Details of Upgradation & New Construction under NRHM taken up during 2005-2013 Sl Name of the New Const/ Up- Approved in PIP Approved Executing Block Name of the work Category Physical Status no institution gradation PIP Year amount Agency 1 Establishment of DTU at DHH DHH Up-gradation 2005-06 2.00 ITDA COMPLETED 2 Khairput New Const. Of SC Andrahal Andra hall SC New Const. 2006-07 6.00 BLOCK COMPLETED 3 Khairput New Const. Of SC Govindpally Govindpally SC New Const. 2006-07 6.00 BLOCK COMPLETED 4 K.Gumma New Const. Of SC Janbai Janbai SC New Const. 2006-07 6.00 BLOCK IN PROGRESS 5 K.Gumma New Const. Of SC Panasput Panasput SC New Const. 2006-07 6.00 BLOCK IN PROGRESS 6 mathili New Const. Of SC Ambaguda Ambaguda SC New Const. 2006-07 6.00 BLOCK COMPLETED 7 kalimela New Const. Of SC Bhejangiwada Bhejangiwada SC New Const. 2006-07 6.00 BLOCK COMPLETED 8 podia Upgradation of labour room Podia CHC podia CHC Up-gradation 2006-07 15.00 BLOCK COMPLETED 9 kalimela Up-gradation of labour room kalimela CHC Kalimela CHC Up-gradation 2006-07 20.00 BLOCK COMPLETED 10 kalimela Repair of Sub Centre at Malavaram SC Malavaram SC Up-gradation 2006-07 0.60 BLOCK COMPLETED 11 kalimela Repair of Sub Centre at MPV -29 MPV 29 sc Up-gradation 2006-07 0.60 BLOCK COMPLETED 12 kalimela Repair of Sub Centre at MV-112 Mv122 SC Up-gradation 2006-07 0.60 BLOCK COMPLETED 13 kalimela Repair of Sub Centre at MV-73 mv-73 SC Up-gradation 2006-07 0.60 BLOCK COMPLETED 14 kalimela Repair of Sub Centre at nalagunthi nalagunthi SC Up-gradation 2006-07 0.60 BLOCK COMPLETED 15 kalimela Repair of Sub Centre at venkatapallam venketa pallam SC Up-gradation 2006-07 0.60 BLOCK COMPLETED 16 kalimela Repair of Sub Centre at MPV-82 MPV-82 SC Up-gradation 2006-07 0.60 BLOCK COMPLETED 17 k.gumma Repair of Sub Centre at Somnathpure somnath SC Up-gradation 2006-07 0.60 BLOCK COMPLETED 18 Khairput Repair of Sub Centre at muduliguda Muduligda SC Up-gradation 2006-07 0.60 BLOCK COMPLETED 19 Khairput Repair of Sub Centre at khairput khairput SC Up-gradation 2006-07 0.60 BLOCK COMPLETED 20 Malkangiri Repair of Sub Centre at MV-97 mv-97 SC Up-gradation 2006-07 0.60 BLOCK COMPLETED 21 podia Repair of Sub Centre at Podia SC podia SC Up-gradation 2006-07 0.60 BLOCK COMPLETED 22 korkunda Repair of Sub Centre at Korkuda block. Korkunda SC Up-gradation 2006-07 0.60 BLOCK COMPLETED 23 korkunda Repair of Sub Centre at Korkunda block korkunda SC Up-gradation 2006-07 0.60 BLOCK COMPLETED 24 korkunda Repair of Sub Centre at korkunda block korkyunda SC Up-gradation 2006-07 0.60 BLOCK COMPLETED 25 Korukonda Up gradation mariwada Mariwada SC Up-gradation 2007-08 1.00 zss COMPLETED 26 Korukonda Up gradation mv-28 s/c MV-28 SC Up-gradation 2007-08 1.00 zss COMPLETED 27 Korukonda Up gradation mv-15 sc MV-15 SC Up-gradation 2007-08 1.00 zss COMPLETED 28 Korukonda Up gradation mv 21 sc MV-21 SC Up-gradation 2007-08 1.00 zss COMPLETED 29 Malkangiri Up gradation mv 97 MV-97 SC Up-gradation 2007-08 1.00 zss COMPLETED 30 Malkangiri Up gradation sc Pandripani SC Up-gradation 2007-08 1.00 zss COMPLETED 31 Mathili Up gradation kiang sc Kiang SC Up-gradation 2007-08 1.00 zss COMPLETED 32 Khairput Up gradation kumarput sc Kumarput SC Up-gradation 2007-08 1.00 zss COMPLETED 33 Malkangiri New Construction Satiguda SC Satiguda SC Up-gradation 2007-08 6.00 zss COMPLETED 34 Mathili New Construction Nayakguda SC Nayakguda SC Up-gradation 2007-08 6.00 zss COMPLETED 35 K.Gumma New Construction Naliguda SC Naliguda SC Up-gradation 2007-08 6.00 zss COMPLETED 36 Korukonda New Construction MV-34 MV-34 sc Up-gradation 2007-08 6.00 zss COMPLETED 37 Malkangiri Up-gradationation of DHH Malkangiri DHH Up-gradation 2007-08 20.00 PWD COMPLETED 38 kalimela Kalimela(New construction :- 2 D , OPD & ARS) kalimela chc New Const. 2007-08 56.39 OHPC COMPLETED 39 mathili Mathili( (Renovation of OT,L.R & Ward, New construction :- 2 D) mathili CHC New Const. 2007-08 64.80 OHPC COMPLETED

40 KHAirput Khairaput(New construction :- Labour room, OT, OPD, ARS & 2 D) KHAirput CHC New Const. 2007-08 87.21 OHPC COMPLETED Details of Upgradation & New Construction under NRHM taken up during 2005-2013 Sl Name of the New Const/ Up- Approved in PIP Approved Executing Block Name of the work Category Physical Status no institution gradation PIP Year amount Agency 41 Malkangiri Malkanagiri(New construction :- 2 D & OPD) Malkangiri CHC New Const. 2007-08 77.31 OHPC COMPLETED 42 Malkangiri Establishment of Data Centre at DHH Malkangiri DHH New Const. 2008-09 8.00 ZSS COMPLETED 43 korkunda New Construction of Medicine Godown Korkunda CHC Korkunda CHC New Const. 2008-09 7.00 ZSS COMPLETED 44 Malkangiri New Construction of Medicine Godown pandripani CHC Pandripani CHC New Const. 2008-09 7.00 ZSS COMPLETED 45 Khairput New Construction of Medicine Godown khairput CHC khairput CHC New Const. 2008-09 7.00 ZSS COMPLETED 46 Podia Up gradation 24X7 chc Podia podia CHC Up-gradation 2008-09 5.00 ZSS COMPLETED 47 Korukonda Up gradation 24X7 CHC Chitrakunda Korukonda CHC Up-gradation 2008-09 5.00 ZSS COMPLETED 48 Podia Up gradation MV 79 AH mv-79 CHC Up-gradation 2008-09 5.00 ZSS COMPLETED 49 Korukonda Up gradation MV 19 AH mv-19 CHC Up-gradation 2008-09 5.00 ZSS COMPLETED 50 K. GUMMA Up gradation 24X7 CHC K. gumma k.gumma CHC Up-gradation 2008-09 5.00 ZSS COMPLETED 51 mathili Up gradation 24X7 CHC mathili mathili CHC Up-gradation 2008-09 5.00 ZSS COMPLETED 52 Khairput Up gradation 24X7 CHC khairput khairput CHC Up-gradation 2008-09 5.00 ZSS IN PROGRESS 53 Malkangiri Up-gradation of DHH Malkangiri Malkangiri DHH Up-gradation 2009-10 20.00 ZSS COMPLETED 54 kalimela New Const.ruction Maharajpali maharajpally SC New Const. 2009-10 9.26 zss COMPLETED 55 kalimela New Const.ruction Lugel lugel SC New Const. 2009-10 9.78 zss COMPLETED 56 korkunda New Const.ruction poteru SC poteru SC New Const. 2009-10 10.00 zss IN PROGRESS 57 k.gumma New Const.ruction of OT atb k. gumma ChC k.gumma chc New Const. 2009-10 9.66 zss IN PROGRESS 58 Mathili Up gradation salimi sc Salimi SC Up-gradation 2009-10 1.00 zss COMPLETED 59 Mathili Up gradation mahupadar sc Mahupadar SC Up-gradation 2009-10 1.00 zss COMPLETED 60 Korukonda Up gradation mv 22 sc MV-22 SC Up-gradation 2009-10 1.00 zss COMPLETED 61 Kalimela Up gradation mpv 82 sc MPV-82 SC Up-gradation 2009-10 1.00 zss COMPLETED 62 Kalimela Up gradation malavaram sc Malavarum SC Up-gradation 2009-10 1.00 zss COMPLETED 63 Korukonda Up gradation korkunda sc Korukonda SC Up-gradation 2009-10 1.00 zss COMPLETED 64 Korukonda Up gradation nilakameru sc Nilakhambaru SC Up-gradation 2009-10 1.00 zss COMPLETED 65 Korukonda Up gradation tandiki sc Tandiki SC Up-gradation 2009-10 1.00 zss COMPLETED 66 Korukonda Up gradation mv 120 sc MV-120 SC Up-gradation 2009-10 1.00 zss COMPLETED 67 Kalimela Up gradation mv 73 sc MV-73 SC Up-gradation 2009-10 1.00 zss COMPLETED 68 Khairput Up gradation rasabeda sc Rasabeda SC Up-gradation 2009-10 1.00 zss COMPLETED 69 Kalimela Up gradation mv-112 sc MV-112 SC Up-gradation 2009-10 1.00 zss COMPLETED 70 Kalimela Up gradation mv 64 sc MV-64 SC Up-gradation 2009-10 1.00 zss COMPLETED 71 Kalimela Up gradation mv 55 sc MV-55 SC Up-gradation 2009-10 1.00 zss COMPLETED 72 Kalimela Up gradation vekenta pallam sc Venkatpallam SC Up-gradation 2009-10 1.00 zss COMPLETED 73 Kalimela Up gradation nalagunthi sc Nalagunthy SC Up-gradation 2009-10 1.00 zss COMPLETED 74 Mathili Up gradation kutnipally sc Kutunipali SC Up-gradation 2009-10 1.00 zss COMPLETED 75 Mathili Up gradation kaliaguda sc Kaliaguda SC Up-gradation 2009-10 1.00 zss COMPLETED 76 Mathili up gradation other than 24 x 7 bhejaguda PHC (N) bhejaguda PHC (N) Up-gradation 2009-10 5.00 zss COMPLETED 77 Mathili up gradation other than 24 x 7 Salimi PHC (N) Salimi PHC (N) Up-gradation 2009-10 5.00 zss COMPLETED 78 korkunda up gradation other than 24 x 7 Tumsapally PHC (N) tumsapally PHC (N) Up-gradation 2009-10 5.00 zss COMPLETED 79 kalimela up gradation other than 24 x 7 manyamkunda PHC (N) manyamkunda PHC (N) Up-gradation 2009-10 5.00 zss COMPLETED 80 Mathili Repair and renovation of PHC (N) Salimi Salimi PHC (N) Up-gradation 2009-10 5.00 zss IN PROGRESS 81 Mathili Repair and renovation of PHC (N) Bhejaguda bhejaguda PHC (N) Up-gradation 2009-10 5.00 zss IN PROGRESS 82 Mathili Repair and renovation of PHC (N) Bijapadar bijapadar PHC (N) Up-gradation 2009-10 5.00 zss IN PROGRESS Details of Upgradation & New Construction under NRHM taken up during 2005-2013 Sl Name of the New Const/ Up- Approved in PIP Approved Executing Block Name of the work Category Physical Status no institution gradation PIP Year amount Agency 83 Khairput Repair and renovation of PHC (N) Govindpalli govindpally PHC (N) Up-gradation 2009-10 5.00 zss IN PROGRESS 84 Mathili Repair and renovation of PHC (N) Pangam pangam PHC (N) Up-gradation 2009-10 5.00 zss IN PROGRESS 85 Malkangiri Repair and renovation of PHC (N) Pedakonda pedakunda PHC (N) Up-gradation 2009-10 5.00 zss IN PROGRESS 86 Malkangiri Repair and renovation of PHC (N) B.L Pur bl pure PHC (N) Up-gradation 2009-10 5.00 IN PROGRESS 87 Malkangiri Repair and renovation of CDMO Officer DHH DHH Up-gradation 2009-10 5.00 zss IN PROGRESS 88 korkunda Repair and renovation of CHC Chitrakonda chitakunda PHC (N) Up-gradation 2009-10 5.00 zss IN PROGRESS 89 Podia Repair and renovation of PHC (N) Dharampalli dharampally PHC (N) Up-gradation 2009-10 5.00 zss IN PROGRESS 90 korkunda Repair and renovation of PHC (N) Matapaka matapakka PHC (N) Up-gradation 2009-10 5.00 zss IN PROGRESS 91 Podia Repair and renovation of PHC (N) Motu motu PHC (N) Up-gradation 2009-10 5.00 zss IN PROGRESS 92 kalimela Repair and renovation of PHC (N) Koikonda koikunda PHC (N) Up-gradation 2009-10 5.00 zss IN PROGRESS 93 Khairput PHC NEW At Podaghat PHC (N) New Const. 20.00 Block COMPLETED 94 kalimela PHC NEW At Poplur PHC (N) New Const. 20.00 Block COMPLETED 95 korkunda PHC NEW At MV-47 PHC (N) New Const. 20.00 Block COMPLETED 96 korkunda Up gradation chalanguda sc sc Up-gradation 2010-11 1.49 Zss COMPLETED 97 Kalimela Up gradation mv 29 sc MPV-29 SC Up-gradation 2010-11 1.00 Zss COMPLETED 98 Kalimela Up gradation mv 70 sc MV-70 SC Up-gradation 2010-11 1.00 Zss COMPLETED 99 Kalimela Up gradation mv 72 sc MV-72 SC Up-gradation 2010-11 1.00 Zss COMPLETED 100 Malkangiri Up gradation gangala dc Gangala SC Up-gradation 2010-11 1.00 Zss COMPLETED 101 Mathili Up gradation chaulamendi sc Chaulamendi SC Up-gradation 2010-11 1.00 Zss COMPLETED 102 K.Gumma BPMSU At CHC K. GummaNew Construction CHC K GUMMA CHC new const. 2010-11 5.00 Zss COMPLETED 103 Malkangiri New Construction SC At MV-08 mv-08 sc new const. 2011-12 12.50 Zss COMPLETED 104 kalimela New Construction Of SC koimetla koimtla sc new const. 2011-12 12.50 Zss COMPLETED 105 kalimela New Const.ruction Of phc new koimetla koimtla PHC (N) New Const. 2011-12 20.00 Zss COMPLETED 106 Malkangiri Up-gradation of NRC DHH DHH Up-gradation 2011-12 10.00 Zss COMPLETED 107 Mathili construction of SU Mathili chc Up-gradation 2011-12 5.00 Zss COMPLETED 108 Malkangiri Construction of DVS DHH DHH New Const. 2011-12 20.00 Block IN PROGRESS 109 Malkangiri Construction of 4 nos of D-type quarter DHH DHH New Const. 2011-12 70.00 Block IN PROGRESS 110 Malkangiri Construction of 4 nos of D-type & 2 E-type quarter DHH DHH New Const. 2011-12 100.00 Block IN PROGRESS 111 Malkangiri Extention of labour room AT DHH DHH malkangiri DHH Up-gradation 2012-13 5.00 ZSS IN PROGRESS 112 Malkangiri Extention of Ward AT DHH DHH malkangiri DHH Up-gradation 2012-13 20.00 pwd COMPLETED 113 Malkangiri Expantion of of watersupply AT DHH DHH malkangiri DHH Up-gradation 2012-13 10.00 ZSS IN PROGRESS 114 Malkangiri Repair of 12 no Quarter AT DHH DHH malkangiri DHH Up-gradation 2012-13 24.00 ZSS COMPLETED 115 Malkangiri Establish ment of SNCU AT DHH DHH malkangiri DHH Up-gradation 2012-13 30.00 ZSS COMPLETED 116 Malkangiri const. of 4 no E type qtr AT DHH DHH malkangiri DHH New Const. 2012-13 48.00 pwd COMPLETED 117 Malkangiri Establish ment of NRC AT DHH DHH malkangiri DHH Up-gradation 2012-13 10.00 ZSS COMPLETED 118 khairput Extention of labour room at CHC Khairput CHC Khairput CHC Up-gradation 2012-13 5.00 ZSS COMPLETED 119 khairput Extention of Ward at CHC Khairput CHC Khairput CHC Up-gradation 2012-13 12.00 ZSS IN PROGRESS 120 khairput Expantion of of watersupply at CHC Khairput CHC Khairput CHC Up-gradation 2012-13 5.00 ZSS IN PROGRESS 121 khairput const. of 2 no D type qtr at CHC Khairput CHC Khairput CHC New Const. 2012-13 30.00 RWD IN PROGRESS 122 khairput const. of 2 no E type qtr at CHC Khairput CHC Khairput CHC New Const. 2012-13 24.00 RWD IN PROGRESS 123 khairput const. of 2 no F type qtr at CHC Khairput CHC Khairput CHC New Const. 2012-13 20.00 RWD IN PROGRESS 124 khairput Repair of 4 no. Quarter at CHC Khairput CHC Khairput CHC Up-gradation 2012-13 8.00 ZSS IN PROGRESS Details of Upgradation & New Construction under NRHM taken up during 2005-2013 Sl Name of the New Const/ Up- Approved in PIP Approved Executing Block Name of the work Category Physical Status no institution gradation PIP Year amount Agency 125 K.gumma New const. of labour room at CHC K.Gumma CHC K.Gumma CHC New Const. 2012-13 18.00 PWD COMPLETED 126 K.gumma Expantion of of watersupply at CHC K.Gumma CHC K.Gumma CHC Up-gradation 2012-13 5.00 ZSS IN PROGRESS 127 K.gumma OPD Up-gradation at CHC K.Gumma CHC K.Gumma CHC Up-gradation 2012-13 5.00 ZSS IN PROGRESS 128 K.gumma const. of 4 no E type qtr at CHC K.Gumma CHC K.Gumma CHC New Const. 2012-13 48.00 RWD IN PROGRESS 129 K.gumma Repair OF at CHC K.Gumma SOMANATHPUR SC SC Up-gradation 2012-13 2.00 ZSS IN PROGRESS 130 mathili Extention of labour room at CHC Mathili CHC Mathili CHC Up-gradation 2012-13 5.00 ZSS COMPLETED 131 mathili Minor repair of OT at CHC Mathili CHC Mathili CHC Up-gradation 2012-13 5.00 ZSS IN PROGRESS 132 mathili Extention of Ward at CHC Mathili CHC Mathili CHC Up-gradation 2012-13 12.00 ZSS IN PROGRESS 133 mathili Maintannce of Electrification at CHC Mathili CHC Mathili CHC Up-gradation 2012-13 5.00 ZSS IN PROGRESS 134 mathili Expantion of of watersupply at CHC Mathili CHC Mathili CHC Up-gradation 2012-13 5.00 ZSS IN PROGRESS 135 mathili Establish ment of BSU at CHC Mathili CHC Mathili CHC Up-gradation 2012-13 1.00 ZSS IN PROGRESS 136 mathili const. of 3 no E type qtr at CHC Mathili CHC Mathili CHC New Const. 2012-13 36.00 RWD COMPLETED 137 mathili Repair of 10 no. Quarter at CHC Mathili CHC Mathili CHC Up-gradation 2012-13 30.00 ZSS IN PROGRESS 138 Kalimela Extention of labour room at CHC Kalimela CHC Kalimela CHC Up-gradation 2012-13 5.00 ZSS IN PROGRESS 139 Kalimela Minor repair of OT at CHC Kalimela CHC Kalimela CHC Up-gradation 2012-13 5.00 ZSS COMPLETED 140 Kalimela Extention of Ward at CHC Kalimela CHC Kalimela CHC Up-gradation 2012-13 12.00 ZSS IN PROGRESS 141 Kalimela Maintannce of Electrification at CHC Kalimela CHC Kalimela CHC Up-gradation 2012-13 5.00 ZSS IN PROGRESS 142 Kalimela Expantion of of watersupply at CHC Kalimela CHC Kalimela CHC Up-gradation 2012-13 5.00 ZSS IN PROGRESS 143 Kalimela Establish ment of NBSU at CHC Kalimela CHC Kalimela CHC Up-gradation 2012-13 3.00 ZSS COMPLETED 144 Kalimela const. of no E type qtr at CHC Kalimela CHC Kalimela CHC New Const. 2012-13 12.00 RWD IN PROGRESS 145 Korkunda Extention of Ward at CHC Korukonda CHC korkunda CHC Up-gradation 2012-13 12.00 ZSS IN PROGRESS 146 Korkunda Expantion of of watersupply at CHC Korukonda CHC korkunda CHC Up-gradation 2012-13 5.00 ZSS IN PROGRESS 147 Korkunda OPD Up-gradation at CHC Korukonda CHC korkunda CHC Up-gradation 2012-13 5.00 ZSS IN PROGRESS 148 Korkunda const. of 1 no E type qtr at CHC Korukonda CHC korkunda CHC New Const. 2012-13 12.00 RWD IN PROGRESS 149 Korkunda Repair of 8 no. Quarter at CHC Korukonda CHC korkunda CHC Up-gradation 2012-13 16.00 ZSS IN PROGRESS 150 Korkunda New const. of labour room at CHC Chitrokonda CHC korkunda CHC New Const. 2012-13 18.00 RWD COMPLETED 151 Korkunda Extention of Ward at CHC Chitrokonda CHC Chitrkunda CHC New Const. 2012-13 15.00 RWD IN PROGRESS 152 Korkunda Expantion of of watersupply at CHC Chitrokonda CHC Chitrkunda CHC Up-gradation 2012-13 5.00 ZSS IN PROGRESS 153 Korkunda const. of 2 no D type qtr at CHC Chitrokonda CHC Chitrkunda CHC New Const. 2012-13 30.00 RWD IN PROGRESS 154 Korkunda Expantion of of watersupply at AH AH Balimela CHC Up-gradation 2012-13 5.00 ZSS IN PROGRESS 155 Korkunda OPD Up-gradation at Balimela AH AH Balimela CHC Up-gradation 2012-13 5.00 ZSS COMPLETED 156 Korkunda const. of 2 no D type qtr at Balimela AH AH Balimela CHC New Const. 2012-13 30.00 PWD COMPLETED 157 Podia Extention of Ward at MV-79 AH AH MV 80 CHC Up-gradation 2012-13 12.00 ZSS COMPLETED 158 Podia Expantion of of watersupply at MV-79 AH AH MV 81 CHC Up-gradation 2012-13 5.00 ZSS IN PROGRESS 159 Podia const. of 2 no D type qtr at MV-79 AH AH MV 82 CHC New Const. 2012-13 30.00 RWD COMPLETED 160 Podia const. of 6 no E type qtr at MV-79 AH AH MV 83 CHC New Const. 2012-13 72.00 RWD IN PROGRESS 161 Podia const. of 2 no F type qtr at MV-79 AH AH MV 84 CHC New Const. 2012-13 20.00 RWD IN PROGRESS 162 Podia New const. of labour room at CHC Podia CHC PODIA CHC New Const. 2012-13 18.00 RWD IN PROGRESS 163 Podia Expantion of of watersupply at CHC Podia CHC PODIA CHC Up-gradation 2012-13 5.00 ZSS IN PROGRESS 164 Podia OPD Up-gradation at CHC Podia CHC PODIA CHC Up-gradation 2012-13 5.00 ZSS COMPLETED 165 Podia const. of 1no E type qtr at CHC Podia CHC PODIA CHC New Const. 2012-13 12.00 RWD COMPLETED Details of Upgradation & New Construction under NRHM taken up during 2005-2013 Sl Name of the New Const/ Up- Approved in PIP Approved Executing Block Name of the work Category Physical Status no institution gradation PIP Year amount Agency 166 Malkangiri Minor repair of labour room at CHC Pandripani CHC PANDRIPANI CHC Up-gradation 2012-13 5.00 ZSS IN PROGRESS 167 Malkangiri Extention of Ward at CHC Pandripani CHC PANDRIPANI CHC Up-gradation 2012-13 12.00 ZSS COMPLETED 168 Malkangiri Expantion of of watersupply at CHC Pandripani CHC PANDRIPANI CHC Up-gradation 2012-13 5.00 ZSS IN PROGRESS 169 Malkangiri const. of 3 no E type qtr at CHC Pandripani CHC PANDRIPANI CHC New Const. 2012-13 36.00 RWD IN PROGRESS