List of tenders finalized by Engineering Department, Division during the financial year 2015-16

Sl. NIT no. with date Name of work Estimated Finalized/Disc LOA reference Accepted Status of no. value of harged(if with date value of work as tender finalized name tender on (`) of agency (`) 1 DRM(Engg)/RNC/88/2014 Ranchi Division: Provision of Automatic Banner Flag 7,72,106 /- Ajay Tyagi TB/07/15/OT 8,10,711/- Work is in dt.04.12.2014 post at engineering non- interlocked manned gates dt.02.04.2015 progress. 34 level crossings. 2 DRM(Engg)/RNC/82/2014 Provision of Lavatory & Urinal in station premises 31,27,146/- Nityanand Saw TB/02/15/OT 31,54,877/- Work is in dt.26.11.2014 under the jurisdiction of Sr.DEN/(East)/RNC to fulfill dt.07.04.2015 progress. MEA (Namkom ,Tatisilwai, Jonha, Gautamdhara, Kita, Silli, Jhalda, Ilu, Torang. Jhimri and Latemda) 3 DRM(Engg)/RNC/05/2015 Renovation of old hospital at and replacement 40,63,982/- M/s Vam Tara TB/16/15/OT 42,12,414/- Work is in dt.11.02.2015 of AC sheet roof of PF shelter by Galvalume sheet in Construction dt.16.04.2015 progress PF No. (1) at Hatia 4 DRM(Engg)/RNC/75/2014 “Replacement of cracked stiffeners by new stiffeners 14,39,377/- Tirupati TB/62/14/OT 16,17,254/- Work is in dt.21.10.2014 of Br. No. 447 (12x12.2mG) at Km 347/18-22 Contract dt.07.04.2015 progress between ILO- MURI in CNI-MURI section and replacement of corroded gussets plates and top lateral bracings of Br. No. 156(9x18.3mG) at Km. 354/33-39 between MURI-THO in MURI-KSX of Ranchi Division.” 5 DRM(Engg)/RNC/04/2015 “Provision of lighting Arrangement, water supply9,92,408/ - Sai Electrical& TB/15/15/OT 11,01,573/- Work is in dt.10.02.2015 arrangement and staff-carrying vehicles for RGM (Rail Trading Co. Pvt. dt.05.05.2015 progress Grinding Machine) work for one month between Orga Ltd. to Barkakhana.” 6 DRM(Engg)/RNC/02/2015 Repairs to black top of colony road and road side 60,73,390/- M/s Mahadeo TB/13/15/OT 66,46,226/- Work is in dt.21.01.2015 drain at Govindpur, Karra and Balisiring under Construction & dt.08.05.2015 progress Jurisdiction of SSE/works/Bano and SSE/P.way/ Co. Govindpur. 7 DRM(Engg)/RNC/09/2015 Provision of 16 bedded AC dormitory in the existing 7,83,314/- Ajay Tyagi TB/20/15/OT 6,94,876/- Work is in dt.28.02.2015 upper class waiting hall of Ranchi station dt.08.05.2015 progress 8 DRM(Engg)/RNC/18/2015 Repairing of circulating area Road, Fencing grill, 93,80,484/- M/s Vam Tara TB/26/15/OT 91,89,623/- Work is in dt.23.03.2015 booking office gate, station main entrance gate, cash Construction dt.22.05.2015 progress & pay office etc. at Ranchi. 9 DRM(Engg)/RNC/11/2015 Civil Engineering work for Provision of 02 nos 57,39,364/- Sai Construction TB/22/15/OT 60,22,234/- Work is in dt.28.02.2015 escalator at Hatia Railway station. & Developers dt.29.05.2015 progress

1

10 DRM(Engg)/RNC/33/2015 Repairs to roof by Galvalume sheet and 58,54,146/- M/s Vam Tara TB/40/15/OT 60,95,807/- Work is in dt.16.04.2015 miscellaneous works for Electrical office & store, Construction dt.10.06.2015 progress Railway Training school, RCT, Rail Tel, Railway Hospital, Rly. court DIG office, RPF Association office, DST Con office, IOW Con Office, RRB strong room etc. at Ranchi. 11 DRM(Engg)/RNC/13/2015 Hatia: Construction of covered shed for Under Floor 66,07,735/- Sai Construction TB/23/15/OT 67,87,942/- Work is in dt.09.03.2015 Wheel Lathe at Coaching Depot/Hatia. & Developers dt.10.06.2015 progress

12 DRM(Engg)/RNC/08/2015 Supply of either 10T or 4T capacity truck under SSE 10,78,136/- M/s TB/19/15/OT 12,57,503/- Work is in dt.28.02.2015 (P. way)/ GBX for carrying of Railway Materials for V.K.Enterprises dt.24.06.2015 progress two years. 13 DRM(Engg)/RNC/66/2014Supply of portion including supervision for welding of 60 kg 90 UTS 2,10,20,520/- The India TB/56/14/OT 2,36,30,750/- Work is in dt.25.09.2014 (2878 joints), 60 kg 110UTS (306 joints), and 52 kg Thermit dt.24.06.2015 progress 90 UTS (2089 joints) rail by Aluminium Thermit SKV Corporation Ltd. processwith automatic Tapping Thimblein connection with maintenance of P.Way Track/Conversion of SWR to LWRunder the jurisdiction of Sr.DEN(East)/RNC.

14 DRM(Engg)/RNC/03/2015 Provision of toilets and drinking water facility (hand 17,59,042/- Ajay Tyagi TB/14/15/OT 18,42,745/- Work is in dt.10.02.2015 tube wells) at manned level crossings under Sr. dt.23.07.2015 progress DEN(East)/RNC 15 DRM(Engg)/RNC/16/2015 “Hiring of 1.5 MT capacity Material Van for 4,27,880/- Ajay Tyagi TB/25/15/OT 4,85,759/- Work is in dt.17.03.2015 SSE(Bridge)/HTE unit at Ranchi for carrying tools, dt.23.07.2015 progress plants,tackles and miscellaneous bridge materialsalong with staffunder the jurisdiction of AXEN(Br-Line)/RNC 16 DRM(Engg)/RNC/37/2015 (i) Through Rail Renewal (P) of existing 60kg 90UTS 22,10,018/- Shree Prakash TB/43/15/OT 25,12,844/- Work is in dt.22.04.2015 rails by new 60 Kg 90 UTS (LWR) rails for 4.55 Tr. COnstruction dt.05.08.2015 progress Km at km 539-540, 543.2-544.55, 544.55-545.75 and 548-549 in HATIA-ORGA Section. (ii) Complete renewal of 10 nos. of 60Kg and 10 nos. of 52Kg ordinary SEJ including fitting and breaking plates under jurisdiction of ADEN (South)/HTE. 17 DRM(Engg)/RNC/39/2015 Hatia: Replacement of damaged platform surface 46,39,719/- Ambey TB/45/15/OT 48,25,413/- Work is in dt.27.04.2015 flooring by Kota stone flooring on platform No.1. Construction dt.12.08.2015 progress

2

18 DRM(Engg)/RNC/46/2015LAD -TORI: Construction of Limited Height Subway in lieu U/M L.C gate 8,11,34,580/- M/s Kumar & TB/48/15/OT 8,70,02,069/- Work is in dt.26.05.2015 No.LT-2(KM. 489/3-4), LT-3(KM. 491/7-8), LT-4(KM. Roy Construction dt.12.08.2015 progress 493/7-8), LT-5&6(KM. 495/7-8,496/2-3) & LT-7(KM. 497/7-8)(Total =5 nos.) under jurisdiction of ADEN/RNC in LAD-TORI Section 19 DRM(Engg)/RNC/19/2015 Maintenance and operation of water tanks pipe 22,58,727/- Sharma TB/27/15/OT 26,42,528/- Work is in dt.08.04.2015 lines of the entire water supply at Ranchi Construction dt.12.08.2015 progress Railway settlement. 20 DRM(Engg)/RNC/26/2015 Zonal works during the period from 01.07.2015 to 58,18,761/- Abhishek TB/34/15/OT 64,58,977/- Work is in dt.08.04.2015 30.06.2016 for Staff quarters and service building in Enterprises dt.14.08.2015 progress North colony under SSE /works/RNC 21 DRM(Engg)/RNC/24/2015 Zonal works during the period from 01.07.2015 to 45,25,129/- Prakash TB/32/15/OT 50,17,337/- Work is in dt.08.04.2015 30.06.2016 for “Service buildings including DRM Construction dt.14.08.2015 progress Office at Hatia under the jurisdiction of SSE(Works)/Hatia.”. 22 DRM(Engg)/RNC/27/2015 Zonal works during the period from 01.07.2015 to 55,37,490/- M/s Hari Om TB/35/15/OT 61,18,766/- Work is in dt.08.04.2015 30.06.2016 for “Staff quarters and service building in Construction dt.14.08.2015 progress South colony under SSE /works/RNC. 23 DRM(Engg)/RNC/25/2015 Zonal works during the period from 01.07.2015 to 53,18,933/- Vivek Kumar TB/33/15/OT 63,81,659/- Work is in dt.08.04.2015 30.06.2016 for “Hatia settlement excluding service Singh dt.14.08.2015 progress buildings under SSE (works)/HTE.” 24 DRM(Engg)/RNC/21/2015 Zonal works during the period from 01.07.2015 to 30,60,400/- Shri Prakash Lal TB/29/15/OT 36,13,298/- Work is in dt.08.04.2015 30.06.2016 for section “ Km. 466/7(Ex) to Km. 500/4 dt.14.08.2015 progress in Hatia – Orga section under the jurisdiction of SSE (Works)/Bano.” 25 DRM(Engg)/RNC/23/2015 Zonal works during the period from 01.07.2015 to 26,85,000/- Shri Prakash Lal TB/31/15/OT 29,76,514/- Work is in dt.08.04.2015 30.06.2016 for section “Km. 530/4(Ex) to Km. 556/12 dt.14.08.2015 progress in Hatia – Orga section under the jurisdiction of SSE (Works)/Bano 26 DRM(Engg)/RNC/22/2015 Zonal works during the period from 01.07.2015 to 33,67,500/- Punyark TB/30/15/OT 37,34,902/- Work is in dt.08.04.2015 30.06.2016 for section “ Km. 500/4(Ex) to Km. 530/4 Constructions dt.14.08.2015 progress in Hatia – Orga section under the jurisdiction of SSE LLP (Works)/Bano.” 27 DRM(Engg)/RNC/20/2015 Zonal works during the period from 01.07.2015 to 25,88,888/- M/s Chintamani TB/28/15/OT 33,89,207/- Work is in dt.08.04.2015 30.06.2016 for section “Km. 428/12 to Km. 466/7 in N shahdeo dt.14.08.2015 progress Hatia – Orga section under the jurisdiction of SSE (Works)/Bano.”

3

28 DRM(Engg)/RNC/06/2015 1. MURI:-Repairs to floor, ceiling, wall, roof, gas slab, 2,67,20,530/- Maa Bhawani TB/17/15/OT 3,07,05,989/- Work is in dt.28.02.2015 bath room, doors & windows etc. of staff quarters of Construction dt.20.08.2015 progress Single storey type I quarters. (Qrs No. DS/185 to DS/187, DS/173, DS/174, DS/76 to DS/82, DS/63 to DS/66, DS/50, ELC/8, ELC/9, TC/35 to TC/39, E/9 to E/11, M/6 to M/11, L/20 to L/26,ES/4,TC/24,DS/86,TY/38, TY/39, RPF/1, DS/87, E/5, E/6, E/7, L/7.) (Total = 186 unit at Muri). 2. Repairs to roof leakage by providing galvalume sheet, floor, wall plaster, Kitchen, gas-slab, bath room, doors and windows of A.C. sheeted staff Qtrs at Muri settelment. [Qrs no. TY/4M, TY/3M, TY/2, M/1, TY/1, TY/3E, TY/12E, EM/8, TY/27, TY/26, TY/17E, TY/9, DS/85, E/4, E/3, ELC/2, M/12, T/21, L/11, L/12, T/3, C/3, T/4, T/5, T/6, L/1, L/2, L/4, L/5, CS/1, T/25, MS/2, G/2 (Total=89 Units) 29 DRM(Engg)/RNC/29/2015Zonal works i.e. Barkakhana (Ex) to Kotshila (Ex) excluding Muri 58,66,893/- M/s Sanjay TB/36/15/OT 65,27,493/- Work is in dt.08.04.2015 Yard and Settlement under the jurisdiction of Kumar Sharma dt.20.08.2015 progress ADEN/Muri.

30 DRM(Engg)/RNC/37/2015 Zonal works i.e. during the period from 01. 07. 2015 54,24,968/- Manoj Pandey TB/39/15/OT 62,65,729/- Work is in dt.08.04.2015 to 30. 06. 2016 for the section Hatia to Muri including dt.20.08.2015 progress Hatia and Ranchi yard from Km.428/12 excluding Muri yard, Ranchi settlement & Hatia settlement under the jurisdiction of ADEN/RNC. 31 DRM(Engg)/RNC/30/2015 Zonal works during the period from 01. 07. 2015 to 47,74,311/- Nityanand Saw TB/37/15/OT 52,82,799/- Work is in dt.08.04.2015 30. 06. 2016 for the section “Muri (Ex) to Chandil (Ex) dt.20.08.2015 progress including Muri yard & settlement under the jurisdiction of ADEN/Muri 32 DRM(Engg)/RNC/31/2015 Zonal works i.e. works during the period from 01. 07. 54,64,333/- Baba TB/38/15/OT 60,94,767/- Work is in dt.08.04.2015 2015 to 30. 06. 2016 for the section “Ranchi to Enterprises dt.21.08.2015 progress Lohardaga excluding Ranchi yard & settlement under the jurisdiction of ADEN/RNC. 33 DRM(Engg)/RNC/36/2015 Hatia: Development of satellite depots for 94,71,642/- Prakash TB/42/15/OT 97,87,391/- Work is in dt.22.04.2015 maintenance of track machines. Construction dt.07.09.2015 progress 34 DRM(Engg)/RNC/50/2015 Improvement to circulating area with ancillary works 66,62,696/- M/s Maruti TB/52/15/OT 67,20,225/- Work is in dt.01.06.2015 at Torang station in MURI-CNI section. Construction dt.08.09.2015 progress

35 DRM(Engg)/RNC/58/2015 Insertion of in-situ glued joints for sanctioned EI/SSI 1,96,54,785/- Eden Vinimay TB/56/15/OT 2,08,34,072/- Work is in dt.30.06.2015 works in Ranchi Division. Private Limited dt.10.09.2015 progress

4

36 DRM(Engg)/RNC/35/2015 Destressing of LWR/CWR track from KM 428/12 to 36,17,095/- M/s Raj TB/41/15/OT 33,77,351/- Work is in dt.16.04.2015 485/15 including loop line in the jurisdiction of Construction dt.14.09.2015 progress SSE/P.Way/GBX under ADEN (South)/HTE. 37 DRM(Engg)/RNC/52/2015 Improvement to passenger amenities at PKF station 72,72,014/- Lalo TB/53/15/OT 75,08,073/- Work is in dt.30.06.2015 by providing piped water supply, improving approach Construction dt.18.09.2015 progress road and circulating area. 38 DRM(Engg)/RNC/41/2015 Improvement to Platform surface on P.F No. 2 & 3 86,81,721/- Maa Bhawani TB/47/15/OT 88,26,276/- Work is in dt.26.05.2015 with Kota Stone surface and PF coping, Chequered Construction dt.29.09.2015 progress tiles in place of worn out mastic flooring surface Ranchi Station 39 DRM(Engg)/RNC/54/2015 Renovation work of RCC structure of façade at 48,39,092/- Eastern Trade TB/54/15/OT 50,81,047/- Work is in dt.30.06.2015 Ranchi Railway station Agency dt.30.09.2015 progress 40 DRM(Engg)/RNC/60/2015 Hatia: Widening of station approach road at Hatia 1,67,41,701/- M/s Vam Tara TB/58/15/OT 1,71,22,585/- Work is in dt.13.07.2015 with drainage and ancillary works. Construction dt.01.10.2015 progress 41 DRM(Engg)/RNC/62/2015 Supply & loading into Railway wagons/ hoppers 8,33,36,000/- Shivam Stone TB/60/15/OT 8,70,10,000/- Work is in dt.13.07.2015 110000 cum of 50 mm size machine crushed hard works dt.08.10.2015 progress stone track ballast at Pakur, Rajgram, Bakudih or Barharwa quarry siding for Ranchi Division of S. E. Railwayincluding unloading the same from Railway wagon & spreading the ballast in Track (Measurement will be done at destination.) 42 DRM(Engg)/RNC/65/2015 Provision of drinking water facility & toilets at manned 9,21,959/- M/s Bajrang TB/62/15/OT 9,45,412/- Work is in dt.13.07.2015 L-xing under the jurisdiction of ADEN/South/HTE Enterprises dt.14.10.2015 progress (HB-2, HB-8, HB-17, HB-24, HB-34, HB-44 & HB-50 = 7 nos) 43 DRM(Engg)/RNC/07/2015 Supply of either 10T or 4T capacity truck under SSE 11,18,736/- M/s Bajrang TB/18/15/OT 12,79,527/- Work is in dt.28.02.2015 (P. way)/ Bano for carrying of Railway Materials for Enterprises dt.14.10.2015 progress two years.

5

44 DRM(Engg)/RNC/73/2015 (i) Ranchi: Roof treatment by Galvalume sheet over 1,47,58,226/- M/s Vam Tara TB/67/15/OT 1,50,81,933/- Work is in dt.11.08.2015 Jack Arch Roof of Type-I and Type-II Qrs. at South Construction dt.16.10.2015 progress Settlement Ranchi. [Type-I( 48,49,50=3 Block),TYPE-II= 4 to 9,11,L-36 to L-37,18,20 =11 Block] Total =14 Block. (ii) Ranchi: Improvement of water supply, lat.,Bath & Kit. of Type-I & TYPE II staff Qtr. at South Settlement Ranchi. [Qtr.No.II TY/4 to TY/11 =8x2=16 unit,& TYPE III TY/3=1x2=2 unit] Total=18 unit. (iii) Ranchi: Roof treatment by Galvalum sheet over Jack Arch Roof of Type-I Qrs. at South Settlement Ranchi. [Type-I( 73,78,DS-49,DS- 54,T-42,L-44,L-45,L-46,87,DS-42,DS-44 to DS-48= 15 Block) (iv) Ranchi: Improvement of water supply, lat.,Bath & Kit. of Type-II staff Qtr. at South Settlement Ranchi. [Type-II.4 to 9,11,OP/12,13L,18,20,L/36, L/37,L/12 =30unit.(v) Hatia: Renovation of kitchen, bath and toilet of Type II quarters (75 units) at Hatia. 45 DRM(Engg)/RNC/78/2015 Repair to cess & Ballast wall etc. in Lohardaga- 75,89,516/- M/s Maa TB/70/15/OT 72,09,088/- Work is in dt.11.08.2015 Barkichanpi section.” Construction dt.16.10.2015 progress

46 DRM(Engg)/RNC/49/2015 “Provision of PCC drain and trolley refuges at km 2,34,56,325/- M/s Sanjay TB/51/15/OT 2,57,08,189/- Work is in dt.01.06.2015 387/14-15, 388/1-8, 390/16-391/7, 395/1-8, 395/11- Kumar Sharma dt.28.10.2015 progress 18, 396/1-9, 402/12-13, 403/1-7and 403/11-13 between GRE-RMT in MURI-BRKA (SL) section.” 47 DRM(Engg)/RNC/82/2015 Misc. P-Way zonal work for the section Ex. Km. 42,77,574/- M/s Mahadeo TB/76/15/OT 45,49,356/- Work is in dt.18.08.2015 530/4 to Km. 556/12 in Hatia – Orga section for the Construction & dt.05.11.2015 progress period ending up to 30.09.2016 under the jurisdiction Co. of PWI/Bano. 48 DRM(Engg)/RNC/88/2015 Misc. P-Way zonal work for the section Ex. Km. 36,36,412/- Shri Prakash Lal TB/74/15/OT 38,76,341/- Work is in dt.18.08.2015 466/7 to Km. 500/4 in Hatia – Orga section for the dt.05.11.2015 progress period ending up to 30.09.2016 under the jurisdiction of PWI/GBX. 49 DRM(Engg)/RNC/79/2015 Misc. P-Way zonal work for the section Km. 428/12 to 36,36,412/- Shri Prakash Lal TB/73/15/OT 38,45,995/- Work is in dt.18.08.2015 Km. 466/7 in Hatia – Orga section for the period dt.05.11.2015 progress ending up to 30.09.2016 under the jurisdiction of PWI/GBX. 50 DRM(Engg)/RNC/68/2015 (i) HTE: Construction of 8units Type-V quarters at 3,74,02,686/- Bhrigujee TB/63/15/OT 3,93,40,233/- Work is in dt.30.07.2015 Hatia.(ii) Provision of Officers Quarter (Type V - 1 Construction dt.10.11.2015 progress unit) at Hatia from Construction fund.

6

51 DRM(Engg)/RNC/81/2015 Misc. P-Way zonal work for the section Ex. Km. 32,58,608/- Punyark TB/75/15/OT 33,88,520/- Work is in dt.18.08.2015 500/4 to Km. 530/4 in Hatia – Orga section for the Constructions dt.12.11.2015 progress period ending up to 30.09.2016 under the jurisdiction LLP of PWI/Bano 52 DRM(Engg)/RNC/74/2015 i) Hatia: Improvement to staff Qtr. at Hatia Railway 3,31,97,288/- Maa Bhawani TB/72/15/OT 3,42,00,684/- Work is in dt.11.08.2015 settlement for up keeping the basic amenities.(ii) Construction dt.13.11.2015 progress Improvement to Type-I staff Qtr. from 1 to 15 (A, B, C, D (Total 60 units) at Hatia.. 53 DRM(Engg)/RNC/107/2015 Provision of limited height subways in lieu of 6,99,75,590/- Biswa Ranjan TB/96/15/OT 7,46,40,633/- Work is in dt.28.09.2015 unmanned level crossings in connection with Mahato dt.27.11.2015 progress elimination of unmanned level crossings HB-5, HB-6, HB-10, HB-12, HB-13 & HB-14 in Hatia-Orga section of Ranchi division. 54 DRM(Engg)/RNC/109/2015 Provision of limited height subways in lieu of 7,03,55,413/- M/s Kumar & TB/98/15/OT 7,50,65,130/- Work is in dt.28.09.2015 unmanned level crossings in connection with Roy Construction dt.27.11.2015 progress elimination of unmanned level crossings HB-29, HB- 31, HB-35, HB-37& HB-41 in Hatia-Orga section of Ranchi division. 55 DRM(Engg)/RNC/108/2015 Provision of limited height subways in lieu of 7,62,31,504/- M/s Kumar &Roy TB/97/15/OT 8,11,63,178/- Work is in dt.28.09.2015 unmanned level crossings in connection with Construction dt.27.11.2015 progress elimination of unmanned level crossings HB-15, HB- 18, HB-21, HB-22, HB-26 &HB-27 in Hatia-Orga section of Ranchi Division. 56 DRM(Engg)/RNC/111/2015 “Provision of limited height subways in lieu of 8,49,29,597/- Biswa Ranjan TB/99/15/OT 8,90,98,525/- Work is in dt.28.09.2015 unmanned level crossings in connection with Mahato dt.30.11.2015 progress elimination of unmanned level crossings 1) at km 293/2-3 in lieu of UM LC no. CM-03 at km 292/14-15 between CNI-GDBR in MURI-CNI (SL) section, 2) at km 318/15-16 in lieu of UM LC no. CM-27 at km 318/13-14 between LTMD-TUL in MURI-CNI (SL) section. 3) at km 347/22-23 in lieu of UM LC no. CM- 53 at km 348/2-3 between ILO-MURI in MURI-CNI (SL) section. 4) at km 366/21-367/1 in lieu of UM LC no. MB-10 at km 366/19-20 between BLNG-HRBR in MURI-BRKA (SL) section. 5) at km 372/14-15 in lieu of UM LC no. MB-14 at km 372/13-14 between BLNG-HRBR in MURI-BRKA (SL) section. 6) at km 387/11-12 in lieu of UM LC no. MB-24 at km 387/13- 14 between GRE-BRKP in MURI-BRKA(SL) section under jurisdiction of ADEN/MURI &7) MH-10 in MURI-HTE section under jurisdiction of ADEN/RNC.

7

57 DRM(Engg)/RNC/70/2015 “Supply, installation and commissioning of track 11,69,494/- Nagory Foster TB/65/15/OT 10,87,629/- Work is in dt.30.07.2015 based Rail Lubricator (Hydraulic Type) under Sr. Private Limited dt.01.12.2015 progress DEN (East)/Ranchi including operation for two years after free operation of one year..” 58 DRM(Engg)/RNC/94/2015 RNC Divn: Transportation of P.Way materials and 42,28,041/- Kishan Lal TB/83/15/OT 40,16,216/- Work is in dt.25.08.2015 bridge tools by road from different places for Agrawal dt.02.12.2015 progress maintenance of bridge and track works under SSE(P)/DSD/RNC of divisional store section.” 59 DRM(Engg)/RNC/55/2015 (i)HTE: Construction of 01 unit Type-III quarter at 92,85,009 Maa TB/55/15/OT 97,25,495/- Work is in dt.30.06.2015 Hatia (ii) HTE: Construction of 02 units Type-II Construction dt.03.12.2015 progress quarters at Hatia (iii) Augmentation of existing Mechanised laundry at Coaching Depot Hatia.” 60 DRM(Engg)/RNC/101/2015 Posting of Gate mitra at vulnerable LCs(23 Nos.) in 27,26,579/- Sharma TB/90/15/OT 29,30,236/- Work is in dt.23.09.2015 Ranchi Division for one year under the jurisdiction of Construction dt.14.12.2015 progress Sr.DEN(East)/RNC(Phase-I)”.

8

61 DRM(Engg)/RNC/95/2015 i) Scattered rail renewal of 0.785 Tr.km of 60Kg Rail 1,08,88,192/- M/s Mahadeo TB/84/15/OT 1,20,64,533/- dt.02.09.2015 due to wheel burnt and wear of rail under the Construction & dt.15.12.2015 jurisdiction SSE/P.way/Bano under ADEN Co (South)/Hatia. (ii) Scattered rail renewal of 0.39 Tr.km of 60Kg Rail due to wheel burnt and wear of rail under the jurisdiction SSE/Pway/GBX under ADEN(South)/Hatia. (iii) TPR (P) for 60KG rail section 26.00 Tr. Km under the jurisdiction of ADEN (South)/ Hatia.(iv) TPR (P) for 52KG rail section 26.00 Tr. Km under the jurisdiction of ADEN (South)/ Hatia (v) Complete renewal of 11 nos. of 60kg ordinary SEJ including fittings jurisdiction of SSE/P.Way/BANO under ADEN (South)/ Hatia. (vi) Complete renewal of 11 nos. of 60kg ordinary SEJ including fittings under jurisdiction of SSE/P.Way/GBX under ADEN (South)/ Hatia. (vii) Complete renewal of 10 nos. of 52kg ordinary SEJ including fittings under jurisdiction of ADEN(South)/ Hatia (viii) Scattered rail renewal due to wheel burnt and wear of rail in curve of 52kg rail of 0.90Tr.km under the jurisdiction SSE/Pway/Bano under ADEN(South)/ Hatia (ix) Scattered rail renewal due to wheel burnt and wear of rail in curve of 60kg rail of 0.80Tr.km under the jurisdiction SSE/Pway/GBX under ADEN(South)/ Hatia. (x) Scattered rail renewal due to wheel burnt and wear of rail in curve of 60kg rail of 0.80Tr.km under the jurisdiction SSE/P.way/Bano under ADEN(South)/ Hatia. (xi) TSR (P) with new PSC-14 Sleeper (1660nos./Km) of 0.760 Tr. Km in MCZ yard main line under jurisdiction of ADEN (South)/ Hatia (xii) Scattered rail renewal due to wheel burnt and wear of rail in curve of 52kg rail of 0.90Tr.km under the jurisdiction SSE/Pway/GBX under ADEN(South)/ Hatia. 62 DRM(Engg)/RNC/96/2015 (i) Hatia: Construction of FOB (20' wide walkway and 94,68,200/- Gharonda TB/85/15/OT 99,97,397/- Work is in dt.02.09.2015 10' wide stair) and other ancillary works. (ii) Provision Homes Pvt. Ltd. dt.16.12.2015 progress of lifts 2nos. each at Ranchi and Hatia 63 DRM(Engg)/RNC/113/2015 “Construction of drain, retaining wall and other 70,53,475/- M/s K.K.Agrawal TB/101/15/OT 67,88,093/- Work is in dt.29.09.2015 ancillary works at RMT yard in dt.18.12.2015 progress MURI-BRKA section in connection with newly constructed 2nd loop line.”

9

64 DRM(Engg)/RNC/69/2015 Execution of pre, post and other associated enabling 77,58,931/- S.D.Construction TB/64/15/OT 87,01,753/- Work is in dt.30.07.2015 works related with track machine like BCM, FRM, dt.30.12.2015 progress CSM etc. under the jurisdiction of ADEN(South)/HTE. 65 DRM(Engg)/RNC/93/2015 Periodical maintenance work of Girder Bridges of 15,86,121/- M/s Satyam TB/82/15/OT 16,23,255/- Work is in dt.19.08.2015 Ranchi division for 2015-16..” Construction dt.28.12.2015 progress 66 DRM(Engg)/RNC/90/2015 “Misc. P. Way Zonal work for the period ending up to 76,27,305/- M/s Lakkar & TB/79/15/OT 83,21,909/- Work is in dt.18.08.2015 30.09.2016 under the jurisdiction of PWI/RNC Company dt.01.01.2016 progress including RNC station limit but excluding RNC-LAD- BICI section.” 67 DRM(Engg)/RNC/121/2015 (i)Hatia: Improvement to water supply arrangement in 35,53,973/- Meenash TB/107/15/OT 37,05,994/- Work is in dt.06.10.2015 RPF colony and RPSF barrack at Hatia by providing Enterprises dt.05.01.2016 progress PVC tank of capacity 25000 litres on steel staging with pump to draw the water from existing deep bore, repairs to pipe line and other miscellaneous works. (ii) Replacement of AC sheet roof with RCC flat roof over part of Engg. department and renovation of toilet in DRM Building Hatia.” 68 DRM(Engg)/RNC/91/2015 “Misc. P. Way Zonal work for the period ending up to 55,85,596/- M/s R.D.P TB/80/15/OT 60,17,729/- Work is in dt.18.08.2015 30.09.2016 in RNC-LAD section excluding RNC Construction, dt.06.01.2016 progress station limit but including LAD station limit under the jurisdiction of PWI/RNC.” 69 DRM(Engg)/RNC/89/2015 “Misc. P. Way Zonal work for the period ending up to 86,63,642/- M/s Lakkar & TB/78/15/OT 93,25,785/- Work is in dt.18.08.2015 30.09.2016 under the jurisdiction of PWI/TIS.” Company dt.06.01.2016 progress 70 DRM(Engg)/RNC/92/2015 “Misc. P.Way Zonal work under the jurisdiction of 15,60,076/- M/s Jay Shree TB/81/15/OT 16,58,451/- Work is in dt.18.08.2015 PWI/RNC in LAD-BICI section Group, dt.06.01.2016 progress during the period ending up to 30.09.2016.”

71 DRM(Engg)/RNC/104/2015 “Misc. P. Way Zonal work for the period ending up to 92,08,042/- Biswa Ranjan TB/93/15/OT 98,47,952/- Work is in dt.23.09.2015 30.09.2016 under the jurisdiction of PWI/MURI-I.” Mahato dt.06.01.2016 progress

72 DRM(Engg)/RNC/116/2015“Provision of limited height subways in lieu of unmanned level crossings 8,92,76,018/- Maa Bhawani TB/103/15/OT 9,33,76,884/- Work is in dt.06.10.2015 in connection with elimination of unmanned level Construction dt.04.01.2016 progress crossings RL-21, RL-25, RL-28, RL-29, RL-31 & RL- 33 under the jurisdiction of ADEN/RNC.”

73 DRM(Engg)/RNC/117/2015 Provision of limited height subways in lieu of 9,06,03,510/- Maa Bhawani TB/104/15/OT 9,45,07,376/- Work is in dt.06.10.2015 unmanned level crossings in connection with Construction dt.04.01.2016 progress elimination of unmanned level crossings RL-34, RL- 35, RL-37, RL-39, RL-40 & RL-42 under the jurisdiction of ADEN/RNC

10

74 DRM(Engg)/RNC/115/2015 Provision of limited height subways in lieu of 9,39,67,445/- Maa Bhawani TB/102/15/OT 9,83,54,619/- Work is in dt.06.10.2015 unmanned level crossings in connection with Construction dt.04.01.2016 progress elimination of unmanned level crossings MH-13, MH- 14, RL-3,RL-10,RL-16 & RL-18 under the jurisdiction of ADEN/RNC. 75 DRM(Engg)/RNC/75/2015 (i) Through Pad Renewal of PSC-6 sleepers between 1,15,44,584/- M/s Maruti TB/71/15/OT 1,22,81,547/- Work is in dt.11.08.2015 km 376/28-354/26 (DN) for 22.0 tr. Km. in MURI-KSX Construction dt.11.01.2016 progress (DL) section under jurisdiction of ADEN/MURI (ii) Through Pad Renewal of PSC-6 sleepers between km 358/5-384/5 for 26.0 tr. Km between MURI-GRE in MURI-BRKA (SL) section under jurisdiction of ADEN/MURI (iii) Through Pad Renewal of PSC-6 sleepers between km 354/13-376/27 (UP) for 22.5 tr. Km. in MURI-KSX (DL) section under jurisdiction of ADEN/MURI(iv) Through Pad Renewal of PSC-6 sleepers between km 384/5-408/10 for 24.5 tr. Km between GRE-RMT in MURI-BRKA (SL) section under jurisdiction of ADEN/MURI(v) Renewal of 17 sets of 60kg SEJ under the jurisdiction of SSE(P.Way)/Muri/ II (vi) Scattered rail renewal of 60kg wheel burnt and scabbed rails for 0.552 tr.km at 381/1-2 to 405/4-5 at different locations in MURI- BRKA section.”

76 DRM(Engg)/RNC/97/2015 Ranchi-Providing house-keeping and hospitality 5,55,159/- Shashikant TB/86/15/OT 5,88,469/- Work is in dt.09.09.2015 services for the officers’ Rest House at Ranchi for Sharma dt.11.01.2016 progress period of one year. 77 DRM(Engg)/RNC/59/2015 1. Improvement to surface of PF No.2 with mastic 97,31,375/- Abhishek TB/57/15/OT 99,24,563/- Work is in dt.30.06.2015 flooring and provision of water booths, PF benches Enterprises dt.14.01.2016 progress at Ramgarh station in MURI-BRKA section. 2.Renovation of Booking cum Reservation office at Namkom.

78 DRM(Engg)/RNC/98/2015 “Balance portion of work of Deep screening of 46 18,70,466/- Shivam Stone TB/87/15/OT 25,62,538/- Work is in dt.09.09.2015 sets points & Crossing under the Jurisdiction of Works dt.18.01.2016 progress ADEN (South)/Hatia.” 79 DRM(Engg)/RNC/61/2015 Provision of RDSO type PF Shed at 'E' category 1,27,82,402/- Siyanand TB/59/15/OT 1,37,73,888/- Work is in dt.13.07.2015 station to fulfill MEA (24 bays) under the jurisdiction Engineering dt.18.01.2016 progress of Sr.DEN(East)/RNC works,

11

80 DRM(Engg)/RNC/102/2015 Posting of Gate Mitra at vulnerable 07LCs (HB-3, HB- 7,45,651/- M/s Rai TB/91/15/OT 8,91,216/- Work is in dt.23.09.2015 6,HB-15,HB-21,HB-26,HB-29,HB-31=07 nos.) for one Interprises dt.18.01.2016 progress year in Hatia-Orga section under jurisdiction of ADEN/South/Hatia.. 81 DRM(Engg)/RNC/63/2015 Provision of RDSO type PF Shed at 'E' category 69,23,801/- Shri Prakash Lal TB/61/15/OT 75,30,906/- Work is in dt.13.07.2015 station to fulfill MEA (13 bays) in HTE-ORGA dt.05.02.2016 progress section under the jurisdiction of ADEN/South/HTE. (Balsiring-1, Lodhma-1, Karra-1, Gobindpur Road-1, Bakaspur-1, Pokla- 1, Pakra-1, KRKR-1, Mahabuang-1, Kanarona-1, Tati-1, Parbatonia-1 and Orga-1).” 82 DRM(Engg)/RNC/128/2015 Misc. P. Way Zonal work for the period ending up to 90,59,755/- M/s Maruti TB/02/16/OT 97,67,443/- Work is in dt.01.12.2015 30.09.2016 under the jurisdiction of Construction dt.24.02.2016 progress PWI/MURI-II.”

83 DRM(Engg)/RNC/106/2015 Hatia: Supply, installation & commissioning of one 12,77,434/- Max-Ion TB/95/15/OT 11,36,916/- Work is in dt.28.09.2015 Electro chlorination Plant with Dosing pump at Hatia. Engineering dt.02.03.2016 progress services

84 DRM(Engg)/RNC/123/2015 (i) Through Pad Renewal of PSC-6 sleepers between 90,00,607/- Biswa Ranjan TB/109/15/OT 97,15,998/- Work is in dt.15.10.2015 km 330/0-345/0 for 15.0 tr. Km. in SISA-ILU (SL) in Mahato dt.09.03.2016 progress Muri-CNI section under jurisdiction of ADEN/MURI. (ii) Through Pad Renewal of PSC-6 sleepers between km 345/0-358/5 for 13.5 tr. Km. in SISA-ILU (SL) in Muri-CNI section under jurisdiction of ADEN/MURI. (iii) Through Pad Renewal of PSC-6 sleepers between km 294/0-314/0 for 20.0 tr. Km. in GDBR-LTMD(SL) in Muri-CNI section under jurisdiction of ADEN/MURI. (iv) Through Pad Renewal of PSC-6 sleepers between km 314/0-330/0 for 116 tr. Km. inLTMD-SSIA (SL) in Muri-CNI section under jurisdiction of ADEN/MURI. (v) Renewal of 17 sets of 60kg SEJ under the jurisdiction of SSE(P.Way)/Muri I. (vi)Construction of sand hump on line no.3of TUL station towards Muri end. 85 DRM(Engg)/RNC/130/2015 Improvement of stadium building, officers Gym Room 32,04,215/- Sharma TB/04/16/OT 32,26,160/- Work is in dt.02.12.2015 and inside fencing of SERSA stadium Ranchi. Construction dt.09.03.2016 progress

12

86 DRM(Engg)/RNC/127/2015 (i) Provision of rain water harvesting and reutilization 90,73,039/- Bhrigujee TB/01/16/OT 95,67,447/- Work is in dt.01.12.2015 of raw water for washing lines at Hatia.. (ii) Construction, dt.03.03.2016 progress Replacement of 100 mm dia. pipe line for Raw water in washing line No.5 and between washing line 5 & 6 including 80 mm dia pipe line for filter water between washing line No.3 & 4 at Hatia. 87 DRM(Engg)/RNC/99/2015 Cess repairing in Muri-Hatia section under the 1,83,44,937/- Maa Bhawani TB/88/15/OT 1,66,57,202/- Work is in dt.23.09.2015 jurisdiction of SSE/P.way/TIS from Construction dt.31.03.2016 progress Km. 356/27 to Km. 408.”

88 DRM(Engg)/RNC/129/2015 “(i) Extension of DRM office building on first floor at 58,06,324/- Baba Enterprises TB/03/16/OT 58,89,518/- Work is in dt.02.12.2015 Hatia. (ii) Provision of upper class waiting hall by dt.10.03.2016 progress renovation of existing parcel office, improvement to sulabh souchalya and drainage System at Ranchi station” 89 DRM(Engg)/RNC/131/2015 Comprehensive operation and maintenance of water 62,25,131/- M/s K.K. Dubey TB/05/16/OT 75,57,727/- Work is in dt.02.12.2015 treatment Plant at Hatia for two year (2015-2017). dt.15.03.2016 progress

13