Metro Manila Infrastructure Development

Total Page:16

File Type:pdf, Size:1020Kb

Metro Manila Infrastructure Development Republic of the Philippines Department of Public Works and Highways URBAN ROAD PROJECTS OFFICE Metro Manila Infrastructure Development CARLOS G. MUTUC Project Director URBANURBAN ROADROAD PROJECTSPROJECTS OFFICEOFFICE URPOURPO isis aa specialspecial projectproject officeoffice responsibleresponsible forfor thethe formulationformulation andand developmentdevelopment ofof allall projectsprojects inin urbanurban areas,areas, particularlyparticularly inin MetroMetro Manila,Manila, financedfinanced byby JBIC,JBIC, WBWB andand ADB.ADB. ItIt alsoalso implementsimplements highlyhighly complexcomplex projectsprojects financedfinanced byby GOP.GOP. URPOURPO’s’s mainmain tasktask isis toto ensureensure aa moremore effectiveeffective andand expedientexpedient implementationimplementation ofof projectsprojects gearedgeared towardstowards completioncompletion ofof thethe MetroMetro ManilaManila MajorMajor RoadRoad NetworkNetwork System.System. URBANURBAN ROADROAD PROJECTSPROJECTS OFFICEOFFICE I STRATEGYSTRATEGYI -- addressaddress criticalcritical bottlenecksbottlenecks andand alleviatealleviate traffictraffic congestioncongestion inin MetroMetro Manila.Manila. GOALSGOALS -- completecomplete thethe MMMM roadroad networknetwork systemsystem -- constructconstruct interchangesinterchanges atat majormajor intersectionsintersections -- constructconstruct secondarysecondary roadsroads toto complementcomplement thethe MMMM RoadRoad NetworkNetwork -- rehabilitaterehabilitate primary/secondaryprimary/secondary roadsroads -- establishestablish aa validvalid urbanurban transporttransport policypolicy inin lineline withwith MMUTISMMUTIS URBANURBAN ROADROAD PROJECTSPROJECTS OFFICEOFFICE I SPECIFICSPECIFICI OBJECTIVESOBJECTIVES -- constructconstruct interchangesinterchanges atat majormajor intersectionsintersections alongalong EDSA,EDSA, CC-5,-5, CC-3-3 andand CC-2-2 -- carrycarry outout corridorcorridor improvementimprovement measuresmeasures throughthrough roadroad rehabilitationrehabilitation -- introduceintroduce traffictraffic managementmanagement measuresmeasures andand transporttransport facilitiesfacilities toto sustainsustain andand supportsupport thethe economiceconomic growthgrowth inin MMMM -- completecomplete missingmissing linkslinks ofofof MMMMMM RoadRoadRoad NetworkNetwork systemsystem -- developdevelop infrainfra accessaccess toto majormajor sea/airsea/air terminalsterminals -- improveimprove existingexisting bridgesbridges alongalong majormajor riversrivers toto increaseincrease traffictraffic capacitycapacity URBANURBAN ROADROAD PROJECTSPROJECTS OFFICEOFFICE I I VISIONSVISIONS FORFOR METROMETRO MANILAMANILA -- fasterfaster traveltravel timetime -- lesserlesser traffictraffic congestioncongestion -- reducereduce directdirect financialfinancial costcost ofof construction,construction, operationoperation andand maintenancemaintenance -- promotepromote environmentalenvironmental balancebalance -- improveimprove usersusers’’ comfortcomfort andand convenienceconvenience METROMETRO MANILAMANILA MAJORMAJOR ROADROAD NETWORKNETWORK CIRCUMFERENTIALCIRCUMFERENTIAL ROADSROADS C-1 : P. Burgos St. (Roxas. Blvd. to Taft Ave.) Ayala Blvd. ((Taft Ave. to Echague St.) P. Casal Street Ave. (Echague Street to Legarda St.) C.M. Recto Ave. (Legarda St. to R-10 Road) C-2 : Pres. Quirino Ave. (Roxas Blvd. to Mendoza- Guanzon St.) Nagtahan (Mendoza-Guanzon St. to Legarda St.) A. Mendoza St. (Legarda St. to Dimasalang St.) Tayuman St. (Dimasalang St. to R-10 Road) C-3 : Sen. G. Puyat Ave. (Roxas Blvd. to Ayala Ave.) San Juan Bridge (N. Domingo St. to Aurora Blvd.) G. Araneta Ave. (Aurora Blvd. to Sgt. River St.) Sgt. Rivera Ave. (G. Araneta Ave. to A. Bonifacio Ave.) C-3 Road (R-10 Road to A. Bonifacio Ave.) C-4 :EDSA (Taft Ave. to McArthur Highway) Samson Road (McArthur Highway to A. Mabini Ave.) Letre Road (A. Mabini Ave. to Sansiangco St.) C-5 : South Superhighway to Katipunan Avenue Katipunan Avenue to Letre Road C-6 : Alignment under Study METROMETRO MANILAMANILA MAJORMAJOR ROADROAD NETWORKNETWORK RADIALRADIAL ROADSROADS R-1 : Roxas Boulevard (Del Pan Bridge to Seaside Road to Bacoor, Cavite) R-2 : Taft Avenue (Lawton to Baclaran) R-3 : Manila South Expressway (Pres. Quirino Ave. to Zapote-Alabang Road) R-4 : Pasig Line (Pedro Gil Street to A. Francisco Street) Kalayaan Ave. (A. Bonifacio St. to Bel-Air Subd.) Kalayaan Ave. (EDSA to C-5) R-5 : V. Mapa St. (R. Magsaysay Blvd. to Valenzuela St.) P. Sanchez (Valenzuela St. to Gen. Kalentong St.) Shaw Blvd. (Gen. Kalentong St. to Capt. Javier St.) Pasig Blvd. (Capt. Javier St. to Dr. Sixto Antonio Ave. R-6 : Legarda St. (C.M. Recto Ave. to Nagtahan) R. Magsaysay Blvd. (Nagtahan to V. Mapa St.) Aurora Blvd. (V. Mapa St. to marcos Highway) A. Bonifacio H-way/Sumulong H-way (Marcos H-way to Marikina Bdy.) R-7 : Lerma Street (Quiapo to Morayta Street) España Avenue (Morayta St. to E. Rodriguez Ave.) Quezon Ave. (E. Rodriguez Ave. to Elliptical Road) D.M. Marcos Ave. (Elliptical Road to Fairview Ave.) R-8 : Quezon Blvd. (Quiapo to Dapitan St.) A. Mendoza Ave. (Dapitan St. to Laong Laan St.) Dimasalang St. (Laong Laan St. to Retiro St.) A. Bonifacio Ave. (Retiro St. to EDSA) Quirino Ave. (EDSA to Quezon City Limit) R-9 : J. Abad Santos Ave. (C.M. Recto Ave. to Aurora Blvd.) Rizal Ave. Ext. (Aurora Blvd. to EDSA) McArthur Highway (EDSA to Baclaran Boundary) R-10: Del Pan Bridge to Spine Road Metro Manila Infrastructure Development Interchange Projects C-5/B.C-5/B. SerranoSerrano Ave.-KatipunanAve.-Katipunan Ave.Ave. InterchangeInterchange ImplementationImplementation ScheduleSchedule StartStart DateDate :: Mar.Mar. 20022002 CompletionCompletion DateDate :: Jan.Jan. 20052005 EDSA/NorthEDSA/North Avenue-WestAvenue-West Avenue-MindanaoAvenue-Mindanao AvenueAvenue InterchangeInterchange ImplementationImplementation ScheduleSchedule (Tentative)(Tentative) StartStart DateDate :: 20062006 CompletionCompletion DateDate :: 20082008 EDSA/NorthEDSA/North Avenue-WestAvenue-West Avenue-MindanaoAvenue-Mindanao AvenueAvenue InterchangeInterchange EDSA/RooseveltEDSA/Roosevelt AvenueAvenue InterchangeInterchange ImplementationImplementation ScheduleSchedule (Tentative)(Tentative) StartStart DateDate :: 20062006 CompletionCompletion DateDate :: 20082008 C-5/R-4C-5/R-4 (Kalayaan(Kalayaan Avenue)Avenue) InterchangeInterchange ImplementationImplementation ScheduleSchedule (Tentative)(Tentative) StartStart DateDate :: 20062006 CompletionCompletion DateDate :: 20072007 C-5/LanuzaC-5/Lanuza Street-J.Street-J. VargasVargas AvenueAvenue InterchangeInterchange ImplementationImplementation ScheduleSchedule (Tentative)(Tentative) StartStart DateDate :: 20062006 CompletionCompletion DateDate :: 20072007 C-3C-3 (Sgt.(Sgt. RiveraRivera St.)/A.St.)/A. BonifacioBonifacio AvenueAvenue InterchangeInterchange ImplementationImplementation ScheduleSchedule (Tentative)(Tentative) StartStart DateDate :: 20082008 CompletionCompletion DateDate :: 20092009 C-2C-2 (Gov.(Gov. Forbes)/R-7Forbes)/R-7 (Espa(Españña)a) InterchangeInterchange ImplementationImplementation ScheduleSchedule (Tentative)(Tentative) StartStart DateDate :: 20082008 CompletionCompletion DateDate :: 20092009 C-3C-3 (G.(G. AranetaAraneta Avenue)/R-7Avenue)/R-7 (Quezon(Quezon Avenue)Avenue) InterchangeInterchange ImplementationImplementation ScheduleSchedule (Tentative)(Tentative) StartStart DateDate :: 20072007 CompletionCompletion DateDate :: 20082008 C-3C-3 (G.(G. AranetaAraneta Avenue)/E.Avenue)/E. Rodriguez,Rodriguez, Sr.Sr. AvenueAvenue InterchangeInterchange ImplementationImplementation ScheduleSchedule (Tentative)(Tentative) StartStart DateDate :: 20072007 CompletionCompletion DateDate :: 20082008 Metro Manila Infrastructure Development Bridge, Road & Sidewalk Improvement Projects Ortigas Avenue Extension LocationLocation MapMap ImplementationImplementation ScheduleSchedule StartStart DateDate :: Aug.Aug. 20022002 CompletionCompletion DateDate :: Oct.Oct. 20042004 Marikina Bridge and Access Road Marcos Highway Marcos . e v A n a n u p ti a K :: Jan.Jan. 20052005 B. Serrano Ave. 5 - C ImplementationImplementation ScheduleSchedule StartStart DateDate CompletionCompletion DateDate :: Feb.Feb. 20072007 Marcos Highway GeneralGeneral LayoutLayout CAINTA RIZAL BOUNDARY LINE MARIKINA ImplementationImplementation ScheduleSchedule BOUNDARY LINE StartStart DateDatePASIG :: 20062006 CompletionCompletion DateDate :: 20082008 Metro Manila Urban Transport Integration Project, Phase II DPWHDPWH ComponentComponent QUIRINOQUIRINO HIGHWAYHIGHWAY 1010THTH AVENUEAVENUE J.J. FAJARDOFAJARDO STREETSTREET TAYUMANTAYUMAN STREETSTREET M.M. DELAFUENTEDELAFUENTE STREETSTREET PEDROPEDRO GILGIL // NEWNEW PANADEROSPANADEROS PASONGPASONG TAMOTAMO SOUTHSOUTH SUPERHIGHWAYSUPERHIGHWAY SERVICESERVICE ROADSROADS MMDAMMDA ComponentComponent GILGIL PUYATPUYAT AVENUEAVENUE A.A. ARNAIZARNAIZ AVE.AVE. (Pasay(Pasay Road) Road) BANAUEBANAUE AVENUEAVENUE BICUTANBICUTAN INTERCHANGEINTERCHANGE ALABANGALABANG INTERCHANGEINTERCHANGE PROJECTPROJECT DESCRIPTION:DESCRIPTION: a.a. RoadRoad surface/drainage/surface/drainage/ intersectionintersection improvementimprovement b.b. PedestrianPedestrian facilities/barriersfacilities/barriers alongalong sidewalkssidewalks c.c. RemovalRemoval ofof on-streeton-street parkingparking andand advertisingadvertising ads/signsads/signs structuresstructures alongalong sidewalksidewalk d.d. ProvisionProvision ofof lanelane markingsmarkings ImplementationImplementation ScheduleSchedulee.e. RestorationRestoration ofof sidewalkssidewalks f.f. InstallationInstallation ofof road/trafficroad/traffic
Recommended publications
  • LAGUNA LAKE DEVELOPMENT AUTHORITY National Ecology Center, East Avenue, Diliman, Quezon City Phone Nos
    LAGUNA LAKE DEVELOPMENT AUTHORITY National Ecology Center, East Avenue, Diliman, Quezon City Phone Nos. (02) 8 376-4039, (02) 8 376-4072, (02) 8 376-4044, (02) 8 332-2353, (02) 8 332-2341, (02) 8 376-5430 Locals 115, 116, 117 and look for Ms. Julie Ann G. Blanquisco or Ms. Marivic A. Dela Torre-Santos E-mail: [email protected] | [email protected] Website: http://llda.gov.ph List of APPROVED DISCHARGE PERMITS as of September 03, 2021 Establishment Address Permit No. Approve Date 11 FTC Enterprises, Inc. 236 P. Dela Cruz San Bartolome Quezon City MM DP-25b-2021-03532 August 18, 2021 189 Realty Corp. (CI Market) Qurino Highway Santa Monica, Novaliches Quezon City MM DP-25b-2021-03744 August 20, 2021 189 Realty Corporation - 2nd (CI Market/Commercial Complex) Quirino Highway, Sta. Monica Novaliches Quezon City MM DP-25b-2021-03743 August 20, 2021 21st Century Mouldings Corporation 18 F. Carlos St. cor. Howmart Road Apolonio Samson Quezon City MM DP-25b-2021-03541 August 23, 2021 24K Property Ventures, Inc. (20 Lansbergh Place Condominium) 170 T. Morato Ave. cor. Sct. Castor Sacred Heart Quezon City MM DP-25b-2021-02819 July 15, 2021 3J Foods Corp. Sta. Ana San Pablo City Laguna DP-16d-2021-03174 August 06, 2021 8 Gilmore Place Condominium 8 Gilmore Ave. cor. 1st St. Valencia New Manila Quezon City MM DP-25b-2021-03829 August 27, 2021 AC Technical Services, Inc. 5 RMT Ind`l. Complex Tunasan Muntinlupa City MM DP-23a-2021-01804 May 12, 2021 Ace Roller Manufacturing, Inc.
    [Show full text]
  • PPP Road Projects
    PPP Road Projects ROGELIO L. SINGSON Secretary Department of Public Works and Highways November 18, 2010 1 PRESENTATION OUTLINE Strategic Directions Expressways in Operation and Under Construction Projects for Bidding in 2011 PPP Pipeline of Projects under the Medium Term Other DPWH PPP Projects Under Development 2 STRATEGIC DIRECTIONS Upgrading the national road network in terms of quality and safety standards with focus on urban centers and strategic tourism destinations; Completion of critical bridges along national roads; Develop more Public-Private Partnership (PPP) projects for much needed infrastructure and level playing field for investments; Address private sector concerns – Transparency, RROW, regulatory risks and government support; Pursue contracts for long term maintenance period (5-10 years) in road and bridge construction; and Introduce innovative technology such as bio-engineering for road slope protection 3 EXPRESSWAYS IN OPERATION Project Name Subic-Clark-Tarlac Expressway (93.77 km) North Luzon Tollway (82.62 km) C-5 Expressway (Segment 8.1, 2.34 km) Metro Manila Skyway, Stage 1 (13.43 km At-grade & 9.30 km Viaduct) Manila-Cavite Toll Expressway (6.75 km) South Luzon Tollway (36.03 km) Southern Tagalog Arterial Road (41.90 km) 4 Total Length = 286.14 km EXPRESSWAY UNDER CONSTRUCTION/PLANNING Project Name Tarlac- Pangasinan- La Union Toll Expressway (TPLEX) (88.58 km) North Luzon Tollway, C-5 Expressway Segment 8.2 - 10.23 km Segment 9 - 4.06 km Segment 10 - 5.63 km NLEx-SLEx Link Expressway (13.4 km) (Unsolicited proposal for NEDA review and subject to Swiss Challenge) Manila-Cavite Toll Expressway, R-1 Extension (7.00 km) Metro Manila Skyway, Stage 2 (6.88 km) Total Length = 135.78 km 5 EXISTING SITUATION IN METRO MANILA AND NEARBY AREAS Arterial road network composed of 6 circumferential and 10 radial roads proposed in the late 1960s.
    [Show full text]
  • Resettlement Plan PHI: EDSA Greenways Project (Balintawak
    Resettlement Plan February 2020 PHI: EDSA Greenways Project (Balintawak Station) Prepared by Department of Transportation for the Asian Development Bank. This resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area CURRENCY EQUIVALENTS (As of 30 January 2020; Central Bank of the Philippines) Philippine Peso (PhP) (51.010) = US $ 1.00 ABBREVIATIONS ADB Asian Development Bank AH Affected Household AO Administrative Order AP Affected Persons BIR Bureau of Internal Revenue BSP Bangko Sentral ng Pilipinas CA Commonwealth Act CGT Capital Gains Tax CAP Corrective Action Plan COI Corridor of Impact DA Department of Agriculture DAO Department Administrative Order DAR Department of Agrarian Reform DAS Deed of Absolute Sale DBM Department of Budget and Management DDR Due Diligence Report DED Detailed Engineering Design DENR Department of Environment and Natural Resources DILG Department of Interior and Local Government DMS Detailed Measurement Survey DO Department Order DOD Deed of Donation DOTr Department of Transportation DPWH Department of
    [Show full text]
  • FOI Manuals/Receiving Officers Database
    National Government Agencies (NGAs) Name of FOI Receiving Officer and Acronym Agency Office/Unit/Department Address Telephone nos. Email Address FOI Manuals Link Designation G/F DA Bldg. Agriculture and Fisheries 9204080 [email protected] Central Office Information Division (AFID), Elliptical Cheryl C. Suarez (632) 9288756 to 65 loc. 2158 [email protected] Road, Diliman, Quezon City [email protected] CAR BPI Complex, Guisad, Baguio City Robert L. Domoguen (074) 422-5795 [email protected] [email protected] (072) 242-1045 888-0341 [email protected] Regional Field Unit I San Fernando City, La Union Gloria C. Parong (632) 9288756 to 65 loc. 4111 [email protected] (078) 304-0562 [email protected] Regional Field Unit II Tuguegarao City, Cagayan Hector U. Tabbun (632) 9288756 to 65 loc. 4209 [email protected] [email protected] Berzon Bldg., San Fernando City, (045) 961-1209 961-3472 Regional Field Unit III Felicito B. Espiritu Jr. [email protected] Pampanga (632) 9288756 to 65 loc. 4309 [email protected] BPI Compound, Visayas Ave., Diliman, (632) 928-6485 [email protected] Regional Field Unit IVA Patria T. Bulanhagui Quezon City (632) 9288756 to 65 loc. 4429 [email protected] Agricultural Training Institute (ATI) Bldg., (632) 920-2044 Regional Field Unit MIMAROPA Clariza M. San Felipe [email protected] Diliman, Quezon City (632) 9288756 to 65 loc. 4408 (054) 475-5113 [email protected] Regional Field Unit V San Agustin, Pili, Camarines Sur Emily B. Bordado (632) 9288756 to 65 loc. 4505 [email protected] (033) 337-9092 [email protected] Regional Field Unit VI Port San Pedro, Iloilo City Juvy S.
    [Show full text]
  • BUS Bus Time Schedule & Line Route
    BUS bus time schedule & line map Senator Gil Puyat Ave, Makati City →Sta. Maria - BUS Tungkong Mangga Rd / Quirino Highway View In Website Mode Intersection, City Of San Jose Del Monte The BUS bus line (Senator Gil Puyat Ave, Makati City →Sta. Maria - Tungkong Mangga Rd / Quirino Highway Intersection, City Of San Jose Del Monte) has 2 routes. For regular weekdays, their operation hours are: (1) Senator Gil Puyat Ave, Makati City →Sta. Maria - Tungkong Mangga Rd / Quirino Highway Intersection, City Of San Jose Del Monte: 12:00 AM - 11:00 PM (2) Sta. Maria - Tungkong Mangga Rd / Quirino Highway Intersection, City Of San Jose Del Monte →Senator Gil Puyat Ave, Lungsod Ng Pasay, Manila: 12:00 AM - 11:00 PM Use the Moovit App to ƒnd the closest BUS bus station near you and ƒnd out when is the next BUS bus arriving. Direction: Senator Gil Puyat Ave, Makati BUS bus Time Schedule City →Sta. Maria - Tungkong Mangga Rd / Quirino Senator Gil Puyat Ave, Makati City →Sta. Maria - Highway Intersection, City Of San Jose Del Monte Tungkong Mangga Rd / Quirino Highway 138 stops Intersection, City Of San Jose Del Monte Route VIEW LINE SCHEDULE Timetable: Sunday 12:00 AM - 10:00 PM Senator Gil Puyat Ave, Makati City Monday 12:00 AM - 11:00 PM U Turn Slot to Pasay Taft, Philippines Tuesday 12:00 AM - 11:00 PM Bautista / Senator Gil Puyot Ave, Makati City, Manila Wednesday 12:00 AM - 11:00 PM Thursday 12:00 AM - 11:00 PM Senator Gil Puyat Ave, Makati City 80 Senator Gil Puyat Avenue, Philippines Friday 12:00 AM - 11:00 PM Senator Gil Puyat Ave / Washington Intersection, Saturday 12:00 AM - 10:00 PM Makati City Senator Gil Puyat Ave, Makati City 252 Senator Gil Puyat Avenue, Philippines BUS bus Info Ayala Ave, Makati City, Manila Direction: Senator Gil Puyat Ave, Makati City →Sta.
    [Show full text]
  • MMARAS Annual Report 2006
    MMARAS Metro Manila Accident Reporting and Analysis System Annual Report January to December 2006 Produced by the Road Safety Unit (RSU) Traffic Operations Center (TOC) Metropolitan Manila Development Authority (MMDA) 1 Introduction The Metro Manila Accident Reporting and Analysis System (MMARAS) is operated by the Road Safety Unit (RSU) of the MMDA-Traffic Operations Center (TOC), with the cooperation and assistance of the Traffic Enforcement Group under National Capital Regional Police Office (TEG-NCRPO) Philippine National Police (PNP). The objective is to compile and maintain an ongoing database of „Fatal‟ and „Non Fatal‟ including the „Damage to Property‟ road accidents, which can indicate areas where safety improvements need to be made. The system will also allow the impact of improvement measures to be monitored. This report is intended to be an annual analysis of „Fatal‟, “Non Fatal‟ and „Damage to Property‟ road accidents that have been recorded by the PNP Traffic Accident Investigators for the year 2006. The information is presented in graphical and tabular form, which provides a readily identifiable pattern of accident locations and causation patterns. Annual comparisons of traffic accident statistics are also included in this report. The Road Safety Unit currently has 9 data researchers who gather traffic accident data from different traffic offices and stations of the Traffic Enforcement Group (TEG-NCRPO) within Metro Manila. Previously, only those incidences involving Fatal and Non Fatal are gathered and encoded at the MMARAS database. But for the year 2005 up to present, we included the Damage to Property incidence so that we can see the significance and the real picture of what really is happening in our roads and also it gives us additional information in analyzing the causes of accident.
    [Show full text]
  • '17 JUL31 All
    SEVENTEENTH CONGRESS OF THE ) REPUBLIC OF THE PHILIPPINES ) 'W e ' C'ffitf pfliir :r-;-,-;rlnry Second Regular Session ) SENATE '17 JUL 31 All '33 Senate Bill No. 1529 RECE iVI D £':■ (In substitution of Senate Bill Nos. 420, 556, 608, 671, 915, 1081 and 1T74)- Prepared jointly by the Committees on Education, Arts and Culture, Ways and Means and Finance, with Senators Legarda, Binay, Trilianes IV, Aquino IV, Ejercito and Escudero as authors AN ACT STRENGTHENING THE NATIONAL MUSEUM OF THE PHILIPPINES, REPEALING FOR THE PURPOSE REPUBLIC ACT NO. 8492, OTHERWISE KNOWN AS THE NATIONAL MUSEUM ACT OF 1998, AND APPROPRIATING FUNDS THEREFOR Be it enacted by the Senate and House of Representatives of the Philippines in Congress assembled: 1 SECTION 1. Short Title. - This Act shall be known as the ‘‘National Museum of the 2 Philippines Act”. 3 4 SEC. 2. Declaration of Policy. - It is the policy of the State to pursue and support the cultural 5 development of the Filipino people, through the preservation, enrichment and dynamic evolution of 6 Filipino national culture, based on the principle of unity in diversity in a climate of free artistic and 7 intellectual expression. 8 9 SEC. 3. Name of the Agency. - The National Museum is hereby renamed as the “National 10 Museum of the Philippines”, or, alternatively in Filipino, “Pambansang Museo ng Pilipinas'\ 11 12 The shortened name “National Museum” or “Pambansang Museo" shall be understood as 13 exclusively referring to the same, and its use in any manner or part of any name with respect to any 14 institution within the Philippines shall be reserved exclusively to the same.
    [Show full text]
  • ACCOMMODATIONS Admiral Hotel 2138 Roxas Boulevard, Metro
    ACCOMMODATIONS Admiral Hotel 2138 Roxas Boulevard, Metro Manila, Philippines Tel: 632-572-081, Fax: 632-522-2018 Pearl Garden Hotel 1700 M. Adriatico St. corner Gen. Malvar St. Malate, Manila Philippines Telephone: (02) 525-1000, Fax Number: (02) 521-9297 Email: [email protected] Riviera Mansion Hotel 1638 A Mabini St. Malate, Manila Phone: +632 523 4511 Fax: +632 522 2606 , Email: [email protected] Pan Pacific Manila Hotel M. Adriatico corner Gen. Malvar Streets, Malate , Manila City 1004 Philippines Tel No.+63 2 318 0788 Fax: +63 2 302 9501 Best Western Hotel La Corona 1166 MH del Pilar cor. Arquiza Sts., Ermita,, Manila, 1000, PH Phone: +63 2 524 2631 Fax: +63 2 525 8268 Traders Hotel Manila 3001 Roxas Boulevard, Pasay City, 1305, Philippines T: (63 2) 708 4888 F: (63 2) 708 9850 City Garden Suites Manila 1158 A. Mabini St., Ermita Manila, Philippines Telephone: (632) 536-1451 to 59, Facsimile: (632) 524-4844 Domestic Toll-Free: 1-800-1-888-6789, Email Address: [email protected] Lotus Garden Hotel 1227 A. Mabini cor. Padre Faura Sts., Ermita, Manila, Philippines Tel: (632) 522-1515, Fax: (632) 522-0768, [email protected] Casa Bocobo Hotel Jorge Bocobo Street corner Kalaw Avenue, Ermita, Manila 1000 Philippines , Tel. No. +63 2 526 3783 or 526 2937 or 526 4017 or 516 7936 or 516 7928 or 516 7931 Chill Out Guest House 4th Floor, Lucky 888 Building, 1288 Marcelo H. Del Pilar Street, Ermita Manila, Philippines , Phone Number: +63 (2) 450 8023 CSB Hotel International Conference Center Manila Arellano Ave.
    [Show full text]
  • Part Ii Metro Manila and Its 200Km Radius Sphere
    PART II METRO MANILA AND ITS 200KM RADIUS SPHERE CHAPTER 7 GENERAL PROFILE OF THE STUDY AREA CHAPTER 7 GENERAL PROFILE OF THE STUDY AREA 7.1 PHYSICAL PROFILE The area defined by a sphere of 200 km radius from Metro Manila is bordered on the northern part by portions of Region I and II, and for its greater part, by Region III. Region III, also known as the reconfigured Central Luzon Region due to the inclusion of the province of Aurora, has the largest contiguous lowland area in the country. Its total land area of 1.8 million hectares is 6.1 percent of the total land area in the country. Of all the regions in the country, it is closest to Metro Manila. The southern part of the sphere is bound by the provinces of Cavite, Laguna, Batangas, Rizal, and Quezon, all of which comprise Region IV-A, also known as CALABARZON. 7.1.1 Geomorphological Units The prevailing landforms in Central Luzon can be described as a large basin surrounded by mountain ranges on three sides. On its northern boundary, the Caraballo and Sierra Madre mountain ranges separate it from the provinces of Pangasinan and Nueva Vizcaya. In the eastern section, the Sierra Madre mountain range traverses the length of Aurora, Nueva Ecija and Bulacan. The Zambales mountains separates the central plains from the urban areas of Zambales at the western side. The region’s major drainage networks discharge to Lingayen Gulf in the northwest, Manila Bay in the south, the Pacific Ocean in the east, and the China Sea in the west.
    [Show full text]
  • Transportation History of the Philippines
    Transportation history of the Philippines This article describes the various forms of transportation in the Philippines. Despite the physical barriers that can hamper overall transport development in the country, the Philippines has found ways to create and integrate an extensive transportation system that connects the over 7,000 islands that surround the archipelago, and it has shown that through the Filipinos' ingenuity and creativity, they have created several transport forms that are unique to the country. Contents • 1 Land transportation o 1.1 Road System 1.1.1 Main highways 1.1.2 Expressways o 1.2 Mass Transit 1.2.1 Bus Companies 1.2.2 Within Metro Manila 1.2.3 Provincial 1.2.4 Jeepney 1.2.5 Railways 1.2.6 Other Forms of Mass Transit • 2 Water transportation o 2.1 Ports and harbors o 2.2 River ferries o 2.3 Shipping companies • 3 Air transportation o 3.1 International gateways o 3.2 Local airlines • 4 History o 4.1 1940s 4.1.1 Vehicles 4.1.2 Railways 4.1.3 Roads • 5 See also • 6 References • 7 External links Land transportation Road System The Philippines has 199,950 kilometers (124,249 miles) of roads, of which 39,590 kilometers (24,601 miles) are paved. As of 2004, the total length of the non-toll road network was reported to be 202,860 km, with the following breakdown according to type: • National roads - 15% • Provincial roads - 13% • City and municipal roads - 12% • Barangay (barrio) roads - 60% Road classification is based primarily on administrative responsibilities (with the exception of barangays), i.e., which level of government built and funded the roads.
    [Show full text]
  • Hub Identification of the Metro Manila Road Network Using Pagerank Paper Identification Number: AYRF15-015 Jacob CHAN1, Kardi TEKNOMO2
    “Transportation for A Better Life: Harnessing Finance for Safety and Equity in AEC August 21, 2015, Bangkok, Thailand Hub Identification of the Metro Manila Road Network Using PageRank Paper Identification Number: AYRF15-015 Jacob CHAN1, Kardi TEKNOMO2 1Department of Information Systems and Computer Science, School of Science and Engineering Ateneo de Manila University, Loyola Heights, Quezon City, Philippines 1108 Telephone +632-426-6001, Fax. +632-4261214 E-mail: [email protected] 2Department of Information Systems and Computer Science, School of Science and Engineering Ateneo de Manila University, Loyola Heights, Quezon City, Philippines 1108 Telephone +632-426-6001, Fax. +632-4261214 E-mail: [email protected] Abstract We attempt to identify the different node hubs of a road network using PageRank for preparation for possible random terrorist attacks. The robustness of a road network against such attack is crucial to be studied because it may cripple its connectivity by simply shutting down these hubs. We show the important hubs in a road network based on network structure and propose a model for robustness analysis. By identifying important hubs in a road network, possible preparation schemes may be done earlier to mitigate random terrorist attacks, including defense reinforcement and transportation security. A case study of the Metro Manila road network is also presented. The case study shows that the most important hubs in the Metro Manila road network are near airports, piers, major highways and expressways. Keywords: PageRank, Terrorist Attack, Robustness 1. Introduction Table 1 Comparative analysis of different Roads are important access points because methodologies on network robustness indices connects different places like cities, districts, and Author Method Strength Weakness landmarks.
    [Show full text]
  • ECC Issued FY 2014 ECC Reference Report Date Application Decision Name Proponent Document Status Series Code Type Received Date Date
    ECC Issued FY 2014 ECC Reference Report Date Application Decision Name Proponent Document Status Series Code Type Received Date Date Alabang Town Center BPO 1 Alabang 1 ECC-NCR-1401-0001 ECC IEEC 1/6/2014 1/6/2014 1/16/2014 Approved Alabang Town Center, Brgy. Ayala, Commercial Corp. Alabang,, Muntinlupa, Metro Manila IBP Tower Ortigas and 2 ECC-NCR-1401-0003 Company Limited ECC IEEC 1/6/2014 1/6/2014 2/6/2014 Approved Julia Vargas Ave., Ortigas Center,, Partnershipp Pasig City, Metro Manila T-Park Project Fort Bonifacio 3 ECC-NCR-1401-0005 Development ECC IEEC 1/6/2014 1/6/2014 1/28/2014 Approved B18,L4, 26th, BGC,, Taguig, Metro Corporation Manila Vertis North Towers 4 ECC-NCR-1401-0006 Ayala Land, Inc. ECC IEEC 1/6/2014 1/6/2014 1/16/2014 Approved Vertis North Triangle, Brgy. Bagong Pag-asa,, Quezon City, Metro Manila Fortune Hill Project 5 ECC-NCR-1401-0008 Filinvest Land, Inc. ECC IEEC 1/6/2014 1/6/2014 1/20/2014 Approved 173 P. Gomez St.,, San Juan, Metro Manila Studio A Residential Condominium 6 ECC-NCR-1401-0009 Filinvest Land, Inc. ECC IEER 1/6/2014 1/6/2014 1/20/2014 Approved 99 Xavierville Ave., cor. E. Abada St., Loyola Heights,, Quezon City, Metro Manila Plastic Recycling Project 7 ECC-NCR-1401-0011 Sanplas Industries ECC IEEC 1/6/2014 1/6/2014 2/7/2014 Approved 6390 Tatalon St., Ugong,, Valenzuela, Metro Manila Shipbuilding and Repair Yard 8 ECC-NCR-1401-0013 Sas Shipyard, Inc.
    [Show full text]