FOR SALE 2 Acres Manchester City Centre Development Opportunity North View, Dantzic Street, Manchester M4 4JE

Total Page:16

File Type:pdf, Size:1020Kb

FOR SALE 2 Acres Manchester City Centre Development Opportunity North View, Dantzic Street, Manchester M4 4JE CIS Piccadilly Gardens Arndale Tower Corn Trinity Shopping Exchange Way Northern Centre Quarter Manchester Victoria Arena Cooperative Station & Building Metrolink Ancoats Angel Meadow Green Quarter Proposed Development River Irk 2 ACRES SITE Dantzic Street FOR SALE 2 Acres Manchester City Centre Development Opportunity North View, Dantzic Street, Manchester M4 4JE Consent For 415 Apartments Together With Commercial And Amenity Space Plus 153 Car Parking Spaces The Opportunity Description • An exciting development • Highly desirable location on the opportunity in the heart of the outskirts of the popular Northern TheNew site Cross is roughly redevelopment square and area Quarter and Ancoats extendsof Manchester to approximately City Centre 0.8Ha • The site has the benefit of being •(2 Planning acres). application submitted sold with vacant possession and Planningfor 14 apartments consent has comprising been granted in shell condition for10no. a single two-bedroom apartment andbuilding • Fantastic residential location arranged4no. one-bedroom around a central apartments communal with regards to amenity, courtyard and which varies from transport and leisure offering 5 to 24 storeys in height. The consent provides for 130 one bed apartments, 262 two bed, two bath apartments and 23 three bed, three bath apartments. In addition there is consent for 268m2 of commercial space, car parking and public space including a resident’s gym. Measured on an NIA basis the floor 1 Proposed Site 7 Arndale 11 Beetham area of the residential element 2 Ancoats Shopping Tower extends to 27,643m2 (297,549ft2). 1 3 Co-operative Centre 12 Three Towers The overall GIA is 41,511m2 Building 8 CIS Tower (Sisters) (446,824ft2). 4 Victoria 9 Northern 13 River Irk Train Station Quarter 14 Strangeways 5 Green Quarter 10 Piccadilly 15 Proposed 6 MEN Arena Train Station Development NOMA Printworks Sadler’s Yard Metrolink The Green Quarter Arndale Centre Selfridges Spinningfields Harvey Nichols Victoria Station ���������� ��������� ������ �������� ������ Location ���� ��� ��� ��� The site fronts Dantzic Street in the ��������� St. Michael’s district of the Lower Irk Valley, ������� ���������������� ���������������� a short walk to the north of Manchester City. The site is close to Angel Meadow, ������ ������� the Noma Development Project and the �������� Green Quarter. The site is adjacent to the ���� ���������� Far Eastern Consortium Angel Gate scheme ��� ������� which is now being developed. M4 4JE ������� ���� MCFC ������� ��� Manchester ���������� ���������� �� City Centre ������������� �������� ������ ������ MUFC ��� �������� LCCC ��� ������ ������� ����������� ��������� ��������� ��������� ��� ���������� Angel Meadow ������� ���� ��� Greater Manchester �������� ��������� � ��� 5% growth £62.8 ����������� between 2015-16 (ONS 2016) 1.3m ��������� ��� billion Fastest growing������ people in employment Manchester’s major city outside London 2,000+ economy GVA foreign owned firms (ONS 2016) Between 2011 and 2016 in Greater Manchester 100,000 GM economy grew by students attending Up to 40% 1 in 5 Greater Manchester’s lower operation 19% Greater Manchester Population 2.8m four universities costs than London (ONS 2016) business export �� � ��� ��� ��� �������� ��� ��������� � � � � ���� �� � �� � ������ River Irk � � � WARFORD �� � � � � ���������� � � � � � � � � � DULWICH STREET � � � � � WARFORD STREET � � � � � � � � � � � � � � � � DANTZIC STREET � � � North � � � � � � � � � � View � � � � � � � � � � � � � � � � � � Consented � � � � � � � Angelgate � �� � � �� Scheme � �� � �� � ��� � ���� � ����������� ��� � �� � ���� � �� � �� �� � � � � � � ����� �� �� ������� � � � � � � �� � � � �� �� ��� � ��� � � ��������� � � �� � � � � � Further Details � ���� �� �� � � � Further details are available on the Manchester Planning �� �� �������� ��� � website, Planning Application No. 114860/FO/2016. �� � � � �� � A Section 106 Agreement has been completed. � � � � �� �� � � � �� � �� � ��������� � �� Tenure �� � � � � �� ������� The property is offered on a � ��� �������� � ��� � freehold basis. ���� ������ ��� �������� �� � � ������� � Price � � � � � The property is available at � �� � � £9.5Million. V.A.T. will not ������������� � Manchester � � � � � ��� � � � apply to this transaction. ������������������ � �� � ������� � � ��������� �� � � � � City Centre � �� ������� � � �� Viewings Mark Grayshon � � �� �� [email protected] � �� � Strictly by appointment ����������� �� � � � only with the sole agent’s Neale Sayle ������� �� �� WT Gunson. [email protected] �������������� � � �� �� � � �� � � Misrepresentation Act 1967. Unfair Contract Terms 1977. The Property Misdescription Act � 1991. These particulars are issued without any responsibility on the part of the agent and � � ���������� � are not to be construed as containing any representation or fact upon which any person � � � � is entitled to rely. Neither the agent nor any person in their employ has any authority � � �� ������ to make or give any representation or warranty whatsoever in relation to the property. ��� � ����������� � � � Subject to Contract. Published May 2019 � �� ����� � ������ � ��� ���� � �� � � � �� � � � � � � � � � � �� � �� ��� � � ���� �� ������� � �� ���� � � � � � ��� � � ���� ���� ���� ����� ����������.
Recommended publications
  • River Irk – Greater Manchester
    River Irk – Greater Manchester An advisory visit carried out by the Wild Trout Trust – Feb 2015 1 1. Introduction This report is the output of a Wild Trout Trust Advisory Visit (AV) undertaken along approximately 3km of the River Irk in Greater Manchester. The visit was carried out by Dr. Paul Gaskell and hosted by Jo Fraser (Groundwork North West), Mike Duddy (Salford Friendly Anglers) and Dave Barlow (Manchester City Council). The River Irk was walked from an upstream limit at NGR (National Grid Reference) SD 86762 05493 to a downstream limit at SD 83972 03627 Throughout the report, normal convention is followed with respect to bank identification i.e. banks are designated Left Hand Bank (LHB) or Right Hand Bank (RHB) whilst looking downstream. Figure 1: Map overview of the catchment including upstream (yellow triangle) and downstream (red dot) limits of inspected reaches 2. Catchment overview The surveyed sections of watercourse are all captured within a single waterbody (GB112069061130); listed as River Irk – Wince Brook to Moston Brook. A number of the parameters are judged to be of less than “Good Potential” for this heavily modified waterbody (e.g. excerpted data given in Table 1.) – giving an overall current and projected ecological potential of “Moderate”. The stand-out assessment results are those for “Phosphate” and “Invertebrate” parameters that are judged to be of “Poor” and “Bad” potential respectively; resulting in an overall biological quality of “Bad”. The presence of a detergents factory (with associated, documented pollution and fish-kill incidents) is a fundamental issue for this section of the River Irk.
    [Show full text]
  • Lower Irk Valley Neighbourhood Development Framework
    Lower Irk Valley Neighbourhood Development Framework January 2016 Lower Irk Valley Neighbourhood Development Framework 2 Lower Irk Valley Neighbourhood Development Framework 3 Contents Executive Summary 4 1. Introduction 12 2. Framework Vision 14 3. Site Analysis 16 4. Masterplan Strategy 44 5. Character Area Guidance 64 Appendix 1: Strategic Context 120 Appendix 2: Malmo – Best Practise Model 136 Appendix 3: Site Photos 138 Lower Irk Valley Neighbourhood Development Framework 4 Executive Summary Introduction - The Study Area Opportunity There is a pressing need for new homes in the City Centre – the Manchester Core Strategy (2012) identifies that an additional 60,000 new homes will be required over the plan period to This Neighbourhood Development Framework (NDF) has been prepared to guide the future 2027. Equally, there is a need to establish neighbourhoods of choice that will support the future development of the Lower Irk Valley in order to ensure a quality of new development and economic growth of the city. Through adoption of appropriate development and urban design supporting public realm, highways and other community infrastructure that will result in a safe, principles, the Lower Irk Valley has the potential to become a key contributor to Manchester’s accessible, vibrant, unique and sustainable residential-led neighbourhood where people want quality of life offer. This is an offer that can become a key differentiator in relation to both retaining to live. The need for this NDF is derived from the Lower Irk Valley’s proximity to the City Centre’s existing talent as well as attracting the new talent that is required to fuel the city’s next wave of employment, leisure, cultural attractions and transport connections.
    [Show full text]
  • Using the Upm Methodology
    USING THE UPM METHODOLOGY Graham Squibbs - North West Water Mark Bottomley and Richard Norreys - Montgomery Watson Introduction The Urban Pollution Management (UPM) studies undertaken by Montgomery Watson with North West Water (NWW)' formed the part of .North West Water's UPM programme within the Mersey Basin. These considered the impact of wastewater treatment work and CSO discharges from the sewer network on the receiving watercourses. These studies covered four areas surrounding and including parts of the City of Manchester being Oldham, to the north east of Manchester, part of Bolton to the north west, Salford to the west and the River Medlock catchment including part of Manchester, Droylesden and Failsworth . The catchments have a population in excess of 600 000 people and contain over 76 UCSOs, four wastewater treatment works requiring upgrading works as part of the National Environmental Programme and in excess of 20 different water courses. Tables 1 to 4 detail the studies. The studies were carried out by Montgomery Watson in conjunction with NWW input to a combined team. The UPM data collection programme covering flow and quality surveys was maintained as a single programme under NWW control. The project involved considerable modelling work. In the course of the studies : 14 HYDROWORKS sewer network quality models were built along with two Mike 11 river impact models and three STOAT wastewater treatment work models. In addition existing drainage area study network hydraulic models were upgraded to HYDROWORKS and reverified. UPM Methodology Urban Pollution Management' (UPM) concerns the management of wastewater discharges from urban sewerage and sewage treatment facilities under wet weather conditions .
    [Show full text]
  • North West River Basin District Flood Risk Management Plan 2015 to 2021 PART B – Sub Areas in the North West River Basin District
    North West river basin district Flood Risk Management Plan 2015 to 2021 PART B – Sub Areas in the North West river basin district March 2016 1 of 139 Published by: Environment Agency Further copies of this report are available Horizon house, Deanery Road, from our publications catalogue: Bristol BS1 5AH www.gov.uk/government/publications Email: [email protected] or our National Customer Contact Centre: www.gov.uk/environment-agency T: 03708 506506 Email: [email protected]. © Environment Agency 2016 All rights reserved. This document may be reproduced with prior permission of the Environment Agency. 2 of 139 Contents Glossary and abbreviations ......................................................................................................... 5 The layout of this document ........................................................................................................ 8 1 Sub-areas in the North West River Basin District ......................................................... 10 Introduction ............................................................................................................................ 10 Management Catchments ...................................................................................................... 11 Flood Risk Areas ................................................................................................................... 11 2 Conclusions and measures to manage risk for the Flood Risk Areas in the North West River Basin District ...............................................................................................
    [Show full text]
  • Strategic Flood Risk Assessment for Greater Manchester
    Strategic Flood Risk Assessment for Greater Manchester Sub-Regional Assessment Appendix B – Supporting Information “Living Document” June 2008 Association of Greater Manchester Authorities SFRA – Sub-Regional Assessment Revision Schedule Strategic Flood Risk Assessment for Greater Manchester June 2008 Rev Date Details Prepared by Reviewed by Approved by 01 August 2007 DRAFT Michael Timmins Jon Robinson David Dales Principal Flood Risk Associate Director Specialist Peter Morgan Alan Houghton Planner Head of Planning North West 02 December DRAFT FINAL Michael Timmins Jon Robinson David Dales 2007 Principal Flood Risk Associate Director Specialist Peter Morgan Alan Houghton Planner Head of Planning North West 03 June 2008 FINAL Michael Timmins Jon Robinson David Dales Principal Flood Risk Associate Director Specialist Anita Longworth Alan Houghton Principal Planner Head of Planning North West Scott Wilson St James's Buildings, Oxford Street, Manchester, This document has been prepared in accordance with the scope of Scott Wilson's M1 6EF, appointment with its client and is subject to the terms of that appointment. It is addressed to and for the sole and confidential use and reliance of Scott Wilson's client. Scott Wilson United Kingdom accepts no liability for any use of this document other than by its client and only for the purposes for which it was prepared and provided. No person other than the client may copy (in whole or in part) use or rely on the contents of this document, without the prior written permission of the Company Secretary of Scott Wilson Ltd. Any advice, opinions, Tel: +44 (0)161 236 8655 or recommendations within this document should be read and relied upon only in the context of the document as a whole.
    [Show full text]
  • Oldham UDP First Deposit
    Schedule of Objections and Representations to 27/11/2002 Oldham Replacement Unitary Development Plan First Deposit, October 2001 By Name Name Policy,Paragraph, Site, Section David Abbot Mersey Met Motorway Stop, Penmon, Beaumaris, Anglesey 0797/1/001/S T1.1 b. Support Supports the extension of Metrolink to Oldham. Metrolink should also be extended to Bolton. Other less polluting public transport systems, e.g. Parry People Mover, should also be considered. Mrs C. Abbott 40 Dorset Avenue, Shaw, Oldham OL2 7DS 0432/1/001/O OE1.7 LR1 Cowlishaw Objection Area should have Green Gap status or become conservation area as it contains SBI, supports wildlife and is a precious green area for children. Development would increase traffic/pollution. Mrs N. Abbott 38 Netherhouse Road, Higher Crompton, Shaw, Oldham OL2 7HY 0193/1/001/O OE1.7 LR1 Cowlishaw Objection Protect as green belt. Suggests renovating derelict houses and improving rundown areas of the Borough. Joint Case Mr&Mrs J. Abson 20 Longfield Road, Shaw, Oldham OL2 7HD 0322/1/001/O OE1.7 LR1 Cowlishaw Objection Allocate as Local Green Gap as land separates built up areas. Also to protect SBI and valued amenity land. Access to site is poor, brownfield sites should be developed before green land. Mr Adamson 98 Oldham Road, Grasscroft, Saddleworth, Oldham OL4 4HU 0601/1/001/O OE1.7 LR9 Summershades Lane, Grasscroft Objection Remove allocation as Land Reserved for Future Development and protect site for the diversity of its wildlife habitats and its recreational/amenity value. Development would increase traffic pollution and could cause flooding.
    [Show full text]
  • Greater Manchester Acknowledgements Contents
    THE CITY WATER RESILIENCE APPROACH CITY CHARACTERISATION REPORT GREATER MANCHESTER ACKNOWLEDGEMENTS CONTENTS On behalf of the study team, I would like to thank The 4 EXECUTIVE SUMMARY Rockefeller Foundation and The Resilience Shift for supporting this project. 6 BACKGROUND The CWRA is a joint effort developed in collaboration 10 RESEARCH METHODOLOGY with our project partners, the Stockholm International 12 UNDERSTANDING GREATER MANCHESTER’S WATER SYSTEM Water Institute (SIWI), along with city partners in Amman, Cape Town, Greater Miami and the Beaches, Mexico City, 16 ENGAGEMENT WITH KEY STAKEHOLDERS Kingston upon Hull, Greater Manchester, Rotterdam and 18 Stakeholder Commentary Thessaloniki, and with contributions from 100 Resilient Cities and the Organisation for Economic Co-operation and 24 Key Programmes Development (OECD). 26 CHARACTERISING RESILIENCE This project would not have been possible without the 28 Critical Interdependencies valued guidance and support of the CWRA Steering 31 Shocks and Stresses Group. Our thanks to the following: Fred Boltz (Resolute 36 Key Factors of Resilience Development Solutions), Casey Brown & Sarah Freeman (University of Massachusetts, Amherst), Katrin Bruebach 44 ACKNOWLEDGEMENTS & Andrew Salkin (100 Resilient Cities), Jo da Silva (Arup), Nancy Kete & Juliet Mian (The Resilience Shift), Diego 46 REFERENCES Rodriguez & Maria Angelica Sotomayor (World Bank). MARK FLETCHER Arup Global Water Leader April 2019 The CWRA project team includes Pilar Avello (SIWI), George Beane (Arup), Kieran Birtill (Arup), James Bristow (Arup), Alexa Bruce (Arup / The Resilience Shift), Louise Ellis (Arup / The Resilience Shift), Sophie Fisher (Arup), Mark Fletcher (Arup), Caroline Karmann (Arup), Richard Gine (SIWI), Alejandro Jiménez (SIWI), James Leten (SIWI), Kathryn Pharr (Venturi Innovation), Oriana Romano (OECD), Iñigo Ruiz-Apilánez (Arup / The Resilience Shift), Panchali Saikia (SIWI), Martin Shouler (Arup) and Paul Simkins (Arup).
    [Show full text]
  • GMPR06 Springwater
    Foreword b Contents b Industrial heritage relating to the textile-fi nishing Introduction .......................................................2 industry has been the poor relation of cotton The River Irwell Catchment ..............................6 spinning, even though it was such a signifi cant part The Early Development of Calico Printing ......8 of the textile-manufacturing economy in the Greater The Development of Bleaching and Dyeing ....14 Manchester area. Its buildings, which are generally The Print Works Around Bury ........................20 very functional, are seen as less architecturally The West East Link Main in the Irwell Valley 24 pleasing than the iconic cotton mills that once Springwater Print Works .................................26 dominated Greater Manchester’s skyline. This Tottington Print Works ...................................32 is refl ected in the designation of heritage assets, Archaeology and Development .......................42 with around 95 mills being listed as regionally or Glossary ...........................................................46 nationally important, but only one fi nishing works. Further Reading ..............................................48 Equally, archaeological recording has focused more Acknowledgements ..........................................49 on the historic buildings of cotton manufacturing, as well as the below-ground remains of their power systems. However, using the planning system, community engagement and specialist research skills of industrial-period experts, it
    [Show full text]
  • The Persistence of Oxbow Lakes As Aquatic Habitats: an Assessment of Rates of Change and Patterns of Alluviation
    The Persistence of Oxbow Lakes as Aquatic Habitats: an Assessment of Rates of Change and Patterns of Alluviation Pauline L. Dieras 2013 Thesis submitted for the degree of Doctorate of Philosophy Declaration This work has not been submitted in substance for any other degree or award at this or any other university or place of learning, nor is being submitted concurrently in candidature for any degree or other award. Signed Pauline Dieras Date: 05/03/2013 This thesis is being submitted in partial fulfilment of the requirements for the degree of PhD Signed Pauline Dieras Date: 05/03/2013 This thesis is the result of my own independent work/investigation, except where otherwise stated. Other sources are acknowledged by explicit references. The views expressed are my own. Signed Pauline Dieras Date: 05/03/2013 I hereby give consent for my thesis, if accepted, to be available for photocopying and for inter-library loan, and for the title and summary to be made available to outside organisations. Signed Pauline Dieras Date: 05/03/2013 i Abstract Oxbow lakes are of high ecological importance due to the number and the diversity of habitats they provide. They are created after the abandonment of meanders and subsequent sediment infilling leads to their progressive terrestrialisation, taking from a few months up to several centuries. Nonetheless, little is known about oxbow lake terrestrialisation processes, sediment composition, or why such a disparity exists in lakes’ longevity. To understand the controls on oxbow lakes alluviation, field observations, remotely sensed data and GIS analyses were combined. Sediment transfers in oxbow lakes were documented by topographic and sampling surveys of sites in France and Wales.
    [Show full text]
  • Review of Discharge Consents Irwell Catchment
    Review of discharge consents. River Irwell catchment report Item Type monograph Publisher North West Water Authority Download date 25/09/2021 14:27:27 Link to Item http://hdl.handle.net/1834/27235 RSD2/A20 REVIEW OF DISCHARGE CONSENTS IRWELL CATCHMENT REPORT Contents 1. Introduction 2. Physical Description of Catchment 3. River Water - Chemical Classification 4 . Discharges and Consents 4.1 Authority Sewage Treatment Works 4.2 Authority Trade Effluent Discharges 4.3 Private Trade Effluent Discharges 4.4 Private Sewage Treatment Works 4 .5 Storm Sewage Overflows 5. Special Cases MARCH 1979 Introduction The purpose of this Report is to make recommendations for the revision of consents for discharges within the catchment of the River Irwell, downstream to and including the River Medlock in Manchester. This revision has the sole objective of recognising the present effluent and river water quality - proposals for long term river water quality objectives are to be put forward in other Reports. The report identifies the existing situation regarding the legal status of effluent discharges from Authority and non-Authority owned installations within the catchment, details the determinand concentration limits included in existing discharge consents (where appropriate) and proposes the limits to be included in the reviewed consents. The reviewed consents will reflect the quality of efflu­ ent achievable by good operation of the existing plant based on 1977 effluent quality data but taking into account any improvements, extensions etc. that have been or are about to be carried out and any known further industrial and/or housing development in the works drainage area. The proposed limits are intended to be the 95% compliance figures rather than the 80% compliance figures inferred in existing consents and hence the new figures will obviously be higher than the old.
    [Show full text]
  • FOR SALE 2 Acres Manchester City Centre Development Opportunity North View, Dantzic Street, Manchester M4 4JE
    CIS Piccadilly Gardens Arndale Tower Corn Trinity Shopping Exchange Way Northern Centre Quarter Manchester Victoria Arena Cooperative Station & Building Metrolink Ancoats Angel Meadow Green Quarter Proposed Development River Irk 2 ACRES SITE Dantzic Street FOR SALE 2 Acres Manchester City Centre Development Opportunity North View, Dantzic Street, Manchester M4 4JE Consent For 415 Apartments Together With Commercial And Amenity Space Plus 153 Car Parking Spaces The Opportunity Description • An exciting development • Highly desirable location on the opportunity in the heart of the outskirts of the popular Northern TheNew site Cross is roughly redevelopment square and area Quarter and Ancoats extendsof Manchester to approximately City Centre 0.8Ha • The site has the benefit of being •(2 Planning acres). application submitted sold with vacant possession and Planningfor 14 apartments consent has comprising been granted in shell condition for10no. a single two-bedroom apartment andbuilding • Fantastic residential location arranged4no. one-bedroom around a central apartments communal with regards to amenity, courtyard and which varies from transport and leisure offering 5 to 24 storeys in height. The consent provides for 130 one bed apartments, 262 two bed, two bath apartments and 23 three bed, three bath apartments. In addition there is consent for 268m2 of commercial space, car parking and public space including a resident’s gym. Measured on an NIA basis the floor 1 Proposed Site 7 Arndale 11 Beetham area of the residential element 2 Ancoats Shopping Tower extends to 27,643m2 (297,549ft2). 1 3 Co-operative Centre 12 Three Towers The overall GIA is 41,511m2 Building 8 CIS Tower (Sisters) (446,824ft2).
    [Show full text]
  • The Tudor Water Mill. ​By Peter James Corbally in 1543 Sir Robert
    The Tudor Water Mill. by Peter James Corbally ​ In 1543 Sir Robert Langley of Agecroft Hall, Lord of the Manor of Prestwich, built a weir across the River Irwell to provide water for a water mill. The weir was to raise the level of the river and pen back water that could be used to work the wheel at the mill. The weir was 20 yards long and 28 inches high above the river level raising the river level by an extra 24 inches. Presumably there was a mill race which led a forceful stream of water to the wheel. The mill and weir cost 300 marks to build and provided a profit of 40 marks per annum. It operated smoothly for four or so years. th Then on 20 ​ June 1548, Thomas Holland, Lord of the Manor of Clifton came with six ​ other men and broke down the end of the weir on the western bank. The water flowed out through the broken weir and the mill ceased operation. Truth to tell the western end of the weir rested on Thomas Holland’s land on the Clifton bank. Sir Robert Langley needed the co-operation of Thomas Holland in order to build the weir. The river must have been surveyed and the best spot for the weir must have rested on the Prestwich bank on the east and the Clifton bank on the west of the river. The two men, Sir Robert Langley and Thomas Holland, made a gentleman’s agreement about the weir five years earlier and Sir Robert, trusting Thomas Holland’s word, had gone ahead and built the project.
    [Show full text]