Pocket Guide to Conventional Roof Construction Facts

Total Page:16

File Type:pdf, Size:1020Kb

Pocket Guide to Conventional Roof Construction Facts POCKET GUIDE TO CONVENTIONAL ROOF CONSTRUCTION FACTS Structural members 2”x 6”s or larger Strength is derived from dimensional width and depth of lumber Longer spans require larger structural members Larger structural members and larger lumber results in longer times to failure when exposed to fire Substantial construction may allow for additional time to conduct and coordinate vertical ventilation operations IDENTIFICATION EXTERIOR FEATURES Masonry walls Buildings constructed prior to 1960 Arched and/or inset windows King rows Tie rod & rafter tie end plates Arched truss roof Bridge truss roof TOP SIDE FEATURES (Identified from interior or inspection/indicator/plug cut) Multiple layers of composition roofing material COMMON FEATURES AND DANGERS LOAD BEARING WALLS / PILASTERS Trusses/rafters are supported by: • Load bearing walls • Pilasters embedded in exterior walls Exterior walls and conventional trusses yield strongest areas for travel and egress DIAGONAL SHEATHING Head and base cuts made on diagonal sheathing may result in a diagonal spring board Diagonal sheathing offers greater strength than straight sheathing, however… MODIFICATIONS/UPGRADES (Frequently laid on top of original sheathing) Plywood/OSB AND multiple layers of composition roofing material Rain roof (double roof) Styrofoam insulation Makes locating Increases chances of trusses/rafters difficult when inadvertently cutting through sounding a rafter Makes cutting slow and Masks failure of structural difficult members beneath VULNERABILITIES FIRE LOAD / UN-PROTECTED STRUCTURAL MEMBERS Typically house heavy fire load Frequently without a working sprinkler system Often no ceiling, leaving trusses directly exposed to fire Lumber degrades 1/8” every 5 minutes when exposed to fire CONVENTIONAL ROOF TYPES CONVENTIONAL FLAT BEAM or WALL (MAY NOT BE PRESENT) RAFTERS CUT CONVENTIONAL FLAT Longer spans will be supported by an interior wall or beam (girder) perpendicular to the rafters • Rafters laid on bottom edge across exterior walls or may sit in steel hangers • Spans of 15’ to 25’ are typical • 16" to 24" on center spacing Nailing blocks, bridging, or scissor bracing stabilizes rafters CONVENTIONAL FLAT WATCH OUTS Rafters held by hangers or toe-nailing may fail earlier than those laid over a wall or beam 24" on center rafter spacing with plywood or OSB decking… offers less support than… 16" on center rafter spacing with 1"x 6" sheathing CONVENTIONAL FLAT WATCH OUTS • Sheathing and plywood/OSB decking will typically fail ahead of rafters • Plywood/OSB decking can fail beneath intact roof coverings • Rafters spanning longer distances offer less support and fail earlier when exposed to fire • Rafters exposed directly to fire may fail in 10 to 20 minutes depending on dimension, span, and load • Be alert for spongy, sagging or self venting areas CONVENTIONAL FLAT OPERATIONAL CONSIDERATIONS Rafters do not always run parallel to Ventilate as close to the seat of the shorter walls the fire as safely possible Inspection cuts are imperative to determine: • That you are not on a lightweight roof • Rafter size & direction • Type and thickness of • Exterior walls yield strongest areas decking/sheathing for travel and egress • Proximity to dead loads, rafters seated in hangers, areas visibly sagging, and areas where water Nailing blocks, bridging, or scissor bracing pools present weak areas will interfere with parallel cuts and louvers ARCHED TRUSS ROOF TRUSS CUT RAFTERS ARCHED TRUSS ROOF Top and bottom chord composed of 2”x 12” lumber Rafters are 2”x 6”s or larger running perpendicular and between trusses Typically laid on edge atop Steel bolts and plates hold truss together trusses, but may sit in hangers BRIDGE / GABLE / PARALLEL CHORD TRUSS ROOF TRUSS CUT Variations in truss geometry: Bridge Gable RAFTERS Parallel Chord BRIDGE / GABLE / PARALLEL CHORD TRUSS ROOF Rafter direction is not always obvious when top chord is flat and may require an inspection cut Design and features similar to arched truss roofs but with straight edges ARCHED & BRIDGE TRUSS WATCH OUTS Failure of a truss will result in collapse of rafters and sheathing/decking attached to neighboring trusses (ie failure of a large section) Rafters/planks may be laid across bottom chords for storage • Adds to dead load and places fire load within the truss work • Leads to early failure when exposed May also result in failure of to fire neighboring trusses ARCHED & BRIDGE TRUSS WATCH OUTS • Sheathing and plywood/OSB decking will typically fail ahead of trusses/rafters • Plywood/OSB decking can fail beneath intact composition roofing material • Rafters spanning longer distances offer less support and fail earlier when exposed to fire • Rafters exposed directly to fire may fail within 10 to 20 minutes depending on dimension, span, and load • Be alert for spongy, sagging, or self venting areas ARCHED & BRIDGE TRUSS WATCH OUTS ARCHED & BRIDGE TRUSS OPERATIONAL CONSIDERATIONS Ventilate as close to the fire as safely possible • Stout construction may allow additional time to conduct and coordinated vertical ventilation • Rafters typically span 15’ to 25’ between trusses • Exterior walls and trusses yield strongest areas for travel and egress • Proximity to dead loads, rafters seated in hangers, areas visibly sagging, and areas where water pools present weak areas TIED ARCH (TIED TRUSS) ROOF RAFTERS TRUSS CUT TIED ARCH (TIED TRUSS) ROOF Top chord composed of 2”x 12” (or larger) lumber TIED ARCH (TIED TRUSS) WATCH OUTS TIED ARCH (TIED TRUSS) WATCH OUTS • Sheathing and plywood/OSB decking will typically fail ahead of trusses/rafters • Plywood/OSB decking can fail beneath intact composition roofing material • Rafters spanning longer distances offer less support and fail earlier when exposed to fire • Rafters exposed directly to fire may fail within 10 to 20 minutes depending on dimension, span, and load • Be alert for spongy, sagging, or self venting areas TIED ARCH (TIED TRUSS) WATCH OUTS TIED ARCH (TIED TRUSS) OPERATIONAL CONSIDERATIONS • Failure times may be less than arched truss roofs • Rafters typically span 15’ to 25’ between trusses • Exterior walls and trusses yield strongest areas for travel and egress Ventilate as close to the seat of the fire as safely possible • Proximity to dead loads, rafters seated in hangers, areas visibly sagging, and areas where water pools present weak areas Director of Training LACoFD Training Services Battalion Chief Derek Section Alkonis (323) 881-2436 .
Recommended publications
  • BUILDING CONSTRUCTION NOTES.Pdf
    10/21/2014 BUILDING CONSTRUCTION RIO HONDO TRUCK ACADEMY Why do firefighters need to know about Building Construction???? We must understand Building Construction to help us understand the behavior of buildings under fire conditions. Having a fundamental knowledge of buildings is an essential component of the decisiondecision--makingmaking process in successful fireground operations. We have to realize that newer construction methods are not in harmony with fire suppression operations. According to NFPA 1001: Standard for FireFighter Professional Qualifications Firefighter 1 Level ––BasicBasic Construction of doors, windows, and walls and the operation of doors, windows, and locks ––IndicatorsIndicators of potential collapse or roof failure ––EffectsEffects of construction type and elapsed time under fire conditions on structural integrity 1 10/21/2014 NFPA 1001 Firefighter 2 Level ––DangerousDangerous building conditions created by fire and suppression activities ––IndicatorsIndicators of building collapse ––EffectsEffects of fire and suppression activities on wood, masonry, cast iron, steel, reinforced concrete, gypsum wallboard, glass and plaster on lath Money, Money, Money….. Everything comes down to MONEY, including building construction. As John Mittendorf says “ Although certain types of building construction are currently popular with architects, modern practices will be inevitably be replaced by newer, more efficient, more costcost--effectiveeffective methods ”” Considerations include: ––CostCost of Labor ––EquipmentEquipment
    [Show full text]
  • Geodesic Dome Roof
    GEODESIC DOME ROOF The HMT Geodesic Dome features a clear-span, all-aluminum, lightweight, corrosion-resistant structure which sets a new standard for performance in aluminum geodesic domes. HMT’s unique overlapping-panel design and attention to details at critical locations all result in a cost-effective solution that provides superior protection of your stored product. The HMT Geodesic Dome can be installed in-service and its superior design was developed under the guidance of API 650, appendix G and AWWA D-108. Key benefits: Key design features: The HMT Geodesic Dome’s advanced tBatten bar and gasket assembly completely technology provides excellent benefits. Here’s encapsulate panel edges for unparallelled how: sealing Most effective leak-protection solution— tOverlapping panels ensure additional Engineered for maximum weather-tightness for protection against weather both new tanks and retrofits tHub designed with three levels of sealing to Low maintenance — Aluminum alloys are ensure maximum leak protection corrosion resistant and don’t require painting like steel fixed roofs tHub can be easily removed for inspection or Emissions reduction — reduces wind-induced adjustment of IFR support chains vapor loss, aids in odor control and provides tOptions for fixed or sliding rim connections significant emission credits; for light products such as gasoline, a dome installed over an EFR tCan easily handle the weight of suspended can cut emissions by over 90% aluminum internal floating roofs In-service installation — Can be erected on tIndustry-leading 3D design software for the ground beside the tank or on an EFR and maximum accuracy and shorter design time lifted into place Custom engineered— To accommodate a wide range of spans and loading conditions Protecting your world, one tank at a time™ www.hmttank.com THE HMT GEODESIC DOME DESIGN HMT’s design incorporates features which dramatically Triple seal hub design improve upon existing technology.
    [Show full text]
  • Basic Technical Rules the Nubian Vault (Nv)
    PRODUCTION CENTRE INTERNATIONAL PROGRAMME BASIC TECHNICAL RULES v3 BASIC TECHNICAL RULES THE NUBIAN VAULT (NV) TECHNICAL CONCEPT THE NUBIAN VAULT ASSOCIATION (AVN) ADVICE TO MSA CLIENTS Version 3.0 SEASON 2013-2014 COUNTRY INTERNATIONAL Association « la Voûte Nubienne » - 7 rue Jean Jaurès – 34190 Ganges - France February 2015 www.lavoutenubienne.org / [email protected] / +33 (0)4 67 81 21 05 1/14 PRODUCTION CENTRE INTERNATIONAL PROGRAMME BASIC TECHNICAL RULES v3 CONTENTS CONTENTS.............................................................................................................2 1.AN ANCIENT TECHNIQUE, SIMPLIFIED, STANDARDISED & ADAPTED.........................3 2.MAIN FEATURES OF THE NV TECHNIQUE........................................................................4 3.THE MAIN STAGES OF NV CONSTRUCTION.....................................................................5 3.1.EXTRACTION, FABRICATION & TRANSPORT OF MATERIAL....................................5 3.2.CHOOSING THE SITE....................................................................................................5 3.3.MAIN STRUCTURAL WORKS........................................................................................6 3.3.1.Foundations........................................................................................................................................ 6 3.3.2.Load-bearing walls.............................................................................................................................. 7 3.3.3.Arches in load-bearing
    [Show full text]
  • Insulating Thatched Roofs This Guidance Note Has Been Prepared and Edited by David Pickles
    Energy Efficiency and Historic Buildings Insulating Thatched Roofs This guidance note has been prepared and edited by David Pickles. It forms one of a series of thirteen guidance notes covering the thermal upgrading of building elements such as roofs, walls and floors. First published by English Heritage March 2012. This edition (v1.1) published by Historic England April 2016. All images © Historic England unless otherwise stated. Illustrations drawn by Simon Revill. Our full range of guidance on energy efficiency can be found at: HistoricEngland.org.uk/energyefficiency Front cover: Thatch repairs in progress. © Philip White. Summary This guidance provides advice on the principles, risks, materials and methods for insulating thatched roofs. There are estimated to be about fifty thousand thatched buildings in England today, some of which retain thatch which is over six hundred years old. Thatching reflects strong vernacular traditions all over the country. Well-maintained thatch is a highly effective weatherproof coating as traditional deep thatched eaves will shed rainwater without the need for any down pipes or gutters. Locally grown thatch is a sustainable material, which has little impact on the environment throughout its life-cycle. It requires no chemicals to grow, can be harvested by hand or using traditional farm machinery, requires no mechanical processing and therefore has low embodied energy and can be fixed using hand tools. At the end of its life it can be composted and returned to the land. Thatch has a much greater insulating value than any other traditional roof covering. With the right choice of material and detailing, a well-maintained thatched roof will keep a building warm in winter and cool in summer and has the added advantage of being highly sound-proof.
    [Show full text]
  • Western BCI ® and VERSA-LAM ® Specifier Guide
    WESTERN SPECIFIER GUIDE for products manufactured in White City, Oregon WSG 03/14/2013 2 The SIMPLE FRAMING SYSTEM® Makes Designing Homes Easier Architects, engineers, and designers trust Boise Cascade's engineered wood products to provide a better system for framing floors and roofs. It's the SIMPLE FRAMING SYSTEM®, conventional framing methods when cross­ventila tion and wiring. featuring beams, joists and rim boards the resulting reduced labor and Ceilings Framed with BCI® Joists materials waste are con sidered. that work together as a system, so you The consistent size of BCI® Joists spend less time cutting and fitting. In There's less sorting and cost associ­ ated with disposing of waste because helps keep gypsum board flat and fact, the SIMPLE FRAMING SYSTEM® you order only what you need. free of unsightly nail pops and ugly uses fewer pieces and longer lengths Although our longer lengths help your shadows, while keeping finish work than conventional framing, so you'll clients get the job done faster, they to a minimum. complete jobs in less time. cost no more. VERSA­LAM® Beams for Floor You'll Build Better Homes Environmentally Sound and Roof Framing with the These highly­stable beams are ® As an added bonus, floor and roof free of the large­scale defects that SIMPLE FRAMING SYSTEM ® systems built with BCI Joists require plague dimension beams. The Now it's easier than ever to design about half the number of trees as and build better floor systems. When result is quieter, flatter floors (no those built with dimension lumber.
    [Show full text]
  • Replacing the Roof on Your Manufactured Or Mobile Home Protectmymanufacturedhome
    What You Should Know: Replacing the roof on your manufactured or mobile home ProtectMyManufacturedHome An alteration permit from the Washington State Department of Labor & Industries is required when you reroof a manufactured home. In some cases, plans for the work must also be submitted to L&I for approval prior to doing the work. L&I has a four-step process for home alterations. Here’s how: Step 1: See if you need to submit plans. You need to submit plans if: You are not removing the old shingles or roof covering before installing the new roofing. The new roof covering is heavier than the original. There are repairs to any roof framing, such as trusses or rafters. A second layer of sheathing or additional framing is added to the roof. Plans must be stamped by a Washington professional engineer (PE) or architect. When you reroof, you need to submit plans when buying a permit (see step 2). There is a fee for reviewing plans which is added to the permit. Get more information It usually takes two to three weeks to process plans and plans must be approved before proceeding with the work. Visit www.Lni.wa.gov/FAS You do not need to submit plans if: For structural issues, contact plan review at: 360-902-5218 You are removing the existing roofing and installing For general permit help, call customer new roofing of the same or lesser weight. service at: 360-902-5206 Existing roof sheathing may be removed and new roof Or email [email protected] sheathing used.
    [Show full text]
  • UFGS 06 10 00 Rough Carpentry
    ************************************************************************** USACE / NAVFAC / AFCEC / NASA UFGS-06 10 00 (August 2016) Change 2 - 11/18 ------------------------------------ Preparing Activity: NAVFAC Superseding UFGS-06 10 00 (February 2012) UNIFIED FACILITIES GUIDE SPECIFICATIONS References are in agreement with UMRL dated July 2021 ************************************************************************** SECTION TABLE OF CONTENTS DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES SECTION 06 10 00 ROUGH CARPENTRY 08/16, CHG 2: 11/18 PART 1 GENERAL 1.1 REFERENCES 1.2 SUBMITTALS 1.3 DELIVERY AND STORAGE 1.4 GRADING AND MARKING 1.4.1 Lumber 1.4.2 Structural Glued Laminated Timber 1.4.3 Plywood 1.4.4 Structural-Use and OSB Panels 1.4.5 Preservative-Treated Lumber and Plywood 1.4.6 Fire-Retardant Treated Lumber 1.4.7 Hardboard, Gypsum Board, and Fiberboard 1.4.8 Plastic Lumber 1.5 SIZES AND SURFACING 1.6 MOISTURE CONTENT 1.7 PRESERVATIVE TREATMENT 1.7.1 Existing Structures 1.7.2 New Construction 1.8 FIRE-RETARDANT TREATMENT 1.9 QUALITY ASSURANCE 1.9.1 Drawing Requirements 1.9.2 Data Required 1.9.3 Humidity Requirements 1.9.4 Plastic Lumber Performance 1.10 ENVIRONMENTAL REQUIREMENTS 1.11 CERTIFICATIONS 1.11.1 Certified Wood Grades 1.11.2 Certified Sustainably Harvested Wood 1.11.3 Indoor Air Quality Certifications 1.11.3.1 Adhesives and Sealants 1.11.3.2 Composite Wood, Wood Structural Panel and Agrifiber Products SECTION 06 10 00 Page 1 PART 2 PRODUCTS 2.1 MATERIALS 2.1.1 Virgin Lumber 2.1.2 Salvaged Lumber 2.1.3 Recovered Lumber
    [Show full text]
  • Installers' Handbook Preface
    HANDBOEK VOOR INSTALLATEURS Handboek voor de installatie van VELUX dakvensters Installers' handbook Preface The purpose of this handbook is to provide an overview of the installation of VELUX products. The handbook describes the various aspects of roof construction in association with VELUX roof windows and also provides advice and information on how to obtain the optimal installation. (Third edition, 2010) The VELUX system Chapter 1 2 3 4 5 6 7 8 Other products Chapter 9 Contents Planning Considerations before choosing roof window 5-13 1 Installation of a roof window Installation step by step 15-25 2 Integration – more windows Combination of more than one window 27-45 3 Special installation conditions Installation in various roof constructions 47-63 4 Special roofing materials Installation in various roof materials 65-81 5 Replacement / renovation Replacement of a roof window 83-93 6 Building physics Roof constructions (humidity, heat, sound etc) 95-109 7 Product information Short presentation of VELUX products 111-137 8 Other products Sun tunnel / Flat roof window / Solar hot water system 139-145 9 Contact VELUX Addresses / Advising / Service 146-147 List of telephone numbers 148 Size chart 151 Planning 1 The construction of the house 6-7 User requirements 8 Building regulations 9-13 VELUX 5 Planning 1 The construction of the house To be able to choose the right VELUX roof window for a given situ- ation, it is always recommended to start from the construction of the house, user requirements and current building regulations. Normally, a standard VELUX roof window can satisfy the basic requirements, but often choosing another window type or vari- ant and/or choosing accessories can optimise the function and increase the utility value of the window.
    [Show full text]
  • Top-Operated Centre-Pivot Polyurethane Roof Window GLU 0061
    Edition 2.0 – 05.04.2017 Product information Top-operated centre-pivot polyurethane roof window GLU 0061 Product description High quality moulded polyurethane with white lacquer finish Triple insulating glass unit with Uw 1.1 Top control bar for easy operation even with furniture under the window Integrated ventilation in top control bar and cleanable dust and insect filter Maintenance-free interior surface Maintenance-free exterior covers Roof pitch Can be installed in roof pitches between 15° and 90° Materials Polyurethane around a core of thermally modified timber Glass; float glass / strengthened glass / toughened glass Lacquered aluminium VELUX ThermoTechnology™ insulation Downloads For installation instructions, CAD drawings, 3D BIM objects, 3D GDL objects etc, please visit velux.bg. Certifications The VELUX product EUTR In compliance with the EU Timber factories guarantee Regulation (EUTR), EU regulation quality systems 995/2010 implementation process and environmental REACH We are aware of the REACH regulation management systems and acknowledge the obligations. No through appropriate products are obliged to be registered in accreditations ISO accordance to REACH and none of our 9001 and ISO 14001 products contain any Substances of Very High Concern. Available sizes and daylight area Lining measurements 472 550 660 mm 780 mm 942 mm 1140 mm 1340 mm Size Width (mm) mm mm GLU p CK-- 495 CK02 mm FK-- 605 78 7 (0.22) MK-- 725 GLU MK04 PK-- 887 m m SK-- 1085 78 9 (0.47) Size Height (mm) GLU GLU FK06 MK06 --02 719 m m --04 919 78 11 --06 1119 (0.47) (0.59) GLU GLU GLU GLU --08 1339 FK08 MK08 PK08 SK08 --10 1549 m 398 m 398 1 (0.58) (0.72) (0.92) (1.16) GLU MK10 1600mm (0.85) ( ) = Effective daylight area, m2 Top-operated centre-pivot roof windows make it possible to place furniture directly below the window without obstructing operation of the window.
    [Show full text]
  • Best Practices Single-Family Residences
    SITE PLANNING best practices single-family residences for aesthetic review by the city of coral gables board of architects 2018 1 SINGLE-FAMILY RESIDENCE BEST PRACTICES July 2018 table of contents 1. Purpose & Uses 2. Site Planning 3. Architecture 4. Checklist Purpose & Uses The purpose of the City of Coral Gables, Florida Zoning Code is to implement the Comprehensive Plan (CP) of the City pursuant to Chapter 163, Florida Statutes for the protection and promotion of the safety, health, comfort, morals, convenience, peace, prosperity, appearance and general welfare of the City and its inhabitants. ~ Zoning Code Section 1-103 Purpose of the City of Coral Gables Zoning Code PURPOSE & USE Single-Family Residential (SFR) District The Single-Family Residential (SFR) District is intended to accommodate low density, single-family dwelling units with adequate yards and open space that characterize the residential neighborhoods of the city. The city is unique not only in South Florida but in the country for its historic and archi- tectural treasures, its leafy canopy, and its well-defined and livable neighborhoods. These residential areas, with tree-lined streets and architecture of harmonious proportion and human scale, provide an oasis of charm and tranquility in the midst of an increasingly built-up metropolitan environment. The intent of the Single-Family Residential code is to protect the distinctive character of the city, while encouraging excellent architectural design that is responsible and responsive to the individual context of the city’s diverse neighborhoods. The single-family regulations, as well as the design and performance standards in the Zoning Code, seek to ensure that the renovation of residences as well as the building of residences is in accord with the civic pride and sense of stewardship felt by the citizens of Coral Gables.
    [Show full text]
  • E-Mount QMSE
    E-Mount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ag pull-out (withdrawal) capacities (lbs) in typical lumber: Lag Bolt Specifications Specific Gravity 5/16" shaft per 3" thread depth 5/16" shaft per 1" thread depth Douglas Fir, Larch .50 798 266 Douglas Fir, South .46 705 235 Engelmann Spruce, Lodgepole Pine (MSR 1650 f & higher) .46 705 235 Hem, Fir .43 636 212 Hem, Fir (North) .46 705 235 Southern Pine .55 921 307 Spruce, Pine, Fir .42 615 205 Spruce, Pine, Fir (E of 2 million psi and higher grades of MSR and MEL) .50 798 266 Sources: American Wood Council, NDS 2005, Table 11.2 A, 11.3.2 A Notes: 1) Thread must be embedded in a rafter or other structural roof member.
    [Show full text]
  • Roof Window Size Comparison
    Roof Windows Roof Window Size Comparison keyliteroofwindows.com Comparison Chart Futuretherm Technology Height (mm) Width (mm) 550 660 780 940 1140 1340 01 03A 04A 07A 08A 09A Keylite CK02 N/A N/A N/A N/A N/A Velux 780 01 22 23 24 25 26 Fakro 02 03B 04 07B 08B 09 Keylite CK04 FK04 MK04 PK04 N/A UK04 Velux 980 02 03 05 15 N/A 12 Fakro 01C 03 05 07C 08 09C Keylite CK06 FK06 MK06 PK06 SK06 N/A Velux 1180 16 04 06 08 10 N/A Fakro 01F 03F 06 07F 08F 10 Keylite N/A FK08 MK08 PK08 SK08 UK08 Velux 1400 N/A N/A 07 09 11 N/A Fakro Keylite 1600 01G 03G 04G 07G 08G 09G Velux N/A N/A MK10 PK10 SK10 UK10 Fakro N/A N/A 13 N/A N/A N/A Centre Pivot Roof Windows Pine White Conservation Pine Conservation White Keylite CP WF-CP CW-CP CW-WF-CP Velux GGL GGU GGL SD5 GGU SD5 Fakro FTP-V FTU-V & PTP-V FTP-V/C PTP-V/C Top Hung / Fire Escape Pine White Conservation Pine Conservation White Keylite FE WF-FE CW-FE CW-WF-FE Velux GPL GPU GPL SD5 GPU SD5 FPP-V & FPU-V & FPP-V/C & FPU-V/C & Fakro FHP-V FHU-V FHP-V/C FHU-V/C Single Flashings Slate Tile Deep Plain Tile Conservation Conservation Conservation Conservation Corrugated Tile Slate Tile Plain Tie Deep Tile Keylite SRF TRF DTRF PTRF CWSRF CWTRF CWPTRF CWDTRF CRF (Recessed As Standard) Standard Recessed Standard Recessed Standard Recessed Standard Recessed Standard Recessed Standard Recessed Standard Recessed Standard Recessed Velux EDL/ EDN EDZ N/A EDW/ EDJ EDP/ N/A N/A EDN N/A N/A EDP N/A EDW EDJ ZWC EBL/ EBW/ EBP/ EKL EKW EKP Fakro EL N/A EZ N/A EH N/A EP N/A /C N/A /C N/A /C N/A /C N/A EE Combi Flashings 18mm
    [Show full text]