AIP Australia is the AIP Book which is supplemented by the other documents and charts. 4. LAY OUT 4.1 The AIP follows the requirements and layout recommended by the International Civil Aviation Organization (ICAO) and, in general, is structured to accord with ICAO Annex 15, Appendix 1 and Doc 8126-AN/872.
    [Show full text]
  • Legislative Council
    Legislative Council Thursday, 11 August 2011 THE PRESIDENT (Hon Barry House) took the chair at 10.00 am, and read prayers. SKILLED LOCAL JOBS BILL 2011 Petition HON MATT BENSON-LIDHOLM (Agricultural) [10.02 am]: I present a petition containing 62 signatures couched in the following terms — To the President and Members of the Legislative Council of the Parliament of Western Australia in Parliament assembled. We the undersigned residents of Western Australia say the WA Parliament should pass laws that ensure a greater share of skilled engineering and fabrication work for our major resources projects is performed in Western Australia. Our major resources projects are increasingly sending their skilled work offshore. Many of Western Australia’s fabrication workshops are almost empty and our engineers have to go overseas if they want to help design our LNG projects. Our natural resources can only be used once and we should use the current resources construction boom to provide training and apprenticeships for our young people, so that they can have a future after the boom. Your petitioners therefore respectfully request the Legislative Council to support the Skilled Local Jobs Bill 2011 with the objective of ensuring a greater share of skilled work for our major resources projects is performed in Western Australia. And your petitioners as in duty bound, will ever pray. [See paper 3587.] MANDATORY SENTENCING — MENTAL HEALTH Petition HON LINDA SAVAGE (East Metropolitan) [10.03 am]: I present a petition containing 55 signatures couched in the following terms — To the President and Members of the Legislative Council of the Parliament of Western Australia in Parliament assembled.
    [Show full text]
  • Uninhabited Systems Growing in Importance for Air Combat
    AUSTRALIAN DEFENCE IN A GLOBAL CONTEXT DEC - JAN 2021 VOL.46 NO.10 UNINHABITED SYSTEMS GROWING IN IMPORTANCE FOR AIR COMBAT SOTG INTERVIEW: INDUSTRY UPDATES IN AFGHANISTAN AND STÉPHANE MAROUANI, LAND 129 THE BRERETON REPORT MATHWORKS AUSTRALIA AND SEA 129 IAI’s Heron Family Interoperable Solution for Your Operational Needs Heron TP Heron MK II Heron Tactical Heron Our Experience - Your Winning Solution The all-in-one platform backed by over 1,800,000 operational UAS flight hours, IAI’s Heron Family features: • Multi-mission, multi-payload configuration • Long Runner capabilities: remotely-controlled landing and take-off • Advanced voice and touch activated workstation • A strong technical and logistic support + a well-established UAS academy • Full automation • Seamlessly shifts between satellites • Highest safety and reliability www.iai.co.il • [email protected] CONTENTS FEATURES Print Post Approved PP349181/00104 11 THE BRERETON REPORT – A POLITICAL PROBLEM Managing Director/Publisher The SAS has had a rogue culture for too long Marilyn Tangye Butler AUSTRALIAN DEFENCE IN A GLOBAL CONTEXT DEC - JAN 2021 Phone: +61 (0) 410 529 324 VOL.46 NO.10 Email: [email protected] 14 AIR 4503 – TIGER ARH REPLACEMENT Editor Misleading answers from the Department Kym Bergmann Phone: +61(0)412 539 106 of Defence Email: [email protected] Contributors 19 UNMANNED SYSTEMS IN THE MARITIME Vladimir Karnozov Arie Egozi DOMAIN Mark Farrer UNINHABITED Air, surface and subsea systems being trialled Mike Yeo Geoff Slocombe SYSTEMS
    [Show full text]
  • Seismic Survey
    EP 487 Meda 2016 2D Seismic Survey Environment Plan - Public Disclosure Document Prepared for Rey Lennard Shelf Pty Ltd by Strategen March 2017 Rev 3 Strategen is a trading name of Strategen Environmental Consultants Pty Ltd Level 1, 50 Subiaco Square Road Subiaco WA 6008 ACN: 056 190 419 March 2017 ! This report (“the report”) has been prepared by Strategen Environmental Consultants Pty Ltd (Strategen) in accordance with the scope of services set out in the contract, or as otherwise agreed, between the Client and Strategen. In some circumstances, a range of factors such as time, budget, access and/or site disturbance constraints may have limited the scope of services. This report is strictly limited to the matters stated in it and is not to be read as extending, by implication, to any other matter in connection with the matters addressed in it. " In preparing the report, Strategen has relied upon data and other information provided by the Client and other individuals and organisations, most of which are referred to in the report (“the data”). Except as otherwise expressly stated in the report, Strategen has not verified the accuracy or completeness of the data. To the extent that the statements, opinions, facts, information, conclusions and/or recommendations in the report (“conclusions”) are based in whole or part on the data, those conclusions are contingent upon the accuracy and completeness of the data. Strategen has also not attempted to determine whether any material matter has been omitted from the data. Strategen will not be liable in relation to incorrect conclusions should any data, information or condition be incorrect or have been concealed, withheld, misrepresented or otherwise not fully disclosed to Strategen.
    [Show full text]
  • Defence Logistics Dir 12194 27
    N2269 NULKA ACTIVE MISSILE DECOY (ADM) ASSEMBLY AND MAINTANANCE FACILITY DEFENCE LOGISTICS - Notice - Defence Support and Reform Group The Department of Defence is seeking service that include the construction of a new Nulka Active Missile Decoy (AMD) Assembly and Maintenance Facility at Defence Establishment Orchard Hills (DEOH) including all associated civil works, engineering services and underground infrastructure to meet Navy operational and support capabilities. The Request for Tender (RFT) will be Head Contractor (HC-1 2003) Document and Construct with the incumbent Design Services Consultant to be novated to the successful Head Contractor. This procurement strategy will provide Defence with the best option to ensure that the construction of the new Nulka facility is efficient and completed in a timely manner. Tenderers will be required to demonstrate their capacity and/or ability, relative experience and expertise for the construction of the facility, which include explosive ordnance storage, defence security requirements and specific ICT, to meet Defence specific and relevant regulatory standards. An Industry Briefing is tentatively planned for Friday 8 May 2020. Estimated Value: From $20,000,000 to $30,000,000 Enquiries: Tony Serra-Martins, Tel: (02) 8907 0998, Email: [email protected] Copies of Notice: www.tenders.gov.au INVESTIGATION SERVICES DIR_12194 27 APR - Request for Tender - Defence Support and Reform Group The Department of Defence is seeking tenders from suitably qualified contractors for the establishment of a Standing Offer Arrangement for the provision of Investigation Services. The Directorate of Investigations and Recoveries (DIR), part of the Audit and Fraud Control Division in Defence is responsible through the First Assistant Secretary Audit and Fraud Control (FASAFC) for meeting the Secretary of Defence’s statutory responsibilities in relation to the investigation of allegations of fraud or other suspected wrongdoing.
    [Show full text]
  • Corporate Directory 2018 – 2019 Airport Members
    CORPORATE DIRECTORY 2018 – 2019 AIRPORT MEMBERS Australian Capital Territory • Wanaaring • Maryborough • Esperance • Canberra • Warren • Miles Tasmania • Exmouth • Wyong • Millaroo • Burnie • Fitzroy Crossing New South Wales • Millmerran • Devonport • Forrest • Albury Northern Territory • Mitchell • Flinders Island • Fortescue Dave Forrest • Armidale • Alice Springs • Morven • Hobart • Geraldton • Ashford • Ayers Rock • Mount Garnet • King Island • Halls Creek • Ballina Byron Gateway • Darwin • Mount Isa • Launceston • Jandakot • Bankstown • Gove • Nanango • Kalgoorlie-Boulder • Barraba • Tennant Creek • Normanton Victoria • Karratha • Bathurst • Troughton • Pittsworth • Bacchus Marsh • Kununurra • Boomi • Truscott Mungalalu • Proserpine-Whitsunday • Bairnsdale • Laverton • Bourke Coast Airport • Ballarat • Learmonth • Broken Hill Queensland • Rockhampton • Bendigo • Leonora • Byrock • Alpha • Rolleston • Cohuna • Manjimup • Camden • Archerfield • Roma • Echuca • Marble Bar • Coffs Harbour • Atherton • Southport • Essendon • Meekatharra • Condobolin • Augathella • Springsure • Hopetoun • Mullewa • Corowa • Ayr • Stonehenge • Horsham • Newman • Deniliquin • Barcaldine • Sunshine Coast • Kerang • Nullagine • Dubbo • Barcoo • Surat • Latrobe • Onslow • Engonnia • Blackall • Tambo • Lethbridge Airpark • Paraburdoo • Fords Brid • Boonah • Tara • Mallacoota • Perth • Goolgowi • Bowen • Toowoomba • Melbourne • Port Hedland • Grafton • Brisbane • Townsville • Mildura • Roebourne • Griffith • Brisbane West Wellcamp • Weipa • Moorabbin • Solomon
    [Show full text]
  • Defence Industry Strategic Plan
    WESTERN AUSTRALIAN DEFENCE AND DEFENCE INDUSTRIES STRATEGIC PLAN CONTENTS Premier’s Foreword 1 Minister’s Foreword 2 Vision 3 1 Executive Summary 6 2 Key Actions to Date 9 3 Key Strategies 11 3.1 Supporting a Strong and Enduring Defence Presence 11 Actions 12 3.2 Growing the State’s Defence Industry Capability and Contribution 12 Actions 13-16 3.3 Developing Strategic Infrastructure 17 Actions 18 3.4 Building Research and Innovation Partnerships 19 Actions 20 3.5 Advancing Education, Training and Skilling 22 Actions 22 3.6 Supporting Veterans and Families 23 Actions 23 4 Implementation and Measuring 25 5 Appendix A - Setting the Scene 26 5.1 WA’s Competitive Advantages 26 5.2 Defence and Sovereign Interest 28 6 Appendix B - Defence and Defence Industries in Western Australia 30 6.1 Defence Industries 30 7 Glossary 32 PREMIER’S FOREWORD Western Australia has always supported Since establishing Defence West almost a our Defence Forces and significantly year ago, we have consulted widely and contributed to our nation’s Defence listened closely. That journey reinforced requirements. We can take pride in the crucial need for collaboration with the our competitive, flexible and resilient Commonwealth Government, Defence and defence industry with its long and very an industry sector that extends well beyond successful history. State borders. Our State has strong, advanced It also reinforced the privilege all manufacturing capabilities supported by Western Australians share in supporting tertiary institutions that are world class and the men and women of our Defence Force truly at the forefront of the next generation and their families.
    [Show full text]