Accident Cluster Sites and Fatal Road Accidents on the Welsh Trans- European Network - Transport, 2012-2014 - Revised
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
London to Wales Route Strategy March 2017 Contents 1
London to Wales Route Strategy March 2017 Contents 1. Introduction 1 Purpose of Route Strategies 2 Strategic themes 2 Stakeholder engagement 3 Transport Focus 3 2. The route 5 Route Strategy overview map 7 3. Current constraints and challenges 9 A safe and serviceable network 9 More free-flowing network 9 Supporting economic growth 10 An improved environment 10 A more accessible and integrated network 10 Diversionary routes 14 Maintaining the strategic road network 15 4. Current investment plans and growth potential 17 Economic context 17 Innovation 17 Investment plans 17 5. Future challenges and opportunities 21 6. Next steps 27 i R Lon ou don to Scotla te nd East London Or bital and M23 to Gatwick str Lon ategies don to Scotland West London to Wales The division of rou tes for the F progra elixstowe to Midlands mme of route strategies on t he Solent to Midlands Strategic Road Network M25 to Solent (A3 and M3) Kent Corridor to M25 (M2 and M20) South Coast Central Birmingham to Exeter A1 South West Peninsula London to Leeds (East) East of England South Pennines A19 A69 North Pen Newccaastlstlee upon Tyne nines Carlisle A1 Sunderland Midlands to Wales and Gloucest M6 ershire North and East Midlands A66 A1(M) A595 South Midlands Middlesbrougugh A66 A174 A590 A19 A1 A64 A585 M6 York Irish S Lee ea M55 ds M65 M1 Preston M606 M621 A56 M62 A63 Kingston upon Hull M62 M61 M58 A1 M1 Liver Manchest A628 A180 North Sea pool er M18 M180 Grimsby M57 A616 A1(M) M53 M62 M60 Sheffield A556 M56 M6 A46 A55 A1 Lincoln A500 Stoke-on-Trent A38 M1 Nottingham -
NORTH WALES Expenditure £'S Scheme Local Authority Type Scheme Name 2011 to Date Future Total
NORTH WALES Expenditure £'s Scheme Local Authority Type Scheme Name 2011 to date Future Total Anglesey Local Llangefni Link Road 365,000 0 365,000 Trunk Britannia Bridge 300,000 0 300,000 Anglesey / Local Surface Access – Anglesey Airport 158,000 0 158,000 Gwynedd Trunk A55 Britannia Bridge 40,000 0 40,000 -A470 Pont yr Afanc, A5 Sth of Cerrigydrudion, A55 rainbow bridge, A5 W Hendre Arddwyfaen, E27A55 Conwy Trunk Tunnels safety improvement 18,845,000 32,500,000 51,345,000 Trunk A55 Junctions 15 and 16 Improvements 10,000 31,600,000 31,610,000 -A55 Talardy Para Refurb,A494 maesgarnedd Jctn, Denbighshire Trunk A5 Llangollen Golf Club, A494 Ruthin Vale 216,000 0 216,000 Trunk A5 Pont Melin Rug 165,000 0 165,000 Local Foryd Rd Junction Improvements 160,000 0 160,000 Flintshire Trunk A494/A550 Deeside Park to Drome Corner 90,000 206,270,000 206,360,000 Trunk -A55 J29 to 21, A55 Refuge/Crossovers 4,300,000 0 4,300,000 Local Shotton Corridor Signalisation B5129 450,000 0 450,000 Trunk A494 Drome Corner to Ewloe 44,000 0 44,000 Gwynedd Trunk A487 Caernarfon to Bontnewydd 921,000 103,927,000 104,847,000 Trunk A487 Dyfi Bridge 65,000 22,880,000 22,945,000 Trunk A487 Porthmadog, Minffordd and Tremadog 15,694,000 446,000 16,140,000 Trunk A470 Maes yr Helmau – Cross Foxes 10,123,000 472,000 10,595,000 Trunk A470 Gelligemlyn 9,185,000 176,000 9,361,000 - Pont Briwet, A493 Pontbren to Nant y Gwenlli, Local -A487Pont Dr Garndolbenmaen, Williams School, A494Dolgellau Golwg Hir, 3,757,000 0 3,757,000 Dolgellau, A487 Golan Junction, A55 Aber Tai’r Trunk -
M4 Smart Motorway Faqs
Transport for NSW M4 Smart Motorway FAQs Here are some of our top questions about the M4 Smart Motorway project. Which motorway is the M4? The M4 Motorway is a 35km long motorway that opened in Sydney in the 1960’s. It stretches from Concord in the inner west to Lapstone in the Blue Mountains. The M4 Motorway connects to the M5 WestConnex at Haberfeld and also intersects the Westlink M7 at Eastern Creek. What is the M4 Smart The M4 Motorway will become frst smart motorway in Motorway Project? NSW with new road structures and technology being installed from Parramatta to Penrith. What is a Smart Motorway? A Smart Motorway, also known as a Managed Motorway in Victoria, use real-time information, communication and trafc control systems in and alongside the road to improve trafc fow. Variable road signs and messages communicate to drivers how to best travel along the motorway for a safer, more consistent journey with less congestion. roads-maritime.transport.nsw.gov.au Page 1 of 3 M4 Smart Motorway FAQs Where else is this technology Smart motorway technologies are being used on Melbourne’s being used in Australia? M1 motorway and introduced in southern Queensland on several roads including the Ipswich Motorway. Some individual elements of the technology are already in place on Sydney roads including the M1, M2, M5 and M7 Motorways. Has this system delivered Yes, studies have reported a signifcant reduction in improvements in other motorway incidents and improved trafc fow. On locations? Melbourne’s M1 Motorway reports have shown: • Travel times have been reduced by up to 42 percent • Crash rates have decreased by 30 percent • Vehicle emissions have been reduced by 11 percent How does the Smart There are a number of diferent parts that work together to Motorway work? ensure trafc fow and safety along the motorway. -
The M49 Motorway and M4 Motorway (Junction 22) (Temporary Prohibition of Traffic) Order 2014
STATUTORY INSTRUMENTS 2014 No. 2283 ROAD TRAFFIC The M49 Motorway and M4 Motorway (Junction 22) (Temporary Prohibition of Traffic) Order 2014 Made - - - - 27th August 2014 Coming into force - - 30th August 2014 WHEREAS the Secretary of State for Transport, being the traffic authority for the M49 Motorway (“the M49”), the M4 Motorway (“the M4”) and connecting roads, is satisfied that traffic on lengths of those roads and some of those connecting roads in the City of Bristol and South Gloucestershire should be prohibited because works are proposed to be executed thereon: NOW, THEREFORE, the Secretary of State, in exercise of the powers conferred by section 14(1)(a) of the Road Traffic Regulation Act 1984( a), hereby makes the following Order:- 1. This Order may be cited as the M49 Motorway and M4 Motorway (Junction 22) (Temporary Prohibition of Traffic) Order 2014 and shall come into force on 30th August 2014. 2. In this Order – “the M49” means both carriageways of the M49 between M5 Junction 18A and the southern edge of the M4 Junction 22 interchange roundabout; “the slip roads” mean the eastbound and westbound exit and entry slip roads at M4 Junction 22; “the works” mean resurfacing, white lining, drainage repairs and surveying works; “a works period” means a period of 10 hours starting at 20.00 hours on Monday 1st September 2014 or on any subsequent day and ending when the said works have been completed; and a reference to an article followed by a number is a reference to the article in this Order which bears that number. -
Joint Spatial Plan Joint Transport Study Final Report October 2017
WEST OF ENGLAND “BUILDING OUR FUTURE” West of England Joint Spatial Plan Joint Transport Study final report October 2017 NOVEMBER 2017 9 www.jointplanningwofe.org.uk West of England Joint Transport Study Final Report Notice This document and its contents have been prepared and are intended solely for the West of England authorities’ information and use in relation to the West of England Joint Transport Study. Atkins Limited assumes no responsibility to any other party in respect of or arising out of or in connection with this document and/or its contents. This document has 120 pages including the cover. Document history Job number: 5137782 Document ref: Final Report Revision Purpose description Originated Checked Reviewed Authorised Date Rev 1.0 First Draft JFC TP, SG RT, TM JFC 05/05/17 Rev 2.0 Second Draft JFC, TP 26/05/17 Rev 3.0 Third Draft JFC BD, SG RT JFC 07/06/17 Rev 4.0 Fourth Draft JFC SG RT JFC 21/06/17 Rev 5.0 5th Draft (Interim Version) JFC 27/06/17 Rev 6.0 Sixth Draft JFC SG RT JFC 28/06/17 Rev 7.0 Final Draft JFC RT RT JFC 07/07/17 Rev 8.0 Revised Final Draft JFC JFC 01/09/17 Rev 9.0 Final JFC SG RT JFC 19/10/17 Client signoff Client West of England authorities Project West of England Joint Transport Study Document title Final Report Job no. 5137782 Copy no. Document 5137782/Final Report reference Atkins West of England Joint Transport Study Final Report | October 2017 West of England Joint Transport Study Final Report Table of contents Chapter Pages 1. -
The M4 Motorway (West of Magor to East of Castleton) and the A48(M) Motorway (West of Castleton to St Mellons) (Variation of Various Schemes) Scheme 201
WELSH STATUTORY INSTRUMENT S 201- No. (W. ) HIGHWAYS, WALES The M4 Motorway (West of Magor to East of Castleton) and The A48(M) Motorway (West of Castleton to St Mellons) (Variation of Various Schemes) Scheme 201- EXPLANATORY NOTE (This note is not part of the Scheme) This Scheme removes the special road classification from various parts of the M4 motorway in the City of Newport and the County of Monmouthshire and from various parts of the A48(M) motorway in the City of Newport and the City and County of Cardiff. The parts removed will continue to be trunk road. The Scheme comes into force on such day or days as may be appointed by the Welsh Ministers and specified in a notice in the London Gazette. WEL SH STATUTORY INSTRUMENT S 201- No. (W. ) HIGHWAYS, WALES The M4 Motorway (West of Magor to East of Castleton) and The A48(M) Motorway (West of Castleton to St Mellons) (Variation of Various Schemes) Scheme 201- Made 201- Coming into force 201- The Welsh Ministers, in exercise of powers conferred by sections 16, 17, 19 and 326 of the Highways Act 1980(1), and of all other enabling powers(2), make this Scheme. Title, Interpretation and Commencement 1. This Scheme may be cited as The M4 Motorway (West of Magor to East of Castleton) and The A48(M) Motorway (West of Castleton to St Mellons) (Variation of Various Schemes) Scheme 201- and shall come into force on such day or days as may be appointed by the Welsh Ministers and specified in a notice in the London Gazette. -
The M4 Motorway (Hillingdon and Hounslow) (Speed Limits) Regulations 1998
Status: This is the original version (as it was originally made). This item of legislation is currently only available in its original format. STATUTORY INSTRUMENTS 1998 No. 1708 ROAD TRAFFIC The M4 Motorway (Hillingdon and Hounslow) (Speed Limits) Regulations 1998 Made - - - - 10th July 1998 Laid before Parliament 16th July 1998 Coming into force - - 30th October 1998 The Secretary of State for Environment, Transport and the Regions, in exercise of the powers conferred by section 17(2) and (3) of the Road Traffic Regulation Act 1984(1), and of all other powers enabling him in that behalf, and after consultation with representative organisations in accordance with section 134(2) of that Act(2), hereby makes the following Regulations: Citation and commencement 1. These Regulations may be cited as the M4 Motorway (Hillingdon and Hounslow) (Speed Limits) Regulations 1998 and shall come into force on 30th October 1998. Prohibitions 2.—(1) No person shall drive a motor vehicle at a speed exceeding 40 miles per hour on the lengths of road specified in Part II of the Schedule to these Regulations. (2) No person shall drive a motor vehicle at a speed exceeding 50 miles per hour on the lengths of road specified in Part III of the Schedule to these Regulations. (3) Part I of the Schedule to these Regulations shall have effect for the interpretation of the Schedule. Revocation 3. The Motorways Traffic (M4) (Speed Limit) Regulations 1971(3) are hereby revoked. (1) 1984 c. 27; section 17(2) was amended by the New Roads and Street Works Act 1991 (c. -
And M4 Motorway (Junction 22 to Moor Lane Overbridge) (Temporary Prohibition and Restriction of Traffic) Order 2011
STATUTORY INSTRUMENTS 2011 No. 875 ROAD TRAFFIC The M48 Motorway (Junction 1 to Moor Lane Overbridge) and M4 Motorway (Junction 22 to Moor Lane Overbridge) (Temporary Prohibition and Restriction of Traffic) Order 2011 Made - - - - 15th March 2011 Coming into force - - 19th March 2011 WHEREAS the Secretary of State for Transport, being the traffic authority for the M48 Motorway (“the M48”) and the M4 Motorway (“the M4”), is satisfied that traffic on lengths of those roads in South Gloucestershire should be prohibited and restricted because works are proposed to be executed thereon: NOW, THEREFORE, the Secretary of State, in exercise of the powers conferred by section 14(1)(a) and (7) of the Road Traffic Regulation Act 1984(a), hereby makes the following Order:- 1. This Order may be cited as the M48 Motorway (Junction 1 to Moor Lane Overbridge) and M4 Motorway (Junction 22 to Moor Lane Overbridge) (Temporary Prohibition and Restriction of Traffic) Order 2011 and shall come into force on 19th March 2011. 2. In this Order – “the M48” means the eastbound carriageway of the M48 from the tip of the nosing of the eastbound exit slip road at Junction 1 to a point at the centre of Moor Lane Overbridge; “the M4” means the eastbound carriageway of the M4 from the tip of the nosing of the eastbound exit slip road at Junction 22 to a point at the centre of Moor Lane Overbridge; “the slip roads” mean (i) the eastbound entry slip road at M4 Junction 22; or (ii) the eastbound entry slip road at M48 Junction 1; “the tip of the nosing” means the first point -
PAINSWICK GLOUCESTERSHIRE Yew Tree Cottage Stepping Stone Lane, Painswick, Gloucestershire, GL6 6RU
YEW TREE COTTAGE PAINSWICK GLOUCESTERSHIRE Yew Tree Cottage Stepping Stone Lane, Painswick, Gloucestershire, GL6 6RU A DETACHED COTTAGE IDEALLY SITUATED IN THE SOUGHT AFTER VILLAGE OF PAINSWICK WITH LOVELY VIEWS OVER THE VALLEY AND CLOSE TO AN EXCELLENT RANGE OF AMENITIES Sitting Room, Kitchen/Breakfast Room, South Facing Conservatory, 2 Double Bedrooms, Family Bathroom, Cottage Garden, Parking and Views. ASKING PRICE £325,000 DIRECTIONS situated on a peaceful lane with a front facing cottage garden and patio. The kitchen offers From our office in Painswick, proceed down the hill and turn left after the churchyard into good storage and space for a table and chairs, incorporates a gas hob with electric oven Stamages Lane. Continue down the hill and at a small crossroads Yew Tree Cottage can be under, space for a fridge freezer, plumbing for a washing machine and views over the located as the second property on the left, this being the beginning of Stepping Stone Lane. valley. There is a WC with a hand basin, a dual aspect sitting room is of a good size and entered directly via the front door from either the pedestrian gate on the lane or from the LOCATION garden path leading up from a good size parking area which has been created at the Painswick is situated about 3 miles north of Stroud and approximately 5 miles east of the bottom of the garden, a cosy south facing part brick conservatory capturing lovely valley city of Gloucester on the A46 Cheltenham Road and provides for most essential needs. views completes the downstairs accommodation. -
Written Guide
Connecting cities A self guided walk to routeways in the Avon Valley Discover the village of Saltford between Bath and Bristol Explore how it has been shaped by four major routeways Find out the physical and political stories behind their development .discoveringbritain www .org ies of our land the stor scapes throug discovered h walks 2 Contents Introduction 4 Route map 5 Practical information 6 Commentary 8 Credits 21 © The Royal Geographical Society with the Institute of British Geographers, London, 2012 Discovering Britain is a project of the Royal Geographical Society (with IBG) The digital and print maps used for Discovering Britain are licensed to the RGS-IBG from Ordnance Survey 3 Connecting cities Explore four different routeways in the Avon Valley Introduction You may think of routeways just as means of getting from A to B, but on this walk in the Avon Valley you will discover that every route has its own story. The Avon Valley links the cities of Bath and Bristol. Half way along, in Saltford village, you can find four different routeways located within a stone’s throw of one another. There is a former stagecoach road, The Great Road, now the present A4 and one of Britain’s busiest A roads. There is the River Avon, which was converted into a canal in the eighteenth Cycle route sign century, although it is used now by narrow boats Rory Walsh © RGS-IBG Discovering Britain for holidays rather than by barges carrying coal. And there are two railway lines – Brunel’s Great Western Railway, still the main Bristol-London route, and the now-defunct Midland line, which was converted into Britain’s first Sustrans cycle track in the 1980s. -
Marine Safety in the Dee Conservancy
Marine Safety in the Dee Conservancy A guide to safe navigation Tony Mills/Shutterstock.com We are Natural Resources Wales the principle adviser and delivery partner to the Welsh Government on the environment. Our purpose is to ensure that the environment and natural resources of Wales are sustainably maintained, sustainably enhanced and sustainably used, in a way that is good for people, good for the environment and good for the economy, now and in the future. NRW is committed to promoting good management of its available resources, and so we will: Undertake and regulate marine operations in a way that safeguards the Dee Conservancy, its users, the public and the environment to achieve the standard of marine safety required by the Port Marine Safety Code. Promote the use of the Dee Conservancy and ensure that its economic development considers and balances the views and needs of all stakeholders with regards to the use of natural resources and conservation of the environment. Published by: Natural Resources Wales Tel: 0300 065 3000 Email: [email protected] www.naturalresourceswales.gov.uk © Natural Resources Wales All rights reserved. This document may be reproduced with prior permission of Natural Resources Wales 2 | Page Foreword by our Chief Executive Introduction to the Dee Estuary The Dee estuary can be a dangerous place, with shifting sands and strong tidal currents. It has been an important route for trading ships for over two thousand years and remains an important area. Those that navigate there need to be aware of the dangers and be ready to deal with them safely. -
Crown Copyright and Database Rights 2020 Ordnance Survey 100023408
50 m 100 ft © Crrown copyrriightt and dattabase rriightts 2020 Orrdnance Surrvey 100023408 16/2020/0810 Scale: 1:2500 Printed on: 2/12/2020 at 12:13 PM © Denbighshire County Council Eitem Agenda 7 / Agenda Item 7 Eitem Agenda 7 / Agenda Item 7 Eitem Agenda 7 / Agenda Item 7 Eitem Agenda 7 / Agenda Item 7 Luci Duncalf WARD : Llanbedr Dyffryn Clwyd / Llangynhafal WARD MEMBER(S): Cllr H O Williams APPLICATION NO: 16/2020/0810/ PF PROPOSAL: Erection of an agricultural building for the storage of hay and fodder (resubmission) LOCATION: Land adjacent to Rhesgoed Farm Llanbedr Dyffryn Clwyd Ruthin LL15 1YE APPLICANT: Mr H O Williams CONSTRAINTS: Within 67m Of Trunk Road AONB PUBLICITY Site Notice - No UNDERTAKEN: Press Notice - No Neighbour letters - Yes REASON(S) APPLICATION REPORTED TO COMMITTEE: Scheme of Delegation Part 2 Application submitted by a County Councillor 4 or more objections/ recommendation grant. CONSULTATION RESPONSES: LLANBEDR DYFFRYN CLWYD COMMUNITY COUNCIL- “No objections” CLWYDIAN RANGE AND DEE VALLEY AREA OF OUTSTANDING NATURAL BEAUTY JOINT ADVISORY COMMITTEE- Objection. Concerned that the proposal will have a significant impact on the open character and appearance of the area. Notwithstanding the landscaping proposals designed to mitigate its visual impact, the building is unrelated to any existing farm building complex and will appear as sporadic and discordant development in the open countryside to the detriment of the AONB. The committee favours proposals for new farm buildings to form part of and be well related to an existing complex of buildings to minimise their impact on the landscape. Concerned that if other small parcels of land which are separate from an existing farm building complex were to make a similar case this could result in a proliferation of agricultural buildings across the countryside to the detriment of the AONB.