Active Residential Occupancy Permits

Total Page:16

File Type:pdf, Size:1020Kb

Active Residential Occupancy Permits Residential Occupancy Permits Please be advised, the City of Albany, NY provides this listing as a public resource for general information. While the City makes every effort to present the most current data, Albany expressly disclaims any liability for errors, omissions or inaccuracies in its content. Though this information is reviewed and updated in the normal course of business, all data is subject to change. DATE ISSUED ADDRESS UNITS EXPIRATION 1/29/2020 71 ACADEMY RD One unit 7/29/2022 11/20/2019 75 ACADEMY RD 1 Family 5/20/2022 9/24/2020 6 ADIRONDACK ST 1 Unit- Second Floor. 3/24/2023 3/3/2021 52 Aka 52.5 JUDSON ST 1 Family House 9/3/2023 7/15/2019 8 ALBANY ST 1-family 1/15/2022 5/5/2021 12 ALBANY ST 1st floor, 2nd floor, Basement 11/5/2023 7/19/2019 26 ALBANY ST Apartment #1 , Apartment #2 1/19/2022 12/24/2020 35 ALBANY ST Apt 1, Apt 2 6/24/2023 11/15/2019 45 ALBANY ST 1-family 5/15/2022 6/7/2021 51 ALBANY ST 2 Units- First Floor, Second Floor. 12/7/2023 10/1/2019 11A ALDEN AVE 1st floor, 2nd floor 4/1/2022 6/23/2020 4 ALDEN AVE 2 Units- First Floor, Second Floor. 12/23/2022 8/16/2019 7 ALDEN AVE 2 Units- Apartment 1, Apartment 2. 2/16/2022 9/24/2020 12 ALDEN AVE 1st floor, 2nd floor 3/24/2023 7/29/2020 20 ALDEN AVE 2nd floor apt 1/29/2023 8/5/2019 25 ALEXANDER ST 3 Units- Apt. 1, Apt. 2, Apt. 3 2/5/2022 7/10/2019 54 ALEXANDER ST First Floor, Third Floor 1/10/2022 6/15/2021 54 ALEXANDER ST 3 Units: 1st, 2nd and 3rd Fls 12/15/2023 6/15/2021 56 ALEXANDER ST 3 Units: Garden Apt, 1st fl, 2nd fl 12/15/2023 3/22/2021 57 ALEXANDER ST 3 Units- Apartment 1, Apartment 2, Appointme 9/22/2023 4/12/2021 73 ALEXANDER ST 2 family duplex, units 73 Alexander St and 75 10/12/2023 11/18/2019 7 ALFRED ST Apt 1, Apt 2 5/18/2022 1/29/2020 3 ARCADIA AVE 1st floor apt and 2nd floor apt 7/29/2022 3/19/2021 12 ARCADIA AVE 1 Units- Single Family. 9/19/2023 2/5/2019 17 ARCADIA AVE 1st floor apartment 8/5/2021 11/9/2020 19 ARCADIA AVE 1st floor apt 5/9/2023 8/15/2019 30 ARCADIA AVE 1 Unit- Apartment 2. 2/15/2022 6/11/2020 13 ASH GROVE PL 4 Units- Basement Apartment, First Floor, Seco 12/11/2022 1/11/2021 15 ASH GROVE PL 3 UNits- Basement, First Floor, second floor. 7/11/2023 5/12/2020 17 ASH GROVE PL Apartment #1 Apartment #2 Apartment #4 11/12/2022 6/24/2020 83 ASPEN CIR 1 Unit- Single Family. 12/24/2022 2/28/2020 3 AUSTAIN AVE 1-family 8/28/2022 9/27/2020 19 AUSTAIN AVE 1 Family House 3/27/2023 11/24/2020 23 AUSTAIN AVE 1 Unit- Single Family. 5/24/2023 1/20/2021 30 AUSTAIN AVE 1 Family 7/20/2023 11/30/2020 1 AVENUE B 2 UNits- First Floor, Second Floor. 5/30/2023 3/20/2019 5 AVENUE B 1st floor, 2nd floor 9/20/2021 Sunday, July 18, 2021 Page 1 of 107 Residential Occupancy Permits Please be advised, the City of Albany, NY provides this listing as a public resource for general information. While the City makes every effort to present the most current data, Albany expressly disclaims any liability for errors, omissions or inaccuracies in its content. Though this information is reviewed and updated in the normal course of business, all data is subject to change. DATE ISSUED ADDRESS UNITS EXPIRATION 10/28/2020 9 AVENUE B 1st floor apt and 2nd floor apt 4/28/2023 6/2/2020 19 AVENUE B 19A,19B,19C,19D,19E,19F,10A,10B,10C,10D 12/2/2022 6/2/2020 20 AVENUE B 13A,13B,13C,13D,13E,13F,20A,20B,20C, 20D 12/2/2022 7/10/2019 2 AVON PL 1st Floor & 2nd Floor 1/10/2022 10/29/2019 28 AVON PL Units 1 & 2 4/29/2022 5/29/2019 2 BANCROFT ST 1st floor and 2nd floor apt 11/29/2021 1/22/2019 10 BANCROFT ST 1 unit 7/22/2021 9/29/2020 8 BARCLAY ST 2 Units - First Floor, Second Floor. 3/29/2023 5/14/2019 9 BARCLAY ST 1 Front, 1 Rear, 2nd Fl. 11/14/2021 2/11/2019 11 BARCLAY ST 1st floor apt and 2nd floor apt 8/11/2021 5/14/2019 13 Barclay St Apartment #1 , Apartment #2 11/14/2021 5/11/2021 14 BARCLAY ST 2 UNITS: 1st Fl & 2nd Fl 11/11/2023 4/29/2020 25 BARCLAY ST First floor apt right 10/29/2022 5/3/2019 29 BARCLAY ST 1st floor, 2nd floor 11/3/2021 10/30/2019 36 BARCLAY ST 1st floor, 2nd floor 4/30/2022 2/25/2020 37 Barclay ST 2 Units- First Floor, Second Floor. 8/25/2022 3/29/2019 39 BARCLAY ST 2nd floor 9/29/2021 4/22/2019 31 Barclay St. 1st floor apt and 2nd floor apt 10/22/2021 6/24/2021 9 BARROWS ST 2 UNITS: Apt 1 & Apt 2 12/24/2023 12/1/2020 10 BARROWS ST Apt. 1, Apt. 2 6/1/2023 4/30/2019 15 BARROWS ST Apt 1, Apt 2 10/30/2021 4/5/2020 19 BARROWS ST 1 Unit- Apartment 1. 10/5/2022 11/13/2020 28 BARROWS ST 1 Unit- First Floor. 5/13/2023 10/15/2020 29 BARROWS ST First floor 4/15/2023 7/28/2020 72 BASSETT ST Basement First Floor 1/28/2023 7/30/2019 23 BEACH AVE 23 A, 23 B 1/30/2022 7/30/2019 27 BEACH AVE 27 A, 27 B 1/30/2022 10/8/2020 5 BEACON AVE Apt 2 4/8/2023 6/27/2019 19 BEACON AVE 2nd Floor Apartment 12/27/2021 2/20/2019 27 BELVIDERE AVE Apartment 1, Apartment 2 8/20/2021 3/10/2020 30 BELVIDERE AVE Apt 1, Apt 2 9/10/2022 1/7/2020 70 BELVIDERE AVE 1 Family 7/7/2022 12/10/2019 8 BENJAMIN ST One Family 6/10/2022 12/3/2019 23 BENJAMIN ST 1 Family 6/3/2022 11/8/2019 26 BENJAMIN ST 1 Family 5/8/2022 1/6/2021 3 BENSON ST 1st floor apt and 2nd floor apt 7/6/2023 5/20/2019 5 BENSON ST Apt. 1, Apt. 2 11/20/2021 Sunday, July 18, 2021 Page 2 of 107 Residential Occupancy Permits Please be advised, the City of Albany, NY provides this listing as a public resource for general information. While the City makes every effort to present the most current data, Albany expressly disclaims any liability for errors, omissions or inaccuracies in its content. Though this information is reviewed and updated in the normal course of business, all data is subject to change. DATE ISSUED ADDRESS UNITS EXPIRATION 7/23/2019 6 BENSON ST Apartment 1, Apartment 2 1/23/2022 7/10/2019 10 BENSON ST 1-family 1/10/2022 5/15/2019 18 BENSON ST Apt 1, Apt 2 11/15/2021 9/27/2019 19 BENSON ST First Floor 3/27/2022 4/14/2021 22 BENSON ST 2 UNITS: Apartments 1 & 2 10/14/2023 7/21/2020 28 BENSON ST Unit #1 & Unit #2 1/21/2023 9/25/2019 39 BENSON ST 1 Unit- Single Family 3/25/2022 11/13/2020 143 BENSON ST Apt 1, Apt 2 5/13/2023 10/30/2020 151 BENSON ST Apt 1, Apt 2 4/30/2023 10/21/2019 156 BENSON ST 2 Units- Apartment 1, Apartment 2. 4/21/2022 4/15/2019 157 BENSON ST Apt 1, Apt 2 10/15/2021 1/14/2020 176 BENSON ST 1 Family 7/14/2022 7/1/2020 184 BENSON ST 1 Unit- Single Family 1/1/2023 9/17/2019 191 BENSON ST Apt. 1, Apt. 2 3/17/2022 3/10/2020 111 Benson Street First Floor 9/10/2022 2/11/2019 160 BERKSHIRE BLVD Apartment A, Apartment B 8/11/2021 10/19/2020 229 BERKSHIRE BLVD 229A & 229B 4/19/2023 1/13/2020 5 BERNCLIFFE AVE 2nd floor unit 7/13/2022 5/31/2019 28 BERNCLIFFE AVE One Family 11/30/2021 3/19/2020 9 BERTHA ST 1 Unit- First Floor Apartment 9/19/2022 11/16/2020 14 BERTHA ST Apt 1, Apt 2 5/16/2023 5/10/2019 15 Bertha St Apt 1, Apt 2 11/10/2021 5/26/2021 22 BERTHA ST Apartment #1 & Apartment #2 11/26/2023 3/3/2021 33 BERTHA ST Apt 1: Apt 2 9/3/2023 11/15/2019 46 BERTHA ST Apt 1 and Apt 2 5/15/2022 12/4/2019 46 BERTHA ST 2 Units- Apartment 1, Apartment 2. 6/4/2022 3/23/2020 56 Bertha St 1 Unit- Second Floor 9/23/2022 5/18/2020 56 BERTHA ST Second Floor 11/18/2022 11/27/2020 58 BERTHA ST 2 UNits- First Floor, 5/27/2023 12/2/2020 26 BESCH AVE 1 Unit: FL 2 6/2/2023 2/18/2020 28 BESCH AVE One Family 8/18/2022 6/15/2021 29 BESCH AVE Second floor Apt 12/15/2023 4/9/2021 31 BESCH AVE 4 Units- Apartment 1 Front, Apartment 1 Rear, 10/9/2023 6/6/2019 35 BESCH AVE Fl 1 & Fl 2 12/6/2021 3/15/2019 36 BESCH AVE 1st floor 9/15/2021 11/4/2019 37 BESCH AVE One Family 5/4/2022 1/14/2021 40 BETWOOD ST UNITS: 1 Family 7/14/2023 Sunday, July 18, 2021 Page 3 of 107 Residential Occupancy Permits Please be advised, the City of Albany, NY provides this listing as a public resource for general information.
Recommended publications
  • Worksop-Inset.Pdf
    Worksop inset map 258 151 43.3m 3 41.8m 139 74 135 ANSTON AVENUE 64 4 SOUTH VIEW 125 AVENUE HARSTOFT 54 3 LB 214 115 42 PCs 31 22 105 40 Shelter 42.4m 13 Supermarket 36 32 El Sub Sta 22 44.5m 1 12 221 81 246 69 2 103 48.2m 37 57 A N S TO N A V E N U E 54 ED & Ward Bdy 52a B L Y TH G R O V E 45 41 Key 33 45.7m 29 23 CR 2 13 STANLEY STREET STANLEY 35 25 3 234 1a3a 1 11 North Nottinghamshire College Shelter 21 5 21 217 (FE) 12 New Housing (ST18) 33 52 12 43 BLYTH ROAD 53 19 222 JA M E S S TR E E T 215 1 G A TE FO R D R O A D 2 Works CR 220 8 Proposed mixed use (Policy 17) 10 54.3m 14 I Ward Bdy 25 13 SP 6 GP 1a 17 1b 208 Shelter 2 1 Committed Housing 36 3 HOLMEFIELD CLOSE HOLMEFIELD 15 43.0m S H E P H E R D 'S A V E N U E 15 2 13 CR Norbridge Academy 29 196 (Sch) 15 PERCIVAL STREET PERCIVAL 38 New Employment (ST08) 2a 24 2 203 L Twrs W52 13 8 1 3 52.4m 10 186 11 S H E P H E R D 'S A V E N U E 34 Pit 18 Wr Pt 9 Exisiting Employment (ST11) SPs 30 12 174 SP 34a M e rry -g o -ro u n d CR 168 28 Locally important openL Twr space (ST48) W ag o n D ep o t The Chestnuts 50.0m 3 El Sub Sta SP Oak Lodge Playingfield and outdoor sportsSandhole Sidings facility (ST49) TU R N E R R O A D 40.0m 20 1 LB El Sub Sta 185 78 Ward Bdy STREET 18 1b 8 CR 1a 102 183 7 Main Green Corridor (ST41) STANLEY 90 72 MP 0.5 50.6m ED Bdy BANK El Sub Sta BLYTH ROAD Turner Road 18a SUNNY ED Bdy TU R N E R R O A D 64 SP Industrial 51.8m Minor Green Corridor (ST41) Estate 18b 54 Club 47.2m 50 Ward Bdy 48.8m 63 61 53 6 50.9m ED Bdy ED & Ward Bdy Ward & ED 49 SUNNY BANK Bowling
    [Show full text]
  • The End of Nuclear Warfighting: Moving to a Deterrence-Only Posture
    THE END OF NUCLEAR WARFIGHTING MOVING TO A W E I DETERRENCE-ONLY V E R POSTURE E R U T S O P R A E L C U N . S . U E V I T A N September 2018 R E T L A Dr. Bruce G. Blair N Jessica Sleight A Emma Claire Foley In Collaboration with the Program on Science and Global Security, Princeton University The End of Nuclear Warfighting: Moving to a Deterrence-Only Posture an alternative u.s. nuclear posture review Bruce G. Blair with Jessica Sleight and Emma Claire Foley Program on Science and Global Security, Princeton University Global Zero, Washington, DC September 2018 Copyright © 2018 Bruce G. Blair published by the program on science and global security, princeton university This work is licensed under the Creative Commons Attribution-Noncommercial License; to view a copy of this license, visit www.creativecommons.org/licenses/by-nc/3.0 typesetting in LATEX with tufte document class First printing, September 2018 Contents Abstract 5 Executive Summary 6 I. Introduction 15 II. The Value of U.S. Nuclear Capabilities and Enduring National Objectives 21 III. Maximizing Strategic Stability 23 IV. U.S. Objectives if Deterrence Fails 32 V. Modernization of Nuclear C3 40 VI. Near-Term Guidance for Reducing the Risks of Prompt Launch 49 VII. Moving the U.S. Strategic Force Toward a Deterrence-Only Strategy 53 VIII.Nuclear Modernization Program 70 IX. Nuclear-Weapon Infrastructure: The “Complex” 86 X. Countering Nuclear Terrorism 89 XI. Nonproliferation and Strategic-Arms Control 91 XII. Conclusion 106 Authors 109 Abstract The United States should adopt a deterrence-only policy based on no first use of nuclear weapons, no counterforce against opposing nuclear forces in second use, and no hair-trigger response.
    [Show full text]
  • Fall 2021 Lookbook Mid-Century Style Meets This-Century Ease with the Towne Collection
    Fall 2021 Lookbook Mid-century style meets this-century ease with the Towne Collection Bi-Sectional Towne Sofa Lounge Funfetti Linen Parliament Stone Mowat Raven Velvet Russet Canyon Whiskey Saddle Black Leather Leather Bi-Sectional W84 D71.5 H30 Seat H16 (in) W213 D183 H76 Seat H41 (cm) Sofa Lounge W84 D35.5 H30 Seat H16 (in) W213 D90 H76 Seat H41 (cm) Lounge W36 D33.5 H23.5 Seat H16 (in) W92 D85 H60 Seat H41 (cm) With an ode to warm Nordic minimalism and a sculptural form that can be admired from every angle, the Baltic Series is designed to harmonize with contemporary life. Baltic Chair Ottoman Frame Options Andorra Pewter Velvet Russet Natural Ash Canyon Whiskey Saddle Black Walnut Leather Leather Chair W30 D31 H31 Seat H17.5 (in) W76 D79 H79 Seat H44 (cm) Ottoman W25 D20 H17.5 (in) W64 D51 H44 (cm) Rialto Introducing Rialto - the world’s dreamiest modern sofa bed. Converts to Full Sized Bed Dawson Moon Dawson Rose Stria Haze Stria Sand Sofabed W76 D39/84 H34 Seat H18 (in) W193 D99/213 D86 Seat H46 (cm) Rialto Aero Dining Stool Counter Stool Counter Stool Bar Stool Swan & Natural Sage & Natural Black & Natural Ash Ash Ash Dining Stool W17.5 D17.5 H18 Seat H18 (in) W44 D44 H46 Seat H46 (cm) Counter Stool W19.25 D18.5 H24 Seat H24 (in) W49 D47 H61 Seat H61 (cm) Bar Stool W20 D21 H30 Seat H30 (in) W51 D53 H76 Seat H76 (cm) Aero Bar Stool Dining Stool Modello Arcade Planters (Set of 3) Swan & Blonde Sage & Blonde Black & Blonde Small Ash Ash Ash W13.5 D10 H16 (in) W34 D25 H41 (cm) Medium W15 D12 H24 (in) W38 D30 H61 (cm) Large W16.5 D14 H32.5 (in) W42 D36 H83 (cm) Bar cart W32 D19.5 H30 (in) W81 D50 H76 (cm) Swan Clay Black Construct Reversible and made from recycled plastic bottles Cargo Reverse of Versa Reverse of Cargo Versa Available rug sizes 5x8, 8x10 (ft) Pillows Puff Ravi Duo Duo (reverse side) Available pillow sizes 20x20 (in), 51x51 (cm) 20x10 (in), 51x25 (cm) Visit gusmodern.com for all available colours The Quarry Table Collection is a minimalist take on casual sophistication.
    [Show full text]
  • Draft Project List 2017-04-24
    Transportation System Development Charge (TSDC) Project List Total Non- Growth City SDC Eligible Project # Project Name Project Location Estimated Growth Cost Responsibility Cost Cost Cost Share Share Driving Solutions (Intersections, Extensions & Expansions) Molalla Avenue from Washington Street to Molalla Avenue/ Beavercreek Road Adaptive D1 Gaffney Lane; Beavercreek Road from Molalla $1,565,000 75% 25% 100% $391,250 Signal Timing Avenue to Maple Lane Road D2 Beavercreek Road Traffic Surveillance Molalla Avenue to Maple Lane Road $605,000 75% 25% 100% $151,250 D3 Washington Street Traffic Surveillance 7th Street to OR 213 $480,000 75% 25% 100% $120,000 D4 7th Street/Molalla Avenue Traffic Surveillance Washington Street to OR 213 $800,000 75% 25% 100% $200,000 OR 213/ 7th Street-Molalla Avenue/ D5 Washington Street Integrated Corridor I-205 to Henrici Road $1,760,000 75% 25% 30% $132,000 Management D6 OR 99E Integrated Corridor Management OR 224 (in Milwaukie) to 10th Street $720,000 75% 25% 30% $54,000 D7 14th Street Restriping OR 99E to John Adams Street $845,000 74% 26% 100% $216,536 D8 15th Street Restriping OR 99E to John Adams Street $960,000 80% 20% 100% $192,000 OR 213/Beavercreek Road Weather D9 OR 213/Beavercreek Road $120,000 100% 0% 30% $0 Information Station Warner Milne Road/Linn Avenue Road Weather D10 Warner Milne Road/Linn Avenue $120,000 100% 0% 100% $0 Information Station D11 Optimize existing traffic signals Citywide $50,000 75% 25% 100% $12,500 D12 Protected/permitted signal phasing Citywide $65,000 75% 25% 100%
    [Show full text]
  • Likely to Be Funded Transportation System
    Table 2: Likely to be Funded Transportation System Project # Project Description Project Extent Project Elements Priority Further Study Identify and evaluate circulation options to reduce motor OR 213/Beavercreek Road Refinement OR 213 from Redland Road to Molalla D0 vehicle congestion along the corridor. Explore alternative Short-term Plan Avenue mobility targets. Identify and evaluate circulation options to reduce motor I-205 at the OR 99E and OR 213 Ramp vehicle congestion at the interchanges. Explore alternative D00 I-205 Refinement Plan Short-term Terminals mobility targets, and consider impacts related to a potential MMA Designation for the Oregon City Regional Center. Driving Solutions (Intersection and Street Management- see Figure 16) Molalla Avenue from Washington Street to Molalla Avenue/ Beavercreek Road Deploy adaptive signal timing that adjusts signal timings to D1 Gaffney Lane; Beavercreek Road from Molalla Short-term Adaptive Signal Timing match real-time traffic conditions. Avenue to Maple Lane Road Option 1: Convert 14th Street to one-way eastbound between McLoughlin Boulevard and John Adams Street: • Convert the Main Street/14th Street intersection to all-way stop control (per project D13). • From McLoughlin Boulevard to Main Street, 14th Street would be restriped to include two 12-foot eastbound travel lanes, a six-foot eastbound bike lane, a six-foot westbound contra-flow bike lane, and an eight-foot landscaping buffer on the north side • From Main Street to Washington Street, 14th Street would be restriped to include
    [Show full text]
  • Tickling the Sleeping Dragon's Tail: Should We Resume Nuclear Testing?
    TICKLING THE SLEEPING DRAGON’S TAIL Should We Resume Nuclear Testing? National Security Report Michael Frankel | James Scouras | George Ullrich TICKLING THE SLEEPING DRAGON’S TAIL Should We Resume Nuclear Testing? Michael Frankel James Scouras George Ullrich Copyright © 2021 The Johns Hopkins University Applied Physics Laboratory LLC. All Rights Reserved. “Tickling the sleeping dragon’s tail” is a metaphor for risking severe consequences by taking an unnecessary provocative action. Its origin can be traced to the last year of the Manhattan Project at Los Alamos National Laboratory (LANL) in 1946. When investigating the critical mass of plutonium, LANL scientists usually brought two halves of a beryllium reflecting shell surrounding a fissile core closer together, observing the increase in reaction rate via a scintillation counter. They manually forced the two half-shells closer together by gripping them through a thumbhole at the top, while as a safety precaution, keeping the shells from completely closing by inserting shims. However, the habit of Louis Slotin was to remove the shims and keep the shells separated by manually inserting a screwdriver. Enrico Fermi is reported to have warned Slotin and others that they would be “dead within a year” if they continued this procedure. One day the screwdriver slipped, allowing the two half-shells to completely close, and the increased reflectivity drove the core toward criticality. Slotin immediately flipped the top half-shell loose with a flick of the screwdriver, but by then he had endured
    [Show full text]
  • Round 13 PORT MACQUARIE MASTERS
    NSW Branch Pointscore - Round 13 proudly hosted by PORT MACQUARIE MASTERS Port Macquarie Olympic Pool Gordon St, Port Macquarie 3/11/2018 Port Macquarie Masters NSW Branch Pointscore - Round 13 Port Macquarie Olympic Pool Saturday 3/11/2018 Warm Up – 10:30am, Start – 11:00 am Estimated Start Time 1 200m Individual Medley 11:00 AM 2 200m Butterfly 11:15 AM 3 200m Backstroke 11:21 AM 4 200m Breaststroke 11:40 AM 5 200m Freestyle 12:01 PM 6 100m Butterfly 12:48 PM 7 100m Backstroke 12:56 PM 8 100m Breaststroke 01:19 PM 9 100m Freestyle 01:39 PM 10 50m Backstroke 02:14 PM 11 50m Breaststroke 02:37 PM 12 50m Freestyle 02:55 PM 13 50m Butterfly 03:17 PM 14 4x50m Medley Relay (Men’s, Women’s,Mixed) 03:27 PM Finish Time 03:27 PM Swimmer Count: 114 Swimmers should consider the above estimated times to be the minimum time that events will take. Note that they are based on the assumption that there will be a 40 second interval between heats. Masters Swimming NSW ‘Sunsmart’ Policy and ‘No Smoking’ policy will apply at this meet. -1- Officials Meet Director: Warren Frumar Meet Referee: Di Partridge Referee: Marilyn Earp, Di Coxon-Ellis, Sue Johnstone, Peter McGee Inspector of Turns: Wendy Gordon, Lynne Johnson Starter: Andrew Barltrop, Colvin Ellis, Tony Tooher Chief Timekeeper: Julia Atkins, Christine Carter Marshal: Noel Partridge, Nancy Whiteley Check Starter Sharon Walsh-Bartrop, Wendy McMurtrie Recorder: Mark Hepple Medical: pool staff Club Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Timekeeping Roster Maitland 20 Port Macquarie 13 Note: Warringah 9 Lake Macquarie Crocs 10 The numbers represent the Wett Ones 8 number of swimmers that Myall Masters 7 should be available from each club for timekeeping in that Ryde 7 lane.
    [Show full text]
  • Round 15 NOVOCASTRIAN MASTERS
    NSW Branch Pointscore - Round 15 proudly hosted by NOVOCASTRIAN MASTERS Charlestown Swimming Centre Dickinson St, Charlestown 26/11/2016 v2 updated 17/11/2016 Novocastrian Masters NSW Branch Pointscore - Round 15 Charlestown Swimming Centre Saturday 26/11/2016 Warm Up – 10:00am, Start – 10:30 am Estimated Start Time 1 400m Freestyle 10:30 AM 2a 200m Backstroke 11:43 AM 2b 200m Breaststroke 11:55 AM 2c 200m Butterfly 12:16 PM 2d 200m Freestyle 12:21 PM 2e 200m Individual Medley 12:58 PM 3 50m Backstroke 01:14 PM 4 50m Freestyle 01:37 PM 5 50m Breaststroke 02:33 PM 6 50m Butterfly 02:53 PM 7 4x100m Freestyle Relay (Mixed/Men’s/Women’s) 03:04 PM 8a 100m Backstroke 03:20 PM 8b 100m Breaststroke 03:30 PM 8c 100m Freestyle 03:50 PM 8d 100m Butterfly 04:15 PM Finish Time 04:20 PM Swimmer Count: 158 Swimmers should consider the above estimated times to be the minimum time that events will take. Note that they are based on the assumption that there will be a 40 second interval between heats. Masters Swimming NSW ‘Sunsmart’ Policy and ‘No Smoking’ policy will apply at this meet. -1- Officials Meet Director: Rhonda O’Donnell Meet Referee: Di Partridge Referee: Gordon Ferguson, Ruth Fitzpatrick, Neil Keele, Peter McGee, Jane Noake, Ruth Wall Inspector of Turns: Alan Moore, Carl Wallace Starter: David Bell, Dennis Moore Chief Timekeeper: Marion Dreyer, Wendy Gordon, Nick Woodcock Marshal: Colleen Garland, Noel Partridge Check Starter: Mike Cockrem, Jamie Turner Recorder: Mark Hepple Medical: pool staff 4 Club Lane 1 Lane 2 Lane 3 Lane Lane 5 Lane 6 Lane 7 Lane 8 Novocastrian 20 Timekeeping Roster Warringah 21 2 Ryde 21 1 Note: Maitland 12 Wyong Wobbygongs 7 The numbers represent the Lake Macquarie Crocs 7 number of swimmers that Port Macquarie 6 should be available from each Manly 5 club for timekeeping in that Myall 5 lane.
    [Show full text]
  • CPS North Playoffs March 23, 2019 Whitney Young High School
    CPS North Playoffs March 23, 2019 Whitney Young High School K-2 Lower Primary Crosstables No. Name Team Pts Rnd1 Rnd2 Rnd3 Rnd4 Rnd5 1 Anderson, Aiden CGBATE 2.5 L44 D21 L4 W6 W27 2 Anderson, Kalen CGBATE 3.0 W40 L30 W19 L4 W33 3 Avila, Marcos CGNEWB 3.5 W19 W34 L41 W48 D15 4 Baker, Toby CGSKIN 3.0 W9 L17 W1 W2 L41 5 Barron, Matthew-RE CGWATE 0.5 --- D11 L46 L34 L16 6 Bronson, Standford CGSKIN 0.5 --- --- D9 L1 -F- 7 Byerly, Nathan CGWATE 2.0 L34 L10 W25 L24 W23 8 Carr, Peter CGBEAU 3.5 D36 W25 W37 L30 W35 9 Chang, Emma CGDECA 1.5 L4 L39 D6 W22 L21 10 Chisholm, Elliott CGEDIS 2.0 L20 W7 L40 D27 D32 11 Chu, Chloe CGSKIN 1.5 L12 D5 L43 D14 D25 12 Contey, Nicola CGBATE 2.0 W11 L41 L39 W26 L31 13 Culotta, Luca CGSKIN 4.0 W45 W29 W28 L47 W38 14 Feinberg, Miles CGWATE 2.0 --- L19 D16 D11 W26 15 Gao, Hannah CGSKIN 4.0 W25 W18 W17 D41 D3 16 Guo, Ivanka CGDECA 1.5 L48 L31 D14 L21 W5 17 Hadj-Chikh, Ronan CGWATE 3.0 W23 W4 L15 W33 L44 18 Hoffman, Alexander CGWATE 2.0 W22 L15 L38 W23 L20 19 Huang, Xi CGSKIN 3.0 L3 W14 L2 W45 W24 20 Kim, Everett CGSKIN 3.0 W10 L44 W45 L37 W18 21 Kong, Hannah CGSKIN 2.5 --- D1 L32 W16 W9 22 Krishnaswamy, Vani CGSKIN 1.5 L18 D26 L36 L9 -B- 23 Leather, Oliver CGSKIN 1.0 L17 L38 -B- L18 L7 24 Lesch, Owen CGBATE 2.0 W46 L37 L33 W7 L19 25 Luz, Azucena CGPRIE 1.5 L15 L8 L7 -B- D11 26 Martin, Sonja CGEDIS 1.0 L35 D22 D27 L12 L14 27 Miske, Fletcher CGSKIN 1.5 L37 D32 D26 D10 L1 28 Moulton, Theo CGWATE 2.0 W42 W33 L13 L39 L48 29 Mukherjee, Deven CGEDIS 3.0 W32 L13 L31 W36 W34 30 Oseledets, Alec CGSKIN 4.5 W38 W2 W44 W8 D47
    [Show full text]
  • Stock Code Description Stock Code Description March 11, 2019
    STOCK CODE DESCRIPTION STOCK CODE DESCRIPTION MARCH 11, 2019 A MIXED C2 COLONIAL A1 ARBOR ACRES C3 CHAUMIERE BB-NL A2 ANDREWS-NL C3 CORBETT A2 BABCOCK C4 DAVIS A3 CAREY C5 HARCO A5 COLONIAL C6 HARDY A6 EURIBRID C7 PARKS A7 GARBER C8 ROWLEY A8 H AND N-NL C9 GUILFORD-NL A8 H AND N C9 TATUM A9 HALEY C10 HENNING-NL A10 HUBBARD C10 WELP A11 LOHMANN C11 SCHOONOVER A12 MERRILL C12 IDEAL A13 PARKS C19 NICHOLAS-NL A14 SHAVER C35 ORLOPP LARGE BROAD-NL A15 TATUM C57 ROSE-A-LINDA-NL A16 WELP C122 ORLOPP BROAD-NL A17 HANSON C129 KENT-NL A18 DEKALB C135 B.U.T.A., LARGE-NL A19 HYLINE C142 HYBRID DOUBLE DIAMOND MEDIUM-NL A38 KENT-NL C143 HYBRID LARGE-NL A45 MARCUM-NL C144 B.U.T.A., MEDIUM-NL A58 ORLOPP-NL C145 NICHOLAS 85-NL B MIXED C146 NICHOLAS 88-NL B1 ARBOR ACRES C147 HYBRID CONVERTER-NL B2 COLONIAL C148 HYBRID EXTREME-NL B3 CORBETT C149 MIXED B4 DAVIS D MIXED B5 DEKALB WARREN D1 ARBOR ACRES B6 HARCO D2 BRADWAY B7 HARDY D3 COBB B8 LAWTON D4 COLONIAL B9 ROWLEY D5 HARDY B10 WELP D6 HUBBARD B11 CARGILL D7 LAWTON B12 SCHOONOVER D8 PILCH B13 CEBE D9 WELP B14 OREGON D10 PENOBSCOT B15 IDEAL D11 WROLSTAD SMALL-NL C MIXED D11 CEBE, RECESSIVE C1 ARBOR ACRES D12 IDEAL C2 BROADWHITE-NL 1 STOCK CODE DESCRIPTION STOCK CODE DESCRIPTION MARCH 11, 2019 E MIXED N15 OLD ENGLISH, BLACK E1 COLONIAL N16 OLD ENGLISH, SPANGLED E2 HUBBARD N17 PIT E3 BOURBON, RED-NL N18 OLD ENGLISH E3 ROWLEY N19 MODERN E4 WELP N20 PIT, WHITE HACKLE E5 SCHOONOVER N21 SAM BIGHAM E6 CEBE N22 MCCLANHANS H MIXED N23 CLIPPERS H1 ARBOR ACRES N24 MINER BLUES H2 COBB N25 LAW GRAYS H3 HARMAN N26 OLD
    [Show full text]
  • Delinquent Tax Report Penalties, Interest, and Costs Will Be Added to Delinquent Taxes
    Date: 03/02/2017 MISSOULA COUNTY Oper: toneal Time: 13:05:17 DELINQUENT TAX REPORT PENALTIES, INTEREST, AND COSTS WILL BE ADDED TO DELINQUENT TAXES. AS OF 03/02/2017 REAL ESTATE RANGES OPTIONS TAX YEAR: (R) 2007 - 2016 DELINQ. AS OF DATE: 03/02/2017 TAX TYPE: (R) RE - RE REPORT SORT ORDER: A LEVY DISTRICT: (A) REPORT TYPE: D3 TOWNSHIP: (A) COMPLETE LEGAL?: Y RANGE: (A) INCLUDE P&I?: Y SECTION: (A) ASSESSMENT YEAR: C LOT: (A) INCL RANGES/OPTIONS?: Y BLOCK: (A) PARCEL#: (A) BANK CODE: (A) MISC CODE: (A) Tax Property Description Misc Levy Sub Total Due Name & Address Cert# (Complete Legal) Year Code Dist Dist (Incl P&I) 1st Half 2nd Half Pen/Int Parcel # 100003 04-2095-08-3-04-11-0000 2016 0000 32.3 463.37 443.33 0.00 20.04 TURNER DOLORES A Sn:08 Twn:12 N Rng:17 W Blk:5 Lot:11 2016 FFP 32.3 10.73 10.26 0.00 0.47 C/O BRADLEY FAAS DONOVAN CREEK ACRES, S08, T12 N, 2016 FMRP 32.3 9.52 9.11 0.00 0.41 PO BOX 37 R17 W, BLOCK 5, Lot 11 2016 ROSP 32.3 2.29 2.19 0.00 0.10 CLINTON, MT 59825-0037 6670 DONOVAN CREEK RD 2016 SOC 32.3 1.00 0.96 0.00 0.04 486.91 465.85 0.00 21.06 TOTAL 486.91 465.85 0.00 21.06 Parcel # 100107 04-2095-08-3-04-12-0000 2016 0000 32.3 461.32 441.37 0.00 19.95 TURNER DOLORES A Sn:08 Twn:12 N Rng:17 W Blk:5 Lot:13 2016 FFP 32.3 10.73 10.26 0.00 0.47 C/O BRADLEY FAAS DONOVAN CREEK ACRES, S08, T12 N, 2016 FMRP 32.3 9.48 9.07 0.00 0.41 PO BOX 37 R17 W, BLOCK 5, Lot 13 2016 ROSP 32.3 2.27 2.18 0.00 0.09 CLINTON, MT 59825-0037 2016 SOC 32.3 0.99 0.95 0.00 0.04 484.79 463.83 0.00 20.96 TOTAL 484.79 463.83 0.00 20.96 Parcel # 1002402
    [Show full text]
  • The Four-Minute Warning Drawing Machine: Revealing the Assemblages of Nuclear Deterrence
    The Four-Minute Warning Drawing Machine: revealing the assemblages of nuclear deterrence Michael Mulvihill Doctor of Philosophy School of Arts and Culture 1st November 2019 ABSTRACT This research sets out to use art practice as a critical method to make the social and cultural production of nuclear weapon systems visible in everyday life experience. The research draws upon a critical framework based on new materialist philosophies that see reality as composed of interacting “machinic” assemblages of affects and more-than-human relationships (DeLanda 2015). These philosophies position active processes, such as artmaking, as tacit ways of making visible “the concrete yet complex materiality of bodies immersed in social relationships of power” (Braidotti 2015), which are otherwise invisible to fixed representational ontology. The artworks that have emerged establish entwined relationships between nuclear weapon manufacture and artmaking by making commonalities between workshop configuration, administrative processes and transportation. Insight has also been drawn from immersive work within the Cold War archives at RAF Fylingdales as the station’s – and the RAF’s – first artist in residence. Unprecedented access was given to the site, which reveals the ballistic missile early warning station’s interconnectivity beyond its barbed wire perimeter. These relationships have been conceptualised as the four-minute warning drawing assemblage comprising interactive social parts that include drawing practices and instruments of deterrence, constantly producing new techno–social worlds and novel arrangements of life beyond normative perception. In doing so, the research makes a contribution to new and urgent debates about nuclear weapons and the emerging risk of nuclear war by providing different and innovative ways of thinking about society and our relationships to the bomb.
    [Show full text]