Republic of the Department of Public Works and Highways

URBAN ROAD PROJECTS OFFICE

Metro Infrastructure Development

CARLOS G. MUTUC Project Director URBANURBAN ROADROAD PROJECTSPROJECTS OFFICEOFFICE

URPOURPO isis aa specialspecial projectproject officeoffice responsibleresponsible forfor thethe formulationformulation andand developmentdevelopment ofof allall projectsprojects inin urbanurban areas,areas, particularlyparticularly inin MetroMetro Manila,Manila, financedfinanced byby JBIC,JBIC, WBWB andand ADB.ADB. ItIt alsoalso implementsimplements highlyhighly complexcomplex projectsprojects financedfinanced byby GOP.GOP. URPOURPO’s’s mainmain tasktask isis toto ensureensure aa moremore effectiveeffective andand expedientexpedient implementationimplementation ofof projectsprojects gearedgeared towardstowards completioncompletion ofof thethe MetroMetro ManilaManila MajorMajor RoadRoad NetworkNetwork System.System. URBANURBAN ROADROAD PROJECTSPROJECTS OFFICEOFFICE

I STRATEGYSTRATEGYI

-- addressaddress criticalcritical bottlenecksbottlenecks andand alleviatealleviate traffictraffic congestioncongestion inin MetroMetro Manila.Manila. GOALSGOALS -- completecomplete thethe MMMM roadroad networknetwork systemsystem -- constructconstruct interchangesinterchanges atat majormajor intersectionsintersections -- constructconstruct secondarysecondary roadsroads toto complementcomplement thethe MMMM RoadRoad NetworkNetwork -- rehabilitaterehabilitate primary/secondaryprimary/secondary roadsroads -- establishestablish aa validvalid urbanurban transporttransport policypolicy inin lineline withwith MMUTISMMUTIS URBANURBAN ROADROAD PROJECTSPROJECTS OFFICEOFFICE

I SPECIFICSPECIFICI OBJECTIVESOBJECTIVES

-- constructconstruct interchangesinterchanges atat majormajor intersectionsintersections alongalong EDSA,EDSA, CC-5,-5, CC-3-3 andand CC-2-2 -- carrycarry outout corridorcorridor improvementimprovement measuresmeasures throughthrough roadroad rehabilitationrehabilitation -- introduceintroduce traffictraffic managementmanagement measuresmeasures andand transporttransport facilitiesfacilities toto sustainsustain andand supportsupport thethe economiceconomic growthgrowth inin MMMM -- completecomplete missingmissing linkslinks ofofof MMMMMM RoadRoadRoad NetworkNetwork systemsystem -- developdevelop infrainfra accessaccess toto majormajor sea/airsea/air terminalsterminals -- improveimprove existingexisting bridgesbridges alongalong majormajor riversrivers toto increaseincrease traffictraffic capacitycapacity URBANURBAN ROADROAD PROJECTSPROJECTS OFFICEOFFICE

I I

VISIONSVISIONS FORFOR METROMETRO MANILAMANILA -- fasterfaster traveltravel timetime -- lesserlesser traffictraffic congestioncongestion -- reducereduce directdirect financialfinancial costcost ofof construction,construction, operationoperation andand maintenancemaintenance -- promotepromote environmentalenvironmental balancebalance -- improveimprove usersusers’’ comfortcomfort andand convenienceconvenience METROMETRO MANILAMANILA MAJORMAJOR ROADROAD NETWORKNETWORK CIRCUMFERENTIALCIRCUMFERENTIAL ROADSROADS

C-1 : P. Burgos St. (Roxas. Blvd. to Taft Ave.) Ayala Blvd. ((Taft Ave. to Echague St.) P. Casal Street Ave. (Echague Street to Legarda St.) C.M. Recto Ave. (Legarda St. to R-10 Road) C-2 : Pres. Quirino Ave. (Roxas Blvd. to Mendoza- Guanzon St.) Nagtahan (Mendoza-Guanzon St. to Legarda St.) A. Mendoza St. (Legarda St. to Dimasalang St.) Tayuman St. (Dimasalang St. to R-10 Road) C-3 : Sen. G. Puyat Ave. (Roxas Blvd. to Ayala Ave.) San Juan Bridge (N. Domingo St. to Aurora Blvd.) G. Araneta Ave. (Aurora Blvd. to Sgt. River St.) Sgt. Rivera Ave. (G. Araneta Ave. to A. Bonifacio Ave.) C-3 Road (R-10 Road to A. Bonifacio Ave.) C-4 :EDSA (Taft Ave. to McArthur Highway) (McArthur Highway to A. Mabini Ave.) Letre Road (A. Mabini Ave. to Sansiangco St.) C-5 : South Superhighway to Avenue to Letre Road C-6 : Alignment under Study METROMETRO MANILAMANILA MAJORMAJOR ROADROAD NETWORKNETWORK RADIALRADIAL ROADSROADS

R-1 : (Del Pan Bridge to Seaside Road to Bacoor, ) R-2 : (Lawton to Baclaran) R-3 : Manila South Expressway (Pres. Quirino Ave. to Zapote- Road) R-4 : Line ( Street to A. Francisco Street) Kalayaan Ave. (A. Bonifacio St. to Bel-Air Subd.) Kalayaan Ave. (EDSA to C-5) R-5 : V. Mapa St. (R. Magsaysay Blvd. to Valenzuela St.) P. Sanchez (Valenzuela St. to Gen. Kalentong St.) Shaw Blvd. (Gen. Kalentong St. to Capt. Javier St.) Pasig Blvd. (Capt. Javier St. to Dr. Sixto Antonio Ave. R-6 : Legarda St. (C.M. Recto Ave. to Nagtahan) R. Magsaysay Blvd. (Nagtahan to V. Mapa St.) Aurora Blvd. (V. Mapa St. to marcos Highway) A. Bonifacio H-way/Sumulong H-way (Marcos H-way to Marikina Bdy.) R-7 : Lerma Street (Quiapo to Morayta Street) España Avenue (Morayta St. to E. Rodriguez Ave.) Quezon Ave. (E. Rodriguez Ave. to ) D.M. Marcos Ave. (Elliptical Road to Fairview Ave.) R-8 : Quezon Blvd. (Quiapo to Dapitan St.) A. Mendoza Ave. (Dapitan St. to Laong Laan St.) Dimasalang St. (Laong Laan St. to Retiro St.) A. Bonifacio Ave. (Retiro St. to EDSA) Quirino Ave. (EDSA to Limit) R-9 : J. Abad Santos Ave. (C.M. Recto Ave. to Aurora Blvd.) Ave. Ext. (Aurora Blvd. to EDSA) McArthur Highway (EDSA to Baclaran Boundary) R-10: Del Pan Bridge to Spine Road Infrastructure Development

Interchange Projects C-5/B.C-5/B. SerranoSerrano Ave.-KatipunanAve.-Katipunan Ave.Ave. InterchangeInterchange

ImplementationImplementation ScheduleSchedule StartStart DateDate :: Mar. Mar. 20022002 CompletionCompletion DateDate : : Jan. Jan. 20052005 EDSA/NorthEDSA/North Avenue-WestAvenue-West Avenue-MindanaoAvenue-Mindanao AvenueAvenue InterchangeInterchange

ImplementationImplementation ScheduleSchedule (Tentative)(Tentative) StartStart DateDate :: 2006 2006 CompletionCompletion DateDate : : 2008 2008 EDSA/NorthEDSA/North Avenue-WestAvenue-West Avenue-MindanaoAvenue-Mindanao AvenueAvenue InterchangeInterchange EDSA/RooseveltEDSA/Roosevelt AvenueAvenue InterchangeInterchange

ImplementationImplementation ScheduleSchedule (Tentative)(Tentative) StartStart DateDate :: 2006 2006 CompletionCompletion DateDate : : 2008 2008 C-5/R-4C-5/R-4 (Kalayaan()Avenue) InterchangeInterchange

ImplementationImplementation ScheduleSchedule (Tentative)(Tentative) StartStart DateDate :: 2006 2006 CompletionCompletion DateDate : : 2007 2007 C-5/LanuzaC-5/Lanuza Street-J.Street-J. VargasVargas AvenueAvenue InterchangeInterchange

ImplementationImplementation ScheduleSchedule (Tentative)(Tentative) StartStart DateDate :: 2006 2006 CompletionCompletion DateDate : : 2007 2007 C-3C-3 (Sgt.(Sgt. RiveraRivera St.)/A.St.)/A. BonifacioBonifacio AvenueAvenue InterchangeInterchange

ImplementationImplementation ScheduleSchedule (Tentative)(Tentative) StartStart DateDate :: 2008 2008 CompletionCompletion DateDate : : 2009 2009 C-2C-2 (Gov.(Gov. Forbes)/R-7Forbes)/R-7 (Espa(Españña)a) InterchangeInterchange

ImplementationImplementation ScheduleSchedule (Tentative)(Tentative) StartStart DateDate :: 2008 2008 CompletionCompletion DateDate : : 2009 2009 C-3C-3 (G.(G. AranetaAraneta Avenue)/R-7Avenue)/R-7 (Quezon()Avenue) InterchangeInterchange

ImplementationImplementation ScheduleSchedule (Tentative)(Tentative) StartStart DateDate :: 2007 2007 CompletionCompletion DateDate : : 2008 2008 C-3C-3 (G.(G. AranetaAraneta Avenue)/E.Avenue)/E. Rodriguez,Rodriguez, Sr.Sr. AvenueAvenue InterchangeInterchange

ImplementationImplementation ScheduleSchedule (Tentative)(Tentative) StartStart DateDate :: 2007 2007 CompletionCompletion DateDate : : 2008 2008 Metro Manila Infrastructure Development

Bridge, Road & Sidewalk Improvement Projects Extension

LocationLocation MapMap

ImplementationImplementation ScheduleSchedule StartStart DateDate :: Aug. Aug. 20022002 CompletionCompletion DateDate : : Oct. Oct. 20042004 Marikina Bridge and Access Road

. Ave nan ipu Kat

B . Se rr an o Av e.

5 - C ImplementationImplementation ScheduleSchedule StartStart DateDate :: Jan. Jan. 20052005 Highway Marcos CompletionCompletion DateDate : : Feb. Feb. 20072007 Marcos Highway

GeneralGeneral LayoutLayout

CAINTA RIZAL

BOUNDARY LINE MARIKINA ImplementationImplementation ScheduleSchedule BOUNDARY LINE

StartStart DateDatePASIG :: 2006 2006 CompletionCompletion DateDate : : 2008 2008 Metro Manila Urban Transport Integration Project, Phase II

DPWHDPWH ComponentComponent QUIRINOQUIRINO HIGHWAYHIGHWAY 1010THTH AVENUEAVENUE J.J. FAJARDOFAJARDO STREETSTREET TAYUMANTAYUMAN STREETSTREET M.M. DELAFUENTEDELAFUENTE STREETSTREET PEDROPEDRO GILGIL // NEWNEW PANADEROSPANADEROS PASONGPASONG TAMOTAMO SOUTHSOUTH SUPERHIGHWAYSUPERHIGHWAY SERVICESERVICE ROADSROADS MMDAMMDA ComponentComponent GILGIL PUYATPUYAT AVENUEAVENUE A.A. ARNAIZARNAIZ AVE.AVE. ((Pasay Road) Road) BANAUEBANAUE AVENUEAVENUE BICUTANBICUTAN INTERCHANGEINTERCHANGE ALABANGALABANG INTERCHANGEINTERCHANGE

PROJECTPROJECT DESCRIPTION:DESCRIPTION:

a.a. Road Road surface/drainage/surface/drainage/ intersectionintersection improvementimprovement b.b. Pedestrian Pedestrian facilities/barriersfacilities/barriers alongalong sidewalkssidewalks c.c. Removal Removal ofof on-streeton-street parkingparking andand advertisingadvertising ads/signsads/signs structuresstructures alongalong sidewalksidewalk d.d. Provision Provision ofof lanelane markingsmarkings ImplementationImplementation ScheduleSchedulee.e. Restoration Restoration ofof sidewalkssidewalks f.f. Installation Installation ofof road/trafficroad/traffic signssigns g.g. Passenger Passenger waitingwaiting shedssheds StartStart DateDate h.h. Lighting Lighting onon : sidewalk:sidewalk 2006 2006 i.i. Landscaping/tree Landscaping/tree plantingplanting Note:Note: Detailed Detailed DesignDesign startedstarted onon Feb.Feb. 16,16, 20042004 CompletionCompletion DateDate : : 2008 2008 RadialRadial RoadRoad 1010 ImprovementImprovement

P 205.25 Million P 200.00 Million

For Bidding

Updating/Review of Plans

ImplementationImplementation ScheduleSchedule StartStart DateDate :: 2003 2003 CompletionCompletion DateDate : : 2008 2008 NAIANAIA ExpresswayExpressway && itsits RelatedRelated RoadsRoads Project,Project, ContractContract PackagesPackages I,I, II,II, IIIIII && IV-AIV-A

ImplementationImplementation ScheduleSchedule StartStart DateDate :: 2003 2003 CompletionCompletion DateDate : : 2006 2006 Build-Operate-Transfer (BOT) Projects BOTBOT PROJECTSPROJECTS

Manila-Cavite Toll Expressway R-1 expressway Extension (Zapote to Noveleta), dual two-lane

Length : 11.24 Km. Cost : 2,352.00 Million Implementation Schedule : 2004 - 2009

C-5 Link Expressway (R-1 to ), dual three-lane

Length : 7.51 Km. Cost : 2,223.00 Million Implementation Schedule : 2007 - 2009 BOTBOT PROJECTSPROJECTS

North Luzon Tollways Project Phase 1 : Extended, Rehabilitated and Widened NLE

Length : 82.62 Km. Cost : 7,412.00 Million Implementation Schedule : 2003 - 2006 BOTBOT PROJECTSPROJECTS

Ninoy Aquino International Airport (NAIA) Expressway Phase II : NAIA Terminal III to Roxas Boulevard

Length : 4.90 Km. Cost : 5,411.70 Million Implementation Schedule : 2007 - 2010 BOTBOT PROJECTSPROJECTS

Metro Manila Stage 2 : Continuation of Stage 1 from Bicutan to Alabang

Length : 6.88 Km. Cost : 8,000.00 Million Implementation Schedule : 2005 - 2007

Stage 3 : Elevated Expressway from Buendia to NLE Balintawak

Length : 17.50 Km. Cost : 24,000.00 Million Implementation Schedule : 2007 - 2012 BOTBOT PROJECTSPROJECTS

Pasig Expressway (PASEX) Construction of an expressway link from C-5 to Ortigas Avenue Extension/Marcos Highway

Length : 15.22 Km. Cost : 19,005.00 Million Implementation Schedule : 2008 - 2011 BOTBOT PROJECTSPROJECTS

Circumferential Road 6 (C-6) Tollway Project Metro Manila Tollway (MMT)

Length : 59.50 Km. Cost : 38,866.00 Million Implementation Schedule : 2008 - 2011 BOTBOT PROJECTSPROJECTS

R-10 / C-3 Expressway

R-10 route & C-3/R-9 route

Length : 9.53 & 6.53 Km. Cost : 14,737.00 Million Implementation Schedule : 2008 - 2011 BOTBOT PROJECTSPROJECTS

Manila Bay Expressway Project

Phase I : from P. Burgos St. to North Harbor

Length : 7.00 Km. Cost : 10,755.00 Million Implementation Schedule : 2007 - 2009

Phase II : from MIA Road to P. Burgos St. along Roxas Blvd. (R-1)

Length : 8.04 Km. Cost : 13,860.00 Million Implementation Schedule : 2008 - 2013 Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS URBAN ROAD PROJECTS OFFICE

EndEnd ofof PresentationPresentation ThankThank YouYou andand GoodGood Day!Day!