Bilateral Agreements on International Road Transport

Total Page:16

File Type:pdf, Size:1020Kb

Bilateral Agreements on International Road Transport Bilateral Agreements on International Road Transport BishnuBishnu Om Om BadeBade NepalNepal NEPAL JAPAN CHINA INDIA Thailand GEOGRAPHICAL LOCATION Latitude: 26o 22’ North to 30o 27 ’ North Longitude: 80o 04’ East to 88o12’ East Border: East, South & West - India North – China East to West Length : 885 Km (Avg.) North south Breadth : 193 Km (Avg.) Total Coverage Area :1,47,181 Sq. Km. Tilicho Lake, Nepal GEOGRAPHICAL DIVERSIFICATION Three Regions: Mountain, Hilly & Terai (plain) 67% Mountains & hills, 33% plain Elevation Ranges from 90 to 8848m above mean sea level. Highest Peak of the world, the Mt. Everest stands in the Northern Range (Himalaya). Hilly Region, Nepal Trade Corridors (Major) Yari Nechung Rasuwa Kimathanka Olangchungola Dryports/ Inland Clearance Depots under operations Dryport under construction Proposed for future construction Dry Ports (Roadbased) BIRATNAGAR BHAIRAHAWA (World Bank) (World Bank) KAKARBHITTA TATOPANI (ADB) (China) Motor vehicle agreement (MVA) Between the Government of Nepal and the Government of India • Signed at Kathmandu, Nepal on 25 November, 2014. • To explore all Possibilities of expansion and promotion of vehicular traffic between the two countries on the basis of mutual advantage and reciprocity and with a view to strengthening the economic bonds between the two countries on the basis of common interests, for operating passenger traffic between the two countries. • Motor vehicle Agreement (MVA) Articles Form of permit Protocol ◦ Annexures Bus Service Routes KTM – NEW DELHI KTM – VARANASI Transport Routes and Border Crossing Points The transport Routes in MVA: ◦ Kathmandu(Nepal)-New Delhi(India) Via Bhairahawa, Gorakhpur, Lucknow Length= 1200 Km ◦ Kathmandu(Nepal)- Varanasi (India) Via Bhairahawa, Azamgarh Length= 640 Km ◦ Pokhara (Nepal)-New Delhi(India) Via Bhairahawa, Gorakhpur, Lucknow Length= 1000 Km . Border crossing point: Bhairahawa (Nepal) Main Border Crossing points ◦ At south with India (Kakarbhitta, Jogbani, Raxaul, Bhairahawa, Nepalgunj) ◦ At north With China (Kodari, Rashwagadhi) PERMIT Requirement of a permit for plying in the territory of the other country: Issuance of a permit for regular passengers transportation to the authorized operator and non-regular passengers transportation by the competent authority of the each country. Permit for regular passenger transportation and private vehicles(custom duty free up to 7 days) Permit for non-regular passenger vehicle (custom duty free up to 30 days) PERMIT continue… Permit to authorized operator: For regular passenger transportation - multiple entries. Valid for one year and renewable every year subject to a maximum period of 5 years. Any deviation from the route - treated as violation of permit condition. Incase of over stay of vehicle An extra charge to be paid to the custom authorities with a valid reason in the destination country at the time of exit. However: The laws of the country would be applicable for a period more than the prescribed time Requirement for vehicle Vehicle - any motor vehicle to be used to transport persons and passengers Both the countries allow passenger and personal vehicles of each country to ply in territory of the other country, subject to the term of the agreement. Regular passenger transportation shall be allowed only through authorized operator(s). Vehicle Insurance Non-regular passengers vehicle insurance by a registered Insurance Company against at least third party loss, in both the countries. Comprehensive insurance policy for regular passenger vehicle . PASSPORT AND VISA The crew shall travel on the basis of valid passports or valid documents of identity. ◦ Other valid documents of identity Citizenship certificate Other for minors e.g. Birth certificate or school identity card Internationally recognized valid travel document as proof of identity for third country passengers Driving License A document of authorization to drive a specified category of vehicles issued by the competent authority of the either country or an internationally recognized permission for driving Institutional arrangement Issuance of a permit to the personal and non-regular passenger vehicles by the following competent authority: Office of district collectors/District Magistrates in India The district Administration officers/Zonal transport officers in Nepal. Diplomatic Missions as also the designated Customs officers or other authorities designated by the respective countries. Other Important Provisions Fees and Charges Restrictions Right to Inspect and search Business Facilitation Applicability of Laws Amendment and Review Mechanism Issues and Challenges Sustainability of transport routes ◦ Business viability, public facilitation, condition of roads Establishment of Joint Transport Facilitation Committee to coordinate, implement and monitor the MVA Future Agreements Bilateral Motor Vehicle Agreement between Nepal and Bangladesh – Plurilateral arrangement to be made SAARC Transport Ministers’ meeting to finalize the draft SAARC Motor Vehicles Agreement THANK YOU.
Recommended publications
  • India-Nepal,Kalapani,Nepal,Open Border
    APRIL 2020 ISSUE NO. 356 India and Nepal’s Kalapani Border Dispute: An Explainer SOHINI NAYAK ABSTRACT Neighbours India and Nepal, who share an open border, have not always had the most amicable of relations, oscillating from one extreme to the other. One of their long-standing disputes is over the border area of Kalapani. This discord has the potential to disrupt the other aspects of their ties, especially in the domains of the economy and cross-border security. Further, if the two countries fail to arrive at a resolution to the disagreement, it might give other stakeholders such as China an opportunity to interfere. This brief explains the Kalapani issue and in that context, explores what can be expected of the bilateral relationship in the future. Attribution: Sohini Nayak, “India and Nepal’s Kalapani Border Dispute: An Explainer,” ORF Issue Brief No. 356, April 2020, Observer Research Foundation. Observer Research Foundation (ORF) is a public policy think tank that aims to influence the formulation of policies for building a strong and prosperous India. ORF pursues these goals by providing informed analyses and in-depth research, and organising events that serve as platforms for stimulating and productive discussions. ISBN 978-93-89622-94-2 © 2020 Observer Research Foundation. All rights reserved. No part of this publication may be reproduced, copied, archived, retained or transmitted through print, speech or electronic media without prior written approval from ORF. India and Nepal’s Kalapani Border Dispute: An Explainer INTRODUCTION External Affairs, Nepal, under the leadership of Foreign Minister Pradeep Kumar Gyawali also In November 2019, the Home Ministry of India issued a statement for the media stating that, released a new edition of the Indian political “The Nepal government is committed to map, showing Jammu and Kashmir along with protecting the country’s external borders and it 1 Ladakh as the new union territories of India.
    [Show full text]
  • Directory Establishment
    DIRECTORY ESTABLISHMENT SECTOR :URBAN STATE : BIHAR DISTRICT : Araria Year of start of Employment Sl No Name of Establishment Address / Telephone / Fax / E-mail Operation Class (1) (2) (3) (4) (5) NIC 2004 : 2021-Manufacture of veneer sheets; manufacture of plywood, laminboard, particle board and other panels and boards 1 PLYWOOD COMPANY P.O.- BHAGATVENEER DIST: ARARIA PIN CODE: 854311, STD CODE: NA , TEL NO: NA , FAX NO: 2000 10 - 50 NA, E-MAIL : N.A. NIC 2004 : 5020-Maintenance and repair of motor vehicles 2 AGARWAL MOTAR GARAGE, P.O.- FORBESGANJ, WARDNO. 11 DIST: ARARIA PIN CODE: 854318, STD CODE: 06455, TEL NO: 1954 10 - 50 FORBESGANJ NA , FAX NO: NA, E-MAIL : N.A. NIC 2004 : 6010-Transport via railways 3 RAILWAY STATION, FORBESGANJ P.O.- FORBISGANJ DIST: ARARIA PIN CODE: 854318, STD CODE: 06455, TEL NO: 0222545, FAX 1963 51 - 100 NO: NA, E-MAIL : N.A. 4 P.W.I.S.E.OFFICE, N.F.RAILWAY, P.O.- FPRBESGANJ DIST: ARARIA PIN CODE: 854318, STD CODE: NA , TEL NO: NA , FAX NO: 1963 101 - 500 FORBESGANJ NA, E-MAIL : N.A. NIC 2004 : 6302-Storage and warehousing 5 SEEMA COLD STORAGE, FORBESGANJ P.O.- FORBESGANJ, WARD NO. 1, LOHIA PATH DIST: ARARIA PIN CODE: 854318, STD CODE: 1961 10 - 50 06455, TEL NO: 222773, FAX NO: NA, E-MAIL : N.A. NIC 2004 : 6511-Central banking_relates to the functions and working of the Reserve Bank of India 6 STATE BANK O FINDIA, S.K.ROAD, P.O.- FORBESGANJ DIST: ARARIA PIN CODE: 854318, STD CODE: 06455, TEL NO: 222540, FAX 1942 10 - 50 FORBESGANJ NO: NA, E-MAIL : N.A.
    [Show full text]
  • Town Survey Report Forbesganj, Series-4, Bihar
    CENSUS OF INDIA 1981 SERIES-4 BIHAR Part-X B TOWN SURVEY REPORT FORBESGANJ Draft by: Edited by: Supervised by ~. P. N. SINHA S. C. SAXENA V.K.BHARGAVA Assistant Director Deputy Director Deputy Director of Census Operations, Bihar of Census Operations, Bihar of Census Operations, Bihar CONTENTS Page Foreword ... (v) Preface (vii) Chapter I Introduction 1-5 Chapter II History of growth of the town 7-8 Chapter III Amenities and services-History of growth and present position 9-17 Chapter IV Economic life of the town 19-42 Chapter V Ethnic and selected socio-demographic characteristics of the population 43-63 Chapter VI Migration and settlement of families 64-75 Chapter VII Neighbourhood pattern 76-86 Chapter VIII Family life in the town 87-93 Chapter IX Housing and materia I culture 95-102 Chapter X Organisation of power and prestige 103-106 Chapter XI Leisure and recreation, social participation, social awareness, religion and crime. 107-112 Chapter XII Linkage and Continua 113-126 Chapter XIII Conclusion 127-128 Map & Charts Showing Urban Land use Showing Pre-urban area Showing Public utility services FORBESGANJ TOWN URBAN LAND USE (NOT TO SCALE) N i BOUNDARY> TOWN WNlD ROAD Rs ,., RAILWAY .. BUSINESS A~EA re-.-el I!.!..!.!I ADMINISTAATIVE AREA ~ RESIDENTIAL AREA • EDUCATIONAL AREA ~ INDUSTRIAL AREA D AGRICULTURAL AREA D UNCLASSIFIED AREA I REGISTRY OFFICE VETERINARY 2 POST OfFICE POLICE STATION 1 HOSPITAL 6 INSPECTION BUNGALOW ~ GRAVE YARD FORBESGANJ TOWN PERI· URBAN AREA Furlongs 8 4 (0 1 Miles t:::t;:!:~~~=::::::l Km, I o 1 Kms. / \ \ ,.1 __ ._ ........
    [Show full text]
  • Nepal-India Relations: Beyond Realist and Liberal Theoretical Prisms
    Journal of International Affairs Vol. 3, 84-102, 2020 Doi: https://doi.org/10.3126/joia.v3i1.29085 Department of International Relations and Diplomacy Tribhuvan University, Kathmandu, Nepal Nepal-India Relations: Beyond Realist and Liberal Theoretical Prisms Karun Kishor Karki Hari KC Abstract Taking, as a point of departure, the historical narratives that tout Nepal-India relations as based on mutual respect of each other’s sovereignty, we provide a critical reflection upon the flaws of such a single uncritical discourse that not only risks the danger of creating stereotypes but also leaves it incomplete and misleading. Although many aspects of the Nepal-India relations indeed predate the origin of the modern nation-state, any historical discourse that downplays the realpolitik in these relations leaves the story untold about India being a hegemon interfering in Nepal’s internal affairs and obstructing Nepal’s social, economic and political progression. From a neocolonial lens, we provide snapshots of the ways and instances in which India has infringed upon Nepal’s sovereignty and independence. Key Words: Nepal-India relations; foreign policy; bilateral relations; border dispute; South Asia; grand narrative; realism; liberalism; neocolonialism; hegemony 84 Karun Kishor Karki & Hari KC / Nepal-India Relations: Beyond … Vol. 3, 84-102, 2020 Introduction Some images implanted into the consciousness of the Nepalese during their formative high school years are those of Nepal as the Shangri-La, characterized by the phrase ‘sundar, shanta, bishal’ (beautiful, peaceful, great), the land of the valiant Gurkhas, and the nation never colonised by foreign powers. History textbooks chime in, hailing the cordiality and co-existence inherent in Nepal-India relations that predated the origin of modern nation-states.
    [Show full text]
  • Third Hotel of the Company in Nepal, Including Kathmandu and Nagarkot
    March 8, 2021 National Stock Exchange of India Limited BSE Limited Exchange Plaza, Bandra Kurla Complex, Phiroze Jeejeebhoy Towers Bandra (East) Dalal Street, Mumbai — 400 001 Mumbai — 400 05] Name of Scrip: LEMONTREE BSE Scrip Code: 541233 Dear Sir Ref: Signing of License Agreement in Biratnagar Sub: Disclosure under Regulation 30 of SEBI (Listing Obligations & Disclosure Requirements) Regulations, 2015 With reference to the captioned subject, we would like to inform you that the company has signed a License Agreement for an 80 room upcoming hotel at Biratnagar in Nepal under the brand ‘Lemon ‘Tree Premier’. The hotel is expected to be operational by January 2023, and this will be the third hotel of the company in Nepal, including Kathmandu and Nagarkot. The hotel will feature 80 well-appointed rooms & suites, complemented by a multi-cuisine restaurant, a bar, meeting and conference spaces and recreational facilities. The hotel is owned by Nepal International Hospitality Pvt. Ltd. Carnation Hotels Private Limited, a subsidiary and the hotel management arm of the Company will be operating and marketing this Hotel. Please find attached herewith the copy of the press release. Please take the above intimation on record Thanking you, Yours faithfully For L enon Pred Hotels Limited iN LS Ge NikhilSethit-~ . Group Company Secretary & GM Legal Lemon Tree Hotels Limited (CIN No. L74899DL1992PLC049022) Registered Office: Asset Na. 6, Aerocity Hospitality District, New Delhi-7 10037 T +91 11 4605 0101, F +91 14 46050110, £ [email protected] www.lemontreehotels.com Lemon Tree Hotels signs new hotel in Biratnagar in Nepal This hotel will add to the portfolio of upcorning hotels in Nepal, which include signed hotels in Kathmandu and Nagarkot New Deihi, 08 March 2021: Lemon Tree Hotels Limitedannounced its latest international signing~ a Lemon Tree Premier in Biratnagar in Nepal.
    [Show full text]
  • Purnea Introduction
    DISTRICT PROFILE PURNEA INTRODUCTION Purnea district is one of the thirty-eight administrative districts of Bihar state. Purnea district is a part of Purnea division. Purnea is bounded by the districts of Araria, Katihar, Bhagalpur, Kishanganj, Madhepura and Saharsa and district of West Dinajpur of West Bengal. The major rivers flowing through Purnea are Kosi, Mahananda, Suwara Kali, Koli and Panar. Purnea district extends northwards from river Ganges. Purnia has seen three districts partitioned off from its territory: Katihar in 1976, and Araria and Kishanganj in 1990. Purnea with its highest rainfall in Bihar and its moderate climate has earned the soubriquet of 'Poor's man's Darjeeling’. HISTORICAL BACKGROUND Purnea has a rich history and a glorious past. It is believed that the name Purnea originates either from the Goddess Puran Devi (Kali) or from Purain meaning Lotus. The earliest inhabitants of Purnea were Anas and Pundras. In the epics, the Anas are grouped with the Bengal tribes and were the eastern most tribes known to the Aryans during the period of Atharva Samhita while the Pundras, although they had Aryan blood were regarded as degraded class of people in the Aitarya Brahmana, Mahabharata and Manu Samhita, because they neglected the performance of sacred rites. According to the legend of Mahabharata, Biratnagar which gave shelter to the five Pandava brothers during their one year incognito exile, is said to be located in Purnea. During the Mughal rule, Purnea was a military frontier province under the command of a Faujdar. The revenue from this outlying province was spent on the maintenance of troops for protecting the borders against tribes from the north and east.
    [Show full text]
  • S.No. State Zone Type of Customs Stations(Port,ACC,ICD,C FS
    Whether Type of Customs connecte Functioning Port S.No. State Zone Stations(Port,ACC,ICD,C Name of Station d / Non code FS and LCS) through functioning EDI Andaman and 1 Kolkata Port Port Blair INIXZ1 YES EDI enabled Nicobar Islands Andhra 2 Vishakahpatnam Port Gangavaram Port, Andhra Pradesh INGGV1 YES EDI enabled Pradesh Andhra 3 Vishakahpatnam ICD Icd Marripalam, District - Guntur, A.P. INGNR6 YES EDI enabled Pradesh Andhra 4 Vishakahpatnam Port Custom House Port Area Kakinada 533007 INKAK1 YES EDI enabled Pradesh Andhra 5 Vishakahpatnam Port Ices Krishnapatnam Port, Nellore-524003 INKRI1 YES EDI enabled Pradesh Andhra Icd Thimmapur, 11-60/5-7 Thimmapur 6 Hyderabad ICD INTMX6 YES EDI enabled Pradesh 509325 Ap Andhra Custom House Port Area Viskhapatnam 7 Vishakahpatnam Port INVTZ1 YES EDI enabled Pradesh 530035 Andhra 8 Vishakahpatnam ACC Air Cargo Complex Visakhapatnam INVTZ4 YES EDI enabled Pradesh 9 Assam GUWAHATI ICD Concor, Icd Amingaon, Guwahati- 781031 INAMG6 YES EDI enabled 10 Assam GUWAHATI ACC Guwahati Air Cargo INGAU4 YES EDI enabled Leveraging Technology For Serving Taxpayers Whether Type of Customs connecte Functioning Port S.No. State Zone Stations(Port,ACC,ICD,C Name of Station d / Non code FS and LCS) through functioning EDI 11 Bihar Patna LCS Bairgania INBGUB YES EDI enabled 12 Bihar Patna LCS Bhimnagar INBNRB YES EDI enabled 13 Bihar Patna LCS Bhitamore INBTMB YES EDI enabled 14 Bihar Patna LCS Galgalia INGALB YES EDI enabled 15 Bihar Patna LCS Jayanagar INJAYB YES EDI enabled 16 Bihar Patna LCS Lcs Jogbani, Dist:Araria,
    [Show full text]
  • Economic Survey 2018/19
    Economic Survey 2018/19 Economic Growth Rate (In Percent) Gross Domestic Saving and Gross Fixed Capital 9.0 Formation (As percent of GDP ) 8.0 40.0 7.0 35.0 6.0 30.0 5.0 25.0 4.0 20.0 3.0 15.0 2.0 10.0 1.0 5.0 0.0 0.0 Saving Fixed Capital Trend of Revenue Province-wise Contribution on GDP 12.0 Consumer Price Inflation 30.0 Sudurpa shchim 10.0 25.0 Karnali Province 6% no. 1 20.0 4% 8.0 Province 15% 15.0 no.5 6.0 13% Province 10.0 no. 2 4.0 5.0 13% 0.0 Gandaki 8% 2.0 0.0 Province no. 3 As percent of GDP Growth rate 41% 40.0 Growth of Export and Import (In Percent) Tourist Arrival (In Thousands) 30.0 1200 20.0 700 10.0 0.0 200 -10.0 -20.0 -300 -30.0 Export Import By Air By land Government of Nepal Ministry of Finance Singh Durbar, Kathmandu Economic Survey 2018/19 Government of Nepal Ministry of Finance Singhdurbar, Kathmandu Foreword Finance Minister has to submit, as per the constitutional provision, the annual estimates of government’s revenue and expenditures of each year in the joint session of both the houses of Federal Parliament on 15 th day of Jestha of previous fiscal year. Annual economic survey is to be submitted to the house prior to tabling the ‘Annual Estimates of Revenue and Expenditures’ to the Parliament. This Economic Survey 2018/19 has been published along this line by incorporating overall economic situations, major economic activities, major economic indicators and their analysis till mid-March of FY 2018/19.
    [Show full text]
  • (C) If Not, the Reasons Therefor, Project-Wise;
    GOVERNMENT OF INDIA MINISTRY OF RAILWAYS LOK SABHA UNSTARRED QUESTION NO. 1737 TO BE ANSWERED ON 13.02.2019 UNDER-CONSTRUCTION ARARIA SEEMANCHAL RAILWAY LINE †1737. SHRI SARFARAZ ALAM: Will the Minister of RAILWAYS be pleased to state: (a) the time by which the doubling and electrification of under construction Araria-Seemanchal railway line and Katihar to Jogbani single line connecting Bihar and Nepal Border is likely to be done; (b) whether these works are being performed as per scheduled time- limit; (c) if not, the reasons therefor, project-wise; (d) whether the Seemanchal express is likely to be substituted by a new train and plied from either New Delhi or Old Delhi Railway Station in place of Anand Vihar Station; and (e) if so, the details thereof and the time by which the same is likely to get started? ANSWER MINISTER OF STATE IN THE MINISTRY OF RAILWAYS (SHRI RAJEN GOHAIN) (a): No doubling work of Araria-Seemanchal is sanctioned. However, new Broad Gauge single line from Araria to Galgalia (110.15 km) has been taken up. Revised Estimate of `2132.03 crore has been sanctioned on 30.05.2018 for this project. Land acquisition has been taken up. Contd……2 - 2 - Further, Gauge Conversion of Katihar-Jogbani (109 km) single line has been completed and commissioned. No doubling of this section is sanctioned. Electrification of Katihar-Purnea-Araria Court-Jogbani (109 route kilometers) rail line has been sanctioned at a cost of `109.91 crore in September, 2018. This section is planned for commissioning on electric traction during 2020-21.
    [Show full text]
  • Nepal Himalaya
    EVEREST FROM DUE WEST NEPAL HIMALAYA BY H. W. TILMAN WITH 61 PHOTOGRAPHS TAKEN BY THE AUTHOR CAMBRIDGE AT THE UNIVERSITY PRESS PUBLISHED BY THE SYNDICS OF THE CAMBRIDGE UNIVERSITY PRESS London Office: Bentley House, N.W.I American Branch: New York Agents for Canada, India, and Pakistan: Macmillan Printed in Great Britain at the IJniversity Press, , (Brooke Crutchley, University Printer] PREFACE A writer of travels, by the title he gives his book, should not promise more than he performs. But titles must be brief and, if possible, striking. The brief and rather too all-embracing title of this book may conjure up visions of the author stepping from lightly one Nepal peak to the next, or surveying the whole from the top of one stupendous giant. In the course of three journeys herein described, only one mountain, a modest r one, w as successfully climbed, a fact which may account for any wordy pomposity, not unlike the style of a White Paper to put out cover up some appalling blunder on the part of Authority. Moreover, two of the three journeys had a serious T purpose, w hich may account for the comparatively few occa r sions on w hich cheerfulness manages to break in. I am glad that the learned will benefit from the report on the Natural History of the Langtang valley specially contributed by Mr O. Polunin in an appendix. Again I have to thank Dr R. J. Perring for criticism and help; and R. T. Sneyd, Esq., for attending to the reading of proofs in my absence.
    [Show full text]
  • List of Branches with Block of Uttar Bihar Gramin Bank
    LIST OF BRANCHES WITH BLOCK OF UTTAR BIHAR GRAMIN BANK S. No. SOL ID REGION District BRANCH Block 1 100691 ARARIA KISHANGANJ TULSIYA DIGHALBANK 2 100694 ARARIA ARARIA BALUA KALIYAGANJ(PALASI) PALASI 3 100695 ARARIA ARARIA KURSAKANTA KURSAKANTA 4 100697 ARARIA ARARIA BARDAHA SIKTI 5 100698 ARARIA ARARIA KHAJURIHAT BHARGAMA 6 100700 ARARIA KISHANGANJ TERHAGACHH TERRAGACHH 7 100702 ARARIA ARARIA JOKIHAT JOKIHAT 8 100704 ARARIA KISHANGANJ POTHIA POTHIA 9 100714 ARARIA KISHANGANJ TAPPU DIGHALBANK 10 100722 ARARIA ARARIA KUARI KURSAKANTA 11 100723 ARARIA ARARIA SIMRAHA FORBESGANJ 12 100729 ARARIA KISHANGANJ POWAKHALI THAKURGANJ 13 100732 ARARIA ARARIA MADANPUR ARARIA 14 100733 ARARIA ARARIA DHOLBAJJA FORBESGANJ 15 100737 ARARIA ARARIA PHULKAHA NARPATGANJ 16 100738 ARARIA ARARIA CHAKARDAHA. NARPATGANJ 17 100748 ARARIA KISHANGANJ TAIYABPUR POTHIA 18 100749 ARARIA ARARIA KALABALUA RANIGANJ 19 100750 ARARIA ARARIA CHANDERDEI ARARIA 20 100752 ARARIA KISHANGANJ LRP CHOWK, BAHADURGANJ BAHADURGANJ 21 100754 ARARIA KISHANGANJ SONTHA KOCHADHAMAN 22 100755 ARARIA KISHANGANJ JANTAHAT KOCHADHAMAN 23 100762 ARARIA ARARIA BIRNAGAR BHARGAMA 24 100766 ARARIA ARARIA GIDHBAS RANIGANJ 25 100767 ARARIA KISHANGANJ CHHATARGACHH POTHIA 26 100780 ARARIA ARARIA KUSIYARGAW ARARIA 27 100783 ARARIA ARARIA MAHATHWA. BHARGAMA 28 100785 ARARIA ARARIA PATEGANA. ARARIA 29 100786 ARARIA ARARIA JOGBANI FORBESGANJ 30 100794 ARARIA KISHANGANJ JHALA TERRAGACHH 31 100795 ARARIA ARARIA PARWAHA FORBESGANJ 32 100809 ARARIA KISHANGANJ KISHANGANJ KISHANGANJ 33 100810 ARARIA KISHANGANJ
    [Show full text]
  • BRIEF of ALL PROJECTS (As on 30Th, November - 2017)
    पूवर सीमा रेल (नमाण) NORTHEAST FRONTIER RAILWAY (CONSTRUCTION) BRIEF OF ALL PROJECTS (As on 30th, November - 2017) महाबंधक (िनमाण) मालीगाँव, गुवाहाटी - 781011 General Manager (Const.) N.F. Railway, Maligaon - 781011 INDEX S. No. Name of Project Page No. NEW LINES 1 New Maynaguri - Jogighopa 1 2 Agartala - Sabroom (NP) 2 3 Bogibeel Bridge (NP) 3 4 Tetelia - Byrnihat (NP) 4 5 Haldibari - International Border (3.50 Km) 5 6 Jiribam - Imphal (NP) 6 7 Jogbani - Biratnagar 7 8 Bhairabi - Sairang (NP) 8 9 Agartala - Akhura (Bangladesh) 9 10 Araria - Galgalia 10 11 Sivok - Rangpo (NP) 11 12 Dimapur - Kohima (NP) 12 13 Murkongselek - Pasighat 13 14 Byrnihat - Shillong (NP) 14 15 Balurghat - Hili 15 16 Jalalgarh-Kishanganj 16 17 Eklakhi - Balurghat, Itahar - Buniadpur 17 18 Kaliaganj - Buniadpur 18 19 Dimapur - Tizit 19 20 Sivsagar-Jorhat (62 km) 20 21 Salona-Khumtai(99 km) 21 22 Tezpur-Silghat(25 km) 22 23 Kumarghat - Agartala (NP) 23 24 Harmuti - Itanagar 24 25 Dudhnoi - Mendipathar 25 GAUGE CONVERSION 26 Lumding - Silchar MM for GC Baraigram - Dulabcherra & Karimganj - Maishashan (NP) 26 27 Katihar - Jogbani - Katihar - Barsoi - Radhikapur, MM for Raiganj - Dalkhola (15.3 km) NL 27 28 New Jalpaiguri - New Bongaigaon MM for Chalsa - Naxal & Rajabhalkowa Jainti 28 29 Katakhal - Bhairabi 29 30 Rangia - Murkongselek (NP) 30 31 Aluabari Road-Siliguri 31 32 Lumding-Dibrugarh (Senchoa - Silghat) including Defence siding at Missa (Dep) 32 DOUBLING 33 New CoochBehar - Samuktala Road 33 34 New Coochbehar - Gumanihat 34 35 Lumding - Hojai Patch Doubling 35 36 Ambari Falakata - New Maynaguri 36 37 Digaru-Hojai 37 38 Bongaigaon-Goalpara-Guwahati 38 39 New Bongaigaon- Rangiya- Kamakhya 39 40 New Maynaguri - Gumanihat (Balance portion 51.65 Km) 40 41 Saraighat Bridge (7 km) 41 42 Kamakhya-New Guwahati Quadrupling 42 43 New Guwahati - Digaru 43 1 New Maynaguri to Jogighopa New Line Project(226.83 KM)along with Gauge Conversion from New Mal Jn.
    [Show full text]