List of Tenders Finalized by Engineering Department, Ranchi Division During the Financial Year 2015-16
Total Page:16
File Type:pdf, Size:1020Kb
List of tenders finalized by Engineering Department, Ranchi Division during the financial year 2015-16 Sl. NIT no. with date Name of work Estimated Finalized/Disc LOA reference Accepted Status of no. value of harged(if with date value of work as tender finalized name tender on (`) of agency (`) 1 DRM(Engg)/RNC/88/2014 Ranchi Division: Provision of Automatic Banner Flag 7,72,106 /- Ajay Tyagi TB/07/15/OT 8,10,711/- Work is in dt.04.12.2014 post at engineering non- interlocked manned gates dt.02.04.2015 progress. 34 level crossings. 2 DRM(Engg)/RNC/82/2014 Provision of Lavatory & Urinal in station premises 31,27,146/- Nityanand Saw TB/02/15/OT 31,54,877/- Work is in dt.26.11.2014 under the jurisdiction of Sr.DEN/(East)/RNC to fulfill dt.07.04.2015 progress. MEA (Namkom ,Tatisilwai, Jonha, Gautamdhara, Kita, Silli, Jhalda, Ilu, Torang. Jhimri and Latemda) 3 DRM(Engg)/RNC/05/2015 Renovation of old hospital at Hatia and replacement 40,63,982/- M/s Vam Tara TB/16/15/OT 42,12,414/- Work is in dt.11.02.2015 of AC sheet roof of PF shelter by Galvalume sheet in Construction dt.16.04.2015 progress PF No. (1) at Hatia 4 DRM(Engg)/RNC/75/2014 “Replacement of cracked stiffeners by new stiffeners 14,39,377/- Tirupati TB/62/14/OT 16,17,254/- Work is in dt.21.10.2014 of Br. No. 447 (12x12.2mG) at Km 347/18-22 Contract dt.07.04.2015 progress between ILO- MURI in CNI-MURI section and replacement of corroded gussets plates and top lateral bracings of Br. No. 156(9x18.3mG) at Km. 354/33-39 between MURI-THO in MURI-KSX of Ranchi Division.” 5 DRM(Engg)/RNC/04/2015 “Provision of lighting Arrangement, water supply9,92,408/ - Sai Electrical& TB/15/15/OT 11,01,573/- Work is in dt.10.02.2015 arrangement and staff-carrying vehicles for RGM (Rail Trading Co. Pvt. dt.05.05.2015 progress Grinding Machine) work for one month between Orga Ltd. to Barkakhana.” 6 DRM(Engg)/RNC/02/2015 Repairs to black top of colony road and road side 60,73,390/- M/s Mahadeo TB/13/15/OT 66,46,226/- Work is in dt.21.01.2015 drain at Govindpur, Karra and Balisiring under Construction & dt.08.05.2015 progress Jurisdiction of SSE/works/Bano and SSE/P.way/ Co. Govindpur. 7 DRM(Engg)/RNC/09/2015 Provision of 16 bedded AC dormitory in the existing 7,83,314/- Ajay Tyagi TB/20/15/OT 6,94,876/- Work is in dt.28.02.2015 upper class waiting hall of Ranchi station dt.08.05.2015 progress 8 DRM(Engg)/RNC/18/2015 Repairing of circulating area Road, Fencing grill, 93,80,484/- M/s Vam Tara TB/26/15/OT 91,89,623/- Work is in dt.23.03.2015 booking office gate, station main entrance gate, cash Construction dt.22.05.2015 progress & pay office etc. at Ranchi. 9 DRM(Engg)/RNC/11/2015 Civil Engineering work for Provision of 02 nos 57,39,364/- Sai Construction TB/22/15/OT 60,22,234/- Work is in dt.28.02.2015 escalator at Hatia Railway station. & Developers dt.29.05.2015 progress 1 10 DRM(Engg)/RNC/33/2015 Repairs to roof by Galvalume sheet and 58,54,146/- M/s Vam Tara TB/40/15/OT 60,95,807/- Work is in dt.16.04.2015 miscellaneous works for Electrical office & store, Construction dt.10.06.2015 progress Railway Training school, RCT, Rail Tel, Railway Hospital, Rly. court DIG office, RPF Association office, DST Con office, IOW Con Office, RRB strong room etc. at Ranchi. 11 DRM(Engg)/RNC/13/2015 Hatia: Construction of covered shed for Under Floor 66,07,735/- Sai Construction TB/23/15/OT 67,87,942/- Work is in dt.09.03.2015 Wheel Lathe at Coaching Depot/Hatia. & Developers dt.10.06.2015 progress 12 DRM(Engg)/RNC/08/2015 Supply of either 10T or 4T capacity truck under SSE 10,78,136/- M/s TB/19/15/OT 12,57,503/- Work is in dt.28.02.2015 (P. way)/ GBX for carrying of Railway Materials for V.K.Enterprises dt.24.06.2015 progress two years. 13 DRM(Engg)/RNC/66/2014Supply of portion including supervision for welding of 60 kg 90 UTS 2,10,20,520/- The India TB/56/14/OT 2,36,30,750/- Work is in dt.25.09.2014 (2878 joints), 60 kg 110UTS (306 joints), and 52 kg Thermit dt.24.06.2015 progress 90 UTS (2089 joints) rail by Aluminium Thermit SKV Corporation Ltd. processwith automatic Tapping Thimblein connection with maintenance of P.Way Track/Conversion of SWR to LWRunder the jurisdiction of Sr.DEN(East)/RNC. 14 DRM(Engg)/RNC/03/2015 Provision of toilets and drinking water facility (hand 17,59,042/- Ajay Tyagi TB/14/15/OT 18,42,745/- Work is in dt.10.02.2015 tube wells) at manned level crossings under Sr. dt.23.07.2015 progress DEN(East)/RNC 15 DRM(Engg)/RNC/16/2015 “Hiring of 1.5 MT capacity Material Van for 4,27,880/- Ajay Tyagi TB/25/15/OT 4,85,759/- Work is in dt.17.03.2015 SSE(Bridge)/HTE unit at Ranchi for carrying tools, dt.23.07.2015 progress plants,tackles and miscellaneous bridge materialsalong with staffunder the jurisdiction of AXEN(Br-Line)/RNC 16 DRM(Engg)/RNC/37/2015 (i) Through Rail Renewal (P) of existing 60kg 90UTS 22,10,018/- Shree Prakash TB/43/15/OT 25,12,844/- Work is in dt.22.04.2015 rails by new 60 Kg 90 UTS (LWR) rails for 4.55 Tr. COnstruction dt.05.08.2015 progress Km at km 539-540, 543.2-544.55, 544.55-545.75 and 548-549 in HATIA-ORGA Section. (ii) Complete renewal of 10 nos. of 60Kg and 10 nos. of 52Kg ordinary SEJ including fitting and breaking plates under jurisdiction of ADEN (South)/HTE. 17 DRM(Engg)/RNC/39/2015 Hatia: Replacement of damaged platform surface 46,39,719/- Ambey TB/45/15/OT 48,25,413/- Work is in dt.27.04.2015 flooring by Kota stone flooring on platform No.1. Construction dt.12.08.2015 progress 2 18 DRM(Engg)/RNC/46/2015LAD -TORI: Construction of Limited Height Subway in lieu U/M L.C gate 8,11,34,580/- M/s Kumar & TB/48/15/OT 8,70,02,069/- Work is in dt.26.05.2015 No.LT-2(KM. 489/3-4), LT-3(KM. 491/7-8), LT-4(KM. Roy Construction dt.12.08.2015 progress 493/7-8), LT-5&6(KM. 495/7-8,496/2-3) & LT-7(KM. 497/7-8)(Total =5 nos.) under jurisdiction of ADEN/RNC in LAD-TORI Section 19 DRM(Engg)/RNC/19/2015 Maintenance and operation of water tanks pipe 22,58,727/- Sharma TB/27/15/OT 26,42,528/- Work is in dt.08.04.2015 lines of the entire water supply at Ranchi Construction dt.12.08.2015 progress Railway settlement. 20 DRM(Engg)/RNC/26/2015 Zonal works during the period from 01.07.2015 to 58,18,761/- Abhishek TB/34/15/OT 64,58,977/- Work is in dt.08.04.2015 30.06.2016 for Staff quarters and service building in Enterprises dt.14.08.2015 progress North colony under SSE /works/RNC 21 DRM(Engg)/RNC/24/2015 Zonal works during the period from 01.07.2015 to 45,25,129/- Prakash TB/32/15/OT 50,17,337/- Work is in dt.08.04.2015 30.06.2016 for “Service buildings including DRM Construction dt.14.08.2015 progress Office at Hatia under the jurisdiction of SSE(Works)/Hatia.”. 22 DRM(Engg)/RNC/27/2015 Zonal works during the period from 01.07.2015 to 55,37,490/- M/s Hari Om TB/35/15/OT 61,18,766/- Work is in dt.08.04.2015 30.06.2016 for “Staff quarters and service building in Construction dt.14.08.2015 progress South colony under SSE /works/RNC. 23 DRM(Engg)/RNC/25/2015 Zonal works during the period from 01.07.2015 to 53,18,933/- Vivek Kumar TB/33/15/OT 63,81,659/- Work is in dt.08.04.2015 30.06.2016 for “Hatia settlement excluding service Singh dt.14.08.2015 progress buildings under SSE (works)/HTE.” 24 DRM(Engg)/RNC/21/2015 Zonal works during the period from 01.07.2015 to 30,60,400/- Shri Prakash Lal TB/29/15/OT 36,13,298/- Work is in dt.08.04.2015 30.06.2016 for section “ Km. 466/7(Ex) to Km. 500/4 dt.14.08.2015 progress in Hatia – Orga section under the jurisdiction of SSE (Works)/Bano.” 25 DRM(Engg)/RNC/23/2015 Zonal works during the period from 01.07.2015 to 26,85,000/- Shri Prakash Lal TB/31/15/OT 29,76,514/- Work is in dt.08.04.2015 30.06.2016 for section “Km. 530/4(Ex) to Km. 556/12 dt.14.08.2015 progress in Hatia – Orga section under the jurisdiction of SSE (Works)/Bano 26 DRM(Engg)/RNC/22/2015 Zonal works during the period from 01.07.2015 to 33,67,500/- Punyark TB/30/15/OT 37,34,902/- Work is in dt.08.04.2015 30.06.2016 for section “ Km.